|
|
(2 intermediate revisions by the same user not shown) |
Line 14: |
Line 14: |
| | document type = OPERATING LICENSES-APPLIATION TO AMEND-RENEW EXISTING, TEXT-LICENSE APPLICATIONS & PERMITS | | | document type = OPERATING LICENSES-APPLIATION TO AMEND-RENEW EXISTING, TEXT-LICENSE APPLICATIONS & PERMITS |
| | page count = 7 | | | page count = 7 |
| | | project = |
| | | stage = Request |
| }} | | }} |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:I , ,.BEFORE Til E UNITED STATES NUCLEAR REGULATORY COM!!1SSION In the fla t t e r of | | {{#Wiki_filter:, |
| -: Docket Nos. 50-277 PHIL AD ELPill A ELECTRIC C0!!P ANY
| | I BEFORE Til E UNITED STATES NUCLEAR REGULATORY COM!!1SSION In the fla t t e r of - |
| : 50-278 APPLICATI0?; FOR A!! E ?ID B1 E N T OF FACILITY OPERATING LICENSES DPR-44 & DPR-56 Edward G.Bauer, Jr. | | : Docket Nos. 50-277 PHIL AD ELPill A ELECTRIC C0!!P ANY : 50-278 APPLICATI0?; FOR A!! E ?ID B1 E N T OF FACILITY OPERATING LICENSES DPR-44 & DPR-56 Edward G. Bauer, Jr. |
| Eugene J.Bradley 2301 St a r k e t Street Philadelphia, Pennsylvania 19101 Attorneys for Philadelphia Electric Company | | Eugene J. Bradley 2301 St a r k e t Street Philadelphia, Pennsylvania 19101 Attorneys for Philadelphia Electric Company DG214G 9909/9n 2 a |
| .DG214G 9909/9n 2 a
| | |
| .,.BEFORE Tile UNITED STATES NUCLEAR REGULATORY COMMISSION In the flatter of
| | BEFORE Tile UNITED STATES NUCLEAR REGULATORY COMMISSION In the flatter of : |
| :: Docket Nos. 50-277 P il I L A D E L P il I A ELECTRIC COMPANY | | : Docket Nos. 50-277 P il I L A D E L P il I A ELECTRIC COMPANY : 50-278 APPLICATION FOR AMENDMENT OF FACILITY OPERATING LICENSES DPR-44 & DPR-56 Section 3.7.A.6 of the Technical Specifications contained in Appendix A of facility operating licenses DPR-44 and DPR-56 permits the ope ra t i on of both reactors for a period up to seven days with an inoperable Containment Atmospheric Dilution (CAD) system. The Standard Technical Specifications for General Electric Boiling Water Reactors (NUREG-0123, Revision 1), |
| : 50-278 APPLICATION FOR AMENDMENT OF FACILITY OPERATING LICENSES DPR-44 & DPR-56 Section 3.7.A.6 of the Technical Specifications contained in Appendix A of facility operating licenses DPR-44 and DPR-56 permits the ope ra t i on of both reactors for a period up to seven days with an inoperable Containment Atmospheric Dilution (CAD) system. | | however, permits continued power operation for a period of up to a |
| The Standard Technical Specifications for General Electric Boiling Water Reactors (NUREG-0123, Revision 1), however, permits continued power operation for a period of up to 30 days with the CAD systen inoperable thereby minimizing startup a and shutdown transients, improving generation availability, and 35Z1C/_ | | 30 days with the CAD systen inoperable thereby minimizing startup and shutdown transients, improving generation availability, and 35Z1C/ |
| '.*.maximizing the effectiveness of mr*ntenance outages.
| | |
| _Accordingly, in order to conform the Peach Botton Units 2 and 3 Technical Specifications on CAD limiting conditions for operation to those contained in the Standard Technical Specifications and to gain the operational advantages permitted by the Standard Technical Specifications, Philadelphia Electric Company hereby requests an amendment to page 172 of the Peach Bottom Units 2 and 3 Technical Specifications.
| | maximizing the effectiveness of mr*ntenance outages. |
| The proposed amendment changes are indicated by a vertical bar in the margin of page 172. | | Accordingly, in order to conform the Peach Botton Units 2 and 3 Technical Specifications on CAD limiting conditions for operation to those contained in the Standard Technical Specifications and to gain the operational advantages permitted by the Standard Technical Specifications, Philadelphia Electric Company hereby requests an amendment to page 172 of the Peach Bottom Units 2 and 3 Technical Specifications. The proposed amendment changes are indicated by a vertical bar in the margin of page 172. |
| On September 6, 1979, the Peach Bottom CAD system was declared inoperable following discovery of as built design deficiencies. | | On September 6, 1979, the Peach Bottom CAD system was declared inoperable following discovery of as built design deficiencies. Although Licensee is expediting action to correct the CAD system deficiencies, and expects to complete the work on Unit 2 within the next week, and on Unit 3 du ring the refueling outage scheduled to start September 15, 1979, under the existing Technical Specifications, both units will have to cease power operation by September 13, 1979,,unless the requested revisions to the Technical Specifications are approved prior to that date. |
| Although Licensee is expediting action to correct the CAD system deficiencies, and expects to complete the work on Unit 2 within the next week, and on Unit 3 du ring the refueling outage scheduled to start September 15, 1979, under the existing Technical Specifications, both units will have to cease power operation by September 13, 1979,,unless the requested revisions to the Technical Specifications are approved prior to that date. | |
| Accordingly, Licensee requests that this Application be reviewed as expeditiously as possible. | | Accordingly, Licensee requests that this Application be reviewed as expeditiously as possible. |
| Since the changes requested involve a single issue having acceptability clearly identified by a Commission position and since they do not involve a significant hazards consideration, pursuant to 10 1 170.22, Philadelphia Electric m.Company, for fee purposes, proposes that the Application for Amendment for Unit No. | | Since the changes requested involve a single issue having acceptability clearly identified by a Commission position and since they do not involve a significant hazards consideration, pursuant to 10 m. 1 170.22, Philadelphia Electric Company, for fee purposes, proposes that the Application for Amendment for Unit No. 2 be considered a Class III Amendment and |
| 2 be considered a Class III Amendment and | | .5bN.50 |
| ,~ ~.5bN.50--_ _ - - _ -
| | ~ ~ |
| __ _ _ _ _ _
| | |
| __
| | that the Application for Amendment for Unit No. 3 be considered a Class I Amendment. |
| '.*.that the Application for Amendment for Unit No. 3 be considered a Class I Amendment.
