ML17249A290: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(4 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 11/15/1979
| issue date = 11/15/1979
| title = App C to QA Manual Re Revised Inservice Pump & Valve Testing Program for May 1979-Dec 1980
| title = App C to QA Manual Re Revised Inservice Pump & Valve Testing Program for May 1979-Dec 1980
| author name = ANDERSON C R, CURTIS A E, MACREDY R C
| author name = Anderson C, Curtis A, Macredy R
| author affiliation = ROCHESTER GAS & ELECTRIC CORP.
| author affiliation = ROCHESTER GAS & ELECTRIC CORP.
| addressee name =  
| addressee name =  
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:QUALITYASSURANCEMANUALSECT.NO.EFFECTIVEDATE8EV.PAGE4990A'"39ROCHESTERGAS6ELECTRICCORPORATIONGINNASTATIONNovember1,l979SIGNATUREDATEAppendixC-GinnaStationInservicePumpandValveTestingProgramfortheMay1,1979throughDecember31,1980PeriodPREPAREDBYREVIEWEDBYAPPROVEDBYIIJGttProramTableofContentsIntroduction:Definitions:DiscussionProgram:PVT1.0ScopeandResponsibilityPVT2.0CodeEditionandTestingIntervalPVT3.0InservicePumpTestingProgramPVT4.0InserviceValveTestingProgramPVT5.0Records 01 QUALITYASSURANCEMANUALGINNASTATIONTITLE:,AppendixCPumpandValveTestingProgramDATE11/1/79PAGEoF39IntroductionThisappendixtotheQualityAssuranceManualdefinestheInservicePumpandValveTestingProgramforthetwentymonthperiodstartingMay1,1979through'December31,1980.IncludedinthisprogramaretheQualityGroupsA,BandCPumpswhichareprovidedwithanemergencypowersourceandthoseQuality"GroupsA,BandCValveswhicharerequiredtoshutdownthereactorortomitigatetheconsequencesofanaccidentandmaintainthereactorinasafeshutdowncondition.ThisprogramhasbeendevelopedasrequiredbySection50.55(a)(g)of10CFR50followingtheguidanceoftheASMEBoilerandPressureVesselCodeSectionXI-"RulesforInserviceInspectionofNuclearPowerPlantComponents,"(hereafterreferredtoasthe"Code")excludingthecontrolsoftheAuthorizedInspector,EnforcementAuthority,Report-ingSystemsandN-StampSymbol.Theinservicetestingpro-gramshallbecontrolledbytheGinnaStationQualityAssur-anceProgramforStationOperation.QualityGroupsA,BandCcomponentscorrespondtothosedefinedinNRCRegula-toryGuide1.26.FurtheraddendaandeditionsofSectionXIoftheCodeshall'beusedforclarificationoftestrequirementsandperformance.TheInservicePumpandValveTestingProgramdoesnotaffectthepumpandvalvesurveillanceprogramrequiredbyTechnicalSpecifications.TechnicalSpecificationre--=quirementsshallcontinuetobeimplementedat,therequiredfrequency.
{{#Wiki_filter:49 90A SECT. NO.       8 EV.         PAGE QUALITY ASSURANCE MANUAL                                              '"   39 EFFECTIVE DATE November 1, l979 ROCHESTER GAS 6 ELECTRIC CORPORATION                        SIGNATURE          DATE GINNA STATION PREPARED BY Appendix  C  Ginna Station REVIEWED BY Inservice  Pump and Valve Testing                                      II JG Program for the May 1, 1979 through December 31, 1980 Period      APPROVED BY tt Pro ram Table  of Contents
QUALITYASSURANCEMANUALGINNASTATIONTITLE:AppendixCPumpandValveTestingProgram4000CoF39DATEll/I/79PAGEDefinitionsAFPAOVAPVBACodeCCCSCSPCVC/RECCSFCVGAGDTHCVHXLCVMAFPMOVMVPCVPIVPORVPRTPRVPVTQRRCDTRCPRCVRHRRMWRVRWSTRXS/GSAFWPSISIVSWAuxiliaryFeedwaterPumpsAirOperatedValveAirOperatedPistonValveBoricAcidAmericanSocietyofMechanicalEBoilerandPressureVesselCodeComponent'oolingContainmentSprayContainmentSprayPumpCheckValveColdShutdownandRefuelingEmergencyCoreCoolingSystemFlowControlValveGasAnalyzerGasDecayTankHandControlValveHeatExchangerLevelControlValveMotorDrivenAuxiliaryFeedwaterMotorOperatedValveManualValvePressureControlValvePrimaryIsolationValvePowerOperatedReliefValvePressurizerReliefTankPressureReliefValvePumpandValveTestingQuarterlyRefuelingOutageReactorCoolantDrainTankReactorCoolantPumpRadiationControlValveResidualHeatRemovalReactorMakeupWaterReliefValveRefuelingWaterStorageTankReactorVesselSteamGeneratorStandbyAuxiliaryFeedwaterPumpSafetyInjectionSecondaryIsolationValveServiceWaterngzneersPump QUALITYASSURANCEMANUALGINNASTATIONTITLE:AppendixCPumpandValveTestingProgramDATE11/1/79PAGE40OOC4ow39DefinitionsTAFPVCVCTVHTurbineDrivenAuxiliaryFeedwaterPumpVolumeControlVolumeControlTankVentHeader QUALITYASSURANCEMANUALGINNASTATIONTITLE:AppendixCPumpandValveTestingProgramDATE11/1/79PAGE49QOC5DF39PumandValveTestinProramPVT1.0ScoeandResonsibilit1-2.TheinservicetestingprogramdefinesthetestingprogramforQualityGroupsA,BandCPumpsandValvesinaccordancewiththerequirementsofArticlesIWPandIWVofSectionXIoftheCode.Theresults,ofthesetestsaretoassuretheoperationalreadinessof.pumpsandvalves.ItistheresponsibilityoftheGinnaStationTestandResultsSupervisortoimplementthistestprogramanddevelopinservicetestproce-dureswhichwilloutlinethespecifictestforeachpumpandvalveincludedintheprogram.1.3Whenavalveoritscontrolsystemhasbeenreplacedorrepairedorhasundergonemaintenancethatcouldaffectitsperformance,andpriortothetimeitisreturnedtoservice,itshallbetestedasnecessarytodemonstratethattheper-formanceparameterswhichcouldhavebeenaffectedbythereplacement,repair,ormaintenancearewithinacceptablelimits.PVT2.0CodeEditionandTestinInterval2.1TheInservicePumpandValveTestingProgramforthetwenty(20)monthperiodstartingMay1,1979throughDecember31,1980wasdevelopedutilizingthe1974EditionofSectionXIoftheCodethroughtheSummer1975Addenda.PVT3.0InservicePumTestinProram3.1TheInservicePumpTestingProgramwasdevelopedinaccordancewiththerequirementsofArticleIWPofSectionXIoftheCode.ThisprogramincludesallQualityGroupA,BandCpumpswhichareprovidedwithanemergencypowersourceandarerequiredtosafely.shutdownthereactorortomitigatetheconsequencesofanaccidentandmaintainthereactorinasafeshutdowncondition.
04 QUALITYASSURANCEMANUALGINNASTATIONTITLE:AppendixCPumpandValveTestingProgramDATE11/1/79PAGE40OOC6DP393.2Thefollowingpumpsshallbetestedinaccord-ancewithArticleIWPofSectionXI:(a)(b)(c)(d)(e)(f)(g)(h).(i)(j)(k)(1)(m)(n)(o)(p)(q)(r)lAComponentCooling1BComponentCooling1ASafetyInjection1BSafetyInjectionlCSafetyInjectionlAResidualHeatRemoval1BResidualHeatRemovallAContainmentSpray1BContainmentSpraylAMotorDrivenAuxiliaryFeedwaterlBMotorDrivenAuxiliaryFeedwaterTurbineDrivenAuxiliaryFeed1AServiceWater1BServiceWater1CServiceWaterlDServiceWater1CStandbyAuxiliaryFeedwater1DStandbyAuxiliaryFeedwaterFlowrateswillnotbeaccuratefortheresidualheatremovalpumpsbecausethebypass.testloopcanonlypass200gpm.Thisbypasstestloopisafixedresistancesystem;therefore,hydraulicresistanceremainsunchangedfromtesttotest.3.4Bearingtemperatureswillnot,beavailablefortheServiceWaterpumps.'hesepumpsandtheirbearingsaresubmersedinfortyfeetofwater,makingitimpossibletotakemeasurements.Be-causetheyaresubmersed,thebearingtemperaturesstayveryclosetothetemperatureoftheintakewater.PVT4.0InserviceValveTestinProram4.1TheInserviceValveTestingProgramwasdevelopedinaccordancewiththerequirementsofArticleIWVofSectionXIoftheCode.Allthosevalvesthatarerequired'toperformasafetyfunctioneithertoshutdownthereactorortomitigatetheconsequencesofanaccidentandmaintainthereactorinasafeshutdownconditionareincluded-intheprogram.
QUALITYASSURANCEMANUALGINNASTATIONTITLE:AppendixCPumpandValveTestingProgramO.,49OOCDATE11/1/79PAGEoF394.2TheInserviceValveTestingProgramRequirementsforCategoryAandBValvesarefoundinTablesPVT4.8and4.9,respectively.CategoryCValvesarebrokendownintotwocategories,CheckValvesandReliefValves,whicharefoundin.TablesPVT4.10and4.11,respectively.CategoryDValvesarenotincludedinthistestingprogrambecausetherearenoneincludedinGinnaStationdesign.CategoryEValvesarefoundinTablePVT'.12.4.3Someexceptionsandexemptionstothetestingre-quirementsofArticleIWVhavebeentakenbasedonoperationalinterference,placingtheplantinanunsafeconditionandTechnicalSpecificationrequirements.Allexceptionsandexemptionsarelistedonthevalvetablesandexplainedinthereferencednotes,PVT4.13.4.4TheexercisingprogramforCategoryAandBValves,withtheexceptionofcheckvalves,shallrequireacompletestrokingofeachvalveperthevalvetestingtables.Allcheckvalves,includingCategoryCValves,shallbeexercisedtotheposi-tionrequiredtofulfilltheirfunction.Thesefunctionaltestsshallbeverifiedbytheoperationoftherequiredsystem.4.5CategoryAandBvalvesoperationshallbetimedeachtimetheyarestrokedut'ilizingswitchinitiationandthepositionindicators,whichareaccessibleduringplantoperation.Duringeachrefuelingoutageavisualverificationshallbemadetoconfirmdirectcorrespondencebetweenvalveoperatorsandthepositionindicators.4.6InaccordancewithparagraphIWV-3700ofSectionXIoftheCode,CategoryEValvesarecontrolledinaccordancewithGinnaStationAdministrationproce-dureA-52.2-ControlofLockedValveOperation.Thisprocedurerequiresalloperationsoflockedvalvestoberecordedinthe"LockedValveOper-ationsLog"orasrequiredbycertainoperationalprocedureswhichalsorecordanylockedvalveoperations.
0LK QUALITYASSURANCEMANUALGINNASTATIONTITLE:AppendixCPumpandValveTestingProgram19OOCDP39DATE11/1/79PAGE47Thetestingofvalvesrequiredatcoldshutdownandrefuelingoutageswillnormallytakefour(4)daystocomplete.Whencoldshutdownsareofashorterduration(2-3days),testpersonnelshallattempttotestasmanyvalvesaspossiblewithoutholdingupthestartupoftheunitwithtestingbeginningnolongerthan48hoursaftertheplantreachescoldshutdown(as"definedinTechnicalSpecification1.2).Forveryshortcoldshutdowns(lessthan48hours),itwouldbeimpossibletomobilizetestpersonneltoimplementthetestingprogramundertherequiredproceduralcontrols,thereforenovalveswouldbetested.Itispossiblethat,duringafour(4)daycoldshutdown,theworkloadontestpersonnelmayprecludetheircompletionofalltherequiredvalvetestspriortostartup.Valvetestingduringcoldshutdownsshallnotbemorefrequentthanonetestperquarterforeachvalveinthetestprogram.4.8CategoryAValvesValveN~TeDescritionNoteTestpFreer304A304BCV1-ARCPSealXnjectionCV1-BRCPSealXnjectionStrokeC/RStrokeC/R313MOVSealWaterReturnIsolationStrokeLeakC/RR370B371383B508CVChargingLineXsolationAOVLetdownXsolationCVAlternateChargingLineAOVRMWtoContainmentVesselStopStrokeC/RStrokeLeaklStrokeC/RRC/RStrokeQLeakR (0L QUALITYASSURANCEMANUALGINNASTATIONTITLE:AppendixCPumpandValveTestingProgram4090Cor-39DATE11/1/79PAGEValveI~TeDescritionNoteTestFreer529CVRMWtoPRT539AOVPRTStop>ValvetoGasAnalyzer528CVN2SupplytoPRTStrokeQLeakRStrokeQLeakRStrokeQLeakR743CVCCFromExcessLetdownHX.StrokeQLeakR745750A750B759A759B813814846862A862BAOVReturnFromExcessLet-downHX.CVCCtoARCPCVCCtoBRCPMOVContainmentStopCCFromLoopARCPMOVContainmentStopCCFromLoopBRCPMOVSupplyCCtoRXSupportCoolersMOVReturnCCtoRXSupportCoolersAOVN2SupplytoAccumulatorsCV1-ACSPDischCV1-BCSPDischStrokeQLeakRStrokeC/RLeakRStrokeC/RLeakRStrokeC/RLeakRStrokeC/RLeakRStrokeC/RLeakRStrokeC/RLeakRStrokeQLeakRStrokeQLeakRStrokeQLeakR 0<r QUALITYASSURANCEMANUALGINNASTATIONTITLE:,AppendixCPumpandValveTestingProgramOATE11/1/79PAGE4090C10or-39ValveNTvVeNoteTestFreer870ACV1-Ato1-CSIPump.DischStrokeLeakQR870BCV1-Bto1-CSIPumpDisch'trokeLeakQR879889AHVSITestL'ineIsolationCV1-ASIPumpDischStrokeLeakRStroke'LeakR8898966A966B966C1003A'V1-BSIPumpDischAOVPressurizerSteamSpaceVCIsolationAOVPressurizerLiquidSpaceVCIsolationAOVLoopAandBHotLegVCIsolationLCV1-ARCDTPumpSuctionStrokeQLeakRStrokeQLeakRStrokeQLeakRStrokeQLeakRStrokeQLeakR1003B17131721LCV1-BRCDTPumpSuctionCVN2toRCDTCheckAOVSuctionlinetoRCDTStrokeQLeakRStrokeQLeakRStrokeQ,LeakR17231728AOVAContainmentSumpDischStoptoWasteHoldupTankAOVAContainmentSumpDischStoptoWasteHoldupTankStrokeQLeak"RStrokeQLeakR 0,
QUALITYASSURANCEMANUALGINNASTATIONTITLEAppendixCPumpandValveTestingProgramDATE11/1/79PAGE11oF39Valve5~Te1786AOVRCDTtoVHNoteTestFreerStrokeQLeakR17871789AOVRCDTtoVHAOVRCDTtoGA'utletIsolationStrokeLeakStrokeLeak5869APVContainmentPurgeSupplyIsolationStrokeQLeakR587058785879APVContainmentPurgeSupplyIsolationAPVContainment.PurgeExhaustIsolationAPVContainmentPurgeExhaustIsolationStrokeLeakStrokeLeakStrokeLeakQRQRQR7226CVDIWaterIsolationInsideContainmentI4'.9CategoryBValvesStrokeLeakQRValve0~TeDescritionNoteTestFreer014017081APVControlRoomVentilationDamperRCVAuxBuildingGDTRelease.RCVCompCoolSurgeTankVent,StrokeStrokeStrokeQ082083084APVAPVAPVControlRoomVentilationDamperControlRoomVentilationDamperControlRoomVentilationDamperStrokeQStrokeQStrokeQ IWQUALITYASSURANCEMANUALGINNASTATIONTITLE:AppendixCPumpandValveTestingProgramDATE11/1/79PAGE12DF39085APVValveN~TeDescritionControlRoomVentilationDamperNoteTestFreerStrokeQ086112BAPVLCVControlRoomVentilationDamperEmergency'akeupRWSTtoChargingPumpStrokeQStrokeQ112C427624625626700LCVVCTOutletAOVLetdownFromLoopBHCV1-BRHRHXOutletHCV1-ARHRHXOutletFCVRHRLoopReturnMOVSuctionStopFromLoopAtoRHRPumpsStrokeQStrokeC/RStrokeQStrokeQStrokeQStrokeC/R701MOVSuctionStopFromLoopAtoRHRPumps8StrokeC/R704A704B720721738A738B825AMOVSuction1-ARHRPumpMOVSuction1-BRHRPump'OVMOV10"DischargetoBLoopFromRHRPumps10"DischtoBLoopFromRHRPumpsMOVCCto1-ARHRHXMOVCCto1-BRHRHXrMOVSIPumpSuction'romRWSTStrokeQStrokeQ8StrokeC/R8StrokeC/RStrokeQStrokeQ9.StrokeC/R825BMOVSIPumpSuctionFromRWST.9StrokeC/R QUALITYASSURANCEMANUALGINNASTATIONTITLE:AppendixCPumpandValveTestingProgramPATE11/1/794990CPAGE13pp39ValveN~TeDescrition826AMOVSIPumpSuctionFromBATankNoteTestFreerStrokeQ826BMOVSIPumpSuctionFromBATankStrokeQ826C826DMOVSIPumpSuctionFromBATankMOVSIPumpSuctionFromBATankStrokeQStrokeQ836A836B850A850B852A852B856857A857B857C860AHCVSprayAdditiveTankDis-chargePHCVSprayAdditiveTankDis-chargeMOV,SumpBtoRHRPumpsMOVSumpBtoRHRPumpsMOVRHRPumpstoRXVesselMOVRHRPumpstoRXVesselMOVRWSTtoRHRPumpsMOVIsolate1BRHRHXFrom.CSandSIPumpsMOVIsolate1ARHRHXFromCSandSIPumpsMOVIsolate1ARHRHXFromCSandSIPumpsMOVParallelDischargeMOVFrom1-ACSPStrokeQStrokeQStroke,QStrokeQStrokeQStrokeQStrokeC/RStrokeQStrokeQStrokeQStrokeQ


