ML19344E203: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
Line 17: Line 17:
=Text=
=Text=
{{#Wiki_filter:(
{{#Wiki_filter:(
Tlb
Tlb y
  ,
f&          '
y f&          '
Nortaheen Indiana Public Service Compang General Offces l 5265 Hohmen Avenue l Hammond Indena 46325 l Tel.: 8535200 (219)
Nortaheen Indiana Public Service Compang General Offces l 5265 Hohmen Avenue l Hammond Indena 46325 l Tel.: 8535200 (219)
Ir. ' GEN E M. SHORS nn' ? viCE PRESIDENT August 11, 1980 Mr. James G. Keppler Regional Director U.S. Nuclear Regulatory Commission Region III 799 Roosevelt Road Glen Ellyn, IL 60137 RE: NRC IE Bulletin No. 80-19, " Failures of Mercury-Wetted Matrix Relays in Reactor Protection Systems of Operating Nuclear Power Plans Designed by Combustion Engineering"
Ir. ' GEN E M. SHORS nn' ? viCE PRESIDENT August 11, 1980 Mr. James G. Keppler Regional Director U.S. Nuclear Regulatory Commission Region III 799 Roosevelt Road Glen Ellyn, IL 60137 RE: NRC IE Bulletin No. 80-19, " Failures of Mercury-Wetted Matrix Relays in Reactor Protection Systems of Operating Nuclear Power Plans Designed by Combustion Engineering"
Line 26: Line 25:


This is to inform you that Northern Indiana Public Service Company's (NIPSCO's) Bailly Generating Station huclear 1 (BGSN-1) Nuclear Steam Supply System which includes the Reactor Protection System (RPS) is designed by the General Electric Company (GE). The RPS for BGSN-1 has not yet been fabricated. However, NIPSCO, through communication with GE, has been assured that there will be no mercury-wetted relays used in the DPS of BGEN-1.
This is to inform you that Northern Indiana Public Service Company's (NIPSCO's) Bailly Generating Station huclear 1 (BGSN-1) Nuclear Steam Supply System which includes the Reactor Protection System (RPS) is designed by the General Electric Company (GE). The RPS for BGSN-1 has not yet been fabricated. However, NIPSCO, through communication with GE, has been assured that there will be no mercury-wetted relays used in the DPS of BGEN-1.
Very truly yours,
Very truly yours, EMS:jrb i
_      -
                                                                    -
EMS:jrb i
ec:    U.S. Nuclear Regulatory Commission Office of Inspection and Enforcement Division of Rea.: tor Construction Inspection Washington, D.C. 20555                                                                    l l
ec:    U.S. Nuclear Regulatory Commission Office of Inspection and Enforcement Division of Rea.: tor Construction Inspection Washington, D.C. 20555                                                                    l l
,
l                                                                                  .                AUG 121980 8 0 0 82 8 0 Q3[p Q=            .}}
l                                                                                  .                AUG 121980
'
8 0 0 82 8 0 Q3[p
    . . . . .            . . .  -
Q=            .}}

Latest revision as of 06:34, 31 January 2020

Responds to IE Bulletin 80-19, Failures of Mercury-Wetted Matrix Relays in Reactor Protection Sys of Operating Nuclear Power Plants Designed by C-E. Reactor Protection Sys Designed by GE W/O mercury-wetted Relays
ML19344E203
Person / Time
Site: Bailly
Issue date: 08/11/1980
From: Shorb E
NORTHERN INDIANA PUBLIC SERVICE CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
IEB-80-19, NUDOCS 8008280036
Download: ML19344E203 (1)


Text

(

Tlb y

f& '

Nortaheen Indiana Public Service Compang General Offces l 5265 Hohmen Avenue l Hammond Indena 46325 l Tel.: 8535200 (219)

Ir. ' GEN E M. SHORS nn' ? viCE PRESIDENT August 11, 1980 Mr. James G. Keppler Regional Director U.S. Nuclear Regulatory Commission Region III 799 Roosevelt Road Glen Ellyn, IL 60137 RE: NRC IE Bulletin No. 80-19, " Failures of Mercury-Wetted Matrix Relays in Reactor Protection Systems of Operating Nuclear Power Plans Designed by Combustion Engineering"

Dear Mr. Keppler:

This is to inform you that Northern Indiana Public Service Company's (NIPSCO's) Bailly Generating Station huclear 1 (BGSN-1) Nuclear Steam Supply System which includes the Reactor Protection System (RPS) is designed by the General Electric Company (GE). The RPS for BGSN-1 has not yet been fabricated. However, NIPSCO, through communication with GE, has been assured that there will be no mercury-wetted relays used in the DPS of BGEN-1.

Very truly yours, EMS:jrb i

ec: U.S. Nuclear Regulatory Commission Office of Inspection and Enforcement Division of Rea.: tor Construction Inspection Washington, D.C. 20555 l l