{{#Wiki_filter:.c'UALITY ASSURANCE ltANUAL GINNA STATION RE Y.PAGE 1 DF 28 OCHESTER GAS 6 ELECTRIC CORPORATION EFFECTIVE DATE.5'ebruary 1, 1981 DATE SIGNATURE TITLE: Appendix C-Ginna Station Inservice Pump and Valve Testing Program for the January 1, 1981 through December 31, 1990 Period PREPARED BY REVIEW APPROVED BY Program Table of Contents ntroduction:
{{#Wiki_filter:'UALITY
efinitions:
.c ASSURANCE ltANUAL                         RE Y.       PAGE GINNA STATION                                                  1 DF 28 EFFECTIVE DATE.
Discussion rogram: PVT 1.0 Scope and Responsibility PVT 2.0 Code Edition and Testing Interval PVT 3.0 Inseryice Pump Testing Program PVT 4.0 Inservice Valve Testing Program PVT 5.0 Records 810'.0 8077k, r.s e 0~,.j (~QUALITY ASSURANCE MANUAL GINNA STATXON TITLE: APPENDIX C Pump and Valve Testing Program DATE 2/1/81 42~5R C PAGE 2 28 OF Xntroduction This appendix to the Quality Assurance Manual defines the Inservice Pump and~Valve(Testing Program for the ten year period starting January 1, 1981 through December 31, 1990.Included in this program are the Quality Groups A, B and C Pumps which are provided with a'n emergency power source and those Quality Groups A, B and C Valves which are required to shut down the reactor or to mitigate the consequences of an accident and maintain the reactor in a safe shutdown condition.
OCHESTER GAS 6 ELECTRIC CORPORATION                   5'ebruary 1, 1981 SIGNATURE      DATE TITLE:                                 PREPARED BY Appendix C Ginna Station Inservice Pump and Valve Testing Program for the January 1, 1981             REVIEW through December 31, 1990 Period APPROVED BY Program Table   of Contents ntroduction:       Discussion efinitions:
This program has been developed as required by Section*50.55a(g) of 10CFR50 following the guidance of the ASME Boiler and Pressure Vessel Code Section XI-"Rules for Inservice Inspection of Nuclear Power Plant Components," (hereafter referred to as the"Code")excluding the controls of the Authorized Inspector, Enforcement Authority, Report-ing Systems and N-Stamp Symbol.The inservice testing pro-gram shall be controlled by the Ginna Station Quality Assur-ance Program for Station Operation.
rogram:       PVT 1.0   Scope and Responsibility PVT 2.0   Code Edition and Testing Interval PVT 3.0   Inseryice Pump Testing Program PVT 4.0   Inservice Valve Testing Program PVT 5.0   Records 810 '.0 8077k,
Quality Groups A, B and C components correspond to those defined in NRC Regula-tory Guide 1.26.Further addenda and editions of Section XI of the Code shall be used for clarification of test requirements and performance.
 
The Inservice Pump and Valve Testing Program does not affect the pump and valve surveillance program required by Technical Specifications.
r.s e
Technical Specification re-quirements shall continue to be implemented at the required frequency.
  ~,
0 5 4'f QUALITY ASSURANCE MANUAL GINNA STATION TITLEs APPENDIX C Pump and Valve Testing Program DATE 2/1/81 42 52C PAGE 3 28 OF Definitions AFP AOV, APV BA Code CC CS CSP CV C/R ECCS FCV GA GDT HCV HX LCV MAFP MOV.MV PCV PIV PORV PRT PRV PVT Q R RCDT RCP RCV RHR RMW RV RWST RX S/G SAFWP SI SIV SOV SW Auxiliary Feedwater Pump Air Operated Valve Air Operated Piston Valve.Boric Acid American Society of Mechanical E Boiler and Pressure'Vessel Code Component Cooling Containment Spray Containment Spray Pump Check Valve Cold Shutdown and Refueling Emergency Core Cooling System Flow Control Valve Gas Analyzer Gas Decay Tank Hand Control Valve Heat Exchanger Level Control.Valve Motor Driven Auxiliary Feedwater Motor Operated Valve Manual Valve Pressure Control Valve Primary Isolation Valve Power Operated Relief Valve Pressurizer Relief Tank Pressure Relief Valve Pump and Valve Testing Quarterly Refueling Outage Reactor Coolant Drain Tank Reactor Coolant Pump Radiation Control Valve Residual Heat Removal Reactor Makeup Water Relief Valve Refueling Water Storage Tank Reactor Vessel Steam Generator Standby Auxiliary Feedwater Pump Safety Injection Secondary Isolation Valve Solenoid Operated Valve Service Water ngxneers Pump
. j ( ~
')l I l f QUALITY ASSURANCE MANUAL GINNA STATION TITLE: APPENDIX C Pump and Valve Testing Program DATE 2/1/81 PAGE 42 52C 4 DP 28 Definitions TAFP VC VCT VH Turbine Driven Auxiliary Feedwater Pump Volume Control Volume Control Tank Vent Header
42 ~ 5R C TITLE:                             DATE QUALITY                                              2/1/81 ASSURANCE                APPENDIX C MANUAL                Pump and Valve           PAGE GINNA STATXON            Testing Program                   2 OF 28 Xntroduction This appendix to the Quality Assurance Manual defines the Inservice Pump and~Valve( Testing Program for the ten year period starting January 1, 1981 through December 31, 1990. Included in this program are the Quality Groups A, B and C Pumps which are provided with a'n emergency power source and those Quality Groups A, B and C Valves which are required to shut down the reactor or to mitigate the consequences of an accident and maintain the reactor in a safe shutdown condition.
'e l~~L QUALITY ASSURANCE MANUAL GINNA STATION TITLE: APPENDIX, C Pump and Valve Testing Program DATE 2/1/81 PAGE 42 52C 5 DP 28 Pum and Valve Testin Pro ram PVT 1.0'co e and Res onsibilit The inservice testing program defines the testing program for Quality Groups A, B and C Pumps and Valves in accordance with the requirements of Articles IWP and IWV of Section XI of the Code.The results of these tests are to assure the operational readiness of pumps and valves.1.2 It is the responsibility of the Ginna Station Test and Results Supervisor to implement this test program and develop inservice test proce-dures which will outline the specific test for each pump.and valve included in the program.1.3 When a valve, pump or its control system has been replaced or repaired or has undergone maintenance that could affect its performance, and prior to the time it is returned to service, it shall be=tested as necessary to demonstrate that the per-formance parameters which could have been affected by the replacement, repair, or maintenance are within acceptable limits.PVT 2.0 Code Edition and Testin Interval 2.1 PVT 3.0 The Inservice Pump and Valve Testing Program for the ten (10)year period starting January 1, 1981 through December 31, 1990 was developed utilizing the 1977 Edition of Section XI of the Code through the Summer 1978 Addenda.Inservice Pum Testinq Pro ram 3.1 The.Inservice Pump Testing Program was developed in accordance with the requirements of Article IWP of Section XI of the Code.This program includes all Quality Group A, B and C pumps which are provided with an emergency power source and are required'to perform a specific function in shutting down a reactor or in mitigating the consequences of an accident and maintain the reactor in a safe shutdown condition.  
This program has been developed as required by Section
~l~)~~
              *50.55a(g) of 10CFR50 following the guidance of the ASME Boiler and Pressure Vessel Code Section XI "Rules for Inservice Inspection of Nuclear Power Plant Components,"
QUALITY ASSURANCE MANUAL GINNA STATION TITLE: APPENDIX C Pump and Valve Testing Program DATE 2/1/81 PAGE 6 OF 42 52C 28 3.2 3.3 The following pumps shall be tested in accord-ance with Article IWP of Section XI: (a)lA Component Cooling (b)1B Component Cooling (c)1A Safety Injection (d)lB Safety Injection (e)1C Safety Injection (f)lA Residual Heat Removal (g)lB Residual Heat Removal (h)lA Containment Spray (i)1B Containment Spray (j)lA Motor Driven Auxiliary Feedwater (k)1B Motor Driven Auxiliary Feedwater (1)Turbine Driven Auxiliary Feedwater (m)1A Service Water (n)1B Service Water (o)1C Service Water (p)1D Service Water (q)1C Standby Auxiliary Feedwater (r)1D Standby Auxiliary Feedwater Flow rates will not be accurate for the residual heat removal pumps because the bypass test loop can'only pass 200 gpm.This bypass test loop is a fixed resistance system;therefore, hydraulic resistance remains unchanged from test to test.3.4 Bearing temperatures will not be available for the Service Water pumps.These pumps and their bearings are submersed in forty feet of water, making it, impossible to take measurements.
(hereafter referred to as the "Code" ) excluding the controls of the Authorized Inspector, Enforcement Authority, Report-ing Systems and N-Stamp Symbol. The inservice testing pro-gram shall be controlled by the Ginna Station Quality Assur-ance Program for Station Operation. Quality Groups A, B and C components correspond to those defined in NRC Regula-tory Guide 1.26.
Be-cause they are submersed, the bearing temperatures stay very close to the temperature of the intake water.PVT 4.0 Inservice-Valve Testin Pro ram 4.1 The Inservice Valve Testing Program was developed in accordance with the requirements of Article'IWV of Section XI of the Code.All those valves that are required to perform a specific function either to shut down the reactor to the cold shut-down condition or in mitigating the consequences of an accident and maintain the reactor in a safe shutdown condition are included in the program.  
Further addenda and editions of Section XI of the Code shall be used for clarification of test requirements and performance.
~<<'I')i~
The Inservice Pump and Valve Testing Program does not affect the pump and valve surveillance program required by Technical Specifications. Technical Specification re-quirements shall continue to be implemented at the required frequency.
QUALITY ASSURANCE MANUAL GINNA STATION TlTLEt APPENDIX C Pump and Valve Testing Program DATE 2/1/81 42 52C PAGE 7 28 OF 4.2 The Inservice Valve Testing Program Requirements for Category A and B Valves are in Tables PVT 4.7 and 4.8, respectively.
 