QUALITYASSURANCEMANUALGINNASTATIONTITLE:AppendixCPumpandValveTestingProgramPATE11/1/79PAGE14PP39860BMOVValveN~TeDescritionParallelDischargeMOVFrom1-ACSPNoteTest~FreStroke.Q860C860DMOVMOVParallelDischargeMOVFrom1-BCSPParallelDischargeMOVFrom1-BCSPStrokeQStrokeQ871A871BMOV1-Ato1-CSIPumpDischarge-MOV1-Bto1-CSIPumpDischarge-StrokeQStrokeQ875A875B876A876BMOVMOVMOVMOVParallelMOVFromCSPumpsto1ACharcoalFilterDelugeParallelMOVFromCSPumpsto1ACharcoalFilterDelugeParallelMOVFromCSPumpsto1BCharcoalFilterDelugeParallelMOVFromCSPumpsto1BCharcoalFilterDelugeStrokeQStrokeQStrokeQStrokeQ896A896B1815AMOVC-SIPumpSuctionFromRWSTMOVRWSTtoCSandSIPumpsMOVRWSTtoCSandSIPumps9'trokeC/R9StrokeC/RStrokeQ1815BMOVC-SIPumpSuctionFromRWSTStrokeQStrokeQ35043505MOVMainSteamtoTAFPFroml-BS/GMOVMainSteamtoTAFPFrom1-AS/GhStrokeQ 0l~t QUALITYASSURANCEMANUALGINNASTATIONTITLEAppendixCPumpandValveTestingProgramDATE11/1/79PAGE15DF39ValveN~TeDescritionNoteTestFreer3652MVMainSteamThrottleValvetoTAFPStroke39964000A4000B40074008MOVTAFPDischargeMOVMOVMOV1-AMAFPDischargeMOV1-BMAFPDischargeCrossOverValveForMAFPtCrossOverValveForMAFPStrokeStroke'trokeStrokeStroke.Q40134027MOVMOVTAFPServiceWaterSupplyIsolation1-AMAFPServiceWaterIsolationStrokeStrokeQ4028MOV1-BMAFPServiceWaterIsolationStrokeQ4291429742984304AOV1-AMAFPRecirculationControlAOVTAFPRecir.LineAOVTAFPDischargeto1-AS/GAOVTAFPDischargeto1-BS/GStrokeStrokeStrokeStroke431045614562AOVAOVAOV1-BMAFPRecirculationControlContainmentVentRecirc.FansDischargeFlowCon-trolContainmentVent.Recirc.FansDischargeFlowCon-trolBypassStrokeQStrokeQStrokeQ QUALITYASSURANCEMANUALGINNASTATIONTITI.E:AppendixCPumpandValveTestingProgramDATE11/1/79PAGE16DP394609MOV~Va1veI~TelAlScreenHouseSWIsolationNoteTestFreerStrokeQ4613MOV1B2TurbineBuildingSWIsolationStrokeQ4614461546164663466446704733MOVMOVMOVMOVMOVMOVMOVlAlTurbineBuildingSWIsolation1B1Aux.BuildingSWIsolation1AlAux.BuildingSWIsolation1A1AirCond.ChillersSWIsolation1A2TurbineBuildingSWIsolation1B1TurbineBuildingSWIsolationlA2AirCond.ChillersSWIsolationStrokeQStrokeQStrokeQStrokeQStrokeQStrokeQStrokeQ473447354780MOV1A2ScreenHouseSWIsolationMOV1B2Aux.Build.SWIsolation-MOV1A2Aux.Build.SWIsolation-StrokeQStrokeQStrokeQ517158715872MOVAPVAPVTurbineBuild.FireWaterLoopSupplyIsolationContainmentPostAccidentFilterDamperContainmentPostAccidentFilterDamperStrokeQStrokeQStrokeQ QUALITYASSURANCEMANUALGINNASTATIONTITLE:AppendixCPumpandValveTestingProgramDATE11/1/79PAGE40OOC17oF39Va1ve0~Te5873APVContainmentPostAccidentFilterDamperNoteTestFreerStrokeQ587458755876APV,ContainmentPostAccidentFilterDamperAPVContainmentPostAccidentFilterDamperAPVContainmentPostAccidentFilterDamperStrokeQStrokeQStrokeQ9629AMOV1CSAFPServiceWaterIsolation9629BMOV1DSAFPServiceWaterIsolation9701AMOV1CSAFPDischarge9701BMOV1DSAFPDischarge9703AMOVSAFPCrossOver9703BMOVSAFPCrossOver9704AMOV1CSAFPContainmentIsolationStrokeQStrokeQStrokeQStrokeQStrokeQStrokeQStrokeQValve'N~TeDescrition710A710BCV-1-ARHRPumpDischargeCV1-BRHRPumpDischarge9704BMOV1DSAFPContainmentIsolation9710AAOV1CSAFPRecirc.Control9710BAOV1DSAFPRecirc.Control4.10CategoryCCheckValvesStrokeQStrokeQStorkeQNoteTestFreerStrokeQStrokeQ 0mY QUALITYASSURANCEMANUALGINNASTATIONTITLE:AppendixCPumpandValveTestingProgramDATE11/1/79PAGE49OOC18oF39ValveN~TeDescritionNoteTestFreer723A723BCV1-ACCPumpDischargeCV1-BCCPumpDischargeStrokeQStrokeQ842A842B847A847BCVCVCVCVFirst.CheckValveinLoopAAccumulator*DumpLineFirstCheckValveinLoopBAccumulatorDumpLineA-CSPFromSprayAdditiveTanktoEductorB-CSPFromSprayAdditiveTanktoEductorStrokeQStrokeQStrokeQStrokeQ853A853B854866ACVCSPump1-AtoCharcoalFilterDelugeCVCoreDelugeCheckCVCoreDelugeCheckCVRWSTtoRHRPumpCheck10St.rokeR10StrokeRllStroke'/R12StrokeC/R866B867A867B878G878JCV,CVCVCVCVCSPump1-BtoCharcoalFilterDelugeAccumulator,DumpandSItoColdLegLoopBAccumulatorDumpandSItoColdLegLoopA,1-ASIPumptoColdLegLoopBAfterMOV878B1-BSIPumptoColdLegLoopAAfterMOV878DStrokeQ13StrokeC/R13StrokeC/R13StrokeC/R13.StrokeC/R
== Introduction:==
Discussion Definitions:
Program:     PVT  1.0  Scope and  Responsibility PVT  2.0 Code Edition and Testing Interval PVT  3.0 Inservice Pump Testing Program PVT  4.0 Inservice Valve Testing Program PVT  5.0  Records


TITLE:DATE4090CQUALITYASSURANCEMANUALGINNASTATIONAppendixCPumpandValveTestingProgram11/1/79PAGE1939ValveN~TeDescritionNoteTestFreer35163517CVCV1BS/GMainSteamSwingCheckStopValvelAS/GMainSteamSwingCheckStopValve1414StrokeStrokeStart-upStart-up39984000CCVlAMAFPDischargeDownstreamMOV-4007CVTAFPDischargeCheckStrokeStroke4000DCV1BMAFPDischargeDownstreamMOV-4008StrokeQ4003400440094010401440164017402346014602CVCV1AServiceDischarge1BServiceDischargeWaterPumpWaterPumpCVTAFPtoS/GlACVTAFPtoS/G1BCVlAMAFPtoS/GlACV1BMAFPtoS/G1BCVTAFPCondensateSuctionCV1BMAFPSuctionCV1AMAFPSuction'CVTAFPRecirculationStrokeQStrokeQStrokeQStrokeQStrokeQStrokeQStrokeQStrokeQStrokeQStrokeQ46034604CVCV1CServiceWaterPumpDischarge1DServiceWaterPumpDischargeStrokeQStrokeQ O.lC'1N'I~'t QUALITYASSURANCEMANUALGINNASTATIONTITLE:AppendixCPumpandValveTestingProgramDATE11/1/79PAGE49OOC20DF39ValveI~TeDescritionNoteTestFreer513351369627A.9627B9700ACVDieselFirePumpDisch.CVMotorFirePumpDischargeCV1CSAFPSWSuctionCV1DSAFPSWSuctionCV1CSAFPDischarge9705A9705BCV1CSAFPtoS/G1ACV1DSAFPtoS/G1B4.11CategoryCReliefValve9700BCV1DSAFPDischargeStrokeQStrokeQStrokeQStrokeQStrokeQStrokeQStrokeQStrokeQValveI~TeDescritionNoteTest~reer203209430431CRVRVPORVPORVLetdownHighPressureSafetyReliefLetdownLowPressureSafetyReliefPrimarySystemReliefPrimarySystemRelief151516StrokeR16StrokeR434435732RVPressurizerReliefRVPressurizerReliefRVCCSurgeTankRelief15744755ARVRVCCFromExcessLetdownHeatExchangerCCFromARCPThermalBarrier15 QUALITYASSURANCEMANUALGINNASTATIONTITLE:AppendixCPumpandValveTestingProgramOATE11/1/79PAGE4990C21or.39ValveN~TeDescritionNoteTestFreer755BRVCCFromBRCPThermalBarrier15758ARVCCFromA-RCPOilCoolers15758B818RVCCFromB-RCPOilCoolersRVCCFromReactorSupportCoolers1515'61RV1-BCSPumpSuctionRelief15887181735083509351035113512351335143515465346544657RVOnSITestLineInsideContainmentRVAlternateSuctionFromRHRPumptoCSIPumpRV1-BS/GPRVRV1-AS/GPRVRV1-BS/GPRVRV1-AS/GPRVRV1AS/GPRVRV1-AS./GPRVRV1-BS/GPRVRV1-AS/GPRVRVServiceWaterReliefRVServiceWaterReliefRVServiceWaterRelief151515151515151515151551345135RVDieselFirePumpDischR.V.15RVMotorFirePumpDischR.V.15 QUALITYASSURANCEMANUALGINNASTATIONTITLE:AppendixCPumpandValveTestingProgramDATE11/1/79PAGE22DP394.12CategoryE-LockedValvesValve5~TeDescritionNormalPosition220246279A279B279C311BMVMVMVMVMVMVCationBedResinFillCationBedLetdownInlet1AChargingPumpReliefLockOpenValve1BChargingPumpReliefLockOpenValve1CChargingPumpReliefLockOpenValveExcessLetdowntoSealWaterReturnClosedClosedOpenOpenOpenOpen329336MVMVlABoricAcidPumpRecir-culation1ABoricAcidTransferPumpSuctionFlushOpenClosed337MV1BBoricAcidTransferPumpSuctionFlushClosed344353369379380381382MV1BBoricAcidPumpRecir-culationMVCationBedRMWBackwashSupplyMVCationBedSpentResinOutletMVRMWEmergencyBorationSupplyFlushingMVLetdownLineSampleandReturnMVCationBedLetdownOutletMVCationBedOutletHutDrainOpenClosed=ClosedClosedClosedClosedClosed IJVhH QUALITYASSURANCEMANUALGINNASTATIONTITLE:AppendixCPumpandValveTestingProgramDATE11/1/79PAGE23oF39Valve5~TeNormalPosition384B543544703705C705DMVChargingLineOutletMVLetdownStopValveMVExcessLetdownMVStop'RHR'OutRHRHX'stoLetdownMVValve850APressureReliefBonnetVentMVValve850BPressureReliefBonnetVent.OpenOpenOpenOpenOpenOpen707A707B708A708B709A709B714715716717728748A748BMVCCto1AResidualHeatPumpMVCCto1BResidualHeat.PumpMVCCFromlAResidualHeatPumpMVCCFrom1BResidualHeat.PumpMVDischargeStoplARHRPumpMVDischargeStop1BRHRPumpMVRHRtolARHRHXMVRHROut1BRHRHXMVRHRto1BRHRHXMVRHROut1ARHRHX.MVCCHXSurgeLineStopMVCCSupplytoDistillateCoolerB.A.Pack.MVCCSupplytoDistillateCoolerB.A.Pack.OpenOpenOpenOpenOpenOpenOpenOpenOpenOpenOpenOpenOpen QUALITYASSURANCEMANUALGINNASTATIONTITLE:AppendixCPumpandValveTestingPxogramDATE11/1/79PAGE24DF39ValveN~TeNormalPosition764CMVCombinedCCReturnFromSIPumpsThrottled764DMVCombinedCCReturnFromCon-tainmentSprayPumpsThrottled769777AMVCombinedStopCCFromRHRPumps"ThrottledMVCCtolAContainment.SprayPumpOpen777B777C777D777E777F777G777H777J777K777L777M777N777P777R777S788AMVCCFrom1ASIPumpMVCCTolASIPumpMVCCFrom1CSIPumpMV'CTo1CSIPumpMVCCTo1BSIPumpMVCCFrom1BSIPumpMVMVMVrMVMVMVMVCCTolASIPumpCCFromlASIPumpCCTo1CSIPumpCCFrom1CSIPumpCCFrom1BSIPumpCCTo1BSIPumpMakeupWaterValvetoSFPMVCCFromlAContainmentSprayPumpMVCCFrom1BContainmentSprayPumpMVCCFrom1BContainmentSprayPumpOpenOpenOpenOpenOpenOpenOpenOpenOpenOpenOpenOpenOpenOpenOpenClosed O.(~'II QUALITYASSURANCEMANUAL6INNASTATIONTITLE:AppendixCPumpandValveTestingProgramDATE11/1/79PAGE4090C25DF39803MV804MV822BMV831AMVValveN~TeDescritionSFPFilterDischargetoRUSTSFPHXBy-passFromSFPFilterRHRPumpRecirculationSprayAdditiveTankPromCSPumpSuctionNormalPositionClosedThrottledOpenOpen831B858A858B859A859B864A864BMVMVMVMVMVMVMVSprayAdditiveTankFromCSPumpSuctionSuctionValvetoCSPumplASuctionValvetoCSPump1BTestLineValveFromCSPump1ATestLineValveFromCSPump1BTestConnectiononDischargeLineofCSPumplATestConnectiononDischargeLineofCSPump1BOpenOpenOpenClosedClosedClosedClosed868A868BMVDischargeValveFromCSPumplAMV'ischargeValveFromCSPump1BOpenOpen873A873B873C873DMVMVMVMVSprayAdditiveTankfromCSPumpsOpenSprayAdditiveTankfromCSPumpsOpenSprayAdditiveTankfromCSPumpsClosedSprayAdditiveTankfromCSPumpsClosed878EMVManualValueAfterMOV878DFrom1BSIPHeadertoColdLegLoopAOpen 4'C QUALITYASSURANCEMANUALGINNASTATIONTITLE:AppendixCPumpandValveTestingProgramOATE11/1/79PAGE26OF39ValveII~TeNormalPosition879880B880C881A881B881C881D888A888B890A890BMVSITestLineMVLoopBAccumulatorTestLineMVLoopAAccumulatorTestLineMVSprayAdditiveTankDrainMVSprayAdditiveTankOutletMVSprayAdditiveEductorOutletMVSprayAdditiveEductorOutletMVlASIPumpDischargeMV1BSIPumpDischargeMVSuctionForSIPump1AMVSuctionForSIPump1BMVFI-903OutlettoChemDrainTankClosedOpenOpenClosedOpenOpenOpenOpenOpenOpenOpenClosed1076A1076B108OA1084A1084B1100B1100CMVBHydrogenRecombinerMainBurnerMVVCTRelieftoCVCSHoldupTankN1ClosedOpenMVVCTRelieftoCVCSHoldupTankp2OpenMVAHydrogenRecombinerPilotLineClosedMVBHydrogenRecombinerPilotLineClosedMVHydrogenRecombinerOxygenMakeupClosedMVAHydrogenRecombinerMainBurnerClosed1100DMVVCTRelieftoCVCSHoldupTank.N3Open1102MVCVCSHut.53OutlettoVentHeaderOpen QUALITYASSURANCEMANUALGINNASTATIONTITLE:AppendixCPumpandValveTestingProgramDATE11/1/79PAGE27oF39ValveI~Te1123AMVDescritionCVCSHoldupTankg3Vent1239MVRMWPumpsSuctionfromMonitorTanks1123BMVCVCSHoldupTankN2Vent1123CMVCVCSHoldupTankgiVentNormalPositionClosedClosedClosedClosed12491252MVMVMonitorPumpDischargeWasteDischargelsol.MonitorPumpDischargetoRMWTanksClosedClosed1256AMVRMWPumpsandMontiorPumpDis-ClosedchargeX-TlE12631264MVCVCSHut52OutlettoVentHeaderOpenMVCVCSHutN1OUtlettoVentHeaderOpen1269MVVentHeaderXsol.ValuetoCVCSHut'sOpen,,15541556155715591560156215631565MVDRecirculationFanAirSampleMVDRecirculationFanAIrSampleMVARecirculationFanAirSampleMVARecirculationFanAirSampleMVAandDRecirculationFansAirSampleReturnMVAandDRecirculationFansAirSampleReturnMVBRecirculationFanAirSample.MVBRecirculationFanAirSampleClosedClosedClosedClosedClosedClosedClosedClosed E
0 1 TITLE:,                          DATE QUALITY ASSURANCE                                        11/1/79 MANUAL                  Appendix C              PAGE GINNA STATION            Pump and Valve Testing Program                      oF  39 Introduction This appendix to the Quality Assurance Manual defines the Inservice Pump and Valve Testing Program for the twenty month period starting May 1, 1979 through'December 31, 1980. Included in this program are the Quality Groups A, B and C Pumps which are provided with an emergency power source and those Quality" Groups A, B and C Valves which are required to shut down the reactor or to mitigate the consequences of an accident and maintain the reactor in a safe shutdown condition.
QUALITYASSURANCEMANUALGINNASTATIONTITLE:AppendixCPumpandValveTestingProgramOATE11/1/79PAGE28oF39ValveI~Te1566MVDescritionBRecirculationFanAirSampleReturnNormalPositionClosed1568MVBRecirculationFanAirSampleReturnClosed156915711572MVMVMVCRecirculationFanAirSampleCRecirculationFanAirSampleCRecirculationFanAirSampleReturnClosedClosedClosed1574MVCRecirculationFairAirSampleClosedReturn161316171618161916201656A1656B1656C1656DMVVH-HUTCrossConnectIsol.MV51GDTManualDischargeMV52GDTManualDischargeMVg3GDTManualDischargeMVN4GDTManualDischargeMVNlGDTRuptureDisc.OutlettoHUTMVN2GDTRuptureDisc.OutlettoHUTMVN3GDTRuptureDisc.OutlettoHUTMVN4GDTRuptureDisc.OutlettoHUTOpenClosedClosedClosedClosed1-TurnOpen1-TurnOpen1-TurnOpen1-TurnOpen1667MVN2Supplyto1AWGC16691701MVN2Supplyto1BWGCMVLaundryandHotShowerCrossTieClosedClosedClosed QUALITYASSURANCE'ANUALGINNASTATIONTITLE:AppendixCPumpandValveTestingProgramDATE11/1/7940QOCPAGE/29DP391722MVValveN~TeDescritionRefuelingCanalDraintoRCDTPumpNormalPositionClosed17481749MVMVChem+LaundryTankOutletCross-TieChem+La'undryPumpDischargeStopValveClosedClosed1762MVWasteHoldupTankPumpDischargeClosedtoWCT's17851795B1795E1795F1820AMVMVMVMVMVMasterWasteDischargeValveR-18MonitorBypassValueWMonitorInletWMonitorOutletShutoffValveforASIPumpTestLineClosedClosedClosedClosedOpen1820B1820CMVMV"ShutoffValveforCSIPumpTestLineShutoffValveforBSIPumpTestLineOpenOpen2231MVLetdownLineCont.OutletDrainClosed28602865MVMVIsol.ValvefromCSP-1AtoChar-OpencoalFilterDelugeIsol.ValvefromCSP-1BtoChar-iOpencoalFilterDeluge352839703971MVMVMainSteamtoAuxiliaryFeedwaterPump1BFeedwaterPumpSuctionValve1AFeedwaterPumpSuctionValveOpenOpenOpen 0T QUALITYASSURANCEMANUALGINNASTATIONTITLE:AppendixCPumpandValveTestingProgramDATE11/1/79PAGE30DF39Valve0~TeDescritionNormalPosition40054006401140124015401840194038MVMVMVMVMVTurbineDrivenAFWS/G1AStopTurbineDrivenAFWS/G1BStopMotorDrivenAFWS/G1AStopMotorDrivenAFWS/G1BStopTAFPSuctionIsolationMVlBMAFPSuctionIsolationMVMVlAMAFPSuctionIsolation1BFeedwaterPumpWarm-upOrificeIsol.OpenOpenOpenOpenOpenOpenOpenClosed40394040404140604061'VMVMVMVMV1AFeedwaterPumpWarm-upOrificeIsol.1BFeedwaterPumpWarm-upOrificeIsol.1AFeedwaterPumpWarm-upOrificeIsol.1AFeedwaterPumpRecirc.Cond.Isol.1BFeedwaterPumpRecirc..Cond.IsolClosedClosedClosedOpenOpen40704070AMVMVCondensateStorageTank1BIsolationCond.StorageTankBMakeuptoHotwellOpenOpen4071MVCondensateStorageTank1AIsolationOpen4071AMVCond.StorageTankAMakeuptoHotwellOpen 1P QUALITYASSURANCEMANUALGINNASTATIONTITLE:AppendixCPumpandValveTestingProgramOATE11/1/79PAGE40OOC31oP39Va1veN~Te4071BMVDescritionCond.MakeupLinetoHotwellDrainNormalPositionClosed4072MV1BCondencateStorageTankDrainClosed407340744075408040814082MVMVMVMVMVMVlACondensateStorageTankDrainAFPRecirculationto1BConden-sateStorageAFPRecirculationtolAConden-sateStorageTAFPDischargeOrificeIsolation1AMAFPDischargeOrificeIsolation1BMAFPDischargeOrificeIsolationClosedOpenOpenOpenOpenOpen4098414043444345473847394789MVServiceWaterIsolationtoTAFPMVHeaterDrainTankLC3343Isol.MVServiceWaterIsolationtoMDAFPMVServiceWaterto1AMAFPMVAServiceWaterLooptoCCMVB.ServiceWaterLooptoCCMVSIPumpBearingOilCoolerIsolationClosedOpenClosedClosedOpenOpenOpen47904791MVSIPumpBearingOilCoolerIsolationMVlASIPumpBear'ingOilCoolerInlet.OpenOpen Ch~
This program has been developed as required by Section 50.55(a)(g) of 10CFR50 following the guidance          of the ASME Boiler and Pressure Vessel Code Section XI - "Rules for Inservice Inspection of Nuclear Power Plant Components,"
QUALITYASSURANCEMANUALGINNASTATIONTITLE:AppendixCPumpandValveTestingProgramDATE11/1/79PAGE49OOC32DF394791AMVValveN~TeDescritionlASIPumpBearingOilCoolerOutletNormalPositionOpen47944794A47954795AMVMVMVMV1BSIPumpBearingOilCoolerInlet1BSIPuihpBearingOilCoolerOutlet1CSIPumpBearingOilCoolerInlet'CSIPumpBearingOilCoolerOutletOpenOpenOpenOpen5100514151425172517351745196MVMVMVMVMVMVMVMVTestLineIsol.DieselFirePumpDischargeMotorFirePumpDischargeAreaN1DelugeSupplyXsol.AreaNlDelugeSupplyXsol.TurbineBldg.FireWaterLoopDivisionTurbineBldg.FireWaterSupplyLoopDivisionStorageTankHighLevelDrainControlIsol.OpenOpenOpenOpenClosedOpenOpenOpen5197MVSorageTankOutletCheckIsol.Open-5198MVStorageTankOutletCheckXsol.Open5200MVStorageTankOutletCheckBypassClosed QUALITYASSURANCEMANUALGINNASTATIONTITLE:AppendixCPumpandValveTestingProgramDATE11/1/79PAGE40OOC33DF39Va1veN~TeDescritionNormalPosition520252205221523352435245524852505438544854625763MVMVMVMVMVMVMVMVMVMVMVMVTurbineBldg.FireWaterSupplyLoopDivisionMotorFirePumpDischargeIsol.FirePumpCrossoverServiceBldg.SprinklerSys.N13Isol.Deluge"A"HeaderIsol.Deluge"B"HeaderSupplyIsol.AFWPumpOilRes.DelugeSupplyIsol.TestLineFlowControlOilBowsertoTurbineOilTankIsol.WaterFeedtoOilCoolderInletIsol.TurbineLubeOilSampleS/GBlowdownfromNuclearSampleRoomOpenOpenClosedOpenOpenOpenOpenClosedClosedClosedClosedOpen5931593259355936MVMVMVMVlADieselGeneratorCoolingWaterOpen1BDieselGeneratorCoolingWaterOpen1ADieselGeneratorCoolingWaterOpen1BDieselGeneratorCoolingWaterOpen5947MV1ADieselGeneratorAirReceiverOutletOpen QUALITYASSURANCEMANUALGINNASTATIONTITLEAppendixCPumpandValveTestingProgramDATE11/1/79PAGE'34DF3940OOCValveN~Te5947AMVDescritionNormalPosition1ADieselGeneratorAirReceiverOutletOpen5948MV1BDieselGeneratorAirReceiverOutletOpen5948AMV5973MV1BDieselGeneratorAirReceiverOutlet1ADieselGeneratorIsolationValveOpenOpen5974MV5977C,MV5977DMV5978CMV5978DMV6151MV6152MV6165MV6175MV7140MV7141MV1BDieselGeneratorIsolationValvelADieselGeneratorDayTank'IlADieselGeneratorDraintoReservoir1BDieselGeneratorDayTank1BDieselGeneratorDraintoReservoirHeatingSteamtoCVHeatingReturnfromCVHeatingSteamtoCVCondensateReturnfromCVServiceAirGuardValveUpstreamSecondaryIsolationValveServiceAirIsolationValveOutsideContainmentOpenClosedClosedClosedClosedClosedClosedClosedClosed*ClosedClosed7227MV7448MVServiceAirIsolationValveInsideContainmentIsolationValvetoPressureIndicatorsClosedClosed 0JAI TITLE:OATE49ROCQUALITYASSURANCEMANUALGINNASTATIONAppendixCPumpandValveTestingProgram11/1/79PAGE35OP397452,MVValveN~TeDescritionIsolationValveforLocalPressureIndicatorsNormalPositionClosed7456MVIsolationValveforLocalPressureIndicatorsClosed84238425MVMV02toH2-RecombinerH2toHRecombiner"B"MainBurner-2"InsideIsol.OpenOpen8427MVHtoHIRecombiner"B"Pilot34"InsideIsol.Open8433MVH2toHRecombiner"A"MainBurner3"InsideIsol.Open8435MVHtoHIRecombiner"A"Pilot,.34"InsideIsol.Open9706A9706B97239725MVMVMVMV"C"SAFWPtoA-S/GStop"D"SAFWPtoB-S/GStopStandbyAuxiliaryFeedwaterSystemPressureTransmitterIsolation'StandbyAuxiliaryFeedwaterSystemPressureTransmitterIsolationOpenOpenClosedClosedMVFuelTransferIsolationValveClosed4.13InserviceValveTestingNotesNote1-Valves304A,304Band313cannotbestrokedduringnormalplantoperationonaquarterlybasisbecausetheywouldinterruptcoolantflowtothereactor.coolantpumpseals.Thesevalveswillbestrokedatcoldshutdownsandrefuel-ingoutages.
(hereafter referred to as the "Code" ) excluding the controls of the Authorized Inspector, Enforcement Authority, Report-ing Systems    and N-Stamp Symbol.      The inservice  testing pro-gram  shall  be controlled by the Ginna Station      Quality Assur-ance Program for Station Operation.          Quality Groups A, B and C components correspond to those        defined in NRC Regula-tory  Guide 1.26.
QUALITYASSURANCEMANUALGINNASTATIONTITLE:AppendixCPumpandValveTestingProgramOATE11/1/79PAGE36OF39Note2-Valve370Bcannotbestrokedduringnormalplantoperationonaquarterlybasisbecausethistestwouldinterruptchargingpumpflow.Thisvalvewillbestrokedatcoldshutdownsandrefuelingoutages.Note3-Note4-Valves371and427cannotbestrokedduringnormalplantoperationonaquarterlybasisbecausethistestwouldinterrupttheletdown(CVCS)system.Thesevalveswillbestrokedatcoldshutdownsandrefuelingoutages.Valve383Bcannotbestrokedduringnormalplantoperationonaquarterlybasisbecausethistestwouldresultinsubstantialradiationexposuretotestpersonnel.Arecent'surveyintheareaofthetestconnectionindicatedaneutronfieldof500mr/hrandagammafieldof250mr/hr.Thisvalvewillbestrokedatcoldshutdownsandrefuelingoutages.Note5-Note6-Valves750A,750B,759Aand759BcannotbestrokedduringnormalplantoperationonaquarterlybasisbecausethistestwouldrequirethereactorcoolantpumpstobeshutdowntoeliminatetheflowthroughthesechecksandMOVs.Thesevalveswillbestrokedatcoldshutdownsandrefuelingoutages.Valves813and8l4cannotbestrokedduringnormalplantoperationonaquarterlybasisbecausethistestwouldremovethecoolanttothereactorvesselsupportsandcavitywall.Thesevalveswillbestrokedatcoldshutdownsandrefuelingoutages.
Further addenda    and  editions of Section XI of the    Code shall  'be used  for clarification of test requirements      and performance.
P;4I QUALITYASSURANCEMANUALGINNASTATIONTITLE:AppendixCPumpandValveTestingProgramDATE11/1/79PAGEOF49OOCNote7-Valve879isamanualvalveinthesafetyinjectiontestlineandiskeptlockedshut.Thisvalveisnotrequiredtochangepositiontoperformasafetyfunc-tion.Theonlyrequirementisthatleak-agethroughvalve879beacceptablylow.Therefore,thequarterlystroketesthasbeendeleted.Thisvalve.willbeleaktestedatrefuelingoutages.Note8-Valves700and721cannotbestrokedduringnormalplantoperationonaquarterlybasisbecausethereisaninterlocksystemwhichpreventsthesevalvesfromopeningwhentheprimarysystemisatoperatingpressure.Valves700,701,720and72lseparateahighpressuresystemfromalowpressuresystem.Thesevalveswillbestrokedat.coldshutdownsandrefuel-ingoutages.Note9-Valves825A,825B,856,896A,and896Bshouldnotbestrokedduringnormalopera-tiononaquarterlybasisbecausethiswouldcauseatemporarylossofsystemfunctionoftheECCS.Thesevalvespro-videthesuctionfromtherefuelingwaterstoragetanktothesafetyinjectionandresidualheatremovalpumps.Thesevalveswillbestrokedatcoldshutdownsandre-fuelingoutages.Note10-Valves853Aand853Bcannotbestrokeddur-ingnormalplantoperationonaquarterlybasisbecause'thistestwouldpressurizetheRHRsystemtotheprimarysystemopera-tionpressure.Thesevalveswillbe'strokeatrefuelingoutages.
The  Inservice Pump and Valve Testing Program does not affect the pump and valve surveillance program required by Technical Specifications.          Technical Specification re--=
00gI+4 TITLE:DATE4990CQUALITYASSURANCEMANUALGINNASTATIONAppendixCPumpandValveTestingProgram11/1/79PAGE38oF39NoteNote11-I12-Valve854cannotbestroked,duringnormalplantoperationonaquarterlybasisbe-causethereisnotawaytoestablishaflowthroughthisvalvewhentheprimary'ystemisatpressureandtheRHRsystemisnotoperating.Thisvalvewillbestrokedatcoldshutdownsandrefuelingoutages.llValve866Acannotbestrokedduringnormalplantoperationonaquarterlybasisbecausethistestwouldresultinasubstantialradiationexposuretotestpersonnel.Arecentsurveyofthetestlocationindicatedagammafieldof800mr./hr.Thisvalvewillbestrokedatcoldshutdownsandrefuelingoutages.NoteNoteNote14-15-Valves867A,867B,878G,and878Jcannotbestrokedduringnormaloperationonaquarterlybasisbecausethistestcannotbedoenwhentheprimarysystemisatoperatingpressure.Thistestmayonlybedonewhentheplantisinacoldshutdownconditionwithapartiallyfull.primarysysteminordertopreventanoverpressurization.Valves3516and3517cannotbestrokedduringnormalplantoperationinaquarterlybasisbecausetheyarethemainsteamswingcheckstopvalves.Thesevalvesarestrokedduringeachplantstartup.CategoryCReliefValvesshallbetestedinaccordancewiththeextentandfrequencyrequirementsofParagraphIWV-3510ofArticleINVofSectionXIoftheCode.Note16Valves430and431Carethepower.operatedreliefvalvesassociatedwiththeoverpressurizationsystem.Thesevalvesshallbestrokedduringeachrefuelingoutageinaccordancewithnormalvalvetestingprocedures.
quirements shall    continue    to  be implemented at, the required frequency.
QUALITYASSURANCEMANUALGINNASTATIONTITLE:AppendixCPumpandValveTestingProgramDATE11/1/79PAGE40QOC39DF39PVT5.0Records5.1RecordsfortheInservicePumpTestingProgramshallbedevelopedandmaintainedinaccordancewithArticleIWP-6000ofSectionXIoftheCode.5.2RecordsfortheInserviceValveTestingProgramshallbedevelopedandmaintainedinaccordancewithArticleIWV-6000ofSectionXIoftheCode.}}
 
