|
|
(2 intermediate revisions by the same user not shown) |
Line 24: |
Line 24: |
|
| |
|
| ==Dear Mr. McGavin:== | | ==Dear Mr. McGavin:== |
| On November 18, 2021, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Edwin I. Hatch Nuclear Plant Units 1 and 2. On November 19, 2021, the NRC inspectors discussed the results of this inspection with you and other members of your staff. | | On November 18, 2021, the U.S. Nuclear Regulatory Commission (N RC) completed an inspection at Edwin I. Hatch Nuclear Plant Units 1 and 2. On No vember 19, 2021, the NRC inspectors discussed the results of this inspection with you an d other members of your staff. |
|
| |
|
| The results of this inspection are documented in the enclosed report. | | The results of this inspection are documented in the enclosed r eport. |
|
| |
|
| No findings or violations of more than minor significance were identified during this inspection. | | No findings or violations of more than minor significance were identified during this inspection. |
Line 34: |
Line 34: |
| Sincerely, | | Sincerely, |
| /RA/ | | /RA/ |
| Jannette G. Worosilo, Chief Plant Support Branch Division of Reactor Safety Docket Nos. 05000321 and 05000366 License Nos. DPR-57 and NPF-5 | | |
| | Jannette G. Worosilo, Chief Plant Support Branch Division of Reactor Safety |
| | |
| | Docket Nos. 05000321 and 05000366 License Nos. DPR-57 and NPF-5 |
|
| |
|
| ===Enclosure:=== | | ===Enclosure:=== |
Line 40: |
Line 43: |
|
| |
|
| ==Inspection Report== | | ==Inspection Report== |
| Docket Numbers: 05000321 and 05000366 License Numbers: DPR-57 and NPF-5 Report Numbers: 05000321/2021402 and 05000366/2021402 Enterprise Identifier: I-2021-402-0021 Licensee: Southern Nuclear Operating Company, Inc. | | Docket Numbers: 05000321 and 05000366 |
|
| |
|
| Facility: Edwin I. Hatch Nuclear Plant Units 1 and 2 Location: Baxley, GA Inspection Dates: August 23-26, 2021 (Southern Company Corporate Office) | | License Numbers: DPR-57 and NPF-5 |
| | |
| | Report Numbers: 05000321/2021402 and 05000366/2021402 |
| | |
| | Enterprise Identifier: I-2021-402-0021 |
| | |
| | Licensee: Southern Nuclear Operating Company, Inc. |
| | |
| | Facility: Edwin I. Hatch Nuclear Plant Units 1 and 2 |
| | |
| | Location: Baxley, GA |
| | |
| | Inspection Dates: August 23-26, 2021 (Southern Company Corporat e Office) |
| November 15-18, 2021 (Hatch Nuclear Plant) | | November 15-18, 2021 (Hatch Nuclear Plant) |
| Inspectors: R. Patterson, Physical Security Inspector A. Richardson, Physical Security Inspector Approved By: Jannette G. Worosilo, Chief Plant Support Branch Division of Reactor Safety Enclosure | | |
| | Inspectors: R. Patterson, Physical Security Inspector A. Richardson, Physical Security Inspector |
| | |
| | Approved By: Jannette G. Worosilo, Chief Plant Support Branch Division of Reactor Safety |
| | |
| | Enclosure |
|
| |
|
| =SUMMARY= | | =SUMMARY= |
| The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a security baseline inspection at EDWIN I. HATCH NUCLEAR PLANT UNITS 1 AND 2, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information. | | The U.S. Nuclear Regulatory Commission (NRC) continued monitori ng the licensees performance by conducting a security baseline inspection at EDW IN I. HATCH NUCLEAR PLANT UNITS 1 AND 2, in accordance with the Reactor Oversight P rocess. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information. |
|
| |
|
| ===List of Findings and Violations=== | | ===List of Findings and Violations=== |
|
| |
| No findings or violations of more than minor significance were identified. | | No findings or violations of more than minor significance were identified. |
|
| |
|
Line 58: |
Line 77: |
| =INSPECTION SCOPES= | | =INSPECTION SCOPES= |
|
| |
|
| Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2201, Security Inspection Program for Commercial Nuclear Power Reactors. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards. | | Inspections were conducted using the appropriate portions of th e inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise note d. Currently approved IPs with their attached revision histories are located on the public web site at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspe ction activity were met consistent with Inspection Manual Chapter (IMC) 2201, Security Inspection Program for Commercial Nuclear Power Reactors. The inspectors reviewed sel ected procedures and records, observed activities, and interviewed personnel to asse ss licensee performance and compliance with Commission rules and regulations, license condi tions, site procedures, and standards. |
