|
|
(4 intermediate revisions by the same user not shown) |
Line 2: |
Line 2: |
| | number = ML11181A149 | | | number = ML11181A149 |
| | issue date = 06/23/2011 | | | issue date = 06/23/2011 |
| | title = Wolf Creek, Revision of Information Provided in 10 CFR 50.75 Report on Status of Decommissioning Funding | | | title = Revision of Information Provided in 10 CFR 50.75 Report on Status of Decommissioning Funding |
| | author name = Stull A F | | | author name = Stull A |
| | author affiliation = Wolf Creek Nuclear Operating Corp | | | author affiliation = Wolf Creek Nuclear Operating Corp |
| | addressee name = | | | addressee name = |
Line 13: |
Line 13: |
| | document type = Letter, Status Report | | | document type = Letter, Status Report |
| | page count = 3 | | | page count = 3 |
| | | project = TAC:ME5552 |
| | | stage = Other |
| }} | | }} |
| | |
| | =Text= |
| | {{#Wiki_filter:W*LF CREEK NUCLEAR OPERATING CORPORATION Annette F. Stull Vice President and Chief Administrative Officer June 23, 2011 CO 11-0003 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555 |
| | |
| | ==Reference:== |
| | : 1) Letter CT 11-0018, dated March 29, 2011, from A. F. Stull, WCNOC to USNRC |
| | : 2) E-mail dated May 10, 2011, from J. R. Hall, USNRC, to D. M. |
| | Hooper, WCNOC, Draft Request for Additional Information - |
| | Decommissioning Funding for Wolf Creek Generating Station (TAC NO. ME5552) |
| | : 3) Letter CO 11-0002, dated June 23, 2011, from A. F. Stull, WCNOC, to USNRC |
| | |
| | ==Subject:== |
| | Docket No. 50-482: Revision of Information Provided in 10 CFR 50.75 Report on Status of Decommissioning Funding Gentlemen: |
| | Reference 1 provided Wolf Creek Nuclear Operating Corporation's (WCNOC) report on status of decommissioning funding for Wolf Creek Generating Station (WCGS). Reference 2 provided a request for additional information (RAI) related to this report. During the preparation of WCNOC's response to reference 2 it was discovered that some of the values reported in reference 1 under the section titled "Assumptions re: Rates/Factors specific to Owner and Jurisdiction" were not accurate. |
| | The correct values are set out in the Attachment to this letter. Please note that while some of the values in the section titled "Assumptions re: Rates/Factors specific to Owner and Jurisdiction" of reference 1 were not correct, the values calculated in the preceding sections of the report used the correct information in the calculations. Therefore the "Schedule of Amounts Collected" and the market values of the Owners' funds were reported correctly even though some of the assumptions listed in reference 1 were not accurate. |
| | Reference 3 provides WCNOCs response to the RAI. |
| | P.O. Box 411 / Burlington, KS 66839 / Phone: (620) 364-8831 An Equal Opportunity Employer M/F/HCNET |
| | |
| | CO 11-0003 Page 2 of 2 This letter contains no commitments. If you have any questions concerning this matter, please contact me at (620) 364-4004, or Mr. Gautam Sen at (620) 364-4175. |
| | Sincerely, "I'1 dz Annette F. Stull AFS/rlt Attachment cc: E. E. Collins (NRC) |
| | J. R. Hall (NRC) |
| | G. B. Miller (NRC) |
| | Senior Resident Inspector (NRC) |
| | |
| | Attachment to CO 11-0003 Page 1 of 1 WOLF CREEK NUCLEAR OPERATING CORPORATION's CORRECTION TO CERTAIN DATA PROVIDED IN ATTACHMENT II TO LETTER CT 11-0018 Assumptions re: Rates/Factors specific to Owner and Jurisdiction KGE KCPL KEPCo Cost Escalation Rate Kansas 3.73%* 3.73%* 3.73%* |
| | Missouri -- 4.40% -- |
| | Rates of Earnings on Funds Kansas 6.5 1%for 2009-2025; 6.95% for 2010-2025; 6.80% for 2009-2025; 6.51% for 2026-2035; Annual decreases in the 6.40% for 2026-2035; 6.77% for 2036-2044; rate thereafter, from 6.73% 6.00% for 2036-2044; 2.79% for 2045 in 2026 down to 1.9 1%in 3.00% for 2045-2053. |
| | through end of 2053. |
| | decommissioning.**_ |
| | Missouri 6.48% for 2008-2025; -- |
| | Annual decreases in the rate thereafter, from 6.36% |
| | in 2026 down to 2.82% in 2053. |
| | Notes: |
| | * Same rate as originally reported. |
| | ** The originally-reported assumed rate of earning for KGE, 5.82%, was an overall average of the annual weighted rates of earnings.}} |
|
---|
Category:Letter
