MONTHYEARML22027A3582022-01-26026 January 2022 DAEC: CY2022 Inspection Plan, Docket No: 05000331, License No: DPR-49 ML21032A1852021-02-0101 February 2021 Daec_ CY2021 Inspection Plan IR 05000331/20200052020-09-0101 September 2020 Updated Inspection Plan for Duane Arnold Energy Center (Report 05000331/2020005) IR 05000331/20190062020-03-0303 March 2020 Annual Assessment Letter Duane Arnold Energy Center (Report 05000331/2019006) ML19290E5482019-10-17017 October 2019 Request for Information for an NRC Triennial Baseline Design Bases Assurance Inspection (Team); Inspection Report 05000331/2020010 IR 05000331/20190052019-08-28028 August 2019 Updated Inspection Plan for Duane Arnold Energy Center (Report 05000331/2019005) ML19099A3522019-04-0909 April 2019 Information Request to Support Upcoming Temporary Instruction 2515/193 Inspection at Duane Arnold Energy Center IR 05000331/20180062019-03-0404 March 2019 Annual Assessment Letter for Duane Arnold Energy Center (Report 05000331/2018006) IR 05000331/20180052018-08-28028 August 2018 Updated Inspection Plan for Duane Arnold Energy Center (Report 05000331/2018005) IR 05000331/20170062018-03-0202 March 2018 Annual Assessment Letter for Duane Arnold Energy Center (Report 05000331/2017006) ML18061A1502018-03-0202 March 2018 Information Request for the Cyber-Security Full Implementation of Inspection, Notification to Perform Inspection 05000331/2018414 (DRS-G.Hausman) ML17313B1882017-11-0909 November 2017 Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information IR 05000331/20170052017-08-28028 August 2017 Updated Inspection Plan (Report 05000331/2017005) ML17172A3872017-06-20020 June 2017 Information Request to Support Upcoming Temporary Instruction 191 Inspection at Duane Arnold Energy Center IR 05000331/20160062017-03-0101 March 2017 Annual Assessment Letter for Duane Arnold Energy Center (Report 05000331/2016006) ML17047A6652017-02-16016 February 2017 Request for Information for an NRC Triennial Baseline Design Bases Assurance Inspection (Team): Inspection Report 05000331/2017008 ML17010A0502017-01-0909 January 2017 Information Request to Support Upcoming Problem Identification and Resolution Inspection at the Duane Arnold Energy Center IR 05000331/20160052016-08-31031 August 2016 Mid-Cycle Assessment Letter for Duane Arnold Energy Center (Report 05000331/2016005) IR 05000331/20150062016-03-0202 March 2016 Annual Assessment Letter for Duane Arnold Energy Center (Inspection Report 05000331/2015006) IR 05000331/20150052015-09-0101 September 2015 Mid-Cycle Assessment Letter for Duane Arnold Energy Center (Report 05000331/2015005) IR 05000331/20140012015-03-0404 March 2015 Annual Assessment Letter for Duane Arnold Energy Center (Report 05000331/2014001) ML15057A3472015-02-26026 February 2015 Information Request to Support Upcoming Problem Identification and Resolution Inspection at the Duane Arnold Energy Center ML14245A2772014-09-0202 September 2014 Mid-Cycle Assessment Letter for Duane Arnold Energy Center ML14148A4002014-05-27027 May 2014 Notification of NRC Supplemental Inspection (95002) and Request for Information IR 05000331/20130012014-03-0404 March 2014 Annual Assessment Letter for Duane Arnold Energy Center (Report 05000331/2013001) ML13246A2222013-09-0303 September 2013 2013 Duane Arnold Energy Center Mid-Cycle Letter Combined ML13176A0812013-06-24024 June 2013 Ltr 6/24/13 Duane Arnold MOD 50.59 Request for Information IR 05000331/20120012013-03-0404 March 2013 Annual Assessment Letter for Duane Arnold Energy Center, Unit 1 (Report 05000331/2012001) ML12249A4092012-09-0404 September 2012 Mid-Cycle Assessment Letter for Duane Arnold Energy Center Unit 1 IR 05000331/20110072012-03-0505 March 2012 Annual Assessment Letter for Duane Arnold Energy