ML20205E782: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
(One intermediate revision by the same user not shown)
Line 13: Line 13:
| document type = MEETING MINUTES & NOTES--CORRESPONDENCE, MEETING SUMMARIES-INTERNAL (NON-TRANSCRIPT)
| document type = MEETING MINUTES & NOTES--CORRESPONDENCE, MEETING SUMMARIES-INTERNAL (NON-TRANSCRIPT)
| page count = 6
| page count = 6
| project =
| stage = Meeting
}}
}}


=Text=
=Text=
{{#Wiki_filter:}}
{{#Wiki_filter:,
i e  -  .
o,,                                                                                                        !    UNITED STATES f(.4}g%j,,,( ; 1 j g
p,                                                                                                  NUCLEAR REGULATORY COMMISSION
                                                                                                                                      ; WASHINGTON, D. C. 20555 March 25, 1987
          \ . . . . . #'
i Docket No. 50-352 LICENSEE: Philadelphia Electric Company FACILITY: Limerick Generating S,tation, Unit 1
 
==SUBJECT:==
 
==SUMMARY==
OF MARCH 23, 1987 MEETING ON STANDBY GAS TREATMENT SYSTEM On March 23, 1987, representatives of the Philadelphia Electric Company (licensee) met with the NRC staff in Bethesda, Maryland. The purpose of the meeting was to discuss in detail the proposal made in the licensee's applica-tion of Januar 13, 1987 concerning connection of the standby gas treatment system (SGTS) yservice to the refueling floor area. A list of attendees is provided in Enclosure 1.
The design objective of the SGTS is to provide a common system to serve both Unit 1 and Unit 2 (Reactor Enclosure Secondary Containment Zones I and II) and the common refueling area (Refueling Area Secondary Containment Zone III).
During the operating license review the licensee proposed and the staff reviewed and found acceptable a scheduler. delay in the connection of the SGTS to the refueling area secondary containment until the first refueling outage when irradiated fuel would first be brought into the area. The licensee's applica-tion of January 13, 1987 proposed changes to the Unit 1 Technical Specifications to facilitate connection of SGTS service to the refueling area (Zone III).
The discussions of the meeting addressed three submittals by the licensee on the SGTS. The first submittal, dated January 13, 1987, was discussed in detail with respect to the expected operational modes of the SGTS,. the procedure to balance the several portions of the modified SGTS/RERS systems and the proposed changes to the TS pages. The staff requested the licensee to submit additional information on several items for the purpose of clarification. The staff is continuing its safety review of the application, however there were no require-ments for modification of the license amendment's proposals identified in the meetings. The licensee expects to submit this additional information by letter in the near future.
The licensee's planned responses to the staff's earlier request for additional information dated March 3, 1987 was also discussed briefly. The licensee expects to submit these responses in the near future.
The licensee s submittal dated March 19, 1987 was also discussed briefly. This submittal re uests, pursuant to a previous licensee commitment, the staff's 8703310013 870325 PDR    ADOCK 05000352 P                                                                                        PDR
 
approval, prior to connection of the SGTS to the refueling floor area, to    '
remove the primary containment head. The staff indicated that it would review the request and would attempt to provide a prompt response. The licensee indicated thit they would need the staff's response by the first day of the refueling outage, row scheduled to begin on May 16, 1987, in order to proceed without delay in the c.tage.
4 C/T$N~
YPobertE(. Martin,ProjectManager BWR Project Directorate No. 4 Division of BWR Licensing
 
==Enclosure:==
 
As stated cc w/ enclosure:
See next page t
 
  ,    m .
2-approval, prior to connection of the SGTS to the refueling floor area, to remove the primary containment head. The staff indicated that it would review the request and would attempt to provide a prompt response. The licensee indicated that they would need the staff's response by the first day of the refueling outage, now scheduled to begin on May 16, 1987, in order to proceed without delay in the outage.
                                                                        /s/
Robert E. Martin, Project Manager BWR Project Directorate No. 4 Division of BWR Licensing
 
