{{#Wiki_filter:ATTACHMENT 2TOAEP:NRC:1215B EXISTINGTECHNICAL SPECIFICATION PAGESMARKEDTOREFLECTPROPOSEDCHANGES95122b0234 951219PDRADOCK05000315PPDR CONTAXNMENT SYSTEMSCONTAXNMENT LEAKAGELXMXTXNGCONDXTXON FOROPERATXON 3.6.l..2Containmene leakageratesshallbelimitedto:a.Anoverallintegrated leakagerateofsL0.25percenebyweightoftheconeainment airper24hoursaeP12.0psig,andb.Acombinedleakagerateofi0.60L,forallpeneeraeions andvalvessubjecteoTypesBandC.testswhenpressurized toP,.1APPLXCABXLXTY:
{{#Wiki_filter:ATTACHMENT 2 TO AEP:NRC:1215B EXISTING TECHNICAL SPECIFICATION PAGES MARKED TO REFLECT PROPOSED  CHANGES 95122b0234 951219 PDR  ADOCK 05000315 P              PDR
Modes1,2,3and4.ACTXON:Pitheither(a)themeasuredoverallintegrated containment leakagerateexceeding 0.75L,or(b)withthemeasuredcombinedleakagerateforallpenetrations andvalvessubjecteoesBandCtestsexceedin0.60A5."rophMolWtHys4am eentesaPu AyPMOP&gh
 
~~~~<w~~lee~g,&O<s7S~nad+4.~1~le+~~fuaaQPaue~+so<$
CONTAXNMENT SYSTEMS CONTAXNMENT LEAKAGE LXMXTXNG CONDXTXON FOR OPERATXON 3.6.l..2    Containmene leakage rates                      shall be limited to:
~Otat~~g4~+07~+0SAWQHsQ+as>Oi(pOLC+lid'4Q~CA4+51~le.~gagJoss(M7SURVEXLLANCE REUXREMENTS o~M~~~hu4zcb~20oC.4.6;1.2nienlereda,bdernoonee'eendabdetx.teapefiAend51d.0sX'.97:teeatdnfC5es,BCerLegeettinhaeemtsscied.moveexIegreddalmbidbeondedaorceApdt0ioEach.coneainment airlockshallbeverifiedtobeincompliance withtherequirements ofSpecification 3.6.1.3.Theprovisions opSpeoipioaeion'4.0.2 asenoeappileah1e.
: a. An    overall integrated leakage rate of sL0.25                                  percene by weight of    the coneainment              air    per 24 hours ae P 12.0 psig, and
fAon-timeensnfeetiervisllodfoththdeAsteson10easecerioorinailscddbprfoedttedoCye.eetwbeerrmporonitesartoowgeereelgoageat11olweCyeCOOKNUCLEARPLANT-UHXTL3/46-2AHENDHENT NO.48,460,4$
: b. A combined leakage                  rate of i0.60 L, for all peneeraeions and valves subject              eo Types B and            C.tests when pressurized to P,.
7-A.4.6.1.2Performleakageratetestinginaccordance with10CFR50AppendixJOptionBandRegulatory Guide1.163,datedSeptember 1995.B.4.6.1.3Inaccordance with10CFR50AppendixJOptionBandRegulatory Guide1.163,datedSeptember 1995,andC.4.6.1.6Thestructural integrity ofthecontainment steellinershallbedetermined inaccordance AppendixJOptionBandRegulatory GuideSeptember 1995.structure andwith10CFR501.163,dated CONTAINMENT SYSTEMSCONTAINMENT AIRLOCKS~a(tLIMITINGCONDITION FOROPERATION 3.6.1.3Eachcontainment airlockshallbeOPERABLEwith:a.Bothdoorsclosed.exceptwhen=theairlockisbeingused,fornormal'transitentryandexitthroughthecontainment, thenatleastoneairlockdoorshall'beclosed,andb.AnoverallairlockleakagerateofatP,12psig.a'PPLICABILITY:
1 APPLXCABXLXTY: Modes 1, 2,                         3  and 4.
MODES1,2,3and4.to0.05LACTXON:Wi.thanairlocki.noperable, restoretheairlocktoOPERABLEstatuswithin24hoursorbeinatleastHOTSTANDBYwi.thin,thenext.6hoursandinCOLDSWgDOMNwithinthefollowing 30hours.SURVEILLANCE REUIRBfEVZS 4.6.1.3Eachcontainment airlockshallbedemonstrated OPERABLE:
ACTXON:
aIteeachen,exptenairckieinusedormupietz,witalledoattoepes~per'nr1geestousacedreseforoerbpresi@ithep.beeenesst2igdvxfygaslegenoateran.5Exponopi"J"ofC5COOKNUCLEARPLANT-UNIT13/46-4AMENDMENT NO.~(~)  
Pith either (a) the            measured overall integrated containment leakage rate exceeding 0.75 L, or (b) with the measured combined leakage rate for all penetrations and valves subject eo                              es B and C tests exceedin 0.60 A5."rophMolWtHys4am eentesaPu g4~ g, &O <s7S~nad             +4.     ~1~                 AyPMOP&gh le+~
(').CONTAImENT SysymsSURVEILLANCE REUIREMENTS Continued v~hac4ob.c~tleoncpermon,peormairakagestwoutsatedessefoeonedoper.6.1.3.,peormaairakatestthsedpssure'rce
          +0 7~+0 SAW Q HsQ +as > Oi(pO LC +lid'4 Q ~CA4+51~ le.
:thdoor,.ypssuringegaetwe"thealst12pgavfyiaseleageoogrter0'.5a't:eastce6mthsbcondingovalla-lockakatesttP2psandyvefyithat'over'irloceaeratiswinilimAtleastonceper6monthsbyverifying thatonlyonedoorineachairlockcanbeopenedatatime.~,CCOOKNUCLEARPIANT-UNIT13/46-5AMENDMENT NO.160 CONThINMENT SYSTEMSCONThINMENT STRUCZUEUQ.
SURVEXLLANCE RE              UXREMENTS
INTEGRITY LXMXTINCCONDITION FOR'PERhTXON 3.6.1.6Thestructural integrity of'thecontainment structure andsteellinershallbemaintained atalevelconsistent vSththeacceptance criteriainSpecification 4.6.1.6.APPLICABILITY:
                                                                    ~
MODES1,2,3and4.IJLCTXOH:Piththestructural integrity ofthecontainment notconforming totheaboverequirements, restoretheirstructural integrity tovithinthelimitspriortoincreasing theReactor.CoolantSystemtemperature above200F.0SURVEILLhNCE REUIREMENTS 4.6.1.6erucaltetythetantscandteel1aleteedinthestdoore4ctanteageateestefencepecifati.6.'byvi1ectiaac'siesaceofthstruest1ranverifgnappntansinppearceotheacorernoegatIhnitrertonyermadegtiofecoinmes1erdecteurthesinsctishbeevI.1yerdectiCOOKNUCLEhRPLANT-UNIT13/46-9FhMENDMENT NO:~
o~ M~~~ hu4z
0I3/4LIMITINGCONDITIONS FOROPERATION ANDSURVEILLANCE REQUIREi~q7$
                                                                                        ~~~~ <w~~
3/4.6CONTAPSIEiVlSYSTEMSCONTAINMENT UENTILATION SYSTEMLIMITINGCONDITION FOROPERATION 3.6.l.7Thecoatainmcat purgesupplyaadexhaustsystemshallbcclosed.except whenoperation ofthccontainmcat purgesystemisrequiredforptessutecoatto1,AUG',andrcspirablc airquaHtycoasidctatioas forpersonnel catty,andforsutveiHancc testingandmaintenance activities.
fuaaQPaue~+so<$
NomorethanoncpurgesupplypathandoacpurgeexhaustpathshaHbcopenatatime.APPLICABILITY:
c b~ 20o ~gag
MODESI,2,3,aad4.ACTION'.Withonceontaiameat purgesupplyand/oroneexhaustisolation valveinoperable, isolatethcaffectedpcaetratioa byuscofatleastoacautomaucvalvesecutedinthc.closedpositioa, and,withia72bouts,either:I)Restoretheiaoperablc valvetoOPERABLEstatus,or,2)Deactivate thcautomatic valvesecuredinthedosedposition.
                                                                                                            ~Ot at~~
b.Operatioa maytheacoatiaueuntilperformance ofthenexttequitedvalvetestprovidedthatthcautomatic valvescoutedinthcclosedpositionisvcriTiedtobedeactivated iatheclosedpo'sitioa atleastonceper3ldays.c..Otherwise, bcinatleastHOTSTANDBYwithhthcnext6heirsandhCOLDSHUTDOWNwithinthefallowing 30hours.('.'IId.Thcprovisions ofSpcciGeation 3.0.4atenotapplicable.
C.
SURUEILLANCE REUIREMENTS 4.6.l.7.1 ThesurvciHanee requirements ofTcchnical Speeilication 3/4.66.Iapply."5r/v.(.,(,z.
lee~
a~ACOOKiIUCLEARPLANT-UiT IPage3/469aAiIEND~IZix 66 P
Joss(M7 4.6;1.2                n    i      en '   le            r  ed      a    ,b    dern    t    ee    at o  o    n    ee              e      e    nd      a      b det              d          nf 51                d.
0CONAINMENTSYSTEMSCONTAINM-"NT LEAKAGELIMITIGCONDITONFOROPERATION 3.6.1.2Containment leakageratesshallbelimitedto:a.Anoverallintegrated leakagerateofsL,0.25percentbyweightofthecontainment airper24hoursatP12.0psig,andb.Acombinedleakagerateofs0.60L,for'allpenetrations andvalvessubjecttoTypes'andCtestswhenpressurized toP,.ACTION;Witheither(a)themeasuredoverallintegrated containment leakagerateexceeding 0.75Lor(b)withthemeasuredcombinedleakagerateforallpenetrations andvalvessub]ecttoTypesBandCtestsexceeding 0.60Lrestoretheoverallintegrated leakageratetos0.75L,andthecombinedleakagerateforallpenetrations andvalvessub]ecttoTypeSBandCteststos0.60L,priortofincreasing theReactorCoolantSystemtemperature above200'F.SURVEILLANCE REUIREMENTS 4.6.1.2Thcoaintakaratesha'bemoratatefowstchuleandalletermedcoceicririspefienAendJo1050usitheedspvionsfN4.4.>i,2:es,BanC(eraIegraeddcaLeagee)estigsh1bcocteincctreirentspecedn'endJoCodiedappovedxeioCoineewh5Eachcontainment airlockshallbeverifiedtobeincompliance withtherequirements ofSpecification 3.6.1.3.Theprovisions ofSpecification 4.0.2arenotapplicable.
x.te 0
eimeexetioto0C50Apndix,ectnsX..2(aanI.D.,wchlowtheovionofTnaleccaon..8oeplileCOOKNUCLEARPZANT-UNXT23/46-2AMENDMENT NO.~,173 A.4.6.1.2Performleakageratetestinginaccordance with10CFR50AppendixJOptionBandRegulatory Guide1.163,datedSeptember 1995.B.4.6.1.3Inaccordance with10CFR50AppendixJOptionBandRegulatory Guide1.163,datedSeptember 1995,andC.4.6.1.6Thestructural integrity ofthecontainment steellinershallbedetermined inaccordance Appendix-JOptionBandRegulatory GuideSeptember 1995.structure andwith10CFR501.163,dated CONTAINMENT SYSTEHS('.)CONTAINMENT AIRLOCKSLIHITINCCONDITION FOROPERATION 3.6.1.3Eachcontainment airlockshallbeOPERABLEwith:a.-Bothdoorsclosedexceptwhentheairlockisbeingusedfornormaltransitentryand-exit:-through thecontaireent, thenatleastoneair1ockdoorshallbeclosed,a.,db.Anoverallairlockleakagerateof<0.05LaatPa,12.0psig.APPLICADILITY:
a s
NODESI,2,3anda.ACTION:Mithanairlockinoperable, maintainatleastonedoorclosed;restoretheairlocktoOPERABLEstatuswithin24hoursorbeinatleastHCTSTANDBYwithinthenext6hoursandin.COLDSHUTDOWNwithinthefollowinq 30hours.SLR".EILLANCE REQUIREMENTS 4.6.1.3Eachcontainment airlockshallbedemonstrated OPERABLE:
pe    f      iX'. A end 97:
a.terchpeng,expteneai1ocsbnosedrltieeneshet1stoep72urs.byerfrmianaleageestithoasulaprreorcontdo.byessizitheolumetwnthdosealtopsanveriingseaeakerat.ngreattn0.L.leaoep6mthsypeormianrlegetesitutsimatedresrefceotherpeScicat4.1.3;tbyerfoingaairakageitasuladprsurforonedo~ryprsurigevumeetwethooreals12igaveriingas11kag.raefnareartha0.00L.Rzq~')+t8,xsooAend."J"flFR5.0.'.COOK'NIT-23/46-4 CONTAINMENT SYSTEMSSURVEILLANCE REUIREMENTS (Continued) c.Ateastncer6nthsycondting.ov11aioc,akatesatP.12',an',vefyithateova'llairockakag.ateswit'ts>mitAtleastonceper6monthsbyverifying thatonlyonedoorineachairlockcanbeopenedatatime.0.C.COOK-UNIT23/46-5 CONTAINMENT SYSTEMSCONTAINMENT STRUCTURAL INTEGRITY LIMITINQCONDITION FOROPERATION 3.6.1.6Thestructu=al integrity ofthecontainment shallbemaintained atalevelconsistent youththeacceptance criteriainSpecification 4.6.1.6.APPLIChBILITY:
