MONTHYEARML22027A3582022-01-26026 January 2022 DAEC: CY2022 Inspection Plan, Docket No: 05000331, License No: DPR-49 ML21032A1852021-02-0101 February 2021 Daec_ CY2021 Inspection Plan IR 05000331/20200052020-09-0101 September 2020 Updated Inspection Plan for Duane Arnold Energy Center (Report 05000331/2020005) IR 05000331/20190062020-03-0303 March 2020 Annual Assessment Letter Duane Arnold Energy Center (Report 05000331/2019006) ML19290E5482019-10-17017 October 2019 Request for Information for an NRC Triennial Baseline Design Bases Assurance Inspection (Team); Inspection Report 05000331/2020010 IR 05000331/20190052019-08-28028 August 2019 Updated Inspection Plan for Duane Arnold Energy Center (Report 05000331/2019005) ML19099A3522019-04-0909 April 2019 Information Request to Support Upcoming Temporary Instruction 2515/193 Inspection at Duane Arnold Energy Center IR 05000331/20180062019-03-0404 March 2019 Annual Assessment Letter for Duane Arnold Energy Center (Report 05000331/2018006) IR 05000331/20180052018-08-28028 August 2018 Updated Inspection Plan for Duane Arnold Energy Center (Report 05000331/2018005) IR 05000331/20170062018-03-0202 March 2018 Annual Assessment Letter for Duane Arnold Energy Center (Report 05000331/2017006) ML18061A1502018-03-0202 March 2018 Information Request for the Cyber-Security Full Implementation of Inspection, Notification to Perform Inspection 05000331/2018414 (DRS-G.Hausman) ML17313B1882017-11-0909 November 2017 Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information IR 05000331/20170052017-08-28028 August 2017 Updated Inspection Plan (Report 05000331/2017005) ML17172A3872017-06-20020 June 2017 Information Request to Support Upcoming Temporary Instruction 191 Inspection at Duane Arnold Energy Center IR 05000331/20160062017-03-0101 March 2017 Annual Assessment Letter for Duane Arnold Energy Center (Report 05000331/2016006) ML17047A6652017-02-16016 February 2017 Request for Information for an NRC Triennial Baseline Design Bases Assurance Inspection (Team): Inspection Report 05000331/2017008 ML17010A0502017-01-0909 January 2017 Information Request to Support Upcoming Problem Identification and Resolution Inspection at the Duane Arnold Energy Center IR 05000331/20160052016-08-31031 August 2016 Mid-Cycle Assessment Letter for Duane Arnold Energy Center (Report 05000331/2016005) IR 05000331/20150062016-03-0202 March 2016 Annual Assessment Letter for Duane Arnold Energy Center (Inspection Report 05000331/2015006) IR 05000331/20150052015-09-0101 September 2015 Mid-Cycle Assessment Letter for Duane Arnold Energy Center (Report 05000331/2015005) IR 05000331/20140012015-03-0404 March 2015 Annual Assessment Letter for Duane Arnold Energy Center (Report 05000331/2014001) ML15057A3472015-02-26026 February 2015 Information Request to Support Upcoming Problem Identification and Resolution Inspection at the Duane Arnold Energy Center ML14245A2772014-09-0202 September 2014 Mid-Cycle Assessment Letter for Duane Arnold Energy Center ML14148A4002014-05-27027 May 2014 Notification of NRC Supplemental Inspection (95002) and Request for Information IR 05000331/20130012014-03-0404 March 2014 Annual Assessment Letter for Duane Arnold Energy Center (Report 05000331/2013001) ML13246A2222013-09-0303 September 2013 2013 Duane Arnold Energy Center Mid-Cycle Letter Combined ML13176A0812013-06-24024 June 2013 Ltr 6/24/13 Duane Arnold MOD 50.59 Request for Information IR 05000331/20120012013-03-0404 March 2013 Annual Assessment Letter for Duane Arnold Energy Center, Unit 1 (Report 05000331/2012001) ML12249A4092012-09-0404 September 2012 Mid-Cycle Assessment Letter for Duane Arnold Energy Center Unit 1 IR 05000331/20110072012-03-0505 March 2012 Annual Assessment Letter for Duane Arnold Energy Center, Unit 1 (Report 05000331-11-007) IR 05000331/20110062011-09-0101 September 2011 Mid-Cycle Letter for Duane Arnold Energy Center; 05000331-11-006 IR 05000331/20110012011-03-0404 March 2011 Annual Assessment Letter for Duane Arnold Energy Center (Report 05000331-11-001) ML1024400522010-09-0101 September 2010 Mid-Cycle Performance Review