==Enclosure:==
 
As stated cc w/ enclosure:
See next page DISTRIBUTION
                  ! Docket E11e NRC PDR LPDR PD#4 Rdg.
WButler REMartin RCaruso Vogler, OGC EJordan BGrimes ACRS(10) l                  M0'Brien JLee NRC Participants O
t ilb        t r          4 J /24787              /y87
* V ',.
w.
Mr. Edward G. Bauer, Jr            Limerick Generating Station Philadelphia Electric Company      Units 1 & 2 cc:
Troy B. Conner, Jr., Esquire      Chairman Board of Supervisors of Conner and Wetterhahn                Limerick Township 1747 Pennsylvania Ave, N.W.        646 West Ridge Pike Washington, D. C. 20006        Limerick, Pennsylvania 19468 Barry M. Hartman                  Frank R. Romano, Chairman Office of General Counsel          Air & Water Pollution Patrol Post Office Box 11775              61 Forest Avenue Harrisburg, Pennsylvania 17108    Ambler, Pennsylvania 19002 Federic M. Wentz                  Dept. of Environmental Resources County Solicitor                  ATTN: Director, Office Radiologic County of Montgomery                        Health Courthouse                        P. O. Box 2063 Norristown, Pennsylvania 19404    Harrisburg, Pennsylvania 17105 Mr. John Franz, Plant r : nager    Mr. David Stone Limerick Generating Station        Limerick Ecology Action, Inc.
Post Office Box A                  P. O. Box 761 Sanatoga, Pennsylvania 19404      Pottstown, Pennsylvania  19464 Mr. Karl Abraham                  Thomas Gerusky, Director Public Affairs Officer            Bureau of Radiation Protection Region I                          PA Dept. of Environmental Resources U.S. Nuclear Regulatory Commission P. O. Box 2063 631 Park Avenue                    Harrisburg, Pennsylvania 17120 King of Prussia, PA 19406 Mr. Gene Kelly                    Governor's Office cf State Senior Resident Inspector            Planning and Development U.S. Nuclear Regulatory Commission ATTN: Coordinator, Pennsylvania P. O. Box 47                              State Clearinghouse Sanatoga, Pcnnsylvania 19464      P. O. Box 1323 Harrisburg, Pennsylvania 17102 f
 
73                                              ,
Philadelphia Electric Company      Limerick Generating Station 1/2 cc:
Director, Pennsylvania Emergency Management Agency Basement, Transportation &
Safety Building Harrisburg, Pennsylvania 17120 f.6izert L. Anthony                    Angus Love, Esq.
Friends of the Earth                  107 East Main Street of the Delaware Valley              Norristown, Pennsylvania 19402 103 Vernon Lane, Box 186 Moylan, Pennsylvania 19065 Helen F. Hoyt, Chairman Charles E. Rainey, Jr., Esquire        Administrative Judge Chief Assistant City Solicitor        Atomic Safety & Licensing Board Law Department, City of Philadelphia  U.S. Nuclear Regulatory Consnission One Reading Ceter                      Washington, D. C. 20555 1101 Market Street, 5th Floor Philadelphia, PA 19107 David Wersan Esq.                      Dr. Jerry Harbour Assistant Consumer Advocate            Administrative Judge Office of Consumer Advocate            Atomic Safety & Licensing Board 1425 Strawberry Square                U.S. Nuclear Regulatory Commission Harrisburg, Pennsylvania 17120        Washington, D. C. 20555 Dr. Richard F. Cole                    Mr. Spence W. Perry, Esq.
Administrative Judge                  Associate General Counsel Atomic Safety & Licensing Board        Federal Emergency Management Agency U.S. Nuclear Regulatory Comission      Room 840 Washington, D. C. 20555                500 C St., S.W.
Washington, D. C. 20472 Mr. J. T. Robb, NS-1 Philadelphia Electric Company 2301 Market Street Philadelphia, Pennylsvania 19101 Timothy R. S. Campbell, Director Department of Emergency Services 14 East Biddle Street West Chester, Pennsylvania 19380                                            ,
f
 
Enclosure
.                                                                                  ~
Name              Orcarization R.E. Martin        NRC, Project Manager Jay Lee            NRC/ DBL /PSB Michael G. McGill  PECo Dennis Klein      Bechtal Kathleen 0. Selby  PECo Mike Kopistanksy  PECo Paul B. Blackiston PECo Charles A. Mengers PECo Carl W. Wiedersum  PEco i
1 l
i
    - - - _ _ _ _ _ _ _ _}}