40 00C TITLE:                      DATE QUALITY ASSURANCE                                    ll/I/79 MANUAL                    Appendix C          PAGE GINNA STATION              Pump and Valve Testing Program                  oF 39 Definitions AFP                Auxiliary Feedwater Pumps AOV                Air Operated Valve APV                Air Operated Piston Valve BA                Boric Acid Code              American Society of Mechanical E ngzneers Boiler and Pressure Vessel Code CC                Component'ooling CS                Containment Spray CSP                Containment Spray Pump CV                Check Valve C/R                Cold Shutdown and Refueling ECCS                Emergency Core Cooling System FCV                Flow Control Valve GA                  Gas Analyzer GDT                Gas Decay Tank HCV                Hand Control Valve HX                  Heat Exchanger LCV                Level Control Valve MAFP                Motor Driven Auxiliary Feedwater  Pump MOV                Motor Operated Valve MV                  Manual Valve PCV                Pressure Control Valve PIV                Primary Isolation Valve PORV                Power Operated Relief Valve PRT                Pressurizer Relief Tank PRV                Pressure Relief Valve PVT                Pump and Valve Testing Q                  Quarterly R                  Refueling Outage RCDT                Reactor Coolant Drain Tank RCP                Reactor Coolant Pump RCV                Radiation Control Valve RHR                Residual Heat Removal RMW                Reactor Makeup Water RV                  Relief Valve RWST                Refueling Water Storage Tank RX                  Reactor Vessel S/G                Steam Generator SAFWP              Standby  Auxiliary Feedwater Pump SI                  Safety Injection SIV                Secondary Isolation Valve SW                  Service Water
 
40 OOC TITLE:                      DATE QUALITY ASSURANCE                                    11/1/79 MANUAL                    Appendix C          PAGE GINNA STATION              Pump and Valve Testing Program            4    ow 39 Definitions TAFP              Turbine Driven Auxiliary Feedwater  Pump VC                Volume Control VCT                Volume Control Tank VH                Vent Header
 
49 QOC TITLE:                          DATE QUALITY ASSURANCE                                        11/1/79 MANUAL                    Appendix C            PAGE GINNA STATION              Pump and Valve Testing Program              5    DF 39 Pum  and Valve    Testin  Pro ram PVT  1. 0    Sco e and Res    onsibilit The inservice testing program defines the testing program for Quality Groups A, B and C Pumps and Valves in accordance with the requirements of Articles IWP and IWV of Section XI of the Code.
The results, of these tests are to assure the operational readiness of. pumps and valves.
1- 2. It is the responsibility of the Ginna Station Test and Results Supervisor to implement this test program and develop inservice test proce-dures which will outline the specific test for each pump and valve included in the program.
1.3      When a  valve or its control system has been replaced or repaired or has undergone maintenance that could affect its performance, and prior to the time  it  is returned to service,  it  shall be tested as necessary to demonstrate that the per-formance parameters which could have been affected by the replacement, repair, or maintenance are within acceptable limits.
PVT  2. 0    Code  Edition and Testin Interval 2.1      The Inservice Pump and Valve Testing Program for the twenty (20) month period starting May 1, 1979 through December 31, 1980 was developed utilizing the 1974 Edition of Section XI of the Code through the    Summer  1975 Addenda.
PVT  3.0      Inservice Pum Testin Pro ram 3.1      The Inservice Pump Testing Program was developed in accordance with the requirements of Article IWP of Section XI of the Code.      This program includes all Quality Group A,    B  and C pumps which are provided with an emergency power source and are required to safely. shut down the reactor or to mitigate the consequences of an accident and maintain the reactor in a safe shutdown condition.
 
0 4
 
40 OOC TITLE:                         DATE QUALITY ASSURANCE                                        11/1/79 MANUAL                    Appendix C            PAGE GINNA STATION              Pump and Valve Testing Program              6    DP  39 3.2      The  following pumps shall be tested in accord-ance  with Article IWP of Section XI:
(a)  lA Component Cooling (b)  1B Component Cooling (c)  1A  Safety Injection (d)  1B  Safety Injection (e)  lC Safety Injection (f)  lA Residual Heat Removal (g)  1B Residual Heat Removal (h)  lA Containment Spray
              .(i)  1B  Containment Spray (j)  lA Motor Driven Auxiliary Feedwater (k)  lB Motor Driven Auxiliary Feedwater (1)  Turbine Driven Auxiliary Feed (m)  1A Service Water (n)  1B Service Water (o)  1C Service Water (p)  lD Service Water (q)  1C  Standby  Auxiliary Feedwater (r)  1D  Standby  Auxiliary Feedwater Flow rates will not be accurate for the residual heat removal pumps because the bypass. test loop can only pass 200 gpm. This bypass test loop is a fixed resistance system; therefore, hydraulic resistance remains unchanged from test to test.
3.4      Bearing temperatures will not, be available for the Service Water pumps.'hese pumps and their bearings are submersed in forty feet of water, making it impossible to take measurements.          Be-cause they are submersed,      the bearing temperatures stay very close to the temperature of the intake water.
PVT  4. 0      Inservice Valve Testin Pro ram 4.1      The  Inservice Valve Testing Program    was developed in accordance with the requirements of Article IWV of Section XI of the Code.      All those valves that are required'to perform a safety function either to shut down the reactor or to mitigate the consequences of an accident and maintain the reactor in a safe shutdown condition are included-in the program.
 
O.,  DATE 49 OOC TITLE:
QUALITY ASSURANCE                                      11/1/79 MANUAL                  Appendix C              PAGE GINNA STATION            Pump and Valve Testing Program                    oF 39 4.2      The  Inservice Valve Testing Program Requirements for Category A and B Valves are found in Tables PVT 4.8 and 4.9, respectively.      Category C Valves are broken down into two categories, Check Valves and Relief Valves, which are found in. Tables PVT 4.10 and 4.11, respectively. Category D Valves are not included in this testing program because there are none included in Ginna Station design. Category E Valves are found in Table PVT'.12.
4.3      Some exceptions and exemptions to the testing re-quirements of Article IWV have been taken based on operational interference, placing the plant in an unsafe condition and Technical Specification requirements. All exceptions and exemptions are listed on the valve tables and explained in the referenced notes, PVT 4.13.
4.4      The exercising program for Category A and B Valves, with the exception of check valves, shall require a complete stroking of each valve per the valve testing tables. All check valves, including Category C Valves, shall be exercised to the posi-tion required to    fulfill their function. These functional tests shall be verified by the operation of the required system.
4.5      Category A and B valves operation shall be timed each time they are stroked ut'ilizing switch initiation and the position indicators, which are accessible during plant operation. During each refueling outage a visual verification shall be made  to confirm direct correspondence between valve operators and the position indicators.
4.6      In accordance with paragraph IWV-3700 of Section XI of the Code, Category E Valves are controlled in accordance with Ginna Station Administration proce-dure A-52.2  Control of Locked Valve Operation.
This procedure requires all operations of locked valves to be recorded in the "Locked Valve Oper-ations Log" or as required by certain operational procedures which also record any locked valve operations.
 