Category C Valves are broken down into two categories, Check Valves and Relief Valves, which are in Tables PVT 4.9 and 4.10, respectively.
0 5
Category D Valves are not included in this testing program because there are none included in Ginna Station design.4.3 Some exceptions and exemptions to the testing re-quirements of Article I07V have been taken based on operational interference, placing the plant in an unsafe condition and Technical Specification requirements.
4
All exceptions and exemptions are listed on the, valve tables and explained in the referenced notes, PVT.4.11.4.4 The exercising program for Category A and B Valves, with the exception of check valves, shall require a complete stroking of each valve per the valve testing tables.All check valves, including Category C Valves, shall be exercised to the posi-tion required to fulfill their function.These functional tests shall be verified by the operation of the required system.4.5 Category A and B valves operation shall be timed each time they are stroked utilizing switch initiation and the position indicators, which are accessible during plant operation.
    'f
During each refueling outage a visual verification shall be made to confirm direct correspondence between valve operators and the position indicators.
 
0 ,)~'a.~'>l~'
42 52C TITLEs                            DATE QUALITY                                           2/1/81 ASSURANCE               APPENDIX C MANUAL                Pump and Valve       PAGE GINNA STATION          Testing Program               3 OF 28 Definitions AFP         Auxiliary Feedwater Pump AOV,         Air Operated Valve APV         Air Operated Piston Valve .
QUALITY ASSURANCE MANUAL.GINNA STATION TITLE: APPEl'3DlX C Pump and Valve Testing Program DATE 2/1/81 42 5RC PAGE 8 28 OF 4.6 The testing of valves required at cold shutdown and refueling outages will normally take four (4)days to complete.When cold shutdowns are of a shorter duration (2-3 days), test personnel shall attempt to test as many valves as possible without holding up the startup of the unit with testing'eginning no longer than 48 hours after the plant reaches cold shutdown (as defined in Technical Specification 1.2).For very short cold shutdowns (less than 48 hours), it would be impossible to mobilize test personnel to implement the testing program under the required procedural controls, therefore no valves would be tested.It is possible that, during a four (4)day cold shutdown, the work load on test personnel may preclude their completion of all the required valve tests prior to startup.Valve testing during cold shutdowns need not be more frequent than one test per quarter for each valve in the test program.304B'V 1-B RCP Seal Injection 313 MOV Seal Water Return Isolation 370B CV Charging Line Isolation 371 AOV Letdown Isolation 4.7 Category A Valves Valve&#xb9;~Te 304A CV 1-A RCP Seal Injection Note'est Freer 1 Stroke C/R Leak R 1 Stroke C/R Leak R 1 Stroke C/R Leak R 2 Stroke C/R Leak R 3 Stroke C/R Leak R 383B 508 CV Alternate Charging Line AOV RMW to Containment Vessel Stop Stroke Leak Stroke Leak C/R R Q R 0 E J'P a~l i~r QUALITY ASSURANCE MANUAL GINNA STATION TITLE: APPENDIX C Pump and Valve Testing Program DATE 2/1/81 PAGE OF 42 52C 28 528 529 539 743 745 750A 750B 7 59A 7 59B 813 814 846 862A CV CV N Supply to PRT RMW to PRT AOV Return From Excess Let-down HX.CV CC,to A RCP CV CC to B RCP MOV Containment'top CC From Loop A RCP MOV Containment Stop CC From Loop B RCP MOV Supply CC to RX Support Coolers MOV Return CC to RX Support Coolers AOV N2 Supply to Accumulators CV 1-A CSP Disch AOV PRT Stop Valve to Gas Analyzer CV CC From Excess Letdown HX.Note Test Freer Stroke Q Leak R Stroke Q Leak R Stroke Q Leak R Stroke Q Leak R Stroke 0 Leak R Stroke C/R Leak R Stroke C/R Leak R Stroke C/R Leak R Stroke C/R Leak R Stroke C/R Leak R Stroke C/R Leak R Stroke Q Leak R Stroke Q Leak R 862B CV 1-B CSP Disch Stroke Leak t~I y~
BA           Boric Acid Code        American Society of Mechanical E ngxneers Boiler and Pressure'Vessel Code CC           Component Cooling CS           Containment Spray CSP         Containment Spray Pump CV           Check Valve C/R         Cold Shutdown and Refueling ECCS         Emergency Core Cooling System FCV         Flow Control Valve GA           Gas Analyzer GDT         Gas Decay Tank HCV         Hand    Control Valve HX           Heat Exchanger LCV         Level Control. Valve MAFP         Motor Driven Auxiliary Feedwater Pump MOV         Motor Operated Valve
QUALITY ASSURANCE MANUAL GINNA STATION TITLE: APPENDIX C Pump and Valve Testing Program DATE 2/1/81 PAGE 10 OF 42 52C 28 Va 1ve I~Te Descri tion Note Test Freer 870A 870B CV CV 1-A to 1-C SI Pump Disch.1-B to 1-C SI Pump Disch Stroke Leak Q R Stroke Q Leak R 879 8 89A 889B MV SI Test Line Isolation CV 1-A SI Pump Disch CV 1-B SI Pump Disch Stroke Leak Stroke Leak Stroke Leak Q R 956A MV Pressurizer Liquid Space Containment Isolation Stroke Leak 956B 956C MV Loop A and Loop B Hot Leg Containment, Isolation Pressurizer'team Space Containment Isolation Stroke Leak Stroke Leak 966A 96 6B 966C 1003A AOV Pressurizer Steam Space Containment Isolation AOV Pressurizer Liquid Space Containment Isolation AOV Loop A and B Hot Leg Containment Isolation LCV 1-A RCDT Pump Suction Stroke Leak Stroke Leak Stroke Leak Stroke Leak Q R 1003B LCV 1-B RCDT Pump Suction Stroke Leak Q R 1076A IV-3A MV Hydrogen to","A" Recombiner 11 Pilot Containment Isolation SOV Hydrogen to"A" Recombiner 11 Pilot Containment SIV Stroke Leak Stroke Leak v J'l~~h f I 4 II" I'QUALITY ASSURANCE MANUAL GINNA STATION TITLE: APPENDIX C Pump and Valve Testing Program DATE 2/1/81 PAGE 11 OF 28 Valve 1~Te Note Test Fr~cr 1076B IV-3B 1080A IV-2A IV-2B 1084A MV SOV Hydrogen to"B" Recombiner 11 Pilot Containment Isolation Hydrogen to~"B" Recombiner 11 Pilot Containment SIV MV Oxygen Make Up to Contain-11 ment PIV Oxygen Make Up to Contain-11 ment SIV (A Recombiner)
. MV           Manual Valve PCV         Pressure Control Valve PIV         Primary Isolation Valve PORV         Power Operated Relief Valve PRT         Pressurizer Relief Tank PRV         Pressure  Relief Valve PVT         Pump and Valve Testing Q           Quarterly R           Refueling Outage RCDT         Reactor Coolant Drain Tank RCP         Reactor Coolant Pump RCV         Radiation Control Valve RHR         Residual Heat Removal RMW         Reactor Makeup Water RV           Relief Valve RWST         Refueling Water Storage Tank RX           Reactor Vessel S/G         Steam Generator SAFWP       Standby Auxiliary Feedwater Pump SI          Safety Injection SIV          Secondary Isolation Valve SOV          Solenoid Operated Valve SW          Service Water
Oxygen Make Up to Contain-11 ment SIV (B Recombiner)
 
