ML20010D190
ML20010D190 | |
Person / Time | |
---|---|
Site: | Wolf Creek, Bailly |
Issue date: | 08/17/1981 |
From: | Eichhorn W EICHHORN, EICHHORN & LINK |
To: | Vollen R BUSINESS & PROFESSIONAL PEOPLE FOR THE PUBLIC INTERES |
References | |
NUDOCS 8108240088 | |
Download: ML20010D190 (1) | |
Similar Documents at Wolf Creek, Bailly | |
---|---|
Category:CORRESPONDENCE-LETTERS
MONTHYEAR05000482/LER-1999-002, Forwards LER 99-002-00,re Identification of Surveillance Performed in Modes Other than Those Required by TS SR 4.6.3.2.a.Commitments Made by Util Are Encl1999-10-15015 October 1999
[Table view]Forwards LER 99-002-00,re Identification of Surveillance Performed in Modes Other than Those Required by TS SR 4.6.3.2.a.Commitments Made by Util Are Encl 05000482/LER-1994-014, Forwards LER 94-014-00 Re Util Identification of Missed Surveillance Required by TS Prior to Changing Modes.List of Commitments Made by Licensee,Encl1999-10-15015 October 1999 Forwards LER 94-014-00 Re Util Identification of Missed Surveillance Required by TS Prior to Changing Modes.List of Commitments Made by Licensee,Encl ML20217F7481999-10-14014 October 1999 Informs That Based on Approval of Core Assessment Damage Guidance in WCAP-14696,rev 1 for Westinghouse Nuclear Power Plants,Licensee May Use WCAP-14696,rev 1 at Wolf Creek Generating Station ML20217F8701999-10-13013 October 1999 Provides Summary of Meeting on 991007 with Representatives of Wolf Creek Nuclear Station in Burlington,Kansas Re Status of Licensee Radiation Protection Program.List of Meeting Attendees & Licensee Presentation Encl ML20217C1721999-10-0707 October 1999 Forwards Insp Rept 50-482/99-09 on 990830-0903.No Violations Noted.Purpose of Insp to Perform Routine Operational Status Insp of Emergency Preparedness Program & to Resolve Questions Re Revised Emergency Plan ML20217A4881999-09-29029 September 1999 Forwards Changes to Plant Data Point Library,Iaw 10CFR50,App E,Section VI.3.a.ERDS Point Affected Is RDS0001 ML20216H9291999-09-29029 September 1999 Informs That Licensee Responses to GL 97-06, Degradation of Steam Generator Internals Acceptable & Did Not Identify Any New Concerns with Condition of SG Intervals at Plant ML20212G1681999-09-24024 September 1999 Notifies NRC of Change in Status of Licensed Individual at Plant,Per 10CFR50.74.RL Acree Holds License OP-42654 at Plant,But Has Been Permanently Reassigned from Position for Which Plant Has Certified Need for RO License ML20216F9591999-09-22022 September 1999 Forwards Withdrawal of Amend Request Re Ultimate Heat Sink Temp for Wolf Creek Generating Station ML20212G5641999-09-20020 September 1999 Forwards Insp Rept 50-482/99-13 on 990725-0904.Three Violations Being Treated as Noncited Violations 05000482/LER-1999-011, Forwards LER 99-011-00 Re Identification of Missed Surveillance Due to Exceeding Flow Rate Specified in TS for Ccps.List of Util Commitments Contained in Attachment I1999-09-17017 September 1999 Forwards LER 99-011-00 Re Identification of Missed Surveillance Due to Exceeding Flow Rate Specified in TS for Ccps.List of Util Commitments Contained in Attachment I ML20212D9381999-09-16016 September 1999 Informs That NRC Staff Completed Midcycle PPR of WCGS on 990818.Areas of EP & Engineering Warranted Increase in NRC Action.Nrc Plan to Conduct Add Insp Beyond Core Insp Program Over Next 7 Months to Address Listed Questions 05000482/LER-1999-010, Forwards LER 99-010-00,re Failure to Correctly Perform TS Surveillance 4.3.3.6.Encl Identifies Actions Committed to by Util1999-09-16016 September 1999 Forwards LER 99-010-00,re Failure to Correctly Perform TS Surveillance 4.3.3.6.Encl Identifies Actions Committed to by Util ML20212C9211999-09-15015 September 1999 Forwards NRC Form 536, Operating Licensing Examination Data, in Response to NRC Administrative Ltr 99-03 05000482/LER-1999-006, Forwards LER 99-006-01,re Identification of Failure to Enter LCO for TS 3.6.1.1 While Taking