| | The Plant Operation Review Committee and the Operation and Safety Review Conmittee have reviewed the proposed changes to the Technical Specifications and have concluded that they do not involve an unreviewed safety question or a significant hazard consideration, and will not endanger the health and safety of the public. |
| The Plant Operation Review Committee and the Operation and Safety Review Conmittee have reviewed the proposed changes to the Technical Specifications and have concluded that they do not involve an unreviewed safety question or a significant hazard consideration, and will not endanger the health and safety of the public.Respectfully submitted, PIII L AD EL P11I A ELECTRIC C 0!!P A N Y A By Rdirb 4 Wm_Vice President | | Respectfully submitted, PIII L AD EL P11I A ELECTRIC C 0!!P A N Y A |
| /., .35'd149_3_.
| | By Rdirb 4 _ Wm Vice President / |
| *., COM!!ONWEALTil 0F PENNSYLVANIA
| | _3_ |
| : ss.COUNTY OF P il I L A D E L P il I A
| | 35'd149 |
| : V.S.Boyer, being first duly sworn, deposes and says:
| | |
| | COM!!ONWEALTil 0F PENNSYLVANIA : |
| | ss. |
| | COUNTY OF P il I L A D E L P il I A : |
| | V. S. Boyer, being first duly sworn, deposes and says: |
| That he is Vice President of Philadelphia Electric Company, the Applicant herein; that he has read the fctegoing Application for Amendment of Facility Operating Licenses and knows the contents thereof; cnd that the statements and matters set forth therein are true and correct to the best of his knowledge, information and belief. | | That he is Vice President of Philadelphia Electric Company, the Applicant herein; that he has read the fctegoing Application for Amendment of Facility Operating Licenses and knows the contents thereof; cnd that the statements and matters set forth therein are true and correct to the best of his knowledge, information and belief. |
| n'', j['%p -i Subscribed and sworn to before me this ll day*E ilI'i-,/o t ry Publi c EU ZA BETH H. DOYG) | | n |
| Nc'ary Public, FMa.. Phi'1 CC, My Commissica Dpiroa Jan. 00,1932 4 352130_ | | , j ['%p - |
| .. , ., CERTIFICATE OF SERVICE I certify that service of the foregoing Application was made upon the Board of Supervisors, Peach Bottom Township, York County, Pennsylvania, by mailing a copy thereof, via first-class mail, to Albert R.Steele, Chairman of the Board of Supervisors, R.D. ,No.1, Delta, Pennsylvania 17314; upon the Board of Supervisors, Fulton Township, Lancaster County, Pennsylvania, by mailing a copy thereof, via first-class mail, to George K.Brinton, Chairman of the Board of Supervisors, Peach Bottom, Pennsylvania 17563; and upon the Board of Supervisors, Drumore Township, Lancaster County, Pennsylvania, by mailing a copy thereof, via first-class mail, to Wilmer P.Bolton, Chairman of the Board of Supervisors, R.D.No.1, Holtwood, Pennsylvania 17532; all this 12th day of September, 1979..1.===**\~J./Bradley Eug ne Attorney for Philadelphia Electric Compan , t 35'il51
| | i Subscribed and sworn to before me this ll day |
| 'o**.PBAPS.LIMITING CONDITIONS FOR OPERATION SURVEILLANCE REQUIREMENTS | | *E i l I |
| ___3.7.A Primary Containment 4.7.A Primary Containment 6.Containment Atmosphere 6.Containment Atmosphere Dilution Dilution a.Whenever either reactor a.The post-LOCA contain-is in p ow e r operation, nent atmosphere dilu-the Post-LOCA Containment tion system shall be Atmosphere Dilution Sys-functionally tested tem must be operable and once per operating capable of supplying cycle, nitrogen to either Unit 2 lor Unit 3 containment for atmosphere dilution if required by post-LOCA conditions.