MV Hydrogen to"A" Recombiner 11 Main Burner Containment PIV Stroke Leak Stroke Leak Stroke Leak Stroke Leak, Stroke Leak Stroke Leak IV-5A 1084B SOV Hydrogen to"A" Recombiner 11 Main Burner Containment SIV Hydrogen to';"B" Recombiner
    '   I l
'11 Main Burner'ontainment PIV Stroke Leak Stroke Leak'!IV-5B 1596 1597 1598 1599 1713 1721 SOV Hydrogen to"B" Recombiner 11 Main Burner Containment SIV MV Radiation Monitor Supply AOV Radiation Monitor Supply AOV Radiation Monitor Exhaust CV Radiation Monitor Exhaust Inside Containment CV N2 to RCDT Check AOV Suction line to RCDT Stroke Leak Stroke Q Leak R Stroke Q Leak.R Stroke Q Leak R Stroke Q Leak R Stroke Q Leak R Stroke 9 Leak R g~~~'I~~,\
      )
QUALITY ASSURANCE MANUAL GINNA STATION TITLE: APPENDIX C Pump and Valve Testing Program f DATE 2/1/81 PAGE 12 OF 42 52C 28 Va lve I~Te Descri tion Note Test Free 1723 1728 1786 AOV A Containment Sump Disch Stop to Waste Holdup Tank AOV A Containment Sump Disch Stop to Waste Holdup Tank AOV RCDT to VH 21 Stroke Q Leak R Stroke Q Leak R Stroke Q Leak R 1787 1789 5392 5393 5735 5736 AOV RCDT to VH AOV RCDT to GA Containment.
l f
Isolation AOV Instrument Air to Contain-19 ment Isolation CV Instrument to Containment 19 Isolation AOV"A" S/G Blowdown Sample Isolation AOV"B" S/G Blowdown Sample Isolation Stroke Q Leak R Stroke Q Leak R Stroke R Leak R Stroke R Leak R Stroke Q Leak R Stroke Leak 5737 AOV"B" S/G Blowdown Isolation Stroke Leak Q R 5738 AOV"A" S/G Blowdown Isolation.Stroke Leak Q R 5869 APV Containment Purge Supply 22 Isolation Stroke Leak 5870 APV Containment Purge Supply 22 Isolation Stroke Leak 5878 5879 APV Containment, Purge Exhaust 22 Isolation APV Containment Purge Exhaust 22 Isolation Stroke Leak Stroke Leak*-See Note 22 0~~  
 
~lQUALITY ASSURANCE MANUAL GINNA STATION TITLE: APPENDIX C Pump and Valve Testing Program DATE 2/1/81 PAGE 13 OF 42 52C 28 Valve 5~Te'ote Te st Freer 6151 MV Heating Steam to Containment Stroke Leak 6175 7141 7226 MV MV CV Condensate Return from Containment Service Air Isolation Outside Containment Service Air Isolation Inside Containment Stroke Leak Stroke'eak Stroke Leak 7443 7444 MOV Containment Air Test Supply MOV Containment Air Test Vent 11 Stroke Leak Stroke Leak 7445 MOV Containment, Air Test Vent 11 Stroke Leak 7970 7971 8418 8419 AOV Containment Depressuri-zation Valve, AOV Containment Depressuri-zation Valve AOV Demin.Water to Contain-ment Is'olation CV Demin.Water to Contain-ment Isolation Stroke Leak Stroke Leak Stroke Leak Stroke Leak 4.8 Category B Valves Va 1ve 0~Te Descri tion Note Test Free 014 017 RCV Aux Building GDT Release RCV Comp Cool Surge Tank Vent Stroke Q h Stroke QUALITY ASSURANCE MANUAL GINNA STATION TITLE>APPENDIX C Pump and Valve Testing Program DATE 2/1/81 PAGE 14 28 OF 081 APV 082 APV Valve N~Te Descri tion Control Room Ventilation Damper Control Room Ventilation Damper Note Test~Fre Stroke Q Stroke Q 083 084 085 086 APV APV APV APV Control Room Ventilation Damper Control Room Ventilation Damper Control Room Ventilation Damper Control Room Ventilation Damper Stroke Q Stroke Q Stroke Q Stroke 112B 112C 427 430 LCV LCV Emergency Makeup RWST to Charging Purqp e I'CT Outlet AOV Letdown From Loop B PORV Reactor Coolant System Pressure Relief 16 Stroke Q Stroke Q Stroke C/R Stroke C/R 431C PORV Reactor Coolant System Pressure Relief 16 Stroke C/R 624 625 626 700 701 704A HCV 1-B RHR HX Outlet HCV 1-A RHR HX Outlet FCV RHR Loop Return MOV Suction Stop From Loop A to RHR Pumps MOV Suction Stop From Loop A to RHR Pumps MOV Suction 1-A RHR Pump Stroke Q Stroke Q Stroke Q Stroke C/R Stroke C/R Stroke Q
42 52C TITLE:                            DATE QUALITY                                          2/1/81 ASSURANCE            APPENDIX  C PAGE MANUAL            Pump and Valve GINNA STATION        Testing Program                  4  DP 28 Definitions TAFP        Turbine Driven Auxiliary Feedwater   Pump VC          Volume Control VCT          Volume Control Tank VH          Vent Header
~~''T  
 