Containment Atmosphere Samples During Power Operation.Commitments Made by Util Are Encl1999-09-15015 September 1999 Forwards LER 99-006-01,re Identification of Failure to Enter LCO for TS 3.6.1.1 While Taking Containment Atmosphere Samples During Power Operation.Commitments Made by Util Are Encl ML20216F1641999-09-14014 September 1999 Forwards Insp Rept 50-482/99-12 on 990816-20.No Violation Noted.Determined That Solid Radwaste Mgt & Radioactive Matls Transportation Programs Were Properly Implemented 05000482/LER-1999-009, Forwards LER 99-009-00 Re Util Identification of Fire Suppression Issue Affecting Safe Shutdown Components. Attachment I Identifies Actions Committed to by Licensee in Encl LER1999-09-10010 September 1999 Forwards LER 99-009-00 Re Util Identification of Fire Suppression Issue Affecting Safe Shutdown Components. Attachment I Identifies Actions Committed to by Licensee in Encl LER ML20212A5651999-09-10010 September 1999 Informs of Completion of Review of & Encl Objectives for Wolf Creek Generating Station 1999 Emergency Preparedness Exercise Scheduled for 991117.Determined Exercise Objectives Appropriate to Meet EP Requirements ML20211M7151999-09-0303 September 1999 Forwards Changes to Wolf Creek Generating Station Data Point Library.Emergency Response Data Sys Points Affected Are EJL0007 & EJL0008 05000482/LER-1999-008, Forwards LER 99-008-00,re Efsa at Plant.Attachment I Identifies Actions Committed to by Licensee in LER1999-09-0303 September 1999 Forwards LER 99-008-00,re Efsa at Plant.Attachment I Identifies Actions Committed to by Licensee in LER ML20211K8301999-09-0202 September 1999 Forwards marked-up TS Page Deleting Inequality Signs from Trip Setpoints in SR 3.3.5.3 & Reflecting Info on Calibr Tolerance Band,Per 990708 Application to Amend License NPF-42 ML20211N0081999-09-0202 September 1999 Informs That NRC Staff Has Reviewed Submittals & Concluded Util Adequately Addressed Actions Requested in GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power- Operated Gate Valves ML20211K1941999-08-31031 August 1999 Forwards Rev 31 to WCGS Physical Security Plan,Safeguards Contingency Plan & Training & Qualification Plan,Iaw 10CFR50.54(p).Encl Withheld,Per 10CFR73.21 ML20211H1491999-08-26026 August 1999 Forwards Insp Rept 50-482/99-16 on 990809-13.No Violations Noted.Insp Focused on Low as Is Reasonably Achievable Program,Training Program for Contract Radiation Protection Personnel & Radiation Protection QA Program ML20211A8581999-08-18018 August 1999 Forwards Insp Rept 50-482/99-08 on 990316-0724.One Violation Being Treated as Noncited Violation ML20211G2201999-08-17017 August 1999 Forwards Exam Rept 50-482/99-301 on 990726-29.Exam Evaluated Six Applicants for SO Licenses & Three Applicants for RO Licenses ML20210U0991999-08-13013 August 1999 Forwards Insp Rept 50-482/99-11 on 990712-16.No Violations Noted.Insp Was to Review Radiological Environ Monitoring Program ML20210U9751999-08-13013 August 1999 Informs That Licensee Identified That Answer Key for One Question on 990720 Written Exam & Event Classification for on Job Performance Measure Required Mod.Description & Justification for Proposed Mod,Including Technical Ref,Encl ML20210R5621999-08-12012 August 1999 Forwards Monthly Operating Rept for July 1999 for Wolf Creek Generating Station,Per TS 6.9.1.8 & GL 97-02.Revised Repts for Apr,May & June 1999,correcting Number of Hours Reactor Critical,Encl ML20211A9501999-08-12012 August 1999 Discusses 990720-21 Workshop Conducted in Region IV Ofc,Re Exchange of Info in Area of Use of Risk Insights in Regulatory Activities.List of Attendees,Summary of Topic & Issues,Agenda & Copies of Handouts Encl ML20210P7491999-08-0909 August 1999 Ack Receipt of ,Which Transmitted Wolf Creek Radiological Emergency Response Plan 06-002,Rev 0,under Provisions of 10CFR50,App E,Section V ML20210L1461999-08-0303 August 1999 Informs That NRC Plans to Administer Gfes of Written Operator