ML19031A918: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(StriderTol Bot change)
 
(One intermediate revision by the same user not shown)
Line 17: Line 17:
=Text=
=Text=
{{#Wiki_filter:r=
{{#Wiki_filter:r=
I
I Frederick W. Schneider                            80 Park Place Newark, N.J. 07101 201/622-7000 Vice President Production January 7, 1976
* Frederick W. Schneider                            80 Park Place Newark, N.J. 07101 201/622-7000 Vice President Production January 7, 1976


==Dear Mr. O'Reilly:==
==Dear Mr. O'Reilly:==
Line 27: Line 26:
CC:    Director, Office of Inspection and Enforcement (30 copies)
CC:    Director, Office of Inspection and Enforcement (30 copies)
Director, Office of Management Information and Program Control (3 copies)
Director, Office of Management Information and Program Control (3 copies)
* Report Number:        76~il/3L Report Date:          1.6/76 Occurrence Date:      12/10/76
 
Report Number:        76~il/3L Report Date:          1.6/76 Occurrence Date:      12/10/76
   !tacility            -Salem Generating Station Public Service Electric & Gas Company .
   !tacility            -Salem Generating Station Public Service Electric & Gas Company .
Hancocks Bridge, New Jersey 08038 IDENTIFICATION OF OCCURRENCE:
Hancocks Bridge, New Jersey 08038 IDENTIFICATION OF OCCURRENCE:
Line 66: Line 66:
.@El This value is below .the minimum concentration of 20, 100 ppm as specified 7 8                                                          .
.@El This value is below .the minimum concentration of 20, 100 ppm as specified 7 8                                                          .
liifill in Technical Specification L.C.O. paragraph 3.5.4.l(b). The Shift Super7 7 89                                                                                                                                          eo
liifill in Technical Specification L.C.O. paragraph 3.5.4.l(b). The Shift Super7 7 89                                                                                                                                          eo
   ~ [ visor implemented Tech Spec Action Statement for L.C.O. paragraph 3.5.4.lj 1      a  9 SYSTEM
   ~ [ visor implemented Tech Spec Action Statement for L.C.O. paragraph 3.5.4.lj 1      a  9 SYSTEM CAUSE PRIME COMPONENT              COMPONENT eo COOE        cooe:          COMPONENT      cooe            SUPflt.IER        MANUFACTURER        VIOLATION
* CAUSE PRIME COMPONENT              COMPONENT eo COOE        cooe:          COMPONENT      cooe            SUPflt.IER        MANUFACTURER        VIOLATION
   @))IS IF I                lA.1        IX I X I X I X I X-1.X.]              l!J            I Z I 919I91          lliJ 7        8 9 10              11        12                        17            43          44          47        48 CAUSE DESCRIPTION
   @]]IS IF I                lA.1        IX I X I X I X I X-1.X.]              l!J            I Z I 919I91          lliJ 7        8 9 10              11        12                        17            43          44          47        48 CAUSE DESCRIPTION
   @]fil I Personnel error in analyzing the boron concentration of the Boron Injec-1
   @]fil I Personnel error in analyzing the boron concentration of the Boron Injec-1
   ~9                                                                      *                                    .                              so l.!Ll!ll tion Tank. Manufacturer's nameplate data not applicable. The Technician I 7      B 9                                                                                                                                    SO
   ~9                                                                      *                                    .                              so l.!Ll!ll tion Tank. Manufacturer's nameplate data not applicable. The Technician I 7      B 9                                                                                                                                    SO
[@]I was re-instructed on sample analytical techniques and procedural                                                                          I 1        89                                                                                                                                    eo FACIL.ITV                                                            METHOOOF r.r.1        STATUS          **  ~POWER              OTHER STATUS              DISCOVERY                OISC:OVERY OESCRIPTION l!-l.!..I . . Lill .          10 lo 10 I        l~,__~Nul~A,,___.;;.__.I              @J        I* Chemistry Analysis 1      a      9              10          12    13                            44      45      46                                          80
[@]I was re-instructed on sample analytical techniques and procedural                                                                          I 1        89                                                                                                                                    eo FACIL.ITV                                                            METHOOOF r.r.1        STATUS          **  ~POWER              OTHER STATUS              DISCOVERY                OISC:OVERY OESCRIPTION l!-l.!..I . . Lill .          10 lo 10 I        l~,__~Nul~A,,___.;;.__.I              @J        I* Chemistry Analysis 1      a      9              10          12    13                            44      45      46                                          80
               *FORM OF ACTIVITY          CONTENT REl..EASEO OF REI.EASE              AMOUNT OF ACTIVl*Tv
               *FORM OF ACTIVITY          CONTENT REl..EASEO OF REI.EASE              AMOUNT OF ACTIVl*Tv LOCATION OF RELEASE
                                                                                                                                                    ....  *',.
LOCATION OF RELEASE
.7 GE8            LkJ 9
.7 GE8            LkJ 9
l!J 10 I
l!J 10 I
Line 87: Line 84:
                                                                                                                                                     ~ .*
                                                                                                                                                     ~ .*
OFFSITE CONSEQUENCSS
OFFSITE CONSEQUENCSS
   ~~                      ...                                N/A LOSS OR OAMAG& TO FACILITY TYPE        CESCAIPTION l"a! t;J            ~~a.----------_.,.....N. ./=A'--------.,..---------~-.'"""'J
   ~~                      ...                                N/A LOSS OR OAMAG& TO FACILITY TYPE        CESCAIPTION l"a! t;J            ~~a.----------_.,.....N. ./=A'--------.,..---------~-.'"""'J PUSL.ICITY GIB0~9------..,..-------------------=~:i...---------------..,..---------------------------------!so 1
                                                                ..
PUSL.ICITY GIB0~9------..,..-------------------=~:i...---------------..,..---------------------------------!so 1
AOOITIONAL. FACTORS III!JI          EVENT DESCRIPTION AND CAUSE DESCRIPTION (Continued on Page 2)                                                                  I 7      8 9                                                                                                                                  eo ITEJ'c;"-~----------~~------~----------------~----~-------------..._.i 1      ai                                                                                                                                    ao NAME=-------=B:;...;..**_.              .;:;;E~*;__C~a~n_f_:i.._*e_l~d_ _ __      PHONE:  (609) 365-7000 Ext.Salem-525:        i
AOOITIONAL. FACTORS III!JI          EVENT DESCRIPTION AND CAUSE DESCRIPTION (Continued on Page 2)                                                                  I 7      8 9                                                                                                                                  eo ITEJ'c;"-~----------~~------~----------------~----~-------------..._.i 1      ai                                                                                                                                    ao NAME=-------=B:;...;..**_.              .;:;;E~*;__C~a~n_f_:i.._*e_l~d_ _ __      PHONE:  (609) 365-7000 Ext.Salem-525:        i