| | - 'i |
| If this specification cannot be met, the system must be restored to an operable i condition within 30 days I or both reactors must be taken out of power opera-tion.I b.Whenever either reactor b.The level in the is in power operation, liquid N2 storage tank the post-LOCA Containment shall be recorded atmosphere Dilution Sys-weekly.tem shall contain a mini-l, mum of 2000 gallons of liquid N If this 2 specification cannot be met, the minimum volume lwill be restored within 30 days or both reactors must be taken out of power operation. | | ,/o t ry Publi c EU ZA BETH H. DOYG) |
| c.Whenever either of the c.* The containment reactors is in power oxygen analyzing sys-operation, there shall be tem shall be func-at least one CAD systen tionally tested twice H2 and 02 analyzer serv-per week in conjunc-ing the drywell and one tion with specifica-CAD system H and 0 tion 4.7.A.5.The 2 2 analyzer serving the sup-oxygen analyzer shall | | Nc'ary Public, FMa.. Phi'1 CC, My Commissica Dpiroa Jan. 00,1932 4 |
| ~pression chamber on that be calibrated once per | | 352130 |
| , reactor.If this speci-6 months.fication cannot be met,-172-35'15'4 2.}}
| | |
| | CERTIFICATE OF SERVICE I certify that service of the foregoing Application was made upon the Board of Supervisors, Peach Bottom Township, York County, Pennsylvania, by mailing a copy thereof, via first-class mail, to Albert R. Steele, Chairman of the Board of Supervisors, R. D. ,No. 1, Delta, Pennsylvania 17314; upon the Board of Supervisors, Fulton Township, Lancaster County, Pennsylvania, by mailing a copy thereof, via first-class mail, to George K. |
| | Brinton, Chairman of the Board of Supervisors, Peach Bottom, Pennsylvania 17563; and upon the Board of Supervisors, Drumore Township, Lancaster County, Pennsylvania, by mailing a copy thereof, via first-class mail, to Wilmer P. Bolton, Chairman of the Board of Supervisors, R. D. No. 1, Holtwood, Pennsylvania 17532; all this 12th day of September, 1979. |
| | 1 |
| | .===**\ |
| | ~ |
| | Eug ne J./Bradley Attorney for Philadelphia Electric Compan , |
| | t 35'il51 |
| | |
| | . 'o PBAPS LIMITING CONDITIONS FOR OPERATION SURVEILLANCE REQUIREMENTS ___ |
| | 3.7.A Primary Containment 4.7.A Primary Containment |
| | : 6. Containment Atmosphere 6. Containment Atmosphere Dilution Dilution |
| | : a. Whenever either reactor a. The post-LOCA contain-is in p ow e r operation, nent atmosphere dilu-the Post-LOCA Containment tion system shall be Atmosphere Dilution Sys- functionally tested tem must be operable and once per operating capable of supplying cycle, nitrogen to either Unit 2 l |
| | or Unit 3 containment for atmosphere dilution if required by post-LOCA conditions. If this specification cannot be met, the system must be restored to an operable i condition within 30 days I or both reactors must be taken out of power opera-tion. |
| | I |
| | : b. Whenever either reactor b. The level in the is in power operation, liquid N2 storage tank the post-LOCA Containment shall be recorded atmosphere Dilution Sys- weekly. |
| | tem shall contain a mini-l mum of 2000 gallons of liquid N 2 If this specification cannot be met, the minimum volume will be restored within 30 l days or both reactors must be taken out of power operation. |
| | : c. Whenever either of the c. |
| | * The containment reactors is in power oxygen analyzing sys-operation, there shall be tem shall be func-at least one CAD systen tionally tested twice H2 and 02 analyzer serv- per week in conjunc-ing the drywell and one tion with specifica-CAD system H 2 and 0 2 tion 4.7.A.5. The analyzer serving the sup- oxygen analyzer shall |
| | ~ |
| | pression chamber on that be calibrated once per reactor. If this speci- 6 months. |
| | fication cannot be met, |
| | -172-35'15'4 2 |
| | .}} |
|
---|
Category:OPERATING LICENSES-APPLIATION TO AMEND-RENEW EXISTING
MONTHYEARML20212H5071999-09-27027 September 1999 Application for Amends to Licenses DPR-44 & DPR-56,change Application ECR 96-01511,to Revise TS Re Loss of Power Setpoints for 4 Kv Emergency Buses ML20211M7081999-09-0101 September 1999 Suppl License Change Application ECR 99-01497 for Licenses DPR-44 & DPR-56,correcting Minor Discrepancies Discovered in Pages of Attachment 2 ML20210P8811999-08-11011 August 1999 Application for Amends to Licenses DPR-44 & DPR-56 in Order to Clarify PBAPS Licensing Basis to Include Specific Info Re Allowed Containment Overpressure Credit Needed to Ensure Adequate NPSH Available for ECCS Pumps.Ufsar Changes,Encl ML20210N0711999-08-0606 August 1999 Exigent License Change Application ECR 99-01727 for Licenses DPR-44 & DPR-56,incorporating Note Into TS Which Will Permit one-time Exemption Until 990930,from 90 F Limit Stated in SR 3.7.2.2 ML20209F7641999-07-12012 July 1999 License Change Application ECR 99-01255,revising TS Sections 2.1.1.2 & 5.6.5 by Incorporating Revised SLMCPR & Deleting Previously Added footnotes.Non-proprietary & Proprietary Info Re Slmcpr,Encl.Proprietary Info Withheld ML20209B9141999-07-0101 July 1999 Application ECR 99-01497 for Amend to Licenses DPR-44 & DPR-56,reflecting