|
|
(3 intermediate revisions by the same user not shown) |
Line 17: |
Line 17: |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:Mr.Haro1dR.DentonAEP:NRC:0849 ATTACHMENT 1EMERGENCY CORECOOLINGSYSTEMSSURVEILLANCE REUIREMENTS Continued f.Byperforming aflowbalancetestduringshutdownfollowing completion ofmodifications totheECCSsubsystem thatalterthesubsystem flowcharacteristics andverifying thefollowing flowrates:BoronInjection SystemSinlePum"Loop1BoronInjection Flow117.5gpmLoop2BoronInjection Flow117.5gpmLoop3BoronInjection Flow117.5gpmLoop4BoronInjection Flow117.5gpmSafetyInjection SystemSinlePum""Loop1and4ColdLegFlow>300gpmLoop2and3ColdLegFlow>300gpmTheflowrateineachBoronInjection (BI)lineshouldbeadjustedtoprovide117.5gpm(nominal) flowintoeachloop.Undertheseconditions thereiszerominiflowand80gpmsimulated RCPsealinjection lineflow.TheactualflowineachBIlinemaydeviatefromthenominalsolongasthedifference betweenthehighestandlowestflowis10gpmorlessandthetotalflowtothefourbranchlinesdoesnotexceed500gpm.Minimumflow(totalflow)requiredis345.8gpmtothethreemostco(servative (lowestflow)branchlines.TotalSIS(singlepump)flow,including miniflow,'hall notexceed650gpm.8310060329'31003 PDRADOCK05000315PDR0.C.COOK-UNIT13/45-6aAmendment No. | | {{#Wiki_filter:Mr. Haro1d R. Denton AEP:NRC:0849 ATTACHMENT 1 EMERGENCY CORE COOLING SYSTEMS SURVEILLANCE RE UIREMENTS Continued |
| w/J Mr.HaroldR.tonATTACHMENT 2BASISFORTECHNICAL SPECIFICATION CHANGEREQUESTThebasisforchangingtheTechnical Specification isthatwehaveperformed asystemtestanddemonstrated thattheEastpumpwoulddeliver499gpmtotheReactorCoolantSystem(RCS)injection pointswithanadditional 80gpmsimulated reactorcoolantpumpsealinjection flow.Inaddition, wehaveperformed anevaluation ofpumpoperation at580gpmtotalflowunderaccidentconditions, andthatevaluation hasshownthat.therewouldbeadequateNetPositiveSuctionHead(NPSH)forproperpumpoperation atthisflow.Onthisbasis,weconcludethatwiththesysteminitsminimumresistance configuration, theECCSEastchargingpumpwillbeoperableinamannersoastoprecludetotalpumpflowfromexceeding runoutconditions. | | : f. By performing a flow balance test during shutdown following completion of modifications to the ECCS subsystem that alter the subsystem flow characteristics and verifying the following flow rates: |
| Itshouldbenotedthat.inarrivingattheaboveconclusion, therunoutcondition iswiththepumpinthealignment delivering 500gpmtotheRCSinjection pointsandanadditional 80gpmsimulated reactorcoolantpumpsealinjection flow.WithregardtotheWestpump,ourjustification isthatbothpumpsareofsimilardesignandhavesimilarNPSHrequirements.
| | Boron Injection System Safety Injection System Sin le Pum " Sin le Pum "" |
| IftheWestpumpwereallowedtodeliver500gpmtotheinjection points,wewouldanticipate thattherewouldbenoproblemregarding runoutbaseduponourEastpumptestresults,designsimilarity, andourNPSHevaluation.
| | Loop 1 Boron Injection Loop 1 and 4 Cold Leg Flow 117.5 gpm Flow > 300 gpm Loop 2 Boron Injection Loop 2 and 3 Cold Leg Flow 117.5 gpm Flow > 300 gpm Loop 3 Boron Injection Flow 117.5 gpm Loop 4 Boron Injection Flow 117.5 gpm The flow rate in each Boron Injection (BI) line should be adjusted to provide 117.5 gpm (nominal) flow into each loop. Under these conditions there is zero miniflow and 80 gpm simulated RCP seal injection line flow. |
| SincetheonlyitemofconcernwiththischangerequestismaximumECCSchargingpumpflow,andsincebothpumpsdelivertheminimumrequiredECCSflowwiththe'roper flowsplitbetweeninjection points,wealsoconcludethatthisrequested changewillnotaffecttheminimumfloworflowsplitrequirements asdefinedinthebasisforthisTechnical Specification.