C      5 es      , B            C        er        I    egr    ed    d        al    mbi d Le      ge        e      t tin          ha      be    ond      ed        a    or    ce e              em      ts  s    ci    ed.       Ap      d        t      0 mo                              ve    ex        io Each. coneainment               air lock shall          be  verified to be in compliance with the requirements                          of Specification 3.6.1.3.
MODES1,2,3and4.JUNCTION:
The    provisions op Speoipioaeion'4.0.2                         ase noe appileah1e.
Viththestructural integrity ofthecontainment notconfoxming totheaboverecpxirements, restorethestructural integxity tovithinthelimitspriorto0increasing theReactorCoolantSystemtemperature above200F.SURVEILLANCE REUHKKENTS4.6.1.6eruc1ingritydux'inhetdoforachTeSpeficion.1.2byasuaterrandxterrsacesanerifgnappartcgesnormadegtifthconenshabeezmdhntaentakarateestefereceinstionexpod.acssiblthconten,incdinge1zple,apranofeacesothCOOKNUCLEARPLANT-UNIT23/46-9AMENDMENT NO.138 3/43/4.6LIMITINGCONDITIONS FOR.OPERATION ANDSVRVEILLANCE REQUIREMENTS.;,',:..,
f    Aon -tim        e    ens n          f      e e      ti      erv      is    llo    d fo      th th d          e A    st        e      s on 10              ea se          ce      rio ori nail sc d d                        b p  rfo    ed    tt    e        do Cy e .                     e e tw            be er rm            p or    o nit    es art        o ow g e e re el g o age                                at 11 ol w e Cy  e COOK NUCLEAR PLANT - UHXT L                              3/4 6-2                    AHENDHENT NO.         48,460,4$ 7-
'."".;."CONTAINMENT SYSTEMS0AfNMEVENTITIONSYSTEMLIMITIGCOND1TINFORPERA03.6.1.7Thceoataiament purgesupplyandexhaustsystemshaHbcclosedexceptwhenoperation ofthccoat;iiament purge,systctn istcttuited forptcssutecontrol,ALPRA.andtespirablc air'quality."
 
considerations forpersonnel catty,:aadfor.sutvcBIancc testingaadmaiatemuice aetiyiYies.','Po.
A. 4.6.1.2 Perform leakage rate testing in accordance with 10    CFR 50 Appendix J Option B and Regulatory Guide 1.163,       dated September 1995.
morcthanoacpurgesupplypathaadoacpurgeexhaustpathshaHbcopenatatime.ACTINN:Withonccontainmeat purgesupplyaad/oroacexhaustisohtioavalveinopcrablc, isolatethe'ffected penetration byuseofatleastoacautomatic valvesecuredinthedosedposiYion,'ad, withia72hours,either:I)Restorethciaoperablc valvetoOPERABLEstatus,or,2)Deactivate thcautomatic.valve securediathcdosedposiYioa.
B. 4.6.1.3 In accordance with 10 CFR 50 Appendix J Option        B  and Regulatory Guide 1.163, dated September 1995, and C. 4.6.1.6 The  structural integrity of the containment structure and steel liner shall be determined in accordance with 10 CFR 50 Appendix J Option    B  and  Regulatory  Guide 1.163, dated September 1995.
~Operation maythencontinueuatilperformance ofthenextrequitedvalvetestprovitlcd thatthc'utomatic valvesecurediathcdosedposiYioaisverifiedtobedeactivated intheclosedposiYionatleastonceper31days...Otherwise; bcinatlastHOTSTANDBYwithhthcaext6hoursaadinCOLDSHUTDOWNwithinthefollowing 30hours.Thcprovisions ofSpecification 3'.4atenotappHcablc.
 
SURVEILLANCE REUIREMENTS 4.6.1.7.1 ThcsurveiHaacc requitetnents ofTeeluucal SpeciQcatio 3/4.6p.lapply.i~eCOOKiiUCLEARPLAif1-~e Page3/46-9aAi>IEG)CLIENT
CONTAINMENT SYSTEMS CONTAINMENT   AIR LIMITING CONDITION LOCKS FOR OPERATION
~181 ATTACHMENT 3TOAEP:NRC:1215B PROPOSEDREVISEDTECHNICAL SPECIFICATION PAGES 3/4LIMITINGCONDITIONS FOROPERATION ANDSURVEILLANCE REQUIREMENTS 3/4.6CONTAINMENT SYSTEMSCONTAINMENT LEAKAGELIMITINGCONDITION FOROPERATION 3.6.1.2Containment leakageratesshallbelimitedto:APPLICABILITY:
                                                              ~a (t
Anoverallintegrated leakagerateof6La,0.25percentbyweightofthecontainment airper24hoursatPa,12.0psig,andAcombinedleakagerateof60.60Laforallpenetrations andvalvessubjecttoTypesBandCtestswhenpressurized toPa.MODES1,2,3and4.ACTION:Witheither(a)themeasuredoverallintegrated containment leakagerateexceeding 0.75La,or(b)withthemeasuredcombinedleakagerateforallpenetrations andvalvessubjecttoTypesBandCtestsexceeding 0.60La,restoretheoverallintegrated leakageratetoS0.75Laandthecombinedleakagerateforallpenetrations andvalvessubjecttoTypesBandCteststo60.60Lapriortoincreasing theReactorCoolantSystemtemperature above200'F.SURVEILLANCE REUIREMENTS 4.6.1.2Performleakageratetestinginaccordance with10CFR50AppendixJOptionBandRegulatory Guide1.163,datedSeptember 1995.a.Eachcontainment airlockshallbeverifiedtobeincompliance withtherequirements ofSpecification 3.6.1.3.b.Theprovisions ofSpecification 4.0.2arenotapplicable.
3.6.1.3  Each containment                    air lock shall        be OPERABLE      with:
COOKNUCLEARPLANT-UNIT 1Page3/46-2AMENDMENT 4S,4',4',406, 3/4LIMITINGCONDITIONS FOROPERATION ANDSURVEILLANCE REQUIREMENTS 3/4.6CONTAINMENT SYSTEMSCONTAINMENT AIRLOCKSLIMITINGCONDITION FOROPERATION 3.6.1.3Eachcontainment airlockshallbeOPERABLEwith:Bothdoorsclosedexceptwhentheairlockisbeingusedfornormaltransitentryandexitthroughthecontainment, thenatleastoneairlockdoorshallbeclosed,andb.Anoverallairlockleakagerateof60.05LaatPa,12psig.APPLICABILITY:
: a. Both doors closed. except when= the air lock is being used, for normal 'transit entry and exit through the containment, then at least one air lock door shall'be closed, and
ACTION:MODES1,2,3and4.Withanairlockinoperable, restoretheairlocktoOPERABLEstatuswithin24hoursorbeinatleastHOTSTANDBYwithinthenext6hoursandinCOLDSHUTDOWNwithinthefollowing 30hours.SURVEILLANCE REUIREMENTS 4.6.1.3Eachcontainment airlockshallbedemonstrated OPERABLE:
: b. An  overall air lock leakage rate of                                                        to 0.05 L at  P , 12                psig.
a.Inaccordance with10CFR50AppendixJOptionBandRegulatory Guide1.163,datedSeptember 1995,andAtleastonceper6monthsbyverifying thatonlyonedoorineachairlockcanbeopenedatatime.COOKNUCLEARPLANT-UNIT 1Page3/46CAMENDMENT
MODES a'PPLICABILITY:
: 440, 03/4LIMITINGCONDITIONS FOROPERATION ANDSURVEILLANCE REQUIREMENTS 3/4.6CONTAINMENT SYSTEMSThisPageIntentionally LeftBlank'OOKNUCLEARPLANT-UNIT IPage3/46-5 3/4LIMITINGCONDITIONS FOROPERATION ANDSURVEILLANCE REQUIREMENTS 3/4.6CONTAINMENT SYSTEMSCONTAINMENT STRUCTURAL INTEGRITY LIMITINGCONDITION FOROPERATION 3.6.1.6Thestructural integrity ofthecontainment structure andsteellinershallbemaintained atalevelconsistent withtheacceptance criteriainSpecification 4.6.1.6.APPLICABILITY:
1, 2,   3  and 4.
MODES1,2,3and4.ACTION:Withthestructural integrity ofthecontainment notconforming totheaboverequirements, restorethestructural integrity towithinthelimitspriortoincreasing theReactorCoolantSystemtemperature above200'F.SURVEILLANCE REUIREMENTS 4.6.1.6Thestructural integrity ofthecontainment structure andsteellinershallbedetermined inaccordance with10CFR50AppendixJOptionBandRegulatory Guide1.163,datedSeptember 1995.COOKNUCLEARPLANT-UNIT 1Page3/46-9 3/4LIMITINGCONDITIONS FOROPERATION ANDSURVEILLANCE REQUIREMENTS 3/4.6CONTAINMENT SYSTEMSCONTAINMENT VENTILATION SYSTEMLIMITINGCONDITION FOROPERATION 3.6.1.7Thecontainment purgesupplyandexhaustsystemshallbeclosedexceptwhenoperation ofthecontainment purgesystemisrequiredforpressurecontrol,ALARA,andrespirable airqualityconsiderations forpersonnel entry,andforsurveillance testingandmaintenance activities.
ACTXON:
Nomorethanonepurgesupplypathandonepurgeexhaustpathshallbeopenatatime.APPLICABILITY:
Wi.th an air lock i.noperable, restore the air lock to OPERABLE status within 24 hours or be in at least HOT STANDBY wi.thin, the next.6 hours and in COLD SWgDOMN  within the following                        30  hours.
MODES1,2,3,and4.ACTION:aoWithonecontainment purgesupplyand/oroneexhaust'isolation valveinoperable, isolatetheaffectedpenetration byuseofatleastoneautomatic valvesecuredintheclosedposition, and,within72hours,either:I)Restoretheinoperable valvetoOPERABLEstatus,or,2)Deactivate theautomatic valvesecuredintheclosedposition.
SURVEILLANCE RE UIRBfEVZS 4.6.1.3 Each containment air lock shall be demonstrated                                    OPERABLE:
Operation maythencontinueuntilperformance ofthenextrequiredvalvetestprovidedthattheautomatic valvesecuredintheclosedpositionisverifiedtobedeactivated intheclosedpositionatleastonceper31days.Otherwise, beinatleastHOTSTANDBYwithinthenext6hoursandinCOLDSHUTDOWNwithinthefollowing 30hours.Theprovisions ofSpecification 3.0.4arenotapplicable.
te                                                            air        i itpt allen aI                          each    en      , ex                            ck      ein used      or mu                pie      tz
SURVEILLANCE REUIREMENTS 4.6.1.7.1 Thesurveillance requirements ofTechnical Specifications 3/4.6.1.2 and3/4.6.3.1 apply.COOKNUCLEARPLANT-UNIT 1Page3/46-9aAMENDMENT 66;40$,
                                          'n  , w                        e do    at      to    e pe          s ~
3/4LIMITINGCONDITIONS FOROPERATION ANDSURVEILLANCE REQUIREMENTS 3/4.6CONTAINME<NT SYSTEMSCONTAINMENT LEAKAGELIMITINGCONDITION FOROPERATION 3.6.1.2Containment leakageratesshallbelimitedto:aoAnoverallintegrated leakagerateof6La,0.25percentbyweightofthecontainment airper24hoursatPa,12psig.APPLICABILITY:
per                                 r  1    ge    est        ou      s    aced    res    e for                  o      e      r  b    pres      i@i    the    p .be  een    e s    s t      2 ig                  d v xfy      g a s        le      ge      no      ater    an  .5 Ex  p  on  o                  p    i  "J" of          C    5 COOK NUCLEAR PLANT                  - UNIT  1                  3/4 6-4            AMENDMENT NO.     ~             (~ )
ACTION:Acombinedleakagerateof60.60Laforallpenetrations andvalvessubjecttoTypesBandCtestswhenpressurized toPa.MODES1,2,3and4.Witheither(a)themeasuredoverallintegrated containment leakagerateexceeding 0.75La,or(b)withthemeasuredcombinedleakagerateforallpenetrations andvalvessubjecttoTypesBandCtestsexceeding 0.60L>>,restoretheoverallintegrated leakagerateto60.75Laandthecombinedleakagerateforallpenetrations and'alvessubjecttoTypesBandCteststo60.60L>>priortoincreasing theReactorCoolantSystemtemperature above200'F.SURVEILLANCE REUIREMENTS 4.6.1.2Performleakageratetestinginaccordance with10CFR50AppendixJOptionBandRegulatory Guide1.163,datedSeptember 1995.a.Eachcontainment airlockshallbeverifiedtobeincompliance withtherequirements ofSpecification 3.6.1.3.b.Theprovisions ofSpecification 4.0.2arenotapplicable.
 
COOKNUCLEARPLANT-UNIT 2Page3/46-2AMENDME<NT 445,~,
CONTAImENT Sysyms
3/4LIMITINGCONDITIONS FOROPERATION ANDSURVEILLANCE REQUIREMENTS 3/4.6CONTAINMENT SYSTEMSCONTAINMENT AIRLOCKSLIMITINGCONDITION FOROPERATION 3.6.1.3Eachcontainment airlockshallbeOPERABLEwith:APPLICABILITY:
(
ACTION:Bothdoorsclosedexceptwhentheairlockisbeingusedfornormaltransitentryandexitthroughthecontainment, thenatleastoneairlockdoorshallbeclosed,andAnoverallairlockleakagerateof60.05LaatPa,12.0psig.MODESI,2,3and4.Withanairlockinoperable, maintainatleastonedoorclosed;restoretheairlocktoOPERABLEstatuswithin24hoursorbeinatleastHOTSTANDBYwithinthenext6hoursandinCOLDSHUTDOWNwithinthefollowing 30hours.SURVEILLANCE REUIREMENTS 4.6.1.3Eachcontainment airlockshallbedemonstrated OPERABLE:
  ').     SURVEILLANCE RE UIREMENTS        Continued
a.Inaccordance with10CFR50AppendixJOptionBandRegulatory Guide1.163,datedSeptember 1995,andb.Atleastonceper6monthsbyverifying thatonlyonedoorineachairlockcanbeopenedatatime.COOKNUCLEARPLANT-UNIT 2Page3/464AMENDMENT 03/4LIMITINGCONDITIONS FOROPERATION ANDSURVEILLANCE REQUIREMENTS 3/4.6CONTAINMENT SYSTEMSThisPageIntentionally LeftBlankCOOKNUCLEARPLANT-UNIT 2Page3/46-5AMENDMENT 03/4LIMITINGCONDITIONS FOROPERATION ANDSURVEILLANCE REQUIREMENTS 3/4.6CONTAINMENT SYSTEMSCONTAINMENT STRUCTURAL INTEGRITY LIMITINGCONDITION FOROPERATION 3.6.1.6Thestructural integrity ofthecontainment shallbemaintained atalevelconsistent withtheacceptance criteriainSpecification 4.6.1.6.APPLICABILITY:
: b. t le      onc    per      mon      ,   pe  orm      air akage st w            out s      ated    ess    e  fo  e on        e do    per  .6.1.3 .,           pe  orm a  air    aka      test      th      s        ed p  ssure'rce         :th  door,.
MODES1,2,3and4.ACTION:Withthestructural integrity ofthecontainment notconforming totheaboverequirements, restorethestructural integrity towithinthelimitspriortoincreasing theReactorCoolantSystemtemperature above200'P.SURVEILLANCE REUIREMENTS 4.6.1.6Thestructural integrity ofthecontainment structure andsteellinershallbedetermined inaccordance with10CFR50AppendixJOptionBandRegulatory Guide1.163,datedSeptember 1995.COOKNUCLEARPLANT-UNIT 2Page3/46-9AMENDMENT
y p  ssur    ing      e ga    etwe      "the    als t  12 p g a v    fyi    a se      lea    ge o      o  gr ter        0'. 5 all
: 438, 3/4LIMITINGCONDITIONS FOROPERATION ANDSURVEILLANCE REQUIREMENTS 3/4.6CONTAINMENT SYSTEMSCONTAINMENT VENTILATION SYSTEMLIMITINGCONDITION FOROPERATION 3.6.1.7Thecontainment purgesupplyandexhaustsystemshallbeclosedexceptwhenoperation ofthecontainment purgesystemisrequiredforpressurecontrol,ALARA,andrespirable airqualityconsiderations forpersonnel entry,andforsurveillance testingandmaintenance activities.
                                                                                                        'ir a't:
Nomorethanonepurgesupplypathandonepurgeexhaustpathshallbeopenatatime.APPLICABILITY:
c          east    ce          6 m  ths b cond          ing    ov        a    -lock t
MODES1,2,3,and4.ACTION:Withonecontainment purgesupplyand/oroneexhaustisolation valveinoperable, isolatetheaffectedpenetration byuseofatleastoneautomatic valvesecuredintheclosedposition, and,within72hours,either:1)Restoretheinoperable valvetoOPERABLEstatus,or,2)Deactivate theautomatic valvesecuredintheclosedposition.
                  ~
Operation maythencontinueuntilperformance ofthenextrequiredvalvetestprovidedthattheautomatic valvesecuredintheclosedpositionisverifiedtobedeactivated intheclosedpositionatleastonceper31days.Otherwise, beinatleastHOTSTANDBYwithinthenext6hoursandinCOLDSHUTDOWNwithinthefollowing 30hours.Theprovisions ofSpecification 3.0.4arenotapplicable.
aka    test      P      2 ps        and    y ve  fyi that'           over loc    ea    e  rat is      w    in    i    lim v~hac          At least    once per 6 months by verifying              that only  one door    in each 4o air lock    can be opened at a time.
SURVEILLANCE REUIREMENTS 4.6.1.7.1 Thesurveillance requirements ofTechnical Specifications 3/4.6.1.2 arid3/4.6.3.1 apply.COOKNUCLEARPLANT-UNIT 2Page3/46-9aAMENDMENT 47)4R, 44}}
                                                                                                              ~,
C COOK NUCLEAR  PIANT  - UNIT 1                  3/4 6-5                    AMENDMENT NO.     160
 
CONThINMENT SYSTEMS CONThINMENT STRUCZUEUQ. INTEGRITY LXMXTINC CONDITION FOR'PERhTXON 3.6.1.6 The structural integrity of 'the containment structure and steel liner shall be maintained at a level consistent vSth the acceptance criteria in Specification 4.6.1.6.
APPLICABILITY:           MODES  1, 2,   3  and 4.
I JLCTXOH:
Pith the structural integrity of the containment not conforming to the above requirements, restore their structural integrity to vithin the limits          0 prior to increasing the Reactor. Coolant System temperature          above 200 F.
SURVEILLhNCE RE UIREMENTS 4.6.1. 6      e    ruc al te              ty the        ta      nt s    c        and  teel 1          al      e    te    ed        in the s tdo          or e            4 c      ta    nt n
ea a
ge ate ac  'si nt est an e s ef ence pecif ati ace in ppear of th stru        e
                                                            . 6.
st
                                                                      'by 1
vi r an 1
verif ecti g
app                  s                  ce o the        ac    or      er      no eg    at                                            I hn      it      re rt o ny              erma deg        tish  of    e co      inme      s 1  er  d    ecte      ur    thes ins cti                  be      e vI.       1    y er  d    ecti F
COOK NUCLEhR PLANT          - UNIT  1            3/4 6-9                        hMENDMENT      NO:~
 
3/4 3/4.6 0
LIMITINGCONDITIONS FOR OPERATION AND SURVEILLANCEREQUIREi~q7$
CONTAPS IEiVl SYSTEMS I
CONTAINMENTUENTILATIONSYSTEM LIMITINGCONDITION FOR OPERATION 3.6.l.7        The coatainmcat purge supply aad exhaust system shall bc closed.except when operation of thc containmcat purge system is required for ptessute coatto1, AUG', and rcspirablc air quaHty coasidctatioas for personnel catty, and for sutveiHancc testing and maintenance activities. No more than onc purge supply path and oac purge exhaust path shaH bc open at a time.
APPLICABILITY:         MODES      I, 2, 3, aad 4.
ACTION'.
With onc eontaiameat purge supply and/or one exhaust isolation valve inoperable, isolate thc affected pcaetratioa by usc of at least oac automauc valve secuted in thc. closed positioa, and, withia 72 bouts, either:
I)       Restore the iaoperablc valve to OPERABLE status, or,
: 2)         Deactivate thc automatic valve secured in the dosed position.
: b.       Operatioa may thea coatiaue until performance of the next tequited valve test provided that thc automatic valve scouted in thc closed position is vcriTied to be deactivated ia the closed po'sitioa at least once per 3l days.
c..       Otherwise, bc in at least HOT STANDBY withh thc next 6 heirs and                  h  COLD SHUTDOWN within the fallowing 30 hours.                                                     ('. 'I I        d.       Thc provisions of SpcciGeation 3.0.4 ate not applicable.
SURUEILLANCE RE UIREMENTS 4.6.l.7.1     The survciHanee requirements of Tcchnical Speeilication 3/4.66.I apply.
5 r/v.(.,(,z. a~A COOK i IUCLEAR PLANT-UiT I                          Page 3/4 6 9a                                AiIEND~IZix66
 
P 0
CON AINMENT SYSTEMS CONTAINM-"NT LEAKAGE LIMITI G      CONDIT ON FOR OPERATION 3.6.1.2        Containment leakage rates            shall    be  limited to:
: a.       An  overall integrated leakage rate of sL, 0.25 percent by weight of the containment        air per 24 hours at P12.0 psig, and
: b.       A combined leakage        rate of s0.60 L, for 'all penetrations                  and    valves subject to      Types'     and C tests when pressurized to P,.
ACTION; With either (a) the measured overall integrated containment leakage rate exceeding 0.75 L or (b) with the measured combined leakage rate for all penetrations and valves sub]ect to Types B and C tests exceeding 0.60 L restore the overall integrated leakage rate to s0.75 L, and the combined leakage rate for all penetrations and valves sub]ect to TypeSB and C tests to s0.60 L, prior to                                          f increasing the Reactor Coolant System temperature above 200'F.