~4.,~1 I QUALITY ASSURANCE MANUAL GINNA STATION TITLEt APPENDIX C Pump and Valve Testing Program DATE 2/1/81 PAGE 15 28 OF Valve&#xb9;~T pe Descri tion 704B 720 MOV Suction.l-B RHR Pump II I MOV 10"-Discharge to B Loop From RHR Pumps Note Test Freer Stroke Q 8 Stroke C/R 721 MOV 10" Disch to B Loop From RHR Pumps 8 Stroke C/R 738A 738B 825A 825B 826A 826B 826C 826D 836A 836B 850A 850B 852A 852B 856 857A MOV CC to l-A RHR HX MOV CC to l-B RHR HX MOV SI Pump Suction From RWST 9 MOV SI Pump Suction From RWST 9 MOV SI Pump Suction From BA Tank MOV SI Pump Suction From BA Tank MOV SI Pump Suction From BA Tank MOV SI Pump Suction From BA Tank-HCV Spray Additive Tank Dis-17 charge HCV Spray Additive Tank Dis-17 charge MOV Sump B to RHR Pumps MOV Sump B to RHR Pumps MOV RHR Pumps to Reactor Vessel 18 MOV RHR Pumps to Reactor Vessel 18 MOV RWST to RHR-Pumps MOV Isolate lB RHR HX From CS and SI Pumps Stroke Q Stroke Q Stroke C/R Stroke C/R Stroke Q Stroke Q Stroke Q Stroke P Stroke Q Stroke Q Stroke Q Stroke Q Stroke C/R Stroke C/R Stroke C/R Stroke Q r~~~QUALITY ASSURANCE MANUAL GINNA STATION TITLEi APPENDIX C Pump and Valve Testing Program DATE 2/1/81 PAGE 16 28 OF Va 1ve 1~Te Descri tion Note Test Freq 857B 857C 860A MOV Isolate lA RHR HX From CS and SI Pumps MOV Isolate lA RHR HX From CS and SI Pumps MOV Parallel Discharge MOV'From 1-A CSP Stroke Q Stroke-Q Stroke Q 860B 860C MOV Parallel Discharge MOV From 1-A CSP MOV Parallel Discharge MOV From 1-B CSP Stroke Q Stroke Q 860D 871A 871B 875A 875B 876A 876B 896A 896B 951 953 MOV Parallel Discharge MOV From 1-B CSP MOV 1-A to 1-C SI Pump Discharge MOV 1-B to 1-C SI Pump Discharge MOV Parallel MOV From CS Pumps to 1A Charcoal Filter Deluge MOV Parallel MOV From CS Pumps to 1A Charcoal Filter Deluge MOV Parallel MOV From CS Pumps to 1B Charcoal Filter Deluge MOV Parallel MOV From CS Pumps to 1B Charcoal Filter Deluge MOV RWST to CS and SI Pumps MOV RWST to CS and SI Pumps AOV Pressurizer, Steam Space Sample AOV Pressurizer Liquid Space Sample Stroke Q Stroke Q Stroke 9 Stroke 9 Stroke Q Stroke Q Stroke Q 9 Stroke C/R 9 Stroke C/R Stroke Q Stroke Q 0.0 QUALITY ASSURANCE MANUAL GINNA STATION 7ITLEi APPENDIX C Pump and Valve Testing Program DATE 2/1/81 PAGE 17 28 OF Valve N TvVe Descri tion Note Test, Freer 955 959 AOV AOV"B" Loop Hot Leg Sample RHR Loop Sample Stroke Q 20'troke C/R 1811A 1811B 1815A l815B 3504 MOV Main Steam to TAFP From l-B S/G Reator Coolant Drain Tank 11 Isolation to RHR System Reactor Coolant Drain Tank 11 Isolation to RHR System MOV C-SI Pump Suction From RWST MOV C-SI Pump Suction From RWST Stroke Q Stroke Q Stroke Q 3505 MOV Main Steam to TAFP From l-A S/G Stroke Q 3652 MV Main Steam Throttle Valve to TAFP Stroke Q 3996 4000A 4000B 4007 4008 4013 MOV TAFP Discharge MOV Cross Over Valve For MAFP MOV Cross Over Valve For MAFP MOV l-A MAFP Discharge MOV l-B MAFP Discharge MOV TAFP Service Water Supply Isolation Stroke Q Stroke Q Stroke Q Stroke Q Stroke Q Stroke Q 4027 MOV 1-A MAFP Service Water Isolation Stroke Q 4028 4291 MOV l-B MAFP Service Water Isolation AOV TAFP Recir.Line Stroke Q Stroke Q 4297 AOV TAFP Discharge to 1-A S/G-Stroke Q 0 0 I~I QUALITY ASSURANCE MANUAL GINNA STATION TITLEt APPENDIX C Pump and Valve Testing Program DATE 2/1/81 PAGE 18 28 OF 4298 AOV 4304.AOV Va lve N~Te Descri tion TAFP Discharge to-1-B S/G 1-A MAFP Recirculation Control Note Test Prep Stroke Q Stroke Q 4310 AOV.,1-B MAFP Recirculation Control Stroke Q 4561 4562 4609 AOV AOV MOV Containment Vent Recirc.Fans Discharge Flow Con-trol Containment Vent Recirc.Fans Discharge Flow Con-trol Bypass lA1'creen House SW'solation Stroke Q Stroke Q Stroke Q 4613 4614 MOV MOV 1B2 Turbine<Building SW Isolation lAl Turbine Building SW.Isolation Stroke Q Stroke Q 4615 MOV lBl Aux.Building SW Isolation Stroke g 4616 MOV 1Al Aux.Building SW Isolation Stroke Q 4663 4664 4670 MOV lA1 Air Cond.Chillers SW Isolation MOV 1A2 Turbine Building SW Isolation MOV 1B1 Turbine Building SW Isolation Stroke Q Stroke Q Stroke Q 4733 4734 MOV 1A2 Air Cond.Chillers SW Isolation MOV 1B2 Aux.Build.SW Isolation-Stroke Q Stroke Q  
'e l ~ ~
'1 0 QUALITY ASSURANCE MANUAL GINNA STATION TITLE)APPENDIX C Pump and Valve Testing Program DATE 2/1/81 42 52C PAGE 19 28 OF Valve 1~Te Descri tion IJote Test Freq 4735 4780 MOV MOV 1A2 Aux.Build.SW Isolation 1A2 Screen House SW Isolation Stroke Stroke 5171 5871 5872 5873 5874 5875 5876 9629A MOV APV APV APV APV APV APV MOV Turbine Build.Fire Water Loop Supply Isolation Containment Post Accident Filter Damper Containment Post Accident Filter Damper Containment.
42 52C TITLE:                              DATE QUALITY                                                    2/1/81 ASSURANCE                    APPENDIX, C PAGE MANUAL                      Pump and Valve GINNA STATION                  Testing Program                  5  DP 28 PVT  1.0 'co        Pum  and Valve e and Res Testin onsibilit Pro ram The inservice testing program defines the testing program for Quality Groups A, B and C Pumps and Valves in accordance with the requirements of Articles IWP and IWV of Section XI of the Code.
Post Accident Filter Damper Containment Post.Accident Filter Damper Containment; Post, Accident Filter Damper Containment Post Accident Filter Damper 1C SAFP Servi'ce.Water Isolation Stroke Stroke Stroke Stroke Stroke Stroke Stroke Stroke Q 9629B MOV 1D SAFP Service Water Isolation Stroke Q 9701A 9701B 9703A 970 3B MOV 9704A MOV SAFP Cross Over 1C SAFP Containment Isolation MOV 1C SAFP Discharge MOV 1D SAFP Discharge MOV SAFP Cross Over Stroke Q Stroke Q Stroke Q Stroke Q Stroke Q 9704B MOV 1D SAFP Containment Isolation Stroke Q  
The results of these tests are to assure the operational readiness of      pumps and valves.
1.2        It is the responsibility of the Ginna Station Test and Results Supervisor to implement this test program and develop inservice test proce-dures which will outline the specific test for each pump.and valve included in the program.
1.3        When a valve, pump or its control system has been replaced or repaired or has undergone maintenance that could affect its performance, and prior to
              =
the time    it is returned to service,  it  shall be tested as necessary to demonstrate that the per-formance parameters which could have been affected by the replacement, repair, or maintenance are within acceptable limits.
PVT  2.0        Code Edition and Testin Interval 2.1        The Inservice Pump and Valve Testing Program for the ten (10) year period starting January 1, 1981 through December 31, 1990 was developed utilizing the 1977 Edition of Section XI of the Code through the Summer 1978 Addenda.
PVT 3.0       Inservice Pum Testinq Pro ram 3.1       The.Inservice Pump Testing Program was developed in accordance with the requirements of Article IWP of Section XI of the Code.       This program includes all Quality Group A, B and C pumps which are provided with an emergency power source and are required'to perform a specific function in shutting down a reactor or in mitigating the consequences of an accident and maintain the reactor in a safe shutdown condition.
 
~
    ~
l ~
  )       ~
 
42 52C TITLE:                              DATE QUALITY                                                 2/1/81 ASSURANCE                   APPENDIX C MANUAL                    Pump and Valve           PAGE GINNA STATION              Testing Program                 6 OF 28 3.2       The   following pumps shall be tested in accord-ance   with Article IWP of Section XI:
(a)   lA Component Cooling (b)   1B Component Cooling (c)   1A Safety Injection (d)   lB Safety   Injection (e)   1C Safety Injection (f)   lA Residual Heat Removal (g)   lB Residual Heat Removal (h)   lA Containment Spray (i)   1B Containment Spray (j)   lA Motor Driven Auxiliary Feedwater (k)   1B Motor Driven Auxiliary Feedwater (1)   Turbine Driven Auxiliary Feedwater (m)   1A Service Water (n)   1B Service Water (o)   1C Service Water (p)   1D Service Water (q)   1C Standby Auxiliary Feedwater (r)   1D Standby Auxiliary Feedwater 3.3        Flow rates will not be accurate for the residual heat removal pumps because the bypass test loop can'only pass 200 gpm. This bypass test loop is a fixed resistance   system; therefore, hydraulic resistance remains unchanged from test to test.
3.4       Bearing temperatures will not be available for the Service Water pumps. These pumps and their bearings are submersed in forty feet of water, making it, impossible to take measurements.     Be-cause they are submersed, the bearing   temperatures stay very close to the temperature of the intake water.
PVT 4.0       Inservice-Valve Testin Pro ram 4.1       The Inservice Valve Testing Program was developed in accordance with the requirements of Article
            'IWV of Section XI of the Code. All those valves that are required to perform a specific function either to shut down the reactor to the cold shut-down condition or in mitigating the consequences of an accident and maintain the reactor in a safe shutdown condition are included in the program.
 
  ~   <<'I
'   ) i   ~
 
42 52C TlTLEt                               DATE QUALITY                                                  2/1/81 ASSURANCE                APPENDIX   C MANUAL                  Pump and   Valve           PAGE GINNA STATION            Testing Program                   7 OF 28 4.2     The Inservice Valve Testing Program Requirements for Category A and B Valves are in Tables PVT 4.7 and 4.8, respectively.       Category C Valves are broken down into two categories, Check Valves and Relief Valves, which are in Tables PVT 4.9 and 4.10, respectively. Category D Valves are not included in this testing program because there are none included in Ginna Station design.
4.3     Some exceptions and exemptions to the testing re-quirements of Article I07V have been taken based on operational interference, placing the plant in an unsafe condition and Technical Specification requirements. All exceptions and exemptions are listed on the, valve tables and explained in the referenced notes,   PVT .4.11.
4.4     The exercising program for Category A and B Valves, with the exception of check valves, shall require a complete stroking of each valve per the valve testing tables. All check valves, including Category C Valves, shall be exercised to the posi-tion required to fulfilltheir function. These functional tests shall be verified by the operation of the required system.
4.5     Category A and B valves operation shall be timed each time they are stroked utilizing switch initiation and the position indicators, which are accessible during plant operation. During each refueling outage a visual verification shall be made to confirm direct correspondence between valve operators and the position indicators.
 