| | The actual flow in each BI line may deviate from the nominal so long as the difference between the highest and lowest flow is 10 gpm or less and the total flow to the four branch lines does not exceed 500 gpm. Minimum flow (total flow) required is 345.8 gpm to the three most co(servative (lowest flow) branch lines. |
| F$"I),')"'I~,),~>*Pd)I>I""f)V,'C.')f3)~F,I'),'L')5)>,0fI'F>,Q!))I),.>F)')JI4).J*)>IyI)())~,)>>))',.<<>>,g<f)I()fj.gQ),I'',>+'I)>).)A('3)F>I>f>)~>I'I"C),,I".)FYIIIII'>'.)MI).),"'"<<f.),)>>")'>.>')iI'II@'Iff*>'>IgI',')f)I>F'II,7fI'l1~>>i">)I)7>~9)r>I>)",~~F~'.)"'3">'I>)-))~hfC>..'*")}} | | Total SIS (single pump) flow, including miniflow,'hall not exceed 650 gpm. |
| | 8310060329'31003 05000315 PDR ADOCK PDR |
| | : 0. C. COOK - UNIT 1 3/4 5-6a Amendment No. |
| | |
| | w |
| | / |
| | J |
| | |
| | Mr. Harold R. ton ATTACHMENT 2 BASIS FOR TECHNICAL SPECIFICATION CHANGE REQUEST The basis for changing the Technical Specification is that we have performed a system test and demonstrated that the East pump would deliver 499 gpm to the Reactor Coolant System (RCS) injection points with an additional 80 gpm simulated reactor coolant pump seal injection flow. In addition, we have performed an evaluation of pump operation at 580 gpm total flow under accident conditions, and that evaluation has shown that. there would be adequate Net Positive Suction Head (NPSH) for proper pump operation at this flow. On this basis, we conclude that with the system in its minimum resistance configuration, the ECCS East charging pump will be operable in a manner so as to preclude total pump flow from exceeding runout conditions. It should be noted that. in arriving at the above conclusion, the runout condition is with the pump in the alignment delivering 500 gpm to the RCS injection points and an additional 80 gpm simulated reactor coolant pump seal injection flow. |
| | With regard to the West pump, our justification is that both pumps are of similar design and have similar NPSH requirements. If the West pump were allowed to deliver 500 gpm to the injection points, we would anticipate that there would be no problem regarding runout based upon our East pump test results, design similarity, and our NPSH evaluation. |
| | Since the only item of concern with this change request is maximum ECCS charging pump flow, and since both pumps deliver the minimum required ECCS flow with the'roper flow split between injection points, we also conclude that this requested change will not affect the minimum flow or flow split requirements as defined in the basis for this Technical Specification. |
| | |
| | F$ |
| | "I), ') "'I ~,), |
| | ) |
| | Pd |
| | ~> |
| | * I |
| | >I""f ) V, 'C. ') f3 * ) > I y |
| | I |
| | >>) |
| | ) ())~,) |
| | ) ~ F, I') |
| | ,'L ' )',. <<>>, g<f |
| | )5 )>,0 |
| | )I fI |
| | ()f j . gQ),I '',>+ ' I) >) . )A( |
| | '3 ) F>I>f>) ~ > |
| | ') I' |
| | 'F>,Q!) )I ),. >F ) J I 4).J fI'l |
| | ".) |
| | FYI I I II' |
| | ,I > '. ).), " '" |
| | <<f.),)>> " ) |
| | I" C), )M I '>.>')i I' II@'If f *> |
| | ">) I) 7 1~ h |
| | '>I g I', i |
| | ')f) I>F 'I 9 |
| | I, 7 |
| | > ~ |
| | )r>I> ) ~ ~F~' .)"' 3 ">'I>) -) |
| | )~ |
| | f C>..'*")}} |
Similar Documents at Cook |
---|
Category:TECHNICAL SPECIFICATIONS
