VERMONT YANKEE NUCLEAR POWER CORPORATION
    =                                        SEVENTY SEVEN OROVC STRCCT RUTLAND, VERMONT 05701 REPLY TO:
  )                                                  VYV-2391                          P. O. BOX 157 VERNON, VERMONT o5354 4
December 28, 1972
    }
li                                                                            ,4a N g
M      f ro
                                                                                -                -          O
  's                  Director                                                O            Q Il
                                                                                                %dh k i'
Directorate of Licensing                                h                        (( 3      .,
U.S. Atomic Energy Commission                        '1
                                                                            '    l jfg 3 g .,A-            --
Washington, D.C. 20545
( er m , . ' , ~ r,.,e _,
                                                                                                              ~
                                                                                                              'jf
  '?                 
 
==REFERENCE:==
Operating License DPR-28                      .d                  ,
  $                                Docket No. 50-271                          'M              - "                    .
l Abnormal Occurrence No. A0-72-16                \hig  ~
(.               
 
==Dear Sir:==
j                      As defined by Technical Specifications for the Vermont Yankee Nuclear
    ;                Power Station, Section 6.7.B.d, we are reporting the following Abnornal 1                Occurrence as A0-72-16.
    ?
    )                      At 1938 on December 20, 1972 the No. 1 fan on the west cooling tower i                tripped. The fan failed after approximately a seven minute run in the reverse direction during deicing operations on the west tower. This
    !                particular fan and associated cooling tower cell are necessary to the
    }                cooling tower portion of the Alternate Cooling System and must be operable j                whenever irradiated fuel is in the reactor vessel and reactor. coolant 1                  temperature is greater than 212*F as required by section 3.5.D.'l of
    }                Technical Specifications. The reactor was operating at approximately l                  60% power at the time of the incident.
j.
    !                      Inmediately after the failure both diesels and both service water d
sub-systems were checked for operability in compliance with Technical Specifications section 4.5.D.3, and found to be. satisfactory.
g g                  Investigation showed that the motor overload heater had failed,
  *'j                thereby severing power to the fan motor. The overload heate,r was g
replaced and the fan was returned to service on December 21. The fan has been operating without incident since the repair and the Plant Operations-Review Committee concluded that no further action is necessary.
jg LN                                        .        Very truly yours,-                            $D      'p 83220po414 730905 VE ONT YANKEE NUCLEAR POWER COPJ' ORATION
                $DRh OCK 05000271 l,                  -
PDR                                        g    --
Robert F. Jor s l
Plant SuperintendefpFY SENT REGION ~w- o
  -}                  MFL/rpb
:                                                                                                              76 i                            . - _  _        _        _ - _
                                                                        . _ _ _                              __      m}}

Latest revision as of 10:57, 19 May 2020

Final AO 72-16:on 721220,fan 1 on West Cooling Tower Tripped.Caused by Failure of Motor Overload Heater.Overload Heater Replaced & Fan Returned to Svc
ML20086D593
Person / Time
Site: Vermont Yankee Entergy icon.png
Issue date: 12/28/1972
From: Rosalyn Jones
VERMONT YANKEE NUCLEAR POWER CORP.
To:
US ATOMIC ENERGY COMMISSION (AEC)
Shared Package
ML20086D587 List:
References
AO-72-16, VYV-2391, NUDOCS 8312020414
Download: ML20086D593 (1)


Text

n t , l.

i

  • O O y V -

Y f

VERMONT YANKEE NUCLEAR POWER CORPORATION

= SEVENTY SEVEN OROVC STRCCT RUTLAND, VERMONT 05701 REPLY TO:

) VYV-2391 P. O. BOX 157 VERNON, VERMONT o5354 4

December 28, 1972

}

li ,4a N g

M f ro

- - O

's Director O Q Il

%dh k i'

Directorate of Licensing h (( 3 .,

U.S. Atomic Energy Commission '1

' l jfg 3 g .,A- --

Washington, D.C. 20545

( er m , . ' , ~ r,.,e _,

~

'jf

'?

REFERENCE:

Operating License DPR-28 .d ,

$ Docket No. 50-271 'M - " .

l Abnormal Occurrence No. A0-72-16 \hig ~

(.

Dear Sir:

j As defined by Technical Specifications for the Vermont Yankee Nuclear

Power Station, Section 6.7.B.d, we are reporting the following Abnornal 1 Occurrence as A0-72-16.

?

) At 1938 on December 20, 1972 the No. 1 fan on the west cooling tower i tripped. The fan failed after approximately a seven minute run in the reverse direction during deicing operations on the west tower. This

! particular fan and associated cooling tower cell are necessary to the

} cooling tower portion of the Alternate Cooling System and must be operable j whenever irradiated fuel is in the reactor vessel and reactor. coolant 1 temperature is greater than 212*F as required by section 3.5.D.'l of

} Technical Specifications. The reactor was operating at approximately l 60% power at the time of the incident.

j.

! Inmediately after the failure both diesels and both service water d

sub-systems were checked for operability in compliance with Technical Specifications section 4.5.D.3, and found to be. satisfactory.

g g Investigation showed that the motor overload heater had failed,

  • 'j thereby severing power to the fan motor. The overload heate,r was g

replaced and the fan was returned to service on December 21. The fan has been operating without incident since the repair and the Plant Operations-Review Committee concluded that no further action is necessary.

jg LN . Very truly yours,- $D 'p 83220po414 730905 VE ONT YANKEE NUCLEAR POWER COPJ' ORATION

$DRh OCK 05000271 l, -

PDR g --

Robert F. Jor s l

Plant SuperintendefpFY SENT REGION ~w- o

-} MFL/rpb