|
| |
|
| ==SAFEGUARDS== | | ==SAFEGUARDS== |
| ==71130.01 - Access Authorization== | | ==71130.01 - Access Authorization== |
| | The inspectors evaluated the access authorization program. The following elements were |
|
| |
|
| The inspectors evaluated the access authorization program. The following elements were evaluated:
| | ===evaluated: |
| | | Access Authorization=== |
| ===Access Authorization===
| |
| {{IP sample|IP=IP 71130.01|count=1}} | | {{IP sample|IP=IP 71130.01|count=1}} |
| : (1) Tier I: All Requirements Tier II: ( 02.05 a, b, 02.07 a, b, 02.08 a, c) | | : (1) Tier I: All Requirements Tier II: ( 02.05 a, b, 02.07 a, b, 02.08 a, c) |
| Tier III: ( 02.09, 02.10 a-c) | | Tier III: ( 02.09, 02.10 a-c) |
| | |
| ==71130.08 - Fitness For Duty Program== | | ==71130.08 - Fitness For Duty Program== |
| | The inspectors evaluated the fitness for duty program by comple ting the following inspection |
|
| |
|
| The inspectors evaluated the fitness for duty program by completing the following inspection
| | ===elements: |
| | | Fitness For Duty Program=== |
| ===elements: Fitness For Duty Program=== | |
| {{IP sample|IP=IP 71130.08|count=1}} | | {{IP sample|IP=IP 71130.08|count=1}} |
|
| |
|
| (1)
| | (1) |
| * Tier I: All Requirements | | * Tier I: All Requirements |
| * Tier II: ( 02.05 a-h, 02.06 a-g, 02.07 a-e, 02.08 a, b, 02.09 a-e) | | * Tier II: ( 02.05 a-h, 02.06 a-g, 02.07 a-e, 02.08 a, b, 02.09 a-e) |
Line 86: |
Line 106: |
| ==EXIT MEETINGS AND DEBRIEFS== | | ==EXIT MEETINGS AND DEBRIEFS== |
| The inspectors verified no proprietary information was retained or documented in this report. | | The inspectors verified no proprietary information was retained or documented in this report. |
| * On November 19, 2021, the inspectors presented the security baseline inspection results to Steven McGavin and other members of the licensee staff. | | * On November 19, 2021, the inspectors presented the security ba seline inspection results to Steven McGavin and other members of the licensee sta ff. |
|
| |
|
| =DOCUMENTS REVIEWED= | | =DOCUMENTS REVIEWED= |
|
| |
|
| Inspection Type Designation Description or Title Revision | | Inspection Type Designation Description or Title Revision |
| Procedure or Date | | Procedure or Date |
| 71130.01 Corrective 10606809 | | 71130.01 Corrective 10606809 |
| Action 10640289 | | Action 10640289 |
| Documents 21-50083075 | | Documents 21-50083075 |
| Corrective 10822941 | | Corrective 10822941 |
| Action | | Action |
| Documents | | Documents |
| Resulting from | | Resulting from |
| Inspection | | Inspection |
| Procedures AA-002 Access Authorization Program Version | | Procedures AA-002 Access Authorization Program Version |
| 8.0 | | 8.0 |
| AA-003 Adjudication of Derogatory Version | | AA-003 Adjudication of Derogatory Version |
| Information and Appeal Process 4.2 | | Information and Appeal Process 4.2 |
| AA-006 Access Authorization Confidential Version | | AA-006 Access Authorization Confidential Version |
| Information Processing 3.1 | | Information Processing 3.1 |
| Procedure | | Procedure |
| AA-008 Access Authorization Personnel Version | | AA-008 Access Authorization Personnel Version |
| Access Data System (PADs) 2.1 | | Access Data System (PADs) 2.1 |
| Procedure | | Procedure |
| NMP-AD-005 Insider Mitigation Program (IMP) Version | | NMP-AD-005 Insider Mitigation Program (IMP) Version |
| Access Authorization 9.2 | | Access Authorization 9.2 |
| NMP-AD-016 Fatigue Management Program Version | | NMP-AD-016 Fatigue Management Program Version |
| 10.2 | | 10.2 |
| NMP-SE-023 Personnel Authorization an Version | | NMP-SE-023 Personnel Authorization an Version |
| Badging Program 4.0 | | Badging Program 4.0 |
| Self- NMP-GM- Check-In Self-Assessment (CISA) Version | | Self-NMP-GM-Check-In Self-Assessment (CISA) Version |
| Assessments 003-F18 Plan and Report 3.0 | | Assessments 003-F18 Plan and Report 3.0 |