Licensing Exam on 991006.Requests Submittal of Ltr Identifying Individuals Taking Exam,Personnel Allowed Access to Exams & Mailing Address for Exams ML20210N0061999-08-0303 August 1999 Forwards Response to NRC 990401 RAI Re GL 95-07, Pressure Locking & Thermal Binding of SR Motor-Operated Gate Valves ML20210J1371999-07-29029 July 1999 Requests NRC Approval of Methodology for Determining RCS Pressure & Temp & Overpressure Mitigation Sys PORV Limits. Attachment I Provides Proposed Changes to Improved TS ML20210H2551999-07-29029 July 1999 Provides 180-day Response to NRC Request for Info Re GL 99-02, Lab Testing of Nuclear-Grade Activated Charcoal ML20210F5931999-07-27027 July 1999 Forwards semi-annual Fitness for Duty Performance Data Rept for Wcnoc,Per 10CFR26.71(d).Rept Covers Period of 990101- 0630 ML20210F5881999-07-23023 July 1999 Submits Response to Administrative Ltr 99-02, Operator Reactor Licensing Action Estimates, ML20210B8191999-07-20020 July 1999 Ack Receipt of ,Which Transmitted Wolf Creek EP Implementing Procedure 06-005,Rev 1.Implementation of Changes Will Be Subj to Insp to Confirm That Changes Does Not Decrease Effectiveness of EP ML20209H5411999-07-15015 July 1999 Forwards Insp Rept 50-482/99-07 on 990614-18.No Violations Noted.Insp Focused on Radiation Program During Normal Operating Conditions ML20209H0751999-07-14014 July 1999 Forwards Monthly Operating Rept for June 1999 for Wolf Creek Generating Station,Per TS 6.9.1.8 & GL 97-02.Max Dependable Capacity Has Been Updated from 1163 to 1170,as Determined by Calculations Based on Capacity Test Results of July 1998 ML20209H0441999-07-14014 July 1999 Forwards Response to NRC 990326 RAI Re GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Movs. Summary of Util Commitments Provided in Attachment 2 ML20209G9871999-07-14014 July 1999 Informs of Changes Affecting Wolf Creek Security Plan,Per 10CFR50.54(p)(2).Encl Provides Description of Changes & Justification for Changes ML20209E3581999-07-12012 July 1999 Discusses Util 980925 Response to GL 92-01,Rev 1,Suppl 1, Rv Structural Integrity, Issued on 950519 to Wolf Creek Generating Station ML20209E0611999-07-0808 July 1999 Forwards Addl Pages to Rev 12 of USAR & Commitment Changes, Inadvertently Omitted from 990311 Submittal ML20196K8231999-07-0606 July 1999 Submits Kansas Electric Power Cooperative,Inc Ltr Pursuant to Commission Direction in Memo & Order CLI-99-19.Addresses Disposition of Existing Antitrust Conditions Attached to License for Wolf Creek Unit 1 Re Proposed License Transfer ML20209C6031999-07-0606 July 1999 Provides Applicants View as Result of 990618 Memo & Order Directing Parties to Address Proper Disposition of Existing Antitrust License Condition Attached to OL for Facility Due to Planned Changes in Ownership of Facility.With Svc List ML20196K0501999-07-0202 July 1999 Forwards Insp Rept 50-482/99-06 on 990502-0612.Three Violations Occurred & Being Treated as Noncited Violations, Consistent with App C of Enforcement Policy ML20209B7131999-07-0101 July 1999 Submits Response to NRC Request for Info Re GL 98-01, Suppl 1, Y2K Readiness of Computer Sys at Npps. Response on Status of Facility Y2K Readiness Was Requested by 990701.Disclosure Encl ML20209A7461999-06-29029 June 1999 Informs of Changes in Project Mgt Staff Assigned to Wcgs. Effective 990628,J Donohew Will Assume PM Responsibilities ML20209B5151999-06-29029 June 1999 Informs That Util Completed Analyses & Modifications to Address Items Discussed in GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design-Basis Accident Conditions 1999-09-03 Category:EXTERNAL CORRESPONDENCE MONTHYEARML20141K4131997-05-20020 May 1997
