{{#Wiki_filter:December 18, 2023
{{#Wiki_filter:December 18, 2023
Cleve Reasoner, Chief Executive Officer
Cleve Reasoner, Chief Executive Officer
  and Chief Nuclear Officer
and Chief Nuclear Officer
Wolf Creek Nuclear Operating Corp.
Wolf Creek Nuclear Operating Corp.
P.O. Box 411
P.O. Box 411
Burlington, KS 66839
Burlington, KS 66839
SUBJECT:         WOLF CREEK GENERATING STATION - NOTIFICATION OF AN NRC
 
                FIRE PROTECTION BASELINE INSPECTION (NRC INSPECTION REPORT
SUBJECT:     WOLF CREEK GENERATING STATION - NOTIFICATION OF AN NRC
                05000482/2024012) AND REQUEST FOR INFORMATION
              FIRE PROTECTION BASELINE INSPECTION (NRC INSPECTION REPORT
              05000482/2024012) AND REQUEST FOR INFORMATION
 
Dear Cleve Reasoner:
Dear Cleve Reasoner:
The purpose of this letter is to notify you that the U.S. Nuclear Regulatory Commission (NRC),
The purpose of this letter is to notify you that the U.S. Nuclear Regulatory Commission (NRC),
Region IV staff will conduct a triennial fire protection baseline inspection at the Wolf Creek
Region IV staff will conduct a triennial fire protection baseline inspection at the Wolf Creek
Line 33: Line 38:
Inspection Procedure 71111, Attachment 21N.05, Fire Protection Team Inspection, the NRCs
Inspection Procedure 71111, Attachment 21N.05, Fire Protection Team Inspection, the NRCs
baseline fire protection inspection procedure.
baseline fire protection inspection procedure.
The schedule for the inspection is as follows:
The schedule for the inspection is as follows:
    *  Information gathering visit:   January 17 - 18, 2024
 
    *  Onsite inspection:             February 12 - 16, 2024, and February 26 - March 1, 2024
  *  Information gathering visit:     January 17 - 18, 2024
  *  Onsite inspection:                 February 12 - 16, 2024, and February 26 - March 1, 2024
 
The purpose of the information gathering visit is to obtain information and documentation
The purpose of the information gathering visit is to obtain information and documentation
needed to support the inspection and to become familiar with the fire protection program, fire
needed to support the inspection and to become familiar with the fire protection program, fire
protection features, post-fire safe shutdown capabilities and plant layout.
protection features, post-fire safe shutdown capabilities and plant layout.
The lead inspector will participate in the information gathering visit to select the scope of
The lead inspector will participate in the information gathering visit to select the scope of
structures, systems, and components for evaluation, identify additional documents needed to
structures, systems, and components for evaluation, identify additional documents needed to
Line 48: Line 57:
for the inspection. Please send this information so that it will arrive in the NRC Region IV office
for the inspection. Please send this information so that it will arrive in the NRC Region IV office
by the dates listed in the enclosure.
by the dates listed in the enclosure.
During the information gathering visit, the team leader will also discuss the following inspection
During the information gathering visit, the team leader will also discuss the following inspection
support administrative details: (1) office space size and location; (2) specific documents
support administrative details: (1) office space size and location; (2) specific documents
requested to be made available to the team in their office spaces; (3) arrangements for reactor
requested to be made available to the team in their office spaces; (3) arrangements for reactor
C. Reasoner                                                2


C. Reasoner                                      2
site access (including radiation protection training, security, safety, and fitness for duty
site access (including radiation protection training, security, safety, and fitness for duty
requirements); and (4) the availability of knowledgeable plant staff and licensing organization
requirements); and (4) the availability of knowledgeable plant staff and licensing organization
personnel to serve as points of contact during the inspection.
personnel to serve as points of contact during the inspection.
We request that during the on-site inspection weeks you ensure that copies of analyses,
We request that during the on-site inspection weeks you ensure that copies of analyses,
evaluations, or documentation regarding the implementation and maintenance of the station fire
evaluations, or documentation regarding the implementation and maintenance of the station fire
Line 68: Line 79:
reactor plant fire protection systems and features, and the station fire protection program and its
reactor plant fire protection systems and features, and the station fire protection program and its
implementation.
implementation.
PAPERWORK REDUCTION ACT STATEMENT
PAPERWORK REDUCTION ACT STATEMENT
This letter contains mandatory information collections that are subject to the Paperwork
This letter contains mandatory information collections that are subject to the Paperwork
Reduction Act of 1995 (44 U.S.C. 3501 et seq.). The Office of Management and Budget (OMB)
Reduction Act of 1995 (44 U.S.C. 3501 et seq.). The Office of Management and Budget (OMB)
Line 77: Line 90:
Information and Regulatory Affairs, NEOB-10202, (3150-0011) Office of Management and
Information and Regulatory Affairs, NEOB-10202, (3150-0011) Office of Management and
Budget, Washington, DC 20503.
Budget, Washington, DC 20503.
PUBLIC PROTECTION NOTIFICATION
PUBLIC PROTECTION NOTIFICATION
The NRC may not conduct nor sponsor, and a person is not required to respond to, a request
The NRC may not conduct nor sponsor, and a person is not required to respond to, a request
for information or an information collection requirement unless the requesting document
for information or an information collection requirement unless the requesting document
displays a currently valid OMB control number.
displays a currently valid OMB control number.
This letter and its enclosure will be made available for public inspection and copying at
This letter and its enclosure will be made available for public inspection and copying at
http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in
http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in
Line 87: Line 103:
concerning this inspection or the inspection teams information or logistical needs, please
concerning this inspection or the inspection teams information or logistical needs, please
contact the lead inspector at (817) 504-2105 or greg.pick@nrc.gov.
contact the lead inspector at (817) 504-2105 or greg.pick@nrc.gov.
 