and Inspection Plan - Duane Arnold Energy Center IR 05000331/20100012010-03-0303 March 2010 Duane Arnold Energy Center EOC Annual Assessment Letter (Report 05000331-10-001) ML0924402492009-09-0101 September 2009 Mid-Cycle Performance Review and Inspection Plan IR 05000331/20090012009-03-0404 March 2009 Annual Assessment Letter - Duane Arnold (05000331-09-001) ML0824602612008-09-0202 September 2008 Duane Arnold - Mid Cycle Performance Review and Inspection Plan IR 05000331/20080012008-03-0303 March 2008 IR 05000331-08-001, Duane Arnold Energy Center EOC Annual Assessment Report Letter ML0735403922007-12-19019 December 2007 Change to Inspection Plan 1/1/08 - 12/31/08 NG-07-0878, Second 10-Year Containment Inspection Plan2007-11-16016 November 2007 Second 10-Year Containment Inspection Plan IR 05000331/20070012007-03-0202 March 2007 EOC Annual Assessment Letter (Report 05000331-07-001) ML0624303352006-08-31031 August 2006 8/31/06 Duane Arnold Station-Mid-Cycle Performance Review and Inspection Plan IR 05000331/20060012006-03-0202 March 2006 (EOC) Annual Assessment Letter (Report 05000331/2006001) ML0524204262005-08-30030 August 2005 Mid-Cycle Performance Review and Inspection Plan - Duane Arnold Energy Center ML0506203742005-03-0202 March 2005 Annual Assessment Letter - Duane Arnold Energy Center ML0424504992004-08-30030 August 2004 Mid-Cycle Performance Review and Inspection Plan for Physical Protection - Duane Arnold Energy Center IR 05000331/20040012004-03-0404 March 2004 Annual Assessment Letter, Duane Arnold (IR 05000331-04-001) ML0324001542003-08-27027 August 2003 IR 05000331-04-001 - Mid-Cycle Assessment Letter ML0224001502002-08-23023 August 2002 Mid-Cycle Performance Review and Inspection Plan - Duane Arnold Energy Center (August 23, 2002) IR 05000331/20020012002-03-0404 March 2002 Annual Assessment Letter - Duane Arnold Energy Center (Report 50-331/02-01) 2022-01-26
[Table view] Category:Letter
MONTHYEARL-2024-010, Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3)2024-01-25025 January 2024 Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3) NG-23-0010, Supplement to Duane Arnold Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final Rule2023-12-0606 December 2023 Supplement to Duane Arnold Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final Rule NG-23-0009, Part 73 Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final Rule2023-11-16016 November 2023 Part 73 Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final Rule ML23201A0872023-08-0303 August 2023 Audit Plan in Support of Review of License Amendment NG-23-0006, Independent Spent Fuel Storage Installation (ISFSI) Financial Assurance Update2023-05-23023 May 2023 Independent Spent Fuel Storage Installation (ISFSI) Financial Assurance Update ML23137A1672023-05-11011 May 2023 Submittal of 2022 Annual Radiological Environmental Operating Report NG-23-0004, 2022 Annual Radioactive Material Release Report2023-04-25025 April 2023 2022 Annual Radioactive Material Release Report NG-23-0003, 2022 Annual Exposure Report - Form 5s2023-04-21021 April 2023 2022 Annual Exposure Report - Form 5s NG-23-0002, 10 CFR 50.59 Report, Commitment Changes, 10 CFR 72.48 Report, Quality Assurance Program Changes, Technical Specification Basis Changes, and Revision of the DAEC Defueled Safety Analysis Report2023-03-27027 March 2023 10 CFR 50.59 Report, Commitment Changes, 10 CFR 72.48 Report, Quality Assurance Program Changes, Technical Specification Basis Changes, and Revision of the DAEC Defueled Safety Analysis Report NG-23-0001, 2023 Annual Decommissioning and Spent Fuel Management Funding Status Report2023-03-27027 March 2023 2023 Annual Decommissioning and Spent Fuel Management Funding Status Report L-2023-029, and Point Beach Units 1 and 2 Nuclear Property Insurance - 10 CFR 50.54(w)(3)2023-03-10010 March 2023 and Point Beach Units 1 and 2 Nuclear Property Insurance - 10 CFR 50.54(w)(3) ML22361A1022023-02-24024 February 2023 Reactor Decommissioning Branch Project Management Changes for Some Decommissioning Facilities and Establishment of Backup Project Manager for All