[Table view]Submits Evaluation of Ameron Corrective Action Status Rept to Wolf Creek Supplier Quality Audit Findings ML20141K4041997-03-28028 March 1997 Informs That Wolf Creek Evaluated Ameron Response to Findings Identified During Audit Conducted on 970122-23 & 970128-31.Evaluation Found Responses to Findings Ron 01/97-001-011 Conditionally Accepted ML20141K6441997-02-27027 February 1997 Forwards WCNOC Supplier Quality Rept of NUPIC Joint Audit Performed by Wcnoc,Union Electric & TVA of Brea,California Facility on 970122-23 & Little Rock,Ar Facility on 970128-31 ML20081D5081995-03-0101 March 1995 Forwards Analysis Summary Rept Re RCS Drain Down Event,Rept Summarizes Analyses to Determine RCS & ECCS Conditions During Actual Event ML20077K4511991-07-25025 July 1991 Forwards Chapter 14 to Updated Sar,Initial Startup Rept, Documents in Response to Item 4,operating License for Facility & Milestone Schedule,Per NRC ML20072P0161983-07-13013 July 1983 Informs That No Changes to Emergency Plan Adopted Since Nov 1982 Rev,In Response to .Certificate of Svc Encl ML20076L6011983-07-11011 July 1983 Discusses Status of 830406 Proposed Stipulation of Contentions.No Agreement Reached Amongst Counsel at 830427 Conference Call.Fema Cannot Commit Resources to Preparing Testimony for 830830 Prefiling ML20076L5781983-07-11011 July 1983 Discusses Status of 830406 Proposed Stipulation of Contentions.No Agreement Reached Amongst Counsel at 830427 Conference Call.Fema Cannot Commit Resources to Preparing Testimony for 830830 Prefiling ML20083P3761983-01-13013 January 1983 Advises of Establishment of Task Force to Oversee Completion of Bm,Ef & Eg Sys,Preparation & Completion of Associated Quality Documentation & Review of Documentation.Task Force Will Commence on 830120 & Be Chartered for 30 Days ML20049J5861982-03-11011 March 1982 Requests Status Rept on Util Implementation of Revised Restoration Plan ML20010J5791981-09-29029 September 1981 Forwards Applicant Further Response to Financial Qualifications Discovery Requests of Intervenor Kansans for Sensible Energy.Related Correspondence ML20010D1901981-08-17017 August 1981 Ack Receipt of 810813 Ltr Requesting Rescheduling of Osann Deposition.Lists Available Dates for Rescheduling.Related Correspondence ML20010B4131981-08-0606 August 1981 Responds to Rj Vollen 810803 Ltr Re 810731 Press Releases on Util Financial Repts.Qualified Audit Rept Will Be Available on or Before 810831.Press Release Encl ML20009H4201981-07-31031 July 1981 Confirms That Rj Bohn Deposition Will Continue on 810814 & AP Severance Depositon Will Commence on 810821,per 810730 Telcon.Related Correspondence ML20009E2121981-07-21021 July 1981 Forwards Proposed Agreement Per ASLB 810522 Memorandum & Order Granting Protective Order to Ge,For Review & Reply. Relevant Documents Available for Insp ML20009E0931981-07-21021 July 1981 Forwards Bohn Deposition Exhibit 2.W/o Encl ML20009B7951981-07-0808 July 1981 Ack Receipt of Ah Petersen,Fg Hiple & CR Kulawinski 810629 Notice of Depositions.Util Pending Motion Suggests Depositions Not Be Scheduled After 810731.Earlier Date Requested ML20008G1091981-06-24024 June 1981 Ack Receipt of Wh Eichhorn 810623 Response to Porter County Chapter Intervenors' 810615 Request for Documents Filed W/ NRC Per Generic Ltr 81-23.Requests Documents When & If Available.Related Correspondence ML20004F7691981-06-15015 June 1981 Requests That Any Repts from Facility Submitted to NRC Per Generic Ltr 81-23 Also Be Submitted to Porter County Chapter Intervenors.Related Correspondence ML20004F6351981-06-15015 June 1981 Informs That Wh Eichhorn Furnished Copy of Answers of People of State of Il to Licensee Second Set of Interrogatories. Requests Correction of Svc List Used by Il.Certificate of Svc Encl.Related Correspondence ML20004C6491981-05-29029 May 1981 Forwards Northern in Public Svc Co Latest Cost Estimate & Documents in Supplementary Response to Item 6(a) of Third Request for Production of Documents.Requests Prompt Return of Documents.Related Correspondence.W/O Encl ML19350E2901981-05-29029 May 1981 Ack Receipt of Constituent Ltr.Subj of Ltr Does Not Fall within DOE Purview & Will Be Forwarded to NRC ML20005B3311981-05-29029 May 1981 Informs That 810529 