MONTHYEARML17335A5581999-10-12012 October 1999 Proposed Tech Specs Surveilllance Requirement 4.6.2.2.d for Spray Additive Sys to Relocate Details Associated with Acceptance Criteria & Test Parameters to Associated TS Bases ML17335A5611999-10-11011 October 1999 Proposed Tech Specs Pages,Correcting TS Pages Inadvertently Submitted in 990923 Submittal ML17335A5431999-10-0101 October 1999 Proposed Tech Specs Re Containment Recirculation Sump Water Inventory ML17326A1591999-09-23023 September 1999 Proposed Tech Specs Re Movement of SG Sections in Auxiliary Bldg for SG Replacement Project ML17326A1461999-09-17017 September 1999 Proposed Tech Specs Pages for Credit of Rod Cluster Control Assemblies for Cold Leg LBLOCA Subcriticality ML17326A1181999-09-10010 September 1999 Proposed Tech Specs Pages,Revising TS Surveillance Requirement 4.4.7,TS Tables 4.4-3,3.4-1 & TS Surveillance Requirement 4.11.2.2 Re RCS & Gas Storage Tank Sampling ML17326A0941999-08-17017 August 1999 Proposed Tech Specs,Removing voltage-based Repair Criteria, F* Repair Criteria & Sleeving Methodologies from Unit 1 TS & Clarifying Bases Section ML17325B6061999-05-21021 May 1999 Proposed Tech Specs Revising Limitations on Positive Reactivity Additions ML17325B5551999-04-19019 April 1999 Proposed Tech Specs 3/4.8.1.2, Electrical Power Systems & Associated Bases,Providing one-time Extension of 18-month Surveillance Interval for Specific SRs ML17335A3681998-12-0303 December 1998 Proposed Tech Specs,Adding New TS Re Distributed Ignition Sys ML17335A3581998-12-0303 December 1998 Proposed Tech Specs 4.6.5.1, Ice Condenser,Ice Bed & Associated Bases,Reflecting Max Ice Condenser Flow Channel Blockage Assumed in Accident Analyses ML17335A3621998-12-0303 December 1998 Proposed Tech Specs Removing Obsolete Info to Provide Consistency Between Units 1 & 2 to Provide Consistency with Std Tech Specs,To Provide Clarification & to Correct Typos ML17335A3651998-12-0303 December 1998 Proposed Tech Specs 3/4.7.7, Sealed Source Contamination & Associated Bases Addressing Revised Testing Requirements for Fission Detectors ML17335A2651998-10-0808 October 1998 Proposed Tech Specs Changing Containment Sys TS Bases 3/4.6.1.4, Internal Pressure & 3/4.6.1.5, Air Temp. ML17335A2691998-10-0808 October 1998 Proposed Tech Specs 3.4.1.3 Re Reactor Coolant Loop Requirements in Modes 4 & 5 ML17335A2781998-10-0808 October 1998 Proposed Tech Specs Sections 3.3.3.8 & 3.3.3.6,placing Tighter Restrictions on Amount of Time RWST Water Level Instrumentation Can Be Out of Svc Before Compensatory Actions Are Required ML17335A2341998-09-14014 September 1998 Proposed Tech Specs Page 3/4 5-6,revising Runout Limits for SI Pump to 675 Gpm Unless Pump Is Specifically Tested to Higher Flow Rate Not Exceeding 700 Gpm ML17335A1931998-08-28028 August 1998 Proposed Tech Specs Requesting Extension of SG Surveillance TS 4.4.5.3,which TSs Require to Be Performed on 990408,until End of Current Fuel Cycle Currently Scheduled for Mar 2000 ML17334B7031998-03-0303 March 1998 Proposed Tech Specs Pages,Removing Word Immediately from Unit 1 Hydrogen Recombiner Surveillance Requirement 4.6.4.2.b.4 & Revising Unit 1 & 2 TS 3/4.6.4 Bases ML20212A7051997-10-21021 October 1997 Proposed Tech Specs 3/4.6.5 Re Ice Weight & Surveillance Requirement ML17333B0751997-10-0808 October 1997 Proposed Tech Specs 3/4.6.5 & 3/4.5.5 Re Ice Weight & SR ML17333B0451997-09-19019 September 1997 Proposed Tech Specs,Deleting Requirement for Automatic Valve Closure Feature on RHR Sys Suction from RCS ML17333A9851997-08-11011 August 1997 Proposed Tech Specs,Allowing Filling of ECCS Accumulators W/O Declaring ECCS Equipment Inoperable ML17333A9891997-08-11011 August 1997 Proposed Tech Specs,Reflecting Changes for Moderator Temp Coefficient Measurement in Response to RAI ML17335A2121997-08-0101 August 1997 Proposed Tech Specs 4.7.1.2.g Deleting Wording When