ML17332A786: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(One intermediate revision by the same user not shown)
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:ROC6.S.1writtenprocedux'es shallbe<<stablished, implemented andmaintained coveringtheactivities referenced b<<lov:a.Theapplicable procedures recommended inAppendshofRegulatozy Guide1.33,Rev.2,February1978.b.Deleted.c.Deleted.d.PROCESSCONTROLPROGRAMimplementation.
{{#Wiki_filter:ROC 6.S.1 written procedux'es shall be <<stablished, implemented       and maintained covering the activities referenced b<<lov:
e.OFFSITEDOSECALQJLhTION KQRALimplementation.
: a. The  applicable procedures recommended in Appends    h of Regulatozy Guide 1.33, Rev. 2, February 1978.
~lityAssurance Programforeffluentandenvironmental monitoring usingtheguidanceinRegulatory Guide1.21,Rev.1,June1974,andRegulatory Guide4.1,Rcv.1,April1975.6.8.2Eachprocedure andadministrative policyofSpecification 6.8.1above,andchangesthereto,including temporary changes,shallbercvicved-priortoimplementation assetforthinSpecification 6.5above.6.8.3Aplantprogramforpost-accident samplingshallbeestablished, implemented, andmaintained vhichvillensurethecapability toobtainandanalyzereactorcoolantsamples,containment atmosphere noblegassamples,andunitveldtgaseouseffluentsamplesforiodinesandpazticulates underaccidentconditions.
: b. Deleted.
Theprogramvillincludethefolloving:
: c. Deleted.
a.Trainingofpersonnel, b.Proceduzes forsamplingandanalysis, c.Provisions fozmaintenance ofsamplingandanalysis<<quipment.
: d. PROCESS  CONTROL PROGRAM  implementation.
COOKNUCLEARPLANT-UNIT19506080i3'4 950530PDRADOCK05000315',
: e. OFFSITE DOSE CALQJLhTION KQRAL    implementation.
P'DR6-13A~H~VrNo.M,4441Q2 Coh8ROCCRS'D6.8.1Vrittenprocedures shallbeestablished, implemented andmafntained coveringtheactivities referenced belov:'.Theapplicable procedures recommended inhppendfx"hofRegulatory Guide1.33,Rev.2,February19?8.b.Deleted.c.Deleted.d.PROCESSCONTROLPROGRAMimplementation.
                      ~lity    Assurance Program for effluent and environmental monitoring using the guidance in Regulatory Guide 1.21, Rev. 1, June 1974, and Regulatory Guide 4.1, Rcv. 1, April 1975.
e,.OFFSITEDOSECALCULATION MANUALimplementation.
6.8.2    Each procedure and administrative policy of Specification 6.8.1 above, and changes thereto, including temporary changes, shall be rcvicved
e~)"h"QualityAssurance ProgramforefQuentandenvironmental monitoring usingtheguidanceinRegulatory Guide1.21,Rev.1,June1974,andRegulatory Guide4.1,Rev.1,hpril1975.6.8.2Eachprocedure andadministrative policyofSpecification 6.8.1above,andchangesthereto,fncluding temporary changes,shallberevievedprfortoimplementatfon assetforthinSpecification 6.5above.6.8.3Aplantprogramforpost-accident samplingshallbeestablfshed, implemented, andmaintained vhichvillensurethecapability toobtainandanalyzereactorcoolantsamples,containment atmosphere noblegassamples,andunitventgaseouseffluentsamplesforfodinesandparticulates underaccidentcond'tions.
      -prior to implementation as set forth in Specification 6.5 above.
Theprogramvillincludethefolloving:
6.8.3 A plant program for post-accident sampling shall be established, implemented, and maintained vhich      vill  ensure the capability to obtain and analyze reactor coolant samples, containment atmosphere noble gas samples, and unit veldt gaseous effluent samples for iodines and pazticulates under accident conditions. The program        vill include the folloving:
a.Trainingofpersonnel, b.Procedures forsamplfngandanalysfs, c.Provisions formaintenance ofsamplingandanalysisequfpment.
: a. Training of personnel,
COOKNUC~~PLANT-UNIT26-13AMENDMENT NO.44,178 Component CyclicorTransient Limitsprogram,whichprovidescontrolstotracktheUFSARcyclicandtransient occurrences toensurethatcomponents aremaintained withinthelimits.
: b. Proceduzes   for sampling and analysis,
ATTACHMENT 2TOAEP:NRC:0980W ADDITIONAL REVISEDTECHNICAL SPECIFICATION PAGES 6.0,.ADMINISTRATIVE CONTROLS6.8PROCEDURES ANDPROGRAMS6.8.1Writtenprocedures shallbeestablished, implemented andmaintained coveringtheactivities referenced below:a.Theapplicable procedures recommended inAppendix"A"ofRegulatory Guide1.33,Rev.2,February1978.Deleted.c.Deleted.d.PROCESSCONTROLPROGRAMimplementation OFFSITEDOSECALCULATION MANUALimplementation.
: c. Provisions foz maintenance of sampling and analysis <<quipment.
QualityAssurance Programforeffluentandenvironmental monitoring usingtheguidanceinRegulatory Guide1.21,Rev.1,June1974,andRegulatory Guide4.1,Rev.1,April1975.g.Component CyclicorTransient Limitsprogram,whichprovidescontrolstotracktheUFSARcyclicandtransient occurrences toensurethatcomponents aremaintained withinthelimits.6.8.2Eachprocedure andadministrative policyofSpecification 6.8.1above,andchangesthereto,including temporaty changes,shallbereviewedpriortoimplementation assetforthinSpecification 6.5above.6.8.3Aplantprogramforpost-accident samplingshallbeestablished, implemented, andmaintained whichwillensurethecapability toobtainandanalyzereactorcoolantsamples,containment atmosphere noblegassamples,andunitventgaseouseffluentsamplesforiodinesandparticulates underaccidentconditions.
COOK NUCLEAR PLANT      - UNIT 1          6-13                A~H~Vr No. M,   444 1Q2 PDR P          'DR 9506080i3'4 950530 ADOCK 05000315',
Theprogramwillincludethefollowing:
 