Latest revision as of 01:03, 17 March 2020

LER 1976-021-01 for Salem, Unit 1, Boron Injection Tank Inoperable
ML19031A918
Person / Time
Site: Salem  PSEG icon.png
Issue date: 01/07/1976
From: Schneider F
Public Service Electric & Gas Co
To: O'Reilly J
NRC/IE, NRC Region 1
References
LER 1976-021-01
Download: ML19031A918 (4)


Text

r=

I Frederick W. Schneider 80 Park Place Newark, N.J. 07101 201/622-7000 Vice President Production January 7, 1976

Dear Mr. O'Reilly:

LICENSE NO. DPR-70 DOCKET NO. 50-272 REPORTABLE OCCURRENCE 76-21/3L Pursuant to the requirements of Salem Generating Station Unit No. 1 Technical Specifications, Section 6.9.1, we are submitting Licensee Event Report for Reportable Occurrence 76-21/3L. This

  • report is required within thirty*(30) days of tJ;ie occurrence.

Sincerely yours, p~

CC: Director, Office of Inspection and Enforcement (30 copies)

Director, Office of Management Information and Program Control (3 copies)

Report Number: 76~il/3L Report Date: 1.6/76 Occurrence Date: 12/10/76

!tacility -Salem Generating Station Public Service Electric & Gas Company .

Hancocks Bridge, New Jersey 08038 IDENTIFICATION OF OCCURRENCE:

Boron Injection Tank. Inoperable.

CONPITIONS PRIOR TO OCCURRENCE: .

  • Mode 3 operation, Plant pressure 2235 psig, Plant temperature 547°F.

pESCRIPTION OF OCCURRENCE:

On 12/10/76; at 5:45 AM, the Chemistry Technician reported the Boron Injection Tank sample analysis for boron concentration was 19~899 ppm.

This value*is below the minimum concentration of .20,100 ppm as specified in Tech Spec L.C.O. paragraph 3.5.4.l(b). The Shift Supervisor imple-mented Technical Specification Action Statement for L.C.O. paragraph 3.5.4.1 and requested additional samples be taken and analyzed. At 10:00 AM,* on 12/10/76, the Chemistry Technician reported the re-analysis indicated the Boron Injection Tank boron concentration was 20,540 ppm.

Technical Specification Action Statement was cancelled.

DESIGNATION OF APPARENT-CAUSE OF OCCURRENCE:

Personnel error in analyzing the boron concentration of the Boron Injec-tion Tank. . The Chemistry Technician did not run a duplicate analysis as stated in the procedur~ to verify the first sample analysis.

ANALYSIS OF OCCURRENCE:

Improper sampling analytical techniques declared the Boron Injection Tank inoperable. SuQsequent sample analysis verifieq proper boron concentra-

. tion in the Boron Injection Tank. At no time was there any hazard to the general public or site personnel.