Secondary Steam Supply Pressure Is Greater than 310 Psig. ML17333A8261997-03-26026 March 1997 Proposed Tech Specs Removing Administrative Controls Related to Quality Assurance Requirements IAW Guidance of Administrative Ltr 95-06 ML17333A8301997-03-26026 March 1997 Proposed Tech Specs Modifying TS 4.7.5.1.e.2 Which Describes Control Room Ventilation Sys Autostart Functions ML17333A8331997-03-26026 March 1997 Proposed Tech Specs Involving Grammatical Correction to Wording of Unit 2 TS 3.4.8,Action a for Modes 1,2 & 3 & Returning Frequency Requirement to TS 4.7.1.2.c & 4.7.1.2.d That Was Inadvertently Deleted in Prior Amend ML20135C3781997-02-24024 February 1997 Revised Proposed Tech Specs Page Re 3/4, Limiting Condition for Operation & Surveillance Requirements ML17333A7161996-12-20020 December 1996 Proposed Tech Specs Change to Allow for Repair of Hybrid Sleeved SG Tubes in Response to RAI ML17333A7151996-12-20020 December 1996 Proposed Tech Specs 3/4.4.10 Re Reactor Coolant Sys ML17333A5161996-07-22022 July 1996 Proposed Tech Specs,Informing Operations Superintendent Will Have to Hold SRO License,Have Held Senior Operator License or Been Certified to Have Senior Operator Knowledge ML17334B5951996-07-11011 July 1996 Proposed Tech Specs,Supporting Operation of Facility at Increased Core Rated Thermal Power of 3,588 Mwt ML17333A4771996-06-19019 June 1996 Proposed Tech Specs Re Voltage Based Repair Criteria for Repair of Westinghouse SG Tubes Affected by Outside Diameter Stress Corrosion Cracking,Per GL 95-05 ML17333A4651996-06-11011 June 1996 Proposed Tech Specs Re Administrative Controls Related to QA ML17333A4221996-04-0808 April 1996 Revised Proposed Ts,Moving TS 4.0.4 Exemption Statement for MSSVs Into Section 4.7.1.1 ML17333A3571996-03-12012 March 1996 Proposed Tech Specs,Removing TSs Re Shutdown & Control Rod Position Indication While in Modes 3,4 & 5 ML17333A3301996-02-29029 February 1996 Proposed Tech Specs Re Boric Acid Storage Sys Boron Concentration ML17333A3231996-02-26026 February 1996 Proposed TS 5.6.2 Re Increase in Max Nominal Fuel Assembly Enrichment Limit,Taking Credit for Use of Integral Fuel Burnable Absorber Matl ML17333A3221996-02-22022 February 1996 Proposed Tech Specs,Proposing to Remove Requirement That Operations Superintendent Must Hold or Have Held Sol at Plant or Similar Reactor ML17333A3171996-02-22022 February 1996 Proposed Tech Specs,Modifying Table 4.8-1,DG Test Schedule by Ref Rg 1.9,Rev 3 Rather than Rg 1.108,Rev 1 Criteria for Determination of Valid DG Test ML17333A3121996-02-16016 February 1996 Proposed Tech Specs Section 3.6.1.6,removing Words Structure & Steel Liner to Be Consistent W/Unit 2 Containment Sys Wording ML17333A2671996-01-12012 January 1996 Proposed Tech Specs,Modifying TS Section 4.4.11 to Eliminate SR Demonstrating Operability of Emergency Power Supply for Pressurizer PORVs & Block Valves ML17333A2411995-12-19019 December 1995 Proposed Tech Specs 3/4.6.1.2,3/4.6.1.3,3/4.6/1/6 & 3/4.6.1.7,replacing Option a Scheduling Requirements for Types A,B & C Tests (Overall Integrated & Local Containment Leakage Rate) W/Requirement Per 10CFR50 App J Option B ML17332B0131995-11-10010 November 1995 Proposed Tech Specs Modifying Surveillance Testing of EDG During Refueling & Normal Operations ML17332A9991995-10-20020 October 1995 Proposed Tech Specs Adding Exemption to TS 4.0.4 in SR for MSIV ML17332A9151995-08-0808 August 1995 Proposed Tech Specs Re Deletion of Component Cyclic or Transient Limit Table ML17332A8751995-08-0404 August 1995 Proposed Tech Specs for Repair of Hybrid Expansion Joint Sleeved SG Tubes ML17332A8291995-06-30030 June 1995 Proposed Tech Specs Re Fuel Reconstitution,Per GL 90-02 ML17332A8111995-06-20020 June 1995 Proposed Tech Specs Removing Fire Protection Systems from Licenses 1999-09-23