a.Trainingofpersonnel, b.Procedures forsamplingandanalysis, c.Provisions formaintenance ofsamplingandanalysisequipment.
Coh 8    ROC    CR S    'D 6.8.1 Vritten procedures shall be established, implemented and mafntained covering the activities referenced       belov:'.
COOKNUCLEARPLANT-UNIT 1Page6-13AMENDMENT VR,484,489,4'  
The  applicable procedures recommended in hppendfx "h          of Regulatory Guide 1.33, Rev. 2, February 19?8.
~,,6.0.ADMINISTRATIVE CONTROLS6.8PROCEDURES ANDPROGRAMS6.8.1Writtenprocedures shallbeestablished, implemented andmaintained coveringtheactivities referenced below:a.Theapplicable procedures recommended inAppendix"A"ofRegulatory Guide1.33,Rev.2,February1978.b.Deleted.c.Deleted.d.PROCESSCONTROLPROGRAMimplementation.
: b. Deleted.
e.OFFSITEDOSECALCULATION MANUALimplementation.
: c. Deleted.
f.QualityAssurance Programforeffluentandenvironmental monitoring usingtheguidanceinRegulatory Guide1.21,Rev.1,June1974,andRegulatory Guide4.1,Rev.1,April1975.g.Component CyclicorTransient Limitsprogram,whichprovidescontrolstotracktheUFSARcyclicandtransient occurrences toensurethatcomponents aremaintained withinthelimits.6.8.2Eachprocedure andadministrative policyofSpecification 6.8.1above,andchangesthereto,including temporary changes,shallbereviewedpriortoimplementation assetforthinSpecification 6.5above.6.8.3Aplantprogramforpost-accident samplingshallbeestablished, implemented, andmaintained whichwillensurethecapability toobtainandanalyzereactorcoolantsamples,containment atmosphere noblegassamples,andunitventgaseouseffluentsamplesforiodinesandparticulates underaccidentconditions.
: d. PROCESS    CONTROL PROGRAM  implementation.
Theprogramwillincludethefollowing:
e,. OFFSITE DOSE CALCULATION MANUAL implementation.
a.Trainingofpersonnel, b.Procedures forsamplingandanalysis, Provisions formaintenance ofsamplingandanalysisequipment.
Quality Assurance Program for efQuent and environmental e~) "h"             monitoring using the guidance in Regulatory Guide 1.21, Rev. 1, June 1974, and Regulatory Guide 4.1, Rev. 1,           hpril  1975.
COOKNUCLEARPLANT-UNIT 2Page6-13AMENDMENT A,438,4-'25,478}}
6.8.2    Each procedure and administrative policy of Specification 6.8.1 above, and changes thereto, fncluding temporary changes, shall be revieved prfor to implementatfon as set forth in Specification 6.5 above.
6.8.3    A plant program for post-accident sampling shall be establfshed, implemented, and maintained vhich      vill        ensure the capability to obtain and analyze reactor coolant samples, containment atmosphere noble gas samples, and unit vent gaseous effluent samples for fodines and particulates under accident cond'tions. The program        vill include the folloving:
: a. Training of personnel,
: b. Procedures   for samplfng and analysfs,
: c. Provisions for maintenance of sampling and analysis equfpment.
COOK NUC~~       PLANT   - UNIT 2                  6-13                AMENDMENT NO. 44, 178
 