MONTHYEARIR 05000482/20244202024-10-31031 October 2024 Security Baseline Inspection Report 05000482/2024420 05000482/LER-2024-001-01, Mode 3 Entry with One Auxiliary Feedwater Pump Train Inoperable Due to Missed Post-Maintenance Testing2024-10-22022 October 2024 Mode 3 Entry with One Auxiliary Feedwater Pump Train Inoperable Due to Missed Post-Maintenance Testing ML24296B1902024-10-22022 October 2024 10 CFR 50.55a Requests for the Fifth Ten-Year Interval Inservice Testing Program 05000482/LER-2024-002, Technical Specification Required Shutdown Due to Inoperable Auxiliary Feedwater Discharge Valve2024-10-21021 October 2024 Technical Specification Required Shutdown Due to Inoperable Auxiliary Feedwater Discharge Valve ML24284A2842024-10-10010 October 2024 (Wcgs), Revision of One Form That Implements the Radiological Emergency Response Plan (RERP) ML24283A0752024-10-0909 October 2024 Notification of Commercial Grade Dedication Inspection (05000482/2025012) and Request for Information ML24199A1712024-09-17017 September 2024 Issuance of Amendment No. 241 Revise Ventilation Filter Testing Program Criteria and Administrative Correction of Absorber in Technical Specification 5.5.11 ML24260A0712024-09-12012 September 2024 License Amendment Request for a Risk-Informed Resolution to GSI-191 IR 05000482/20240102024-09-10010 September 2024 Biennial Problem Identification and Resolution Inspection Report 05000482/2024010 (Public) ML24255A8642024-09-0606 September 2024 Rscc Wire & Cable LLC Dba Marmon Industrial Energy & Infrastructure - Part 21 Retraction of Final Notification ML24248A2492024-09-0404 September 2024 Inservice Inspection Program Fourth Interval, Third Period, Refueling Outage 26 Owner’S Activity Report ML24248A0762024-09-0404 September 2024 Containment Inservice Inspection Program Third Interval, Second Period, Refueling Outage 26 Owner’S Activity Report ML24241A2212024-08-29029 August 2024 Notice of Enforcement Discretion for Wolf Creek Generating Station ML24240A2642024-08-27027 August 2024 Corporation - Request for Notice of Enforcement Discretion Regarding Technical Specification 3.7.5, Auxiliary Feedwater (AFW) System ML24239A3972024-08-23023 August 2024 Rssc Wire & Cable LLC Dba Marmon - Part 21 Final Notification - 57243-EN 57243 IR 05000482/20240052024-08-14014 August 2024 Updated Inspection Plan for Wolf Creek Generating Station (Report 05000482/2024005) ML24227A5562024-08-14014 August 2024 Application to Revise Technical Specifications to Adopt TSTF-569-A, Revision 2, Revision of Response Time Testing Definitions ML24213A3352024-07-31031 July 2024 License Amendment Request to Revise Technical Specification 3.2.1, Heat Flux Hot Channel Factor (Fq(Z)) (Fq Methodology), to Implement the Methodology from WCAP-17661-P-A, Revision 1. ML24206A1252024-07-24024 July 2024 Revision of Three Procedures and Two Forms That Implement the Radiological Emergency Response Plan (RERP) IR 05000482/20240022024-07-18018 July 2024 Integrated Inspection Report 05000482/2024002 05000482/LER-2024-001, Mode 3 Entry with One Auxiliary Feedwater Pump Train Inoperable Due to Missed Post-Maintenance Testing2024-07-0202 July 2024 Mode 3 Entry with One Auxiliary Feedwater Pump Train Inoperable Due to Missed Post-Maintenance Testing IR 05000482/20244012024-07-0202 July 2024 Security Baseline Inspection Report 05000482/2024401 ML24178A4142024-06-26026 June 2024 Revision of One Procedure and One Form That Implement the Radiological Emergency Response Plan (RERP) ML24178A3672024-06-26026 June 2024 Correction to 2023 Annual Radioactive Effluent Release Report – Report 47 ML24162A1632024-06-11011 June 2024 Operating Corporation – Notification of Biennial Problem Identification and Resolution Inspection and Request for Information (05000482/2024010) ML24150A0562024-05-29029 May 2024 Foreign Ownership, Control or Influence (FOCI) Information – Change to Lists of Owners, Officers, Directors and Executive Personnel - Form 405F Amendment ML23345A1602024-05-0909 May 2024 Revision of Safety Evaluation for Amendment No. 237 Request for Deviation from Fire Protection Requirements ML24089A2622024-04-29029 April 2024 Financial Protection Levels ML24118A0032024-04-27027 April 2024 2023 Annual Radioactive Effluent Release Report - Report 47 ML24118A0022024-04-27027 April 2024 Wolf Generating Nuclear Station - 2023 Annual Radiological Environmental Operating Report ML24113A1882024-04-19019 April 2024 Foreign Ownership, Control or Influence Information - Change to Lists of Owners, Officers, Directors and Executive Personnel - Form 405F Amendment ML24109A1212024-04-18018 April 2024 (WCGS) Form 5 Exposure Report for Calendar Year 2023 ML24109A1842024-04-18018 April 2024 Cycle 27 Core Operating Limits Report IR 05000482/20240012024-04-17017 April 2024 Integrated Inspection Report 05000482/2024001 ML24114A1442024-04-15015 April 2024 Redacted Updated Safety Analysis Report (WCGS Usar), Revision 37 ML24106A1482024-04-15015 April 2024 Notification of Inspection (NRC Inspection Report 05000482/2024003) and Request for Information ML24098A0052024-04-0707 April 2024 2023 Annual Environmental Operating Report ML24089A1352024-03-29029 March 2024 10 CFR 50.46 Annual Report of Emergency Core Cooling System (ECCS) Evaluation Model Changes ML24089A0972024-03-29029 March 2024 Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations ML24074A3312024-03-14014 March 2024 Missed Quarterly Inspection Per 40 CFR 266 Subpart N ML24080A3452024-03-11011 March 2024 7 of the Wolf Creek Generating Station Updated Safety Analysis Report IR 05000482/20240122024-03-11011 March 2024 Fire Protection Team Inspection Report 05000482/2024012 ML24016A0702024-03-0808 March 2024 Issuance of Amendment No. 240 Removal of the Power Range Neutron Flux Rate - High Negative Rate Trip Function from Technical Specifications ML24068A1992024-03-0707 March 2024 Changes to Technical Specification Bases - Revisions 93 and 94 ML24066A0672024-03-0505 March 2024 4-2022-024 Letter - OI Closure to Licensee ML24061A2642024-03-0101 March 2024 Revision of Two Procedures That Implement the Radiological Emergency Response Plan (RERP) for Wolf Creek Generating Station (WCGS) Commissioners ML24059A1702024-02-28028 February 2024 Annual Fitness for Duty Program Performance Report, and Annual Fatigue Report for 2023 IR 05000482/20230062024-02-28028 February 2024 Annual Assessment Letter for Wolf Creek Generating Station Report 05000482/2023006 ML24026A0212024-02-27027 February 2024 Issuance of Amendment No. 239 Modified Implementation Date of License Amendment No. 238 ML24050A0012024-02-19019 February 2024 (Wcgs), Revision of One Form That Implements the Radiological Emergency Response Plan (RERP) 2024-09-06
[Table view] Category:Status Report
MONTHYEARWM 23-0009, Financial Assurance Requirements for Decommissioning Nuclear Power Reactors 10 CFR 50.75(f)(1)2023-05-10010 May 2023 Financial Assurance Requirements for Decommissioning Nuclear Power Reactors 10 CFR 50.75(f)(1) ML17361A0732017-12-20020 December 2017 Submittal of Anchor Darling Double Disc Gate Valve Information and Status ET 16-0018, Seventh Six-Month Status Report for the Implementation of Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events.2016-08-18018 August 2016 Seventh Six-Month Status Report for the Implementation of Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events. ET 16-0008, Sixth Six-Month Status Report for the Implementation of Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events.2016-02-17017 February 2016 Sixth Six-Month Status Report for the Implementation of Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events. ET 15-0006, Operating Corporation, Fourth Six-Month Status Report for the Implementation of Order EA-12-051, Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation.2015-02-24024 February 2015 Operating Corporation, Fourth Six-Month Status Report for the Implementation of Order EA-12-051, Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation. ET 15-0005, Operating Corporation'S Fourth Six - Month Status Report for the Implementation of Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events2015-02-24024 February 2015 Operating Corporation'S Fourth Six - Month Status Report for the Implementation of Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events ET 14-0025, Six-Month Status Report for the Implementation of Order EA-12-051, Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation.2014-08-21021 August 2014 Six-Month Status Report for the Implementation of Order EA-12-051, Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation. ET 14-0010, Operating Corporation'S Second Six-Month Status Report for the Implementation of Order EA-12-051, Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation2014-02-26026 February 2014 Operating Corporation'S Second Six-Month