| number = ML20100H599
| number = ML20100H599
| issue date = 11/16/1984
| issue date = 11/16/1984
| title = Deficiency Rept (D/N#54) Re Defective Westinghouse Ds/Dsl Circuit Breakers.Field Insp of All Applicable Class 1E Circuit Breakers in Progress to Determine Extent of Problem. Next Rept Will Be Submitted by 841228
| title = Deficiency Rept (D/N 54) Re Defective Westinghouse Ds/Dsl Circuit Breakers.Field Insp of All Applicable Class 1E Circuit Breakers in Progress to Determine Extent of Problem. Next Rept Will Be Submitted by 841228
| author name = Kohler A
| author name = Kohler A
| author affiliation = WASHINGTON PUBLIC POWER SUPPLY SYSTEM
| author affiliation = WASHINGTON PUBLIC POWER SUPPLY SYSTEM

Latest revision as of 03:24, 24 September 2022

Deficiency Rept (D/N 54) Re Defective Westinghouse Ds/Dsl Circuit Breakers.Field Insp of All Applicable Class 1E Circuit Breakers in Progress to Determine Extent of Problem. Next Rept Will Be Submitted by 841228
ML20100H599
Person / Time
Site: Satsop
Issue date: 11/16/1984
From: Kohler A
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To: Kirsch D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
(D-N#54), GO3-84-721, NUDOCS 8412100042
Download: ML20100H599 (2)


Text

~

35CEfldU

v Washington Public Power Supply System Box 1223 Efrpa;(WasNingtor@8541 (206)482-4428 pEpp , N Docket No. 50-508 November 16, 1984 G03-84-721 U. S. Nuclear Regulatory Commission, Region V Office of Ins,rection and Enforcement 1450 Maria Lane, Suite 260 Walnut Creek, California 94596-5368 Attention: Mr. D. F. Kirsch, Acting Director Division of Reactor Safety and Projects

Subject:

NUCLEAR PROJECT NO. 3 POTENTIAL 10CFR50.55(e) DEFICIENCY WESTINGHOUSE DS/DSL CIRCUIT BREAKER DEFICIENCIES (D/N#54)

On October 12, 1984, the Supply System notified your office of a potential 10CFR50.55(e) deficiency concerning the subject condition. The condition involves possible damage to internal control wiring in type DS and DSL circuit breakers supplied by Westinghouse. The damage can occur when a breaker is moved on the extension rails into or out of its compartment. This movement of the breaker could possibly pinch the wire bundle between the wire retainer and the steel gas shield mounted on the power center frame.

Field inspections of all applicable Class IE circuit breakers are presently being performed to determine the extent of the problem. Upon completion of the inspections and subsequent Engineering evaluation, a final report will be provided. It is anticipated that the report will be submitted to your office by December 28, 1984.

h$k kOOOO 000 S

p~- '?

c-.

e. -' 4 Should'you have any questions or desire further information, please contact me directly.

U i

A. D. Kohler (760) j- WNP-3 Pregram Director

cc
J. Adams, NESCO D. Smithpeter, BPA Ebasco, Elma Ebasco, New York E. M. Burton, Pacific Power'&-Light' Company R.'D. Hill, Puget Sound Power &' Light Company P. Inman, Washington Water Power Company B. D. Withers, Portland General Electric Company '