IR 05000275/2008402: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
(2 intermediate revisions by the same user not shown)
Line 1: Line 1:
{{Adams|number = ML082180857}}
{{Adams
| number = ML082180857
| issue date = 08/05/2008
| title = IR 05000275-08-402, and IR 05000323-08-402, on 07/17/2008, for Diablo Canyon, Units 1 and 2
| author name = Shannon M
| author affiliation = NRC/RGN-IV/DRS/PSB
| addressee name = Conway J
| addressee affiliation = Pacific Gas & Electric Co
| docket = 05000275, 05000323
| license number = DPR-080, DPR-082
| contact person =
| document report number = IR-08-402
| document type = Letter, Inspection Report
| page count = 2
}}


{{IR-Nav| site = 05000275 | year = 2008 | report number = 402 }}
{{IR-Nav| site = 05000275 | year = 2008 | report number = 402 }}


=Text=
=Text=
{{#Wiki_filter:
{{#Wiki_filter:UNITED STATES NUC LE AR RE G UL AT O RY C O M M I S S I O N ust 5, 2008
[[Issue date::August 5, 2008]]


John T. Conway, Senior Vice President & Chief Nuclear Officer Pacific Gas and Electric Company P.O. Box 3 Mail Code 104/6/601 Avila Beach, CA 93424
==SUBJECT:==
DIABLO CANYON POWER PLANT, UNITS 1 AND 2 - NRC SECURITY INSPECTION REPORT 05000275/2008402 AND 05000323/2008402


SUBJECT: DIABLO CANYON POWER PLANT, UNITS 1 AND 2 - NRC SECURITY INSPECTION REPORT 05000275/2008402 AND 05000323/2008402
==Dear Mr. Conway:==
On July 17, 2008, the U.S. Nuclear Regulatory Commission (NRC) completed a security baseline inspection at your Diablo Canyon Power Plant, Units 1 and 2. The inspection covered one or more of the key attributes of the security cornerstone of the NRC's Reactor Oversight Process. The enclosed inspection report documents the inspection results, which were discussed on July 17, 2008, with Mr. W. G. Guldemond, Director, Site Support Services, and other members of your staff.


==Dear Mr. Conway:==
The inspection examined activities conducted under your license as they relate to security and compliance with the Commissions rules and regulations and with the conditions of your license.
On July 17, 2008, the U.S. Nuclear Regulatory Commission (NRC) completed a security baseline inspection at your Diablo Canyon Power Plant, Units 1 and 2. The inspection covered one or more of the key attributes of the security cornerstone of the NRC's Reactor Oversight Process. The enclosed inspection report documents the inspection results, which were discussed on July 17, 2008, with Mr. W. G. Guldemond, Director, Site Support Services, and other members of your staff. The inspection examined activities conducted under your license as they relate to security and compliance with the Commission's rules and regulations and with the conditions of your license. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.
 
The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.


No findings of significance were identified. In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRC's document system, ADAMS. ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, because of the security-related concerns contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letter's enclosure will not be available for public inspection. In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response, if any. This practice will ensure that your response will not be made available electronically for public inspection in the NRC Public Document Room or from the NRC's document system, ADAMS. If Safeguards Information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21. Otherwise, mark your entire response "Security-Related Information-Withhold Under 10 CFR 2.390" and follow the instructions for withholding in 10 CFR 2.390(b)(1).
No findings of significance were identified.


Sincerely,/RA/ Michael P. Shannon, Chief Plant Support Branch Division of Reactor Safety Docket Nos.: 50-275, 50-323 License Nos.: DPR-80, DPR-82 Nonpublic
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRCs document system, ADAMS.


===Enclosure:===
ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, because of the security-related concerns contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letters enclosure will not be available for public inspection. In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response, if any. This practice will ensure that your response will not be made available electronically for public inspection in the NRC Public Document Room or from the NRCs document system, ADAMS. If Safeguards Information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21. Otherwise, mark your entire response Security-Related Information-Withhold Under 10 CFR 2.390 and follow the instructions for withholding in 10 CFR 2.390(b)(1).
NRC Inspection Report 05000275/2008402 and 05000323/2008402


===w/Attachment:===
Sincerely,
Supplemental Information cc w/o enclosure: James R. Becker, Site Vice President and Station Director Diablo Canyon Power Plant P.O. Box 56 Avila Beach, CA 93424
/RA/
Michael P. Shannon, Chief Plant Support Branch Division of Reactor Safety Docket Nos.: 50-275, 50-323 License Nos.: DPR-80, DPR-82 Nonpublic Enclosure:
NRC Inspection Report 05000275/2008402 and 05000323/2008402 w/Attachment:
Supplemental Information cc w/o enclosure:
James R. Becker, Site Vice President and Station Director Diablo Canyon Power Plant P.O. Box 56 Avila Beach, CA 93424
}}
}}

Latest revision as of 14:19, 14 November 2019

IR 05000275-08-402, and IR 05000323-08-402, on 07/17/2008, for Diablo Canyon, Units 1 and 2
ML082180857
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 08/05/2008
From: Shannon M
Plant Support Branch Region IV
To: Conway J
Pacific Gas & Electric Co
References
IR-08-402
Download: ML082180857 (2)


Text

UNITED STATES NUC LE AR RE G UL AT O RY C O M M I S S I O N ust 5, 2008

SUBJECT:

DIABLO CANYON POWER PLANT, UNITS 1 AND 2 - NRC SECURITY INSPECTION REPORT 05000275/2008402 AND 05000323/2008402

Dear Mr. Conway:

On July 17, 2008, the U.S. Nuclear Regulatory Commission (NRC) completed a security baseline inspection at your Diablo Canyon Power Plant, Units 1 and 2. The inspection covered one or more of the key attributes of the security cornerstone of the NRC's Reactor Oversight Process. The enclosed inspection report documents the inspection results, which were discussed on July 17, 2008, with Mr. W. G. Guldemond, Director, Site Support Services, and other members of your staff.

The inspection examined activities conducted under your license as they relate to security and compliance with the Commissions rules and regulations and with the conditions of your license.

The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.

No findings of significance were identified.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRCs document system, ADAMS.

ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, because of the security-related concerns contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letters enclosure will not be available for public inspection. In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response, if any. This practice will ensure that your response will not be made available electronically for public inspection in the NRC Public Document Room or from the NRCs document system, ADAMS. If Safeguards Information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21. Otherwise, mark your entire response Security-Related Information-Withhold Under 10 CFR 2.390 and follow the instructions for withholding in 10 CFR 2.390(b)(1).

Sincerely,

/RA/

Michael P. Shannon, Chief Plant Support Branch Division of Reactor Safety Docket Nos.: 50-275, 50-323 License Nos.: DPR-80, DPR-82 Nonpublic Enclosure:

NRC Inspection Report 05000275/2008402 and 05000323/2008402 w/Attachment:

Supplemental Information cc w/o enclosure:

James R. Becker, Site Vice President and Station Director Diablo Canyon Power Plant P.O. Box 56 Avila Beach, CA 93424