Component Cyclic or Transient Limits program, which provides controls to track the UFSAR cyclic and transient occurrences to ensure that components are maintained within the limits.
 
ATTACHMENT 2 TO AEP:NRC:0980W ADDITIONAL REVISED TECHNICAL SPECIFICATION PAGES
 
6.0,. ADMINISTRATIVECONTROLS 6.8 PROCEDURES AND PROGRAMS 6.8.1  Written procedures shall be established, implemented and maintained covering the activities referenced below:
: a.       The applicable procedures recommended in Appendix "A" of Regulatory Guide 1.33, Rev. 2, February 1978.
Deleted.
: c.       Deleted.
: d.       PROCESS CONTROL PROGRAM implementation OFFSITE DOSE CALCULATIONMANUALimplementation.
Quality Assurance Program for effluent and environmental monitoring using the guidance in Regulatory Guide 1.21, Rev. 1, June 1974, and Regulatory Guide 4.1, Rev. 1, April 1975.
: g.       Component Cyclic or Transient Limits program, which provides controls to track the UFSAR cyclic and transient occurrences to ensure that components are maintained within the limits.
6.8.2  Each procedure and administrative policy of Specification 6.8.1 above, and changes thereto, including temporaty changes, shall be reviewed prior to implementation as set forth in Specification 6.5 above.
6.8.3  A plant program for post-accident sampling shall  be established, implemented, and maintained which will ensure the capability to obtain and analyze reactor coolant samples, containment atmosphere noble gas samples, and unit vent gaseous effluent samples for iodines and particulates under accident conditions. The program will include the following:
: a.       Training of personnel,
: b.       Procedures for sampling and analysis,
: c.       Provisions for maintenance  of sampling  and analysis equipment.
COOK NUCLEAR PLANT-UNIT 1                          Page 6-13                  AMENDMENTVR, 484, 489,         4'
 