SURVEILLANCE RE UIREMENTS 4.6.1.2        Th    co    ai    nt    aka      rate sha        'be    mo    rat      at    e  f    ow st    ch cri ri spe fie ule and          all n A end e
J term ed o    10      50 c
usi o
the ce e
i ds p vi ons f                  N4 .4.>i, 2:
es,     B    an    C  (   era      I  egra ed        d      ca      Co    ine Lea    ge      e)     esti  g sh      1 b    co    cte    in    cc            e w    h t    re    ire nts        pec      ed    n'     end    J    o      C      5 odi ed        app oved xe            io Each containment air lock shall be verified to be                                      in compliance with the requirements of Specification 3.6.1.3.
The  provisions of Specification 4.0.2 are not applicable.
I e  ime exe        tio to      0 C        50    Ap    ndix,         ect    ns      X..2(a          an
            .D.   , w    ch    low the          ovi on of        T    n    al    ec      ca  on      .   .8    o e    pli      le COOK NUCLEAR PZANT        - UNXT 2              3/4 6-2                              AMENDMENT NO.         ~,     173
 
A. 4.6.1.2 Perform leakage rate testing in accordance with 10    CFR 50 Appendix J Option B and Regulatory Guide 1.163,       dated September 1995.
B. 4.6.1.3 In accordance with 10 CFR 50 Appendix J Option        B  and Regulatory Guide 1.163, dated September 1995, and C. 4.6.1.6 The  structural integrity of the containment structure and steel liner shall be determined in accordance with 10 CFR 50 Appendix- J  Option B  and  Regulatory  Guide 1.163, dated September  1995.
 
('. )
CONTAINMENT SYSTEHS CONTAINMENT AIR LOCKS LIHITINC CONDITION          FOR OPERATION 3.6.1.3      Each containment        air lock shall        be OPERABLE      with:
: a.   - Both doors closed except when the                air lock is being used for normal    transit entry and -exit:-through the contaireent, then at least one air 1ock door shall be closed, a.,d
: b.     An    overall air lock leakage rate of                < 0.05 La    at  Pa, 12.0 psig.
APPLICADILITY:         NODES    I, 2, 3  and  a.
ACTION:
Mith an air lock inoperable, maintain at least one door closed; restore the air lock to OPERABLE status within 24 hours or be in at least HCT STANDBY within the next 6 hours and in. COLD SHUTDOWN within the followinq 30 hours.
SLR".EILLANCE REQUIREMENTS 4.6.1.3      Each containment          air lock shall      be demonstrated        OPERABLE:
: a.           ter                                                i lti e g,en es pt he t st o e p 72 urs.
ch    pen        ex          en    e a      1oc    s b  no sed      r                                      1 by    erf rmi an a le age est itho a s ula                                    pr re orc on t do by ess izi the olum etw n
                                              .                                                   Rzq~'
th do seal to                  ps    an veri ing            sea    eak e rat.      )+t n great        t n 0. L .                                                       8, lea      o    e p    6m ths y pe ormi                  an     r le    ge tes      it    ut    sim    ated res re        f    ce  o    the      r pe
                                        .1.3; t          by erfo ing a air itci    cat S                    4                                                      akage a s    ula    d  pr    sur    for    on      e do~r y pr suri            g e v    ume    etwe      th    oor eals          12    ig  a    veri    ing a s    11      kag  .rae      fn    area    rtha      0.00      L.
x    so      oA    end    ."J"    fl      FR  5.
: 0. '. COOK'NI T - 2                              3/4 6-4
 
CONTAINMENT SYSTEMS SURVEILLANCE RE UIREMENTS        (Continued)
: c. At east air
              ,aka ock tes nce at akag r
P 6
                                      .12 ate
                                          ', 'ts nths s wit y cond an  ',veting fyi .ov that
                                                              >mit 11  ai e ov oc a'll At least once per        6  months by    verifying that only      one door  in each air lock can        be opened    at  a  time.
: 0. C. COOK  -  UNIT 2                        3/4 6-5
 
CONTAINMENT SYSTEMS CONTAINMENT STRUCTURAL INTEGRITY LIMITINQ CONDITION  FOR OPERATION 3.6.1.6 The structu=al integrity of the containment shall be maintained at      a level consistent youth the acceptance criteria in Specification 4.6.1.6.
APPLIChBILITY:  MODES  1, 2, 3 and 4.
JUNCTION:
Vith the structural integrity of the containment not confoxming to the above recpxirements, restore the structural integxity to vithin the limits prior to 0
increasing the Reactor Coolant System temperature above  200 F.
SURVEILLANCE RE UHKKENTS 4.6.1.6      e  ruc    1 in grity f th con        en sha    be    ezm  d dux'in    he  tdo    for ach T e h nta ent aka rate est efere ce Spe fic ion        .1.2 by a sua ins tion              expo d. ac ssibl ter r and xter r s aces          th cont    en , inc ding    e 1   z pl e, an    erif g n appar t c ges          ap  ran  of  e     aces    oth norma  deg  ti COOK NUCLEAR PLANT  - UNIT 2          3/4 6-9                AMENDMENT NO. 138
 
3/4      LIMITINGCONDITIONS FOR. OPERATION AND SVRVEILLANCEREQUIREMENTS.;,',:.., '." ".;."
3/4.6    CONTAINMENTSYSTEMS 0     AfNME    VENTI      TION SYSTEM LIMITI G COND1TI N FOR            PERA    0 3.6.1.7        Thc eoataiament purge supply and exhaust system shaH bc closed except when operation of thc coat;iiament purge,systctn is tcttuited for ptcssute control, ALPRA. and tespirablc air'quality."
considerations for personnel catty,: aad for.sutvcBIancc testing aad maiatemuice aetiyiYies.','Po.
morc than oac purge supply path aad oac purge exhaust path shaH bc open at a time.
ACTI    NN:
With onc containmeat purge supply aad/or oac exhaust isohtioa valve inopcrablc, isolate penetration by use of at least oac automatic valve secured in the dosed posiYion,'ad, the'ffected withia 72 hours, either:
I)      Restore thc iaoperablc valve to OPERABLE status, or,
: 2)        Deactivate thc automatic.valve secured ia thc dosed posiYioa.
              ~ Operation may then continue uatil performance of the next requited valve test provitlcd that thc
              'utomatic valve      secured ia thc dosed posiYioa is verified to be deactivated in the closed posiYion at least once per 31 days..
                .Otherwise; bc in at last HOT STANDBY withh thc aext 6 hours aad in COLD SHUTDOWN within the following 30 hours.
Thc provisions of Specification    3'.4 ate not appHcablc.
SURVEILLANCE RE UIREMENTS 4.6.1.7.1      Thc surveiHaacc requitetnents of Teeluucal SpeciQcatio        3/4.6p.l apply.
i ~
e COOK iiUCLEAR PLAif1-~e                            Page 3/4 6-9a                                Ai>IEG)CLIENT              ~
181
 
ATTACHMENT 3 TO AEP:NRC:1215B PROPOSED REVISED TECHNICAL SPECIFICATION PAGES
 
3/4      LIMITINGCONDITIONS FOR OPERATION AND SURVEILLANCEREQUIREMENTS 3/4.6    CONTAINMENTSYSTEMS CONTAINMENT LEAKAGE LIMITINGCONDITION FOR OPERATION 3.6.1.2          Containment leakage rates shall be limited to:
An overall integrated leakage rate of 6 La, 0.25 percent by weight of the containment air per 24 hours at Pa, 12.0 psig, and A combined leakage rate of 6 0.60 La for all penetrations and valves subject to Types B and C tests when pressurized to Pa.
APPLICABILITY:              MODES 1, 2, 3 and 4.
ACTION:
With either (a) the measured overall integrated containment leakage rate exceeding 0.75 La, or (b) with the measured combined leakage rate for all penetrations and valves subject to Types B and C tests exceeding 0.60 La, restore the overall integrated leakage rate to S 0.75 La and the combined leakage rate for all penetrations and valves subject to Types B and C tests to 6 0.60 La prior to increasing the Reactor Coolant System temperature above 200'F.
SURVEILLANCE RE UIREMENTS 4.6.1.2           Perform leakage rate testing in accordance with 10 CFR 50 Appendix J Option B and Regulatory Guide 1.163, dated September 1995.
: a.       Each containment air lock shall be verified to be in compliance with the requirements of Specification 3.6.1.3.
: b.        The provisions  of Specification 4.0.2 are not applicable.
COOK NUCLEAR PLANT-UNIT 1                           Page 3/4 6-2           AMENDMENT4S,        4', 4', 406,
 
3/4    LIMITINGCONDITIONS FOR OPERATION AND SURVEILLANCE REQUIREMENTS 3/4.6  CONTAINMENTSYSTEMS CONTAINMENT AIR LOCKS LIMITINGCONDITION FOR OPERATION 3.6.1.3        Each containment air lock shall be OPERABLE with:
Both doors closed except when the air lock is being used for normal transit entry and exit through the containment, then at least one air lock door shall be closed, and
: b.      An overall air lock leakage rate of 6  0.05 La at Pa, 12 psig.
APPLICABILITY:           MODES 1, 2, 3 and 4.
ACTION:
With an air lock inoperable, restore the air lock to OPERABLE status within 24 hours or be in at least HOT STANDBY within the next 6 hours and in COLD SHUTDOWN within the following 30 hours.
SURVEILLANCE RE UIREMENTS 4.6.1.3        Each containment air lock shall be demonstrated OPERABLE:
: a.      In accordance with 10 CFR 50 Appendix J Option B and Regulatory Guide 1.163, dated September 1995, and At least once per 6 months by verifying that only one door in each air lock can be opened at a time.