C. Reasoner 3
C. Reasoner                             3
Sincerely,
                                          Sincerely,
Gregory Pick  
                                                                Signed by Pick, Gregory
Senior Inspector
                                                                on 12/18/23
Engineering Branch 2  
                                          Gregory Pick
Division of Reactor Safety
                                          Senior Inspector
Docket Nos. 05000482  
                                          Engineering Branch 2
                                          Division of Reactor Safety
Docket Nos. 05000482
License Nos. NPF-42
License Nos. NPF-42
Enclosures:
Enclosures:
1. Fire Protection Team Inspection Document Request
1. Fire Protection Team Inspection Document Request
cc w/ encl: Distribution via LISTSERV
cc w/ encl: Distribution via LISTSERV
Signed by Pick, Gregory
on 12/18/23




ML23348A366
ML23348A366
  SUNSI Review     Yes  No ADAMS         Yes  No
  SUNSI Review       Yes  No   ADAMS     Yes  No
  Publicly Avail   Yes  No Sensitive     Yes  No
  Publicly Avail     Yes  No   Sensitive Yes  No
  OFFCIE           RIV: DORS/EB2/SRI
OFFCIE             RIV: DORS/EB2/SRI
  NAME             Greg Prick
NAME               Greg Prick
  SIGNATURE         /RA/
SIGNATURE         /RA/
  DATE             12/18/2023
DATE               12/18/2023
                             
                             
                      Fire Protection Team Inspection Document Request
                    Fire Protection Team Inspection Document Request
 
The documents and information requested below should generally be made available to the
The documents and information requested below should generally be made available to the
inspection team prior to the inspection. Electronic format is the preferred format, except where
inspection team prior to the inspection. Electronic format is the preferred format, except where
Line 117: Line 133:
service, then the remote document access must allow inspectors to download, save, and print
service, then the remote document access must allow inspectors to download, save, and print
the documents.
the documents.
If a secure document management service is utilized, it is recommended that a separate folder
If a secure document management service is utilized, it is recommended that a separate folder
be used corresponding to each item listed below. It is recommended that multiple documents
be used corresponding to each item listed below. It is recommended that multiple documents
Line 122: Line 139:
same folder. Documents should be identified by both document number and noun name.
same folder. Documents should be identified by both document number and noun name.
Electronic media on compact disc or paper records (hard copy) are also acceptable.
Electronic media on compact disc or paper records (hard copy) are also acceptable.
Where C-size paper drawings are requested, please prepare two copies. Retain one copy on
Where C-size paper drawings are requested, please prepare two copies. Retain one copy on
site for the Teams use during the inspection weeks. Send one copy to the team leader at the
site for the Teams use during the inspection weeks. Send one copy to the team leader at the
NRC Region IV office.
NRC Region IV office.
To allow review before the on-site information gathering visit, the documents requested in items
To allow review before the on-site information gathering visit, the documents requested in items
A.1 thru A.26 should be made available to the team no later than January 8, 2024.
A.1 thru A.26 should be made available to the team no later than January 8, 2024.
Based on review of the documentation, the team leader will identify the scope for the inspection
Based on review of the documentation, the team leader will identify the scope for the inspection
prior to the end of the on-site information gathering visit or in-office review of the information
prior to the end of the on-site information gathering visit or in-office review of the information
obtained.
obtained.
This document request is based on typical documents that a generic plant might have. As such,
This document request is based on typical documents that a generic plant might have. As such,
this generic document request is not meant to imply that any specific plant is required to have all
this generic document request is not meant to imply that any specific plant is required to have all
Line 135: Line 156:
for your plant. In addition, the document titles listed below are based on typical industry
for your plant. In addition, the document titles listed below are based on typical industry
document names; your plant-specific document titles may vary.
document names; your plant-specific document titles may vary.
To allow review before the on-site inspection weeks, all requested documents should be made
To allow review before the on-site inspection weeks, all requested documents should be made
available to the team no later than February 1, 2024.
available to the team no later than February 1, 2024.
A.      DESIGN/LICENSING AND PROGRAM BASIS DOCUMENTS
        A.1    The current version of the Fire Protection Program and Fire Hazards Analysis.
        A.2    Post-fire safe shutdown analysis and the supporting calculations that
                demonstrate acceptable plant response.
        A.3    The fire protection probabilistic risk assessment (PRA) or portions of the plants
                individual plant examination for external events (IPEEE) report addressing fire
                events. Also, include the results of any post-IPEEE reviews and listings of
                actions taken/plant modifications conducted in response to IPEEE information
                that relate to fire risk.
        A.4    Licensing basis documents for fire protection (safety evaluation reports, pertinent
                sections of the final safety analysis report, exemptions, deviations, letters to/from
                the NRC regarding fire protection/fire safe shutdown, etc.).
                                                                                          Enclosure 1


A.5 List of post-fire safe shutdown systems and components (i.e., safe shutdown
A.    DESIGN/LICENSING AND PROGRAM BASIS DOCUMENTS
    equipment list).
 
A.6 List of fire areas with automatic fire suppression systems.
      A.1    The current version of the Fire Protection Program and Fire Hazards Analysis.
A.7 A list, with descriptions, of design change packages performed since the last fire
 
    protection team inspection associated with fire protection or post-fire safe
      A.2    Post-fire safe shutdown analysis and the supporting calculations that
    shutdown systems.
              demonstrate acceptable plant response.
A.8 A list, with descriptions, of any fire protection program changes and evaluations
 
    (not limited to Generic Letter 86-10 evaluations) performed since the last fire
      A.3    The fire protection probabilistic risk assessment (PRA) or portions of the plants
    protection team inspection.
              individual plant examination for external events (IPEEE) report addressing fire
A.9 Facility Operating License.
              events. Also, include the results of any post-IPEEE reviews and listings of
A.10 Technical Specifications (electronic format only).
              actions taken/plant modifications conducted in response to IPEEE information
A.11 Updated Final Safety Analysis Report (electronic format only).
              that relate to fire risk.
A.12 A list of the ten most risk significant plant systems for core damage frequency
 
    from the fire protection probabilistic risk assessment (if available) or the internal
      A.4    Licensing basis documents for fire protection (safety evaluation reports, pertinent
    events probabilistic risk assessment.
              sections of the final safety analysis report, exemptions, deviations, letters to/from
A.13 A list of the ten most risk significant plant systems for large early release
              the NRC regarding fire protection/fire safe shutdown, etc.).
    frequency from the fire protection probabilistic risk assessment (if available) or
 
    the internal events probabilistic risk assessment.
 