| 71130.08 Corrective 15-10593933 | | 71130.08 Corrective 15-10593933 |
| Action 15-10594136 | | Action 15-10594136 |
| Documents 15-10594140 | | Documents 15-10594140 |
| 15-10594144 | | 15-10594144 |
| 15-10594148 | | 15-10594148 |
Line 136: |
Line 156: |
| 21-50092463 | | 21-50092463 |
| 21-50101177 | | 21-50101177 |
| Procedures 720-001 SNC Corporate Policy- Fitness- January | | Procedures 720-001 SNC Corporate Policy-Fitness-January |
| Inspection Type Designation Description or Title Revision | | |
| Procedure or Date | | Inspection Type Designation Description or Title Revision |
| For-Duty 24, 2017 | | Procedure or Date |
| MS-FFD-001 Fitness-for-Duty Standard Version 8 | | For-Duty 24, 2017 |
| | MS-FFD-001 Fitness-for-Duty Standard Version 8 |
| Operating and Collection | | Operating and Collection |
| Procedure | | Procedure |
| MS-FFD-003 Intoxilyzer Operations Version | | MS-FFD-003 Intoxilyzer Operations Version |
| 3.1 | | 3.1 |
| MS-FFD-004 Random Selection and Version | | MS-FFD-004 Random Selection and Version |
| Verification Procedure 4.0 | | Verification Procedure 4.0 |
| MS-FFD-005 Medical Review Officer Version | | MS-FFD-005 Medical Review Officer Version |
| 7.0 | | 7.0 |
| MS-FFD-006 Follow-up Testing Version | | MS-FFD-006 Follow-up Testing Version |
| 4.1 | | 4.1 |
| MS-FFD-007 Blind Performance Test/Quality Version | | MS-FFD-007 Blind Performance Test/Quality Version |
| Control 5.0 | | Control 5.0 |
| MS-FFD-008 FFD Records Version | | MS-FFD-008 FFD Records Version |
| 3.2 | | 3.2 |
| MS-FFD-009 Contractor Review and Screening Version | | MS-FFD-009 Contractor Review and Screening Version |
| Procedure 2.0 | | Procedure 2.0 |
| MS-FFD-010 Interface and Reporting Version | | MS-FFD-010 Interface and Reporting Version |
| 4.1 | | 4.1 |
| MS-FFD-011 Training and Qualification of Version | | MS-FFD-011 Training and Qualification of Version |
| Fitness for Duty Personnel 6.0 | | Fitness for Duty Personnel 6.0 |
| MS-FFD-012 Testing for Other Legal and Illegal Vesrion | | MS-FFD-012 Testing for Other Legal and Illegal Vesrion |
| Substances 3.1 | | Substances 3.1 |
| MS-FFD-013 Security of FFD Centers and Version | | MS-FFD-013 Security of FFD Centers and Version |
| Medical Facilities 3.2 | | Medical Facilities 3.2 |
| MS-FFD-014 Call-ins to Perform Unscheduled Version | | MS-FFD-014 Call-ins to Perform Unscheduled Version |
| Work 2.1 | | Work 2.1 |
| MS-FFD-015 Determination of Fitness Version | | MS-FFD-015 Determination of Fitness Version |
| Evaluation and Process 4.4 | | Evaluation and Process 4.4 |
| Self- Fleet MF/MRO 2019 Nuclear April 9, | | Self-Fleet MF/MRO 2019 Nuclear April 9, |
| Assessments Oversight (NOS) Managing 2019 | | Assessments Oversight (NOS) Managing 2019 |
| Fatigue/Medical Review Officer | | Fatigue/Medical Review Officer |
| Audit | | Audit |
| | |
| 5 | | 5 |
| }} | | }} |
Similar Documents at Hatch |
---|
Category:Inspection Report
MONTHYEARIR 05000321/20240102024-11-0606 November 2024 NRC Inspection Report 05000321/2024010 and 05000366/2024010 IR 05000321/20240032024-10-30030 October 2024 Edwin I Hatch, Units 1 and 2 - Integrated Inspection Report 05000321/2024003 and 05000366/2024003 IR 05000321/20244012024-10-10010 October 2024 Security Baseline Inspection Report 05000321-2024401 and 05000366-2024401 IR 05000321/20240912024-08-27027 August 2024 NRC Investigation Report 2-2023-003 and NOV - NRC Inspection Report 05000321/2024091 and 05000366/2024091 IR 05000321/20240052024-08-26026 August 2024 Updated Inspection Plan for Edwin I. Hatch Nuclear Plant, Units 1 and 2 - Report 05000321/2024005 and 05000366/2024005 IR 05000321/20240022024-08-0808 August 2024 Edwin I Hatch Nuclear Plants, Units 1 and 2 – Integrated Inspection Report 05000321-2024002 and 05000366-2024002 IR 05000321/20240902024-05-15015 May 2024 NRC Inspection Report 05000321-2024090 and 05000366-2024090, Investigation Report 2-2023-003; and Apparent Violation IR 05000032/20240112024-04-25025 April 2024 Notification of Edwin I. Hatch Nuclear Plant - Comprehensive Engineering Team Inspection (CETI) Baseline Inspection Report 0500032/2024011 and 05000366/2024011 IR 05000321/20240012024-04-22022 April 2024 Integrated Inspection Report 05000321/2024001 and 05000366/2024001 IR 05000321/20230062024-02-28028 February 2024 