Center, Unit 1 (Report 05000331-11-007) IR 05000331/20110062011-09-0101 September 2011 Mid-Cycle Letter for Duane Arnold Energy Center; 05000331-11-006 IR 05000331/20110012011-03-0404 March 2011 Annual Assessment Letter for Duane Arnold Energy Center (Report 05000331-11-001) ML1024400522010-09-0101 September 2010 Mid-Cycle Performance Review and Inspection Plan - Duane Arnold Energy Center IR 05000331/20100012010-03-0303 March 2010 Duane Arnold Energy Center EOC Annual Assessment Letter (Report 05000331-10-001) ML0924402492009-09-0101 September 2009 Mid-Cycle Performance Review and Inspection Plan IR 05000331/20090012009-03-0404 March 2009 Annual Assessment Letter - Duane Arnold (05000331-09-001) ML0824602612008-09-0202 September 2008 Duane Arnold - Mid Cycle Performance Review and Inspection Plan IR 05000331/20080012008-03-0303 March 2008 IR 05000331-08-001, Duane Arnold Energy Center EOC Annual Assessment Report Letter ML0735403922007-12-19019 December 2007 Change to Inspection Plan 1/1/08 - 12/31/08 NG-07-0878, Second 10-Year Containment Inspection Plan2007-11-16016 November 2007 Second 10-Year Containment Inspection Plan IR 05000331/20070012007-03-0202 March 2007 EOC Annual Assessment Letter (Report 05000331-07-001) ML0624303352006-08-31031 August 2006 8/31/06 Duane Arnold Station-Mid-Cycle Performance Review and Inspection Plan IR 05000331/20060012006-03-0202 March 2006 (EOC) Annual Assessment Letter (Report 05000331/2006001) ML0524204262005-08-30030 August 2005 Mid-Cycle Performance Review and Inspection Plan - Duane Arnold Energy Center ML0506203742005-03-0202 March 2005 Annual Assessment Letter - Duane Arnold Energy Center ML0424504992004-08-30030 August 2004 Mid-Cycle Performance Review and Inspection Plan for Physical Protection - Duane Arnold Energy Center IR 05000331/20040012004-03-0404 March 2004 Annual Assessment Letter, Duane Arnold (IR 05000331-04-001) ML0324001542003-08-27027 August 2003 IR 05000331-04-001 - Mid-Cycle Assessment Letter ML0224001502002-08-23023 August 2002 Mid-Cycle Performance Review and Inspection Plan - Duane Arnold Energy Center (August 23, 2002) IR 05000331/20020012002-03-0404 March 2002 Annual Assessment Letter - Duane Arnold Energy Center (Report 50-331/02-01) 2022-01-26
[Table view] Category:Letter
MONTHYEARIR 05000331/20240022024-10-25025 October 2024 NRC Inspection Report No. 07200032/2024001 and 05000331/2024002 ML24240A1692024-09-18018 September 2024 Cy 2023 Summary of Decommissioning Trust Fund Status ML24249A1362024-09-0404 September 2024 EN 57304 - Westinghouse Electric Company, LLC, Final Report - No Embedded Files. Notification of the Potential Existence of Defects Pursuant to 10 CFR Part 21 ML24163A0012024-08-0505 August 2024 LTR-24-0119-1-1 Response to Nh Letter Regarding Review of NextEras Emergency Preparedness Amendment Review ML24193A2432024-07-12012 July 2024 – Interim Audit Summary Report in Support of Review of License Amendment Requests Regarding Fleet Emergency Plan ML24149A2862024-06-12012 June 2024 NextEra Fleet - Proposed Alternative Frr 23-01 to Use ASME Code Case N-752-1, Risk-Informed Categorization and Treatment for Repair/Replacement Activities in Class 2 and 3 Systems Section X1, Division 1 (EPID L-2023-LLR-0009) - Letter ML24151A6482024-06-0303 June 2024 Changes in Reactor Decommissioning Branch Project Management Assignments for Some Decommissioning Facilities NG-24-0004, 2023 Annual Radiological Environmental Operating Report2024-05-0808 May 2024 2023 Annual Radiological Environmental Operating Report NG-24-0003, Submittal of 2023 Annual Radioactive Material Release Report2024-04-24024 April 2024 Submittal of 2023 Annual Radioactive Material Release Report ML24072A0292024-03-29029 March 2024 Nextera Energy Duane Arnold, Llc. Exemption