0  L K
 
19 OOC TITLE:                      DATE QUALITY ASSURANCE                                      11/1/79 MANUAL                    Appendix C          PAGE GINNA STATION              Pump and Valve Testing Program                  DP  39 4  7    The  testing of valves required at cold shutdown and  refueling outages will normally take four (4) days to complete. When cold shutdowns are of a shorter duration (2-3 days), test personnel shall attempt to test as many valves as possible without holding up the startup of the unit with testing beginning no longer than 48 hours after the plant reaches cold shutdown (as"defined in Technical Specification 1.2). For very short cold shutdowns (less than 48 hours), it would be impossible to mobilize test personnel to implement the testing program under the required procedural controls, therefore no valves would be tested.
It is possible that, during a four (4) day cold shutdown, the work load on test personnel may preclude their completion of all the required valve tests prior to startup. Valve testing during cold shutdowns shall not be more frequent than one test per quarter for each valve in the test program.
4.8      Category  A  Valves p
Va lve  N  ~Te              Descri tion        Note    Test    Freer 304A        CV    1-A  RCP  Seal Xnjection          Stroke    C/R 304B        CV    1-B  RCP  Seal Xnjection          Stroke    C/R 313          MOV    Seal Water Return                  Stroke    C/R Isolation                          Leak        R 370B        CV    Charging Line Xsolation            Stroke    C/R 371          AOV    Letdown Xsolation                  Stroke    C/R Leak        R l
38 3B        CV    Alternate Charging Line            Stroke    C/R 508          AOV    RMW to Containment Vessel          Stroke      Q Stop                                Leak        R
 
(0 L 40 90C TITLE:                      DATE QUALITY ASSURANCE                                      11/1/79 MANUAL                      Appendix C GINNA STATION Pump and Valve      PAGE Testing Program                or-  39 Valve  I    ~Te              Descri tion        Note  Test    Freer 528        CV    N2  Supply to    PRT              Stroke      Q Leak        R 529        CV    RMW  to  PRT                      Stroke      Q Leak        R 539        AOV    PRT  Stop>Valve to Gas              Stroke      Q Analyzer                            Leak        R 743        CV    CC  From Excess Letdown HX.        Stroke      Q Leak        R 745        AOV    Return From Excess Let-            Stroke      Q down HX.                            Leak        R 750A        CV    CC  to  A RCP                      Stroke    C/R Leak        R 750B        CV    CC  to  B RCP                      Stroke    C/R Leak        R 759A        MOV    Containment Stop      CC From      Stroke    C/R Loop A    RCP                      Leak        R 759B        MOV    Containment Stop      CC From      Stroke    C/R Loop  B RCP                        Leak        R 813        MOV    Supply CC to      RX  Support      Stroke    C/R Coolers                            Leak        R 814        MOV    Return CC to      RX  Support      Stroke    C/R Coolers                            Leak        R 846        AOV    N2  Supply to Accumulators          Stroke      Q Leak        R 862A        CV    1-A  CSP  Disch                    Stroke      Q Leak        R 862B        CV    1-B CSP Disch                      Stroke      Q Leak        R
 
0 <r 40 90C TITLE:,                      OATE QUALITY ASSURANCE                                        11/1/79 MANUAL                      Appendix C          PAGE GIN NA STATION              Pump and Valve Testing Program            10    or-  39 Valve    N    TvVe                                Note    Test      Freer 8 70A        CV    1-A  to  1-C SI Pump.Disch          Stroke        Q Leak          R 8 70B        CV    1-B  to  1-C SI Pump    Disch'troke Leak Q
R 879          HV    SI Test L'ine Isolation              Stroke Leak          R 889A          CV    1-A SI Pump Disch                    Stroke Leak          R 8898                1-B SI Pump Disch                    Stroke        Q Leak          R 966A          AOV    Pressurizer Steam Space              Stroke        Q 966B    'V    AOV VC VC Isolation Pressurizer Liquid Space Isolation Leak Stroke Leak R
Q R
966C          AOV    Loop A and      B Hot Leg  VC        Stroke        Q Isolation                            Leak          R 1003A        LCV    1-A  RCDT Pump    Suction          Stroke        Q Leak          R 1003B        LCV    1-B  RCDT Pump    Suction          Stroke        Q Leak          R 1713        CV    N2  to  RCDT    Check                Stroke        Q Leak          R 1721        AOV    Suction line to      RCDT          Stroke        Q
                                                        , Leak          R 1723        AOV    A  Containment Sump Disch            Stroke        Q Stop to Waste Holdup Tank            Leak"        R 1728        AOV    A  Containment Sump Disch            Stroke      Q Stop to Waste Holdup Tank            Leak          R
 
0, TITLE                        DATE QUALITY ASSURANCE                                    11/1/79 MANUAL                  Appendix C            PAGE GINNA STATION            Pump and Valve Testing Program            11    oF    39 Valve  5  ~Te                                  Note  Test    Freer 1786        AOV  RCDT  to  VH                        Stroke      Q Leak        R 1787        AOV  RCDT  to  VH                        Stroke Leak 1789        AOV  RCDT  to GA'utlet Isolation        Stroke Leak 5869        APV  Containment Purge Supply            Stroke      Q Isolation                          Leak        R 5870        APV  Containment Purge Supply            Stroke      Q Isolation                          Leak        R 5878        APV  Containment. Purge Exhaust          Stroke      Q Isolation                          Leak        R 5879        APV  Containment Purge Exhaust          Stroke      Q Isolation                          Leak        R 7226        CV    DI Water Isolation Inside          Stroke      Q Containment    I Leak        R 4'.9    Category  B  Valves Va lve 0    ~Te            Descri tion          Note  Test    Freer 014          RCV  Aux  Building    GDT Release.      Stroke 017          RCV  Comp  Cool Surge Tank Vent,        Stroke 081          APV  Control  Room    Ventilation      Stroke      Q Damper 082          APV  Control  Room  Ventilation        Stroke      Q Damper 083          APV  Control  Room  Ventilation        Stroke      Q Damper 084          APV  Control  Room  Ventilation        Stroke      Q Damper
 
IW TITLE:                              DATE QUALITY ASSURANCE                                              11/1/79 MANUAL                    Appendix C                  PAGE GINNA STATION              Pump and Valve Testing Program                    12    DF    39 Va lve  N    ~Te              Descri tion                  Note  Test    Freer 085          APV  Control    Room    Ventilation              Stroke      Q Damper 086          APV  Control    Room    Ventilation              Stroke      Q Damper 112B        LCV  Emergency'akeup          RWST      to        Stroke      Q Charging Pump 112C        LCV  VCT  Outlet                                  Stroke      Q 427          AOV  Letdown From Loop          B                  Stroke  C/R 624          HCV    1-B  RHR HX    Outlet                      Stroke      Q 625          HCV    1-A  RHR HX    Outlet                      Stroke      Q 626          FCV  RHR  Loop Return                            Stroke      Q 700          MOV    Suction Stop From Loop              A        Stroke  C/R to  RHR Pumps 701          MOV    Suction Stop From Loop              A    8  Stroke  C/R to  RHR Pumps 704A        MOV    Suction 1-A      RHR Pump                  Stroke      Q 704B        MOV    Suction 1-B      RHR Pump                  Stroke      Q 10" Discharge        to                      Stroke
                                                    'OV 720                                          B  Loop          8          C/R From  RHR Pumps 721          MOV    10" Disch      to  B  Loop From          8  Stroke  C/R RHR Pumps 738A        MOV    CC  to  1-A    RHR HX                        Stroke      Q 738B        MOV    CC  to  1-B    RHR HX r
Stroke      Q 825A        MOV    SI  Pump  Suction'rom            RWST    9. Stroke  C/R 825B        MOV    SI  Pump  Suction From          RWST . 9  Stroke  C/R
 
49 90C TITLE:                      PATE QUALITY ASSURANCE 11/1/79 MANUAL Appendix C Pump and Valve      PAGE G INNA STATION Testing Program          13    pp    39 Valve    N    ~Te              Descri tion        Note  Test      Freer 826A          MOV    SI Pump  Suction From    BA      Stroke        Q Tank 8 26B          MOV    SI Pump  Suction From    BA      Stroke        Q Tank 826C          MOV    SI Pump  Suction From    BA      Stroke        Q Tank 826D          MOV    SI Pump  Suction From    BA      Stroke        Q Tank 836A          HCV    Spray Additive Tank Dis-          Stroke        Q charge                P 836B          HCV    Spray Additive Tank Dis-          Stroke        Q charge 850A          MOV, Sump B    to  RHR Pumps            Stroke      , Q 850B          MOV    Sump B  to  RHR Pumps            Stroke        Q 852A          MOV    RHR Pumps    to  RX Vessel        Stroke        Q 852B          MOV    RHR Pumps    to  RX Vessel        Stroke        Q 856            MOV    RWST  to  RHR Pumps                Stroke    C/R 8 57A          MOV    Isolate  1B RHR HX From          Stroke        Q
                    .CS and SI Pumps 857B          MOV    Isolate  1A RHR HX From          Stroke        Q CS and SI Pumps 8 57C          MOV    Isolate  1A RHR HX  From        Stroke        Q CS and SI Pumps 860A          MOV    Parallel Discharge      MOV        Stroke        Q From 1-A CSP
 
TITLE:                          PATE QUALITY ASSURANCE                                          11/1/79 MANUAL                    Appendix C Pump and Valve            PAGE GINNA STATION Testing Program                14    PP    39 Valve    N    ~Te              Descri tion          Note      Test    ~Fre 860B          MOV  Parallel Discharge    MOV              Stroke    .Q From 1-A CSP 860C          MOV  Parallel Discharge    MOV              Stroke      Q From 1-B CSP 860D          MOV  Parallel Discharge    MOV              Stroke      Q From 1-B CSP 8 71A        MOV  1-A  to 1-C SI Pump Discharge-          Stroke      Q 8 71B        MOV  1-B to 1-C SI Pump Discharge            Stroke      Q 875A          MOV  Parallel MOV From CS Pumps              Stroke      Q to 1A Charcoal Filter Deluge 875B          MOV  Parallel MOV From CS Pumps              Stroke      Q to 1A Charcoal Filter Deluge 8 76A        MOV  Parallel MOV From CS Pumps              Stroke      Q to 1B Charcoal Filter Deluge 8 76B        MOV  Parallel MOV From CS Pumps              Stroke      Q to 1B Charcoal Filter Deluge 896A          MOV  RWST to CS and SI Pumps          9  'troke        C/R 896B          MOV  RWST to CS and SI Pumps          9      Stroke    C/R 18 15A        MOV  C-SI  Pump    Suction From              Stroke      Q RWST 1815B        MOV  C-SI  Pump    Suction From              Stroke      Q RWST 3504          MOV  Main Steam    to TAFP From  l-B        Stroke      Q S/G 3505          MOV  Main Steam    to TAFP From 1-A          Stroke      Q S/G                    h
 
0 l ~ t TITLE                          DATE QUALITY ASSURANCE                                        11/1/79 MANUAL                    Appendix C GINNA STATION              Pump and Valve          PAGE Testing Program            15    DF    39 Valve  N  ~Te              Descri tion        Note    Test    Freer 3652        MV    Main Steam    Throttle Valve        Stroke to  TAFP 3996        MOV    TAFP  Discharge                      Stroke 4000A      MOV    Cross Over Valve For      MAFP        Stroke t
4000B      MOV    Cross Over Valve For      MAFP      'troke 4007        MOV    1-A MAFP Discharge                    Stroke 4008        MOV    1-B MAFP Discharge                    Stroke      . Q 4013        MOV    TAFP  Service Water Supply            Stroke Isolation 4027        MOV    1-A  MAFP    Service Water            Stroke        Q Isolation 4028        MOV    1-B MAFP Service Water                Stroke        Q Isolation 4291        AOV    TAFP  Recir. Line                    Stroke 4297        AOV    TAFP  Discharge to 1-A S/G            Stroke 4298        AOV    TAFP  Discharge to 1-B S/G            Stroke 4304        AOV    1-A  MAFP    Recirculation            Stroke Control 4310        AOV    1-B  MAFP    Recirculation            Stroke        Q Control 4561        AOV    Containment Vent Recirc.            Stroke        Q Fans Discharge Flow Con-trol 4562        AOV    Containment Vent. Recirc.            Stroke        Q Fans Discharge Flow Con-trol  Bypass
 
TITI.E:                          DATE QUALITY ASSURANCE                                        11/1/79 MANUAL                      Appendix C            PAGE GINNA STATION Pump and Valve Testing Program              16    DP    39
~
Va 1ve  I    ~Te                                    Note  Test    Freer 4609        MOV  lAl Screen    House  SW              Stroke      Q Isolation 4613        MOV  1B2 Turbine Building        SW          Stroke      Q Isolation 4614        MOV  lAl Turbine Building        SW          Stroke      Q Isolation 4615        MOV  1B1 Aux. Building      SW              Stroke      Q Isolation 4616        MOV  1Al Aux. Building      SW              Stroke      Q Isolation 4663        MOV  1A1 Air Cond. Chillers        SW      Stroke      Q Isolation 4664        MOV  1A2  Turbine Building      SW          Stroke      Q Isolation 4670        MOV  1B1  Turbine Building      SW          Stroke      Q Isolation 4733        MOV  lA2 Air Cond. Chillers        SW      Stroke      Q Isolation 4734        MOV  1B2  Aux. Build. SW  Isolation-    Stroke      Q 4735        MOV  1A2  Aux. Build.      SW  Isolation-    Stroke      Q 4780        MOV  1A2 Screen      House  SW              Stroke      Q Isolation 5171        MOV  Turbine Build. Fire Water              Stroke      Q Loop  Supply Isolation 5871        APV    Containment Post Accident              Stroke      Q Filter  Damper 5872        APV    Containment Post Accident              Stroke      Q Filter  Damper
 
40 OOC TITLE:                    DATE QUALITY ASSURANCE                                  11/1/79 MANUAL                  Appendix C        PAGE GINNA STATION              Pump and Valve Testing Program          17    oF    39 Va 1ve 0    ~Te                                Note  Test    Freer 5873        APV    Containment Post Accident        Stroke      Q Filter  Damper 5874        APV    Containment Post Accident        Stroke      Q Filter Damper 5875        APV    Containment Post Accident        Stroke      Q Filter  Damper 5876        APV    Containment Post Accident        Stroke      Q Filter  Damper 9629A        MOV    1C SAFP  Service Water          Stroke      Q Isolation 9629B        MOV    1D SAFP  Service Water          Stroke      Q Isolation 9701A        MOV    1C SAFP  Discharge              Stroke      Q 9701B        MOV    1D SAFP  Discharge              Stroke      Q 9703A        MOV    SAFP  Cross Over                Stroke      Q 9703B        MOV    SAFP  Cross Over                Stroke      Q 9704A        MOV    1C SAFP  Containment            Stroke      Q Isolation 9704B        MOV    1D SAFP  Containment            Stroke      Q Isolation 9710A        AOV    1C SAFP  Recirc. Control        Stroke      Q 9710B        AOV    1D SAFP  Recirc. Control        Storke      Q
: 4. 10    Category  C  Check Valves Valve  'N    ~Te            Descri tion      Note    Test    Freer 710A          CV  1-A  RHR Pump    Discharge        Stroke        Q 710B          CV    1-B  RHR Pump    Discharge        Stroke        Q
 
0 m
Y
 
49 OOC TITLE:                        DATE QUALITY ASSURANCE                                            11/1/79 MANUAL                      Appendix C            PAGE G INNA STATION                Pump and  Valve Testing Program              18    oF    39 Valve    N    ~Te              Descri tion        Note      Test    Freer 723A          CV    1-A  CC Pump    Discharge              Stroke        Q 723B          CV    1-B  CC Pump    Discharge            Stroke        Q 842A        CV      First. Check Valve in Loop          Stroke        Q A  Accumulator*Dump Line 842B        CV      First    Check Valve in Loop          Stroke        Q B  Accumulator Dump Line 847A          CV    A-CSP From Spray      Additive          Stroke        Q Tank  to Eductor 847B          CV    B-CSP From Spray      Additive          Stroke        Q Tank  to Eductor 853A          CV    Core Deluge Check              10      St.roke      R 853B          CV    Core Deluge Check              10      Stroke        R 854            CV    RWST  to  RHR Pump  Check    ll      Stroke  '/R 866A          CV    CS  Pump 1-A    to Charcoal    12      Stroke    C/R Filter    Deluge 866B          CV    CS  Pump 1-B    to Charcoal            Stroke        Q Filter    Deluge 8 67A        ,CV    Accumulator, Dump and SI        13      Stroke    C/R to Cold Leg Loop B 867B          CV    Accumulator Dump and SI        13      Stroke    C/R to Cold Leg Loop A 8 78G          CV    ,1-A SI Pump to Cold Leg        13      Stroke    C/R Loop B After MOV 878B 878J          CV    1-B SI Pump to Cold Leg        13  . Stroke    C/R Loop A After MOV 878D
 
40 90C TITLE:                    DATE QUALITY ASSURANCE                                  11/1/79 MANUAL                    Appendix C        PAGE GINNA STATION              Pump and Valve Testing Program          19          39 Valve  N    ~Te            Descri tion      Note  Test    Freer 3516        CV    1B S/G Main Steam Swing      14  Stroke  Start-Check Stop Valve                          up 3517        CV    lA S/G Main Steam Swing      14  Stroke  S tart-Check Stop Valve                          up 3998        CV    TAFP Discharge Check              Stroke 4000C        CV    lA MAFP  Discharge              Stroke Downstream MOV-4007 4000D        CV    1B MAFP  Discharge              Stroke      Q Downstream MOV-4008 4003        CV    TAFP to  S/G lA                  Stroke      Q 4004        CV    TAFP to  S/G  1B                Stroke      Q 4009        CV    lA MAFP  to  S/G lA              Stroke      Q 4010        CV    1B MAFP  to  S/G 1B              Stroke      Q 4014        CV    TAFP Condensate    Suction        Stroke      Q 4016        CV    1B MAFP  Suction                Stroke      Q 4017        CV    1A MAFP  Suction                Stroke      Q 4023        'CV    TAFP Recirculation                Stroke      Q 4601        CV    1A Service Water    Pump        Stroke      Q Discharge 4602        CV    1B Service Water    Pump        Stroke      Q Discharge 4603        CV    1C Service Water    Pump        Stroke      Q Discharge 4604        CV    1D Service Water    Pump        Stroke      Q Discharge
 
O.       l C
      '1 N
        'I
  ~'
t
 
49 OOC TITLE:                       DATE QUALITY ASSURANCE                                    11/1/79 MANUAL                    Appendix  C PAGE GINNA STATION              Pump and  Valve Testing Program            20    DF    39 Valve  I    ~Te            Descri tion          Note  Test    Freer 5133        CV    Diesel Fire    Pump  Disch.       Stroke      Q 5136        CV    Motor Fire    Pump  Discharge      Stroke      Q 9627A.       CV    1C SAFP SW    Suction              Stroke      Q 9627B        CV    1D SAFP SW    Suction              Stroke      Q 9700A        CV    1C SAFP  Discharge                Stroke      Q 9700B        CV    1D SAFP  Discharge                Stroke      Q 9705A        CV    1C SAFP  to S/G 1A                Stroke      Q 9705B        CV    1D SAFP  to S/G 1B                Stroke      Q 4.11    Category  C  Relief Valve Va lve  I    ~Te            Descri tion          Note  Test    ~reer 203          RV    Letdown High Pressure          15 Safety Relief 209          RV    Letdown Low Pressure            15 Safety Relief 430          PORV  Primary System Relief          16  Stroke      R 431C        PORV  Primary System Relief          16  Stroke      R 434          RV    Pressurizer Relief 435          RV    Pressurizer Relief 732          RV    CC Surge Tank    Relief        15 744          RV    CC  From Excess Letdown Heat Exchanger 755A        RV    CC From A RCP Thermal          15 Barrier
 