Annual Assessment Letter Edwin I. Hatch Nuclear Plant Units 1 and 2 - Nrc Inspection Report 05000321/2023006 and 05000366/2023006 IR 05000321/20230042024-01-31031 January 2024 Integrated Inspection Report 05000321/2023004 and 05000366/2023004 IR 05000321/20234022023-11-29029 November 2023 – Security Baseline Inspection Report 05000321/2023402, 05000366/2023402, and 07200036/2023401 IR 05000321/20230112023-11-17017 November 2023 – Biennial Problem Identification and Resolution Inspection Report 050003212023011 and 050003662023011 IR 05000321/20230032023-11-0202 November 2023 – Integrated Inspection Report 05000321/2023003, and 05000366/2023003 IR 05000321/20234032023-10-26026 October 2023 – Cyber Security Inspection Report 05000321/2023403 and 05000366/2023403 IR 05000321/20234012023-10-17017 October 2023 Security Baseline Inspection Report 05000321 2023401 and 05000366 2023401 IR 05000321/20230052023-08-27027 August 2023 Updated Inspection Plan for Edwin I. Hatch Nuclear Plant, Units 1 & 2 - Report 05000321/2023005 and 05000366/2023005 IR 05000321/20230022023-08-0808 August 2023 Integrated Inspection Report 07200036/2023001, 05000321/2023002, and 05000366/2023002 ML23178A0012023-06-27027 June 2023 Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection 05000321 2023403 and 05000366 2023403 IR 05000321/20230102023-06-0909 June 2023 – Focused Engineering Inspection Report 05000321 2023010 and 05000366 2023010 IR 05000321/20233012023-05-0101 May 2023 Plant– Notification of Licensed Operator Initial Examination 05000321/2023301, and 05000366/2023301 IR 05000321/20230012023-04-26026 April 2023 – Integrated Inspection Report 05000321/2023001 and 05000366/2023001 IR 05000321/20220062023-03-0101 March 2023 Annual Assessment Letter Edwin I. Hatch Nuclear Plant, Units 1 and 2 - NRC Inspection Report 05000321/2022006 and 05000366/2022006 IR 05000321/20220042023-02-0101 February 2023 Integrated Inspection Report 05000321/2022004 and 05000366/2022004 IR 05000321/20224202022-12-16016 December 2022 Cover Letter - Edwin I. Hatch Nuclear Plant, Units 1 & 2 – Security Baseline Inspection Report 05000321/2022420 and 05000366/2022420 IR 05000321/20224042022-11-28028 November 2022 Security Baseline Inspection Report 05000321/2022404 and 05000366/2022404 IR 05000366/20220032022-11-0808 November 2022 Integrated Inspection Report 05000321 /2022003 and 05000366/2022003 IR 05000321/20224032022-10-31031 October 2022 Security Baseline Inspection Report 05000321/2022403 and 05000366/2022403 IR 05000321/20224012022-10-28028 October 2022 Material Control and Accounting Program Inspection Report 05000321/2022401 and 05000366/2022401 Cover Letter IR 05000321/20220052022-08-23023 August 2022 Updated Inspection Plan for Edwin I. Hatch Nuclear Plant, Units and 2 Report 05000321/2022005 and 05000366/2022005 IR 05000321/20220022022-08-0303 August 2022 Integrated Inspection Report 05000321/2022002 and 05000366/2022002 IR 05000321/20224022022-07-19019 July 2022 Security Baseline Inspection Report 05000321/2022402 and 05000366/2022402 IR 05000321/20220112022-07-13013 July 2022 Fire Protection Team Inspection Report 05000321/2022011 and 05000366/2022011 IR 05000321/20220102022-05-20020 May 2022 Triennial Inspection of Evaluation of Changes, Tests and Experiments Baseline Inspection Report 05000321/2022010 and 05000366/2022010 ML22129A1452022-05-10010 May 2022 IR 2022001 Final IR 05000321/20210062022-03-0202 March 2022 Annual Assessment Letter for Erwin I. Hatch Nuclear Plant, Units 1 and 2 (Report No. 05000321/2021006 and 05000366/2021006) IR 05000321/20210042022-02-0404 February 2022 Integrated Inspection Report 05000321/2021004 and 05000366/2021004 IR 05000321/20213022022-01-21021 January 2022 NRC Operator License Examination Report 05000321/2021302 and 05000366/2021302 IR 05000321/20214022021-12-0606 December 2021 Security Baseline Inspection Report 05000321/2021402 and 05000366/2021402 IR 05000321/20210102021-11-0404 November 2021 Biennial Problem Identification and Resolution Inspection Report 05000321/2021010 and 05000366/2021010 IR 05000321/20210032021-10-19019 October 2021 Integrated Inspection Report 05000321/2021003 and 05000366/2021003 IR 05000321/20214012021-10-0606 October 2021 Security Baseline Inspection Report 05000321/2021401, 