Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML20217F348 | 15 October 1999 | Marked-up & Reprinted TS Pages,Changing TS Requirements for Insp of RCP Flywheels | Fuel cladding Liquid penetrant Pressure Boundary Leakage Overspeed trip |
ML20216E660 | 13 September 1999 | Marked-up & Revised TS Pages,Making Permanent One Time Only Changes Incorporated Into TS 3.7.9 Allowing Up to 24 Hours to Restore Control Room Pressure Boundary to Operable Status When Two Cravs Trains Inoperable | Fuel cladding Pressure boundary leak |
ML20211G671 | 27 August 1999 | Proposed Tech Specs 3.1.4 Re Rod Group Alignment Limits | Safe Shutdown Fuel cladding |
ML20210R013 | 10 August 1999 | Revised Tech Specs Bases Pages B 3.4.14-2 & B 3.4.14-6, RCS PIV Leakage | Unidentified leakage |
ML20196H755 | 24 June 1999 | Proposed Tech Specs 2.0, Safety Limits, TS 3.3.1, Reactor Trip Sys Instrumentation & TS 3.4.1, RCS Pressure,Temp & Flow Departure from Nucleate Boiling (DNB) Limits | Shutdown Margin Anticipated operational occurrence Fuel cladding |
ML20195F294 | 10 June 1999 | Proposed Tech Specs,Facilitating one-time Addition of Condition G & Administrative Controls Note to TS 3.7.9, Cravs | Fuel cladding Pressure boundary leak |
ML20206M939 | 6 May 1999 | Proposed Tech Specs,Revising List of Referenced Documents in TS 5.6.5b Re COLR Requirements | Shutdown Margin Post Accident Monitoring Fuel cladding |
ML20206B076 | 6 April 1999 | Proposed Tech Specs Expanding Allowable Values for Interlocks P-6 (Intermediate Range Neutron Flux) & P-10 (Power Range Neutron Flux) in TS 3.3.1,Table 3.3.1-1, Function 16 | |
ML20205L225 | 5 April 1999 | Proposed Tech Specs,Providing Revised SFP Storage Configuration,Revised SFP Storage Criteria & Revised Fuel Enrichment & Burnup Requirements | |
ML20205B623 | 23 March 1999 | Proposed Tech Specs Pages Mark Ups for Unit 1,changing Record for FOL NPF-9 Amend Submittal | |
ML20204F676 | 18 March 1999 | Marked-up Tech Spec Pages Re License Bases Record Change to License Amend Submittals | Post Accident Monitoring |
ML20207C692 | 22 February 1999 | Proposed Tech Specs Bases,Reflecting Removal of SI Signal on Low Steamline Pressure on Page B 3.3.2-16 & Adding Clarification for Increasing Hydrogen Recombiner Power During Testing on Page B 3.6.7-4 | |
ML20198B967 | 9 December 1998 | Revised TS 3.7.11 LCO Bases to Specify That AB Filtered Ventilation Exhaust Sys Is Considered Operable When Associated Two Fans,Filters,Ductwork,Valves & Dampers Are Operable | |
ML20155B211 | 22 October 1998 | Proposed Revs to Improved Tech Specs,Implementing W Fuel as Described in TRs DPC-NE-2009 & DPC-NE-2009P | Post Accident Monitoring |
ML20151Y246 | 15 September 1998 | Proposed Improved Tss,Resolving Items Identified by Util During Review | Shutdown Margin |
ML20151U352 | 8 September 1998 | Proposed Tech Specs & Bases Converting to Improved Tech Specs | Safe Shutdown Boric Acid Time of Discovery Shutdown Margin Reactor Vessel Water Level High Radiation Area Grab sample Offsite Dose Calculation Manual Anticipated operational occurrence Post Accident Monitoring Hydrostatic Operating Basis Earthquake Annual Radiological Environmental Operating Report Stress corrosion cracking Deep Dose Equivalent Fuel cladding Pressure Boundary Leakage Offsite Circuit Power change Unidentified leakage Overspeed trip Eddy-Current Testing Manual Operator Action Operational leakage |