from Select Requirements of 10 CFR Part 73 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting) NG-24-0001, 2024 Annual Decommissioning and Spent Fuel Management Funding Status Report and Independent Spent Fuel Storage Installation (ISFSI) Decommissioning Financial Assurance Update2024-03-0606 March 2024 2024 Annual Decommissioning and Spent Fuel Management Funding Status Report and Independent Spent Fuel Storage Installation (ISFSI) Decommissioning Financial Assurance Update NG-24-0002, 2023 Annual Exposure Report - Form 5s2024-03-0606 March 2024 2023 Annual Exposure Report - Form 5s L-2024-010, Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3)2024-01-25025 January 2024 Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3) NG-23-0010, Supplement to Duane Arnold Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final Rule2023-12-0606 December 2023 Supplement to Duane Arnold Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final Rule NG-23-0009, Part 73 Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final Rule2023-11-16016 November 2023 Part 73 Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final Rule ML23201A0872023-08-0303 August 2023 Audit Plan in Support of Review of License Amendment NG-23-0006, Independent Spent Fuel Storage Installation (ISFSI) Financial Assurance Update2023-05-23023 May 2023 Independent Spent Fuel Storage Installation (ISFSI) Financial Assurance Update ML23137A1672023-05-11011 May 2023 Submittal of 2022 Annual Radiological Environmental Operating Report NG-23-0004, 2022 Annual Radioactive Material Release Report2023-04-25025 April 2023 2022 Annual Radioactive Material Release Report NG-23-0003, 2022 Annual Exposure Report - Form 5s2023-04-21021 April 2023 2022 Annual Exposure Report - Form 5s NG-23-0002, 10 CFR 50.59 Report, Commitment Changes, 10 CFR 72.48 Report, Quality Assurance Program Changes, Technical Specification Basis Changes, and Revision of the DAEC Defueled Safety Analysis Report2023-03-27027 March 2023 10 CFR 50.59 Report, Commitment Changes, 10 CFR 72.48 Report, Quality Assurance Program Changes, Technical Specification Basis Changes, and Revision of the DAEC Defueled Safety Analysis Report NG-23-0001, 2023 Annual Decommissioning and Spent Fuel Management Funding Status Report2023-03-27027 March 2023 2023 Annual Decommissioning and Spent Fuel Management Funding Status Report L-2023-029, And Point Beach Units 1 and 2 Nuclear Property Insurance - 10 CFR 50.54(w)(3)2023-03-10010 March 2023 And Point Beach Units 1 and 2 Nuclear Property Insurance - 10 CFR 50.54(w)(3) ML22361A1022023-02-24024 February 2023 Reactor Decommissioning Branch Project Management Changes for Some Decommissioning Facilities and Establishment of Backup Project Manager for All Decommissioning Facilities ML22339A0012022-12-22022 December 2022 – Acceptance of Requested Licensing Action Amendment Request for Common Emergency Plan IR 05000331/20220032022-12-13013 December 2022 NRC Inspection Report No. 05000331/2022003 (Drss) ML22285A0072022-10-13013 October 2022 NRC Analysis of NextEra Energy Duane Arnolds Decommissioning Funding Status Report, Docket No. 50-331 IR 05000331/20220022022-07-13013 July 2022 NRC Inspection Report Nos. 05000331/2022002(DNMS) and 07200032/2022002(DNMS) ML22090A1922022-05-26026 May 2022 Letter to B. Coffey, FPL from M. Doell - Duane Arnold Post Shutdown Activities Report Review Letter ML22132A2872022-05-24024 May 2022 ISFSI DQAP Approval Letter ML22111A0332022-05-20020 May 2022 Operating License Page Correction Letter to B. Coffey, Florida Power and Light, from M. Doell NG-22-0055, Revision to Duane Arnold Energy Center (DAEC) ISFSI-Only Emergency Plan2022-05-20020 May 2022 Revision to Duane Arnold Energy Center (DAEC) ISFSI-Only Emergency