Line 19: |
Line 19: |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:August 20, 2024 | | {{#Wiki_filter:August 20, 2024 LICENSEE: |
| | | Tennessee Valley Authority FACILITY: |
| LICENSEE: Tennessee Valley Authority | | Sequoyah Nuclear Plant, Units 1 and 2 Watts Bar Nuclear Plant, Units 1 and 2 |
| | |
| FACILITY: Sequoyah Nuclear Plant, Units 1 and 2 Watts Bar Nuclear Plant, Units 1 and 2 | |
|
| |
|
| ==SUBJECT:== | | ==SUBJECT:== |
| ==SUMMARY== | | ==SUMMARY== |
| OF AUGUST 14, 2024, PUBLIC PRE-SUBMITTAL MEETING WITH TENNESSEE VALLEY AUTHORITY REGARDING A FUTURE SEQUOYAH NUCLEAR PLANT AND WATTS BAR NUCLEAR PLANT LICENSE AMENDMENT REQUEST RELATED TO TE CHNICAL SPECIFICATION 3.5.2., | | OF AUGUST 14, 2024, PUBLIC PRE-SUBMITTAL MEETING WITH TENNESSEE VALLEY AUTHORITY REGARDING A FUTURE SEQUOYAH NUCLEAR PLANT AND WATTS BAR NUCLEAR PLANT LICENSE AMENDMENT REQUEST RELATED TO TECHNICAL SPECIFICATION 3.5.2., |
| ECCS - OPERATING (EPID L-2024-LRM-0090) | | ECCS - OPERATING (EPID L-2024-LRM-0090) |
| | | On August 14, 2024, the U.S. Nuclear Regulatory Commission (NRC) staff held a pre-submittal meeting with representatives from Tennessee Valley Authority (TVA). The purpose of the meeting was to discuss the licensees plans to submit a license amendment request (LAR) related to the emergency core cooling system (ECCS) at Sequoyah Nuclear Plant, Units 1 and 2 (Sequoyah) and Watts Bar Nuclear Plant, Units 1 and 2 (Watts Bar), which would revise Note 1 of Technical Specification (TS) 3.5.2, ECCS - Operating, to add isolation of residual heat removal (RHR) flow paths for pressure isolation valve testing. The meeting notice and agenda, dated July 30, 2024, are available in the NRCs Agencywide Documents Access and Management System (ADAMS) under Accession No. ML24226A432. A list of attendees is provided in the enclosure. |
| On August 14, 2024, the U.S. Nuclear Regulatory Commission (NRC) staff held a pre-submittal meeting with representatives from Tennessee Valley Authority (TVA). The purpose of the meeting was to discuss the licensees plans to submit a license amendment request (LAR) related to the emergency core cooling system (ECCS) at Sequoyah Nuclear Plant, Units 1 and 2 (Sequoyah) and Watts Bar Nuclear Plant, Units 1 and 2 (Watts Bar), which would revise Note 1 of Technical Specification (TS) 3.5.2, ECCS - Operating, to add isolation of residual heat removal (RHR) flow paths for pressure isolat ion valve testing. The meeting notice and agenda, dated July 30, 2024, are available in the NRCs Agencywide Documents Access and Management System (ADAMS) under Accession No. ML24226A432. A list of attendees is provided in the enclosure. | |
| | |
| During the meeting, the licensee presented information (ML24225A254) regarding the proposed TS changes including an EECS description, reasons for the proposed change, technical background, precedent LARs and the submittal timeframe. | | During the meeting, the licensee presented information (ML24225A254) regarding the proposed TS changes including an EECS description, reasons for the proposed change, technical background, precedent LARs and the submittal timeframe. |
|
| |
| Below is a summary of the key comments and discussions: | | Below is a summary of the key comments and discussions: |
| : 1. Any changes to related in-service testing requirements would be included in the LAR. | | : 1. Any changes to related in-service testing requirements would be included in the LAR. |
| : 2. TS 3.5.2, Note 1, does not specify when the RHR flow path can be isolated, other than it is in Mode 3. | | : 2. TS 3.5.2, Note 1, does not specify when the RHR flow path can be isolated, other than it is in Mode 3. |
| | The NRC staff did not make any regulatory decisions or commitments at the meeting. There were no members of the public in attendance. |
|
| |
|
| The NRC staff did not make any regulatory decisions or commitments at the meeting. There were no members of the public in attendance.
