ML032400154

From kanterella
Jump to navigation Jump to search
IR 05000331-04-001 - Mid-Cycle Assessment Letter
ML032400154
Person / Time
Site: Duane Arnold 
Issue date: 08/27/2003
From: Burgess B
NRC/RGN-III/DRP/RPB2
To: Peifer M
Nuclear Management Co
References
IR-04-001
Download: ML032400154 (6)


See also: IR 05000331/2004001

Text

August 27, 2003

Mr. Mark Peifer

Site Vice-President

Duane Arnold Energy Center

Nuclear Management Company, LLC

3277 DAEC Road

Palo, IA 52324

SUBJECT:

MID-CYCLE ASSESSMENT LETTER - DUANE ARNOLD ENERGY CENTER

(REPORT 50-331/04-01)

Dear Mr. Peifer:

On July 30, 2003, the U.S. Nuclear Regulatory Commission (NRC) staff completed its mid-cycle

plant performance assessment of the Duane Arnold Energy Center. The mid-cycle review for

Duane Arnold involved the participation of all technical divisions in evaluating performance

indicators (PIs) for the most recent quarter and inspection results for the period July 1, 2002

through June 20, 2003. The purpose of this letter is to inform you of our assessment of your

safety performance during this period and our plans for future inspections at your facility so that

you will have an opportunity to prepare for these inspections and to inform us of any planned

inspections that may conflict with your plant activities.

Overall, Duane Arnold operated in a manner that preserved public health and safety and fully

met all cornerstone objectives. Plant performance for the most recent quarter, as well as for

the first three quarters of the assessment cycle, was within the Licensee Response Column of

the NRCs Action Matrix, based on all inspection findings being classified as having very low

safety significance (Green) and all PIs indicating performance at a level requiring no additional

NRC oversight (Green). Therefore, we plan to conduct only baseline inspections at your facility

through September 30, 2004.

The enclosed inspection plan details the inspection scheduled through September 30, 2004.

The inspection plan is provided to minimize the resource impact on your staff and to allow for

scheduling conflicts and personnel availability to be resolved in advance or inspector arrival

onsite. Routine resident inspections are not listed due to their ongoing and continuous nature.

The inspections in the last 6 months of the inspection plan are tentative and may be revised at

the end-of-cycle review meeting.

In accordance with 10 CFR 2.790 of the NRCs Rule of Practice, a copy of this letter and its

enclosure will be made available electronically for public inspection in the NRC Public

Document Room or from the Publicly Available Records (PARS) component of the NRCs

document system (ADAMS). ADAMS is accessible from the NRC web site at

http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

M. Peifer

-2-

If circumstances arise which cause us to change this inspection plan, we will contact you to

discuss the change as soon as possible. Please contact me at 630-829-9629 with any

questions you may have regarding this letter or the inspection plan.

Sincerely,

/RA/

Bruce L Burgess, Chief

Branch 2

Division of Reactor Projects

Docket No. 50-331

License No. DPR-49

Enclosure:

Duane Arnold Inspection/Activity Plan

See Attached Distribution

M. Peifer

-2-

If circumstances arise which cause us to change this inspection plan, we will contact you to

discuss the change as soon as possible. Please contact me at 630-829-9629 with any

questions you may have regarding this letter or the inspection plan.

Sincerely,

/RA/

Bruce L Burgess, Chief

Branch 2

Division of Reactor Projects

Docket No. 50-331

License No. DPR-49

Enclosure: Duane Arnold Inspection/Activity Plan

See Attached Distribution

DOCUMENT NAME: G:\\Branch TSS\\midcycle2003\\Dua midcycle ltr 03.wpd

To receive a copy of this document, indicate in the box "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy

OFFICE

RIII

RIII

NAME

JWright/co

BBurgess

DATE

08/15/03

08/19/03

OFFICIAL RECORD COPY

M. Peifer

-3-

cc w/encl:

E. Protsch, Executive Vice President -

Energy Delivery, Alliant;

President, IES Utilities, Inc.

J. Cowan, Chief Nuclear Officer

J. Forbes, Senior Vice President

J. Bjorseth, Plant Manager

S. Catron, Manager, Regulatory Affairs

J. Rogoff, Esquire General Counsel

B. Lacy, Nuclear Asset Manager

D. McGhee, Iowa Department of Commerce

Chairman, Linn County Board of Supervisors

State Liaison Officer

Chairperson, Iowa Utilities Board

The Honorable Charles W. Larson, Jr.