Plan ML22089A0492022-05-12012 May 2022 Sfmp Review Letter NG-22-0053, 2021 Annual Radiological Environmental Operating Report2022-05-0606 May 2022 2021 Annual Radiological Environmental Operating Report NG-22-0052, Regulatory Issue Summary 2000-11. NRC Emergency Telecommunications System, Statement of Intent to Implement the Proposed Voluntary Initiative2022-05-0404 May 2022 Regulatory Issue Summary 2000-11. NRC Emergency Telecommunications System, Statement of Intent to Implement the Proposed Voluntary Initiative IR 05000331/20224012022-04-27027 April 2022 Decommissioning Security Inspection Report 05000331/2022401 NG-22-0050, Revised Response to Request for Additional Information Relating to Decommissioning Quality Assurance Program, Revision 02022-04-26026 April 2022 Revised Response to Request for Additional Information Relating to Decommissioning Quality Assurance Program, Revision 0 NG-22-0049, 2021 Annual Radioactive Material Release Report2022-04-26026 April 2022 2021 Annual Radioactive Material Release Report ML22066A7632022-04-25025 April 2022 ISFSI-Only Emergency Plan License Amendment Approval L-2022-068, NextEra Energy Duane Arnold Quality Assurance Topical Report (FPL-3) Revision 22022-04-25025 April 2022 NextEra Energy Duane Arnold Quality Assurance Topical Report (FPL-3) Revision 2 NG-22-0035, Response to Request for Additional Information Relating to Decommissioning Quality Assurance Program. Revision 02022-04-13013 April 2022 Response to Request for Additional Information Relating to Decommissioning Quality Assurance Program. Revision 0 NG-22-0047, Registration of Independent Spent Fuel Installation Storage Cask and Notification of Permanent Removal of All Spent Fuel Assemblies from the Spent Fuel Pool2022-04-11011 April 2022 Registration of Independent Spent Fuel Installation Storage Cask and Notification of Permanent Removal of All Spent Fuel Assemblies from the Spent Fuel Pool NG-22-0042, Registration of Independent Spent Fuel Installation Storage Casks2022-04-0808 April 2022 Registration of Independent Spent Fuel Installation Storage Casks NG-22-0041, And Independent Spent Fuel Storage Installation, 2022 Annual Decommissioning and Spent Fuel Management Funding Status Report2022-03-31031 March 2022 And Independent Spent Fuel Storage Installation, 2022 Annual Decommissioning and Spent Fuel Management Funding Status Report NG-22-0030, Registration of Independent Spent Fuel Installation Storage Casks2022-03-23023 March 2022 Registration of Independent Spent Fuel Installation Storage Casks NG-22-0031, 2021 Annual Exposure Report - Form 5s2022-03-23023 March 2022 2021 Annual Exposure Report - Form 5s ML22080A1822022-03-22022 March 2022 Letter to B. Coffey from M. Doell - Duane Arnold ISFSI QAPD RAI Letter L-2022-012, Florida Power & Light Company Nuclear Property Insurance - 10 CFR 50.54(w)(3)2022-03-16016 March 2022 Florida Power & Light Company Nuclear Property Insurance - 10 CFR 50.54(w)(3) ML22059A7462022-03-10010 March 2022 ISFSI-Only Physical Security Plan License Amendment Approval NG-22-0025, Registration of Independent Spent Fuel Installation Storage Casks2022-03-0808 March 2022 Registration of Independent Spent Fuel Installation Storage Casks 2024-09-04
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE RD. SUITE 210 LISLE, IL 60532-4352 January 9, 2017 Mr. Thomas A. Vehec Vice President NextEra Energy Duane Arnold, LLC 3277 DAEC Road Palo, IA 52324-9785
SUBJECT:
INFORMATION REQUEST TO SUPPORT UPCOMING PROBLEM IDENTIFICATION AND RESOLUTION INSPECTION AT THE DUANE ARNOLD ENERGY CENTER
Dear Mr. Vehec:
This letter is to request information to support our scheduled Problem Identification and Resolution (PI&R) inspection beginning March 6, 2017, at your Duane Arnold Energy Center.
