ML082460261
| ML082460261 | |
| Person / Time | |
|---|---|
| Site: | Duane Arnold |
| Issue date: | 09/02/2008 |
| From: | Kenneth Riemer NRC/RGN-III/DRP/B2 |
| To: | Richard Anderson Duane Arnold |
| References | |
| FOIA/PA-2010-0209 | |
| Download: ML082460261 (7) | |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 September 2, 2008 Mr. R. L. Anderson Vice-President Duane Arnold Energy Center 3277 DAEC Road Palo, IA 52324-9785
SUBJECT:
MID-CYCLE PERFORMANCE REVIEW AND INSPECTION PLAN -
DUANE ARNOLD ENERGY CENTER
Dear Mr. Anderson:
On August 14, 2008, the NRC staff completed its performance review of the Duane Arnold Energy Center for the first half of the calendar year 2008 assessment cycle. Our technical staff reviewed performance indicators (PIs) for the most recent quarter and inspection results over the previous 12 months. The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility.
This performance review and enclosed inspection plan do not include security information. A separate letter designated and marked as "Official Use Only - Security Information" will include the security cornerstone review and resultant inspection plan.
Plant performance for the most recent quarter at Duane Arnold Energy Center was within the Licensee Response column of the NRCs Action Matrix, based on all inspection findings being classified as having very low safety significance (Green) and all PIs indicating performance at a level requiring no additional NRC oversight (Green). Therefore, we plan to conduct reactor oversight process (ROP) baseline inspections at your facility.
The enclosed inspection plan details the inspections, less those related to security, scheduled through December 31, 2009. The inspection plan is provided to allow for the resolution of any scheduling conflicts and personnel availability issues well in advance of inspector arrival onsite.
Routine resident inspections are not listed due to their ongoing and continuous nature. Of note, the plan includes an EP exercise inspection, a biennial PI&R inspection, and a triennial fire protection inspection. The inspections in the last nine months of the inspection plan are tentative and may be revised at the end-of-cycle review.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC
R. Anderson Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
The NRC is currently evaluating the scope and frequency of all the baseline inspection procedures. If the results of the evaluation, or any other circumstances, cause us to change the inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at (630) 829-9628 with any questions you may have regarding this letter or the inspection plan.
Sincerely,
/RA/
Kenneth Riemer, Chief Reactor Projects Branch 2 Division of Reactor Projects Docket No. 50-331;72-032 License No. DPR-49
Enclosure:
Duane Arnold Energy Center Inspection/Activity Plan DISTRIBUTION:
See next page
Letter to R. Anderson from K. Riemer dated September 2, 2008
SUBJECT:
MID-CYCLE PERFORMANCE REVIEW AND INSPECTION PLAN -
DUANE ARNOLD ENERGY CENTER cc w/encl:
M. Nazar, Senior Vice President and Chief Operating Officer J. Stall, Executive Vice President, Nuclear and Chief Nuclear Officer M. Ross, Managing Attorney A. Khanpour, Vice President, Nuclear Engineering M. Warner, Vice President, Nuclear Plant Support D. Curtland, Plant Manager S. Catron, Manager, Regulatory Affairs M. Gettler, Vice President, New Nuclear Projects W. Maher, Licensing Director, New Nuclear Projects Chief Radiological Emergency Preparedness Section, Dept. Of Homeland Security M. Rasmusson, State Liaison Officer Iowa Department of Public Health Chairman, Linn County Board of Supervisors The Honorable Robert Hogg Chairman, Benton County Supervisors Benton County Sheriff Coordinator, Benton County Emergency Services Mayor of Atkins Mayor of Shellsburg Mayor of Urbana Linn County Sheriff Director, Linn County Emergency Management Agency Mayor of Robins Mayor of Alburnett Mayor of Cedar Rapids Mayor of Hiawatha Mayor of Marion City Manager of Marion Mayor of Center Point Mayor of Palo G. Mortensen, INPO
R. Anderson Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
The NRC is currently evaluating the scope and frequency of all the baseline inspection procedures. If the results of the evaluation, or any other circumstances, cause us to change the inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at (630) 829-9628 with any questions you may have regarding this letter or the inspection plan.