| | Please direct any inquiries to me at 301-415-1383 or by e-mail to Perry.Buckberg@nrc.gov. |
| | | /RA/ |
| Please direct any inquiries to me at 301-415-1383 or by e-mail to Perry.Buckberg@nrc.gov. | | Perry H. Buckberg, Senior Project Manager Plant Licensing Branch II-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-327, 50-328, 50-390 and 50-391 |
| | |
| /RA/
| |
| | |
| Perry H. Buckberg, Senior Project Manager Plant Licensing Branch II-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation | |
| | |
| Docket Nos. 50-327, 50-328, 50-390 and 50-391 | |
|
| |
|
| ==Enclosure:== | | ==Enclosure:== |
| List of Attendees | | List of Attendees cc: Listserv |
| | |
| cc: Listserv | |
| | |
| LIST OF ATTENDEES
| |
| | |
| AUGIST 14, 2024, VIRTUAL PUBLIC MEETING
| |
| | |
| WITH TENNESSEE VALLEY AUTHORITY, ET AL.
| |
| | |
| SEQUOYAH NUCLEAR PLANT, UNITS 1 AND 2
| |
| | |
| WATTS BAR NUCLEAR PLANT, UNITS 1 AND 2
| |
| | |
| PRE-APPLICATION MEETING REGARDING
| |
| | |
| TECHNICAL SPECIFICATION 3.5.2, NOTE 1
| |
| | |
| U.S. Nuclear Regulatory Commission Branch Perry Buckberg - NRR1/DORL2/LPLII-23 Jo Ambrosini - NRR/DSS/SNSB4 Steve Smith - NRR/DSS/STSB5
| |
| | |
| Tennessee Valley Authority Jesse Baron Andrew Taylor Chris Carey Paul Parashak Stuart Rymer Shawna Hughes Kasey Decker Dustin Martin
| |
| | |
| 1 Office of Nuclear Reactor Regulation 2 Division of Operating Reactor Licensing 3 Plant Licensing Branch II-2 4 Nuclear Systems Performance Branch 5 Technical Specifications Branch
| |
|
| |
|
| Enclosure | | Enclosure LIST OF ATTENDEES AUGIST 14, 2024, VIRTUAL PUBLIC MEETING WITH TENNESSEE VALLEY AUTHORITY, ET AL. |
| | SEQUOYAH NUCLEAR PLANT, UNITS 1 AND 2 WATTS BAR NUCLEAR PLANT, UNITS 1 AND 2 PRE-APPLICATION MEETING REGARDING TECHNICAL SPECIFICATION 3.5.2, NOTE 1 U.S. Nuclear Regulatory Commission Branch Perry Buckberg - |
| | NRR1/DORL2/LPLII-23 Jo Ambrosini - |
| | NRR/DSS/SNSB4 Steve Smith - |
| | NRR/DSS/STSB5 Tennessee Valley Authority Jesse Baron Andrew Taylor Chris Carey Paul Parashak Stuart Rymer Shawna Hughes Kasey Decker Dustin Martin 1 Office of Nuclear Reactor Regulation 2 Division of Operating Reactor Licensing 3 Plant Licensing Branch II-2 4 Nuclear Systems Performance Branch 5 Technical Specifications Branch |
|
| |
|
| ML24228A268 (Package) | | ML24228A268 (Package) |
|
---|
Category:Meeting Summary
MONTHYEARML24292A1832024-10-30030 October 2024 Summary of Meeting with Tennessee Valley Authority, October 16, 2024, to Discuss Proposed License Amendment Regarding Implementation of an Online Monitoring Methodology ML24269A0062024-10-0303 October 2024 Correction to Summary of August 19, 2024, Meeting with Tennessee Valley Authority Regarding a Proposed Supplement to the TVA Nuclear Quality Assurance Plan ML24262A0602024-09-23023 September 2024 Summary of August 19, 2024, Meeting with Tennessee Valley Authority Regarding a Proposed Supplement to the Tennessee Valley Authority Nuclear Quality Assurance Plan ML24228A2652024-08-20020 August 2024 Summary of Public Pre-Submittal Meeting with Tennessee Valley Authority Regarding a Future Sequoyah Nuclear Plant and Watts Bar Nuclear Plant LAR Related to TS 3.5.2. ECCS - Operating ML24221A0132024-08-19019 August 2024 July 10, 2024, Summary of Meeting with Tennessee Valley Authority Regarding a Proposed Change to the Tennessee Valley Authority Nuclear Quality Assurance Plan ML24218A2182024-08-15015 August 2024 Summary of July 16, 2024, Public Preapplication Meeting with Tennessee Valley Authority Regarding a Future Sequoyah Nuclear Plant LAR Related to Containment Penetrations and Fuel Handling ML24173A2122024-06-27027 June 2024 Summary of Public Meeting with Tennessee Valley Authority to Discuss a Proposed License Amendment Request Regarding Adoption of TSTF-276-A, Revision 2 to Clarify Requirements for Diesel Generator Testing ML24158A3002024-06-11011 June 2024 Summary of May 6, 2024, Public