{{#Wiki_filter:0
                                                                              ,3,9 I
ENCLOSURE            ,
HARTSVILLE NUCLEAR PLANT - ALL UNITS WIRING DISCREPANCIES IN HIGH PRESSURE CORE SPRAY METAL-CLAD SWITCHGEAR        i 10CFR50 55(e) REPORT NO.1 (INTERIH)                          l NCR HNP-A-090 Gn March 25, 1980, TVA informed NRC-0IE Region II, Inspector R. W.
Wright, of a reportable deficiency under 10CFR50.55(e) involving wiring discrepancies on the high pressure core spray (HPCS) metal-clad        ;
switchgear.
This is the first interim report n this reportable deficiency. TVA will transmit a final report on this deficiency on or before August 29, 1980.
Descriotion of Deficiencies Wiring checks by Hartsville site personnel disclosed wiring discrepancies in the HPCS metal-clad switchgear. These discrepancies          j involve wiring terminations which'do not match the wiring diagrams, errors on the wiring diagrams, missing wires, mislabeling or nonlabeling of parts or terminations, and examples of discrepancies between bill of materials and installed components.
Also, as discussed with R. W. Wright, the wiring check disclosed six GE SB-12 auxiliary switches with either no date codes or date codes from August 1,1978, to July 1,1979          This was previously indicated in TVA NCR 2-1 (final report filed August 16, 1979) as the date code for potentially defective SB-12 auxiliary switches. The potentially defective SB-12 switches were not discovered in the HPCS metal-clad switchgear because this switchgear was initially shipped to Hartsville before August 1, 1978. However, the subject switchgear had been shipped back to GE's Switchboard Division (GE-SBD) in November 1978 to have work done on ML-13 operating mechanisms. Evidently, at that time the potentially defective SB-12 switches were installed in the
    .switchgear by GE-SBD. This will be verified and discussed in the final report.
The metal-clad switchgear was fabricated by GE-SBD, Philadelphia, Pennsylvania, as part of the NSSS package for both Hartsville and Phipps Bend Nuclear Plants.                    ,
Initial Corrective Action TVA has informed GE of their findings regarding this matter and GE is investigating the situation. Phipps Bend personnel has been requested to check HPCS metal-clad switchgear for discrepancies.
Their investigation should be completed by May 31, 1980.
'}}

Latest revision as of 10:14, 1 February 2020

First Interim Deficiency Rept Re Wiring in HPCS Metal Clad Switchgear.Ge Has Been Notified of Wiring Diagram & Labeling Discrepancies,Missing Wires & Billing Problems.Phipps Bend Mgt Investigating Discrepancies
ML19309F703
Person / Time
Site: Hartsville  Tennessee Valley Authority icon.png
Issue date: 04/24/1980
From:
TENNESSEE VALLEY AUTHORITY
To:
Shared Package
ML19309F702 List:
References
NCR-HNP-A-090, NCR-HNP-A-90, NUDOCS 8004300397
Download: ML19309F703 (1)


Text

0

,3,9 I

ENCLOSURE ,

HARTSVILLE NUCLEAR PLANT - ALL UNITS WIRING DISCREPANCIES IN HIGH PRESSURE CORE SPRAY METAL-CLAD SWITCHGEAR i 10CFR50 55(e) REPORT NO.1 (INTERIH) l NCR HNP-A-090 Gn March 25, 1980, TVA informed NRC-0IE Region II, Inspector R. W.

Wright, of a reportable deficiency under 10CFR50.55(e) involving wiring discrepancies on the high pressure core spray (HPCS) metal-clad  ;

switchgear.

This is the first interim report n this reportable deficiency. TVA will transmit a final report on this deficiency on or before August 29, 1980.

Descriotion of Deficiencies Wiring checks by Hartsville site personnel disclosed wiring discrepancies in the HPCS metal-clad switchgear. These discrepancies j involve wiring terminations which'do not match the wiring diagrams, errors on the wiring diagrams, missing wires, mislabeling or nonlabeling of parts or terminations, and examples of discrepancies between bill of materials and installed components.

Also, as discussed with R. W. Wright, the wiring check disclosed six GE SB-12 auxiliary switches with either no date codes or date codes from August 1,1978, to July 1,1979 This was previously indicated in TVA NCR 2-1 (final report filed August 16, 1979) as the date code for potentially defective SB-12 auxiliary switches. The potentially defective SB-12 switches were not discovered in the HPCS metal-clad switchgear because this switchgear was initially shipped to Hartsville before August 1, 1978. However, the subject switchgear had been shipped back to GE's Switchboard Division (GE-SBD) in November 1978 to have work done on ML-13 operating mechanisms. Evidently, at that time the potentially defective SB-12 switches were installed in the

.switchgear by GE-SBD. This will be verified and discussed in the final report.

The metal-clad switchgear was fabricated by GE-SBD, Philadelphia, Pennsylvania, as part of the NSSS package for both Hartsville and Phipps Bend Nuclear Plants. ,

Initial Corrective Action TVA has informed GE of their findings regarding this matter and GE is investigating the situation. Phipps Bend personnel has been requested to check HPCS metal-clad switchgear for discrepancies.

Their investigation should be completed by May 31, 1980.

'