~,,6.0 . ADMINISTRATIVECONTROLS 6.8 PROCEDURES AND PROGRAMS 6.8.1  Written procedures shall be established, implemented and maintained covering the activities referenced below:
: a.       The applicable procedures recommended in Appendix "A" of Regulatory Guide 1.33, Rev. 2, February 1978.
: b.       Deleted.
: c.       Deleted.
: d.       PROCESS CONTROL PROGRAM implementation.
: e.       OFFSITE DOSE CALCULATIONMANUALimplementation.
: f.       Quality Assurance Program for effluent and environmental monitoring using the guidance in Regulatory Guide 1.21, Rev. 1, June 1974, and Regulatory Guide 4.1, Rev. 1, April 1975.
: g.       Component Cyclic or Transient Limits program, which provides controls to track the UFSAR cyclic and transient occurrences to ensure that components are maintained within the limits.
6.8.2  Each procedure and administrative policy of Specification 6.8.1 above, and changes thereto, including temporary changes, shall be reviewed prior to implementation as set forth in Specification 6.5 above.
6.8.3  A plant program for post-accident sampling shall be established, implemented, and maintained which will ensure the capability to obtain and analyze reactor coolant samples, containment atmosphere noble gas samples, and unit vent gaseous effluent samples for iodines and particulates under accident conditions. The program will include the following:
: a.       Training of personnel,
: b.       Procedures for sampling and analysis, Provisions for maintenance  of sampling and analysis equipment.
COOK NUCLEAR PLANT-UNIT2                            Page 6-13                  AMENDMENTA, 438,           4-'25, 478}}

Latest revision as of 13:35, 22 October 2019

Proposed Tech Specs Reflecting Addl Administrative Change to Proposed Amends,Dtd 931112 & 941118
ML17332A786
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 05/30/1995
From:
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
To:
Shared Package
ML17332A785 List:
References
NUDOCS 9506080134
Download: ML17332A786 (6)


Text

ROC 6.S.1 written procedux'es shall be <<stablished, implemented and maintained covering the activities referenced b<<lov:

a. The applicable procedures recommended in Appends h of Regulatozy Guide 1.33, Rev. 2, February 1978.
b. Deleted.
c. Deleted.
d. PROCESS CONTROL PROGRAM implementation.
e. OFFSITE DOSE CALQJLhTION KQRAL implementation.

~lity Assurance Program for effluent and environmental monitoring using the guidance in Regulatory Guide 1.21, Rev. 1, June 1974, and Regulatory Guide 4.1, Rcv. 1, April 1975.

6.8.2 Each procedure and administrative policy of Specification 6.8.1 above, and changes thereto, including temporary changes, shall be rcvicved

-prior to implementation as set forth in Specification 6.5 above.

6.8.3 A plant program for post-accident sampling shall be established, implemented, and maintained vhich vill ensure the capability to obtain and analyze reactor coolant samples, containment atmosphere noble gas samples, and unit veldt gaseous effluent samples for iodines and pazticulates under accident conditions. The program vill include the folloving:

a. Training of personnel,
b. Proceduzes for sampling and analysis,
c. Provisions foz maintenance of sampling and analysis <<quipment.

COOK NUCLEAR PLANT - UNIT 1 6-13 A~H~Vr No. M, 444 1Q2 PDR P 'DR 9506080i3'4 950530 ADOCK 05000315',

Coh 8 ROC CR S 'D 6.8.1 Vritten procedures shall be established, implemented and mafntained covering the activities referenced belov:'.

The applicable procedures recommended in hppendfx "h of Regulatory Guide 1.33, Rev. 2, February 19?8.

b. Deleted.
c. Deleted.
d. PROCESS CONTROL PROGRAM implementation.

e,. OFFSITE DOSE CALCULATION MANUAL implementation.

Quality Assurance Program for efQuent and environmental e~) "h" monitoring using the guidance in Regulatory Guide 1.21, Rev. 1, June 1974, and Regulatory Guide 4.1, Rev. 1, hpril 1975.

6.8.2 Each procedure and administrative policy of Specification 6.8.1 above, and changes thereto, fncluding temporary changes, shall be revieved prfor to implementatfon as set forth in Specification 6.5 above.