05000366/2021401 IR 05000321/20210052021-08-23023 August 2021 Updated Inspection Plan for Edwin I. Hatch Nuclear Plant, Units 1 and 2 (Report 05000321/2021005 and 05000366/2021005) IR 05000321/20210022021-08-0404 August 2021 Integrated Inspection Report 05000321/2021002 and 05000366/2021002 IR 05000321/20200112021-07-15015 July 2021 Plants, Units 1 and 2 Temporary Instruction 2515/193 Inspection Report 05000321/2020011 and 05000366/2020011 IR 05000321/20210112021-06-25025 June 2021 Design Bases Assurance Inspection - U.S. Nuclear Regulatory Commission Inspection Report 05000321/2021011 and 05000366/2021011 ML21165A1142021-06-14014 June 2021 Operation of an Independent Spent Fuel Storage Installation Report 07200036/2021001 IR 05000321/20210012021-05-0606 May 2021 Integrated Inspection Report 05000321/2021001 and 05000366/2021001 IR 05000321/20200062021-03-0303 March 2021 Annual Assessment Letter for Edwin I. Hatch Nuclear Plant - Report 05000321/2020006 and 05000366/2020006 IR 05000321/20200042021-02-10010 February 2021 Integrated Inspection Report 05000321/2020004 and 05000366/2020004 and Independent Spent Fuel Storage Installation Report 07200036/2020003 2024-08-08
[Table view] Category:Letter
MONTHYEARIR 05000321/20240102024-11-0606 November 2024 NRC Inspection Report 05000321/2024010 and 05000366/2024010 ML24299A2222024-10-31031 October 2024 Audit Summary for License Amendment Request to Revise Renewed Facility Operating Licenses to Adopt an Alternative Seismic Method for Categorization of Structures, Systems, and Components IR 05000321/20240032024-10-30030 October 2024 Edwin I Hatch, Units 1 and 2 - Integrated Inspection Report 05000321/2024003 and 05000366/2024003 NL-24-0357, Notification of Deviation from the Inspection Frequency Requirements of the Boiling Water Reactor Vessel and Internals Project (BWRVIP) BWR Jet Pump Assembly Inspection and Flaw Evaluation Guidelines2024-10-30030 October 2024 Notification of Deviation from the Inspection Frequency Requirements of the Boiling Water Reactor Vessel and Internals Project (BWRVIP) BWR Jet Pump Assembly Inspection and Flaw Evaluation Guidelines ML24292A1602024-10-22022 October 2024 Request for Withholding Information from Public Disclosure License Amendment Request to Revise Technical Specification Surveillance Requirements to Increase Safety/Relief Valve Setpoints ML24290A0792024-10-18018 October 2024 SLR Environmental Preapplication Meeting Summary ML24303A4102024-10-17017 October 2024 Dir Results Letter to NRC - Hatch - Hurricane Helene IR 05000321/20244012024-10-10010 October 2024 Security Baseline Inspection Report 05000321-2024401 and 05000366-2024401 ML24256A0282024-09-12012 September 2024 2024 Hatch Requal Inspection Corporate Notification Letter NL-23-0930, Application to Revise Technical Specifications to Adopt TSTF-591, Revise Risk Informed Completion Time (RICT) Program2024-09-11011 September 2024 Application to Revise Technical Specifications to Adopt TSTF-591, Revise Risk Informed Completion Time (RICT) Program NL-24-0337, Interim 10 CFR 21.21(a)(2) Report Regarding Operation Technology, Inc., ETAP Software Error in Transient Stability Program2024-09-0909 September 2024 Interim 10 CFR 21.21(a)(2) Report Regarding Operation Technology, Inc., ETAP Software Error in Transient Stability Program ML24249A1362024-09-0404 September 2024 EN 57304 - Westinghouse Electric Company, LLC, Final Report - No Embedded Files. Notification of the Potential Existence of Defects Pursuant to 10 CFR Part 21 NL-24-0334, 0 to the Updated Final Safety Analysis Report, Technical Specifications Bases Changes, Technical Requirements Manual Changes, License Renewal 10 CFR 54 .37(b) Changes, 10 CFR 50.59 Summary Report & Revised Nrc2024-09-0303 September 2024 0 to the Updated Final Safety Analysis Report, Technical Specifications Bases Changes, Technical Requirements Manual Changes, License Renewal 10 CFR 54 .37(b) Changes, 10 CFR 50.59 Summary Report & Revised Nrc IR 05000321/20240912024-08-27027 August 2024 NRC Investigation Report 2-2023-003 and NOV - NRC Inspection Report 05000321/2024091 and 05000366/2024091 IR 05000321/20240052024-08-26026 August 2024 Updated Inspection Plan for Edwin I. Hatch Nuclear Plant, Units 1 and 2 - Report 05000321/2024005 and 05000366/2024005 