Decommissioning Facilities ML22339A0012022-12-22022 December 2022 Acceptance of Requested Licensing Action Amendment Request for Common Emergency Plan IR 05000331/20220032022-12-13013 December 2022 NRC Inspection Report No. 05000331/2022003 (Drss) ML22285A0072022-10-13013 October 2022 NRC Analysis of NextEra Energy Duane Arnold'S Decommissioning Funding Status Report, Docket No. 50-331 IR 05000331/20220022022-07-13013 July 2022 NRC Inspection Report Nos. 05000331/2022002(DNMS) and 07200032/2022002(DNMS) ML22090A1922022-05-26026 May 2022 Letter to B. Coffey, FPL from M. Doell - Duane Arnold Post Shutdown Activities Report Review Letter ML22132A2872022-05-24024 May 2022 ISFSI DQAP Approval Letter ML22111A0332022-05-20020 May 2022 Operating License Page Correction Letter to B. Coffey, Florida Power and Light, from M. Doell NG-22-0055, Revision to Duane Arnold Energy Center (DAEC) ISFSI-Only Emergency Plan2022-05-20020 May 2022 Revision to Duane Arnold Energy Center (DAEC) ISFSI-Only Emergency Plan ML22089A0492022-05-12012 May 2022 Sfmp Review Letter NG-22-0053, 2021 Annual Radiological Environmental Operating Report2022-05-0606 May 2022 2021 Annual Radiological Environmental Operating Report NG-22-0052, Regulatory Issue Summary 2000-11. NRC Emergency Telecommunications System, Statement of Intent to Implement the Proposed Voluntary Initiative2022-05-0404 May 2022 Regulatory Issue Summary 2000-11. NRC Emergency Telecommunications System, Statement of Intent to Implement the Proposed Voluntary Initiative IR 05000331/20224012022-04-27027 April 2022 Decommissioning Security Inspection Report 05000331/2022401 NG-22-0050, Revised Response to Request for Additional Information Relating to Decommissioning Quality Assurance Program, Revision 02022-04-26026 April 2022 Revised Response to Request for Additional Information Relating to Decommissioning Quality Assurance Program, Revision 0 NG-22-0049, 2021 Annual Radioactive Material Release Report2022-04-26026 April 2022 2021 Annual Radioactive Material Release Report L-2022-068, NextEra Energy Duane Arnold Quality Assurance Topical Report (FPL-3) Revision 22022-04-25025 April 2022 NextEra Energy Duane Arnold Quality Assurance Topical Report (FPL-3) Revision 2 ML22066A7632022-04-25025 April 2022 ISFSI-Only Emergency Plan License Amendment Approval NG-22-0035, Response to Request for Additional Information Relating to Decommissioning Quality Assurance Program. Revision 02022-04-13013 April 2022 Response to Request for Additional Information Relating to Decommissioning Quality Assurance Program. Revision 0 NG-22-0047, Registration of Independent Spent Fuel Installation Storage Cask and Notification of Permanent Removal of All Spent Fuel Assemblies from the Spent Fuel Pool2022-04-11011 April 2022 Registration of Independent Spent Fuel Installation Storage Cask and Notification of Permanent Removal of All Spent Fuel Assemblies from the Spent Fuel Pool NG-22-0042, Registration of Independent Spent Fuel Installation Storage Casks2022-04-0808 April 2022 Registration of Independent Spent Fuel Installation Storage Casks NG-22-0041, and Independent Spent Fuel Storage Installation, 2022 Annual Decommissioning and Spent Fuel Management Funding Status Report2022-03-31031 March 2022 and Independent Spent Fuel Storage Installation, 2022 Annual Decommissioning and Spent Fuel Management Funding Status Report NG-22-0031, 2021 Annual Exposure Report - Form 5s2022-03-23023 March 2022 2021 Annual Exposure Report - Form 5s NG-22-0030, Registration of Independent Spent Fuel Installation Storage Casks2022-03-23023 March 2022 Registration of Independent Spent Fuel Installation Storage Casks ML22080A1822022-03-22022 March 2022 Letter to B. Coffey from M. Doell - Duane Arnold ISFSI QAPD RAI Letter L-2022-012, Florida Power & Light Company Nuclear Property Insurance - 10 CFR 50.54(w)(3)2022-03-16016 March 2022 Florida Power & Light Company Nuclear Property Insurance - 10 CFR 50.54(w)(3) ML22059A7462022-03-10010 March 2022 ISFSI-Only Physical Security Plan License Amendment Approval NG-22-0025, Registration of Independent Spent Fuel