COOK NUCLEAR PLANT-UNIT 1                        Page 3/4 6C                            AMENDMENT440,
 
0 3/4  LIMITINGCONDITIONS FOR OPERATION AND SURVEILLANCE REQUIREMENTS 3/4.6 CONTAINMENTSYSTEMS This Page Intentionally Left Blank
'OOK NUCLEAR PLANT-UNITI            Page 3/4 6-5
 
3/4     LIMITINGCONDITIONS FOR OPERATION AND SURVEILLANCE REQUIREMENTS 3/4.6    CONTAINMENTSYSTEMS CONTAINMENTSTRUCTURAL INTEGRITY LIMITINGCONDITION FOR OPERATION 3.6.1.6          The structural integrity of the containment structure and steel liner shall be maintained at a level consistent with the acceptance criteria in Specification 4.6.1.6.
APPLICABILITY:             MODES 1, 2, 3 and 4.
ACTION:
With the structural integrity of the containment not conforming to the above requirements, restore the structural integrity to within the limits prior to increasing the Reactor Coolant System temperature above 200'F.
SURVEILLANCE RE UIREMENTS 4.6.1.6          The structural integrity of the containment structure and steel liner shall be determined in accordance with 10 CFR 50 Appendix J Option B and Regulatory Guide 1.163, dated September 1995.
COOK NUCLEAR PLANT-UNIT 1                            Page 3/4 6-9
 
3/4      LIMITINGCONDITIONS FOR OPERATION AND SURVEILLANCE REQUIREMENTS 3/4.6    CONTAINMENTSYSTEMS CONTAINMENT VENTILATIONSYSTEM LIMITINGCONDITION FOR OPERATION 3.6.1.7        The containment purge supply and exhaust system shall be closed except when operation of the containment purge system is required for pressure control, ALARA, and respirable air quality considerations for personnel entry, and for surveillance testing and maintenance activities. No more than one purge supply path and one purge exhaust path shall be open at a time.
APPLICABILITY:           MODES 1, 2, 3, and 4.
ACTION:
ao      With one containment purge supply and/or one exhaust'isolation valve inoperable, isolate the affected penetration by use of at least one automatic valve secured in the closed position, and, within 72 hours, either:
I)       Restore the inoperable valve to OPERABLE status, or,
: 2)       Deactivate the automatic valve secured in the closed position.
Operation may then continue until performance of the next required valve test provided that the automatic valve secured in the closed position is verified to be deactivated in the closed position at least once per 31 days.
Otherwise, be in at least HOT STANDBY within the next 6 hours and in COLD SHUTDOWN within the following 30 hours.
The provisions  of Specification 3.0.4 are not applicable.
SURVEILLANCE RE UIREMENTS 4.6.1.7.1       The surveillance requirements   of Technical Specifications 3/4.6.1.2   and 3/4.6.3.1 apply.
COOK NUCLEAR PLANT-UNIT 1                        Page 3/4 6-9a                      AMENDMENT66; 40$ ,
 
3/4      LIMITINGCONDITIONS FOR OPERATION AND SURVEILLANCE REQUIREMENTS 3/4.6    CONTAINME<NTSYSTEMS CONTAINMENTLEAKAGE LIMITINGCONDITION FOR OPERATION 3.6.1.2          Containment leakage rates shall be limited to:
ao        An overall integrated leakage rate of  6  La, 0.25 percent by weight  of the containment air per 24 hours at Pa, 12 psig.
A combined leakage rate of 6 0.60 La for all penetrations    and valves subject to Types B and C tests when pressurized to Pa.
APPLICABILITY:              MODES 1, 2, 3 and 4.
ACTION:
With either (a) the measured overall integrated containment leakage rate exceeding 0.75 La, or (b) with the measured combined leakage rate for all penetrations and valves subject to Types B and C tests exceeding 0.60 L>>,
restore the overall integrated leakage rate to 6 0.75 La and the combined leakage rate for all penetrations and
'alves subject to Types B and C tests to 6 0.60 L>> prior to increasing the Reactor Coolant System temperature above 200'F.
SURVEILLANCE RE UIREMENTS 4.6.1.2          Perform leakage rate testing in accordance with 10 CFR 50 Appendix J Option B and Regulatory Guide 1.163, dated September 1995.
: a.        Each containment air lock shall be verified to be in compliance with the requirements of Specification 3.6.1.3.
: b.        The provisions  of Specification 4.0.2 are not applicable.
COOK NUCLEAR PLANT-UNIT2                            Page 3/4 6-2                      AMENDME<NT445,        ~,
 
3/4      LIMITINGCONDITIONS FOR OPERATION AND SURVEILLANCE REQUIREMENTS 3/4.6    CONTAINMENTSYSTEMS CONTAINMENTAIR LOCKS LIMITINGCONDITION FOR OPERATION 3.6.1.3            Each containment air lock shall be OPERABLE with:
Both doors closed except when the air lock is being used for normal transit entry and exit through the containment, then at least one air lock door shall be closed, and An overall air lock leakage rate of  6 0.05 La at Pa, 12.0 psig.
APPLICABILITY:            MODES      I, 2, 3 and 4.
ACTION:
With an air lock inoperable, maintain at least one door closed; restore the air lock to OPERABLE status within 24 hours or be in at least HOT STANDBY within the next 6 hours and in COLD SHUTDOWN within the following 30 hours.
SURVEILLANCE RE UIREMENTS 4.6.1.3          Each containment air lock shall be demonstrated OPERABLE:
: a.      In accordance with 10 CFR 50 Appendix J Option B and Regulatory Guide 1.163, dated September 1995, and
: b.      At least once per 6 months by verifying that only one door in each air lock can be opened at a time.
COOK NUCLEAR PLANT-UNIT2                            Page 3/4 64                              AMENDMENT
 
0 3/4  LIMITINGCONDITIONS FOR OPERATION AND SURVEILLANCEREQUIREMENTS 3/4.6 CONTAINMENTSYSTEMS This Page Intentionally Left Blank COOK NUCLEAR PLANT-UNIT2            Page 3/4 6-5              AMENDMENT
 
0 3/4      LIMITINGCONDITIONS FOR OPERATION AND SURVEILLANCE REQUIREMENTS 3/4.6    CONTAINMENTSYSTEMS CONTAINMENTSTRUCTURAL INTEGRITY LIMITINGCONDITION FOR OPERATION 3.6.1.6          The structural integrity of the containment shall be maintained at a level consistent with the acceptance criteria in Specification 4.6.1.6.
APPLICABILITY:            MODES 1, 2, 3 and 4.
ACTION:
With the structural integrity of the containment not conforming to the above requirements, restore the structural integrity to within the limits prior to increasing the Reactor Coolant System temperature above 200'P.
SURVEILLANCE RE UIREMENTS 4.6.1.6          The structural integrity of the containment structure and steel liner shall be determined in accordance with 10 CFR 50 Appendix J Option B and Regulatory Guide 1.163, dated September 1995.
COOK NUCLEAR PLANT-UNIT2                            Page 3/4 6-9                        AMENDMENT438,
 
3/4      LIMITINGCONDITIONS FOR OPERATION AND SURVEILLANCE REQUIREMENTS 3/4.6    CONTAINMENTSYSTEMS CONTAINMENTVENTILATIONSYSTEM LIMITINGCONDITION FOR OPERATION 3.6.1.7        The containment purge supply and exhaust system shall be closed except when operation of the containment purge system is required for pressure control, ALARA, and respirable air quality considerations for personnel entry, and for surveillance testing and maintenance activities. No more than one purge supply path and one purge exhaust path shall be open at a time.
APPLICABILITY:          MODES 1, 2, 3, and 4.
ACTION:
With one containment purge supply and/or one exhaust isolation valve inoperable, isolate the affected penetration by use of at least one automatic valve secured in the closed position, and, within 72 hours, either:
: 1)      Restore the inoperable valve to OPERABLE status, or,
: 2)        Deactivate the automatic valve secured in the closed position.
Operation may then continue until performance of the next required valve test provided that the automatic valve secured in the closed position is verified to be deactivated in the closed position at least once per 31 days.
Otherwise, be in at least HOT STANDBY within the next 6 hours and in COLD SHUTDOWN within the following 30 hours.
The provisions of Specification 3.0.4 are not applicable.
SURVEILLANCE RE UIREMENTS 4.6.1.7.1      The surveillance requirements  of Technical Specifications 3/4.6.1.2  arid 3/4.6.3.1 apply.
COOK NUCLEAR PLANT-UNIT2                        Page 3/4 6-9a                      AMENDMENT47) 4R,
 
4 4}}

Latest revision as of 01:15, 4 February 2020

Proposed Tech Specs 3/4.6.1.2,3/4.6.1.3,3/4.6/1/6 & 3/4.6.1.7,replacing Option a Scheduling Requirements for Types A,B & C Tests (Overall Integrated & Local Containment Leakage Rate) W/Requirement Per 10CFR50 App J Option B
ML17333A241
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 12/19/1995
From:
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
To:
Shared Package
ML17333A240 List:
References
NUDOCS 9512260234
Download: ML17333A241 (26)


Text

ATTACHMENT 2 TO AEP:NRC:1215B EXISTING TECHNICAL SPECIFICATION PAGES MARKED TO REFLECT PROPOSED CHANGES 95122b0234 951219 PDR ADOCK 05000315 P PDR

CONTAXNMENT SYSTEMS CONTAXNMENT LEAKAGE LXMXTXNG CONDXTXON FOR OPERATXON 3.6.l..2 Containmene leakage rates shall be limited to:

a. An overall integrated leakage rate of sL0.25 percene by weight of the coneainment air per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> ae P 12.0 psig, and
b. A combined leakage rate of i0.60 L, for all peneeraeions and valves subject eo Types B and C.tests when pressurized to P,.

1 APPLXCABXLXTY: Modes 1, 2, 3 and 4.

ACTXON:

Pith either (a) the measured overall integrated containment leakage rate exceeding 0.75 L, or (b) with the measured combined leakage rate for all penetrations and valves subject eo es B and C tests exceedin 0.60 A5."rophMolWtHys4am eentesaPu g4~ g, &O <s7S~nad +4. ~1~ AyPMOP&gh le+~

+0 7~+0 SAW Q HsQ +as > Oi(pO LC +lid'4 Q ~CA4+51~ le.

SURVEXLLANCE RE UXREMENTS

~

o~ M~~~ hu4z