A.14 Plant layout drawings which identify: (electronic format and C-size paper
 
    drawings)
                                                                                  Enclosure 1
    *   Plant fire area boundaries
A.5   List of post-fire safe shutdown systems and components (i.e., safe shutdown
    *   Combustible control zone drawings
      equipment list).
    *   Areas protected by automatic fire suppression and/or detection
 
A.15 For local manual operator actions, provide the following:
A.6   List of fire areas with automatic fire suppression systems.
    *   Manual Action Feasibility Study
 
    *   Operator Time Critical Action Program
A.7   A list, with descriptions, of design change packages performed since the last fire
    *   Timelines for time-critical manual actions
      protection team inspection associated with fire protection or post-fire safe
    *   Timeline validations
      shutdown systems.
A.16 Pre-fire plans for all fire areas.
 
A.17 Fire protection system health reports for the two most recent quarters.
A.8   A list, with descriptions, of any fire protection program changes and evaluations
A.18 Fire protection program health reports for the two most recent quarters.
      (not limited to Generic Letter 86-10 evaluations) performed since the last fire
A.19 Fire Protection System(s) Design Basis Document.
      protection team inspection.
                                                                                Enclosure 2
 
A.9   Facility Operating License.
 
A.10   Technical Specifications (electronic format only).
 
A.11   Updated Final Safety Analysis Report (electronic format only).
 
A.12   A list of the ten most risk significant plant systems for core damage frequency
      from the fire protection probabilistic risk assessment (if available) or the internal
      events probabilistic risk assessment.
 
A.13   A list of the ten most risk significant plant systems for large early release
      frequency from the fire protection probabilistic risk assessment (if available) or
      the internal events probabilistic risk assessment.
 
A.14   Plant layout drawings which identify: (electronic format and C-size paper
      drawings)
 
      *   Plant fire area boundaries
      *   Combustible control zone drawings
      *   Areas protected by automatic fire suppression and/or detection
 
A.15   For local manual operator actions, provide the following:
 
      *   Manual Action Feasibility Study
      *   Operator Time Critical Action Program
      *   Timelines for time-critical manual actions
      *   Timeline validations
 
A.16   Pre-fire plans for all fire areas.
 
A.17   Fire protection system health reports for the two most recent quarters.
 
A.18   Fire protection program health reports for the two most recent quarters.
 
A.19   Fire Protection System(s) Design Basis Document.
 
 
 
 
                                                                              Enclosure 2
      A.20  Fire protection program requirements (e.g., limiting conditions for operation,
              surveillance test requirements) covered by technical specifications, the technical
              requirements manual, the updated final safety analysis report, procedures, or
              similar documents.
 
      A.21  List of applicable National Fire Protection Association (NFPA) codes and
              standards and issuance dates (i.e., codes of record).
 
      A.22  A list or document identifying any deviations from the NFPA codes of record.
 
      A.23  Organization charts of site personnel down to the level of fire protection staff
              personnel.
 
      A.24  A contact list of key site personnel who will be supporting this inspection, giving
              the office location and phone number onsite.
 
      A.25  Self-assessments, peer assessments, and audits of fire protection activities for
              the last three years.
 
      A.26  Self-assessments, peer assessments, and audits of post-fire safe shutdown
              capability for the last three years.
 
B.    GENERAL PLANT DESIGN DOCUMENTS
 
      B.1    Piping and instrumentation diagrams and legend list for components used to
              achieve and maintain post-fire safe shutdown for the sample systems or fire
              areas selected (electronic format and C-size paper drawings).
 
      B.2    Piping and instrumentation diagrams and legend list for fire protection systems,
              including the fire water supply; water suppression sprinklers; and deluge,
              gaseous suppression systems for the sample systems or fire areas selected
              (electronic format and C-size paper drawings).
 
      B.3    AC and DC electrical system single line diagrams, from off-site power down to
              the highest safety-related bus level (typically 4kV, EDG bus) (electronic format
              and C-size paper drawings).
 
      B.4    Single line diagrams for motor control centers that supply post-fire nuclear safety
              component loads for the sample systems or fire areas selected (electronic format
              and C-size paper drawings).
 
      B.5    Equipment location drawings which identify the physical plant locations of post-
              fire safety shutdown equipment for the sample systems or fire areas selected
              (electronic format and C-size paper drawings).
 
 
 
 
 
 
 
 
 
                                                                                    Enclosure 3
C.    CLASSIC FIRE PROTECTION
 
      C.1    Copy of fire protection program implementing procedures (e.g., administrative
              controls, surveillance testing, and fire brigade).
 
      C.2    List, with descriptions, of calculations and engineering analyses, studies, or
              evaluations for the fire protection system, including the fire water system.
 
      C.3    Last two completed surveillances of fire protection features for the sample
              systems selected (detection, suppression, damper inspections, damper tests,
              penetration inspections, barrier inspections, etc.).
 
      C.4    List, with descriptions, of routine tests, surveillances, and preventive
              maintenance on fire pumps, including pump controllers and batteries.
 
      C.5    Last two completed annual fire pump pressure and flow tests with a complete
              copy of the test procedure.
 
      C.6    Last two completed monthly and/or quarterly fire pump tests with a complete
              copy of the test procedure.
 
      C.7    Last two completed fire water system flow tests and flushes with a complete copy
              of the test procedure.
 
      C.8    For Fire Brigade Drills, provide the following:
 
              *  Last fire brigade drill critique
              *  Last drill critique for a drill with off-site fire department support
              *  Last unannounced drill critique
              *  Last back-shift drill critique
              *  Dates, shifts, and locations of unannounced drills for last three years
              *  Summary of any unsatisfactory drill performance items for last three years
              *  Last unannounced drill critique by a qualified individual independent of the
                  licensees staff
 
      C.9    For fire brigade equipment provide the following:
 
              *  Procedure for inventory and inspection
              *  Most recent inspection and inventory results
 
      C.10    Fire Brigade Qualifications, including self-contained breathing apparatus, and
              training lesson plans.
 