Change in Corporate Structure ML20205F6221999-03-29029 March 1999 Application for Amends to Licenses DPR-44 & DPR-56,revising TS to Delete Requirement for Refuel Platform Fuel Grapple Fully Retracted Position Interlock Currently Required by TS Surveillance Requirement 3.9.1.1 ML20207E2421999-03-0101 March 1999 License Amend Request ECR 98-01802 for Licenses DPR-44 & DPR-56,proposing Changes to Support PBAPS Mod P00507 Which Will Install Digital Power Range Neutron Monitoring Sys & Incorporate long-term T/H Stability Solution Hardware ML20198N2471998-12-24024 December 1998 License Change Application ECR 96-01511,revising Setpoints & Limits of Allowable Values for LOP Instrumentation for 4kV Emergency Buses Contained in TS Table 3.3.8.1-1, LOP Instrumentation ML20236R3011998-07-10010 July 1998 Application for License Change ECR 98-01403,requesting Change to License DPR-44 Revising TS Section 2.0 & non-proprietary & Proprietary Versions of 980609 Addl Info Re 1.10 Cycle Specific Slmcpr.Proprietary Version Withheld ML20247C2481998-05-0101 May 1998 License Change Application ECR 98-00499 for Amends to Licenses DPR-44 & DPR-56,revising TS to Delete Requirements for Functional Testing of SRVs During Each Unit Startup ML20217G7481998-03-20020 March 1998 License Change Application ECR 97-02809,revising Tech Specs to Incorporate end-of-cycle Recirculation Pump Trip Sys at Units 1 & 2 ML20217Q4631998-03-0202 March 1998 Application for Amend to License DPR-12,adding Requirements to TS to Achieve Compliance w/10CFR50.36a, TS on Effluents from Nuclear Power Reactors ML20202F4151998-02-0404 February 1998 Application for Amends to Licenses DPR-44 & DPR-56,revising SR 3.6.4.1.2 & Associated Bases to Reflect Changes in Requirements for Secondary Containment Doors ML20211H9171997-09-26026 September 1997 Application for Amend to License DPR-56,deleting Submitted Page 2.0-1 to Be Replaced W/Encl Page 2.0-1 & Adding Page 5.0-21 for Unit 3 ML20141G4821997-06-30030 June 1997 License Change Request ECR 96-03620,revising TS Section 2.0, Safety Limits to Incorporate Revised SLMCPRs Due to Use of GE13 Fuel Product Line & cycle-specific Analysis Performed by GE ML20140D8501997-06-0404 June 1997 License Change Application ECR 97-00086,revising TS Section 3.8.2.1 to Eliminate Inconsistency Between Requirements for ECCS Operability & auto-start & Trip Bypass of EDGs on ECCS Initiation During Listed Events ML20141L0081997-05-23023 May 1997 License Change Application ECR 96-02324,revising Section 5.5.12 to Exclude Measured Main Steam Isolation Valves Leakage from Total Type B & C Local Leak Rate Test Results ML20141E0721997-05-0909 May 1997 License Change Application ECR 96-00982,revising TS SR 3.6.1.3.16 Re Replacement Frequency of Primary Containment Purge & Exhaust Valve Inflatable Seals ML20141A7861997-05-0505 May 1997 Application for Amend to Licenses DPR-44 & DPR-56,requesting Approval for Implementation of Plant Mod to ECCS Pumps in Order to Satisfy Recommendations Stipulated in NRC Bulletin 96-003 ML18102B0071997-04-30030 April 1997 Application for Amends to Licenses DPR-40,DPR-56,DPR-70 & DPR-75,requesting Consent of NRC for Indirect Transfer of Control of Interest in Plants That Will Occur Under Proposed Merger ML20137P7511997-03-31031 March 1997 License Change Request ECR 96-00627,extending Surveillance Interval for Calibr of Average Power Range Monitor Flow Bias Instrumentation from 18 Months to 24 Months ML20134F6091996-10-30030 October 1996 Application for Amend to License DPR-56,revising Slmcprs,Ts Section 2.0,by Incorporating Rev Due to GE Determination That Previous Calculation Is non-conservative ML20117L2821996-09-0606 September 1996 Application for Amends to Licenses DPR-44 & DPR-56 Adding Notes to Allow Core Spray & LPCI Pumps to Start out-of- Sequence Under Certain Conditions & Adding Notes to Selected Surveillance Requirements ML20117F9321996-08-27027 August 1996 Application for Amends to Licenses DPR-44 & DPR-56, Correcting Administrative Error in TS Re CRD Charging Water Header Pressure for Shutdown Margin Test ML20117H6711996-08-23023 August 1996 License Change Request 96-01 to Licenses DPR-44 & DPR-56, Revising TS Section 2.0, Safety Limits to Incorporate New Safety Limit Min Critical Power Ratios,Due to Use of GE13 Fuel Product Line ML20117M6981996-06-13013 June 1996 License Change Request ECR 96-02011 to License DPR-44, Permitting One Time Performance of SR 3.3.1.1.12 for APRM Flow Biased High Scram Function,W/Delayed Entry Into Associated TS Conditions & Required Actions for Up to Six H ML20101K7961996-03-25025 March 1996 License Change Request 96-01 to Licenses DPR-44 & DPR-56, Revising TS Section 2.0, Safety Limits ML20100J7361996-02-15015 February 1996 License Change Request 95-11 to Licenses DPR-44 & DPR-56, Reflecting Implementation of 10CFR50,App J,Option B ML20095J1251995-12-21021 December 1995 TS Change Request 95-08,eliminating Outdated Matl from FOLs & Making FOL for Unit 2 Consistent W/Fol for Unit 3 ML20095J6971995-12-19019 December 1995 TS Change Request 95-13 to Licenses DPR-44 & DPR-56, Correcting