Status Report for the Implementation of Order EA-12-051, Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation ET 13-0026, First Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order EA-12-051)2013-08-28028 August 2013 First Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order EA-12-051) ML13102A3012013-03-29029 March 2013 Financial Assurance Requirements for Decommissioning Nuclear Power Reactors 10 CFR 50.75(0)(1) ML11181A1492011-06-23023 June 2011 Revision of Information Provided in 10 CFR 50.75 Report on Status of Decommissioning Funding ML1109506592011-03-29029 March 2011 CFR 50.75 Report on Status of Decommissioning Funding ML0910002882009-03-31031 March 2009 CFR 50.75 Report on Status of Decommissioning Funding ML0807300242008-02-22022 February 2008 Status Report and Proposed Agenda for the ACRS Subcommittee on March 5, 2008 Related to the License Renewal Application of Wolf Creek Generating Stations Unit 1 ML0709900532007-03-29029 March 2007 CFR 50.75 Report on Status of Decommissioning Funding ML0509603662005-03-30030 March 2005 10 CFR 50.75 Report on Status of Decommissioning Funding ML0224007812002-01-18018 January 2002 E-mail from Jacob Zimmerman, Bulletin 2001-01 Status Report 2023-05-10
[Table view] |
Text
W*LF CREEK NUCLEAR OPERATING CORPORATION Annette F. Stull Vice President and Chief Administrative Officer June 23, 2011 CO 11-0003 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555
Reference:
- 1) Letter CT 11-0018, dated March 29, 2011, from A. F. Stull, WCNOC to USNRC
- 2) E-mail dated May 10, 2011, from J. R. Hall, USNRC, to D. M.
Hooper, WCNOC, Draft Request for Additional Information -
Decommissioning Funding for Wolf Creek Generating Station (TAC NO. ME5552)
- 3) Letter CO 11-0002, dated June 23, 2011, from A. F. Stull, WCNOC, to USNRC
Subject:
Docket No. 50-482: Revision of Information Provided in 10 CFR 50.75 Report on Status of Decommissioning Funding Gentlemen:
Reference 1 provided Wolf Creek Nuclear Operating Corporation's (WCNOC) report on status of decommissioning funding for Wolf Creek Generating Station (WCGS). Reference 2 provided a request for additional information (RAI) related to this report. During the preparation of WCNOC's response to reference 2 it was discovered that some of the values reported in reference 1 under the section titled "Assumptions re: Rates/Factors specific to Owner and Jurisdiction" were not accurate.
The correct values are set out in the Attachment to this letter. Please note that while some of the values in the section titled "Assumptions re: Rates/Factors specific to Owner and Jurisdiction" of reference 1 were not correct, the values calculated in the preceding sections of the report used the correct information in the calculations. Therefore the "Schedule of Amounts Collected" and the market values of the Owners' funds were reported correctly even though some of the assumptions listed in reference 1 were not accurate.
Reference 3 provides WCNOCs response to the RAI.
P.O. Box 411 / Burlington, KS 66839 / Phone: (620) 364-8831 An Equal Opportunity Employer M/F/HCNET
CO 11-0003 Page 2 of 2 This letter contains no commitments. If you have any questions concerning this matter, please contact me at (620) 364-4004, or Mr. Gautam Sen at (620) 364-4175.
Sincerely, "I'1 dz Annette F. Stull AFS/rlt Attachment cc: E. E. Collins (NRC)
J. R. Hall (NRC)
G. B. Miller (NRC)
Senior Resident Inspector (NRC)
Attachment to CO 11-0003 Page 1 of 1 WOLF CREEK NUCLEAR OPERATING CORPORATION's CORRECTION TO CERTAIN DATA PROVIDED IN ATTACHMENT II TO LETTER CT 11-0018 Assumptions re: Rates/Factors specific to Owner and Jurisdiction KGE KCPL KEPCo Cost Escalation Rate Kansas 3.73%* 3.73%* 3.73%*
Missouri -- 4.40% --
Rates of Earnings on Funds Kansas 6.5 1%for 2009-2025; 6.95% for 2010-2025; 6.80% for 2009-2025; 6.51% for 2026-2035; Annual decreases in the 6.40% for 2026-2035; 6.77% for 2036-2044; rate thereafter, from 6.73% 6.00% for 2036-2044; 2.79% for 2045 in 2026 down to 1.9 1%in 3.00% for 2045-2053.
through end of 2053.
decommissioning.**_
Missouri 6.48% for 2008-2025; --
Annual decreases in the rate thereafter, from 6.36%
in 2026 down to 2.82% in 2053.
Notes:
- Same rate as originally reported.
- The originally-reported assumed rate of earning for KGE, 5.82%, was an overall average of the annual weighted rates of earnings.