49 90C TITLE:                         OATE QUALITY ASSURANCE                                          11/1/79 MANUAL                    Appendix C            PAGE GINNA STATION              Pump and Valve Testing Program              21    or. 39 Valve  N    ~Te              Descri tion        Note      Test    Freer 755B        RV    CC  From  B RCP  Thermal      15 Barrier 758A        RV    CC  From A-RCP    Oil Coolers  15 758B        RV    CC  From B-RCP    Oil Coolers  15 818          RV    CC  From Reactor Support        15 Coolers
                                                      '61 RV    1-B  CS  Pump  Suction Relief  15 887          RV    On  SI Test Line Inside        15 Containment 1817        RV    Alternate Suction From          15 RHR Pump to C SI Pump 3508        RV    1-B  S /G PRV                  15 3509        RV    1-A S/G    PRV                  15 3510        RV    1-B  S /G PRV                  15 3511        RV    1-A  S /G PRV                  15 3512        RV    1 A  S/G PRV                    15 3513        RV    1-A S./G  PRV                  15 3514        RV    1-B S/G PRV 3515        RV    1-A S/G    PRV 4653        RV    Service Water Relief            15 4654        RV    Service Water Relief            15 4657        RV    Service Water Relief            15 5134        RV    Diesel Fire Pump Disch R.V. 15 5135        RV    Motor Fire    Pump Disch R.V. 15
 
TITLE:                         DATE QUALITY ASSURANCE                                          11/1/79 MANUAL                    Appendix C            PAGE G INN A STATI ON              Pump and Valve Testing Program              22    DP  39 4.12      Category    E    Locked Valves Valve    5  ~Te            Descri tion                Normal  Position 220          MV      Cation Bed Resin    Fill              Closed 246          MV      Cation Bed Letdown    Inlet          Closed 279A        MV      1A Charging    Pump Relief Lock        Open Open  Valve 279B        MV      1B Charging    Pump Relief Lock        Open Open  Valve 279C        MV      1C Charging    Pump Relief  Lock      Open Open  Valve 311B        MV      Excess Letdown to Seal                  Open Water Return 329          MV      lA Boric Acid    Pump Recir-           Open culation 336          MV      1A Boric Acid Transfer    Pump        Closed Suction Flush 337          MV      1B Boric Acid Transfer Pump            Closed Suction Flush 344          MV      1B Boric Acid Pump Recir-               Open culation 353          MV      RMW  Emergency  Boration Supply      Closed Flushing 369          MV      Letdown Line Sample and Return        =Closed 379          MV      Cation Bed Letdown Outlet              Closed 380          MV      Cation Bed Outlet Hut Drain            Closed 381          MV      Cation Bed RMW Backwash Supply        Closed 382          MV      Cation Bed Spent Resin Outlet          Closed
 
I J
V h
H
 
TITLE:                         DATE QUALITY ASSURANCE                                          11/1/79 MANUAL                    Appendix C              PAGE GINNA STATION              Pump and Valve Testing Program                23    oF  39 Valve  5  ~Te                                          Normal  Position 384B      MV      Charging Line Outlet                      Open 543        MV      Letdown Stop Valve                        Open 544        MV      Excess Letdown                            Open 703        MV      Stop'RHR'Out    RHR HX's to              Open Letdown 705C      MV      Valve 850A Pressure      Relief          Open Bonnet Vent 705D      MV      Valve 850B Pressure      Relief          Open Bonnet Vent.
707A      MV      CC  to  1A  Residual Heat    Pump          Open 707B      MV      CC  to  1B  Residual Heat. Pump          Open 708A      MV      CC  From lA Residual Heat Pump            Open 708B      MV      CC  From 1B Residual Heat. Pump            Open 709A      MV      Discharge Stop lA      RHR Pump          Open 709B      MV      Discharge Stop    1B RHR Pump            Open 714        MV      RHR  to lA    RHR HX                      Open 715        MV      RHR  Out  1B RHR HX                      Open 716        MV      RHR  to  1B RHR HX                        Open 717        MV      RHR  Out  1A RHR HX  .
Open 728        MV      CC HX  Surge Line Stop                    Open 748A      MV      CC  Supply to    Distillate  Cooler      Open B.A. Pack.
748B      MV      CC  Supply to    Distillate  Cooler      Open B.A. Pack.
 
TITLE:                         DATE QUALITY ASSURANCE                                          11/1/79 MANUAL                      Appendix C PAGE GINNA STATION Pump and  Valve Testing Pxogram                24    DF  39 Valve  N  ~Te                                          Normal  Position 764C      MV      Combined    CC  Return From SI Pumps    Throttled 764D      MV      Combined    CC Return From Con-           Throttled tainment Spray Pumps 769        MV      Combined Stop      CC From RHR Pumps  " Throttled 77 7A      MV      CC  to lA Containment .Spray    Pump      Open 777B      MV      CC  From lA Containment    Spray          Open Pump 777C      MV      CC  From 1B Containment Spray              Open Pump 777D        MV    CC  From 1B Containment Spray              Open Pump 777E      MV      CC  From 1A SI Pump                        Open 777F      MV      CC  To  lA SI    Pump                      Open 777G      MV      CC  From  1C  SI Pump                    Open 777H      MV  'C    To 1C  SI  Pump                      Open 777J        MV    CC  To 1B    SI  Pump                      Open 777K      MV      CC  From 1B SI Pump                        Open 777L        MV    CC  To lA    SI  Pump                      Open 777M        MV    CC  From lA SI Pump                        Open 777N        MV    CC  To 1C    SI  Pump                      Open r
777P        MV    CC  From  1C  SI Pump                    Open 777R        MV    CC  From 1B SI Pump                        Open 777S        MV    CC  To 1B    SI  Pump                      Open 788A        MV    Make up Water      Valve to SFP          Closed
 
(~
O.
'I I
 
40 90C TITLE:                           DATE QUALITY ASSURANCE                                          11/1/79 MANUAL                    Appendix C              PAGE 6INNA STATION              Pump and Valve Testing Program                  25    DF  39 Valve    N  ~Te          Descri tion                    Normal  Position 803        MV      SFP  Filter    Discharge to  RUST        Closed 804        MV      SFP HX  By-pass From    SFP  Filter      Throttled 822B        MV      RHR Pump  Recirculation                  Open 831A        MV      Spray Additive Tank Prom      CS          Open Pump  Suction 8 31B      MV      Spray Additive Tank From      CS          Open Pump  Suction 858A        MV      Suction Valve to    CS  Pump  lA          Open 858B        MV      Suction Valve to    CS  Pump 1B          Open 859A        MV      Test Line Valve From      CS  Pump 1A    Closed 859B        MV      Test Line Valve From      CS  Pump 1B    Closed 864A        MV      Test Connection on Discharge              Closed Line of CS Pump lA 864B        MV      Test Connection on Discharge              Closed Line of CS Pump 1B 868A        MV    Discharge Valve From      CS  Pump  lA    Open 868B        MV  'ischarge        Valve From  CS  Pump 1B      Open 873A        MV      Spray Additive Tank from      CS  Pumps  Open 873B        MV      Spray Additive Tank from      CS  Pumps  Open 873C        MV      Spray Additive Tank from      CS  Pumps  Closed 8 73D      MV    Spray Additive Tank from        CS  Pumps  Closed 8 78E      MV    Manual Value After MOV 878D From            Open 1B SIP Header to Cold Leg Loop A
 
4
'C
 
TITLE:                         OATE QUALITY ASSURANCE                                          11/1/79 MANUAL                    Appendix C              PAGE GINNA STATION                Pump and Valve Testing Program              26    OF  39 Valve  II  ~Te                                          Normal  Position 879        MV    SI Test Line                              Closed 880B        MV    Loop    B  Accumulator Test Line            Open 880C        MV    Loop    A  Accumulator Test Line            Open 881A        MV    Spray Additive Tank Drain                  Closed 881B        MV    Spray Additive Tank Outlet                  Open 881C        MV    Spray Additive Eductor Outlet              Open 881D        MV    Spray Additive Eductor Outlet              Open 888A        MV      lA SI    Pump  Discharge                  Open 888B        MV      1B  SI  Pump  Discharge                  Open 890A        MV    Suction For SI      Pump 1A                Open 890B        MV    Suction For SI      Pump 1B                Open MV    FI    903    Outlet to  Chem Drain      Closed Tank 1076A      MV    A  Hydrogen Recombiner      Pilot Line    Closed 1076B      MV    B  Hydrogen Recombiner      Pilot Line    Closed 108 OA      MV    Hydrogen Recombiner Oxygen Makeup          Closed 1084A      MV    A  Hydrogen Recombiner Main Burner        Closed 1084B      MV    B  Hydrogen Recombiner Main Burner        Closed 1100B      MV    VCT  Relief to CVCS      Holdup Tank  N1  Open 1100C      MV    VCT Relief to CVCS        Holdup Tank p2    Open 1100D      MV    VCT Relief to CVCS        Holdup Tank .N3  Open 1102        MV    CVCS Hut. 53 Outlet      to Vent Header    Open
 
TITLE:                             DATE QUALITY ASSURANCE                                            11/1/79 MANUAL                    Appendix C                PAGE GINNA STATION              Pump and Valve Testing Program                  27    oF  39 Valve  I ~Te            Descri tion                      Normal  Position 1123A      MV      CVCS  Holdup Tank    g3  Vent            Closed 1123B      MV      CVCS  Holdup Tank    N2  Vent            Closed 1123C      MV      CVCS  Holdup Tank gi Vent                  Closed 1239      MV      RMW  Pumps    Suction from Monitor        Closed Tanks 1249      MV      Monitor  Pump    Discharge Waste          Closed Discharge    lsol.
1252      MV      Monitor  Pump    Discharge to  RMW      Closed Tanks 1256A      MV      RMW  Pumps    and  Montior  Pump  Dis-     Closed charge X-TlE 1263      MV      CVCS  Hut 52 Outlet      to Vent Header      Open 1264      MV      CVCS Hut N1 OUtlet to Vent Header            Open 1269      MV      Vent Header Xsol. Value to CVCS              Open,,
Hut's 1554      MV      D Recirculation Fan Air Sample            Closed 1556      MV      D Recirculation Fan AIr Sample            Closed 1557      MV      A Recirculation Fan Air Sample            Closed 1559      MV      A Recirculation Fan Air Sample            Closed 1560      MV      A and D Recirculation Fans                Closed Air Sample Return 1562      MV      A and  D  Recirculation    Fans            Closed Air Sample Return 1563      MV      B Recirculation      Fan  Air Sample.     Closed 1565      MV      B Recirculation      Fan  Air Sample        Closed
 
E TITLE:                         OATE QUALITY ASSURANCE                                      11/1/79 MANUAL                    Appendix C            PAGE GINNA STATION              Pump and Valve Testing Program              28    oF  39 Valve  I ~Te            Descri tion                Normal  Position 1566      MV      B  Recirculation  Fan Air Sample      Closed Return 1568      MV      B  Recirculation  Fan Air Sample      Closed Return 1569      MV      C  Recirculation  Fan Air Sample      Closed 1571      MV      C  Recirculation  Fan Air Sample      Closed 1572      MV      C  Recirculation  Fan Air Sample      Closed Return 1574      MV      C  Recirculation Fair Air Sample      Closed Return 1613      MV      VH-HUT Cross Connect    Isol.           Open 1617      MV      51 GDT  Manual Discharge              Closed 1618      MV      52 GDT  Manual Discharge              Closed 1619      MV      g3 GDT  Manual Discharge              Closed 1620      MV      N4 GDT  Manual Discharge              Closed 1656A      MV      Nl GDT  Rupture Disc. Outlet to        1-Turn HUT                                    Open 1656B      MV      N2 GDT  Rupture Disc. Outlet  to      1-Turn HUT                                    Open 1656C      MV      N3 GDT  Rupture Disc. Outlet to        1-Turn HUT                                    Open 1656D      MV      N4 GDT  Rupture Disc. Outlet to        1-Turn HUT                                    Open 1667      MV      N2  Supply to  1A WGC                Closed 1669      MV      N2  Supply to  1B WGC                Closed 1701      MV      Laundry and Hot Shower Cross Tie      Closed
 
40 QOC TITLE:                           DATE QUALITY ASSURANCE                                        11/1/79
      'ANUAL                      Appendix C              PAGE GINNA STATION              Pump and Valve        /
Testing Program                29    DP  39 Valve  N  ~Te            Descri tion                  Normal  Position 1722      MV      Refueling Canal Drain to      RCDT        Closed Pump 1748      MV      Chem +   Laundry Tank Outlet              Closed Cross-Tie 1749      MV      Chem +   La'undry  Pump Discharge        Closed Stop Valve 1762      MV      Waste Holdup Tank Pump Discharge          Closed to  WCT's 178 5      MV      Master Waste Discharge Valve              Closed 1795B      MV      R-18  Monitor Bypass Value              Closed 1795E      MV      W  Monitor Inlet                          Closed 1795F      MV      W  Monitor Outlet                        Closed 1820A      MV      Shutoff Valve for A SI Pump                Open Test Line 1820B      MV    "Shutoff Valve for C SI Pump                Open Test Line 1820C      MV      Shutoff Valve for B SI Pump                Open Test Line 2231      MV      Letdown Line Cont. Outlet Drain          Closed 2860      MV      Isol. Valve from CSP-1A to Char-         Open coal  Filter  Deluge 2865      MV      Isol. Valve from CSP-1B to Char-     i  Open coal  Filter  Deluge 3528                Main Steam to Auxiliary                  Open Feedwater Pump 3970      MV      1B Feedwater    Pump Suction Valve      Open 3971      MV      1A Feedwater    Pump Suction Valve      Open
 
0 T TITLE:                           DATE QUALITY ASSURANCE                                            11/1/79 MANUAL                    Appendix C              PAGE G INNA STATION              Pump and Valve Testing Program                30    DF  39 Va lve  0  ~Te            Descri tion                    Normal  Position 4005        MV      Turbine Driven      AFW S/G 1A Stop        Open 4006        MV      Turbine Driven      AFW S/G 1B Stop        Open 4011        MV      Motor Driven    AFW  S/G 1A Stop          Open 4012        MV      Motor Driven    AFW  S/G 1B Stop          Open 4015        MV      TAFP  Suction Isolation                    Open 4018        MV      lBMAFP  Suction Isolation                  Open 4019        MV      lAMAFP  Suction Isolation                  Open 4038        MV      1B Feedwater    Pump Warm-up    Orifice Closed Isol.
4039                1A Feedwater    Pump Warm-up    Orifice Closed Isol.
4040        MV      1B Feedwater    Pump Warm-up    Orifice  Closed 4041  'V    MV Isol.
1A Feedwater Isol.
Pump Warm-up    Orifice  Closed 4060        MV      1A Feedwater    Pump  Recirc. Cond.       Open Isol.
4061        MV      1B Feedwater    Pump  Recirc..Cond.       Open Isol 4070        MV      Condensate    Storage Tank  1B            Open Isolation 4070A      MV      Cond. Storage Tank      B Makeup  to        Open Hotwell 4071        MV      Condensate    Storage Tank  1A            Open Isolation 4071A      MV      Cond. Storage Tank      A Makeup  to        Open Hotwell
 
1 P
 
40 OOC TITLE:                             OATE QUALITY ASSURANCE                                            11/1/79 MANUAL                    Appendix C                PAGE G INNA STATION              Pump and Valve Testing Program                  31    oP  39 Va 1ve  N  ~Te          Descri tion                      Normal  Position 4071B        MV    Cond. Makeup Line        to Hotwell        Closed Drain 4072        MV      1B  Condencate    Storage Tank Drain      Closed 4073        MV      lA Condensate    Storage Tank Drain      Closed 4074        MV    AFP  Recirculation to      1B  Conden-     Open sate Storage 4075        MV    AFP  Recirculation to lA      Conden-     Open sate Storage 4080        MV      TAFP  Discharge    Orifice Isolation      Open 4081        MV      1A MAFP Discharge Orifice                  Open Isolation 4082        MV      1B MAFP Discharge Orifice                  Open Isolation 4098        MV      Service Water Isolation to TAFP            Closed 4140        MV      Heater Drain Tank LC 3343 Isol.             Open 4344        MV      Service Water Isolation to MDAFP          Closed 4345        MV      Service Water to      1A MAFP            Closed 4738        MV      A  Service Water Loop to      CC          Open 4739        MV    B  .Service Water Loop to      CC          Open 4789        MV      SI  Pump  Bearing Oil Cooler                Open Isolation 4790        MV      SI  Pump  Bearing Oil Cooler                Open Isolation 4791        MV      lA SI  Pump    Bear'ing  Oil Cooler        Open Inlet  .
 