Ltr Forwarding Constituent 810320 Comments on Proposed Rule 10CFR2 Allowing Interim Licensing of Nuclear Reactors Before Safety Procedure Completion Has Been Sent to NRC ML19352A9501981-05-29029 May 1981 Comments on Revision 1 to Environ Rept for Facility,Per 810506 Request.Lists Species Present in Proposed Project Area.Nrc Should Evaluate Possible Effects of Const on Listed Endangered Species ML19346A0531981-05-28028 May 1981 Poses Addl Questions Re Const Permit Extension to Obtain Info Omitted from First Set of Interrogatories.First Set of Answers Were Not Sufficiently Detailed.Related Correspondence ML20004B7021981-05-19019 May 1981 Responds to 810428 Ltr Re Motion to Compel Answers to Porter County Chapter Intervenors' First Set of Interrogatories to Util.Ltr Is Not Proper Substitute for Answer to Interrogatory ML19347F4221981-05-14014 May 1981 Advises That Proposed Action Re Revision 1 to Environ Rept Does Not Affect Ongoing or Planned Water & Power Projects ML19345H5851981-05-0707 May 1981 Ack Receipt of 810505 Ltr Demanding Documents.Documents Requested Will Be Delivered During Week of 810511.Two Documents Beyond Discovery Scope,One Proprietary Document & One Other Document Removed.Related Correspondence ML20008G1201981-05-0505 May 1981 Requests Prompt Delivery of Documents Per Porter County Chapter Intervenors Second & Third Requests to Produce Directed to Util ML20003J3781981-04-28028 April 1981 Discusses Concerns Re Util Answers to Porter County Chapter Intervenors' First Set of Interrogatories.Prefers Settling Differences W/O ASLB Ruling ML20126H9441981-04-10010 April 1981 Forwards Util 810410 First Set of Interrogatories Re Dewatering Effects on Lakeshore,Expert Witnesses to Be Called & Documents to Be Introduced Into Evidence or Used in cross-examination.Related Correspondence ML20126H9761981-04-10010 April 1981 Forwards Util 810410 First Set of Interrogatories Re Dewatering Effects on Lakeshore,Expert Witnesses to Be Called & Documents to Be Introduced Into Evidence or Used in cross-examination.Related Correspondence ML19345G8861981-04-0808 April 1981 Responds to 810403 Ltr Requesting Addl Info Re Production of Documents.All Documents Produced in Response to Paragraphs 9,10 & 11 Available for Insp.Page Count of Documents to Be Produced Not Available.Related Correspondence ML19347D9601981-04-0303 April 1981 Ack Receipt of 810325 Ltr.Requests to Be Informed of Possibility of Documents from Second Request & Quantity of Addl Info to Be Produced ML19345G5301981-03-25025 March 1981 Responds to 810313 Ltr Re Documents Identified in First & Second Requests for Production of Documents Per ASLB 801120 Order.Documents Tending to Prove or Disprove Any Assertion Not to Be Produced.Related Correspondence ML19350E3031981-03-20020 March 1981 Requests Congressional Assistance to Require NRC to Expedite Licensing of Nuclear Power Plants.Facility Fuel Load Delays Discussed.Aif Ltr Dtd 810217 Forwarded ML20003E2071981-03-13013 March 1981 Requests Production by 810406 of CP Extension Documents Requested in ASLB 801120 Discovery Order ML20003E2451981-03-13013 March 1981 Submits Formal Request That Listed Documents Be Produced on or Before 810406,per ASLB 801120 Order Re Discovery ML19347D2341981-02-18018 February 1981 Forwards Response to Util 801208 Ltr Re Site Groundwater Analysis.D'Appolonia Consulting Engineers Rept Criticizing USGS Contains Only Repetition of Known & Ack Methodology Limitations.Internal Doi Memos Encl ML19351G2761981-02-12012 February 1981 Forwards Sargent & Lundy 781030 Rept, Hydrogeologic Evaluation of Const Dewatering,Bailly Generating Station, Nuclear 1. Other Requested Documents Have Already Been Produced.Certificate of Svc Encl.W/O Rept ML20126E7471981-02-0505 February 1981 Ack Receipt of Re Comments on Dewatering Rept. Panel Completed Work.No Plans Made to Reconvene Group. Studies of Cowles Bog & Wetlands & Effects of Dewatering on Lakeshore Will Continue.Certificate