0
      ,)     ~
: a. ~
    '     >   l     ~
 
42 5RC TITLE:                                DATE QUALITY                                                   2/1/81 ASSURANCE                   APPEl'3DlX C MANUAL                    Pump and Valve             PAGE
. GINNA STATION              Testing Program                   8 OF 28 4.6       The testing of valves required at cold shutdown and refueling outages will normally take four (4) days to complete. When cold shutdowns are of a shorter duration (2-3 days), test personnel shall attempt to test as many valves as possible without holding up the startup of the unit with testing'eginning no longer than 48 hours after the plant reaches cold shutdown (as defined in Technical Specification 1.2). For very short cold shutdowns (less than 48 hours), it would be impossible to mobilize test personnel to implement the testing program under the required procedural controls, therefore no valves would be tested.
It is possible that,load  during a four (4) day cold on test personnel may shutdown, the work preclude their completion of all the required valve tests prior to startup. Valve testing during cold shutdowns need not be more frequent than one test per quarter for each valve in the test program.
4.7      Category    A Valves Valve &#xb9;   ~Te                                   Note  'est        Freer 304A       CV   1-A RCP Seal Injection         1   Stroke   C/R Leak         R 304B    'V      1-B  RCP  Seal  Injection        1   Stroke Leak C/R R
313        MOV  Seal Water Return                1    Stroke    C/R Isolation                              Leak          R 370B      CV    Charging Line    Isolation        2   Stroke   C/R Leak         R 371        AOV  Letdown  Isolation              3   Stroke   C/R Leak         R 383B       CV   Alternate Charging Line               Stroke    C/R Leak          R 508        AOV   RMW to Containment Vessel             Stroke        Q Stop                                   Leak         R
 
J 0
        'P a
      ~   l i ~
E r
 
42 52C TITLE:                          DATE QUALITY                                             2/1/81 ASSURANCE                 APPENDIX C MANUAL                  Pump and Valve       PAGE GINNA STATION              Testing Program                         28 OF Note  Test    Freer 528         CV  N  Supply to  PRT              Stroke        Q Leak          R 529         CV  RMW  to PRT                      Stroke        Q Leak          R 539        AOV PRT Stop Valve    to Gas        Stroke        Q Analyzer                          Leak          R 743        CV  CC  From Excess Letdown HX.      Stroke        Q Leak          R 745        AOV Return From Excess Let-           Stroke        0 down HX.                         Leak          R 750A        CV CC,to   A RCP                     Stroke    C/R Leak          R 750B        CV CC to B RCP                     Stroke    C/R Leak          R 7 59A      MOV Containment'top     CC From     Stroke    C/R Loop A   RCP                     Leak          R 7 59B      MOV Containment Stop     CC From     Stroke    C/R Loop   B RCP                     Leak        R 813        MOV Supply   CC to RX Support       Stroke    C/R Coolers                           Leak        R 814        MOV Return CC to   RX Support       Stroke    C/R Coolers                           Leak        R 846        AOV N2 Supply to Accumulators       Stroke      Q Leak        R 862A      CV   1-A CSP Disch                     Stroke       Q Leak         R 862B      CV  1-B CSP Disch                    Stroke Leak
 
t
~ I y ~
 
42 52C TITLE:                            DATE QUALITY                                                2/1/81 ASSURANCE                  APPENDIX    C MANUAL                  Pump and    Valve        PAGE GINNA STATION              Testing Program                10 OF 28 Va 1ve I    ~Te            Descri tion          Note  Test    Freer 870A        CV  1-A  to  1-C SI Pump Disch          Stroke       Q Leak         R 870B        CV .1-B to 1-C SI    Pump  Disch       Stroke       Q Leak         R 879        MV  SI Test Line    Isolation          Stroke Leak 8 89A      CV  1-A SI Pump Disch                  Stroke        Q Leak          R 889B        CV  1-B SI Pump Disch                   Stroke Leak 956A        MV  Pressurizer Liquid      Space      Stroke Containment    Isolation           Leak 956B             Loop   A and Loop   B Hot Leg     Stroke Containment, Isolation             Leak 956C        MV  Pressurizer'team Space             Stroke Containment Isolation               Leak 966A       AOV Pressurizer   Steam Space         Stroke Containment   Isolation           Leak 96 6B      AOV Pressurizer Liquid     Space       Stroke Containment   Isolation           Leak 966C        AOV Loop A and   B Hot Leg             Stroke Containment   Isolation           Leak 1003A      LCV   1-A RCDT Pump   Suction           Stroke       Q Leak         R 1003B     LCV   1-B RCDT Pump Suction               Stroke       Q Leak         R 1076A     MV   Hydrogen to", "A" Recombiner   11 Stroke Pilot   Containment Isolation       Leak IV-3A      SOV   Hydrogen to "A" Recombiner 11       Stroke Pilot Containment SIV               Leak
 
v J'
          ~ ~
l h
f I
4 II"
 
I TITLE:                            DATE QUALITY                                             2/1/81 ASSURANCE                 APPENDIX C MANUAL                  Pump and Valve         PAGE GINNA STATION            Testing Program               11 OF 28 Valve 1   ~Te                               Note   Test     Fr~cr 1076B     MV Hydrogen   to "B" Recombiner   11 Stroke Pilot Containment Isolation       Leak IV-3B      SOV Hydrogen to~ "B" Recombiner   11 Stroke Pilot Containment SIV             Leak 1080A      MV Oxygen Make Up   to Contain- 11 Stroke ment PIV                           Leak IV-2A          Oxygen Make Up to Contain-     11 Stroke ment SIV (A Recombiner)           Leak, IV-2B          Oxygen Make Up to Contain-     11 Stroke ment SIV (B Recombiner)           Leak 1084A      MV Hydrogen to "A" Recombiner 11     Stroke Main Burner Containment PIV       Leak IV-5A     SOV Hydrogen to "A" Recombiner 11     Stroke Main Burner Containment SIV       Leak 1084B          Hydrogen to'; "B" Recombiner '11   Stroke Main Burner'ontainment PIV         Leak IV-5B     SOV Hydrogen to "B" Recombiner 11     Stroke Main Burner Containment SIV       Leak 1596      MV Radiation Monitor Supply           Stroke        Q Leak          R 1597      AOV Radiation Monitor Supply           Stroke        Q Leak    . R 1598      AOV Radiation Monitor Exhaust         Stroke        Q Leak          R 1599      CV Radiation Monitor Exhaust         Stroke      Q Inside Containment                 Leak          R 1713      CV N2 to RCDT Check               Stroke      Q Leak        R 1721      AOV Suction line to     RCDT           Stroke       9 Leak         R
 
  ~
g
      ' ~ ~
I
  ~   ~
,\
 
42 52C TITLE:                            DATE QUALITY                                                 2/1/81 ASSURANCE                     APPENDIX   C MANUAL                      Pump and   Valve         PAGE GINNA STATION                Testing Program               12        28 f                 OF Va lve   I   ~Te           Descri tion         Note Test   Free 1723         AOV A Containment Sump Disch           Stroke      Q Stop to Waste Holdup Tank           Leak        R 1728          AOV A Containment Sump Disch           Stroke      Q Stop to Waste Holdup Tank           Leak        R 1786          AOV RCDT   to VH                     21 Stroke     Q Leak       R 1787          AOV  RCDT  to VH                        Stroke     Q Leak       R 1789         AOV RCDT   to GA Containment.         Stroke      Q Isolation                           Leak        R 5392          AOV Instrument Air to Contain-       19 Stroke      R ment   Isolation                   Leak        R 5393          CV   Instrument to Containment       19 Stroke      R Isolation                           Leak        R 5735          AOV "A" S/G Blowdown Sample             Stroke      Q Isolation                           Leak        R 5736          AOV "B" S/G Blowdown Sample             Stroke Isolation                           Leak 5737         AOV "B" S/G Blowdown     Isolation     Stroke     Q Leak       R 5738         AOV "A" S/G Blowdown     Isolation . Stroke     Q Leak       R 5869         APV Containment Purge Supply         22 Stroke Isolation                           Leak 5870         APV Containment Purge Supply         22 Stroke Isolation                           Leak 5878         APV Containment, Purge Exhaust       22 Stroke Isolation                           Leak 5879          APV Containment Purge Exhaust       22 Stroke Isolation                           Leak
* See Note 22
 
0 ~ ~
~
l 42 52C TITLE:                         DATE QUALITY                                            2/1/81 APPENDIX
                      'ote ASSURANCE                            C MANUAL                    Pump and Valve       PAGE GINNA STATION              Testing Program               13             28 OF Valve   5 ~Te                                     Te st         Freer 6151       MV   Heating Steam to                 Stroke Containment                     Leak 6175       MV   Condensate Return from           Stroke Containment                     Leak 7141      MV    Service Air Isolation           Stroke Outside Containment                       'eak 7226      CV    Service Air Isolation           Stroke Inside Containment               Leak 7443      MOV   Containment   Air Test           Stroke Supply                           Leak 7444      MOV   Containment   Air Test Vent 11 Stroke Leak 7445       MOV   Containment, Air Test Vent 11 Stroke Leak 7970       AOV   Containment Depressuri-         Stroke zation Valve,                   Leak 7971      AOV   Containment Depressuri-         Stroke zation Valve                     Leak 8418      AOV   Demin. Water to Contain-         Stroke ment Is'olation                 Leak 8419      CV   Demin. Water to Contain-         Stroke ment Isolation                   Leak 4.8   Category   B Valves Va 1ve 0 ~Te             Descri tion       Note Test         Free 014       RCV   Aux Building   GDT Release     Stroke            Q h
017        RCV   Comp Cool Surge Tank Vent       Stroke
 