C h ~
 
49 OOC TITLE:                         DATE QUALITY ASSURANCE                                          11/1/79 MANUAL                      Appendix C          PAGE GINNA STATION                Pump and Valve Testing Program            32    DF  39 Valve  N  ~Te            Descri tion                  Normal  Position 4791A      MV      lA SI    Pump    Bearing Oil Cooler      Open Outlet 4794      MV    1B  SI  Pump    Bearing Oil Cooler        Open Inlet 4794A      MV      1B  SI    Puihp  Bearing Oil Cooler      Open Outlet 4795      MV      1C  SI  Pump    Bearing Oil Cooler      Open Inlet  'C 4795A      MV          SI  Pump    Bearing Oil Cooler      Open Outlet 5100      MV      Test Line      Isol.                     Open 5141      MV      Diesel Fire      Pump  Discharge        Open 5142      MV      Motor Fire      Pump  Discharge          Open 5172      MV      Area  N1    Deluge Supply Xsol.         Open 5173      MV      Area Nl Deluge Supply Xsol.             Closed 5174      MV      Turbine Bldg. Fire Water Loop            Open Division MV      Turbine Bldg. Fire Water Supply          Open Loop  Division 5196      MV      Storage Tank High Level Drain            Open Control Isol.
5197      MV      Sorage Tank Outlet Check Isol.           Open-5198      MV      Storage Tank Outlet Check Xsol.           Open 5200      MV      Storage Tank Outlet Check Bypass        Closed
 
40 OOC TITLE:                         DATE QUALITY ASSURANCE                                        11/1/79 MANUAL                    Appendix C            PAGE GINNA STATION              Pump and Valve Testing Program              33    DF  39 Va 1 ve N  ~Te          Descri tion                  Normal  Position 5202        MV      Turbine Bldg. Fire Water Supply          Open Loop  Division 5220        MV      Motor Fire Pump Discharge Isol.           Open 5221        MV      Fire Pump Crossover                    Closed 5233        MV      Service Bldg. Sprinkler Sys. N13          Open Isol.
5243        MV      Deluge "A" Header Isol.                   Open 5245        MV      Deluge "B" Header Supply      Isol.       Open 5248        MV      AFW Pump    Oil  Res. Deluge Supply      Open Isol.
5250        MV      Test Line Flow Control                  Closed 5438        MV      Oil  Bowser    to Turbine Oil  Tank      Closed Isol.
5448        MV      Water Feed to    Oil Coolder Inlet      Closed Isol.
5462        MV      Turbine Lube Oil Sample                  Closed 5763        MV      S/G Blowdown from    Nuclear Sample      Open Room 5931        MV      lA Diesel Generator Cooling Water        Open 5932        MV      1B Diesel Generator Cooling Water        Open 5935        MV      1A Diesel Generator Cooling Water        Open 5936        MV      1B Diesel Generator Cooling Water        Open 5947        MV      1A Diesel Generator Air Receiver          Open Outlet
 
40 OOC TITLE                        DATE QUALITY ASSURANCE                                      11/1/79 MANUAL                  Appendix C            PAGE GINNA STATION            Pump and Valve Testing Program            '34    DF  39 Valve  N  ~Te          Descri tion                Normal  Position 594 7A    MV      1A Diesel  Generator  Air Receiver    Open Outlet 5948      MV      1B Diesel  Generator Air Receiver    Open Outlet 5948A    MV      1B Diesel  Generator  Air Receiver    Open Outlet 5973      MV      1A Diesel  Generator Isolation        Open Valve 5974      MV      1B Diesel Generator Isolation          Open Valve 5977C,   MV      lA Diesel Generator Day Tank  'I Closed 5977D    MV      lA Diesel Generator Drain to          Closed Reservoir 5978C    MV      1B Diesel Generator Day Tank          Closed 5978D    MV      1B Diesel Generator Drain to          Closed Reservoir 6151      MV      Heating Steam to    CV                Closed 6152      MV      Heating Return from    CV            Closed 6165      MV      Heating Steam to    CV                Closed 6175      MV      Condensate    Return from  CV          Closed 7140      MV      Service Air Guard Valve Upstream      *Closed Secondary  Isolation Valve 7141      MV      Service Air Isolation Valve            Closed Outside Containment 7227      MV      Service Air Isolation Valve            Closed Inside Containment 7448      MV      Isolation Valve to Pressure            Closed Indicators
 
0 IA J
 
49 ROC TITLE:                           OATE QUALITY ASSURANCE                                              11/1/79 MANUAL                      Appendix  C PAGE G INNA STATION                Pump and  Valve Testing Program                35    OP  39 Valve  N  ~Te            Descri tion                    Normal  Position 7452      , MV      Isolation Valve for Local                  Closed Pressure      Indicators 7456        MV      Isolation Valve for Local                  Closed Pressure      Indicators 8423        MV      02  to  H2-Recombiner                      Open 8425        MV      H2  to  H  Recombiner "B" Main            Open Burner- 2" Inside Isol.
8427        MV      H    to HI Recombiner "B"       Pilot        Open 3  4" Inside      Isol.
8433        MV      H2  to  H  Recombiner "A" Main            Open Burner 3" Inside        Isol.
8435        MV      H    to  HI Recombiner "A"     Pilot,.       Open 3  4"   Inside Isol.
9706A      MV      "C" SAFWP to A  S/G Stop                    Open 9706B      MV      "D" SAFWP to B  S/G Stop                    Open 9723        MV      Standby Auxiliary Feedwater                Closed System Pressure Transmitter Isolation                  '
9725        MV      Standby Auxiliary Feedwater                Closed System Pressure Transmitter Isolation MV      Fuel Transfer Isolation Valve              Closed 4.13      Inservice Valve Testing Notes Note    1  Valves 304A, 304B and 313        cannot be stroked during normal plant operation on a quarterly basis because they would interrupt coolant flow to the reactor
                            .coolant pump seals. These valves will be stroked at cold shutdowns and refuel-ing outages.
 
TITLE:                         OATE QUALITY ASSURANCE                                    11/1/79 MANUAL                  Appendix C            PAGE GINNA STATION            Pump and Valve Testing Program              36    OF 39 Note  2 Valve  370B cannot be stroked during normal plant operation on a quarterly basis because this test would interrupt charging pump flow. This valve will be stroked at cold shutdowns and refueling outages.
Note 3 Valves 371 and 427 cannot be stroked during normal plant operation on a quarterly basis because this test would interrupt the letdown (CVCS) system. These valves will be stroked at cold shutdowns and refueling outages.
Note  4 Valve  383B cannot be stroked during normal plant operation on a quarterly basis because this test would result in substantial radiation exposure to test personnel. A recent'survey in the area of the test connection indicated a neutron field of 500 mr/hr and a gamma field of 250 mr/hr. This valve will be stroked at cold shutdowns and refueling outages.
Note  5Valves    750A, 750B, 759A and 759B cannot be stroked during normal plant operation on a quarterly basis because this test would require the reactor coolant pumps to  be shut down to eliminate the flow through these checks and MOVs. These valves will be stroked at cold shutdowns and refueling outages.
Note  6 Valves 813 and 8l4 cannot be stroked during normal plant operation on a quarterly basis because this test would remove the coolant to the reactor vessel supports and cavity wall. These valves will be stroked at cold shutdowns and refueling outages.
 
P; 4
I
 
49 OOC TITLE:                           DATE QUALITY ASSURANCE                                        11/1/79 MANUAL Appendix C GINNA STATION Pump and  Valve          PAGE Testing Program                      OF Note  7  Valve 879  is a manual valve in the safety injection  test  line and is kept locked shut. This    valve  is not required to change position to perform a safety func-tion. The only requirement is that leak-age through valve 879 be acceptably low.
Therefore, the quarterly stroke test has been deleted. This valve .will be leak tested at refueling outages.
Note  8  Valves 700 and 721    cannot be stroked during  normal  plant operation on a quarterly  basis  because there is an interlock system which prevents these valves from opening when the primary system is at operating pressure.
Valves 700, 701, 720 and 72l separate a high pressure system from a low pressure system. These valves will be stroked at. cold shutdowns and refuel-ing outages.
Note  9  Valves 825A, 825B, 856, 896A, and 896B should not be stroked during normal opera-tion on a quarterly basis because this would cause a temporary loss of system function of the ECCS. These valves pro-vide the suction from the refueling water storage tank to the safety injection and residual heat removal pumps. These valves will be stroked at cold shutdowns and re-fueling outages.
Note 10- Valves 853A and 853B cannot be stroked dur-ing normal plant operation on a quarterly basis because'this test would pressurize the RHR system to the primary system opera-tion pressure. These valves will be 'stroke at refueling outages.
 
0 0 g I+ 4 49 90C TITLE:                             DATE QUALITY ASSURANCE                                            11/1/79 MANUAL                      Appendix  C PAGE GINNA STATION                Pump and  Valve Testing Program                38  oF 39 Note 11- Valve 854 cannot be stroked, during normal plant operation on a quarterly basis be-cause there is not a way to establish a I    flow through this valve when the primary is at pressure and the RHR system    'ystem is not operating. This valve will be stroked at cold shutdowns and refueling outages.
ll Note 12- Valve 866A cannot be stroked during normal plant operation on a quarterly basis because this test would result in a substantial radiation exposure to test personnel.     A recent survey of the test location indicated a gamma field of 800 mr./hr. This valve will be stroked at cold shutdowns and refueling outages.
Note        Valves 867A, 867B, 878G, and 878J cannot be stroked during normal operation on a quarterly basis      because this test cannot be doen when the primary system is at operating pressure. This test may only be done when the plant is in a cold shutdown condition with a partially full
                        .primary system in order to prevent an overpressurization.
Note 14- Valves 3516 and 3517 cannot be stroked during normal plant operation in a quarterly basis because they are the main steam swing check stop valves.
These valves are stroked during each plant startup.
Note 15- Category C Relief Valves shall be tested in accordance with the extent and frequency requirements of Paragraph IWV-3510 of Article INV of Section XI of the Code.
Note 16      Valves 430 and 431C are the power        .
operated relief valves associated with the overpressurization system. These valves shall be stroked during each refueling outage in accordance with normal valve testing procedures.
 
40 QOC TITLE:                     DATE QUALITY ASS U RAN CE                                  11/1/79 MANUAL                    Appendix C        PAGE GINNA STATION              Pump and Valve Testing Program          39    DF 39 PVT  5.0        Records 5.1        Records for the Inservice Pump Testing Program shall be developed and maintained in accordance with Article IWP-6000 of Section XI of the Code.
5.2        Records for the Inservice Valve Testing Program shall be developed and maintained in accordance with Article IWV-6000 of Section XI of the Code.}}

Latest revision as of 12:46, 4 February 2020

App C to QA Manual Re Revised Inservice Pump & Valve Testing Program for May 1979-Dec 1980
ML17249A290
Person / Time
Site: Ginna Constellation icon.png
Issue date: 11/15/1979
From: Anderson C, Curtis A, Macredy R
ROCHESTER GAS & ELECTRIC CORP.
To:
Shared Package
ML17249A289 List:
References
TASK-05-11.A, TASK-5-11.A, TASK-RR NUDOCS 7911230285
Download: ML17249A290 (60)


Text

49 90A SECT. NO. 8 EV. PAGE QUALITY ASSURANCE MANUAL '" 39 EFFECTIVE DATE November 1, l979 ROCHESTER GAS 6 ELECTRIC CORPORATION SIGNATURE DATE GINNA STATION PREPARED BY Appendix C Ginna Station REVIEWED BY Inservice Pump and Valve Testing II JG Program for the May 1, 1979 through December 31, 1980 Period APPROVED BY tt Pro ram Table of Contents

Introduction:

Discussion Definitions:

Program: PVT 1.0 Scope and Responsibility PVT 2.0 Code Edition and Testing Interval PVT 3.0 Inservice Pump Testing Program PVT 4.0 Inservice Valve Testing Program PVT 5.0 Records

0 1 TITLE:, DATE QUALITY ASSURANCE 11/1/79 MANUAL Appendix C PAGE GINNA STATION Pump and Valve Testing Program oF 39 Introduction This appendix to the Quality Assurance Manual defines the Inservice Pump and Valve Testing Program for the twenty month period starting May 1, 1979 through'December 31, 1980. Included in this program are the Quality Groups A, B and C Pumps which are provided with an emergency power source and those Quality" Groups A, B and C Valves which are required to shut down the reactor or to mitigate the consequences of an accident and maintain the reactor in a safe shutdown condition.

This program has been developed as required by Section 50.55(a)(g) of 10CFR50 following the guidance of the ASME Boiler and Pressure Vessel Code Section XI - "Rules for Inservice Inspection of Nuclear Power Plant Components,"

(hereafter referred to as the "Code" ) excluding the controls of the Authorized Inspector, Enforcement Authority, Report-ing Systems and N-Stamp Symbol. The inservice testing pro-gram shall be controlled by the Ginna Station Quality Assur-ance Program for Station Operation. Quality Groups A, B and C components correspond to those defined in NRC Regula-tory Guide 1.26.

Further addenda and editions of Section XI of the Code shall 'be used for clarification of test requirements and performance.

The Inservice Pump and Valve Testing Program does not affect the pump and valve surveillance program required by Technical Specifications. Technical Specification re--=

quirements shall continue to be implemented at, the required frequency.

40 00C TITLE: DATE QUALITY ASSURANCE ll/I/79 MANUAL Appendix C PAGE GINNA STATION Pump and Valve Testing Program oF 39 Definitions AFP Auxiliary Feedwater Pumps AOV Air Operated Valve APV Air Operated Piston Valve BA Boric Acid Code American Society of Mechanical E ngzneers Boiler and Pressure Vessel Code CC Component'ooling CS Containment Spray CSP Containment Spray Pump CV Check Valve C/R Cold Shutdown and Refueling ECCS Emergency Core Cooling System FCV Flow Control Valve GA Gas Analyzer GDT Gas Decay Tank HCV Hand Control Valve HX Heat Exchanger LCV Level Control Valve MAFP Motor Driven Auxiliary Feedwater Pump MOV Motor Operated Valve MV Manual Valve PCV Pressure Control Valve PIV Primary Isolation Valve PORV Power Operated Relief Valve PRT Pressurizer Relief Tank PRV Pressure Relief Valve PVT Pump and Valve Testing Q Quarterly R Refueling Outage RCDT Reactor Coolant Drain Tank RCP Reactor Coolant Pump RCV Radiation Control Valve RHR Residual Heat Removal RMW Reactor Makeup Water RV Relief Valve RWST Refueling Water Storage Tank RX Reactor Vessel S/G Steam Generator SAFWP Standby Auxiliary Feedwater Pump SI Safety Injection SIV Secondary Isolation Valve SW Service Water

40 OOC TITLE: DATE QUALITY ASSURANCE 11/1/79 MANUAL Appendix C PAGE GINNA STATION Pump and Valve Testing Program 4 ow 39 Definitions TAFP Turbine Driven Auxiliary Feedwater Pump VC Volume Control VCT Volume Control Tank VH Vent Header

49 QOC TITLE: DATE QUALITY ASSURANCE 11/1/79 MANUAL Appendix C PAGE GINNA STATION Pump and Valve Testing Program 5 DF 39 Pum and Valve Testin Pro ram PVT 1. 0 Sco e and Res onsibilit The inservice testing program defines the testing program for Quality Groups A, B and C Pumps and Valves in accordance with the requirements of Articles IWP and IWV of Section XI of the Code.

The results, of these tests are to assure the operational readiness of. pumps and valves.

1- 2. It is the responsibility of the Ginna Station Test and Results Supervisor to implement this test program and develop inservice test proce-dures which will outline the specific test for each pump and valve included in the program.

1.3 When a valve or its control system has been replaced or repaired or has undergone maintenance that could affect its performance, and prior to the time it is returned to service, it shall be tested as necessary to demonstrate that the per-formance parameters which could have been affected by the replacement, repair, or maintenance are within acceptable limits.

PVT 2. 0 Code Edition and Testin Interval 2.1 The Inservice Pump and Valve Testing Program for the twenty (20) month period starting May 1, 1979 through December 31, 1980 was developed utilizing the 1974 Edition of Section XI of the Code through the Summer 1975 Addenda.

PVT 3.0 Inservice Pum Testin Pro ram 3.1 The Inservice Pump Testing Program was developed in accordance with the requirements of Article IWP of Section XI of the Code. This program includes all Quality Group A, B and C pumps which are provided with an emergency power source and are required to safely. shut down the reactor or to mitigate the consequences of an accident and maintain the reactor in a safe shutdown condition.

0 4

40 OOC TITLE: DATE QUALITY ASSURANCE 11/1/79 MANUAL Appendix C PAGE GINNA STATION Pump and Valve Testing Program 6 DP 39 3.2 The following pumps shall be tested in accord-ance with Article IWP of Section XI:

(a) lA Component Cooling (b) 1B Component Cooling (c) 1A Safety Injection (d) 1B Safety Injection (e) lC Safety Injection (f) lA Residual Heat Removal (g) 1B Residual Heat Removal (h) lA Containment Spray

.(i) 1B Containment Spray (j) lA Motor Driven Auxiliary Feedwater (k) lB Motor Driven Auxiliary Feedwater (1) Turbine Driven Auxiliary Feed (m) 1A Service Water (n) 1B Service Water (o) 1C Service Water (p) lD Service Water (q) 1C Standby Auxiliary Feedwater (r) 1D Standby Auxiliary Feedwater Flow rates will not be accurate for the residual heat removal pumps because the bypass. test loop can only pass 200 gpm. This bypass test loop is a fixed resistance system; therefore, hydraulic resistance remains unchanged from test to test.

3.4 Bearing temperatures will not, be available for the Service Water pumps.'hese pumps and their bearings are submersed in forty feet of water, making it impossible to take measurements. Be-cause they are submersed, the bearing temperatures stay very close to the temperature of the intake water.

PVT 4. 0 Inservice Valve Testin Pro ram 4.1 The Inservice Valve Testing Program was developed in accordance with the requirements of Article IWV of Section XI of the Code. All those valves that are required'to perform a safety function either to shut down the reactor or to mitigate the consequences of an accident and maintain the reactor in a safe shutdown condition are included-in the program.

O., DATE 49 OOC TITLE:

QUALITY ASSURANCE 11/1/79 MANUAL Appendix C PAGE GINNA STATION Pump and Valve Testing Program oF 39 4.2 The Inservice Valve Testing Program Requirements for Category A and B Valves are found in Tables PVT 4.8 and 4.9, respectively. Category C Valves are broken down into two categories, Check Valves and Relief Valves, which are found in. Tables PVT 4.10 and 4.11, respectively. Category D Valves are not included in this testing program because there are none included in Ginna Station design. Category E Valves are found in Table PVT'.12.

4.3 Some exceptions and exemptions to the testing re-quirements of Article IWV have been taken based on operational interference, placing the plant in an unsafe condition and Technical Specification requirements. All exceptions and exemptions are listed on the valve tables and explained in the referenced notes, PVT 4.13.

4.4 The exercising program for Category A and B Valves, with the exception of check valves, shall require a complete stroking of each valve per the valve testing tables. All check valves, including Category C Valves, shall be exercised to the posi-tion required to fulfill their function. These functional tests shall be verified by the operation of the required system.

4.5 Category A and B valves operation shall be timed each time they are stroked ut'ilizing switch initiation and the position indicators, which are accessible during plant operation. During each refueling outage a visual verification shall be made to confirm direct correspondence between valve operators and the position indicators.

4.6 In accordance with paragraph IWV-3700 of Section XI of the Code, Category E Valves are controlled in accordance with Ginna Station Administration proce-dure A-52.2 Control of Locked Valve Operation.

This procedure requires all operations of locked valves to be recorded in the "Locked Valve Oper-ations Log" or as required by certain operational procedures which also record any locked valve operations.

0 L K

19 OOC TITLE: DATE QUALITY ASSURANCE 11/1/79 MANUAL Appendix C PAGE GINNA STATION Pump and Valve Testing Program DP 39 4 7 The testing of valves required at cold shutdown and refueling outages will normally take four (4) days to complete. When cold shutdowns are of a shorter duration (2-3 days), test personnel shall attempt to test as many valves as possible without holding up the startup of the unit with testing beginning no longer than 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> after the plant reaches cold shutdown (as"defined in Technical Specification 1.2). For very short cold shutdowns (less than 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br />), it would be impossible to mobilize test personnel to implement the testing program under the required procedural controls, therefore no valves would be tested.

It is possible that, during a four (4) day cold shutdown, the work load on test personnel may preclude their completion of all the required valve tests prior to startup. Valve testing during cold shutdowns shall not be more frequent than one test per quarter for each valve in the test program.