of Svc Encl ML19344B3241980-08-12012 August 1980 Informs That Council Has Reviewed 800527 Ltr Re Application of NEPA Future Decisions Concerning Facility.Council Concludes That NRC Should Prepare & Circulate Suppl to EIS on CP Prior to Rendering Decision ML19309A5141980-03-21021 March 1980 Forwards Three Sargent & Lundy Repts & 780413,790629 & 0814 Ltrs,Re H-pile Foundations in Response to NRC Request.W/O Encl ML19322E7941980-02-29029 February 1980 Responds to Eichhorn 800227 Ltr.Arrangements Will Be Made Re Pick Up of Applicant Responses to Supplemental Petitions at Convenient Time.Certificate of Svc Encl ML19270G1781979-04-27027 April 1979 Supports Nationwide Halt to Nuclear Plant Const.Cites Wolf Creek Controversy as Example ML20027A4981978-11-30030 November 1978 Presents Results of Review of Low Strength Values for Facility Base Mat 90-day Concrete Cylinders.Base Mat Concrete Meets Spec Requirements & All Matls Used in Mix Are Acceptable ML20027A5001978-04-19019 April 1978 Forwards Dh Campbell & Lm Meyer Repts W/Results of Petrographic Examination,Compressive Strengths & Chem Analysis of Concrete Cylinders & Other Samples.Basemat Concrete Probably Exceeds 5000 Psi Strength Requirement 1997-05-20 Category:EXTERNAL LETTERS ROUTED TO NRC MONTHYEARML20072P0161983-07-13013 July 1983
[Table view]Informs That No Changes to Emergency Plan Adopted Since Nov 1982 Rev,In Response to .Certificate of Svc Encl ML20076L6011983-07-11011 July 1983 Discusses Status of 830406 Proposed Stipulation of Contentions.No Agreement Reached Amongst Counsel at 830427 Conference Call.Fema Cannot Commit Resources to Preparing Testimony for 830830 Prefiling ML20076L5781983-07-11011 July 1983 Discusses Status of 830406 Proposed Stipulation of Contentions.No Agreement Reached Amongst Counsel at 830427 Conference Call.Fema Cannot Commit Resources to Preparing Testimony for 830830 Prefiling ML20083P3761983-01-13013 January 1983 Advises of Establishment of Task Force to Oversee Completion of Bm,Ef & Eg Sys,Preparation & Completion of Associated Quality Documentation & Review of Documentation.Task Force Will Commence on 830120 & Be Chartered for 30 Days ML20049J5861982-03-11011 March 1982 Requests Status Rept on Util Implementation of Revised Restoration Plan ML20010J5791981-09-29029 September 1981 Forwards Applicant Further Response to Financial Qualifications Discovery Requests of Intervenor Kansans for Sensible Energy.Related Correspondence ML20010D1901981-08-17017 August 1981 Ack Receipt of 810813 Ltr Requesting Rescheduling of Osann Deposition.Lists Available Dates for Rescheduling.Related Correspondence ML20010B4131981-08-0606 August 1981 Responds to Rj Vollen 810803 Ltr Re 810731 Press Releases on Util Financial Repts.Qualified Audit Rept Will Be Available on or Before 810831.Press Release Encl ML20009H4201981-07-31031 July 1981 Confirms That Rj Bohn Deposition Will Continue on 810814 & AP Severance Depositon Will Commence on 810821,per 810730 Telcon.Related Correspondence ML20009E0931981-07-21021 July 1981 Forwards Bohn Deposition Exhibit 2.W/o Encl ML20009E2121981-07-21021 July 1981 Forwards Proposed Agreement Per ASLB 810522 Memorandum & Order Granting Protective Order to Ge,For Review & Reply. Relevant Documents Available for Insp ML20009B7951981-07-0808 July 1981 Ack Receipt of Ah Petersen,Fg Hiple & CR Kulawinski 810629 Notice of Depositions.Util Pending Motion Suggests Depositions Not Be Scheduled After 810731.Earlier Date Requested ML20008G1091981-06-24024 June 1981 Ack Receipt of Wh Eichhorn 810623 Response to Porter County Chapter Intervenors' 810615 Request for Documents Filed W/ NRC Per Generic Ltr 81-23.Requests Documents When & If Available.Related Correspondence ML20004F6351981-06-15015 June 1981 Informs That Wh Eichhorn Furnished Copy of Answers of People of State of Il to Licensee Second Set of Interrogatories. Requests Correction of Svc List Used by Il.Certificate of Svc Encl.Related