Latest revision as of 00:46, 7 December 2021

Summary of 870323 Meeting W/Util & Bechtel in Bethesda,Md Re Proposal Made in Licensee 870113 Application Concerning Connection of Standby Gas Treatment Sys Svc to Refueling Floor Area.List of Attendees Encl
ML20205E782
Person / Time
Site: Limerick Constellation icon.png
Issue date: 03/25/1987
From: Martin R
Office of Nuclear Reactor Regulation
To:
Office of Nuclear Reactor Regulation
References
NUDOCS 8703310013
Download: ML20205E782 (6)


Text

,

i e - .

o,,  ! UNITED STATES f(.4}g%j,,,( ; 1 j g

p, NUCLEAR REGULATORY COMMISSION

WASHINGTON, D. C. 20555 March 25, 1987

\ . . . . . #'

i Docket No. 50-352 LICENSEE: Philadelphia Electric Company FACILITY: Limerick Generating S,tation, Unit 1

SUBJECT:

SUMMARY

OF MARCH 23, 1987 MEETING ON STANDBY GAS TREATMENT SYSTEM On March 23, 1987, representatives of the Philadelphia Electric Company (licensee) met with the NRC staff in Bethesda, Maryland. The purpose of the meeting was to discuss in detail the proposal made in the licensee's applica-tion of Januar 13, 1987 concerning connection of the standby gas treatment system (SGTS) yservice to the refueling floor area. A list of attendees is provided in Enclosure 1.

The design objective of the SGTS is to provide a common system to serve both Unit 1 and Unit 2 (Reactor Enclosure Secondary Containment Zones I and II) and the common refueling area (Refueling Area Secondary Containment Zone III).

During the operating license review the licensee proposed and the staff reviewed and found acceptable a scheduler. delay in the connection of the SGTS to the refueling area secondary containment until the first refueling outage when irradiated fuel would first be brought into the area. The licensee's applica-tion of January 13, 1987 proposed changes to the Unit 1 Technical Specifications to facilitate connection of SGTS service to the refueling area (Zone III).

The discussions of the meeting addressed three submittals by the licensee on the SGTS. The first submittal, dated January 13, 1987, was discussed in detail with respect to the expected operational modes of the SGTS,. the procedure to balance the several portions of the modified SGTS/RERS systems and the proposed changes to the TS pages. The staff requested the licensee to submit additional information on several items for the purpose of clarification. The staff is continuing its safety review of the application, however there were no require-ments for modification of the license amendment's proposals identified in the meetings. The licensee expects to submit this additional information by letter in the near future.

The licensee's planned responses to the staff's earlier request for additional information dated March 3, 1987 was also discussed briefly. The licensee expects to submit these responses in the near future.

The licensee s submittal dated March 19, 1987 was also discussed briefly. This submittal re uests, pursuant to a previous licensee commitment, the staff's 8703310013 870325 PDR ADOCK 05000352 P PDR

approval, prior to connection of the SGTS to the refueling floor area, to '

remove the primary containment head. The staff indicated that it would review the request and would attempt to provide a prompt response. The licensee indicated thit they would need the staff's response by the first day of the refueling outage, row scheduled to begin on May 16, 1987, in order to proceed without delay in the c.tage.

4 C/T$N~

YPobertE(. Martin,ProjectManager BWR Project Directorate No. 4 Division of BWR Licensing

Enclosure:

As stated cc w/ enclosure:

See next page t

, m .

2-approval, prior to connection of the SGTS to the refueling floor area, to remove the primary containment head. The staff indicated that it would review the request and would attempt to provide a prompt response. The licensee indicated that they would need the staff's response by the first day of the refueling outage, now scheduled to begin on May 16, 1987, in order to proceed without delay in the outage.

/s/

Robert E. Martin, Project Manager BWR Project Directorate No. 4 Division of BWR Licensing

Enclosure:

As stated cc w/ enclosure:

See next page DISTRIBUTION

! Docket E11e NRC PDR LPDR PD#4 Rdg.