4.8 Category A Valves p

Va lve N ~Te Descri tion Note Test Freer 304A CV 1-A RCP Seal Xnjection Stroke C/R 304B CV 1-B RCP Seal Xnjection Stroke C/R 313 MOV Seal Water Return Stroke C/R Isolation Leak R 370B CV Charging Line Xsolation Stroke C/R 371 AOV Letdown Xsolation Stroke C/R Leak R l

38 3B CV Alternate Charging Line Stroke C/R 508 AOV RMW to Containment Vessel Stroke Q Stop Leak R

(0 L 40 90C TITLE: DATE QUALITY ASSURANCE 11/1/79 MANUAL Appendix C GINNA STATION Pump and Valve PAGE Testing Program or- 39 Valve I ~Te Descri tion Note Test Freer 528 CV N2 Supply to PRT Stroke Q Leak R 529 CV RMW to PRT Stroke Q Leak R 539 AOV PRT Stop>Valve to Gas Stroke Q Analyzer Leak R 743 CV CC From Excess Letdown HX. Stroke Q Leak R 745 AOV Return From Excess Let- Stroke Q down HX. Leak R 750A CV CC to A RCP Stroke C/R Leak R 750B CV CC to B RCP Stroke C/R Leak R 759A MOV Containment Stop CC From Stroke C/R Loop A RCP Leak R 759B MOV Containment Stop CC From Stroke C/R Loop B RCP Leak R 813 MOV Supply CC to RX Support Stroke C/R Coolers Leak R 814 MOV Return CC to RX Support Stroke C/R Coolers Leak R 846 AOV N2 Supply to Accumulators Stroke Q Leak R 862A CV 1-A CSP Disch Stroke Q Leak R 862B CV 1-B CSP Disch Stroke Q Leak R

0 <r 40 90C TITLE:, OATE QUALITY ASSURANCE 11/1/79 MANUAL Appendix C PAGE GIN NA STATION Pump and Valve Testing Program 10 or- 39 Valve N TvVe Note Test Freer 8 70A CV 1-A to 1-C SI Pump.Disch Stroke Q Leak R 8 70B CV 1-B to 1-C SI Pump Disch'troke Leak Q

R 879 HV SI Test L'ine Isolation Stroke Leak R 889A CV 1-A SI Pump Disch Stroke Leak R 8898 1-B SI Pump Disch Stroke Q Leak R 966A AOV Pressurizer Steam Space Stroke Q 966B 'V AOV VC VC Isolation Pressurizer Liquid Space Isolation Leak Stroke Leak R

Q R

966C AOV Loop A and B Hot Leg VC Stroke Q Isolation Leak R 1003A LCV 1-A RCDT Pump Suction Stroke Q Leak R 1003B LCV 1-B RCDT Pump Suction Stroke Q Leak R 1713 CV N2 to RCDT Check Stroke Q Leak R 1721 AOV Suction line to RCDT Stroke Q

, Leak R 1723 AOV A Containment Sump Disch Stroke Q Stop to Waste Holdup Tank Leak" R 1728 AOV A Containment Sump Disch Stroke Q Stop to Waste Holdup Tank Leak R

0, TITLE DATE QUALITY ASSURANCE 11/1/79 MANUAL Appendix C PAGE GINNA STATION Pump and Valve Testing Program 11 oF 39 Valve 5 ~Te Note Test Freer 1786 AOV RCDT to VH Stroke Q Leak R 1787 AOV RCDT to VH Stroke Leak 1789 AOV RCDT to GA'utlet Isolation Stroke Leak 5869 APV Containment Purge Supply Stroke Q Isolation Leak R 5870 APV Containment Purge Supply Stroke Q Isolation Leak R 5878 APV Containment. Purge Exhaust Stroke Q Isolation Leak R 5879 APV Containment Purge Exhaust Stroke Q Isolation Leak R 7226 CV DI Water Isolation Inside Stroke Q Containment I Leak R 4'.9 Category B Valves Va lve 0 ~Te Descri tion Note Test Freer 014 RCV Aux Building GDT Release. Stroke 017 RCV Comp Cool Surge Tank Vent, Stroke 081 APV Control Room Ventilation Stroke Q Damper 082 APV Control Room Ventilation Stroke Q Damper 083 APV Control Room Ventilation Stroke Q Damper 084 APV Control Room Ventilation Stroke Q Damper

IW TITLE: DATE QUALITY ASSURANCE 11/1/79 MANUAL Appendix C PAGE GINNA STATION Pump and Valve Testing Program 12 DF 39 Va lve N ~Te Descri tion Note Test Freer 085 APV Control Room Ventilation Stroke Q Damper 086 APV Control Room Ventilation Stroke Q Damper 112B LCV Emergency'akeup RWST to Stroke Q Charging Pump 112C LCV VCT Outlet Stroke Q 427 AOV Letdown From Loop B Stroke C/R 624 HCV 1-B RHR HX Outlet Stroke Q 625 HCV 1-A RHR HX Outlet Stroke Q 626 FCV RHR Loop Return Stroke Q 700 MOV Suction Stop From Loop A Stroke C/R to RHR Pumps 701 MOV Suction Stop From Loop A 8 Stroke C/R to RHR Pumps 704A MOV Suction 1-A RHR Pump Stroke Q 704B MOV Suction 1-B RHR Pump Stroke Q 10" Discharge to Stroke

'OV 720 B Loop 8 C/R From RHR Pumps 721 MOV 10" Disch to B Loop From 8 Stroke C/R RHR Pumps 738A MOV CC to 1-A RHR HX Stroke Q 738B MOV CC to 1-B RHR HX r

Stroke Q 825A MOV SI Pump Suction'rom RWST 9. Stroke C/R 825B MOV SI Pump Suction From RWST . 9 Stroke C/R

49 90C TITLE: PATE QUALITY ASSURANCE 11/1/79 MANUAL Appendix C Pump and Valve PAGE G INNA STATION Testing Program 13 pp 39 Valve N ~Te Descri tion Note Test Freer 826A MOV SI Pump Suction From BA Stroke Q Tank 8 26B MOV SI Pump Suction From BA Stroke Q Tank 826C MOV SI Pump Suction From BA Stroke Q Tank 826D MOV SI Pump Suction From BA Stroke Q Tank 836A HCV Spray Additive Tank Dis- Stroke Q charge P 836B HCV Spray Additive Tank Dis- Stroke Q charge 850A MOV, Sump B to RHR Pumps Stroke , Q 850B MOV Sump B to RHR Pumps Stroke Q 852A MOV RHR Pumps to RX Vessel Stroke Q 852B MOV RHR Pumps to RX Vessel Stroke Q 856 MOV RWST to RHR Pumps Stroke C/R 8 57A MOV Isolate 1B RHR HX From Stroke Q

.CS and SI Pumps 857B MOV Isolate 1A RHR HX From Stroke Q CS and SI Pumps 8 57C MOV Isolate 1A RHR HX From Stroke Q CS and SI Pumps 860A MOV Parallel Discharge MOV Stroke Q From 1-A CSP

TITLE: PATE QUALITY ASSURANCE 11/1/79 MANUAL Appendix C Pump and Valve PAGE GINNA STATION Testing Program 14 PP 39 Valve N ~Te Descri tion Note Test ~Fre 860B MOV Parallel Discharge MOV Stroke .Q From 1-A CSP 860C MOV Parallel Discharge MOV Stroke Q From 1-B CSP 860D MOV Parallel Discharge MOV Stroke Q From 1-B CSP 8 71A MOV 1-A to 1-C SI Pump Discharge- Stroke Q 8 71B MOV 1-B to 1-C SI Pump Discharge Stroke Q 875A MOV Parallel MOV From CS Pumps Stroke Q to 1A Charcoal Filter Deluge 875B MOV Parallel MOV From CS Pumps Stroke Q to 1A Charcoal Filter Deluge 8 76A MOV Parallel MOV From CS Pumps Stroke Q to 1B Charcoal Filter Deluge 8 76B MOV Parallel MOV From CS Pumps Stroke Q to 1B Charcoal Filter Deluge 896A MOV RWST to CS and SI Pumps 9 'troke C/R 896B MOV RWST to CS and SI Pumps 9 Stroke C/R 18 15A MOV C-SI Pump Suction From Stroke Q RWST 1815B MOV C-SI Pump Suction From Stroke Q RWST 3504 MOV Main Steam to TAFP From l-B Stroke Q S/G 3505 MOV Main Steam to TAFP From 1-A Stroke Q S/G h

0 l ~ t TITLE DATE QUALITY ASSURANCE 11/1/79 MANUAL Appendix C GINNA STATION Pump and Valve PAGE Testing Program 15 DF 39 Valve N ~Te Descri tion Note Test Freer 3652 MV Main Steam Throttle Valve Stroke to TAFP 3996 MOV TAFP Discharge Stroke 4000A MOV Cross Over Valve For MAFP Stroke t

4000B MOV Cross Over Valve For MAFP 'troke 4007 MOV 1-A MAFP Discharge Stroke 4008 MOV 1-B MAFP Discharge Stroke . Q 4013 MOV TAFP Service Water Supply Stroke Isolation 4027 MOV 1-A MAFP Service Water Stroke Q Isolation 4028 MOV 1-B MAFP Service Water Stroke Q Isolation 4291 AOV TAFP Recir. Line Stroke 4297 AOV TAFP Discharge to 1-A S/G Stroke 4298 AOV TAFP Discharge to 1-B S/G Stroke 4304 AOV 1-A MAFP Recirculation Stroke Control 4310 AOV 1-B MAFP Recirculation Stroke Q Control 4561 AOV Containment Vent Recirc. Stroke Q Fans Discharge Flow Con-trol 4562 AOV Containment Vent. Recirc. Stroke Q Fans Discharge Flow Con-trol Bypass

TITI.E: DATE QUALITY ASSURANCE 11/1/79 MANUAL Appendix C PAGE GINNA STATION Pump and Valve Testing Program 16 DP 39

~

Va 1ve I ~Te Note Test Freer 4609 MOV lAl Screen House SW Stroke Q Isolation 4613 MOV 1B2 Turbine Building SW Stroke Q Isolation 4614 MOV lAl Turbine Building SW Stroke Q Isolation 4615 MOV 1B1 Aux. Building SW Stroke Q Isolation 4616 MOV 1Al Aux. Building SW Stroke Q Isolation 4663 MOV 1A1 Air Cond. Chillers SW Stroke Q Isolation 4664 MOV 1A2 Turbine Building SW Stroke Q Isolation 4670 MOV 1B1 Turbine Building SW Stroke Q Isolation 4733 MOV lA2 Air Cond. Chillers SW Stroke Q Isolation 4734 MOV 1B2 Aux. Build. SW Isolation- Stroke Q 4735 MOV 1A2 Aux. Build. SW Isolation- Stroke Q 4780 MOV 1A2 Screen House SW Stroke Q Isolation 5171 MOV Turbine Build. Fire Water Stroke Q Loop Supply Isolation 5871 APV Containment Post Accident Stroke Q Filter Damper 5872 APV Containment Post Accident Stroke Q Filter Damper

40 OOC TITLE: DATE QUALITY ASSURANCE 11/1/79 MANUAL Appendix C PAGE GINNA STATION Pump and Valve Testing Program 17 oF 39 Va 1ve 0 ~Te Note Test Freer 5873 APV Containment Post Accident Stroke Q Filter Damper 5874 APV Containment Post Accident Stroke Q Filter Damper 5875 APV Containment Post Accident Stroke Q Filter Damper 5876 APV Containment Post Accident Stroke Q Filter Damper 9629A MOV 1C SAFP Service Water Stroke Q Isolation 9629B MOV 1D SAFP Service Water Stroke Q Isolation 9701A MOV 1C SAFP Discharge Stroke Q 9701B MOV 1D SAFP Discharge Stroke Q 9703A MOV SAFP Cross Over Stroke Q 9703B MOV SAFP Cross Over Stroke Q 9704A MOV 1C SAFP Containment Stroke Q Isolation 9704B MOV 1D SAFP Containment Stroke Q Isolation 9710A AOV 1C SAFP Recirc. Control Stroke Q 9710B AOV 1D SAFP Recirc. Control Storke Q

4. 10 Category C Check Valves Valve 'N ~Te Descri tion Note Test Freer 710A CV 1-A RHR Pump Discharge Stroke Q 710B CV 1-B RHR Pump Discharge Stroke Q

0 m

Y

49 OOC TITLE: DATE QUALITY ASSURANCE 11/1/79 MANUAL Appendix C PAGE G INNA STATION Pump and Valve Testing Program 18 oF 39 Valve N ~Te Descri tion Note Test Freer 723A CV 1-A CC Pump Discharge Stroke Q 723B CV 1-B CC Pump Discharge Stroke Q 842A CV First. Check Valve in Loop Stroke Q A Accumulator*Dump Line 842B CV First Check Valve in Loop Stroke Q B Accumulator Dump Line 847A CV A-CSP From Spray Additive Stroke Q Tank to Eductor 847B CV B-CSP From Spray Additive Stroke Q Tank to Eductor 853A CV Core Deluge Check 10 St.roke R 853B CV Core Deluge Check 10 Stroke R 854 CV RWST to RHR Pump Check ll Stroke '/R 866A CV CS Pump 1-A to Charcoal 12 Stroke C/R Filter Deluge 866B CV CS Pump 1-B to Charcoal Stroke Q Filter Deluge 8 67A ,CV Accumulator, Dump and SI 13 Stroke C/R to Cold Leg Loop B 867B CV Accumulator Dump and SI 13 Stroke C/R to Cold Leg Loop A 8 78G CV ,1-A SI Pump to Cold Leg 13 Stroke C/R Loop B After MOV 878B 878J CV 1-B SI Pump to Cold Leg 13 . Stroke C/R Loop A After MOV 878D

40 90C TITLE: DATE QUALITY ASSURANCE 11/1/79 MANUAL Appendix C PAGE GINNA STATION Pump and Valve Testing Program 19 39 Valve N ~Te Descri tion Note Test Freer 3516 CV 1B S/G Main Steam Swing 14 Stroke Start-Check Stop Valve up 3517 CV lA S/G Main Steam Swing 14 Stroke S tart-Check Stop Valve up 3998 CV TAFP Discharge Check Stroke 4000C CV lA MAFP Discharge Stroke Downstream MOV-4007 4000D CV 1B MAFP Discharge Stroke Q Downstream MOV-4008 4003 CV TAFP to S/G lA Stroke Q 4004 CV TAFP to S/G 1B Stroke Q 4009 CV lA MAFP to S/G lA Stroke Q 4010 CV 1B MAFP to S/G 1B Stroke Q 4014 CV TAFP Condensate Suction Stroke Q 4016 CV 1B MAFP Suction Stroke Q 4017 CV 1A MAFP Suction Stroke Q 4023 'CV TAFP Recirculation Stroke Q 4601 CV 1A Service Water Pump Stroke Q Discharge 4602 CV 1B Service Water Pump Stroke Q Discharge 4603 CV 1C Service Water Pump Stroke Q Discharge 4604 CV 1D Service Water Pump Stroke Q Discharge

O. l C

'1 N

'I

~'

t

49 OOC TITLE: DATE QUALITY ASSURANCE 11/1/79 MANUAL Appendix C PAGE GINNA STATION Pump and Valve Testing Program 20 DF 39 Valve I ~Te Descri tion Note Test Freer 5133 CV Diesel Fire Pump Disch. Stroke Q 5136 CV Motor Fire Pump Discharge Stroke Q 9627A. CV 1C SAFP SW Suction Stroke Q 9627B CV 1D SAFP SW Suction Stroke Q 9700A CV 1C SAFP Discharge Stroke Q 9700B CV 1D SAFP Discharge Stroke Q 9705A CV 1C SAFP to S/G 1A Stroke Q 9705B CV 1D SAFP to S/G 1B Stroke Q 4.11 Category C Relief Valve Va lve I ~Te Descri tion Note Test ~reer 203 RV Letdown High Pressure 15 Safety Relief 209 RV Letdown Low Pressure 15 Safety Relief 430 PORV Primary System Relief 16 Stroke R 431C PORV Primary System Relief 16 Stroke R 434 RV Pressurizer Relief 435 RV Pressurizer Relief 732 RV CC Surge Tank Relief 15 744 RV CC From Excess Letdown Heat Exchanger 755A RV CC From A RCP Thermal 15 Barrier

49 90C TITLE: OATE QUALITY ASSURANCE 11/1/79 MANUAL Appendix C PAGE GINNA STATION Pump and Valve Testing Program 21 or. 39 Valve N ~Te Descri tion Note Test Freer 755B RV CC From B RCP Thermal 15 Barrier 758A RV CC From A-RCP Oil Coolers 15 758B RV CC From B-RCP Oil Coolers 15 818 RV CC From Reactor Support 15 Coolers

'61 RV 1-B CS Pump Suction Relief 15 887 RV On SI Test Line Inside 15 Containment 1817 RV Alternate Suction From 15 RHR Pump to C SI Pump 3508 RV 1-B S /G PRV 15 3509 RV 1-A S/G PRV 15 3510 RV 1-B S /G PRV 15 3511 RV 1-A S /G PRV 15 3512 RV 1 A S/G PRV 15 3513 RV 1-A S./G PRV 15 3514 RV 1-B S/G PRV 3515 RV 1-A S/G PRV 4653 RV Service Water Relief 15 4654 RV Service Water Relief 15 4657 RV Service Water Relief 15 5134 RV Diesel Fire Pump Disch R.V. 15 5135 RV Motor Fire Pump Disch R.V. 15

TITLE: DATE QUALITY ASSURANCE 11/1/79 MANUAL Appendix C PAGE G INN A STATI ON Pump and Valve Testing Program 22 DP 39 4.12 Category E Locked Valves Valve 5 ~Te Descri tion Normal Position 220 MV Cation Bed Resin Fill Closed 246 MV Cation Bed Letdown Inlet Closed 279A MV 1A Charging Pump Relief Lock Open Open Valve 279B MV 1B Charging Pump Relief Lock Open Open Valve 279C MV 1C Charging Pump Relief Lock Open Open Valve 311B MV Excess Letdown to Seal Open Water Return 329 MV lA Boric Acid Pump Recir- Open culation 336 MV 1A Boric Acid Transfer Pump Closed Suction Flush 337 MV 1B Boric Acid Transfer Pump Closed Suction Flush 344 MV 1B Boric Acid Pump Recir- Open culation 353 MV RMW Emergency Boration Supply Closed Flushing 369 MV Letdown Line Sample and Return =Closed 379 MV Cation Bed Letdown Outlet Closed 380 MV Cation Bed Outlet Hut Drain Closed 381 MV Cation Bed RMW Backwash Supply Closed 382 MV Cation Bed Spent Resin Outlet Closed

I J

V h

H

TITLE: DATE QUALITY ASSURANCE 11/1/79 MANUAL Appendix C PAGE GINNA STATION Pump and Valve Testing Program 23 oF 39 Valve 5 ~Te Normal Position 384B MV Charging Line Outlet Open 543 MV Letdown Stop Valve Open 544 MV Excess Letdown Open 703 MV Stop'RHR'Out RHR HX's to Open Letdown 705C MV Valve 850A Pressure Relief Open Bonnet Vent 705D MV Valve 850B Pressure Relief Open Bonnet Vent.

707A MV CC to 1A Residual Heat Pump Open 707B MV CC to 1B Residual Heat. Pump Open 708A MV CC From lA Residual Heat Pump Open 708B MV CC From 1B Residual Heat. Pump Open 709A MV Discharge Stop lA RHR Pump Open 709B MV Discharge Stop 1B RHR Pump Open 714 MV RHR to lA RHR HX Open 715 MV RHR Out 1B RHR HX Open 716 MV RHR to 1B RHR HX Open 717 MV RHR Out 1A RHR HX .

Open 728 MV CC HX Surge Line Stop Open 748A MV CC Supply to Distillate Cooler Open B.A. Pack.

748B MV CC Supply to Distillate Cooler Open B.A. Pack.

TITLE: DATE QUALITY ASSURANCE 11/1/79 MANUAL Appendix C PAGE GINNA STATION Pump and Valve Testing Pxogram 24 DF 39 Valve N ~Te Normal Position 764C MV Combined CC Return From SI Pumps Throttled 764D MV Combined CC Return From Con- Throttled tainment Spray Pumps 769 MV Combined Stop CC From RHR Pumps " Throttled 77 7A MV CC to lA Containment .Spray Pump Open 777B MV CC From lA Containment Spray Open Pump 777C MV CC From 1B Containment Spray Open Pump 777D MV CC From 1B Containment Spray Open Pump 777E MV CC From 1A SI Pump Open 777F MV CC To lA SI Pump Open 777G MV CC From 1C SI Pump Open 777H MV 'C To 1C SI Pump Open 777J MV CC To 1B SI Pump Open 777K MV CC From 1B SI Pump Open 777L MV CC To lA SI Pump Open 777M MV CC From lA SI Pump Open 777N MV CC To 1C SI Pump Open r

777P MV CC From 1C SI Pump Open 777R MV CC From 1B SI Pump Open 777S MV CC To 1B SI Pump Open 788A MV Make up Water Valve to SFP Closed

(~

O.