Correspondence ML20004F7691981-06-15015 June 1981 Requests That Any Repts from Facility Submitted to NRC Per Generic Ltr 81-23 Also Be Submitted to Porter County Chapter Intervenors.Related Correspondence ML20004C6491981-05-29029 May 1981 Forwards Northern in Public Svc Co Latest Cost Estimate & Documents in Supplementary Response to Item 6(a) of Third Request for Production of Documents.Requests Prompt Return of Documents.Related Correspondence.W/O Encl ML19350E2901981-05-29029 May 1981 Ack Receipt of Constituent Ltr.Subj of Ltr Does Not Fall within DOE Purview & Will Be Forwarded to NRC ML20005B3311981-05-29029 May 1981 Informs That 810529 Ltr Forwarding Constituent 810320 Comments on Proposed Rule 10CFR2 Allowing Interim Licensing of Nuclear Reactors Before Safety Procedure Completion Has Been Sent to NRC ML19352A9501981-05-29029 May 1981 Comments on Revision 1 to Environ Rept for Facility,Per 810506 Request.Lists Species Present in Proposed Project Area.Nrc Should Evaluate Possible Effects of Const on Listed Endangered Species ML19346A0531981-05-28028 May 1981 Poses Addl Questions Re Const Permit Extension to Obtain Info Omitted from First Set of Interrogatories.First Set of Answers Were Not Sufficiently Detailed.Related Correspondence ML20004B7021981-05-19019 May 1981 Responds to 810428 Ltr Re Motion to Compel Answers to Porter County Chapter Intervenors' First Set of Interrogatories to Util.Ltr Is Not Proper Substitute for Answer to Interrogatory ML19347F4221981-05-14014 May 1981 Advises That Proposed Action Re Revision 1 to Environ Rept Does Not Affect Ongoing or Planned Water & Power Projects ML19345H5851981-05-0707 May 1981 Ack Receipt of 810505 Ltr Demanding Documents.Documents Requested Will Be Delivered During Week of 810511.Two Documents Beyond Discovery Scope,One Proprietary Document & One Other Document Removed.Related Correspondence ML20008G1201981-05-0505 May 1981 Requests Prompt Delivery of Documents Per Porter County Chapter Intervenors Second & Third Requests to Produce Directed to Util ML20003J3781981-04-28028 April 1981 Discusses Concerns Re Util Answers to Porter County Chapter Intervenors' First Set of Interrogatories.Prefers Settling Differences W/O ASLB Ruling ML20126H9441981-04-10010 April 1981 Forwards Util 810410 First Set of Interrogatories Re Dewatering Effects on Lakeshore,Expert Witnesses to Be Called & Documents to Be Introduced Into Evidence or Used in cross-examination.Related Correspondence ML20126H9761981-04-10010 April 1981 Forwards Util 810410 First Set of Interrogatories Re Dewatering Effects on Lakeshore,Expert Witnesses to Be Called & Documents to Be Introduced Into Evidence or Used in cross-examination.Related Correspondence ML19345G8861981-04-0808 April 1981 Responds to 810403 Ltr Requesting Addl Info Re Production of Documents.All Documents Produced in Response to Paragraphs 9,10 & 11 Available for Insp.Page Count of Documents to Be Produced Not Available.Related Correspondence ML19347D9601981-04-0303 April 1981 Ack Receipt of 810325 Ltr.Requests to Be Informed of Possibility of Documents from Second Request & Quantity of Addl Info to Be Produced ML19345G5301981-03-25025 March 1981 Responds to 810313 Ltr Re Documents Identified in First & Second Requests for Production of Documents Per ASLB 801120 Order.Documents Tending to Prove or Disprove Any Assertion Not to Be Produced.Related Correspondence ML19350E3031981-03-20020 March 1981 Requests Congressional Assistance to Require NRC to Expedite Licensing of Nuclear Power Plants.Facility Fuel Load Delays Discussed.Aif Ltr Dtd 810217 Forwarded ML20003E2071981-03-13013 March 1981 Requests Production by 810406 of CP Extension Documents Requested in ASLB 801120 Discovery Order ML20003E2451981-03-13013 March 1981 Submits Formal Request That Listed Documents Be Produced on or Before 810406,per ASLB 801120 Order Re Discovery ML19347D2341981-02-18018 February 1981 Forwards Response to Util 801208 Ltr