CORRECTIVE ACTION:

The Chemistry Technician was re-instructed on sample analytical tech-niques and procedural instructions which requires duplicate analysis to be performed. ...

FAILURE DATA:

This is the second failure of this type.

Equipment Identification: .Not Applicable B. Canfield Manager - Station SORC. Meeting No. 122-76


~~~~~~~

CONTROL BLOCK L.ICENSEE I

. Ll&SEE EVENT REPORT 6

L.ICENSE

  • I EVENT i ....

... -~

NAME L.ICENSE NUMBER TYPE TYPE:

@ITJ4N1J-1s1G1s1~1 ts°101--1010101010-1-101qJ 141111111 lJo WJ.14.

REPORT REPORT CATEGORY TY~ SOURCE OOC:KET NUMBER EVENT CATE REPORT CATE roJ11 coN"TtRJ..Qj

~ 57 58 IL I 59

~

60 I 0 I 51 0 I -I 0 I 21 71 2J 61 111 2 111 0 17 I 6 I 69 74 11121 1 I 6 I 7 I

. 75 6J EVENT DESCRIPTION

@li] I On 12/10/76, at 5:45 AM, the Chemistry Technician reported the Boron In-1 7 8 9 so

@:ill j ec tion Tank sample analysis for boron concentration was 19,899 ppm.

7 89

.@El This value is below .the minimum concentration of 20, 100 ppm as specified 7 8 .

liifill in Technical Specification L.C.O. paragraph 3.5.4.l(b). The Shift Super7 7 89 eo

~ [ visor implemented Tech Spec Action Statement for L.C.O. paragraph 3.5.4.lj 1 a 9 SYSTEM CAUSE PRIME COMPONENT COMPONENT eo COOE cooe: COMPONENT cooe SUPflt.IER MANUFACTURER VIOLATION

@))IS IF I lA.1 IX I X I X I X I X-1.X.] l!J I Z I 919I91 lliJ 7 8 9 10 11 12 17 43 44 47 48 CAUSE DESCRIPTION

@]fil I Personnel error in analyzing the boron concentration of the Boron Injec-1

~9 * . so l.!Ll!ll tion Tank. Manufacturer's nameplate data not applicable. The Technician I 7 B 9 SO

[@]I was re-instructed on sample analytical techniques and procedural I 1 89 eo FACIL.ITV METHOOOF r.r.1 STATUS ** ~POWER OTHER STATUS DISCOVERY OISC:OVERY OESCRIPTION l!-l.!..I . . Lill . 10 lo 10 I l~,__~Nul~A,,___.;;.__.I @J I* Chemistry Analysis 1 a 9 10 12 13 44 45 46 80

  • FORM OF ACTIVITY CONTENT REl..EASEO OF REI.EASE AMOUNT OF ACTIVl*Tv LOCATION OF RELEASE

.7 GE8 LkJ 9

l!J 10 I

11 N/A

~

I '~-----N~/A

~

_________~I 80 PERSc;lNNEL. EXPOSURES

  • r.r.;'J NUMBER TYPE OESCRIPTION t!.2.J\010101  !].JI~---~~~N~/=A~~--.-~--.----~~~--.-~-----.-~~~~--,,.,!I 7 8 9 11 12 13 80 PERSONNEL. INJURIES
  • NUMBER. OESCRIPTION G:EJto 101011I 7 a§ N A

~12:r--------------..;;;....l,---'--------------------------------------------------ao~

~ .*

OFFSITE CONSEQUENCSS

~~ ... N/A LOSS OR OAMAG& TO FACILITY TYPE CESCAIPTION l"a! t;J ~~a.----------_.,.....N. ./=A'--------.,..---------~-.'"""'J PUSL.ICITY GIB0~9------..,..-------------------=~:i...---------------..,..---------------------------------!so 1

AOOITIONAL. FACTORS III!JI EVENT DESCRIPTION AND CAUSE DESCRIPTION (Continued on Page 2) I 7 8 9 eo ITEJ'c;"-~----------~~------~----------------~----~-------------..._.i 1 ai ao NAME=-------=B:;...;..**_. .;:;;E~*;__C~a~n_f_:i.._*e_l~d_ _ __ PHONE: (609) 365-7000 Ext.Salem-525: i

-l- 12/16/76

~

EVEN! DESCRIPTION (Continued)

~

  • l and requested additional samples be taken and analyzed. At 10:00 AM, on 12/10/76, the* Chemistry Technician reported the re-analysis indicated that the Boron Injection Tank boron concentration was 20,540 ppm. Technical Specification Action Statement was cancelled.

The Boron Injection Tank is a passive component common to both ECCS subsystems and therefore, no redundant component exists. This is the second occurrence of this type. (76~21/3L).

CAUSE DESCRIPTION (Continued) instructions to perform duplicate analysis.