{{#Wiki_filter:From:            Edwards, Rhex To:              Davis, J.Michael Cc:              Hills, David; Doell, Marlayna; Orth, Steven; Bonano, Gene
 
==Subject:==
DAEC: CY2021 Inspection Plan Date:            Monday, February 1, 2021 9:02:03 AM
 
==Dear Mr. Davis,==
 
In accordance with Inspection Manual Chapter (IMC) 2561, Decommissioning Power Reactor Inspection Program, and IMC 2690, Inspection Program for Dry Cask Storage of Spent Reactor Fuel at Independ or 10 CFR Part 71 Transportation Packagings, the NRC Region III staff developed an inspection plan for the Duane Arnold Energy Center for calendar year 2021. The inspection plan is based on your current performance and your planned decommissioning activities for the site in January through December 2021. Below is a list of the periodic inspection procedures we expect to use during our inspections. The procedures used during each inspection will depend on the specific activities being conducted at the site. Additional discretionary inspection procedures may be used if decommissioning activities warrant. We will gladly discuss any questions you may have regarding this plan. If you have questions, please contact me at (630) 829-9722. If you have questions related to security inspections, please contact the Plant Support Branch Chief at 630-829-9500.
Sincerely, Rhex Edwards Inspection Procedure No.                Title Safety Reviews, Design Changes, and Modifications at IP 37801                      Permanently Shutdown Reactors Self-Assessment, Auditing, and Corrective Action at Permanently IP 40801                      Shutdown Reactors IP 60801                      Spent Fuel Pool Safety at Permanently Shutdown Reactors IP 60853                      On-Site Fabrication of Components and Construction of an ISFSI IP 60855                      Operation of an ISFSI IP 64704                      Fire Protection Program at Permanently Shutdown Reactors Decommissioning Performance and Status Review at IP 71801                      Permanently Shutdown Reactors Decommissioning Emergency Preparedness Scenario Review and IP 82401                      Exercise Evaluation IP 82501                      Decommissioning Emergency Preparedness Program Evaluation Occupational Radiation Exposure at Permanently Shutdown IP 83750                      Reactors IP 83801                      Inspection of Final Surveys at Permanently Shutdown Reactors Radioactive Waste Treatment and Effluent and Environmental IP 84750                      Monitoring IP 85103                      Material Control and Accounting at Decommissioning Reactors Solid Radioactive Waste Management and Transportation of
 
IP 86750                    Radioactive Materials Rhex Edwards Senior Health Physicist Division of Nuclear Materials Safety U.S. NRC Region III 630-829-9722}}

Latest revision as of 19:47, 20 January 2022

Daec_ CY2021 Inspection Plan
ML21032A185
Person / Time
Site: Duane Arnold NextEra Energy icon.png
Issue date: 02/01/2021
From: Rhex Edwards
Division of Nuclear Materials Safety III
To: Jennifer Davis
Duane Arnold
References
Download: ML21032A185 (2)


Text

From: Edwards, Rhex To: Davis, J.Michael Cc: Hills, David; Doell, Marlayna; Orth, Steven; Bonano, Gene

Subject:

DAEC: CY2021 Inspection Plan Date: Monday, February 1, 2021 9:02:03 AM

Dear Mr. Davis,

In accordance with Inspection Manual Chapter (IMC) 2561, Decommissioning Power Reactor Inspection Program, and IMC 2690, Inspection Program for Dry Cask Storage of Spent Reactor Fuel at Independ or 10 CFR Part 71 Transportation Packagings, the NRC Region III staff developed an inspection plan for the Duane Arnold Energy Center for calendar year 2021. The inspection plan is based on your current performance and your planned decommissioning activities for the site in January through December 2021. Below is a list of the periodic inspection procedures we expect to use during our inspections. The procedures used during each inspection will depend on the specific activities being conducted at the site. Additional discretionary inspection procedures may be used if decommissioning activities warrant. We will gladly discuss any questions you may have regarding this plan. If you have questions, please contact me at (630) 829-9722. If you have questions related to security inspections, please contact the Plant Support Branch Chief at 630-829-9500.

Sincerely, Rhex Edwards Inspection Procedure No. Title Safety Reviews, Design Changes, and Modifications at IP 37801 Permanently Shutdown Reactors Self-Assessment, Auditing, and Corrective Action at Permanently IP 40801 Shutdown Reactors IP 60801 Spent Fuel Pool Safety at Permanently Shutdown Reactors IP 60853 On-Site Fabrication of Components and Construction of an ISFSI IP 60855 Operation of an ISFSI IP 64704 Fire Protection Program at Permanently Shutdown Reactors Decommissioning Performance and Status Review at IP 71801 Permanently Shutdown Reactors Decommissioning Emergency Preparedness Scenario Review and IP 82401 Exercise Evaluation IP 82501 Decommissioning Emergency Preparedness Program Evaluation Occupational Radiation Exposure at Permanently Shutdown IP 83750 Reactors IP 83801 Inspection of Final Surveys at Permanently Shutdown Reactors Radioactive Waste Treatment and Effluent and Environmental IP 84750 Monitoring IP 85103 Material Control and Accounting at Decommissioning Reactors Solid Radioactive Waste Management and Transportation of

IP 86750 Radioactive Materials Rhex Edwards Senior Health Physicist Division of Nuclear Materials Safety U.S. NRC Region III 630-829-9722