TITLE>                               DATE QUALITY                                                2/1/81 ASSURANCE                  APPENDIX       C MANUAL                  Pump and       Valve       PAGE GINNA STATION            Testing Program                   14 OF 28 Valve N   ~Te           Descri tion             Note  Test    ~Fre 081        APV  Control Room       Ventilation       Stroke      Q Damper 082        APV  Control Room       Ventilation       Stroke     Q Damper 083       APV Control Room       Ventilation       Stroke      Q Damper 084        APV  Control Room       Ventilation       Stroke      Q Damper 085        APV  Control Room       Ventilation       Stroke      Q Damper 086        APV  Control Room       Ventilation       Stroke Damper 112B       LCV Emergency Makeup       RWST to     Stroke      Q Charging Purqp e
112C      LCV      Outlet  I'CT Stroke      Q 427        AOV Letdown From Loop       B           Stroke  C/R 430        PORV Reactor Coolant System           16 Stroke   C/R Pressure Relief 431C       PORV Reactor Coolant System           16 Stroke   C/R Pressure Relief 624       HCV 1-B RHR HX Outlet                   Stroke      Q 625        HCV 1-A RHR HX Outlet                   Stroke      Q 626        FCV RHR Loop Return                     Stroke      Q 700        MOV Suction Stop From Loop         A     Stroke  C/R to RHR Pumps 701        MOV Suction Stop From Loop         A     Stroke  C/R to RHR Pumps 704A      MOV Suction 1-A       RHR Pump           Stroke     Q
 
    ~
      ~
'T
 
~
  ~
4.,
1 I
TITLEt                                DATE QUALITY                                                   2/1/81 ASSURANCE                   APPENDIX   C MANUAL                    Pump and   Valve         PAGE GINNA STATION              Testing Program                   15 OF 28 Valve &#xb9;   ~T pe           Descri tion           Note    Test    Freer 704B       MOV   Suction.l-B   II RHR Pump             Stroke        Q I
720        MOV   10"-Discharge to     B Loop       8  Stroke    C/R From RHR Pumps 721        MOV   10" Disch   to   B Loop From       8 Stroke     C/R RHR Pumps 738A       MOV   CC to l-A   RHR HX                   Stroke        Q 738B      MOV   CC to l-B   RHR HX                   Stroke        Q 825A      MOV   SI Pump Suction From     RWST     9 Stroke    C/R 825B      MOV   SI Pump Suction From     RWST     9 Stroke    C/R 826A      MOV   SI Pump Suction From     BA Tank     Stroke        Q 826B      MOV  SI Pump Suction From     BA Tank     Stroke        Q 826C      MOV   SI Pump Suction From     BA Tank     Stroke        Q 826D      MOV   SI Pump Suction From     BA Tank   Stroke      P 836A      HCV   Spray Additive Tank Dis-           17 Stroke        Q charge 836B      HCV   Spray Additive Tank Dis-           17 Stroke      Q charge 850A      MOV   Sump B   to RHR Pumps                 Stroke      Q 850B      MOV   Sump B   to RHR Pumps                 Stroke      Q 852A      MOV   RHR Pumps   to Reactor Vessel     18 Stroke    C/R 852B      MOV   RHR Pumps   to Reactor Vessel     18 Stroke    C/R 856        MOV   RWST   to RHR-Pumps                   Stroke    C/R 857A      MOV   Isolate lB RHR HX     From           Stroke      Q CS and SI Pumps
 
~
r ~
  ~
TITLEi                          DATE QUALITY                                           2/1/81 ASSURANCE                APPENDIX C MANUAL                  Pump and Valve         PAGE GINNA STATION            Testing Program               16 OF 28 Va 1ve 1   ~Te           Descri tion         Note Test     Freq 857B       MOV Isolate lA RHR HX From         Stroke        Q CS and SI Pumps 857C      MOV Isolate lA RHR HX From         Stroke Q
CS and SI Pumps 860A      MOV Parallel Discharge   MOV         Stroke        Q
                      'From 1-A CSP 860B       MOV Parallel Discharge   MOV         Stroke        Q From 1-A CSP 860C      MOV Parallel Discharge   MOV         Stroke        Q From 1-B CSP 860D      MOV Parallel Discharge   MOV         Stroke        Q From 1-B CSP 871A      MOV 1-A to 1-C SI Pump Discharge     Stroke        Q 871B      MOV 1-B to 1-C SI Pump Discharge     Stroke        9 875A      MOV Parallel MOV From CS Pumps       Stroke        9 to 1A Charcoal Filter Deluge 875B      MOV Parallel MOV From CS Pumps       Stroke        Q to 1A Charcoal Filter Deluge 876A      MOV Parallel MOV From CS Pumps       Stroke        Q to 1B Charcoal Filter Deluge 876B      MOV Parallel MOV From CS Pumps       Stroke        Q to 1B Charcoal Filter Deluge 896A      MOV RWST to CS and SI Pumps       9  Stroke    C/R 896B      MOV RWST to CS and SI Pumps       9  Stroke    C/R 951        AOV Pressurizer, Steam Space         Stroke        Q Sample 953        AOV Pressurizer Liquid   Space       Stroke       Q Sample
 
0 .0 7ITLEi                                DATE QUALITY                                                   2/1/81 ASSURANCE                   APPENDIX C MANUAL                    Pump and Valve           PAGE GINNA STATION              Testing Program                   17 OF 28 Valve N   TvVe           Descri tion           Note   Test,     Freer 955       AOV "B" Loop Hot Leg Sample                 Stroke        Q 959        AOV  RHR Loop Sample                   20 'troke     C/R 1811A           Reator Coolant Drain Tank         11 Isolation to     RHR System 1811B          Reactor Coolant Drain Tank         11 Isolation to     RHR System 1815A      MOV C-SI   Pump Suction From   RWST       Stroke        Q l815B      MOV C-SI   Pump Suction From   RWST       Stroke       Q 3504      MOV Main Steam     to TAFP From l-B      Stroke        Q S/G 3505      MOV  Main Steam    to  TAFP From  l-A      Stroke       Q S/G 3652       MV   Main Steam     Throttle Valve           Stroke        Q to TAFP 3996       MOV TAFP   Discharge                       Stroke        Q 4000A      MOV Cross Over Valve For       MAFP         Stroke        Q 4000B      MOV Cross Over Valve For       MAFP         Stroke        Q 4007      MOV l-A MAFP   Discharge                 Stroke        Q 4008      MOV l-B MAFP   Discharge                 Stroke        Q 4013      MOV TAFP   Service Water Supply             Stroke       Q Isolation 4027      MOV  1-A  MAFP    Service Water              Stroke       Q Isolation 4028       MOV l-B MAFP   Service Water             Stroke        Q Isolation 4291      AOV TAFP   Recir. Line                     Stroke       Q 4297       AOV TAFP   Discharge to 1-A S/G           Stroke       Q
 
0 0   I ~
I
 
TITLEt                                      DATE QUALITY                                                           2/1/81 ASSURANCE                   APPENDIX C MANUAL                    Pump and Valve                     PAGE GINNA STATION                Testing Program                         18 OF 28 Va lve N   ~Te             Descri tion                   Note  Test    Prep 4298        AOV  TAFP Discharge to- 1-B S/G                   Stroke      Q 4304      . AOV  1-A MAFP Recirculation                     Stroke     Q Control 4310       AOV .,1-B MAFP   Recirculation                     Stroke     Q Control 4561       AOV   Containment Vent Recirc.                     Stroke      Q Fans Discharge Flow Con-trol 4562        AOV  Containment Vent Recirc.                     Stroke      Q Fans Discharge Flow Con-trol Bypass 4609        MOV  lA1'creen   House SW                       Stroke     Q
                                            'solation 4613       MOV   1B2 Turbine <Building             SW         Stroke      Q Isolation 4614        MOV  lAl Turbine Building               SW .     Stroke     Q Isolation 4615       MOV   lBl Aux. Building SW                         Stroke     g Isolation 4616       MOV   1Al Aux. Building   SW                     Stroke     Q Isolation 4663       MOV   lA1 Air Cond. Chillers               SW     Stroke      Q Isolation 4664        MOV   1A2 Turbine Building             SW         Stroke      Q Isolation 4670        MOV   1B1 Turbine Building             SW         Stroke     Q Isolation 4733       MOV   1A2 Air Cond. Chillers               SW     Stroke      Q Isolation 4734        MOV   1B2 Aux. Build. SW Isolation             Stroke     Q
 
  ' 1 0
 
42 52C TITLE)                                DATE QUALITY                                                   2/1/81 ASSURANCE                 APPENDIX   C MANUAL                  Pump and Valve             PAGE GINNA STATION              Testing Program                   19 OF 28 Valve 1 ~Te           Descri tion             IJote Test     Freq 4735       MOV 1A2 Aux. Build. SW Isolation     Stroke 4780      MOV 1A2   Screen House   SW               Stroke Isolation 5171       MOV Turbine Build. Fire Water               Stroke Loop Supply     Isolation 5871    APV  Containment Post Accident             Stroke Filter   Damper 5872    APV  Containment Post Accident             Stroke Filter   Damper 5873    APV  Containment. Post Accident             Stroke Filter   Damper 5874    APV  Containment Post. Accident             Stroke Filter   Damper 5875    APV  Containment; Post, Accident           Stroke Filter   Damper 5876    APV  Containment Post Accident             Stroke Filter   Damper 9629A    MOV  1C SAFP   Servi'ce. Water             Stroke       Q Isolation 9629B   MOV   1D SAFP   Service Water               Stroke        Q Isolation 9701A    MOV  1C SAFP    Discharge                  Stroke       Q 9701B   MOV  1D SAFP    Discharge                  Stroke        Q 9703A   MOV   SAFP   Cross Over                     Stroke      Q 970 3B  MOV   SAFP   Cross Over                     Stroke       Q 9704A    MOV  1C SAFP    Containment                Stroke       Q Isolation 9704B   MOV   1D SAFP   Containment                 Stroke       Q Isolation
 