Installation Storage Casks2022-03-0808 March 2022 Registration of Independent Spent Fuel Installation Storage Casks IR 05000331/20220012022-03-0404 March 2022 Subject: NRC Inspection Report Nos. 05000331/2022001(DNMS) and 07200032/2022001(DNMS) NG-22-0021, Registration of Independent Spent Fuel Installation Storage Casks2022-02-24024 February 2022 Registration of Independent Spent Fuel Installation Storage Casks ML22007A2722022-02-11011 February 2022 Cover Letter - NRC Duane Arnold Exemption Issuance NG-22-0014, Registration of Independent Spent Fuel Installation Storage Casks2022-02-10010 February 2022 Registration of Independent Spent Fuel Installation Storage Casks ML22028A2822022-02-0303 February 2022 Defueled Physical Security Plan License Amendment Approval ML22033A0802022-02-0202 February 2022 Supplement to License Amendment Request (TSCR-188): Proposed Change to the Physical Security Plan for the Post-Shutdown and Permanently Defueled Condition IR 05000331/20210012022-01-25025 January 2022 NRC Inspection Report Nos. 05000331/2021001(DNMS); 07200032/2021001(DNMS); and 07200032/2021002(DNMS) - Duane Arnold Energy Center ML21172A2172022-01-21021 January 2022 Issuance of License Amendment to Adopt ISFSI-Only Technical Specifications NG-22-0009, Registration of Independent Spent Fuel Installation Storage Casks2022-01-20020 January 2022 Registration of Independent Spent Fuel Installation Storage Casks NG-22-0001, Supplement to Exemption Request for Failed Fuel Can Weight in a Certificate of Compliance 1004 Renewed Amendment 17 61BTH Type 2 Dry Shielded Canister2022-01-0606 January 2022 Supplement to Exemption Request for Failed Fuel Can Weight in a Certificate of Compliance 1004 Renewed Amendment 17 61BTH Type 2 Dry Shielded Canister NG-21-0038, Registration of Independent Spent Fuel Installation Storage Casks2021-12-22022 December 2021 Registration of Independent Spent Fuel Installation Storage Casks NG-21-0035, Supplement to Exemption Request for Failed Fuel Can Weight in a Certificate of Compliance 1004 Renewed Amendment 17 61 Bth Type 2 Dry Shielded Canister2021-12-10010 December 2021 Supplement to Exemption Request for Failed Fuel Can Weight in a Certificate of Compliance 1004 Renewed Amendment 17 61 Bth Type 2 Dry Shielded Canister 2024-01-25
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE RD. SUITE 210 LISLE, IL 60532-4352 April 9, 2019 Mr. Dean Curtland Director of Site Operations NextEra Energy Duane Arnold, LLC 3277 DAEC Road Palo, IA 52324-9785
SUBJECT:
INFORMATION REQUEST TO SUPPORT UPCOMING TEMPORARY INSTRUCTION 2515/193 INSPECTION AT DUANE ARNOLD ENERGY CENTER
Dear Mr. Curtland:
This letter is to request information to support our inspection of the Implementation of EA-13-109: Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation under Severe Accident Conditions beginning July 22, 2019 at your Duane Arnold Energy Center. This inspection will be performed in accordance with the U.S.
Nuclear Regulatory Commission (NRC) Temporary Instruction 2515/193.
In order to minimize the impact that the inspection has on the site and to ensure a productive inspection, we have enclosed a list of documents requested for the inspection. Please provide this information prior to July 3, 2019. It is important that all of these documents are up to date and complete in order to minimize the number of additional documents requested during the preparation and/or the on-site portions of the inspection. Insofar as possible, this information should be provided electronically to the lead inspector.
The lead inspector for this inspection is Dr. Stuart Sheldon. We understand that our primary contact for this inspection is Mr. Bob Murrell of your organization. If there are any questions about the inspection or the material requested in the enclosure, please contact the lead inspector at 630-829-9727 or via e-mail at Stuart.Sheldon@nrc.gov.
This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements were approved by the Office of Management and Budget, Control Number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget control number.
