ML20065H944: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
(One intermediate revision by the same user not shown)
(No difference)

Latest revision as of 08:01, 6 January 2021

Proposed Tech Spec 3/4.6.5.1 Re Containment Ice Condenser Ice Bed Ice Weight Reduction
ML20065H944
Person / Time
Site: Mcguire, McGuire  Duke Energy icon.png
Issue date: 10/04/1990
From:
DUKE POWER CO.
To:
Shared Package
ML20065H941 List:
References
NUDOCS 9010310122
Download: ML20065H944 (1)


Text

. , , . . . . .

IABLE 6.2.1 -16 .

ECCS AND SPRAY FLOW RAltd ASST #ED IN CONTAlf91[NI PRfSSURE CAICUt ATION SPRAY Fl0W ECCS fl0W SPRAY flow Auxiliary Spray Interval ECCS FLOW from Suse flow from Suse_

from RWST Lrom Sump

'fsec.) from RWST ES 0 0 0 0 O O - 45 0 ,

$5 0 -

O 8g 45 - 1886.9- 4857 2 3400 0 m3 0 3400 3793 0 o4- 1887 - 2036.9 1064 v:o

  • 0 0 002 f

2037'- 2999.9 0 3400 3917 0 2400 3000 - 3319.9 0 3400 624

'O$

0 624 0 2400 3320 - 3499.9 0 0 624 3432 2400 3500 - End of 0 Transient I All flow rates in gpa 2 This assumes 3793 gpa from the Residual Heat Removal pump plus 603 gpa from the Safety injection pump and 461 from the Centrifugal Charging pump.

  • Recirculation - RHR flow

. _ _ _ _ . _ , _ . _ _