Administrative Error in Improved Tech Specs Re Ventilation Filter Testing Program ML20095A1621995-11-30030 November 1995 Application for Amends to Licenses DPR-44 & DPR-56, Consisting of Change Request 95-12,changing Minimum Allowable Control Rod Scram Accumulator Pressure & Charging Water Header Pressure from Value of 955 Psig to 940 Psig ML20094Q6541995-11-21021 November 1995 Application for Amends to Licenses DPR-44 & DPR-56,changing SR for High Pressure Test of the HPCI & RCIC Sys. Administrative Change Proposed to Eliminate Ref to Section Previously Eliminated ML20092L6251995-09-22022 September 1995 Informs of Change to Pbaps,Units 2 & 3 TS Bases,Figure 1.1-1.Change Allows PBAPS Units 2 & 3 to Maximize Generation Throughout Entire Fuel Cycle ML20092A2071995-09-0101 September 1995 Application for Amend to License DPR-56,consisting of Change Request 95-07,deleting License Condition 2.C ML20092B9361995-08-28028 August 1995 Rev E to TS Change Request (Tscr) 93-16 to Licenses DPR-44 & DPR-56 Re Implementation of Improved Ts.Rev E to Tscr 93-16 Redesignates Change Control Mechanism from 10CFR50.59,as Indicated Previously,To 10CFR50.54(a) for Six Listed Items ML20086Q4271995-07-21021 July 1995 Application for Amends to Licenses DPR-44 & DPR-56,proposing Overall Conversion of Current PBAPS TS to Improved TS as Contained in NUREG-1433, Std Ts,Ge Plants,BWR/4 ML20083Q7341995-05-16016 May 1995 Rev a to Tscr 93-16 Re Conversion to Improved TSs as Contained in NUREG-1433 ML20083K8581995-05-0909 May 1995 Application for Amend to Licenses DPR-44 & DPR-56,consisting of Change Request 93-16 Re Conversion of Current PBAPS TS to Improved TS ML20082M3191995-04-12012 April 1995 Suppl 2 to License Change Request 94-08,supporting Mod P00068-3,which Upgrades Major Components of TIP Sys to Correct Typo.Revised TS Page 186 Encl ML20087H0411995-04-10010 April 1995 Application for Amends to Licenses DPR-44 & DPR-56, Consisting of Change Requests 94-11,94-12 & 94-13,relocating Certain Review & Audit Requirements to Plant UFSAR ML20082B2121995-03-23023 March 1995 Revised Page 4 to TS Change Request 90-03 ML20082B0491995-03-22022 March 1995 License Change Request 95-04 to Licenses DPR-44 & DPR-56, Reducing Local Leak Rate Test Hold Time Duration from One H to 20 Minutes ML20081H1261995-03-16016 March 1995 Application for Amends to Licenses DPR-44 & DPR-56 Re Requirements for SRMs While in Refueling Condition ML20080H0401995-02-10010 February 1995 Application for Amends to Licenses DPR-44 & DPR-56, Correcting Administrative Errors Made During Past TS Changes ML20078A0531995-01-17017 January 1995 Application for Amends to Licenses DPR-44 & DPR-56,proposing to Change Source Range Monitor to Range Neutron Monotors & Delete Intermediate Range Monitors ML20077S6191995-01-13013 January 1995 License Change Request 94-07 to Licenses DPR-44 & DPR-56, Revising Allowed Time Between Signal Calibrs of LPRM from Every 6 Wks (Approx 1,000 EFPH) to Every 2,000 Megawatt Days Per Std Ton ML20077S4691995-01-13013 January 1995 License Change Request 94-08 to Licenses DPR-44 & DPR-56, Revising TS Tables 3.7.1 & 3.7.4 to Reflect Reduction in Number of Primary Containment Power Operated Outboard Valves for TIP Probes,Per PBAPS Mod P00068 ML20078L7541994-11-21021 November 1994 TS Change Request 94-14 to License DPR-56,re One Time Schedular Exemption from 10CFR50,App J,Section III.D.1(a) Concerning 10CFR50,App J Type a Test Intervals ML20078K7601994-11-17017 November 1994 License Change Request 93-13 to Licenses DPR-44 & DPR-56, Revising TS to Support Mods 5384 & 5386,upgrading Main Stack & Vent Stack Radiation Monitoring Sys 1999-09-27
[Table view] Category:TEXT-LICENSE APPLICATIONS & PERMITS
MONTHYEARML20217K9761999-10-14014 October 1999 Amend 234 to License DPR-56,changing TS in Response to 990301 Application & Suppls ,1001 & 06,to Support PBAPS Mod P00507,which Will Install Digital Pr Neutron Monitoring Sys ML20217B4261999-10-0505 October 1999 Amend 233 to License DPR-56,changing Minimum Critical Power Ratio Safety Limit & Approved Methodologies Referenced in Core Operating Limits Repts ML20212H5071999-09-27027 September 1999 Application for Amends to Licenses DPR-44 & DPR-56,change Application ECR 96-01511,to Revise TS Re Loss of Power Setpoints for 4 Kv Emergency Buses ML20216H6891999-09-24024 September 1999 Amends 229 & 232 to Licenses DPR-44 & DPR-56,respectively, Delete SR Associated Only with Refueling Platform Fuel Grapple Fully Retracted Position Interlock Input,Currently Required by TSs SR 3.9.1.1 ML20211M7081999-09-0101 September 1999 Suppl License Change Application ECR 99-01497 for Licenses DPR-44 & DPR-56,correcting Minor Discrepancies Discovered in Pages of Attachment 2 ML20211D5471999-08-23023 August 1999 Amends 228 & 231 to Licenses DPR-44 & DPR-56,respectively, Revising TSs to Correct Typo & Editorial Errors Introduced in TSs by Previous Amends ML20210P8811999-08-11011 August 1999 Application for Amends to Licenses DPR-44 & DPR-56 in Order to Clarify PBAPS Licensing Basis to Include Specific Info Re Allowed Containment Overpressure Credit Needed