Sincerely,
/RA/
Kenneth Riemer, Chief Reactor Projects Branch 2 Division of Reactor Projects Docket No. 50-331;72-032 License No. DPR-49
Enclosure:
Duane Arnold Energy Center Inspection/Activity Plan DISTRIBUTION:
See next page DOCUMENT NAME: G:\\1-Secy\\2008 Mid-cycle final letters\\DUAN MOC letter2008.doc Publicly Available Non-Publicly Available Sensitive Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII NAME KRiemer:cms DATE 08/27/08 OFFICIAL RECORD COPY
Letter to R. Anderson from K. Riemer dated September 2, 2008
SUBJECT:
MID-CYCLE PERFORMANCE REVIEW AND INSPECTION PLAN - DUANE ARNOLD ENERGY CENTER DISTRIBUTION:
Tamara Bloomer RidsNrrDorlLpl3-1 RidsNrrPMDuaneArnold Resource RidsNrrDirsIpab Resource James Caldwell Mark Satorius Kenneth Obrien Jared Heck Allan Barker DRPIII DRSIII Patricia Buckley Tammy Tomczak ROPreports@nrc.gov
Duane Arnold Inspection / Activity Plan 09/01/2008 - 12/31/2009 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title 2
BI OL
- BIENNIAL REQUAL. PROGRAM INSPECTION Baseline Inspections Licensed Operator Requalification Program 10/06/2008 10/10/2008 7111111B IP 3
BI EP
- EP EXERCISE INSPECTION / PI VERIFICATION EP Baseline Inspection Exercise Evaluation 10/20/2008 10/24/2008 7111401 IP Baseline Inspections Drill/Exercise Performance 10/20/2008 10/24/2008 71151-EP01 IP Baseline Inspections ERO Drill Participation 10/20/2008 10/24/2008 71151-EP02 IP Baseline Inspections Alert & Notification System 10/20/2008 10/24/2008 71151-EP03 IP 1
BI RP
- RADIATION PROTECTION BASELINE INSPECTION Baseline Inspections ALARA Planning and Controls 10/20/2008 10/24/2008 7112102 IP 1
- ROUTINE INSPECTION Other Routine Operation of an Independent Spent Fuel Storage Installation at Operating Plants 11/01/2008 11/30/2008 60855.1 IP 1
BI RP
- RADIATION PROTECTION BASELINE INSPECTION Baseline Inspections Access Control to Radiologically Significant Areas 02/09/2009 02/13/2009 7112101 IP Baseline Inspections ALARA Planning and Controls 02/09/2009 02/13/2009 7112102 IP Baseline Inspections Occupational Exposure Control Effectiveness 02/09/2009 02/13/2009 71151-OR01 IP 1
BI ENG
- ENGINEERING INSERVICE INSPECTION Baseline Inspections Inservice Inspection Activities - BWR 02/09/2009 02/14/2009 7111108G IP 1
BI RP
- RADIATION PROTECTION BASELINE INSPECTION Generic Safety Inspectio Review of the Implementation of the Industry Ground Water Protection Voluntary Initiative 03/16/2009 03/20/2009 2515/173 IP Baseline Inspections Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control Program 03/16/2009 03/20/2009 7112203 IP Baseline Inspections RETS/ODCM Radiological Effluent 03/16/2009 03/20/2009 71151-PR01 IP 4
BI PI&R
- BIENNIAL PI&R INSPECTION Baseline Inspections Identification and Resolution of Problems 05/04/2009 05/22/2009 71152B IP 5
RENEWAL
- LICENSE RENEWAL INSPECTION License Renewal Inspec License Renewal Inspection 07/13/2009 07/31/2009 71002 IP 1
BI RP
- RADIATION PROTECTION BASELINE INSPECTION Baseline Inspections Radioactive Material Processing and Transportation 08/03/2009 08/07/2009 7112202 IP Baseline Inspections Reactor Coolant System Activity 08/03/2009 08/07/2009 71151-BI01 IP 2
OL EXAM
- OPERATOR LICENSING EXAM Not Applicable OL - INITIAL EXAM - SEPT. 2009 - DUAN 08/24/2009 08/28/2009 W90207 Not Applicable OL - INITIAL EXAM - SEPT. 2009 - DUAN 09/14/2009 09/25/2009 W90207 1
BI EP
- EP ROUTINE INSPECTION / PI VERIFICATION EP Baseline Inspection Alert and Notification System Testing 10/26/2009 10/30/2009 7111402 IP EP Baseline Inspection Emergency Response Organization Augmentation Testing 10/26/2009 10/30/2009 7111403 IP EP Baseline Inspection Correction of Emergency Preparedness Weaknesses and Deficiencies 10/26/2009 10/30/2009 7111405 IP
Duane Arnold Inspection / Activity Plan 09/01/2008 - 12/31/2009 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title 1
BI EP
- EP ROUTINE INSPECTION / PI VERIFICATION Baseline Inspections Drill/Exercise Performance 10/26/2009 10/30/2009 71151-EP01 IP Baseline Inspections ERO Drill Participation 10/26/2009 10/30/2009 71151-EP02 IP Baseline Inspections Alert & Notification System 10/26/2009 10/30/2009 71151-EP03 IP 3
BI ENG
- TRIENNIAL FIRE PROTECTION INSPECTION Baseline Inspections Fire Protection [Triennial]
11/02/2009 11/20/2009 7111105T IP 3
BI ENG
- TRIENNIAL FIRE PROT. INFO GATHERING TRIP Baseline Inspections Fire Protection [Triennial]
10/19/2009 10/23/2009 7111105T IP 1
BI RP
- RADIATION PROTECTION BASELINE INSPECTION Baseline Inspections Access Control to Radiologically Significant Areas 11/16/2009 11/20/2009 7112101 IP Baseline Inspections ALARA Planning and Controls 11/16/2009 11/20/2009 7112102 IP