NL-24-0313, Application to Revise Technical Specifications Surveillance Requirements to Increase Safety/Relief Valves Setpoint Response to Request for Additional Information2024-08-23023 August 2024 Application to Revise Technical Specifications Surveillance Requirements to Increase Safety/Relief Valves Setpoint Response to Request for Additional Information IR 05000321/20240022024-08-0808 August 2024 Edwin I Hatch Nuclear Plants, Units 1 and 2 – Integrated Inspection Report 05000321-2024002 and 05000366-2024002 NL-24-0290, Response to Request for Additional Information Related to Request for Specific Exemption2024-07-26026 July 2024 Response to Request for Additional Information Related to Request for Specific Exemption NL-24-0276, Post-Audit Supplement to License Amendment Request to Revise Renewed Facility Operating Licenses to Adopt an Alternative Seismic Method for Categorization of Structures, Systems, and Components2024-07-26026 July 2024 Post-Audit Supplement to License Amendment Request to Revise Renewed Facility Operating Licenses to Adopt an Alternative Seismic Method for Categorization of Structures, Systems, and Components NL-24-0261, 10 CFR 50.46 ECCS Evaluation Model Annual Report for 20232024-07-19019 July 2024 10 CFR 50.46 ECCS Evaluation Model Annual Report for 2023 ML24198A1252024-07-16016 July 2024 Edwin I Hatch Nuclear Plant Units 1 - 2 Notification of Conduct of Title 10 of the Code of Federal Regulations 50 NL-24-0260, Inservice Inspection Program Owner’S Activity Report (OAR-1) for Refueling Outage 1R312024-07-0909 July 2024 Inservice Inspection Program Owner’S Activity Report (OAR-1) for Refueling Outage 1R31 05000321/LER-2024-002-01, Incorrectly Installed Temporary Modification Results in Multiple Conditions Prohibited by Plant Technical Specifications2024-07-0303 July 2024 Incorrectly Installed Temporary Modification Results in Multiple Conditions Prohibited by Plant Technical Specifications 05000321/LER-2024-003, Reactor Core Isolation Cooling (RCIC) System Inoperable Due to Mispositioned Link2024-07-0303 July 2024 Reactor Core Isolation Cooling (RCIC) System Inoperable Due to Mispositioned Link NL-24-0143, Proposed Alternative to Use ASME Code Case N-752, Risk-Informed Categorization and Treatment for Repair/ Replacement Activities in2024-06-27027 June 2024 Proposed Alternative to Use ASME Code Case N-752, Risk-Informed Categorization and Treatment for Repair/ Replacement Activities in NL-24-0239, Response to Apparent Violation in NRC Inspection Report 05000321, 366/2024090: EA-23-1392024-06-17017 June 2024 Response to Apparent Violation in NRC Inspection Report 05000321, 366/2024090: EA-23-139 ML24163A0532024-06-14014 June 2024 Audit Plan - Alternative Seismic Method LAR NL-24-0148, Report of Changes to Emergency Plan and Summary of 50.54(q) Analysis2024-06-0404 June 2024 Report of Changes to Emergency Plan and Summary of 50.54(q) Analysis ML24149A0492024-06-0404 June 2024 SNC Fleet - Regulatory Audit in Support of Review of the License Amendment Request to Revise TS 1.1, Use and Application Definitions, and Add New Technical Specification 5.5.21 and 5.5.17, Online Monitoring Program, NL-24-0202, SNC Response to Regulatory Issue Summary 2024-01: Preparation and Scheduling of Operator Licensing Examinations2024-05-24024 May 2024 SNC Response to Regulatory Issue Summary 2024-01: Preparation and Scheduling of Operator Licensing Examinations IR 05000321/20240902024-05-15015 May 2024 NRC Inspection Report 05000321-2024090 and 05000366-2024090, Investigation Report 2-2023-003; and Apparent Violation NL-24-0191, Annual Radiological Environmental Operating Reports for 20232024-05-10010 May 2024 Annual Radiological Environmental Operating Reports for 2023 05000321/LER-2024-002, Manual Reactor Trip Due to Loss of Feedwater2024-05-0909 May 2024 Manual Reactor Trip Due to Loss of Feedwater NL-24-0195, Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times for Residual Heat Removal Service Water.2024-05-0707 May 2024 Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times for Residual Heat Removal Service Water. NL-24-0064, Units 1 & 2 and Hatch Nuclear Plant - Units 1 & 2 License Amendment Request to Revise Technical Specification 1.1 and Add Online Monitoring Program to Technical Specification 