to Ensure Adequate NPSH Available for ECCS Pumps.Ufsar Changes,Encl ML20210N0711999-08-0606 August 1999 Exigent License Change Application ECR 99-01727 for Licenses DPR-44 & DPR-56,incorporating Note Into TS Which Will Permit one-time Exemption Until 990930,from 90 F Limit Stated in SR 3.7.2.2 ML20209F7641999-07-12012 July 1999 License Change Application ECR 99-01255,revising TS Sections 2.1.1.2 & 5.6.5 by Incorporating Revised SLMCPR & Deleting Previously Added footnotes.Non-proprietary & Proprietary Info Re Slmcpr,Encl.Proprietary Info Withheld ML20209B9141999-07-0101 July 1999 Application ECR 99-01497 for Amend to Licenses DPR-44 & DPR-56,reflecting Change in Corporate Structure ML20205K7371999-04-0707 April 1999 Amends 227 & 230 to Licenses DPR-44 & DPR-56,respectively, Consisting of Changes to TS SRs Re Secondary Containment Doors in Response to 980204 Application,As Revised by ML20205F6221999-03-29029 March 1999 Application for Amends to Licenses DPR-44 & DPR-56,revising TS to Delete Requirement for Refuel Platform Fuel Grapple Fully Retracted Position Interlock Currently Required by TS Surveillance Requirement 3.9.1.1 ML20207E2421999-03-0101 March 1999 License Amend Request ECR 98-01802 for Licenses DPR-44 & DPR-56,proposing Changes to Support PBAPS Mod P00507 Which Will Install Digital Power Range Neutron Monitoring Sys & Incorporate long-term T/H Stability Solution Hardware ML20198N2471998-12-24024 December 1998 License Change Application ECR 96-01511,revising Setpoints & Limits of Allowable Values for LOP Instrumentation for 4kV Emergency Buses Contained in TS Table 3.3.8.1-1, LOP Instrumentation ML20155C6011998-10-26026 October 1998 Amend 226 to License DPR-44,revising TSs for Safety Limit MCPR from Current Value of 1.11 to 1.10 for Two Recirculation Loop Operation & from 1.13 to 1.12 for Single Recirculation Loop Operation ML20154H4691998-10-0505 October 1998 Amends 225 & 229 to Licenses DPR-44 & DPR-56,respectively, Revising TSs to Permit Incorporation of EOC-RPT Sys at Plant,Units 2 & 3 ML20154J2261998-10-0505 October 1998 Amends 224 & 228 to Licenses DPR-44 & DPR-56,respectively, Revising TSs to Delete Requirements for Functional Testing of SRVs During Each Unit Startup ML20154G6551998-10-0101 October 1998 Amends 223 & 227 to Licenses DPR-44 & DPR-56,respectively, Revising Plant,Units 2 & 3 TSs to Exclude MSIV Leakage from Total Type B & Type C Local Leak Rate Test Results ML20153B9581998-09-14014 September 1998 Amend 9 to License DPR-12,adding Requirements for Control of Effluents & Annual Reporting Per 10CFR50.36a ML20238F2611998-08-24024 August 1998 Amend 222 to License DPR-44,revising Pbaps,Unit 2 TSs to Support Mod P00271,which Would Replace SRMs & IRMs W/Wrnms, During Forthcoming Outage 2R12,scheduled for Early Oct 1998 ML20236R3011998-07-10010 July 1998 Application for License Change ECR 98-01403,requesting Change to License DPR-44 Revising TS Section 2.0 & non-proprietary & Proprietary Versions of 980609 Addl Info Re 1.10 Cycle Specific Slmcpr.Proprietary Version Withheld ML20247C2481998-05-0101 May 1998 License Change Application ECR 98-00499 for Amends to Licenses DPR-44 & DPR-56,revising TS to Delete Requirements for Functional Testing of SRVs During Each Unit Startup ML20217G7481998-03-20020 March 1998 License Change Application ECR 97-02809,revising Tech Specs to Incorporate end-of-cycle Recirculation Pump Trip Sys at Units 1 & 2 ML20217Q4631998-03-0202 March 1998 Application for Amend to License DPR-12,adding Requirements to TS to Achieve Compliance w/10CFR50.36a, TS on Effluents from Nuclear Power Reactors ML20202F4151998-02-0404 February 1998 Application for Amends to Licenses DPR-44 & DPR-56,revising SR 3.6.4.1.2 & Associated Bases to Reflect Changes in Requirements for Secondary Containment Doors ML20212G8261997-10-24024 October 1997 Amends 221 & 226 to Licenses DPR-44 & DPR-56,respectively, Changing TSs to Eliminate Inconsistency Between ECCS Operability Requirements & Autostart & Protective Trip Bypass of EDGs on ECCS Initiation Signal ML20217J5571997-10-0909 October 1997 Amend 225 to License DPR-56,revising MCPR Safety Limit in Section 2.1 of TSs from 1.07 to 1.11 for Two Recirculation Loops in Operation ML20217D8101997-09-30030 September 1997 Amend 224 to License DPR-56,revises TS to Support PBAPS Mod P00271,which Would Replace Source Range & Intermediate Range Monitors W/Wide Range Neutron Monitoring System ML20211H9171997-09-26026 September 1997 Application for Amend to License DPR-56,deleting Submitted Page 2.0-1 to Be Replaced W/Encl Page 2.0-1 & Adding Page 5.0-21 for Unit 3 ML20216G5321997-09-0404 September 1997 Amends 220 & 223 to Licenses DPR-44 & DPR-56,respectively, Revising TS to Extend Replacement Frequency for Inflatable Seat Seals for Primary Containment Purge & Vent Valves to 96 Months ML20217M7961997-08-19019 August 1997 Amends 219 & 222 to Licenses DPR-44 & DPR-56,respectively, Extending APRM Flow Bias Instrumentation Surveillance Interval from 18 Months to 24 Months ML20141G4821997-06-30030 June 1997 License Change Request ECR 96-03620,revising TS Section 