Summary of 921201 Meeting W/Util in Rockville,Md Re Various Licensing Activities.List of Attendees Encl
ML20126F124
Person / Time
Site: Peach Bottom, Limerick  Constellation icon.png
Issue date: 12/10/1992
From: James Shea
Office of Nuclear Reactor Regulation
To:
Office of Nuclear Reactor Regulation
References
NUDOCS 9212300116
Download: ML20126F124 (6)


Text

. ~ - = -.~~- - -

'\** /

d' "

o,, <

n UNITED STATES ,

.i NUCLEAR REGULATORY COMMISSION '

o WASHINGTON. D C 20M4 k,y# December 10, 1992 i

Docket Nos. 50-277/50-278 50-352/S0-353 LICENSEE: Philadelphia Electric Company FACILITY: Peach Bottom Atomic Power Station, Units 2 and 3, and Limerick Generating Station, Units 1 and 2

SUBJECT:

PERIODIC DISCUSSION OF LICENSING ACTIVITIES -

On December 1,1992, the NRC staff met with Philadelphia Electric Company I (PEco) representatives at the NRC offices in Rockville, Maryland, to discuss various licensing activities related to the Peach Bottom Atomic Power Station (PBAPS) and the Limerick Generating Station (LGS). Enclosed is a list of meeting participants. Meeting highlights are described in the following summary.

After introductory remarks by the licensee concerning the recent Electrical i Distribution Safety functional Inspection at LGS and PEco activities concerning generic Boiling Water Reactor water level instrument issues, the licensee and NRC staff discussed the status of pending licensing actions. Of particular note were applications for both LGS and PBAPS to extend Technical Specification (TS) surveillance intervals to accommodate' a 24-month fuel cycle. It was noted by the licensee that LGS, Unit 2 is expected to operate until the planned January 1993 refueling outage without exceeding the grace-- ,

period for any current surveillances. The staff informed PEco that it would not be able to meet the licensee recuested March 1993 issue date for the PBAPS -

24-month surveillance interval amencment application. _ PEco committed to verifying their belief that- all 18-month-surveillances necessary for_ operation until the planned September 1993 PBAPS Unit 3 refueling outage had been completed-during a recent forced outage. The staff indicated that continued 3 discussion and review was necessary to ensure that PBAPS Unit 3 did not  ;

operate with surveillances that had passed the due date-grace period. 4 Additional discussions were held on pending LGS relief requests, a pending LGS TS change concerning allowed out of service time for the Residual Heat Removal (RHR) system, a pending PBAPS request to extend the operating license expiration date by reconsidering the years the plant was under construction and a pending PBAPS TS change request concerning installation of Generic Letter 89-16, Hardened Torus Vent (HWV) system. The staff requested that the >

licensee take-action- to modify or withdraw the HWV TS application in the-light of PEco's recent decision to modify the-planned design of the HWV. The staff:

also requested that'PEco take_ action-to modify its PBAPS TS change request that would capture ANSI /ANS 3.1-1981 training standards for its personnel. It ,

was recognized ~by the staff that the ANSI /ANS 3.1 1981 TS change was part of a 1989 commitment _to the State of Pennsylvania, however, the staff requested that the licensee take more decisive action to resolve confilets concerni_ng-the specific wording of the TS pages.

[

210000 p ^

9212300116 921210 ' '

% I PDR .ADOCK 05000277L .j ,

P- l PDR ( ,

~. ~ , .. . . ..- , . , . - -- -

R I.

The licensee then presented a discussion of planned future licensing actions for both stations. PECo indicated that both stations will be spplying for license amendments to increase the rated thermal power of the facilities.

PBAPS is expected to submit such an application in July 1994 and LGS is exaected to follow in the fall of 1994. Both facilities will be submitting ot1er supporting licensing actions prior to those' dates. The licensee requested that the staff take steps to plan staff resources for the timely review of power uprate submittals. Other future actions discussed included the adoption of the Improved Standard Technical Specifications by PBAPS, significant service water system upgrades at LGS and an application to rerack the spent fuel pool at LGS.

Jc ;ep i W. Shea, Acting Project Manager Project Directorate 1-2 Division of Reactor Projects - 1/11 Office of Nuclear Reactor Regulation

Enclosure:

List of Meeting Participants cc w/ enclosure:

See next page DJSTRIBUTION Docket file JShea CAnderson, RGN-1 NRC & Local PDRs FRinaldi RClark PDI-2 Reading M0'Brien TMurley/FMiraglia OGC JPartlow EJordan, 3701 SVarga ACRS(10)

JCalvo VMcCree, 17G-21 Chiller EWenzinger, RGN-1 0FFICE PDIS/LA' PDI-2/PM/) PDiv2'/?N[. .PDI-2/0 NAME Md bkN JShea:r$Nb FRinak CHilTkF l

DATE 9/7/92 I d'i/9h

/ IL/ # /92 l'2//h/92 OFFICIAL RECORD COPY DOCUMENT NAME: PB12-1. SUM

<i

-.... . . s

8 The licensee then presented a discussion of planned future licensing actions for both stations. PECo indicated that both stations will be applying for license amendments to increase the rated thermal power of the facilities.