5.52024-05-0303 May 2024 Units 1 & 2 and Hatch Nuclear Plant - Units 1 & 2 License Amendment Request to Revise Technical Specification 1.1 and Add Online Monitoring Program to Technical Specification 5.5 IR 05000032/20240112024-04-25025 April 2024 Notification of Edwin I. Hatch Nuclear Plant - Comprehensive Engineering Team Inspection (CETI) Baseline Inspection Report 0500032/2024011 and 05000366/2024011 NL-24-0165, Annual Non-Radiological Environmental Operating Reports and Annual Radioactive Effluent Release Reports for 20232024-04-25025 April 2024 Annual Non-Radiological Environmental Operating Reports and Annual Radioactive Effluent Release Reports for 2023 ML23032A3322024-04-24024 April 2024 Issuance of Amendments Nos. 322 and 267, Regarding LAR to Relax Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Studs in TS Table 1.1-1, Modes 05000366/LER-2024-002, Incorrectly Installed Temporary Modification Results in a Condition Prohibited by Plant Technical Specifications2024-04-24024 April 2024 Incorrectly Installed Temporary Modification Results in a Condition Prohibited by Plant Technical Specifications IR 05000321/20240012024-04-22022 April 2024 Integrated Inspection Report 05000321/2024001 and 05000366/2024001 NL-24-0026, Application to Revise Technical Specifications Surveillance Requirements to Increase Safety/Relief Valves Setpoint2024-04-19019 April 2024 Application to Revise Technical Specifications Surveillance Requirements to Increase Safety/Relief Valves Setpoint 05000321/LER-2024-001, Primary Containment Penetration Exceeded Maximum Allowable Primary Containment Leakage Rate (La)2024-04-0909 April 2024 Primary Containment Penetration Exceeded Maximum Allowable Primary Containment Leakage Rate (La) NL-24-0115, Response to Request for Additional Information Exemption Requests for Physical.2024-04-0404 April 2024 Response to Request for Additional Information Exemption Requests for Physical. NL-24-0116, Nuclear Property Insurance Coverage as of April 1, 2024 and Licensee Guarantees of Payment of Deferred.2024-03-29029 March 2024 Nuclear Property Insurance Coverage as of April 1, 2024 and Licensee Guarantees of Payment of Deferred. ML23275A2402024-03-22022 March 2024 SNC Fleet - Issuance of Environmental Assessment and Finding of No Significant Impact Regarding Exemption from the Requirements of 10 CFR Part 73, Section 73.2, Definitions (EPID Nos. L-2023-LLE-0018 & L-2023-LLE-0021) - Letter NL-24-0062, Report of Changes to Emergency Plan and Summary of 50.54(q) Analysis2024-03-12012 March 2024 Report of Changes to Emergency Plan and Summary of 50.54(q) Analysis NL-24-0089, Correction of Technical Specification Omission2024-03-0909 March 2024 Correction of Technical Specification Omission ML24069A0012024-03-0909 March 2024 – Correction of Amendment No. 266 Regarding License Amendment Request Regarding Relocation of Specific Surveillance Frequencies to a Licensee-Controlled Program (TSTF-425, Revision 3) ML24047A0362024-03-0404 March 2024 Response to Hatch and Vogtle FOF Dates Change Request (2025) NL-24-0061, Cycle 32 Core Operating Limits Report Version 12024-03-0101 March 2024 Cycle 32 Core Operating Limits Report Version 1 2024-09-09
[Table view] |
Text
December 6, 2021
SUBJECT:
EDWIN I. HATCH NUCLEAR PLANT UNITS 1 AND 2 - SECURITY BASELINE INSPECTION REPORT 05000321/2021402 AND 05000366/2021402
Dear Mr. McGavin:
On November 18, 2021, the U.S. Nuclear Regulatory Commission (N RC) completed an inspection at Edwin I. Hatch Nuclear Plant Units 1 and 2. On No vember 19, 2021, the NRC inspectors discussed the results of this inspection with you an d other members of your staff.
The results of this inspection are documented in the enclosed r eport.
No findings or violations of more than minor significance were identified during this inspection.
This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.
Sincerely,
/RA/
Jannette G. Worosilo, Chief Plant Support Branch Division of Reactor Safety
Docket Nos. 05000321 and 05000366 License Nos. DPR-57 and NPF-5
Enclosure:
As stated
Inspection Report
Docket Numbers: 05000321 and 05000366
License Numbers: DPR-57 and NPF-5
Report Numbers: 05000321/2021402 and 05000366/2021402
Enterprise Identifier: I-2021-402-0021
Licensee: Southern Nuclear Operating Company, Inc.