2.0, Safety Limits to Incorporate Revised SLMCPRs Due to Use of GE13 Fuel Product Line & cycle-specific Analysis Performed by GE ML20140D8501997-06-0404 June 1997 License Change Application ECR 97-00086,revising TS Section 3.8.2.1 to Eliminate Inconsistency Between Requirements for ECCS Operability & auto-start & Trip Bypass of EDGs on ECCS Initiation During Listed Events ML20141L0081997-05-23023 May 1997 License Change Application ECR 96-02324,revising Section 5.5.12 to Exclude Measured Main Steam Isolation Valves Leakage from Total Type B & C Local Leak Rate Test Results ML20141E0721997-05-0909 May 1997 License Change Application ECR 96-00982,revising TS SR 3.6.1.3.16 Re Replacement Frequency of Primary Containment Purge & Exhaust Valve Inflatable Seals ML20141A7861997-05-0505 May 1997 Application for Amend to Licenses DPR-44 & DPR-56,requesting Approval for Implementation of Plant Mod to ECCS Pumps in Order to Satisfy Recommendations Stipulated in NRC Bulletin 96-003 ML18102B0071997-04-30030 April 1997 Application for Amends to Licenses DPR-40,DPR-56,DPR-70 & DPR-75,requesting Consent of NRC for Indirect Transfer of Control of Interest in Plants That Will Occur Under Proposed Merger ML20137P7511997-03-31031 March 1997 License Change Request ECR 96-00627,extending Surveillance Interval for Calibr of Average Power Range Monitor Flow Bias Instrumentation from 18 Months to 24 Months ML20135B3851997-02-19019 February 1997 Amends 218 & 221 to Licenses DPR-44 & DPR-56,respectively, Changing Min Allowable Charging Water Header Pressure from Value 955 Psig to Value of 940 Psig in TS 3.10.8 ML20134F6091996-10-30030 October 1996 Application for Amend to License DPR-56,revising Slmcprs,Ts Section 2.0,by Incorporating Rev Due to GE Determination That Previous Calculation Is non-conservative ML20117L2821996-09-0606 September 1996 Application for Amends to Licenses DPR-44 & DPR-56 Adding Notes to Allow Core Spray & LPCI Pumps to Start out-of- Sequence Under Certain Conditions & Adding Notes to Selected Surveillance Requirements ML20117F9321996-08-27027 August 1996 Application for Amends to Licenses DPR-44 & DPR-56, Correcting Administrative Error in TS Re CRD Charging Water Header Pressure for Shutdown Margin Test ML20117H6711996-08-23023 August 1996 License Change Request 96-01 to Licenses DPR-44 & DPR-56, Revising TS Section 2.0, Safety Limits to Incorporate New Safety Limit Min Critical Power Ratios,Due to Use of GE13 Fuel Product Line ML20117M6981996-06-13013 June 1996 License Change Request ECR 96-02011 to License DPR-44, Permitting One Time Performance of SR 3.3.1.1.12 for APRM Flow Biased High Scram Function,W/Delayed Entry Into Associated TS Conditions & Required Actions for Up to Six H ML20101K7961996-03-25025 March 1996 License Change Request 96-01 to Licenses DPR-44 & DPR-56, Revising TS Section 2.0, Safety Limits ML20100J7361996-02-15015 February 1996 License Change Request 95-11 to Licenses DPR-44 & DPR-56, Reflecting Implementation of 10CFR50,App J,Option B ML20095J1251995-12-21021 December 1995 TS Change Request 95-08,eliminating Outdated Matl from FOLs & Making FOL for Unit 2 Consistent W/Fol for Unit 3 ML20095J6971995-12-19019 December 1995 TS Change Request 95-13 to Licenses DPR-44 & DPR-56, Correcting Administrative Error in Improved Tech Specs Re Ventilation Filter Testing Program ML20095A1621995-11-30030 November 1995 Application for Amends to Licenses DPR-44 & DPR-56, Consisting of Change Request 95-12,changing Minimum Allowable Control Rod Scram Accumulator Pressure & Charging Water Header Pressure from Value of 955 Psig to 940 Psig ML20094Q6541995-11-21021 November 1995 Application for Amends to Licenses DPR-44 & DPR-56,changing SR for High Pressure Test of the HPCI & RCIC Sys. Administrative Change Proposed to Eliminate Ref to Section Previously Eliminated 1999-09-27
[Table view] |
Text
,
I BEFORE Til E UNITED STATES NUCLEAR REGULATORY COM!!1SSION In the fla t t e r of -
- Docket Nos. 50-277 PHIL AD ELPill A ELECTRIC C0!!P ANY : 50-278 APPLICATI0?; FOR A!! E ?ID B1 E N T OF FACILITY OPERATING LICENSES DPR-44 & DPR-56 Edward G. Bauer, Jr.
Eugene J. Bradley 2301 St a r k e t Street Philadelphia, Pennsylvania 19101 Attorneys for Philadelphia Electric Company DG214G 9909/9n 2 a
BEFORE Tile UNITED STATES NUCLEAR REGULATORY COMMISSION In the flatter of :
- Docket Nos. 50-277 P il I L A D E L P il I A ELECTRIC COMPANY : 50-278 APPLICATION FOR AMENDMENT OF FACILITY OPERATING LICENSES DPR-44 & DPR-56 Section 3.7.A.6 of the Technical Specifications contained in Appendix A of facility operating licenses DPR-44 and DPR-56 permits the ope ra t i on of both reactors for a period up to seven days with an inoperable Containment Atmospheric Dilution (CAD) system. The Standard Technical Specifications for General Electric Boiling Water Reactors (NUREG-0123, Revision 1),
however, permits continued power operation for a period of up to a
30 days with the CAD systen inoperable thereby minimizing startup and shutdown transients, improving generation availability, and 35Z1C/
maximizing the effectiveness of mr*ntenance outages.