This inspection will be performed in accordance with the NRC baseline Inspection Procedure 71152.
Experience has shown that these inspections are extremely resource intensive both for the NRC inspectors and the utility staff. In order to minimize the impact that the inspection has on the site and to ensure a productive inspection, we have enclosed a list of documents required for the inspection.
The documents requested are copies of condition reports and lists of information necessary to ensure the inspection team is adequately prepared for the inspection. The information requested prior to the inspection may be provided in either CD-ROM/DVD (preferred) or hard copy format and should be ready for NRC review by February 17, 2017. Mr. Raymond Ng, the Lead Inspector, will contact your staff to determine the best method of providing the requested information.
If there are any questions about the material requested or the inspection in general, please contact Mr. Ng at 630-829-9574 or Raymond.Ng@nrc.gov.
This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements were approved by the Office of Management and Budget, Control Number 3150-0011.
T. Vehec The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget control number.
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public Inspections, Exemptions, Requests for Withholding, of the NRC's Rules of Practice, a copy of this letter, its enclosure, and your response (if any) will be available electronically for public inspection in the NRCs Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS).
ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,
/RA/
Karla Stoedter, Chief Branch 1 Division of Reactor Projects Docket No. 50-331 License No. DPR-49
Enclosure:
Requested Info. to Support PI&R Inspection cc: Distribution via LISTSERV
Requested Information to Support Problem Identification and Resolution Inspection Please provide the information on a compact disc or thumb drive (one for each of four team members), if possible. Unless otherwise specified, the time frame for requested information is for the period of January 1, 2015, through the time the data request is answered. Please label any electronic files with file content information. In the case of list of condition reports requested, the list should be sortable electronically.
In addition, inspectors will require computer access to the corrective action program (CAP) database while on site.
PROGRAM DOCUMENTS
- 1. Copies of current administrative procedures associated with the corrective action program. This should include procedures related to: (1) corrective action process; (2) operating experience program; (3) self-assessment program; (4) maintenance rule program; (5) operability determination process; (6) degraded/non-conforming condition process (e.g., RIS 2005-20); (7) system health process or equivalent equipment reliability improvement programs; and (8) operational decision making (ODMI) process.
- 2. A current copy of the Employee Concerns Program/Ombudsman administrative procedure.
- 3. Description of any substantive changes made to the CAP since the last Problem Identification and Resolution (PI&R) Inspection (April 2015). Please include the effective date with each listed change.
ASSESSMENTS
- 4. A copy of Quality Assurance (QA) audits of the corrective action program.
- 5. A copy of self-assessments and associated condition reports generated in preparation for this PI&R inspection.
- 6. A list of all other QA audits completed.
- 7. The schedule of future QA audits.
- 8. A copy of completed CAP self-assessments and the plan/schedule for future CAP self-assessments.