ML20237B624 | 14 August 1998 | Proposed Tech Specs 4.6.5.1.b.2 & 4.6.5.1b.3 Relating to Ice Condenser Ice Bed Changing Portion of Surveillances Pertaining to Lower Inlet Plenum Support Structures & Turning Vanes from 9-month Frequency to 18-month Frequency | Fuel cladding |
ML20237B572 | 12 August 1998 | Proposed Tech Specs 4.6.5.1b.3 Re Ice Condenser Sys Components W/Respect to Accumulation of Frost or Ice | |
ML20237A041 | 5 August 1998 | Suppl 8 to Improved TS Noting Differences Between Two Units. Proposed Changes Require That Specs & Surveillances Apply to Each Unit Individually,Unless Otherwise Noted,Consistent W/Version of Current TS Prior to Amends 166 & 148 | Time of Discovery Hydrostatic |
ML20236U153 | 22 July 1998 | Proposed Revised Improved Tech Specs,Implementing W Fuel as Described in TRs DPC-NE-2009P & DPC-NE-2009 | Post Accident Monitoring Fuel cladding |
ML20236G530 | 29 June 1998 | Rev to Bases of TS 3/4.6/3,correcting Editorial Errors | |
ML20247E389 | 8 May 1998 | Proposed Tech Specs,Revising Power Range Neutron Flux High Trip Setpoints in Event of Inoperable MSSVs & Deleting References to 3-loop Operation in Current TS Section 3.7.1.1(b) & Table 3.7-2 | |
ML20217E653 | 20 April 1998 | Proposed Improved Tech Specs Re Section 1.0,2.0,3.0 & 4.0 | Anticipated operational occurrence Post Accident Monitoring Missed surveillance Pressure and Temperature Limits Report Fuel cladding Grace period |
ML20217B787 | 20 March 1998 | Marked-up Proposed Improved TS 3.6 & 5.5.2 | |
ML20217N931 | 3 March 1998 | Proposed Tech Specs 5.5 Re Meteorological Tower Location | Tornado Missile |
ML20216B985 | 2 March 1998 | Proposed Tech Specs Responding to 980116 RAI Re Improved TS Sections 3.1 & 3.2.Suppl Changes to Improved TS Encl | Safe Shutdown Boric Acid Shutdown Margin Reactor Vessel Water Level Grab sample Anticipated operational occurrence Post Accident Monitoring Missed surveillance Pressure and Temperature Limits Report Fuel cladding Offsite Circuit Power change Unidentified leakage Overspeed trip Manual Operator Action |
ML20197G439 | 17 December 1997 | Proposed Tech Specs Referencing Updated or Recently Approved Methodologies Used to Calculate cycle-specific Limits Contained in COLR | |
ML20198H536 | 17 December 1997 | Tech Spec Pages for TS 3/4.7.8 for Use in Lieu of ASME Section XI Requirements | |
ML20217H554 | 13 October 1997 | Proposed Tech Specs Supporting Replacement of Three Safety Related Narrow Range Refueling Water Storage Tank Level Instruments W/Three Safety Related Wide Range Level Instruments | Boric Acid Shutdown Margin Fuel cladding Manual Operator Action |
ML20212A251 | 6 October 1997 | Proposed Tech Specs Deleting All References to Steam Line Low Pressure Safety Injection Function | Anticipated operational occurrence Fuel cladding Manual Operator Action |
ML20133M554 | 13 January 1997 | Proposed Tech Specs Implementing performance-based Containment Leak Rate Testing Requirements of 10CFR50, App J,Option B | |
ML20133D399 | 6 January 1997 | Proposed Tech Specs 3/4.6 Re Containment Systems | Stroke time Safe Shutdown Earthquake Coatings Local Leak Rate Testing Fuel cladding |