WButler REMartin RCaruso Vogler, OGC EJordan BGrimes ACRS(10) l M0'Brien JLee NRC Participants O

t ilb t r 4 J /24787 /y87

  • V ',.

w.

Mr. Edward G. Bauer, Jr Limerick Generating Station Philadelphia Electric Company Units 1 & 2 cc:

Troy B. Conner, Jr., Esquire Chairman Board of Supervisors of Conner and Wetterhahn Limerick Township 1747 Pennsylvania Ave, N.W. 646 West Ridge Pike Washington, D. C. 20006 Limerick, Pennsylvania 19468 Barry M. Hartman Frank R. Romano, Chairman Office of General Counsel Air & Water Pollution Patrol Post Office Box 11775 61 Forest Avenue Harrisburg, Pennsylvania 17108 Ambler, Pennsylvania 19002 Federic M. Wentz Dept. of Environmental Resources County Solicitor ATTN: Director, Office Radiologic County of Montgomery Health Courthouse P. O. Box 2063 Norristown, Pennsylvania 19404 Harrisburg, Pennsylvania 17105 Mr. John Franz, Plant r : nager Mr. David Stone Limerick Generating Station Limerick Ecology Action, Inc.

Post Office Box A P. O. Box 761 Sanatoga, Pennsylvania 19404 Pottstown, Pennsylvania 19464 Mr. Karl Abraham Thomas Gerusky, Director Public Affairs Officer Bureau of Radiation Protection Region I PA Dept. of Environmental Resources U.S. Nuclear Regulatory Commission P. O. Box 2063 631 Park Avenue Harrisburg, Pennsylvania 17120 King of Prussia, PA 19406 Mr. Gene Kelly Governor's Office cf State Senior Resident Inspector Planning and Development U.S. Nuclear Regulatory Commission ATTN: Coordinator, Pennsylvania P. O. Box 47 State Clearinghouse Sanatoga, Pcnnsylvania 19464 P. O. Box 1323 Harrisburg, Pennsylvania 17102 f

73 ,

Philadelphia Electric Company Limerick Generating Station 1/2 cc:

Director, Pennsylvania Emergency Management Agency Basement, Transportation &

Safety Building Harrisburg, Pennsylvania 17120 f.6izert L. Anthony Angus Love, Esq.

Friends of the Earth 107 East Main Street of the Delaware Valley Norristown, Pennsylvania 19402 103 Vernon Lane, Box 186 Moylan, Pennsylvania 19065 Helen F. Hoyt, Chairman Charles E. Rainey, Jr., Esquire Administrative Judge Chief Assistant City Solicitor Atomic Safety & Licensing Board Law Department, City of Philadelphia U.S. Nuclear Regulatory Consnission One Reading Ceter Washington, D. C. 20555 1101 Market Street, 5th Floor Philadelphia, PA 19107 David Wersan Esq. Dr. Jerry Harbour Assistant Consumer Advocate Administrative Judge Office of Consumer Advocate Atomic Safety & Licensing Board 1425 Strawberry Square U.S. Nuclear Regulatory Commission Harrisburg, Pennsylvania 17120 Washington, D. C. 20555 Dr. Richard F. Cole Mr. Spence W. Perry, Esq.

Administrative Judge Associate General Counsel Atomic Safety & Licensing Board Federal Emergency Management Agency U.S. Nuclear Regulatory Comission Room 840 Washington, D. C. 20555 500 C St., S.W.

Washington, D. C. 20472 Mr. J. T. Robb, NS-1 Philadelphia Electric Company 2301 Market Street Philadelphia, Pennylsvania 19101 Timothy R. S. Campbell, Director Department of Emergency Services 14 East Biddle Street West Chester, Pennsylvania 19380 ,

f

Enclosure

. ~

Name Orcarization R.E. Martin NRC, Project Manager Jay Lee NRC/ DBL /PSB Michael G. McGill PECo Dennis Klein Bechtal Kathleen 0. Selby PECo Mike Kopistanksy PECo Paul B. Blackiston PECo Charles A. Mengers PECo Carl W. Wiedersum PEco i

1 l

i