Facility: Edwin I. Hatch Nuclear Plant Units 1 and 2
Location: Baxley, GA
Inspection Dates: August 23-26, 2021 (Southern Company Corporat e Office)
November 15-18, 2021 (Hatch Nuclear Plant)
Inspectors: R. Patterson, Physical Security Inspector A. Richardson, Physical Security Inspector
Approved By: Jannette G. Worosilo, Chief Plant Support Branch Division of Reactor Safety
Enclosure
SUMMARY
The U.S. Nuclear Regulatory Commission (NRC) continued monitori ng the licensees performance by conducting a security baseline inspection at EDW IN I. HATCH NUCLEAR PLANT UNITS 1 AND 2, in accordance with the Reactor Oversight P rocess. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.
List of Findings and Violations
No findings or violations of more than minor significance were identified.
Additional Tracking Items
None.
INSPECTION SCOPES
Inspections were conducted using the appropriate portions of th e inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise note d. Currently approved IPs with their attached revision histories are located on the public web site at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspe ction activity were met consistent with Inspection Manual Chapter (IMC) 2201, Security Inspection Program for Commercial Nuclear Power Reactors. The inspectors reviewed sel ected procedures and records, observed activities, and interviewed personnel to asse ss licensee performance and compliance with Commission rules and regulations, license condi tions, site procedures, and standards.
SAFEGUARDS
71130.01 - Access Authorization
The inspectors evaluated the access authorization program. The following elements were
===evaluated:
Access Authorization===
Main article: IP 71130.01
- (1) Tier I: All Requirements Tier II: ( 02.05 a, b, 02.07 a, b, 02.08 a, c)
Tier III: ( 02.09, 02.10 a-c)
The inspectors evaluated the fitness for duty program by comple ting the following inspection
===elements:
Fitness For Duty Program===
Main article: IP 71130.08
(1)
- Tier II: ( 02.05 a-h, 02.06 a-g, 02.07 a-e, 02.08 a, b, 02.09 a-e)
- Tier III: ( 02.10, 02.11 a, 02.12 a, 02.13 a-d, 02.14 a-c)
INSPECTION RESULTS
No findings were identified.
EXIT MEETINGS AND DEBRIEFS
The inspectors verified no proprietary information was retained or documented in this report.
- On November 19, 2021, the inspectors presented the security ba seline inspection results to Steven McGavin and other members of the licensee sta ff.
DOCUMENTS REVIEWED
Inspection Type Designation Description or Title Revision
Procedure or Date
71130.01 Corrective 10606809
Action 10640289
Documents 21-50083075
Corrective 10822941
Action
Documents
Resulting from
Inspection
Procedures AA-002 Access Authorization Program Version
8.0
AA-003 Adjudication of Derogatory Version
Information and Appeal Process 4.2
AA-006 Access Authorization Confidential Version
Information Processing 3.1
Procedure
AA-008 Access Authorization Personnel Version
Access Data System (PADs) 2.1
Procedure
NMP-AD-005 Insider Mitigation Program (IMP) Version
Access Authorization 9.2
NMP-AD-016 Fatigue Management Program Version
10.2
NMP-SE-023 Personnel Authorization an Version
Badging Program 4.0
Self-NMP-GM-Check-In Self-Assessment (CISA) Version
Assessments 003-F18 Plan and Report 3.0
71130.08 Corrective 15-10593933
Action 15-10594136
Documents 15-10594140
15-10594144
15-10594148
19-10591520
19-10593807
19-10595571
19-10599479
19-10599486
21-10784272
21-10789235
21-50063923
21-50063927
21-50063933
21-50063935
21-50092463
21-50101177
Procedures 720-001 SNC Corporate Policy-Fitness-January
Inspection Type Designation Description or Title Revision
Procedure or Date
For-Duty 24, 2017
MS-FFD-001 Fitness-for-Duty Standard Version 8
Operating and Collection
Procedure
MS-FFD-003 Intoxilyzer Operations Version
3.1
MS-FFD-004 Random Selection and Version
Verification Procedure 4.0
MS-FFD-005 Medical Review Officer Version
7.0
MS-FFD-006 Follow-up Testing Version
4.1
MS-FFD-007 Blind Performance Test/Quality Version
Control 5.0
MS-FFD-008 FFD Records Version
3.2
MS-FFD-009 Contractor Review and Screening Version
Procedure 2.0
MS-FFD-010 Interface and Reporting Version
4.1
MS-FFD-011 Training and Qualification of Version
Fitness for Duty Personnel 6.0
MS-FFD-012 Testing for Other Legal and Illegal Vesrion
Substances 3.1
MS-FFD-013 Security of FFD Centers and Version
Medical Facilities 3.2
MS-FFD-014 Call-ins to Perform Unscheduled Version
Work 2.1
MS-FFD-015 Determination of Fitness Version
Evaluation and Process 4.4
Self-Fleet MF/MRO 2019 Nuclear April 9,
Assessments Oversight (NOS) Managing 2019
Fatigue/Medical Review Officer
Audit
5