[Table view] Category:TECHNICAL SPECIFICATIONS & TEST REPORTS
MONTHYEARML17335A5581999-10-12012 October 1999 Proposed Tech Specs Surveilllance Requirement 4.6.2.2.d for Spray Additive Sys to Relocate Details Associated with Acceptance Criteria & Test Parameters to Associated TS Bases ML17335A5611999-10-11011 October 1999 Proposed Tech Specs Pages,Correcting TS Pages Inadvertently Submitted in 990923 Submittal ML17335A5431999-10-0101 October 1999 Proposed Tech Specs Re Containment Recirculation Sump Water Inventory ML17326A1591999-09-23023 September 1999 Proposed Tech Specs Re Movement of SG Sections in Auxiliary Bldg for SG Replacement Project ML17326A1461999-09-17017 September 1999 Proposed Tech Specs Pages for Credit of Rod Cluster Control Assemblies for Cold Leg LBLOCA Subcriticality ML17326A1181999-09-10010 September 1999 Proposed Tech Specs Pages,Revising TS Surveillance Requirement 4.4.7,TS Tables 4.4-3,3.4-1 & TS Surveillance Requirement 4.11.2.2 Re RCS & Gas Storage Tank Sampling ML17326A0941999-08-17017 August 1999 Proposed Tech Specs,Removing voltage-based Repair Criteria, F* Repair Criteria & Sleeving Methodologies from Unit 1 TS & Clarifying Bases Section ML17326A1471999-05-28028 May 1999 Non-proprietary Version of Control Rod Insertion Following Cold Leg LBLOCA at DC Cook,Units 1 & 2. ML17325B6061999-05-21021 May 1999 Proposed Tech Specs Revising Limitations on Positive Reactivity Additions ML17325B5891999-05-0707 May 1999 Rev 5 to PMP 7200.RST.004, Expanded Sys Readiness Review Program. ML17325B5901999-05-0707 May 1999 Rev 1 to PMP 7200.RST.006, Expanded Sys Readiness Review Program for Level 2 Sys. ML17325B5551999-04-19019 April 1999 Proposed Tech Specs 3/4.8.1.2, Electrical Power Systems & Associated Bases,Providing one-time Extension of 18-month Surveillance Interval for Specific SRs ML17325B4671999-03-0303 March 1999 Rev 5 to Cook Nuclear Plant Restart Plan. ML17335A3581998-12-0303 December 1998 Proposed Tech Specs 4.6.5.1, Ice Condenser,Ice Bed & Associated Bases,Reflecting Max Ice Condenser Flow Channel Blockage Assumed in Accident Analyses ML17335A3681998-12-0303 December 1998 Proposed Tech Specs,Adding New TS Re Distributed Ignition Sys ML17335A3651998-12-0303 December 1998 Proposed Tech Specs 3/4.7.7, Sealed Source Contamination & Associated Bases Addressing Revised Testing Requirements for Fission Detectors ML17335A3621998-12-0303 December 1998 Proposed Tech Specs Removing Obsolete Info to Provide Consistency Between Units 1 & 2 to Provide Consistency with Std Tech Specs,To Provide Clarification & to Correct Typos ML17325B4431998-11-0202 November 1998 Rev 4 to Cook Nuclear Plant Restart Plan. with 981216 Ltr ML17335A4071998-11-0202 November 1998 Rev 4 to Cook Nuclear Plant Restart Plan. ML17335A2781998-10-0808 October 1998 Proposed Tech Specs Sections 3.3.3.8 & 3.3.3.6,placing Tighter Restrictions on Amount of Time RWST Water Level Instrumentation Can Be Out of Svc Before Compensatory Actions Are Required ML17335A2691998-10-0808 October 1998 Proposed Tech Specs 3.4.1.3 Re Reactor Coolant Loop Requirements in Modes 4 & 5 ML17335A2651998-10-0808 October 1998 Proposed Tech Specs Changing Containment Sys TS Bases 3/4.6.1.4, Internal Pressure & 3/4.6.1.5, Air Temp. ML17335A2341998-09-14014 September 1998 Proposed Tech Specs Page 3/4 5-6,revising Runout Limits for SI Pump