 
 
 
 
 
 
 
 
 
 
                                                                                    Enclosure 4
      C.11    Copy of the evaluation or analysis of the effects of fire suppression activities on
              the ability to achieve the safe shutdown for the sample systems selected
              demonstrating:
 
              *  The automatic or manual actuation of a suppression system, due to a fire in a
                  single location, will not indirectly cause damage to the success path.
              *  The inadvertent actuation or rupture of a suppression system will not
                  indirectly cause damage to the success path.
              *  Adequate drainage for areas protected by water suppression systems.
              *  The hydrostatic rating of any floor penetration seals installed within the fire
                  areas that are credited with keeping water from leaking into fire areas below.
 
      C.12    Impairment Log (at start of inspection) for fire protection features that are out of
              service.
 
      C.13    List of penetration seal work, re-work, or installation activities, in the last three
              years.
 
      C.14    List of fire wrap work, re-work, or installation activities, in the last three years.
 
      C.15    Licensee evaluations of industry operating experience concerning fire protection
              issues completed in the last three years.
 
      C.16    List of fire event analysis reports for the last three years.
 
      C.17    The team would like to observe a day-shift unannounced fire brigade drill in the
              plant, if possible, during the week of February 12, 2024. Please put us in contact
              with the appropriate personnel for planning fire brigade drills during the onsite
              information gathering trip.
 
      C.18    The team would like to perform a walkdown of the sample fire protection systems
              and/or fire areas with fire protection personnel in the plant during the week of
              February 12, 2024. Please put us in contact with the appropriate personnel for
              planning the walkdowns during the onsite information gathering trip.
 
D.    ELECTRICAL
 
      D.1    Electrical system health reports for the two most recent quarters.
 
      D.2    Surveillance procedures and last surveillance demonstrating operability of
              components required for alternative shutdown.
 
E.    OPERATIONS
 
      E.1    The team would like to perform a walkthrough of a sample of post-fire safe
              shutdown procedures with qualified operators in the plant during the week of
              February 12, 2024. Please put us in contact with the appropriate personnel for
              planning the walkthroughs during the onsite information gathering trip.
 
 
 
 
                                                                                    Enclosure 5
      E.2    List, with descriptions, of licensed operator Job Performance Measures (JPMs)
              for operator actions required to achieve and maintain post-fire safe shutdown.
 
      E.3    List, with descriptions, of non-licensed operator training associated with non-
              licensed operator actions to achieve and maintain post-fire nuclear safe
              shutdown (including JPMs, in-field training walkdowns, simulations, or initial
              qualification).
 
      E.4    Lesson plans for post-fire safe shutdown training for licensed and non-licensed
              operators.
 
      E.5    Thermal hydraulic calculation or analysis that determines the time requirements
              for time-critical manual operator actions.
 
      E.6    Operating procedures to achieve and maintain post-fire safe shutdown from the
              control room and requiring a control room evacuation.
 
      E.7    For safe shutdown equipment and tools, provide the following:
 
              *  Procedure for inventory and inspection.
              *  Most recent inspection and inventory results.
 
      E.8    List, with descriptions, of procedures that implement cold shutdown repairs (if
              required).
 
F.    FIRE PROTECTION PROGRAM ADMINISTRATIVE CONTROLS
 
      F.1    Copies of procedures that control the configuration of the fire protection program,
              features, and post-fire safe shutdown methodology and system design. Also,
              copies of procedures that govern the implementation of plant modifications,
              maintenance, and special operations and their impact on fire protection.
 
      F.2    List, with descriptions, of open and closed condition reports for the fire protection
              systems for the last three years.
 
      F.3    List, with descriptions, of open and closed condition reports associated with the
              post-fire safe shutdown analysis for the last three years.
 
      F.4    List, with descriptions, of open and closed condition reports associated with
              operator actions to achieve and maintain post-fire safe shutdown for the last
              three years.
 
      F.5    List, with descriptions, of open and closed condition reports associated with the
              fire protection program including plant change evaluations, post-fire operating
              procedures and/or training, timeline evaluations for operator actions, and
              supporting engineering evaluations, analysis, or calculations for the last three
              years.
 
      F.6    List, with descriptions, of open and closed condition reports for emergency
              lighting units for the last three years.
 
 
                                                                                    Enclosure 6
      F.7    Provide administrative procedures that control temporary modifications,
              permanent plant changes, design changes, procedure changes, ageing
              management changes, equivalency evaluations, suitability analyses,
              calculations, commercial grade dedication, safety-security interface, and repairs.
 
      F.8    Provide procedures that control the following: combustible controls, hot work,
              monitoring, compensatory measures, and work-around.
 
      F.9    Last five hot work permits (at power).
 
      F.10  Last five transient combustible permits (at power).
 
G.    AGING MANAGEMENT PROGRAM
 
      G.1    Copies of the aging management programs applicable to fire protection including
              but not limited to the following:
 
              *  Fire Protection
              *  Fire Water System
              *  Aboveground Metallic Tanks
              *  Buried and Underground Piping and Tanks
 
      G.2    Copies of procedures, work orders, preventive maintenance tasks, or other
              documents which implement the commitments made as part of the license
              extension related to fire protection.
 
      G.3    List of aging management activities related to fire protection performed to date.
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 