Iowa State Representative

R. Buch, Chairman, Benton County Supervisors

K. Popenhagen, Benton County Sheriff

S. Hansen, Coordinator of Emergency Services

The Honorable Shawn Steffen

The Honorable Rick Grimm

The Honorable Lloyd Benson

J. Houser, Board of Supervisors

L. Langston, Linn County Supervisor

D. Zeller, Linn County Sheriff

L. Barron, Chairman, Board of Supervisors

R. Foubert, Linn County Safety Director

W. Wright, Linn County Emergency

Management Coordinator

The Honorable Randy Fouts

The Honorable Tom Svoboda

The Honorable Paul Pate

The Honorable Thomas Patterson

The Honorable Victor Klopfenstein

J. Schott, City Manager, Marion

The Honorable Tom Neenan

The Honorable Larry Dauenbaugh

INPO

M. Peifer

-4-

Distribution:

DFT

H. Nieh (HKN), OEDO

Project Director, NRR

Project Mgr., NRR

RidsNrrDipmlipb

JLC1

GEG

HBC

RML2

SRI Duane Arnold

DRPIII

DRSIII

PLB1

JRK1

Duane Arnold

Inspection / Activity Plan

09/01/2003 - 09/30/2004

Inspection

Type

Inspection Activity

Planned Dates

Start End

No. of Staff

on Site

Title

Unit

Number

Page 1 of 1

08/25/2003

13:16:17

Report 22

1

ISFSI

- ISFSI OPERATIONAL INSPECTION

Other Routine

08/18/2003

10/25/2003

Operation Of An ISFSI

IP 60855

1

1

7112101

- RP ACCESS CONTROLS

Baseline Inspections

09/15/2003

09/19/2003

Access Control to Radiologically Significant Areas

IP 7112101

1

Baseline Inspections

09/15/2003

09/19/2003

Performance Indicator Verification

IP 71151

1

1

HT SNK B

- HEAT SINK BIENNIAL (DRS)

Baseline Inspections

10/20/2003

10/24/2003

Heat Sink Performance

IP 7111107B

1

1

INSP

- NON-EXERCISE EP INSP

Baseline Inspections

11/03/2003

11/07/2003

Alert and Notification System Testing

IP 7111402

1

Baseline Inspections

11/03/2003

11/07/2003

Emergency Response Organization Augmentation Testing

IP 7111403

1

Baseline Inspections

11/03/2003

11/07/2003

Correction of Emergency Preparedness Weaknesses and Deficiencies

IP 7111405

1

Baseline Inspections

11/03/2003

11/07/2003

Performance Indicator Verification

IP 71151

1

6

SSDI

- SAFETY SYSTEM DESIGN AND PERFORMANCE INS

Baseline Inspections

01/26/2004

02/13/2004

Safety System Design and Performance Capability

IP 7111121

1

1

71122.02

- RADIOACTIVE MATERIAL TRANSPORTATION

Baseline Inspections

02/02/2004

02/06/2004

Radioactive Material Processing and Transportation

IP 7112202

1

1

TRANS

- TRANSPORTATION OF RADIOACTIVE MATERIALS

Baseline Inspections

02/09/2004

02/13/2004

Access Control to Radiologically Significant Areas

IP 7112101

1

Baseline Inspections

02/09/2004

02/13/2004

Radiological Environmental Monitoring Program

IP 7112203

1

1

71121.02

- ALARA PLANNING AND CONTROL

Baseline Inspections

03/01/2004

03/05/2004

Access Control to Radiologically Significant Areas

IP 7112101

1

Baseline Inspections

03/01/2004

03/05/2004

ALARA Planning and Controls

IP 7112102

1

Baseline Inspections

03/01/2004

03/05/2004

Performance Indicator Verification

IP 71151

1

1

ALARA

- NONOUTAGE ALARA AND ACCESS CONTROL

Baseline Inspections

03/15/2004

03/19/2004

Access Control to Radiologically Significant Areas

IP 7112101

1

Baseline Inspections

03/15/2004

03/19/2004

ALARA Planning and Controls

IP 7112102

1

1

INSTR

- RADIATION PROTECTION INSTRUMENTATION

Baseline Inspections

07/12/2004

07/19/2004

Access Control to Radiologically Significant Areas

IP 7112101

1

Baseline Inspections

07/12/2004

07/19/2004

Radiation Monitoring Instrumentation and Protective Equipment

IP 7112103

1

This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.