PBAPS is expected to submit such an application in July 1994 and LGS is expected to follow in the fall of 1994. Both facilities will be submitting other supporting licensing actions prior to those dates. The licensee requested that the staff take steps to plan staff resources for the timely review of power u) rate submittals. Other future actions discussed included the adoption of tie Improved Standard Technical Specifications by PBAPS, significant service water system upgrades at LGS and an application to rerack the spent fuel pool at LGS.

)

,J ,

( C s

ose W. Shea, Acting Project Manager

'roj ct Directorate 1-2 Division of Reactor Projects - 1/II 4 Office of Nuclear Reactor Regulation )

Enclosure:

List of Meeting Participants cc w/ enclosure:

See next page a

Peach Bottom Atomic Power Station, Philadelphia Electric Company Units 2 and 3 Limerick Generating Station, Units 1 and 2 cc:

J. W. Durham, Sr., Esquire Mr. William P. Dornsife, Director Sr. V.P. & General Counsel Bureau of Radiation Protection Philadelphia Electric Company Pennsylvania Department of 2301 Mar (et Street, S26-1 Environmental Resources Philadelphia, Pennsylvania 19101 P.O. Box 2063 Harrisburg, Pennsylvania 17120 Philadelphia Electric Company ATIN: Mr. D. B. Miller, Vice President Board of Supervisors Peach Bottom Atomic Power Station Peach Bottom Township Route 1, Box 208 R. D. #1 Delta, Pennsylvania 17314 Delta, Pennsylvania 17314 Philadelphia Electric Company Public Service Comission of Maryland ATTH: Regulatory Engineer, Al-25 Engineering Division Peach Bottom Atomic Power Station AT1H: Chief Engineer Route 1 Box 208 231 E. Baltimore Street Delta, Pennsylvania 17314 Baltimore, MD 21202-3486 Resident Inspector Mr. Richard McLean U.S. Nuclear Regulatory Commission Power Plant and Environmental Peach Bottom Atomic Power Station Review Division P.O. Box 399 Department of Natural Resources Delta, Pennsylvania 17314 B-3, Tawes State Office Building Regional Administrator, Region I U.S. Nuclear Regulatory Comission Mr. Rod Krich, 52A-5 475 Allendale Road Philadelphia Electric Company King of Prussia, Pennsylvania 19406 955 Chesterbrook Boulevard Wayne, Pennsylvania 19087-5691 Mr. Roland Fletcher Department of Environment Mr. Graham W. Leitch, Vice President 201 West Preston Street Limerick Generating Station Baltimore, Maryland 21201 P.O. Box A Sanatoga, Pennsylvania 19464 Carl D. Schaefer External Operations - Nuclear Mr. John Doering Delmarva Power & Light Company Plant Manager P.O. Box 231 Limerick Generating Station Wilmington, DE 19899 P.O. Box A Sanatoga, Pennsylvania 19464 t

I

i q r

Philadelphia Electric Company Peach Bottom Atomic Power Station, Units 2 and 3 Limerick Generating Station, Units 1 and 2 Mr. Richard W. Dubiel Mr. Thomas Kenny Superintendent - Services Senior Resident inspector Limerick Generating Station U.S. Nuclear Regulatory Commission P. O. Box A P.O. Box 596 Sanatoga, Pennsylvania 19464 Pottstown, PA 19464 Mr. Gil J. Madsen Library Regulatory Engineer U.S. Nuclear Regulatory Commission Limerick Generating Station Region I P. O. Box A 475 Allendale Road Sanatoga, Pennsylvania 19464 King of Prussia, PA 19406 Mr. George A. Hunger Mr. Larry Hopkins Project Manager Superintendent-0perations Limerick Generating Station Limerick Generating Station P. O. Box A P. O. Box A Sanatoga, Pennsylvania 19464 Sanatoga, Pennsylvania 19464 Mr. James A. Muntz Superintendent - Technical Limerick Generating Station P.O. Box A Sanatoga, Pennsylvania 19464 Mr. George J. Beck Manager-Licensing, 52A-5 Philadelphia Electric Company Nuclear Group Headquarters Correspondence Control Desk P.O. Box No. 195 Wayne, Pennsylvania 190B7-0195

f ENCLOSURE ,

NRC/ PHILADELPHIA ELECTRIC COMPANY MEETING ON LICENSING ACTIVITIES  ;

December 1, 1992 HAME ORGANIZATION G. Beck PEco J. Basilio PEco R. Krich PECo C. Miller NRC R. Clark NRC F. Rinaldi NRC J. Shea NRC