  A.20 Fire protection program requirements (e.g., limiting conditions for operation,
        surveillance test requirements) covered by technical specifications, the technical
        requirements manual, the updated final safety analysis report, procedures, or
        similar documents.
  A.21 List of applicable National Fire Protection Association (NFPA) codes and
        standards and issuance dates (i.e., codes of record).
  A.22 A list or document identifying any deviations from the NFPA codes of record.
  A.23 Organization charts of site personnel down to the level of fire protection staff
        personnel.
  A.24 A contact list of key site personnel who will be supporting this inspection, giving
        the office location and phone number onsite.
  A.25 Self-assessments, peer assessments, and audits of fire protection activities for
        the last three years.
  A.26 Self-assessments, peer assessments, and audits of post-fire safe shutdown
        capability for the last three years.
B. GENERAL PLANT DESIGN DOCUMENTS
  B.1  Piping and instrumentation diagrams and legend list for components used to
        achieve and maintain post-fire safe shutdown for the sample systems or fire
        areas selected (electronic format and C-size paper drawings).
  B.2  Piping and instrumentation diagrams and legend list for fire protection systems,
        including the fire water supply; water suppression sprinklers; and deluge,
        gaseous suppression systems for the sample systems or fire areas selected
        (electronic format and C-size paper drawings).
  B.3  AC and DC electrical system single line diagrams, from off-site power down to
        the highest safety-related bus level (typically 4kV, EDG bus) (electronic format
        and C-size paper drawings).
  B.4  Single line diagrams for motor control centers that supply post-fire nuclear safety
        component loads for the sample systems or fire areas selected (electronic format
        and C-size paper drawings).
  B.5  Equipment location drawings which identify the physical plant locations of post-
        fire safety shutdown equipment for the sample systems or fire areas selected
        (electronic format and C-size paper drawings).
                                                                                Enclosure 3


C. CLASSIC FIRE PROTECTION
  C.1  Copy of fire protection program implementing procedures (e.g., administrative
        controls, surveillance testing, and fire brigade).
  C.2  List, with descriptions, of calculations and engineering analyses, studies, or
        evaluations for the fire protection system, including the fire water system.
  C.3  Last two completed surveillances of fire protection features for the sample
        systems selected (detection, suppression, damper inspections, damper tests,
        penetration inspections, barrier inspections, etc.).
  C.4  List, with descriptions, of routine tests, surveillances, and preventive
        maintenance on fire pumps, including pump controllers and batteries.
  C.5  Last two completed annual fire pump pressure and flow tests with a complete
        copy of the test procedure.
  C.6  Last two completed monthly and/or quarterly fire pump tests with a complete
        copy of the test procedure.
  C.7  Last two completed fire water system flow tests and flushes with a complete copy
        of the test procedure.
  C.8  For Fire Brigade Drills, provide the following:
        *  Last fire brigade drill critique
        *  Last drill critique for a drill with off-site fire department support
        *  Last unannounced drill critique
        *  Last back-shift drill critique
        *  Dates, shifts, and locations of unannounced drills for last three years
        *  Summary of any unsatisfactory drill performance items for last three years
        *  Last unannounced drill critique by a qualified individual independent of the
            licensees staff
  C.9  For fire brigade equipment provide the following:
        *  Procedure for inventory and inspection
        *  Most recent inspection and inventory results
  C.10 Fire Brigade Qualifications, including self-contained breathing apparatus, and
        training lesson plans.
                                                                                  Enclosure 4


  C.11 Copy of the evaluation or analysis of the effects of fire suppression activities on
        the ability to achieve the safe shutdown for the sample systems selected
        demonstrating:
        *  The automatic or manual actuation of a suppression system, due to a fire in a
            single location, will not indirectly cause damage to the success path.
        *  The inadvertent actuation or rupture of a suppression system will not
            indirectly cause damage to the success path.
        *  Adequate drainage for areas protected by water suppression systems.
        *  The hydrostatic rating of any floor penetration seals installed within the fire
            areas that are credited with keeping water from leaking into fire areas below.
  C.12 Impairment Log (at start of inspection) for fire protection features that are out of
        service.
  C.13 List of penetration seal work, re-work, or installation activities, in the last three
        years.
  C.14 List of fire wrap work, re-work, or installation activities, in the last three years.
  C.15 Licensee evaluations of industry operating experience concerning fire protection
        issues completed in the last three years.
  C.16 List of fire event analysis reports for the last three years.
  C.17 The team would like to observe a day-shift unannounced fire brigade drill in the
        plant, if possible, during the week of February 12, 2024. Please put us in contact
        with the appropriate personnel for planning fire brigade drills during the onsite
        information gathering trip.
  C.18 The team would like to perform a walkdown of the sample fire protection systems
        and/or fire areas with fire protection personnel in the plant during the week of
        February 12, 2024. Please put us in contact with the appropriate personnel for
        planning the walkdowns during the onsite information gathering trip.
D. ELECTRICAL
  D.1  Electrical system health reports for the two most recent quarters.
  D.2  Surveillance procedures and last surveillance demonstrating operability of
        components required for alternative shutdown.
E. OPERATIONS
  E.1  The team would like to perform a walkthrough of a sample of post-fire safe
        shutdown procedures with qualified operators in the plant during the week of
        February 12, 2024. Please put us in contact with the appropriate personnel for
        planning the walkthroughs during the onsite information gathering trip.
                                                                                      Enclosure 5


  E.2  List, with descriptions, of licensed operator Job Performance Measures (JPMs)
        for operator actions required to achieve and maintain post-fire safe shutdown.
  E.3  List, with descriptions, of non-licensed operator training associated with non-
        licensed operator actions to achieve and maintain post-fire nuclear safe
        shutdown (including JPMs, in-field training walkdowns, simulations, or initial
        qualification).
  E.4  Lesson plans for post-fire safe shutdown training for licensed and non-licensed
        operators.
  E.5  Thermal hydraulic calculation or analysis that determines the time requirements
        for time-critical manual operator actions.
  E.6  Operating procedures to achieve and maintain post-fire safe shutdown from the
        control room and requiring a control room evacuation.
  E.7  For safe shutdown equipment and tools, provide the following:
        *    Procedure for inventory and inspection.
        *    Most recent inspection and inventory results.
  E.8  List, with descriptions, of procedures that implement cold shutdown repairs (if
        required).
F. FIRE PROTECTION PROGRAM ADMINISTRATIVE CONTROLS
  F.1  Copies of procedures that control the configuration of the fire protection program,
        features, and post-fire safe shutdown methodology and system design. Also,
        copies of procedures that govern the implementation of plant modifications,
        maintenance, and special operations and their impact on fire protection.
  F.2  List, with descriptions, of open and closed condition reports for the fire protection
        systems for the last three years.
  F.3  List, with descriptions, of open and closed condition reports associated with the
        post-fire safe shutdown analysis for the last three years.
  F.4  List, with descriptions, of open and closed condition reports associated with
        operator actions to achieve and maintain post-fire safe shutdown for the last
        three years.
  F.5  List, with descriptions, of open and closed condition reports associated with the
        fire protection program including plant change evaluations, post-fire operating
        procedures and/or training, timeline evaluations for operator actions, and
        supporting engineering evaluations, analysis, or calculations for the last three
        years.
  F.6  List, with descriptions, of open and closed condition reports for emergency
        lighting units for the last three years.
                                                                                  Enclosure 6