- 9. A chronological list of department and site self-assessments completed (include date completed).
- 10. A list of condition reports (CRs) written for findings or concerns identified in self-assessments and audits. Include a short description/title of the finding, its status, and include a cross-reference to the audit or self-assessment number.
Enclosure
CORRECTIVE ACTION DOCUMENTS
- 11. A list of completed root cause evaluations with a brief description of the issue. Provide status of any actions developed as part of the evaluations. Include a reference, if not part of the root cause package, to the documents and/or CRs directing and tracking the actions.
- 12. A list of completed apparent cause evaluations with a brief description of the issue.
Provide status of any actions developed as part of the evaluations. Include a reference, if not part of the apparent cause package, to the documents and/or CRs directing and tracking the actions.
- 13. A list of completed common cause evaluations with a brief description of the issue.
Provide status of any actions developed as part of the evaluations. Include a reference, if not part of the common cause package, to the documents and/or CRs directing and tracking the actions.
- 14. A list of all open condition reports sorted by significance level. Include CR number, the date initiated, a brief description/title, system affected if any, significance level, and anticipated completion date, if available.
- 15. A list of closed CRs sorted by significance level and then initiation date. Include CR number, a brief description/title, the date initiated and closed, assigned organization, system affected and whether there was an associated operability evaluation.
- 16. A list of open corrective actions, sorted by significance/priority level, with a brief description/title, initiating date and due date. The list should include the number of due date extension and be grouped by the responsible department.
- 17. A list of CRs generated by the corporate office that involve or affect plant operation, sorted by significance level. Include the date initiated, a brief description/title, site(s) affected, system affected, assigned organization, and status (if closed include date closed; if open, include scheduled date to be closed).
- 18. A list of completed effectiveness reviews with a brief description of the results. Include a cross-reference to the CRs for which the effectiveness review was conducted and, if applicable, CR numbers documenting any additional follow-up actions.
- 19. A list of CRs initiated for inadequate or ineffective corrective actions. Include the date initiated, a brief description/title, significance/priority level, system affected, assigned organization, and status (if closed include date closed; if open, include scheduled date to be closed). Include a cross-reference to the CR or evaluation that generated the original corrective action.
- 20. A copy of any performance reports or indicators used to track CAP effectiveness.
The end-of-quarter data will suffice; monthly reports are not required.
- 21. A data table (or similar format) showing the total number of CRs generated per year since 2012 sortable by department (i.e. operations, engineering, security etc.).
2
- 22. A data table showing the number of issues identified externally (NRC, INPO, other etc.)
per year as compared to internally since 2012.
TRENDS
- 23. A list of CRs initiated for trends of conditions adverse to quality. Include the date initiated, a brief description/title, significance/priority level, and status (if closed include date closed; if open, include scheduled date to be closed).
- 24. Copies of any completed trend reports for CRs. Quarterly trend reports are acceptable; copies of all monthly reports are not required.
- 25. Copies of all apparent, common and/or root cause evaluations regarding adverse human performance trends.
OPERATING EXPERIENCE
- 26. A copy of the most recent operating experience program effectiveness review.
- 27. A list of CRs initiated to evaluate industry and NRC operating experience, and NRC generic communications (e.g. bulletins, information notices, generic letters, etc.).
Include date the CR was initiated, a brief description/title, and the status (if closed include date closed; if open, include scheduled date to be closed).
SYSTEMS AND COMPONENTS
- 28. A list of the top ten risk significant systems and top ten risk significant components.
- 29. A list of operability determinations/evaluations. Include a brief description/title, date initiated, date closed or date scheduled to be closed. Also include any open operability evaluations that were initiated prior to January 1, 2015.
- 30. Cause analysis, corrective actions documents, health reports, and trend analysis for systems and components considered Maintenance Rule (a)(1). Provide this information starting one year earlier from when the system or component entered (a)(1) status.