TITLE:                                DATE QUALITY                                                  2/1/81 ASSURANCE                    APPENDIX    C MANUAL                    Pump and    Valve        PAGE GINNA STATION                Testing Program                  20 OF 28 Valve  I  ~Te                                    Note  Test    Frea I  971 0A    AOV    1C 'SAFP  Recirc. Control            Stroke 9710a      AOV    1D SAFP    Recirc. Control            Stroke 4.9    Category  C  Check Valves Valve  0  ~T pe                                  Note  Test    Freer 710A        CV    1-A  RHR Pump      Discharge          Stroke      Q 710B        CV    1-B  RHR Pump      Discharge          Stroke      Q 723A        CV    1-A  CC Pump      Discharge            Stroke      Q 723B        CV-. 1-B  CC Pump      Discharge            Stroke      Q 842A        CV    First  Check Valve in Loop            Stroke      Q A  Accumulator Dump Line 842B        CV    First  Check<Valve      in Loop      Stroke      Q B  Accumulator      Dump  Line 847A        CV    A-CSP From Spray      Additive        Stroke      Q Tank  to Eductor 847B        CV    B-CSP From Spray      Additive        Stroke      9 Tank  to Eductor 853A        CV    Core Deluge Check                10  Stroke  C/R 853B        CV    Core Deluge Check                10  Stroke  C/R 854        CV    RWST  to  RHR Pump    Check          Stroke      Q 8 66A      CV    CS  Pump  1-A    to Charcoal    12  Stroke  C/R Filter    Deluge 866B        CV    CS  Pump 1-B      to Charcoal          Stroke      Q Filter    Deluge
                                    'f 3
867A        CV    Accumulator.- Dump and SI        13  Stroke      R to Cold Leg Loop B 867B        CV    Accumulator      Dump and SI    13  Stroke      R to Cold    Leg Loop A
 
t 4i ~
I ~
TITLE                            DATE QUALITY                                            2/1/81 ASSURANCE                  APPENDIX  C MANUAL                  Pump and Valve        PAGE GINNA STATION              Testing Program              21        28 OF Va 1ve 0  ape            Descri tion      Note    Test    Freq 878G      CV  1-A SI Pump to Cold Leg      13    Stroke      R Loop B After MOV 878B 878J      CV  l-B SI    Pump to Cold Leg  13    Stroke      R Loop A    After MOV 878D 3516      CV  1B S/G Main Steam Swing      14  , Stroke  Start-Check Stop Valve                            up 3517      CV  lA S/G Main Steam Swing      14    Stroke  Start-Check Stop Valve                            up 3998      CV  TAFP  Discharge Check            Stroke      Q 4000C      CV  lA  MAFP  Discharge              Stroke      Q Downstream MOV-4007 4000D      CV  lB  MAFP  Discharge              Stroke      .Q Downstream MOV-4008 4003      CV  TAFP  to  S/G lA                  Stroke      Q 4004      CV  TAFP  to  S/G lB                  Stroke 4009      CV  lA  MAFP  to  S/G lA              Stroke      Q 4010      CV  1B MAFP    to  S/G 1B              Stroke      Q 4014      CV  TAFP  Condensate  Suction        Stroke      Q 4016      CV  1B MAFP    Suction                Stroke      9 4017      CV  1A MAFP    Suction                Stroke      Q 4023      CV  TAFP  Recirculation              Stroke      Q 4601      CV  lA Service Water      Pump        Stroke      Q Discharge 4602      CV  1B Service Water      Pump        Stroke      Q Discharge
 
      'I 1
I' t'
 
42 52C TITLE:                            DATE QUALITY                                                2/1/81 ASSURANCE                    APPENDIX  C MANUAL                    Pump and  Valve        PAGE GINNA STATION                Testing Program              22          28 OF Valve &#xb9;    ~Te                                Note  Test    Frey 4603        CV    1C Service Mater    Pump          Stroke Discharge 4604        CV    1D Service Water    Pump          Stroke      Q Discharge 5133        CV    Diesel Fire    Pump  Disch.        Stroke      Q 5136        CV    Motor Fire    Pump  Discharge      Stroke      Q 9627A      CV    1C SAFP SW    Suction              Stroke      Q 9627B      CV    1D SAFP  Slf Suction              Stroke      Q 9700A      CV    1C SAFP  Discharge                Stroke      Q 9700B      CV 'D    SAFP  Discharge                Stroke      Q 9705A      CV    1C SAFP  to S/G 1A                Stroke    ,
Q 9705B      CV    1D SAFP  to S/G 1B                Stroke      0 4.10    Category  C Relief Valve Va lve  &#xb9;  ~Te            Descri tion        Note  Test    Freer 203        RV    Letdown High Pressure          15 Safety Relief 209        RV    Letdown Low Pressure          15 Safety Relief 434        RV    Pressurizer Safety Relief      15 435        RV    Pressurizer Safety Relief      15 732        RV    CC  Surge Tank  Relief        15
 
0 I ~
ir
 
42 $ 2C TITLE:                            DATE QUALITY                                              2/1/81 ASSURANCE                APPENDIX    C MANUAL                Pump and    Valve        PAGE GINNA STATION            Testing Program                23 OF 28 Va lve I  ~Te          Descri tion          Note  Test    Freer 744        RV  CC  From Excess Letdown        15 Heat Exchan er 755A      RV  CC  From A  RCP  Thermal      15 Barrier 755B      RV  CC  From  B RCP  Thermal      15 Barrier 758A      RV  CC  From A-RCP    Oil Coolers  15 758B      RV  CC  From B-RCP    Oil Coolers  15 818        RV  CC  From Reactor Support        15 Coolers 861        RV  1-B  CS  Pump  Suction Relief  15 887        RV  SI Test Line Inside            15 ContainmentI Relief 1817      RV  Alternate Suction From          15 RHR Pump to C SI Pump 3508      RV  1-B S/G PRV                    15 3509      RV  1-A S/G PRV                    15 3510      RV  1-B S/G PRV                    15 3511      RV  1-A S/G  PRV                  15 3512      RV  1-A S/G PRV                    15 3513      RV  1-A S/G  PRV 3514      RV  1-B S/G PRV                    15 3515      RV  1-A S/G PRV,                    15 4
4653      RV  Service Water Relief            15 4654      RV  Service Water Relief            15
 
g, 0 7
    . ~
l
        \
 
TITLE                              DATE QUALITY                                                2/1/81 ASSURANCE                  APPENDIX  C MANUAL                    Pump and Valve            PAGE GINNA STATION              Testing Program                24 OF 28 Valve  I  ~Te                                  Note  Test    Freer 4657      RV    Service Water Relief            15 5134      RV    Diesel Fire  Pump  Disch R.V. 15 5135      RV    Motor Fire  Pump  Disch R.V. 15 4.11    Inservice Valve Testing Notes Note  1  Valves  304A, 304B and 313 cannot be stroked during normal plant operation on a quarterly basis because they would interrupt coolant flow to the reactor coolant pump seals. These valves will be stroked at cold shutdowns and refuel-ing outages.
Note  2  Valve 370B cannot be stroked during normal plant operation on a quarterly basis because this test would interrupt charging pump flow. This valve will be stroked at cold shutdowns and refueling outages.
Note  3  Valves 371 and 427 cannot be stroked during normal plant operation on a quarterly basis because this test would interrupt the letdown (CVCS) system. These valves will be stroked at cold shutdowns and refueling outages.
Note  4  Valve 383B  cannot be stroked during normal plant operation on a quarterly basis because this test would result in substantial radiation exposure,to test personnel. Surveys in the area of the test connection during plant operation indicate neutron fields of approximately 500 mr/hr and a gamma fields of 250 mr/hr.
Total whole body dosage to test personnel is estimated to be 375 mrem. This valve will be stroked at cold shutdowns and refueling outages.
 