Meeting with Tennessee Valley Authority to Discuss the Potential for a License Amendment Request Regarding the Control Room Envelope and Selective Use of an Alternative Source Term ML24136A2242024-05-15015 May 2024 1B EDG NRC Regulatory Conference Meeting Summary May 2, 2024 ML24102A1212024-04-18018 April 2024 Summary of Conference Call with Tennessee Valley Authority Regarding Sequoyah Nuclear Plant, Unit 1 Spring 2024 Steam Generator Tube Inspections ML24089A0712024-04-0101 April 2024 3/20/24 & 3/27/24 2023 TVA Public Annual Assessment Meeting Summary ML24082A2532024-03-26026 March 2024 Summary of March 18, 2024, Public Preapplication Meeting with Tennessee Valley Authority Regarding a Future License Amendment Request Related to Fuel Handling and Fuel Decay Time ML24057A3792024-03-0808 March 2024 Summary of Public Preapplication Meeting with Tennessee Valley Authority Regarding a Future License Amendment Request Related to Fuel Handling and Fuel Decay Time ML24065A0262024-03-0101 March 2024 LAR Pre-Application Meeting TS 3.9.8 (Decay Time) and FHA Dose Analysis Meteorological Monitoring and Dispersion Modeling Topics ML24057A0582024-02-27027 February 2024 Summary of February 15, 2024, Public Meeting with Tennessee Valley Authority Regarding Proposed License Amendment Request for Watts Bar Nuclear Plant, Units 1 and 2 ML24044A0372024-02-15015 February 2024 February 8, 2024, Summary of Public Preapplication Meeting with Tennessee Valley Authority Regarding a Future License Amendment Request Related to Technical Specification Surveillance Requirement 3.1.1.8 ML24008A1592024-01-18018 January 2024 Summary of December 13, 2023, Meeting with Tennessee Valley Authority Regarding a Proposed Change to the Tennessee Valley Authority Nuclear Quality Assurance Plan ML23304A0682023-11-0606 November 2023 Summary of October 24, 2023, Public Mtg W/Tennessee Valley Authority Regarding Proposed License Amendment Request for Watts Bar Nuclear Plant, Units 1 and 2, and Sequoyah Nuclear Plant, Units 1 and 2 to Revise Function 5, Turbine Trip and F ML23265A1512023-09-28028 September 2023 Summary of September 12, 2023, Partially Closed Meeting with Tennessee Valley Authority to Discuss Proposed License Amendment Request ML23198A3102023-07-20020 July 2023 July 10, 2023, Summary of Public Meeting with Tennessee Valley Authority Regarding Proposed License Amendment Request for Watts Bar Nuclear Plant, Units 1 and 2 ML23142A2132023-05-22022 May 2023 Public Meeting Summary - 2022 Annual Assessment Meetings for Browns Ferry, Sequoyah and Watts Bar Nuclear Plants ML23068A1532023-03-16016 March 2023 Summary of February 22, 2023, Meeting with Tennessee Valley Authority Regarding Proposed License Amendment Request to Increase Allowable Number of Tritium Producing Burnable Absorber Rods at Watts Bar Nuclear Plant, Units 1 and 2 ML23055A4562023-03-0909 March 2023 Summary of February 15, 2023, Public Meeting with Tennessee Valley Authority Regarding Proposed Expedited License Amendment Request for Watts Bar Nuclear Plant, Units 1 and 2 ML22329A1382022-12-0505 December 2022 Summary of Meeting with Tennessee Valley Authority Related to Planned Alternative Request WBN-2-ISI-01 for Watts Bar Nuclear Plant, Unit 2 ML22312A3522022-12-0101 December 2022 – Revised - Summary of Regulatory Audit for Alternative Request RV-02 ML22207B8302022-07-28028 July 2022 Summary of July 20, 2022, Observation Public Meeting with the Tennessee Valley Authority to Discuss Planned Alternative Request RP-12 to ASME OM Code Testing for the 1B-B Centrifugal Charging Pump at Sequoyah Nuclear Plant, Unit 1 ML22168A1642022-06-27027 June 2022 Summary of June 9, 2022, Meeting with TVA Regarding a Proposed License Amendment Request Related to Low Temperature Overpressure System and Cold Overpressure Mitigation System for Sequoyah and Watts Bar Nuclear Plants ML22104A2252022-04-20020 April 2022 Summary of Meeting with