'I I

40 90C TITLE: DATE QUALITY ASSURANCE 11/1/79 MANUAL Appendix C PAGE 6INNA STATION Pump and Valve Testing Program 25 DF 39 Valve N ~Te Descri tion Normal Position 803 MV SFP Filter Discharge to RUST Closed 804 MV SFP HX By-pass From SFP Filter Throttled 822B MV RHR Pump Recirculation Open 831A MV Spray Additive Tank Prom CS Open Pump Suction 8 31B MV Spray Additive Tank From CS Open Pump Suction 858A MV Suction Valve to CS Pump lA Open 858B MV Suction Valve to CS Pump 1B Open 859A MV Test Line Valve From CS Pump 1A Closed 859B MV Test Line Valve From CS Pump 1B Closed 864A MV Test Connection on Discharge Closed Line of CS Pump lA 864B MV Test Connection on Discharge Closed Line of CS Pump 1B 868A MV Discharge Valve From CS Pump lA Open 868B MV 'ischarge Valve From CS Pump 1B Open 873A MV Spray Additive Tank from CS Pumps Open 873B MV Spray Additive Tank from CS Pumps Open 873C MV Spray Additive Tank from CS Pumps Closed 8 73D MV Spray Additive Tank from CS Pumps Closed 8 78E MV Manual Value After MOV 878D From Open 1B SIP Header to Cold Leg Loop A

4

'C

TITLE: OATE QUALITY ASSURANCE 11/1/79 MANUAL Appendix C PAGE GINNA STATION Pump and Valve Testing Program 26 OF 39 Valve II ~Te Normal Position 879 MV SI Test Line Closed 880B MV Loop B Accumulator Test Line Open 880C MV Loop A Accumulator Test Line Open 881A MV Spray Additive Tank Drain Closed 881B MV Spray Additive Tank Outlet Open 881C MV Spray Additive Eductor Outlet Open 881D MV Spray Additive Eductor Outlet Open 888A MV lA SI Pump Discharge Open 888B MV 1B SI Pump Discharge Open 890A MV Suction For SI Pump 1A Open 890B MV Suction For SI Pump 1B Open MV FI 903 Outlet to Chem Drain Closed Tank 1076A MV A Hydrogen Recombiner Pilot Line Closed 1076B MV B Hydrogen Recombiner Pilot Line Closed 108 OA MV Hydrogen Recombiner Oxygen Makeup Closed 1084A MV A Hydrogen Recombiner Main Burner Closed 1084B MV B Hydrogen Recombiner Main Burner Closed 1100B MV VCT Relief to CVCS Holdup Tank N1 Open 1100C MV VCT Relief to CVCS Holdup Tank p2 Open 1100D MV VCT Relief to CVCS Holdup Tank .N3 Open 1102 MV CVCS Hut. 53 Outlet to Vent Header Open

TITLE: DATE QUALITY ASSURANCE 11/1/79 MANUAL Appendix C PAGE GINNA STATION Pump and Valve Testing Program 27 oF 39 Valve I ~Te Descri tion Normal Position 1123A MV CVCS Holdup Tank g3 Vent Closed 1123B MV CVCS Holdup Tank N2 Vent Closed 1123C MV CVCS Holdup Tank gi Vent Closed 1239 MV RMW Pumps Suction from Monitor Closed Tanks 1249 MV Monitor Pump Discharge Waste Closed Discharge lsol.

1252 MV Monitor Pump Discharge to RMW Closed Tanks 1256A MV RMW Pumps and Montior Pump Dis- Closed charge X-TlE 1263 MV CVCS Hut 52 Outlet to Vent Header Open 1264 MV CVCS Hut N1 OUtlet to Vent Header Open 1269 MV Vent Header Xsol. Value to CVCS Open,,

Hut's 1554 MV D Recirculation Fan Air Sample Closed 1556 MV D Recirculation Fan AIr Sample Closed 1557 MV A Recirculation Fan Air Sample Closed 1559 MV A Recirculation Fan Air Sample Closed 1560 MV A and D Recirculation Fans Closed Air Sample Return 1562 MV A and D Recirculation Fans Closed Air Sample Return 1563 MV B Recirculation Fan Air Sample. Closed 1565 MV B Recirculation Fan Air Sample Closed

E TITLE: OATE QUALITY ASSURANCE 11/1/79 MANUAL Appendix C PAGE GINNA STATION Pump and Valve Testing Program 28 oF 39 Valve I ~Te Descri tion Normal Position 1566 MV B Recirculation Fan Air Sample Closed Return 1568 MV B Recirculation Fan Air Sample Closed Return 1569 MV C Recirculation Fan Air Sample Closed 1571 MV C Recirculation Fan Air Sample Closed 1572 MV C Recirculation Fan Air Sample Closed Return 1574 MV C Recirculation Fair Air Sample Closed Return 1613 MV VH-HUT Cross Connect Isol. Open 1617 MV 51 GDT Manual Discharge Closed 1618 MV 52 GDT Manual Discharge Closed 1619 MV g3 GDT Manual Discharge Closed 1620 MV N4 GDT Manual Discharge Closed 1656A MV Nl GDT Rupture Disc. Outlet to 1-Turn HUT Open 1656B MV N2 GDT Rupture Disc. Outlet to 1-Turn HUT Open 1656C MV N3 GDT Rupture Disc. Outlet to 1-Turn HUT Open 1656D MV N4 GDT Rupture Disc. Outlet to 1-Turn HUT Open 1667 MV N2 Supply to 1A WGC Closed 1669 MV N2 Supply to 1B WGC Closed 1701 MV Laundry and Hot Shower Cross Tie Closed

40 QOC TITLE: DATE QUALITY ASSURANCE 11/1/79

'ANUAL Appendix C PAGE GINNA STATION Pump and Valve /

Testing Program 29 DP 39 Valve N ~Te Descri tion Normal Position 1722 MV Refueling Canal Drain to RCDT Closed Pump 1748 MV Chem + Laundry Tank Outlet Closed Cross-Tie 1749 MV Chem + La'undry Pump Discharge Closed Stop Valve 1762 MV Waste Holdup Tank Pump Discharge Closed to WCT's 178 5 MV Master Waste Discharge Valve Closed 1795B MV R-18 Monitor Bypass Value Closed 1795E MV W Monitor Inlet Closed 1795F MV W Monitor Outlet Closed 1820A MV Shutoff Valve for A SI Pump Open Test Line 1820B MV "Shutoff Valve for C SI Pump Open Test Line 1820C MV Shutoff Valve for B SI Pump Open Test Line 2231 MV Letdown Line Cont. Outlet Drain Closed 2860 MV Isol. Valve from CSP-1A to Char- Open coal Filter Deluge 2865 MV Isol. Valve from CSP-1B to Char- i Open coal Filter Deluge 3528 Main Steam to Auxiliary Open Feedwater Pump 3970 MV 1B Feedwater Pump Suction Valve Open 3971 MV 1A Feedwater Pump Suction Valve Open

0 T TITLE: DATE QUALITY ASSURANCE 11/1/79 MANUAL Appendix C PAGE G INNA STATION Pump and Valve Testing Program 30 DF 39 Va lve 0 ~Te Descri tion Normal Position 4005 MV Turbine Driven AFW S/G 1A Stop Open 4006 MV Turbine Driven AFW S/G 1B Stop Open 4011 MV Motor Driven AFW S/G 1A Stop Open 4012 MV Motor Driven AFW S/G 1B Stop Open 4015 MV TAFP Suction Isolation Open 4018 MV lBMAFP Suction Isolation Open 4019 MV lAMAFP Suction Isolation Open 4038 MV 1B Feedwater Pump Warm-up Orifice Closed Isol.

4039 1A Feedwater Pump Warm-up Orifice Closed Isol.

4040 MV 1B Feedwater Pump Warm-up Orifice Closed 4041 'V MV Isol.

1A Feedwater Isol.

Pump Warm-up Orifice Closed 4060 MV 1A Feedwater Pump Recirc. Cond. Open Isol.

4061 MV 1B Feedwater Pump Recirc..Cond. Open Isol 4070 MV Condensate Storage Tank 1B Open Isolation 4070A MV Cond. Storage Tank B Makeup to Open Hotwell 4071 MV Condensate Storage Tank 1A Open Isolation 4071A MV Cond. Storage Tank A Makeup to Open Hotwell

1 P

40 OOC TITLE: OATE QUALITY ASSURANCE 11/1/79 MANUAL Appendix C PAGE G INNA STATION Pump and Valve Testing Program 31 oP 39 Va 1ve N ~Te Descri tion Normal Position 4071B MV Cond. Makeup Line to Hotwell Closed Drain 4072 MV 1B Condencate Storage Tank Drain Closed 4073 MV lA Condensate Storage Tank Drain Closed 4074 MV AFP Recirculation to 1B Conden- Open sate Storage 4075 MV AFP Recirculation to lA Conden- Open sate Storage 4080 MV TAFP Discharge Orifice Isolation Open 4081 MV 1A MAFP Discharge Orifice Open Isolation 4082 MV 1B MAFP Discharge Orifice Open Isolation 4098 MV Service Water Isolation to TAFP Closed 4140 MV Heater Drain Tank LC 3343 Isol. Open 4344 MV Service Water Isolation to MDAFP Closed 4345 MV Service Water to 1A MAFP Closed 4738 MV A Service Water Loop to CC Open 4739 MV B .Service Water Loop to CC Open 4789 MV SI Pump Bearing Oil Cooler Open Isolation 4790 MV SI Pump Bearing Oil Cooler Open Isolation 4791 MV lA SI Pump Bear'ing Oil Cooler Open Inlet .

C h ~

49 OOC TITLE: DATE QUALITY ASSURANCE 11/1/79 MANUAL Appendix C PAGE GINNA STATION Pump and Valve Testing Program 32 DF 39 Valve N ~Te Descri tion Normal Position 4791A MV lA SI Pump Bearing Oil Cooler Open Outlet 4794 MV 1B SI Pump Bearing Oil Cooler Open Inlet 4794A MV 1B SI Puihp Bearing Oil Cooler Open Outlet 4795 MV 1C SI Pump Bearing Oil Cooler Open Inlet 'C 4795A MV SI Pump Bearing Oil Cooler Open Outlet 5100 MV Test Line Isol. Open 5141 MV Diesel Fire Pump Discharge Open 5142 MV Motor Fire Pump Discharge Open 5172 MV Area N1 Deluge Supply Xsol. Open 5173 MV Area Nl Deluge Supply Xsol. Closed 5174 MV Turbine Bldg. Fire Water Loop Open Division MV Turbine Bldg. Fire Water Supply Open Loop Division 5196 MV Storage Tank High Level Drain Open Control Isol.

5197 MV Sorage Tank Outlet Check Isol. Open-5198 MV Storage Tank Outlet Check Xsol. Open 5200 MV Storage Tank Outlet Check Bypass Closed

40 OOC TITLE: DATE QUALITY ASSURANCE 11/1/79 MANUAL Appendix C PAGE GINNA STATION Pump and Valve Testing Program 33 DF 39 Va 1 ve N ~Te Descri tion Normal Position 5202 MV Turbine Bldg. Fire Water Supply Open Loop Division 5220 MV Motor Fire Pump Discharge Isol. Open 5221 MV Fire Pump Crossover Closed 5233 MV Service Bldg. Sprinkler Sys. N13 Open Isol.

5243 MV Deluge "A" Header Isol. Open 5245 MV Deluge "B" Header Supply Isol. Open 5248 MV AFW Pump Oil Res. Deluge Supply Open Isol.

5250 MV Test Line Flow Control Closed 5438 MV Oil Bowser to Turbine Oil Tank Closed Isol.

5448 MV Water Feed to Oil Coolder Inlet Closed Isol.

5462 MV Turbine Lube Oil Sample Closed 5763 MV S/G Blowdown from Nuclear Sample Open Room 5931 MV lA Diesel Generator Cooling Water Open 5932 MV 1B Diesel Generator Cooling Water Open 5935 MV 1A Diesel Generator Cooling Water Open 5936 MV 1B Diesel Generator Cooling Water Open 5947 MV 1A Diesel Generator Air Receiver Open Outlet

40 OOC TITLE DATE QUALITY ASSURANCE 11/1/79 MANUAL Appendix C PAGE GINNA STATION Pump and Valve Testing Program '34 DF 39 Valve N ~Te Descri tion Normal Position 594 7A MV 1A Diesel Generator Air Receiver Open Outlet 5948 MV 1B Diesel Generator Air Receiver Open Outlet 5948A MV 1B Diesel Generator Air Receiver Open Outlet 5973 MV 1A Diesel Generator Isolation Open Valve 5974 MV 1B Diesel Generator Isolation Open Valve 5977C, MV lA Diesel Generator Day Tank 'I Closed 5977D MV lA Diesel Generator Drain to Closed Reservoir 5978C MV 1B Diesel Generator Day Tank Closed 5978D MV 1B Diesel Generator Drain to Closed Reservoir 6151 MV Heating Steam to CV Closed 6152 MV Heating Return from CV Closed 6165 MV Heating Steam to CV Closed 6175 MV Condensate Return from CV Closed 7140 MV Service Air Guard Valve Upstream *Closed Secondary Isolation Valve 7141 MV Service Air Isolation Valve Closed Outside Containment 7227 MV Service Air Isolation Valve Closed Inside Containment 7448 MV Isolation Valve to Pressure Closed Indicators

0 IA J

49 ROC TITLE: OATE QUALITY ASSURANCE 11/1/79 MANUAL Appendix C PAGE G INNA STATION Pump and Valve Testing Program 35 OP 39 Valve N ~Te Descri tion Normal Position 7452 , MV Isolation Valve for Local Closed Pressure Indicators 7456 MV Isolation Valve for Local Closed Pressure Indicators 8423 MV 02 to H2-Recombiner Open 8425 MV H2 to H Recombiner "B" Main Open Burner- 2" Inside Isol.

8427 MV H to HI Recombiner "B" Pilot Open 3 4" Inside Isol.

8433 MV H2 to H Recombiner "A" Main Open Burner 3" Inside Isol.

8435 MV H to HI Recombiner "A" Pilot,. Open 3 4" Inside Isol.

9706A MV "C" SAFWP to A S/G Stop Open 9706B MV "D" SAFWP to B S/G Stop Open 9723 MV Standby Auxiliary Feedwater Closed System Pressure Transmitter Isolation '

9725 MV Standby Auxiliary Feedwater Closed System Pressure Transmitter Isolation MV Fuel Transfer Isolation Valve Closed 4.13 Inservice Valve Testing Notes Note 1 Valves 304A, 304B and 313 cannot be stroked during normal plant operation on a quarterly basis because they would interrupt coolant flow to the reactor

.coolant pump seals. These valves will be stroked at cold shutdowns and refuel-ing outages.

TITLE: OATE QUALITY ASSURANCE 11/1/79 MANUAL Appendix C PAGE GINNA STATION Pump and Valve Testing Program 36 OF 39 Note 2 Valve 370B cannot be stroked during normal plant operation on a quarterly basis because this test would interrupt charging pump flow. This valve will be stroked at cold shutdowns and refueling outages.

Note 3 Valves 371 and 427 cannot be stroked during normal plant operation on a quarterly basis because this test would interrupt the letdown (CVCS) system. These valves will be stroked at cold shutdowns and refueling outages.

Note 4 Valve 383B cannot be stroked during normal plant operation on a quarterly basis because this test would result in substantial radiation exposure to test personnel. A recent'survey in the area of the test connection indicated a neutron field of 500 mr/hr and a gamma field of 250 mr/hr. This valve will be stroked at cold shutdowns and refueling outages.

Note 5Valves 750A, 750B, 759A and 759B cannot be stroked during normal plant operation on a quarterly basis because this test would require the reactor coolant pumps to be shut down to eliminate the flow through these checks and MOVs. These valves will be stroked at cold shutdowns and refueling outages.

Note 6 Valves 813 and 8l4 cannot be stroked during normal plant operation on a quarterly basis because this test would remove the coolant to the reactor vessel supports and cavity wall. These valves will be stroked at cold shutdowns and refueling outages.

P; 4

I

49 OOC TITLE: DATE QUALITY ASSURANCE 11/1/79 MANUAL Appendix C GINNA STATION Pump and Valve PAGE Testing Program OF Note 7 Valve 879 is a manual valve in the safety injection test line and is kept locked shut. This valve is not required to change position to perform a safety func-tion. The only requirement is that leak-age through valve 879 be acceptably low.

Therefore, the quarterly stroke test has been deleted. This valve .will be leak tested at refueling outages.

Note 8 Valves 700 and 721 cannot be stroked during normal plant operation on a quarterly basis because there is an interlock system which prevents these valves from opening when the primary system is at operating pressure.

Valves 700, 701, 720 and 72l separate a high pressure system from a low pressure system. These valves will be stroked at. cold shutdowns and refuel-ing outages.

Note 9 Valves 825A, 825B, 856, 896A, and 896B should not be stroked during normal opera-tion on a quarterly basis because this would cause a temporary loss of system function of the ECCS. These valves pro-vide the suction from the refueling water storage tank to the safety injection and residual heat removal pumps. These valves will be stroked at cold shutdowns and re-fueling outages.

Note 10- Valves 853A and 853B cannot be stroked dur-ing normal plant operation on a quarterly basis because'this test would pressurize the RHR system to the primary system opera-tion pressure. These valves will be 'stroke at refueling outages.

0 0 g I+ 4 49 90C TITLE: DATE QUALITY ASSURANCE 11/1/79 MANUAL Appendix C PAGE GINNA STATION Pump and Valve Testing Program 38 oF 39 Note 11- Valve 854 cannot be stroked, during normal plant operation on a quarterly basis be-cause there is not a way to establish a I flow through this valve when the primary is at pressure and the RHR system 'ystem is not operating. This valve will be stroked at cold shutdowns and refueling outages.

ll Note 12- Valve 866A cannot be stroked during normal plant operation on a quarterly basis because this test would result in a substantial radiation exposure to test personnel. A recent survey of the test location indicated a gamma field of 800 mr./hr. This valve will be stroked at cold shutdowns and refueling outages.

Note Valves 867A, 867B, 878G, and 878J cannot be stroked during normal operation on a quarterly basis because this test cannot be doen when the primary system is at operating pressure. This test may only be done when the plant is in a cold shutdown condition with a partially full

.primary system in order to prevent an overpressurization.

Note 14- Valves 3516 and 3517 cannot be stroked during normal plant operation in a quarterly basis because they are the main steam swing check stop valves.

These valves are stroked during each plant startup.

Note 15- Category C Relief Valves shall be tested in accordance with the extent and frequency requirements of Paragraph IWV-3510 of Article INV of Section XI of the Code.

Note 16 Valves 430 and 431C are the power .

operated relief valves associated with the overpressurization system. These valves shall be stroked during each refueling outage in accordance with normal valve testing procedures.

40 QOC TITLE: DATE QUALITY ASS U RAN CE 11/1/79 MANUAL Appendix C PAGE GINNA STATION Pump and Valve Testing Program 39 DF 39 PVT 5.0 Records 5.1 Records for the Inservice Pump Testing Program shall be developed and maintained in accordance with Article IWP-6000 of Section XI of the Code.

5.2 Records for the Inservice Valve Testing Program shall be developed and maintained in accordance with Article IWV-6000 of Section XI of the Code.