~~~~ <w~~

fuaaQPaue~+so<$

c b~ 20o ~gag

~Ot at~~

C.

lee~

Joss(M7 4.6;1.2 n i en ' le r ed a ,b dern t ee at o o n ee e e nd a b det d nf 51 d.

x.te 0

a s

pe f iX'. A end 97:

C 5 es , B C er I egr ed d al mbi d Le ge e t tin ha be ond ed a or ce e em ts s ci ed. Ap d t 0 mo ve ex io Each. coneainment air lock shall be verified to be in compliance with the requirements of Specification 3.6.1.3.

The provisions op Speoipioaeion'4.0.2 ase noe appileah1e.

f Aon -tim e ens n f e e ti erv is llo d fo th th d e A st e s on 10 ea se ce rio ori nail sc d d b p rfo ed tt e do Cy e . e e tw be er rm p or o nit es art o ow g e e re el g o age at 11 ol w e Cy e COOK NUCLEAR PLANT - UHXT L 3/4 6-2 AHENDHENT NO. 48,460,4$ 7-

A. 4.6.1.2 Perform leakage rate testing in accordance with 10 CFR 50 Appendix J Option B and Regulatory Guide 1.163, dated September 1995.

B. 4.6.1.3 In accordance with 10 CFR 50 Appendix J Option B and Regulatory Guide 1.163, dated September 1995, and C. 4.6.1.6 The structural integrity of the containment structure and steel liner shall be determined in accordance with 10 CFR 50 Appendix J Option B and Regulatory Guide 1.163, dated September 1995.

CONTAINMENT SYSTEMS CONTAINMENT AIR LIMITING CONDITION LOCKS FOR OPERATION

~a (t

3.6.1.3 Each containment air lock shall be OPERABLE with:

a. Both doors closed. except when= the air lock is being used, for normal 'transit entry and exit through the containment, then at least one air lock door shall'be closed, and
b. An overall air lock leakage rate of to 0.05 L at P , 12 psig.

MODES a'PPLICABILITY:

1, 2, 3 and 4.

ACTXON:

Wi.th an air lock i.noperable, restore the air lock to OPERABLE status within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> or be in at least HOT STANDBY wi.thin, the next.6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SWgDOMN within the following 30 hours.

SURVEILLANCE RE UIRBfEVZS 4.6.1.3 Each containment air lock shall be demonstrated OPERABLE:

te air i itpt allen aI each en , ex ck ein used or mu pie tz

'n , w e do at to e pe s ~

per r 1 ge est ou s aced res e for o e r b pres i@i the p .be een e s s t 2 ig d v xfy g a s le ge no ater an .5 Ex p on o p i "J" of C 5 COOK NUCLEAR PLANT - UNIT 1 3/4 6-4 AMENDMENT NO. ~ (~ )

CONTAImENT Sysyms

(

'). SURVEILLANCE RE UIREMENTS Continued

b. t le onc per mon , pe orm air akage st w out s ated ess e fo e on e do per .6.1.3 ., pe orm a air aka test th s ed p ssure'rce :th door,.

y p ssur ing e ga etwe "the als t 12 p g a v fyi a se lea ge o o gr ter 0'. 5 all

'ir a't:

c east ce 6 m ths b cond ing ov a -lock t

~

aka test P 2 ps and y ve fyi that' over loc ea e rat is w in i lim v~hac At least once per 6 months by verifying that only one door in each 4o air lock can be opened at a time.

~,

C COOK NUCLEAR PIANT - UNIT 1 3/4 6-5 AMENDMENT NO. 160

CONThINMENT SYSTEMS CONThINMENT STRUCZUEUQ. INTEGRITY LXMXTINC CONDITION FOR'PERhTXON 3.6.1.6 The structural integrity of 'the containment structure and steel liner shall be maintained at a level consistent vSth the acceptance criteria in Specification 4.6.1.6.

APPLICABILITY: MODES 1, 2, 3 and 4.

I JLCTXOH:

Pith the structural integrity of the containment not conforming to the above requirements, restore their structural integrity to vithin the limits 0 prior to increasing the Reactor. Coolant System temperature above 200 F.