D. Curtland This letter and its enclosure will be available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding Sincerely,
/RA Kenneth Riemer Acting for/
Ann Marie Stone, Team Lead Technical Support Staff Division of Reactor Projects Docket Nos. 50-331;72-032 License Nos. DPR-49
Enclosure:
Requested Information to Support Temporary Instruction 2515/193 Inspection Report 05000331/2019011 cc: Distribution via LISTSERV
D. Curtland Letter to Dean Curtland from Ann Marie Stone dated April 9, 2019
SUBJECT:
INFORMATION REQUEST TO SUPPORT UPCOMING TEMPORARY INSTRUCTION 2515/193 INSPECTION AT DUANE ARNOLD ENERGY CENTER DISTRIBUTION:
Michael McCoppin RidsNrrDorlLpl3 RidsNrrPMDuaneArnold Resource RidsNrrDirsIrib Resource Darrell Roberts John Giessner Jamnes Cameron Allan Barker DRPIII DRSIII ROPassessment.Resource@nrc.gov ADAMS Accession Number: ML19099A352 OFFICE RIII RIII NAME SSheldon:lg KRiemer for AStone DATE 4/9/2019 4/9/2019 OFFICIAL RECORD COPY
REQUESTED INFORMATION TO SUPPORT TEMPORARY INSTRUCTION 2515/193 INSPECTION REPORT 005000331/2019011 Please provide the following information on a compact disc or another form of electronic media, if possible. For requested lists please provide the information, if possible, in a sortable Excel spreadsheet format. This document requests information pertaining to your implementation of a hardened containment vent system (HCVS). This includes the capability to use Severe Accident Water Addition (SAWA) and Severe Accident Water Management (SAWM).
- 1. A current copy of the Final Integrated Plan (FIP) for compliance with HCVS Order EA-13-109 and any subsequent documentation to or from the NRC related to the FIP.
Please include any changes to the FIP since submittal to the NRC.
- 2. A listing of any changes to the FIP since issuance of the NRC Safety Evaluation Report.
- 3. A listing of Corrective Action Program (CAP) items related to implementation of HCVS and SAWA, maintenance of the HCVS and SAWA programs and equipment, HCVS and SAWA modifications, and training related on HCVS and SAWA.
- 4. A copy of any audits or self-assessments related to your preparation for this inspection as well as any related to the implementation or maintenance of HCVS and SAWA/SAWM.
- 5. A current copy of administrative procedure(s) for the CAP, modification program, operations procedure writing and implementing, and top-level documents for the work control programs, and work scheduling programs.
- 6. A current copy of the Emergency Operating Procedures, Abnormal Operating Procedures, Off-Normal Procedures, FLEX Support Guidelines (FSGs), and Severe Accident Guides (SAGs) and any additional procedures implementing HCVS and SAWA/SAWM. Please have the annunciator response procedures available during the inspection. Also include Station Blackout related procedures if they are separate from the above.
- 7. A copy of documents managing allowed out of service times for HCVS and SAWA/SAWM equipment. (Ref. NEI 13-02, Section 6.3)
- 8. A listing of time sensitive actions associated with HCVS and SAWA/SAWM and associated validation documentation. (Ref. NEI 13-02, Section 6.1.1.7.4)
- 9. Documentation demonstrating HCVS and SAWA/SAWM equipment was tested or otherwise verified capable of performing its required function. (Ref. NEI 13-02, Section 5.4.1)
- 10. Documentation demonstrating HCVS and SAWA/SAWM procedures have been validated. (Ref. NEI 13-02, Section 6.1.2.3)
- 11. HCVS and SAWA/SAWM related training program documents, aids, and records, including presentations and videos. (Ref. NEI 13-02, Section 6.1.3.1)
Enclosure
- 12. A listing of testing and Inspection tasks for equipment, and documentation demonstrating your implementation a program for testing and inspection of HCVS and SAWA/SAWM. Include leak testing of HVCS valves. Include a copy of the most recent tests and inspections (work orders) for this equipment. (Ref. NEI 13-02 Section 6.2)
- 13. A copy of the Updated Final Safety Analysis Report, Technical Specifications and bases documents.
OTHER:
On the first day of the inspection, please provide the inspection team a briefing of your FIP and overall strategy. This brief discussion should include the entry conditions or trigger points for implementing HCVS and SAWA/SAWM.
On the first day of the inspection, please provide a copy of any procedures revised after your response to this request for information.
In addition, the inspectors will require computer access to the CAP database while on site.
2