  F.7  Provide administrative procedures that control temporary modifications,
                                                                                  Enclosure 7
        permanent plant changes, design changes, procedure changes, ageing
        management changes, equivalency evaluations, suitability analyses,
        calculations, commercial grade dedication, safety-security interface, and repairs.
  F.8  Provide procedures that control the following: combustible controls, hot work,
        monitoring, compensatory measures, and work-around.
  F.9  Last five hot work permits (at power).
  F.10 Last five transient combustible permits (at power).
G. AGING MANAGEMENT PROGRAM
  G.1  Copies of the aging management programs applicable to fire protection including
        but not limited to the following:
        *  Fire Protection
        *  Fire Water System
        *  Aboveground Metallic Tanks
        *  Buried and Underground Piping and Tanks
  G.2  Copies of procedures, work orders, preventive maintenance tasks, or other
        documents which implement the commitments made as part of the license
        extension related to fire protection.
  G.3  List of aging management activities related to fire protection performed to date.
                                                                                Enclosure 7
}}
}}

Latest revision as of 15:50, 12 November 2024

Notification of an NRC Fire Protection Baseline Inspection (NRC Inspection Report 05000482 2024012) and Request for Information
ML23348A366
Person / Time
Site: Wolf Creek Wolf Creek Nuclear Operating Corporation icon.png
Issue date: 12/18/2023
From: Greg Pick
NRC/RGN-IV/DORS/PBB
To: Reasoner R
Wolf Creek
References
IR 2024012
Download: ML23348A366 (11)


See also: IR 05000482/2024012

Text

December 18, 2023

Cleve Reasoner, Chief Executive Officer

and Chief Nuclear Officer

Wolf Creek Nuclear Operating Corp.

P.O. Box 411

Burlington, KS 66839

SUBJECT: WOLF CREEK GENERATING STATION - NOTIFICATION OF AN NRC

FIRE PROTECTION BASELINE INSPECTION (NRC INSPECTION REPORT

05000482/2024012) AND REQUEST FOR INFORMATION

Dear Cleve Reasoner:

The purpose of this letter is to notify you that the U.S. Nuclear Regulatory Commission (NRC),

Region IV staff will conduct a triennial fire protection baseline inspection at the Wolf Creek

Generating Station in February 2024. The inspection team will be comprised of three reactor

inspectors from the NRC Region IV office. The inspection will be conducted in accordance with

Inspection Procedure 71111, Attachment 21N.05, Fire Protection Team Inspection, the NRCs

baseline fire protection inspection procedure.

The schedule for the inspection is as follows:

  • Information gathering visit: January 17 - 18, 2024
  • Onsite inspection: February 12 - 16, 2024, and February 26 - March 1, 2024

The purpose of the information gathering visit is to obtain information and documentation

needed to support the inspection and to become familiar with the fire protection program, fire

protection features, post-fire safe shutdown capabilities and plant layout.

The lead inspector will participate in the information gathering visit to select the scope of

structures, systems, and components for evaluation, identify additional documents needed to

support the inspection, obtain unescorted access, and meet with the key personnel who will

support the inspection. The fire inspection sample selection will require a walkdown of fire areas

in company with key personnel from your staff. The enclosure to this letter provides an initial list

of the documents the team will need for their review. We request that your staff transmit copies

of the documents listed in the enclosure to the NRC Region IV office for team use in preparation

for the inspection. Please send this information so that it will arrive in the NRC Region IV office

by the dates listed in the enclosure.

During the information gathering visit, the team leader will also discuss the following inspection

support administrative details: (1) office space size and location; (2) specific documents

requested to be made available to the team in their office spaces; (3) arrangements for reactor

C. Reasoner 2

site access (including radiation protection training, security, safety, and fitness for duty

requirements); and (4) the availability of knowledgeable plant staff and licensing organization

personnel to serve as points of contact during the inspection.

We request that during the on-site inspection weeks you ensure that copies of analyses,

evaluations, or documentation regarding the implementation and maintenance of the station fire

protection program, including the success path necessary to achieve and maintain the nuclear

safety performance criteria, be readily accessible to the team for their review. Of specific

interest for the fire protection portion of the inspection are those documents which establish that

your fire protection program satisfies NRC regulatory requirements and conforms to applicable

NRC and industry fire protection guidance (i.e., fire protection compliance assessment

documents). Personnel should be available at the site during the inspection who are

knowledgeable regarding those plant systems required to achieve and maintain safe and stable

plant conditions, including the electrical aspects of the nuclear safety capability assessment,

reactor plant fire protection systems and features, and the station fire protection program and its

implementation.

PAPERWORK REDUCTION ACT STATEMENT

This letter contains mandatory information collections that are subject to the Paperwork

Reduction Act of 1995 (44 U.S.C. 3501 et seq.). The Office of Management and Budget (OMB)

approved these information collections (approval number 3150-0011). Send comments

regarding this information collection to the Information Services Branch, Office of the Chief

Information Officer, Mail Stop: T6 A10M, U.S. Nuclear Regulatory Commission, Washington, DC

20555-0001, or by e-mail to Infocollects.Resource@nrc.gov, and to the Desk Officer, Office of

Information and Regulatory Affairs, NEOB-10202, (3150-0011) Office of Management and

Budget, Washington, DC 20503.

PUBLIC PROTECTION NOTIFICATION

The NRC may not conduct nor sponsor, and a person is not required to respond to, a request

for information or an information collection requirement unless the requesting document

displays a currently valid OMB control number.

This letter and its enclosure will be made available for public inspection and copying at

http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in

accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.

Your cooperation and support during this inspection will be appreciated. If you have questions

concerning this inspection or the inspection teams information or logistical needs, please

contact the lead inspector at (817) 504-2105 or greg.pick@nrc.gov.