6.8.3 A plant program for post-accident sampling shall be establfshed, implemented, and maintained vhich vill ensure the capability to obtain and analyze reactor coolant samples, containment atmosphere noble gas samples, and unit vent gaseous effluent samples for fodines and particulates under accident cond'tions. The program vill include the folloving:

a. Training of personnel,
b. Procedures for samplfng and analysfs,
c. Provisions for maintenance of sampling and analysis equfpment.

COOK NUC~~ PLANT - UNIT 2 6-13 AMENDMENT NO. 44, 178

Component Cyclic or Transient Limits program, which provides controls to track the UFSAR cyclic and transient occurrences to ensure that components are maintained within the limits.

ATTACHMENT 2 TO AEP:NRC:0980W ADDITIONAL REVISED TECHNICAL SPECIFICATION PAGES

6.0,. ADMINISTRATIVECONTROLS 6.8 PROCEDURES AND PROGRAMS 6.8.1 Written procedures shall be established, implemented and maintained covering the activities referenced below:

a. The applicable procedures recommended in Appendix "A" of Regulatory Guide 1.33, Rev. 2, February 1978.

Deleted.

c. Deleted.
d. PROCESS CONTROL PROGRAM implementation OFFSITE DOSE CALCULATIONMANUALimplementation.

Quality Assurance Program for effluent and environmental monitoring using the guidance in Regulatory Guide 1.21, Rev. 1, June 1974, and Regulatory Guide 4.1, Rev. 1, April 1975.

g. Component Cyclic or Transient Limits program, which provides controls to track the UFSAR cyclic and transient occurrences to ensure that components are maintained within the limits.

6.8.2 Each procedure and administrative policy of Specification 6.8.1 above, and changes thereto, including temporaty changes, shall be reviewed prior to implementation as set forth in Specification 6.5 above.

6.8.3 A plant program for post-accident sampling shall be established, implemented, and maintained which will ensure the capability to obtain and analyze reactor coolant samples, containment atmosphere noble gas samples, and unit vent gaseous effluent samples for iodines and particulates under accident conditions. The program will include the following:

a. Training of personnel,
b. Procedures for sampling and analysis,
c. Provisions for maintenance of sampling and analysis equipment.

COOK NUCLEAR PLANT-UNIT 1 Page 6-13 AMENDMENTVR, 484, 489, 4'

~,,6.0 . ADMINISTRATIVECONTROLS 6.8 PROCEDURES AND PROGRAMS 6.8.1 Written procedures shall be established, implemented and maintained covering the activities referenced below:

a. The applicable procedures recommended in Appendix "A" of Regulatory Guide 1.33, Rev. 2, February 1978.
b. Deleted.
c. Deleted.
d. PROCESS CONTROL PROGRAM implementation.
e. OFFSITE DOSE CALCULATIONMANUALimplementation.
f. Quality Assurance Program for effluent and environmental monitoring using the guidance in Regulatory Guide 1.21, Rev. 1, June 1974, and Regulatory Guide 4.1, Rev. 1, April 1975.
g. Component Cyclic or Transient Limits program, which provides controls to track the UFSAR cyclic and transient occurrences to ensure that components are maintained within the limits.

6.8.2 Each procedure and administrative policy of Specification 6.8.1 above, and changes thereto, including temporary changes, shall be reviewed prior to implementation as set forth in Specification 6.5 above.

6.8.3 A plant program for post-accident sampling shall be established, implemented, and maintained which will ensure the capability to obtain and analyze reactor coolant samples, containment atmosphere noble gas samples, and unit vent gaseous effluent samples for iodines and particulates under accident conditions. The program will include the following:

a. Training of personnel,
b. Procedures for sampling and analysis, Provisions for maintenance of sampling and analysis equipment.

COOK NUCLEAR PLANT-UNIT2 Page 6-13 AMENDMENTA, 438, 4-'25, 478