Accordingly, in order to conform the Peach Botton Units 2 and 3 Technical Specifications on CAD limiting conditions for operation to those contained in the Standard Technical Specifications and to gain the operational advantages permitted by the Standard Technical Specifications, Philadelphia Electric Company hereby requests an amendment to page 172 of the Peach Bottom Units 2 and 3 Technical Specifications. The proposed amendment changes are indicated by a vertical bar in the margin of page 172.
On September 6, 1979, the Peach Bottom CAD system was declared inoperable following discovery of as built design deficiencies. Although Licensee is expediting action to correct the CAD system deficiencies, and expects to complete the work on Unit 2 within the next week, and on Unit 3 du ring the refueling outage scheduled to start September 15, 1979, under the existing Technical Specifications, both units will have to cease power operation by September 13, 1979,,unless the requested revisions to the Technical Specifications are approved prior to that date.
Accordingly, Licensee requests that this Application be reviewed as expeditiously as possible.
Since the changes requested involve a single issue having acceptability clearly identified by a Commission position and since they do not involve a significant hazards consideration, pursuant to 10 m. 1 170.22, Philadelphia Electric Company, for fee purposes, proposes that the Application for Amendment for Unit No. 2 be considered a Class III Amendment and
.5bN.50
~ ~
that the Application for Amendment for Unit No. 3 be considered a Class I Amendment.
The Plant Operation Review Committee and the Operation and Safety Review Conmittee have reviewed the proposed changes to the Technical Specifications and have concluded that they do not involve an unreviewed safety question or a significant hazard consideration, and will not endanger the health and safety of the public.
Respectfully submitted, PIII L AD EL P11I A ELECTRIC C 0!!P A N Y A
By Rdirb 4 _ Wm Vice President /
_3_
35'd149
COM!!ONWEALTil 0F PENNSYLVANIA :
ss.
COUNTY OF P il I L A D E L P il I A :
V. S. Boyer, being first duly sworn, deposes and says:
That he is Vice President of Philadelphia Electric Company, the Applicant herein; that he has read the fctegoing Application for Amendment of Facility Operating Licenses and knows the contents thereof; cnd that the statements and matters set forth therein are true and correct to the best of his knowledge, information and belief.
n
, j ['%p -
i Subscribed and sworn to before me this ll day
- 'i
,/o t ry Publi c EU ZA BETH H. DOYG)
Nc'ary Public, FMa.. Phi'1 CC, My Commissica Dpiroa Jan. 00,1932 4
352130
CERTIFICATE OF SERVICE I certify that service of the foregoing Application was made upon the Board of Supervisors, Peach Bottom Township, York County, Pennsylvania, by mailing a copy thereof, via first-class mail, to Albert R. Steele, Chairman of the Board of Supervisors, R. D. ,No. 1, Delta, Pennsylvania 17314; upon the Board of Supervisors, Fulton Township, Lancaster County, Pennsylvania, by mailing a copy thereof, via first-class mail, to George K.
Brinton, Chairman of the Board of Supervisors, Peach Bottom, Pennsylvania 17563; and upon the Board of Supervisors, Drumore Township, Lancaster County, Pennsylvania, by mailing a copy thereof, via first-class mail, to Wilmer P. Bolton, Chairman of the Board of Supervisors, R. D. No. 1, Holtwood, Pennsylvania 17532; all this 12th day of September, 1979.
1
.===**\
~
Eug ne J./Bradley Attorney for Philadelphia Electric Compan ,
t 35'il51
. 'o PBAPS LIMITING CONDITIONS FOR OPERATION SURVEILLANCE REQUIREMENTS ___
3.7.A Primary Containment 4.7.A Primary Containment
- 6. Containment Atmosphere 6. Containment Atmosphere Dilution Dilution
- a. Whenever either reactor a. The post-LOCA contain-is in p ow e r operation, nent atmosphere dilu-the Post-LOCA Containment tion system shall be Atmosphere Dilution Sys- functionally tested tem must be operable and once per operating capable of supplying cycle, nitrogen to either Unit 2 l
or Unit 3 containment for atmosphere dilution if required by post-LOCA conditions. If this specification cannot be met, the system must be restored to an operable i condition within 30 days I or both reactors must be taken out of power opera-tion.
I
- b. Whenever either reactor b. The level in the is in power operation, liquid N2 storage tank the post-LOCA Containment shall be recorded atmosphere Dilution Sys- weekly.
tem shall contain a mini-l mum of 2000 gallons of liquid N 2 If this specification cannot be met, the minimum volume will be restored within 30 l days or both reactors must be taken out of power operation.
- c. Whenever either of the c.
- The containment reactors is in power oxygen analyzing sys-operation, there shall be tem shall be func-at least one CAD systen tionally tested twice H2 and 02 analyzer serv- per week in conjunc-ing the drywell and one tion with specifica-CAD system H 2 and 0 2 tion 4.7.A.5. The analyzer serving the sup- oxygen analyzer shall
~
pression chamber on that be calibrated once per reactor. If this speci- 6 months.
fication cannot be met,
-172-35'15'4 2
.