SURVEILLhNCE RE UIREMENTS 4.6.1. 6 e ruc al te ty the ta nt s c and teel 1 al e te ed in the s tdo or e 4 c ta nt n

ea a

ge ate ac 'si nt est an e s ef ence pecif ati ace in ppear of th stru e

. 6.

st

'by 1

vi r an 1

verif ecti g

app s ce o the ac or er no eg at I hn it re rt o ny erma deg tish of e co inme s 1 er d ecte ur thes ins cti be e vI. 1 y er d ecti F

COOK NUCLEhR PLANT - UNIT 1 3/4 6-9 hMENDMENT NO:~

3/4 3/4.6 0

LIMITINGCONDITIONS FOR OPERATION AND SURVEILLANCEREQUIREi~q7$

CONTAPS IEiVl SYSTEMS I

CONTAINMENTUENTILATIONSYSTEM LIMITINGCONDITION FOR OPERATION 3.6.l.7 The coatainmcat purge supply aad exhaust system shall bc closed.except when operation of thc containmcat purge system is required for ptessute coatto1, AUG', and rcspirablc air quaHty coasidctatioas for personnel catty, and for sutveiHancc testing and maintenance activities. No more than onc purge supply path and oac purge exhaust path shaH bc open at a time.

APPLICABILITY: MODES I, 2, 3, aad 4.

ACTION'.

With onc eontaiameat purge supply and/or one exhaust isolation valve inoperable, isolate thc affected pcaetratioa by usc of at least oac automauc valve secuted in thc. closed positioa, and, withia 72 bouts, either:

I) Restore the iaoperablc valve to OPERABLE status, or,

2) Deactivate thc automatic valve secured in the dosed position.
b. Operatioa may thea coatiaue until performance of the next tequited valve test provided that thc automatic valve scouted in thc closed position is vcriTied to be deactivated ia the closed po'sitioa at least once per 3l days.

c.. Otherwise, bc in at least HOT STANDBY withh thc next 6 heirs and h COLD SHUTDOWN within the fallowing 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />. ('. 'I I d. Thc provisions of SpcciGeation 3.0.4 ate not applicable.

SURUEILLANCE RE UIREMENTS 4.6.l.7.1 The survciHanee requirements of Tcchnical Speeilication 3/4.66.I apply.

5 r/v.(.,(,z. a~A COOK i IUCLEAR PLANT-UiT I Page 3/4 6 9a AiIEND~IZix66

P 0

CON AINMENT SYSTEMS CONTAINM-"NT LEAKAGE LIMITI G CONDIT ON FOR OPERATION 3.6.1.2 Containment leakage rates shall be limited to:

a. An overall integrated leakage rate of sL, 0.25 percent by weight of the containment air per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> at P12.0 psig, and
b. A combined leakage rate of s0.60 L, for 'all penetrations and valves subject to Types' and C tests when pressurized to P,.

ACTION; With either (a) the measured overall integrated containment leakage rate exceeding 0.75 L or (b) with the measured combined leakage rate for all penetrations and valves sub]ect to Types B and C tests exceeding 0.60 L restore the overall integrated leakage rate to s0.75 L, and the combined leakage rate for all penetrations and valves sub]ect to TypeSB and C tests to s0.60 L, prior to f increasing the Reactor Coolant System temperature above 200'F.

SURVEILLANCE RE UIREMENTS 4.6.1.2 Th co ai nt aka rate sha 'be mo rat at e f ow st ch cri ri spe fie ule and all n A end e

J term ed o 10 50 c

usi o

the ce e

i ds p vi ons f N4 .4.>i, 2:

es, B an C ( era I egra ed d ca Co ine Lea ge e) esti g sh 1 b co cte in cc e w h t re ire nts pec ed n' end J o C 5 odi ed app oved xe io Each containment air lock shall be verified to be in compliance with the requirements of Specification 3.6.1.3.

The provisions of Specification 4.0.2 are not applicable.

I e ime exe tio to 0 C 50 Ap ndix, ect ns X..2(a an

.D. , w ch low the ovi on of T n al ec ca on . .8 o e pli le COOK NUCLEAR PZANT - UNXT 2 3/4 6-2 AMENDMENT NO. ~, 173

A. 4.6.1.2 Perform leakage rate testing in accordance with 10 CFR 50 Appendix J Option B and Regulatory Guide 1.163, dated September 1995.

B. 4.6.1.3 In accordance with 10 CFR 50 Appendix J Option B and Regulatory Guide 1.163, dated September 1995, and C. 4.6.1.6 The structural integrity of the containment structure and steel liner shall be determined in accordance with 10 CFR 50 Appendix- J Option B and Regulatory Guide 1.163, dated September 1995.

('. )

CONTAINMENT SYSTEHS CONTAINMENT AIR LOCKS LIHITINC CONDITION FOR OPERATION 3.6.1.3 Each containment air lock shall be OPERABLE with:

a. - Both doors closed except when the air lock is being used for normal transit entry and -exit:-through the contaireent, then at least one air 1ock door shall be closed, a.,d
b. An overall air lock leakage rate of < 0.05 La at Pa, 12.0 psig.

APPLICADILITY: NODES I, 2, 3 and a.

ACTION:

Mith an air lock inoperable, maintain at least one door closed; restore the air lock to OPERABLE status within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> or be in at least HCT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in. COLD SHUTDOWN within the followinq 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

SLR".EILLANCE REQUIREMENTS 4.6.1.3 Each containment air lock shall be demonstrated OPERABLE:

a. ter i lti e g,en es pt he t st o e p 72 urs.

ch pen ex en e a 1oc s b no sed r 1 by erf rmi an a le age est itho a s ula pr re orc on t do by ess izi the olum etw n

. Rzq~'

th do seal to ps an veri ing sea eak e rat. )+t n great t n 0. L . 8, lea o e p 6m ths y pe ormi an r le ge tes it ut sim ated res re f ce o the r pe

.1.3; t by erfo ing a air itci cat S 4 akage a s ula d pr sur for on e do~r y pr suri g e v ume etwe th oor eals 12 ig a veri ing a s 11 kag .rae fn area rtha 0.00 L.

x so oA end ."J" fl FR 5.

0. '. COOK'NI T - 2 3/4 6-4

CONTAINMENT SYSTEMS SURVEILLANCE RE UIREMENTS (Continued)

c. At east air

,aka ock tes nce at akag r

P 6

.12 ate

', 'ts nths s wit y cond an ',veting fyi .ov that

>mit 11 ai e ov oc a'll At least once per 6 months by verifying that only one door in each air lock can be opened at a time.

0. C. COOK - UNIT 2 3/4 6-5

CONTAINMENT SYSTEMS CONTAINMENT STRUCTURAL INTEGRITY LIMITINQ CONDITION FOR OPERATION 3.6.1.6 The structu=al integrity of the containment shall be maintained at a level consistent youth the acceptance criteria in Specification 4.6.1.6.

APPLIChBILITY: MODES 1, 2, 3 and 4.

JUNCTION:

Vith the structural integrity of the containment not confoxming to the above recpxirements, restore the structural integxity to vithin the limits prior to 0

increasing the Reactor Coolant System temperature above 200 F.

SURVEILLANCE RE UHKKENTS 4.6.1.6 e ruc 1 in grity f th con en sha be ezm d dux'in he tdo for ach T e h nta ent aka rate est efere ce Spe fic ion .1.2 by a sua ins tion expo d. ac ssibl ter r and xter r s aces th cont en , inc ding e 1 z pl e, an erif g n appar t c ges ap ran of e aces oth norma deg ti COOK NUCLEAR PLANT - UNIT 2 3/4 6-9 AMENDMENT NO. 138

3/4 LIMITINGCONDITIONS FOR. OPERATION AND SVRVEILLANCEREQUIREMENTS.;,',:.., '." ".;."

3/4.6 CONTAINMENTSYSTEMS 0 AfNME VENTI TION SYSTEM LIMITI G COND1TI N FOR PERA 0 3.6.1.7 Thc eoataiament purge supply and exhaust system shaH bc closed except when operation of thc coat;iiament purge,systctn is tcttuited for ptcssute control, ALPRA. and tespirablc air'quality."

considerations for personnel catty,: aad for.sutvcBIancc testing aad maiatemuice aetiyiYies.','Po.

morc than oac purge supply path aad oac purge exhaust path shaH bc open at a time.

ACTI NN:

With onc containmeat purge supply aad/or oac exhaust isohtioa valve inopcrablc, isolate penetration by use of at least oac automatic valve secured in the dosed posiYion,'ad, the'ffected withia 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />, either:

I) Restore thc iaoperablc valve to OPERABLE status, or,

2) Deactivate thc automatic.valve secured ia thc dosed posiYioa.

~ Operation may then continue uatil performance of the next requited valve test provitlcd that thc

'utomatic valve secured ia thc dosed posiYioa is verified to be deactivated in the closed posiYion at least once per 31 days..

.Otherwise; bc in at last HOT STANDBY withh thc aext 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> aad in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

Thc provisions of Specification 3'.4 ate not appHcablc.

SURVEILLANCE RE UIREMENTS 4.6.1.7.1 Thc surveiHaacc requitetnents of Teeluucal SpeciQcatio 3/4.6p.l apply.

i ~

e COOK iiUCLEAR PLAif1-~e Page 3/4 6-9a Ai>IEG)CLIENT ~

181

ATTACHMENT 3 TO AEP:NRC:1215B PROPOSED REVISED TECHNICAL SPECIFICATION PAGES

3/4 LIMITINGCONDITIONS FOR OPERATION AND SURVEILLANCEREQUIREMENTS 3/4.6 CONTAINMENTSYSTEMS CONTAINMENT LEAKAGE LIMITINGCONDITION FOR OPERATION 3.6.1.2 Containment leakage rates shall be limited to:

An overall integrated leakage rate of 6 La, 0.25 percent by weight of the containment air per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> at Pa, 12.0 psig, and A combined leakage rate of 6 0.60 La for all penetrations and valves subject to Types B and C tests when pressurized to Pa.