to 675 Gpm Unless Pump Is Specifically Tested to Higher Flow Rate Not Exceeding 700 Gpm ML17335A2301998-09-12012 September 1998 Rev 3 to Cook Nuclear Plant Restart Plan. ML17335A2721998-09-0404 September 1998 Rev 0 to PL-CNSI-98-007, Transportation & Emergency Response Plan for DC Cook Unit 2 SG Project. ML17335A2751998-09-0202 September 1998 Rev 1 to ER-98-012, Evaluation of Dose Rate from U-Tube End of DC Cook SG Lower Assembly. ML17335A1931998-08-28028 August 1998 Proposed Tech Specs Requesting Extension of SG Surveillance TS 4.4.5.3,which TSs Require to Be Performed on 990408,until End of Current Fuel Cycle Currently Scheduled for Mar 2000 ML17335A2731998-08-21021 August 1998 Rev 0 to ST-307, Structural Evaluation of DC Cook Unit 2 Sgla Package. ML17334A7301998-05-0606 May 1998 Rev 2 of Cook Nuclear Plant Restart Plan. ML17325B5271998-04-0707 April 1998 Rev 1 to Cook Nuclear Plant Restart Plan. ML17334B8041998-04-0303 April 1998 Rev 1 to Valve IST Program for DCP Third 10-Yr Interval. ML17325B5261998-03-0707 March 1998 Rev 0 to Cook Nuclear Plant Restart Plan. ML17334B7031998-03-0303 March 1998 Proposed Tech Specs Pages,Removing Word Immediately from Unit 1 Hydrogen Recombiner Surveillance Requirement 4.6.4.2.b.4 & Revising Unit 1 & 2 TS 3/4.6.4 Bases ML20212A7051997-10-21021 October 1997 Proposed Tech Specs 3/4.6.5 Re Ice Weight & Surveillance Requirement ML17333B0751997-10-0808 October 1997 Proposed Tech Specs 3/4.6.5 & 3/4.5.5 Re Ice Weight & SR ML17333B0451997-09-19019 September 1997 Proposed Tech Specs,Deleting Requirement for Automatic Valve Closure Feature on RHR Sys Suction from RCS ML17333A9891997-08-11011 August 1997 Proposed Tech Specs,Reflecting Changes for Moderator Temp Coefficient Measurement in Response to RAI ML17333A9851997-08-11011 August 1997 Proposed Tech Specs,Allowing Filling of ECCS Accumulators W/O Declaring ECCS Equipment Inoperable ML17335A2121997-08-0101 August 1997 Proposed Tech Specs 4.7.1.2.g Deleting Wording When Secondary Steam Supply Pressure Is Greater than 310 Psig. ML17333A8301997-03-26026 March 1997 Proposed Tech Specs Modifying TS 4.7.5.1.e.2 Which Describes Control Room Ventilation Sys Autostart Functions ML17333A8331997-03-26026 March 1997 Proposed Tech Specs Involving Grammatical Correction to Wording of Unit 2 TS 3.4.8,Action a for Modes 1,2 & 3 & Returning Frequency Requirement to TS 4.7.1.2.c & 4.7.1.2.d That Was Inadvertently Deleted in Prior Amend ML17333A8261997-03-26026 March 1997 Proposed Tech Specs Removing Administrative Controls Related to Quality Assurance Requirements IAW Guidance of Administrative Ltr 95-06 ML20135C3781997-02-24024 February 1997 Revised Proposed Tech Specs Page Re 3/4, Limiting Condition for Operation & Surveillance Requirements ML17333A7161996-12-20020 December 1996 Proposed Tech Specs Change to Allow for Repair of Hybrid Sleeved SG Tubes in Response to RAI ML17333A7151996-12-20020 December 1996 Proposed Tech Specs 3/4.4.10 Re Reactor Coolant Sys ML17333A5161996-07-22022 July 1996 Proposed Tech Specs,Informing Operations Superintendent Will Have to Hold SRO License,Have Held Senior Operator License or Been Certified to Have Senior Operator Knowledge ML17334B5951996-07-11011 July 1996 Proposed Tech Specs,Supporting Operation of Facility at Increased Core Rated Thermal Power of 3,588 Mwt ML17333A4771996-06-19019 June 1996 Proposed Tech Specs Re Voltage Based Repair Criteria for Repair of Westinghouse SG Tubes Affected by Outside Diameter Stress Corrosion Cracking,Per GL 95-05 ML17333A4841996-06-11011 June 1996 ISI & Testing. ML17333A4651996-06-11011 June 1996 Proposed Tech Specs Re Administrative Controls Related to QA 1999-09-23