Re Site Groundwater Analysis.D'Appolonia Consulting Engineers Rept Criticizing USGS Contains Only Repetition of Known & Ack Methodology Limitations.Internal Doi Memos Encl ML19351G2761981-02-12012 February 1981 Forwards Sargent & Lundy 781030 Rept, Hydrogeologic Evaluation of Const Dewatering,Bailly Generating Station, Nuclear 1. Other Requested Documents Have Already Been Produced.Certificate of Svc Encl.W/O Rept ML20126E7471981-02-0505 February 1981 Ack Receipt of Re Comments on Dewatering Rept. Panel Completed Work.No Plans Made to Reconvene Group. Studies of Cowles Bog & Wetlands & Effects of Dewatering on Lakeshore Will Continue.Certificate of Svc Encl ML19344B3241980-08-12012 August 1980 Informs That Council Has Reviewed 800527 Ltr Re Application of NEPA Future Decisions Concerning Facility.Council Concludes That NRC Should Prepare & Circulate Suppl to EIS on CP Prior to Rendering Decision ML19309A5141980-03-21021 March 1980 Forwards Three Sargent & Lundy Repts & 780413,790629 & 0814 Ltrs,Re H-pile Foundations in Response to NRC Request.W/O Encl ML19322E7941980-02-29029 February 1980 Responds to Eichhorn 800227 Ltr.Arrangements Will Be Made Re Pick Up of Applicant Responses to Supplemental Petitions at Convenient Time.Certificate of Svc Encl ML19270G1781979-04-27027 April 1979 Supports Nationwide Halt to Nuclear Plant Const.Cites Wolf Creek Controversy as Example ML20027A4981978-11-30030 November 1978 Presents Results of Review of Low Strength Values for Facility Base Mat 90-day Concrete Cylinders.Base Mat Concrete Meets Spec Requirements & All Matls Used in Mix Are Acceptable ML20027A5001978-04-19019 April 1978 Forwards Dh Campbell & Lm Meyer Repts W/Results of Petrographic Examination,Compressive Strengths & Chem Analysis of Concrete Cylinders & Other Samples.Basemat Concrete Probably Exceeds 5000 Psi Strength Requirement 1983-07-13 |
Text
.
IU UTE!) CU ;ESiO W T G ElCHHORN, EICHHORN & LINK FREDE Recm r. ocwMoRN,sR. ATTCMNEYS AT law wlLLI A M M. EsCH MOR N S243 HO M M AN AV E NU E FR EDE RIC n H. LIN N J AM E S J. N AGY H AM MON D, I N DI AN A TELEPH3NE DAVID C.J E NS E N 46320 .3, o o R*CM ARD M. ScMuMacHER A R E A CO D E 219
" ' " ' ~ " * " ~ >
August 17, 1981 3 PAJL A. R AM E "(
RICHARD A. H ANNING /' ,
M AURE E N JOHNS GRIM MER [
G g 30 N > -
Mr. Robert J. Vollen 'h , ,d G c/o BPI \A' 109 North Doctrborn Street g
g llinois 60602 D[ 8
/- Y\
Re: In the Matter of Northe_n Indiana Public Servide> \.\, l($ g]Vd' Company (BaillyGeneratingStation, Nuclear-lg Docket No. 50-367 i_f , ..,p 2 1 gpj ra kO m (Construction Permit Extension) Q &g,ygh cc
- 7
Dear Mr. Vollen:
\/,q -
c3 7 , '
I have your letter of August 13 advising that Mr. Osann would'2 -
not be available on August 20 for the purpose of deposition.
If on July 17 you advised me of a personal commitment which precluded your availability on August 20, I had forgotten it and did not intentionally schedule Mr. Osann's deposition to conflict with your schedule. I apologize for this oversight on my part. As you know, I have never objected to rescheduling depositions to meet the convenience of the parties or the deponents.
I suggest that Mr. Osann's deposition be rescheduled for any of the following dates: September 2, 4, 5, 8, 10, 11, 14, 15, 16, 17, 18, 19, 21, 22, 23, 24, 25, 26, 28, 29 or 30. I recognize that you have requested the Board to issue subpoenas for taking of depositions of various people ou many of the suggested dates; however, the Board has not granted your request for any subpoenas at this time and thus all of the above-referenced dates should be available for the taking of the deposition of Mr. Osann.
Please advise me of a convenient date from those listed above for the taking of Mr. Osann's deposition so that I may make the necessary arrangements. o3 5
l Yours very truly, /
i
\ EICHHORN, EICHHORN & LINK llo i
/ + .
i By: [b William H. Ei'6 hor'h WHE/dgg cc: Service List l 0108240088 8108 -
PDR ADOCK 05000 G