C. Reasoner 3

Sincerely,

Gregory Pick

Senior Inspector

Engineering Branch 2

Division of Reactor Safety

Docket Nos. 05000482

License Nos. NPF-42

Enclosures:

1. Fire Protection Team Inspection Document Request

cc w/ encl: Distribution via LISTSERV

Signed by Pick, Gregory

on 12/18/23

ML23348A366

SUNSI Review Yes No ADAMS Yes No

Publicly Avail Yes No Sensitive Yes No

OFFCIE RIV: DORS/EB2/SRI

NAME Greg Prick

SIGNATURE /RA/

DATE 12/18/2023

Fire Protection Team Inspection Document Request

The documents and information requested below should generally be made available to the

inspection team prior to the inspection. Electronic format is the preferred format, except where

specifically noted. If electronic files are made available via a secure document management

service, then the remote document access must allow inspectors to download, save, and print

the documents.

If a secure document management service is utilized, it is recommended that a separate folder

be used corresponding to each item listed below. It is recommended that multiple documents

within each folder be individually entered and combined into a ZIP file which is uploaded into the

same folder. Documents should be identified by both document number and noun name.

Electronic media on compact disc or paper records (hard copy) are also acceptable.

Where C-size paper drawings are requested, please prepare two copies. Retain one copy on

site for the Teams use during the inspection weeks. Send one copy to the team leader at the

NRC Region IV office.

To allow review before the on-site information gathering visit, the documents requested in items

A.1 thru A.26 should be made available to the team no later than January 8, 2024.

Based on review of the documentation, the team leader will identify the scope for the inspection

prior to the end of the on-site information gathering visit or in-office review of the information

obtained.

This document request is based on typical documents that a generic plant might have. As such,

this generic document request is not meant to imply that any specific plant is required to have all

the listed documents. It is recognized that some documents listed below may not be available

for your plant. In addition, the document titles listed below are based on typical industry

document names; your plant-specific document titles may vary.

To allow review before the on-site inspection weeks, all requested documents should be made

available to the team no later than February 1, 2024.

A. DESIGN/LICENSING AND PROGRAM BASIS DOCUMENTS

A.1 The current version of the Fire Protection Program and Fire Hazards Analysis.

A.2 Post-fire safe shutdown analysis and the supporting calculations that

demonstrate acceptable plant response.

A.3 The fire protection probabilistic risk assessment (PRA) or portions of the plants

individual plant examination for external events (IPEEE) report addressing fire

events. Also, include the results of any post-IPEEE reviews and listings of

actions taken/plant modifications conducted in response to IPEEE information

that relate to fire risk.

A.4 Licensing basis documents for fire protection (safety evaluation reports, pertinent

sections of the final safety analysis report, exemptions, deviations, letters to/from

the NRC regarding fire protection/fire safe shutdown, etc.).

Enclosure 1

A.5 List of post-fire safe shutdown systems and components (i.e., safe shutdown

equipment list).

A.6 List of fire areas with automatic fire suppression systems.

A.7 A list, with descriptions, of design change packages performed since the last fire

protection team inspection associated with fire protection or post-fire safe

shutdown systems.

A.8 A list, with descriptions, of any fire protection program changes and evaluations

(not limited to Generic Letter 86-10 evaluations) performed since the last fire

protection team inspection.

A.9 Facility Operating License.

A.10 Technical Specifications (electronic format only).

A.11 Updated Final Safety Analysis Report (electronic format only).

A.12 A list of the ten most risk significant plant systems for core damage frequency

from the fire protection probabilistic risk assessment (if available) or the internal

events probabilistic risk assessment.

A.13 A list of the ten most risk significant plant systems for large early release

frequency from the fire protection probabilistic risk assessment (if available) or

the internal events probabilistic risk assessment.

A.14 Plant layout drawings which identify: (electronic format and C-size paper

drawings)

  • Plant fire area boundaries
  • Combustible control zone drawings
  • Areas protected by automatic fire suppression and/or detection

A.15 For local manual operator actions, provide the following:

  • Manual Action Feasibility Study
  • Operator Time Critical Action Program
  • Timelines for time-critical manual actions
  • Timeline validations

A.16 Pre-fire plans for all fire areas.

A.17 Fire protection system health reports for the two most recent quarters.

A.18 Fire protection program health reports for the two most recent quarters.

A.19 Fire Protection System(s) Design Basis Document.

Enclosure 2

A.20 Fire protection program requirements (e.g., limiting conditions for operation,

surveillance test requirements) covered by technical specifications, the technical

requirements manual, the updated final safety analysis report, procedures, or

similar documents.

A.21 List of applicable National Fire Protection Association (NFPA) codes and

standards and issuance dates (i.e., codes of record).

A.22 A list or document identifying any deviations from the NFPA codes of record.

A.23 Organization charts of site personnel down to the level of fire protection staff

personnel.

A.24 A contact list of key site personnel who will be supporting this inspection, giving

the office location and phone number onsite.

A.25 Self-assessments, peer assessments, and audits of fire protection activities for

the last three years.

A.26 Self-assessments, peer assessments, and audits of post-fire safe shutdown

capability for the last three years.

B. GENERAL PLANT DESIGN DOCUMENTS

B.1 Piping and instrumentation diagrams and legend list for components used to

achieve and maintain post-fire safe shutdown for the sample systems or fire

areas selected (electronic format and C-size paper drawings).

B.2 Piping and instrumentation diagrams and legend list for fire protection systems,

including the fire water supply; water suppression sprinklers; and deluge,

gaseous suppression systems for the sample systems or fire areas selected

(electronic format and C-size paper drawings).

B.3 AC and DC electrical system single line diagrams, from off-site power down to

the highest safety-related bus level (typically 4kV, EDG bus) (electronic format

and C-size paper drawings).

B.4 Single line diagrams for motor control centers that supply post-fire nuclear safety

component loads for the sample systems or fire areas selected (electronic format

and C-size paper drawings).

B.5 Equipment location drawings which identify the physical plant locations of post-

fire safety shutdown equipment for the sample systems or fire areas selected

(electronic format and C-size paper drawings).