APPLICABILITY: MODES 1, 2, 3 and 4.

ACTION:

With either (a) the measured overall integrated containment leakage rate exceeding 0.75 La, or (b) with the measured combined leakage rate for all penetrations and valves subject to Types B and C tests exceeding 0.60 La, restore the overall integrated leakage rate to S 0.75 La and the combined leakage rate for all penetrations and valves subject to Types B and C tests to 6 0.60 La prior to increasing the Reactor Coolant System temperature above 200'F.

SURVEILLANCE RE UIREMENTS 4.6.1.2 Perform leakage rate testing in accordance with 10 CFR 50 Appendix J Option B and Regulatory Guide 1.163, dated September 1995.

a. Each containment air lock shall be verified to be in compliance with the requirements of Specification 3.6.1.3.
b. The provisions of Specification 4.0.2 are not applicable.

COOK NUCLEAR PLANT-UNIT 1 Page 3/4 6-2 AMENDMENT4S, 4', 4', 406,

3/4 LIMITINGCONDITIONS FOR OPERATION AND SURVEILLANCE REQUIREMENTS 3/4.6 CONTAINMENTSYSTEMS CONTAINMENT AIR LOCKS LIMITINGCONDITION FOR OPERATION 3.6.1.3 Each containment air lock shall be OPERABLE with:

Both doors closed except when the air lock is being used for normal transit entry and exit through the containment, then at least one air lock door shall be closed, and

b. An overall air lock leakage rate of 6 0.05 La at Pa, 12 psig.

APPLICABILITY: MODES 1, 2, 3 and 4.

ACTION:

With an air lock inoperable, restore the air lock to OPERABLE status within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

SURVEILLANCE RE UIREMENTS 4.6.1.3 Each containment air lock shall be demonstrated OPERABLE:

a. In accordance with 10 CFR 50 Appendix J Option B and Regulatory Guide 1.163, dated September 1995, and At least once per 6 months by verifying that only one door in each air lock can be opened at a time.

COOK NUCLEAR PLANT-UNIT 1 Page 3/4 6C AMENDMENT440,

0 3/4 LIMITINGCONDITIONS FOR OPERATION AND SURVEILLANCE REQUIREMENTS 3/4.6 CONTAINMENTSYSTEMS This Page Intentionally Left Blank

'OOK NUCLEAR PLANT-UNITI Page 3/4 6-5

3/4 LIMITINGCONDITIONS FOR OPERATION AND SURVEILLANCE REQUIREMENTS 3/4.6 CONTAINMENTSYSTEMS CONTAINMENTSTRUCTURAL INTEGRITY LIMITINGCONDITION FOR OPERATION 3.6.1.6 The structural integrity of the containment structure and steel liner shall be maintained at a level consistent with the acceptance criteria in Specification 4.6.1.6.

APPLICABILITY: MODES 1, 2, 3 and 4.

ACTION:

With the structural integrity of the containment not conforming to the above requirements, restore the structural integrity to within the limits prior to increasing the Reactor Coolant System temperature above 200'F.

SURVEILLANCE RE UIREMENTS 4.6.1.6 The structural integrity of the containment structure and steel liner shall be determined in accordance with 10 CFR 50 Appendix J Option B and Regulatory Guide 1.163, dated September 1995.

COOK NUCLEAR PLANT-UNIT 1 Page 3/4 6-9

3/4 LIMITINGCONDITIONS FOR OPERATION AND SURVEILLANCE REQUIREMENTS 3/4.6 CONTAINMENTSYSTEMS CONTAINMENT VENTILATIONSYSTEM LIMITINGCONDITION FOR OPERATION 3.6.1.7 The containment purge supply and exhaust system shall be closed except when operation of the containment purge system is required for pressure control, ALARA, and respirable air quality considerations for personnel entry, and for surveillance testing and maintenance activities. No more than one purge supply path and one purge exhaust path shall be open at a time.

APPLICABILITY: MODES 1, 2, 3, and 4.

ACTION:

ao With one containment purge supply and/or one exhaust'isolation valve inoperable, isolate the affected penetration by use of at least one automatic valve secured in the closed position, and, within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />, either:

I) Restore the inoperable valve to OPERABLE status, or,

2) Deactivate the automatic valve secured in the closed position.

Operation may then continue until performance of the next required valve test provided that the automatic valve secured in the closed position is verified to be deactivated in the closed position at least once per 31 days.

Otherwise, be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

The provisions of Specification 3.0.4 are not applicable.

SURVEILLANCE RE UIREMENTS 4.6.1.7.1 The surveillance requirements of Technical Specifications 3/4.6.1.2 and 3/4.6.3.1 apply.

COOK NUCLEAR PLANT-UNIT 1 Page 3/4 6-9a AMENDMENT66; 40$ ,

3/4 LIMITINGCONDITIONS FOR OPERATION AND SURVEILLANCE REQUIREMENTS 3/4.6 CONTAINME<NTSYSTEMS CONTAINMENTLEAKAGE LIMITINGCONDITION FOR OPERATION 3.6.1.2 Containment leakage rates shall be limited to:

ao An overall integrated leakage rate of 6 La, 0.25 percent by weight of the containment air per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> at Pa, 12 psig.

A combined leakage rate of 6 0.60 La for all penetrations and valves subject to Types B and C tests when pressurized to Pa.

APPLICABILITY: MODES 1, 2, 3 and 4.

ACTION:

With either (a) the measured overall integrated containment leakage rate exceeding 0.75 La, or (b) with the measured combined leakage rate for all penetrations and valves subject to Types B and C tests exceeding 0.60 L>>,

restore the overall integrated leakage rate to 6 0.75 La and the combined leakage rate for all penetrations and

'alves subject to Types B and C tests to 6 0.60 L>> prior to increasing the Reactor Coolant System temperature above 200'F.

SURVEILLANCE RE UIREMENTS 4.6.1.2 Perform leakage rate testing in accordance with 10 CFR 50 Appendix J Option B and Regulatory Guide 1.163, dated September 1995.

a. Each containment air lock shall be verified to be in compliance with the requirements of Specification 3.6.1.3.
b. The provisions of Specification 4.0.2 are not applicable.

COOK NUCLEAR PLANT-UNIT2 Page 3/4 6-2 AMENDME<NT445, ~,

3/4 LIMITINGCONDITIONS FOR OPERATION AND SURVEILLANCE REQUIREMENTS 3/4.6 CONTAINMENTSYSTEMS CONTAINMENTAIR LOCKS LIMITINGCONDITION FOR OPERATION 3.6.1.3 Each containment air lock shall be OPERABLE with:

Both doors closed except when the air lock is being used for normal transit entry and exit through the containment, then at least one air lock door shall be closed, and An overall air lock leakage rate of 6 0.05 La at Pa, 12.0 psig.

APPLICABILITY: MODES I, 2, 3 and 4.

ACTION:

With an air lock inoperable, maintain at least one door closed; restore the air lock to OPERABLE status within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

SURVEILLANCE RE UIREMENTS 4.6.1.3 Each containment air lock shall be demonstrated OPERABLE:

a. In accordance with 10 CFR 50 Appendix J Option B and Regulatory Guide 1.163, dated September 1995, and
b. At least once per 6 months by verifying that only one door in each air lock can be opened at a time.

COOK NUCLEAR PLANT-UNIT2 Page 3/4 64 AMENDMENT

0 3/4 LIMITINGCONDITIONS FOR OPERATION AND SURVEILLANCEREQUIREMENTS 3/4.6 CONTAINMENTSYSTEMS This Page Intentionally Left Blank COOK NUCLEAR PLANT-UNIT2 Page 3/4 6-5 AMENDMENT

0 3/4 LIMITINGCONDITIONS FOR OPERATION AND SURVEILLANCE REQUIREMENTS 3/4.6 CONTAINMENTSYSTEMS CONTAINMENTSTRUCTURAL INTEGRITY LIMITINGCONDITION FOR OPERATION 3.6.1.6 The structural integrity of the containment shall be maintained at a level consistent with the acceptance criteria in Specification 4.6.1.6.

APPLICABILITY: MODES 1, 2, 3 and 4.

ACTION:

With the structural integrity of the containment not conforming to the above requirements, restore the structural integrity to within the limits prior to increasing the Reactor Coolant System temperature above 200'P.

SURVEILLANCE RE UIREMENTS 4.6.1.6 The structural integrity of the containment structure and steel liner shall be determined in accordance with 10 CFR 50 Appendix J Option B and Regulatory Guide 1.163, dated September 1995.

COOK NUCLEAR PLANT-UNIT2 Page 3/4 6-9 AMENDMENT438,

3/4 LIMITINGCONDITIONS FOR OPERATION AND SURVEILLANCE REQUIREMENTS 3/4.6 CONTAINMENTSYSTEMS CONTAINMENTVENTILATIONSYSTEM LIMITINGCONDITION FOR OPERATION 3.6.1.7 The containment purge supply and exhaust system shall be closed except when operation of the containment purge system is required for pressure control, ALARA, and respirable air quality considerations for personnel entry, and for surveillance testing and maintenance activities. No more than one purge supply path and one purge exhaust path shall be open at a time.

APPLICABILITY: MODES 1, 2, 3, and 4.

ACTION:

With one containment purge supply and/or one exhaust isolation valve inoperable, isolate the affected penetration by use of at least one automatic valve secured in the closed position, and, within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />, either:

1) Restore the inoperable valve to OPERABLE status, or,
2) Deactivate the automatic valve secured in the closed position.

Operation may then continue until performance of the next required valve test provided that the automatic valve secured in the closed position is verified to be deactivated in the closed position at least once per 31 days.

Otherwise, be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

The provisions of Specification 3.0.4 are not applicable.

SURVEILLANCE RE UIREMENTS 4.6.1.7.1 The surveillance requirements of Technical Specifications 3/4.6.1.2 arid 3/4.6.3.1 apply.

COOK NUCLEAR PLANT-UNIT2 Page 3/4 6-9a AMENDMENT47) 4R,

4 4