[Table view] |
Text
Mr. Haro1d R. Denton AEP:NRC:0849 ATTACHMENT 1 EMERGENCY CORE COOLING SYSTEMS SURVEILLANCE RE UIREMENTS Continued
- f. By performing a flow balance test during shutdown following completion of modifications to the ECCS subsystem that alter the subsystem flow characteristics and verifying the following flow rates:
Boron Injection System Safety Injection System Sin le Pum " Sin le Pum ""
Loop 1 Boron Injection Loop 1 and 4 Cold Leg Flow 117.5 gpm Flow > 300 gpm Loop 2 Boron Injection Loop 2 and 3 Cold Leg Flow 117.5 gpm Flow > 300 gpm Loop 3 Boron Injection Flow 117.5 gpm Loop 4 Boron Injection Flow 117.5 gpm The flow rate in each Boron Injection (BI) line should be adjusted to provide 117.5 gpm (nominal) flow into each loop. Under these conditions there is zero miniflow and 80 gpm simulated RCP seal injection line flow.
The actual flow in each BI line may deviate from the nominal so long as the difference between the highest and lowest flow is 10 gpm or less and the total flow to the four branch lines does not exceed 500 gpm. Minimum flow (total flow) required is 345.8 gpm to the three most co(servative (lowest flow) branch lines.
Total SIS (single pump) flow, including miniflow,'hall not exceed 650 gpm.
8310060329'31003 05000315 PDR ADOCK PDR
- 0. C. COOK - UNIT 1 3/4 5-6a Amendment No.
w
/
J
Mr. Harold R. ton ATTACHMENT 2 BASIS FOR TECHNICAL SPECIFICATION CHANGE REQUEST The basis for changing the Technical Specification is that we have performed a system test and demonstrated that the East pump would deliver 499 gpm to the Reactor Coolant System (RCS) injection points with an additional 80 gpm simulated reactor coolant pump seal injection flow. In addition, we have performed an evaluation of pump operation at 580 gpm total flow under accident conditions, and that evaluation has shown that. there would be adequate Net Positive Suction Head (NPSH) for proper pump operation at this flow. On this basis, we conclude that with the system in its minimum resistance configuration, the ECCS East charging pump will be operable in a manner so as to preclude total pump flow from exceeding runout conditions. It should be noted that. in arriving at the above conclusion, the runout condition is with the pump in the alignment delivering 500 gpm to the RCS injection points and an additional 80 gpm simulated reactor coolant pump seal injection flow.
With regard to the West pump, our justification is that both pumps are of similar design and have similar NPSH requirements. If the West pump were allowed to deliver 500 gpm to the injection points, we would anticipate that there would be no problem regarding runout based upon our East pump test results, design similarity, and our NPSH evaluation.
Since the only item of concern with this change request is maximum ECCS charging pump flow, and since both pumps deliver the minimum required ECCS flow with the'roper flow split between injection points, we also conclude that this requested change will not affect the minimum flow or flow split requirements as defined in the basis for this Technical Specification.
F$
"I), ') "'I ~,),
)
Pd
~>
>I""f ) V, 'C. ') f3 * ) > I y
I
>>)
) ())~,)
) ~ F, I')
,'L ' )',. <<>>, g<f
)5 )>,0
)I fI
()f j . gQ),I ,>+ ' I) >) . )A(
'3 ) F>I>f>) ~ >
') I'
'F>,Q!) )I ),. >F ) J I 4).J fI'l
".)
FYI I I II'
,I > '. ).), " '"
<<f.),)>> " )
I" C), )M I '>.>')i I' II@'If f *>
">) I) 7 1~ h
'>I g I', i
')f) I>F 'I 9
I, 7
> ~
)r>I> ) ~ ~F~' .)"' 3 ">'I>) -)
)~
f C>..'*")