Enclosure 3

C. CLASSIC FIRE PROTECTION

C.1 Copy of fire protection program implementing procedures (e.g., administrative

controls, surveillance testing, and fire brigade).

C.2 List, with descriptions, of calculations and engineering analyses, studies, or

evaluations for the fire protection system, including the fire water system.

C.3 Last two completed surveillances of fire protection features for the sample

systems selected (detection, suppression, damper inspections, damper tests,

penetration inspections, barrier inspections, etc.).

C.4 List, with descriptions, of routine tests, surveillances, and preventive

maintenance on fire pumps, including pump controllers and batteries.

C.5 Last two completed annual fire pump pressure and flow tests with a complete

copy of the test procedure.

C.6 Last two completed monthly and/or quarterly fire pump tests with a complete

copy of the test procedure.

C.7 Last two completed fire water system flow tests and flushes with a complete copy

of the test procedure.

C.8 For Fire Brigade Drills, provide the following:

  • Last fire brigade drill critique
  • Last drill critique for a drill with off-site fire department support
  • Last unannounced drill critique
  • Last back-shift drill critique
  • Dates, shifts, and locations of unannounced drills for last three years
  • Summary of any unsatisfactory drill performance items for last three years
  • Last unannounced drill critique by a qualified individual independent of the

licensees staff

C.9 For fire brigade equipment provide the following:

  • Procedure for inventory and inspection
  • Most recent inspection and inventory results

C.10 Fire Brigade Qualifications, including self-contained breathing apparatus, and

training lesson plans.

Enclosure 4

C.11 Copy of the evaluation or analysis of the effects of fire suppression activities on

the ability to achieve the safe shutdown for the sample systems selected

demonstrating:

  • The automatic or manual actuation of a suppression system, due to a fire in a

single location, will not indirectly cause damage to the success path.

  • The inadvertent actuation or rupture of a suppression system will not

indirectly cause damage to the success path.

  • Adequate drainage for areas protected by water suppression systems.

areas that are credited with keeping water from leaking into fire areas below.

C.12 Impairment Log (at start of inspection) for fire protection features that are out of

service.

C.13 List of penetration seal work, re-work, or installation activities, in the last three

years.

C.14 List of fire wrap work, re-work, or installation activities, in the last three years.

C.15 Licensee evaluations of industry operating experience concerning fire protection

issues completed in the last three years.

C.16 List of fire event analysis reports for the last three years.

C.17 The team would like to observe a day-shift unannounced fire brigade drill in the

plant, if possible, during the week of February 12, 2024. Please put us in contact

with the appropriate personnel for planning fire brigade drills during the onsite

information gathering trip.

C.18 The team would like to perform a walkdown of the sample fire protection systems

and/or fire areas with fire protection personnel in the plant during the week of

February 12, 2024. Please put us in contact with the appropriate personnel for

planning the walkdowns during the onsite information gathering trip.

D. ELECTRICAL

D.1 Electrical system health reports for the two most recent quarters.

D.2 Surveillance procedures and last surveillance demonstrating operability of

components required for alternative shutdown.

E. OPERATIONS

E.1 The team would like to perform a walkthrough of a sample of post-fire safe

shutdown procedures with qualified operators in the plant during the week of

February 12, 2024. Please put us in contact with the appropriate personnel for

planning the walkthroughs during the onsite information gathering trip.

Enclosure 5

E.2 List, with descriptions, of licensed operator Job Performance Measures (JPMs)

for operator actions required to achieve and maintain post-fire safe shutdown.

E.3 List, with descriptions, of non-licensed operator training associated with non-

licensed operator actions to achieve and maintain post-fire nuclear safe

shutdown (including JPMs, in-field training walkdowns, simulations, or initial

qualification).

E.4 Lesson plans for post-fire safe shutdown training for licensed and non-licensed

operators.

E.5 Thermal hydraulic calculation or analysis that determines the time requirements

for time-critical manual operator actions.

E.6 Operating procedures to achieve and maintain post-fire safe shutdown from the

control room and requiring a control room evacuation.

E.7 For safe shutdown equipment and tools, provide the following:

  • Procedure for inventory and inspection.
  • Most recent inspection and inventory results.

E.8 List, with descriptions, of procedures that implement cold shutdown repairs (if

required).

F. FIRE PROTECTION PROGRAM ADMINISTRATIVE CONTROLS

F.1 Copies of procedures that control the configuration of the fire protection program,

features, and post-fire safe shutdown methodology and system design. Also,

copies of procedures that govern the implementation of plant modifications,

maintenance, and special operations and their impact on fire protection.

F.2 List, with descriptions, of open and closed condition reports for the fire protection

systems for the last three years.

F.3 List, with descriptions, of open and closed condition reports associated with the

post-fire safe shutdown analysis for the last three years.

F.4 List, with descriptions, of open and closed condition reports associated with

operator actions to achieve and maintain post-fire safe shutdown for the last

three years.

F.5 List, with descriptions, of open and closed condition reports associated with the

fire protection program including plant change evaluations, post-fire operating

procedures and/or training, timeline evaluations for operator actions, and

supporting engineering evaluations, analysis, or calculations for the last three

years.

F.6 List, with descriptions, of open and closed condition reports for emergency

lighting units for the last three years.

Enclosure 6

F.7 Provide administrative procedures that control temporary modifications,

permanent plant changes, design changes, procedure changes, ageing

management changes, equivalency evaluations, suitability analyses,

calculations, commercial grade dedication, safety-security interface, and repairs.

F.8 Provide procedures that control the following: combustible controls, hot work,

monitoring, compensatory measures, and work-around.

F.9 Last five hot work permits (at power).

F.10 Last five transient combustible permits (at power).

G. AGING MANAGEMENT PROGRAM

G.1 Copies of the aging management programs applicable to fire protection including

but not limited to the following:

  • Fire Protection
  • Fire Water System
  • Aboveground Metallic Tanks
  • Buried and Underground Piping and Tanks

G.2 Copies of procedures, work orders, preventive maintenance tasks, or other

documents which implement the commitments made as part of the license

extension related to fire protection.

G.3 List of aging management activities related to fire protection performed to date.

Enclosure 7