Tennessee Valley Authority Regarding a Proposed Exemption Request for Watts Bar Nuclear Plant, Unit 2 ML22109A0042022-04-20020 April 2022 Summary of Meeting with Tennessee Valley Authority Regarding a Proposed Alternative Request Related to Testing of the Motor-Driven Auxiliary Feedwater Pumps at Sequoyah and Watts Bar Nuclear Plants ML22108A1842022-04-18018 April 2022 TVA 2021 Annual Assessment Public Meeting Summary ML22048B7852022-03-0202 March 2022 Summary of February 16, 2022, Public Preapplication Meeting with Tennessee Valley Authority Regarding a Future Submittal of a Request for an Alternative to Requirements for Addressing Pressure Isolation Valve Leakage ML22042B3262022-02-14014 February 2022 Summary of February 8, 2022, Meeting with Tennessee Valley Authority Regarding a Proposed License Amendment Request to Revise the Allowable Value for Trip of Turbine-Driven Main Feedwater Pump at Watts Bar Nuclear Plant, Unit 1 ML22025A3112022-02-0909 February 2022 Summary of January 19, 2022, Meeting with Tennessee Valley Authority Regarding a Proposed Schedule for Development of a License Amendment Request for Increased Tritium Production ML21349A3642022-01-0404 January 2022 Summary of December 14, 2021, Teleconference with Tennessee Valley Authority Regarding a Proposed Change to the Capsule Withdrawal Schedule for Watts Bar Nuclear Plant, Unit 2 ML21313A3482021-11-18018 November 2021 Summary of Public Preapplication Meeting with Tennessee Valley Authority Regarding a Future Submittal of a License Amendment Request Regarding Seismic and Fire Probabilistic Risk Assessment (PRA) Modifications to 10 CFR 50.69 ML21279A0902021-11-0303 November 2021 Summary of Conference Calls Regarding the Fall 2021, Mid-Cycle Steam Generator Tube Inspections ML21291A0092021-11-0303 November 2021 Tennessee Valley Authority Fleet - Summary of October 13, 2021, Teleconference with Tennessee Valley Authority to Discuss Planned License Amendment Requests Related to the Emergency Action Level Scheme ML21265A5142021-10-12012 October 2021 Summary of September 15, 2021, Public Preapplication Meeting with Tennessee Valley Authority Regarding a Future Submittal of a License Amendment Request Regarding Elimination of the High Negative Flux Rate Trip ML21245A4252021-09-15015 September 2021 Summary of August 19, 2021, Teleconference with Tennessee Valley Authority Regarding Planned License Amendment Request Related to the Watts Bar Nuclear Plant, Units 1 and 2 ML21253A0872021-09-15015 September 2021 Summary of August 19, 2021, Partially Closed Meeting with Tennessee Valley Authority to Discuss Mid-Cycle Outage Contingencies for Watts Bar Nuclear Plant, Unit 2 ML21218A1472021-08-11011 August 2021 August 5, 2021 N-769 Relief Pre-Submittal Meeting Summary ML21165A1482021-06-30030 June 2021 Summary of Closed Meeting with Tennessee Valley Authority to Discuss Planned Requests for Exemption from Certain Requirements of 10 CFR Part 37 ML21152A1252021-06-0202 June 2021 Summary of Verbal Authorization of Alternative Request RP-10 for the 1B-B Motor Driven Auxiliary Feedwater Pump ML21137A0022021-05-17017 May 2021 Public Meeting Summary - Browns Ferry, Sequoyah and Watts Bar Nuclear Plants, Docket Nos. 50-259, 50-260, 50-296, 50-327, 50-328, 50-390, and 50-391, Meeting Number 20210392 ML21120A2192021-05-0404 May 2021 April 28,2021, Summary of Meeting with Tennessee Valley Authority Related to a Planned License Amendment Request for Watts Bar Nuclear Plant, Units 1 and 2, to Remove from Technical Specifications Redundant Units of Measurement for Control ML21112A3262021-04-30030 April 2021 Summary of April 21, 2021, Teleconference with Tennessee Valley Authority to Discuss a Planned License Amendment Request for Sequoyah Nuclear Plant, Units 1 and 2 ML21099A2072021-04-13013 April 2021 Summary of April 7, 2021, Meeting with Tennessee Valley Authority Related to a Planned Relief Request from ASME