ROC 6.S.1 written procedux'es shall be <<stablished, implemented and maintained covering the activities referenced b<<lov:
a.
The applicable procedures recommended in Appends h of Regulatozy Guide 1.33, Rev. 2, February 1978.
b.
Deleted.
c.
Deleted.
d.
PROCESS CONTROL PROGRAM implementation.
e.
OFFSITE DOSE CALQJLhTION KQRAL implementation.
~lity Assurance Program for effluent and environmental monitoring using the guidance in Regulatory Guide 1.21, Rev. 1, June
- 1974, and Regulatory Guide 4.1, Rcv. 1, April 1975.
6.8.2 Each procedure and administrative policy of Specification 6.8.1
- above, and changes
- thereto, including temporary changes, shall be rcvicved
-prior to implementation as set forth in Specification 6.5 above.
6.8.3 A plant program for post-accident sampling shall be established, implemented, and maintained vhich vill ensure the capability to obtain and analyze reactor coolant samples, containment atmosphere noble gas samples, and unit veldt gaseous effluent samples for iodines and pazticulates under accident conditions.
The program vill include the folloving:
a.
Training of personnel, b.
Proceduzes for sampling and analysis, c.
Provisions foz maintenance of sampling and analysis
<<quipment.
COOK NUCLEAR PLANT - UNIT 1 9506080i3'4 950530 PDR ADOCK 05000315',
P
'DR 6-13 A~H~Vr No. M, 444 1Q2
Coh 8
ROC CR S
'D 6.8.1 Vritten procedures shall be established, implemented and mafntained covering the activities referenced belov:'.
The applicable procedures recommended in hppendfx "h of Regulatory Guide 1.33, Rev. 2, February 19?8.
b.
Deleted.
c.
Deleted.
d.
PROCESS CONTROL PROGRAM implementation.
e,.
OFFSITE DOSE CALCULATION MANUALimplementation.
e~) "h" Quality Assurance Program for efQuent and environmental monitoring using the guidance in Regulatory Guide 1.21, Rev.
1, June
- 1974, and Regulatory Guide 4.1, Rev. 1, hpril 1975.
6.8.2 Each procedure and administrative policy of Specification 6.8.1
- above, and changes
- thereto, fncluding temporary changes, shall be revieved prfor to implementatfon as set forth in Specification 6.5 above.
6.8.3 A plant program for post-accident sampling shall be establfshed, implemented, and maintained vhich vill ensure the capability to obtain and analyze reactor coolant samples, containment atmosphere noble gas samples, and unit vent gaseous effluent samples for fodines and particulates under accident cond'tions.
The program vill include the folloving:
a.
Training of personnel, b.
Procedures for samplfng and analysfs, c.
Provisions for maintenance of sampling and analysis equfpment.
COOK NUC~~
PLANT - UNIT 2 6-13 AMENDMENT NO. 44, 178
Component Cyclic or Transient Limits program, which provides controls to track the UFSAR cyclic and transient occurrences to ensure that components are maintained within the limits.
ATTACHMENT 2 TO AEP:NRC:0980W ADDITIONALREVISED TECHNICAL SPECIFICATION PAGES
6.0,.
ADMINISTRATIVECONTROLS 6.8 PROCEDURES AND PROGRAMS 6.8.1 Written procedures shall be established, implemented and maintained covering the activities referenced below:
a.
The applicable procedures recommended in Appendix "A" of Regulatory Guide 1.33, Rev. 2, February 1978.
Deleted.
c.
Deleted.
d.
PROCESS CONTROL PROGRAM implementation OFFSITE DOSE CALCULATIONMANUALimplementation.
Quality Assurance Program for effluent and environmental monitoring using the guidance in Regulatory Guide 1.21, Rev. 1, June 1974, and Regulatory Guide 4.1, Rev. 1, April 1975.
g.
Component Cyclic or Transient Limits program, which provides controls to track the UFSAR cyclic and transient occurrences to ensure that components are maintained within the limits.
6.8.2 Each procedure and administrative policy of Specification 6.8.1 above, and changes thereto, including temporaty changes, shall be reviewed prior to implementation as set forth in Specification 6.5 above.
6.8.3 A plant program for post-accident sampling shall be established, implemented, and maintained which will ensure the capability to obtain and analyze reactor coolant samples, containment atmosphere noble gas samples, and unit vent gaseous effluent samples for iodines and particulates under accident conditions. The program willinclude the following:
a.
Training of personnel, b.
Procedures for sampling and analysis, c.
Provisions for maintenance of sampling and analysis equipment.
COOK NUCLEAR PLANT-UNIT1 Page 6-13 AMENDMENTVR, 484, 489, 4'
~,,6.0. ADMINISTRATIVECONTROLS 6.8 PROCEDURES AND PROGRAMS 6.8.1 Written procedures shall be established, implemented and maintained covering the activities referenced below:
a.
The applicable procedures recommended in Appendix "A" of Regulatory Guide 1.33, Rev. 2, February 1978.
b.
Deleted.
c.
Deleted.
d.
PROCESS CONTROL PROGRAM implementation.
e.
OFFSITE DOSE CALCULATIONMANUALimplementation.
f.
Quality Assurance Program for effluent and environmental monitoring using the guidance in Regulatory Guide 1.21, Rev. 1, June 1974, and Regulatory Guide 4.1, Rev. 1, April 1975.
g.
Component Cyclic or Transient Limits program, which provides controls to track the UFSAR cyclic and transient occurrences to ensure that components are maintained within the limits.
6.8.2 Each procedure and administrative policy of Specification 6.8.1 above, and changes thereto, including temporary changes, shall be reviewed prior to implementation as set forth in Specification 6.5 above.
6.8.3 A plant program for post-accident sampling shall be established, implemented, and maintained which will ensure the capability to obtain and analyze reactor coolant samples, containment atmosphere noble gas samples, and unit vent gaseous effluent samples for iodines and particulates under accident conditions. The program willinclude the following:
a.
Training of personnel, b.
Procedures for sampling and analysis, Provisions for maintenance of sampling and analysis equipment.
COOK NUCLEARPLANT-UNIT2 Page 6-13 AMENDMENTA, 438, 4-'25, 478