Include dates when system/components entered (a)(1) status and, if applicable, returned to (a)(2) status. For recurring reports, quarterly reports are sufficient; monthly reports are not required.
- 31. A list of temporary modifications that were installed since January 1, 2015, with a brief description/title, installation date, and current status. Include any in-place temporary modifications that were installed prior to January 1, 2015.
SCWE
- 32. Results of completed safety culture/safety conscious work environment surveys or self-assessments. Include reference to associated CRs and status of the CRs actions.
Also include schedule/plans for future surveys.
3
REGULATORY ISSUES
- 33. A list of CRs for issues (findings, violations, etc.) documented in NRC inspection reports.
Include the CR number, brief description/title, date initiated and the status (if closed include date closed; if open, include scheduled date to be closed).
- 34. A list of CRs for licensee identified violations that have been documented in NRC inspection reports. Include the CR number, brief description/title, date initiated and the status (if closed include date closed; if open, include scheduled date to be closed).
- 35. A list of CRs associated with NRC identified issues. Include the CR number, brief description/title, date initiated and the status (if closed include date closed; if open, include scheduled date to be closed).
- 36. A list of degraded/non-conforming conditions. Include the CR number, brief description/title, date initiated and date closed or projected closeout date. Include open issues that were identified prior to January 1, 2015.
- 37. A list of current control room deficiencies and operator work-arounds, sortable by priority, with a brief description/title and corresponding CR and/or work order number.
5-YEAR REVIEW
- 38. A list of CRs regarding the Instrument Air System that have been generated since January 1, 2012. Include the CR number, brief description/title, level of evaluation (i.e. root cause, apparent cause, common cause etc.), date initiated, and the status (if closed include date closed; if open, include scheduled date to be closed).
- 39. A list of CRs regarding Control Building Chiller System that have been generated since January 1, 2012. Include the CR number, brief description/title, level of evaluation (i.e. root cause, apparent cause, common cause, etc.), date initiated, and the status (if closed include date closed; if open, include scheduled date to be closed).
ADMIN
- 40. A copy of the latest plant organizational chart and phone listing.
- 41. Scheduled dates, times, and location for all meetings associated with implementing the CAP (e.g. CR screening meetings, corrective action review board meetings). Include work order screening/assessment meetings.
Documents requested to be available on-site during the inspection:
- a. Updated Final Safety Analysis Report.
- b. Technical Specifications.
- c. Procedures and procedure index.
- d. A copy of the QA manual.
4
- e. A list of issues brought to the ECP/ombudsman and the actions taken for resolution.
- f. A list of the codes used in the CAP.
- g. A copy of the latest independent/offsite organization review of safety culture/safety conscious work environment and internal equivalent assessments if not provided as part of the requested data package.
Other:
On the first day of the inspection, or early on the second day, please provide the inspection team a briefing of your corrective action program. Include your expectations for personnel using the program and how the work order system fits into the overall scheme for addressing identified issues. Also please demonstrate how to use a computer to access CAP data.
5
T. Vehec Letter to Thomas A. Vehec from Raymond Ng dated January 9, 2017
SUBJECT:
INFORMATION REQUEST TO SUPPORT UPCOMING PROBLEM IDENTIFICATION AND RESOLUTION INSPECTION AT THE DUANE ARNOLD ENERGY CENTER cc: Distribution via LISTSERV DISTRIBUTION:
Jeremy Bowen RidsNrrDorlLpl3-1 Resource RidsNrrPMDuaneArnold Resource RidsNrrDirsIrib Resource Cynthia Pederson Darrell Roberts Richard Skokowski Allan Barker Carole Ariano Linda Linn DRPIII DRSIII ROPassessment.Resource@nrc.gov ADAMS Accession Number: ML17010A050 OFFICE RIII RIII NAME RNg:tt KStoedter DATE 1/06/2017 1/09/2017 OFFICIAL RECORD COPY