Code Testing Requirements ML21067A2132021-03-23023 March 2021 Summary of March 2, 2021, Teleconference with Tennessee Valley Authority to Discuss a Planned Alternative Request ML21060B0532021-03-0303 March 2021 Summary of February 11, 2021, Meeting with Tennessee Valley Authority Related to a Planned License Amendment Request for Watts Bar Nuclear Plant, Unit 2, to Apply a Temperature Adjusted Steam Generator Tube Flaw Growth Rate Methodology ML21033A5952021-02-23023 February 2021 Summary of Teleconference with Tennessee Valley Authority Regarding Planned License Amendment Requests Related to the Watts Bar Nuclear Plant, Unit 2 Steam Generator Replacement 2024-09-23
[Table view] |
Text
August 20, 2024 LICENSEE:
Tennessee Valley Authority FACILITY:
Sequoyah Nuclear Plant, Units 1 and 2 Watts Bar Nuclear Plant, Units 1 and 2
SUBJECT:
SUMMARY
OF AUGUST 14, 2024, PUBLIC PRE-SUBMITTAL MEETING WITH TENNESSEE VALLEY AUTHORITY REGARDING A FUTURE SEQUOYAH NUCLEAR PLANT AND WATTS BAR NUCLEAR PLANT LICENSE AMENDMENT REQUEST RELATED TO TECHNICAL SPECIFICATION 3.5.2.,
ECCS - OPERATING (EPID L-2024-LRM-0090)
On August 14, 2024, the U.S. Nuclear Regulatory Commission (NRC) staff held a pre-submittal meeting with representatives from Tennessee Valley Authority (TVA). The purpose of the meeting was to discuss the licensees plans to submit a license amendment request (LAR) related to the emergency core cooling system (ECCS) at Sequoyah Nuclear Plant, Units 1 and 2 (Sequoyah) and Watts Bar Nuclear Plant, Units 1 and 2 (Watts Bar), which would revise Note 1 of Technical Specification (TS) 3.5.2, ECCS - Operating, to add isolation of residual heat removal (RHR) flow paths for pressure isolation valve testing. The meeting notice and agenda, dated July 30, 2024, are available in the NRCs Agencywide Documents Access and Management System (ADAMS) under Accession No. ML24226A432. A list of attendees is provided in the enclosure.
During the meeting, the licensee presented information (ML24225A254) regarding the proposed TS changes including an EECS description, reasons for the proposed change, technical background, precedent LARs and the submittal timeframe.
Below is a summary of the key comments and discussions:
- 1. Any changes to related in-service testing requirements would be included in the LAR.
- 2. TS 3.5.2, Note 1, does not specify when the RHR flow path can be isolated, other than it is in Mode 3.
The NRC staff did not make any regulatory decisions or commitments at the meeting. There were no members of the public in attendance.
Please direct any inquiries to me at 301-415-1383 or by e-mail to Perry.Buckberg@nrc.gov.
/RA/
Perry H. Buckberg, Senior Project Manager Plant Licensing Branch II-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-327, 50-328, 50-390 and 50-391
Enclosure:
List of Attendees cc: Listserv
Enclosure LIST OF ATTENDEES AUGIST 14, 2024, VIRTUAL PUBLIC MEETING WITH TENNESSEE VALLEY AUTHORITY, ET AL.
SEQUOYAH NUCLEAR PLANT, UNITS 1 AND 2 WATTS BAR NUCLEAR PLANT, UNITS 1 AND 2 PRE-APPLICATION MEETING REGARDING TECHNICAL SPECIFICATION 3.5.2, NOTE 1 U.S. Nuclear Regulatory Commission Branch Perry Buckberg -
NRR1/DORL2/LPLII-23 Jo Ambrosini -
NRR/DSS/SNSB4 Steve Smith -
NRR/DSS/STSB5 Tennessee Valley Authority Jesse Baron Andrew Taylor Chris Carey Paul Parashak Stuart Rymer Shawna Hughes Kasey Decker Dustin Martin 1 Office of Nuclear Reactor Regulation 2 Division of Operating Reactor Licensing 3 Plant Licensing Branch II-2 4 Nuclear Systems Performance Branch 5 Technical Specifications Branch
ML24228A268 (Package)
ML24228A265 (Summary)
ML24226A432 (Meeting Notice)
ML24225A254 (Meeting Slides)
OFFICE NRR/DORL/LPL2-2/PM NRR/DORL/LPL2-2/LA NRR/DSS/SNSB/BC NRR/DSS/STSB/BC NAME PBuckberg ABaxter PSahd SMehta (RElliott for)
DATE 08/15/2024 08/19/2024 08/19/2024 08/19/2024 OFFICE NRR/DORL/LPL2-2/BC NRR/DORL/LPL2-2/PM NAME DWrona PBuckberg DATE 08/20/2024 08/20/2024