ML20132F000 | 17 December 1996 | Proposed Tech Specs,Supplementing Amend Request to Change Surveillance 4.8.2.1.2.e Which Will Achieve Alignment W/ Improved STS SR 3.8.4.8 | |
ML20135B038 | 26 November 1996 | Proposed Tech Specs 3.8.2 Re DC Sources | |
ML20134M154 | 1 November 1996 | Proposed Tech Specs 3.8.2 Allowing Use of Low Specific Gravity Cells in Vital 125 Volt Dc Sys When Desired | Safe Shutdown |
ML20129F759 | 22 October 1996 | Proposed Tech Specs 3.6.1.5 Re Containment Systems & Air Temp | GOTHIC |
ML20117K101 | 29 August 1996 | Proposed Tech Specs,Replacing 960516 Response to Concerns Re Proposed Changes for Diesel Starting Air Sys Surveillance Testing | Safe Shutdown Offsite Circuit Overspeed trip |
ML20113C720 | 21 June 1996 | Proposed Tech Specs 3.9.6,revising Term Lifting Loads to Lifting Force Used in Manipulator Crane TS 3.9.6b.2 & Redefining Auxiliary Hoist Min Capacities | |
ML20112A757 | 16 May 1996 | Proposed Tech Specs 3/4.8 Re Surveillance Requirements | Offsite Circuit Overspeed trip |
ML20101H610 | 15 March 1996 | Proposed Tech Specs Re Replacement of SGs | Shutdown Margin Operating Basis Earthquake Stress corrosion cracking Earthquake Pressure Boundary Leakage Unidentified leakage Eddy-Current Testing Operational leakage |
ML20101C828 | 8 March 1996 | Proposed Tech Specs Reflecting Separate Vols for Unit 1 & Unit 2 | Safe Shutdown Boric Acid Shutdown Margin Packing leak High Radiation Area Ultimate heat sink Grab sample Offsite Dose Calculation Manual Anticipated operational occurrence Hydrostatic Operating Basis Earthquake Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report Process Control Program Stress corrosion cracking Eddy Current Testing Earthquake Fuel cladding Pressure Boundary Leakage Offsite Circuit Fire Protection Program Grace period Power change Unidentified leakage Overspeed trip Eddy-Current Testing Operational leakage |
ML20100R460 | 4 March 1996 | Proposed Tech Specs,Deleting Flow Monitoring Sys from TS 3.4.6.1 & Associated SRs | Loop seal Grab sample Unidentified leakage |
ML20097G391 | 13 February 1996 | Proposed Tech Specs Re Listing of Core Operating Limit Methodologies for Editorial Correction | Shutdown Margin |
ML20095E957 | 14 December 1995 | Proposed Tech Specs Action Statements & SRs for Dgs, Incorporating Guidance & Recommendations in NUREG-1366,GL 93-05,GL 94-01 & NUREG-1431 | Safe Shutdown High Radiation Area Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report Process Control Program Offsite Circuit Overspeed trip |
ML20095E808 | 12 December 1995 | Proposed Tech Specs,Making McGuire Afd Limit Equations Identical to Previously Approved by NRC for Catawba Nuclear Station | |
ML20095B622 | 5 December 1995 | Proposed TS SR 4.8.2.1.2.e Re 60-month Battery Testing | |
ML20093L286 | 17 October 1995 | Proposed Tech Specs Listings of Core Operating Limit Methodologies | |
ML20098A463 | 18 September 1995 | Proposed Tech Specs,Providing Revised Record Pages for LTOP Protection in TS Amend | Hydrostatic |
ML20092K448 | 18 September 1995 | Proposed Tech Spec Table 2.2-1, Reactor Trip Sys Instrumentation Trip Setpoints | |
ML20092B157 | 1 September 1995 | Proposed Tech Specs,Revising TS 3/4.6.5 to Reduce Required Ice Weight in Containment Ice Condenser of Each Unit from 2,099,790 Lbs to 1,516,800 Lbs | GOTHIC |