0 c' 0
a C
              ,y h
l'II
 
l ~
    'UALITY            TITLE:
2/1/81 RE V.
ASSURANCE                  APPENDIX  C MANUAL                  Pump and  Valve          PAGE GINNA STATION              Testing Program                  25  OP 28 Note  5Valves      750A, 750B, 759A and 759B cannot be stroked during normal plant operation on a quarterly basis because this test would require the reactor coolant. pumps to  be shut down to eliminate the flow through these checks and MOVs. These valves will be stroked at, cold shutdowns and refueling outages.
Note  6-  Valves 813 and 814 cannot be stroked during normal plant operation on a quarterly basis because this test would remove the coolant to the reactor vessel supports and cavity wall. These valves will be stroked at cold shutdowns and refueling outages.
Note  7Valve 879 is a manual valve in the safety injection test line and is kept locked shut. This valve is not required to change position to perform a safety func-tion. The only requirement is that leak-age through valve 879 be acceptably 1'ow.
Therefore, the quarterly stroke test has been deleted. This passive valve will be only leak tested at refueling outages consistent with IWV-3700-1.
Note  8 Valves 700 and 721 cannot be stroked during normal plant operation on a quarterly basis because there is an interlock system which. prevents these valves from opening when the primary system is at operating pressure.      Valves 700, 701, 720,and 721 separate a high pressure system from a low pressure system. These valves will be stroked at cold shutdowns and refueling outages.
Note  9    Valves 825A, 825B, 856, 896A, and 896B should not be stroked during normal opera-tion on a quarterly basis because this would cause a temporary los's of system function of the ECCS. These valves pro-vide the suction from the refueling water
 
TITLE:                                              RE Y.
QUALITY                                                  2/1/81 AS SURANCE                APPENDIX  C MANUAL                  Pump and Valve              PAGE GINNA STATION              Testing Program                    26  OP 28 storage tank to the safety injection and residual heat removal pumps. These valves will be stroked at cold shutdowns and re-fueling outages.
Note 10- Valves 853A and 853B cannot be stroked during normal plant operation on a quarterly basis because this test, require would pressurizing the RHR system to the primary system operation pressure. These valves will be stroked at refueling outages.
Note  ll- Valves    1076A, IV-3A, IV-3B, 1076B, 1080A, 1084A, 1084B, IV-5A, IV-5B, IV-2A, IV-2B, 1811A, 1811B, 6151, 6175, 7141, 7226, 7443 7444, 7445, 8418 and 8419 are considered passive valves which are not required to change position to acccomplish their specific function. Stroking these valves would serve no useful function and will therefore not be done as per IWV-3700-1.
Note 12- Valve 866A cannot be stroke tested during normal plant operation on a quarterly basis because this test. would result in a substantial radiation expo-sure to test personnel.      Stroke testing at this location resulted in approxi-mately 400 mrem whole body exposure to the test personnel. This valve will be stroked at cold shutdowns and refueling outages.
Note 13- Valves 867A, 867B, 878G, and 878J cannot be stroked during normal operation on a quarterly basis or at cold shutdown condition when the primary system is full. This test may only be done when the plant is in a refueling shutdown condition with a partially    full primary system in order to prevent    an  over-pressurization.
 
v l ~
                    ~
I
'1 P l,f
      'I!
 
TITLE:                                                RE V.
QUALITY                                                      2/1/81 ASSURANCE                        APPENDIX  C MANUAL                      Pump and    Valve          PAGE GINNA STATION                Testing Program                    27  OP 28 C
Note 14- Valves 3516 and 3517 cannot be stroked during normal plant operation on a quarterly basis because they are the main steam swing check stop valves.
These valves 'are stroked during each plant startup.
Note 15- Category C Reli'ef Valves shall be tested in accordance with the extent and fre-quency requirements of Paragraph IWV-3510 of Article IWV of Section XI of the Code.
No te  l6-    Valves 430 and 43lC are the power operated relief valves associated with the overpressurization system. These valves shall not be stroked quarterly as they need not. be operable when the plant is at, normal system pressure.
Operability of these valves shall be verified as follows:
(1) Full stroke exercising during cool down prior to achieving water solid condition in Ne pressurizer and during cold shutdown prior to heat up.
(2)    Stroke timing to be performed as a minimum once each refueling cycle as a part of the channel calibration specified by Technical Specifications 4.16.1b.
(3) Fail safe actuation testing is permitted by the code to be per-formed at each cold shutdown    if valve cannot be tested during power operation.
(4) Technical specification 4.16.1a and 4.16.1c delineate additional re-quirements for operability verifi-cation of the PORV actuation channel and valve position.
Note 17- Valve stroking will be'normally ac-complished monthly, except during cold and refueling shutdowns, consistent with the monthly Technical Specification requirement.


QUALITY ASSURANCE MANUAL GINNA STATION TITLE: APPENDIX C Pump and Valve Testing Program DATE 2/1/81 PAGE 20 28 OF Valve I~Te Note Test Frea I 971 0A 9710a 4.9 AOV 1C'SAFP Recirc.Control AOV 1D SAFP Recirc.Control Category C Check Valves Stroke Stroke Valve 0~T pe Note Test Freer 710A 710B 723A 723B 842A 842B 847A 847B 853A 853B 854 8 66A CV 1-A RHR Pump Discharge CV 1-B RHR Pump Discharge CV 1-A CC Pump Discharge CV-.1-B CC Pump Discharge CV First Check Valve in Loop A Accumulator Dump Line CV First Check<Valve in Loop B Accumulator Dump Line CV A-CSP From Spray Additive Tank to Eductor CV B-CSP From Spray Additive Tank to Eductor CV Core Deluge Check CV Core Deluge Check CV RWST to RHR Pump Check CV CS Pump 1-A to Charcoal Filter Deluge Stroke Q Stroke Q Stroke Q Stroke Q Stroke Q Stroke Q Stroke Q Stroke 9 12 Stroke Q Stroke C/R 10 Stroke C/R 10 Stroke C/R 866B 867A CV CV CS Pump 1-B to Charcoal Filter Deluge'f 3 Accumulator.-
Dump and SI to Cold Leg Loop B Stroke Q 13 Stroke R 867B CV Accumulator Dump and SI to Cold Leg Loop A 13 Stroke R t 4i~I~QUALITY ASSURANCE MANUAL GINNA STATION TITLE APPENDIX C Pump and Valve Testing Program DATE 2/1/81 PAGE 21 OF 28 Va 1ve 0 ape 878G CV Descri tion 1-A SI Pump to Cold Leg Loop B After MOV 878B Note Test Freq 13 Stroke R 878J 3516 CV CV l-B SI Pump to Cold Leg Loop A After MOV 878D 1B S/G Main Steam Swing Check Stop Valve 13 Stroke R 14 , Stroke Start-up 3517 3998 4000C CV lA MAFP Discharge Downstream MOV-4007 CV lA S/G Main Steam Swing Check Stop Valve CV TAFP Discharge Check 14 Stroke Start-up Stroke Q Stroke Q 4000D CV lB MAFP Discharge Downstream MOV-4008 Stroke.Q 4003 4004 4009 4010 4014 4016 4017 4023 4601 CV CV 1A MAFP Suction TAFP Recirculation CV lA Service Water Pump Discharge CV TAFP to S/G lA CV TAFP to S/G lB CV lA MAFP to S/G lA CV 1B MAFP to S/G 1B CV TAFP Condensate Suction CV 1B MAFP Suction Stroke Q Stroke Stroke Q Stroke Q Stroke Q Stroke 9 Stroke Q Stroke Q Stroke Q 4602 CV 1B Service Water Pump Discharge Stroke Q
'I 1 I't' QUALITY ASSURANCE MANUAL GINNA STATION TITLE: APPENDIX C Pump and Valve Testing Program DATE 2/1/81 PAGE 22 OF 42 52C 28 Valve&#xb9;~Te Note Test Frey 4603 4604 CV 1C Service Mater Pump Discharge CV 1D Service Water Pump Discharge Stroke Stroke Q 5133 5136 9627A 9627B 9700A 9700B CV Diesel Fire Pump Disch.CV Motor Fire Pump Discharge CV 1C SAFP SW Suction CV 1D SAFP Slf Suction CV 1C SAFP Discharge CV'D SAFP Discharge 9705B CV 1D SAFP to S/G 1B 4.10 Category C Relief Valve 9705A CV 1C SAFP to S/G 1A Stroke Q Stroke Q Stroke Q Stroke Q Stroke Q Stroke Q Stroke , Q Stroke 0 Va lve&#xb9;~Te 203 RV Descri tion Letdown High Pressure Safety Relief Note 15 Test Freer 209 RV Letdown Low Pressure Safety Relief 15 434 435 RV Pressurizer Safety Relief 15 RV Pressurizer Safety Relief 15 732 RV CC Surge Tank Relief 15 0~ir I QUALITY ASSURANCE MANUAL GINNA STATION TITLE: APPENDIX C Pump and Valve Testing Program DATE 2/1/81 42$2C PAGE 23 28 OF Va lve I~Te Descri tion Note Test Freer 744 755A RV RV CC From Excess Letdown Heat Exchan er CC From A RCP Thermal Barrier 15 15 755B RV CC From B RCP Thermal Barrier 15 758A 758B RV CC From A-RCP Oil Coolers 15 RV CC From B-RCP Oil Coolers 15 818 RV CC From Reactor Support 15 Coolers 861 RV 1-B CS Pump Suction Relief 15 887 1817 RV RV SI Test Line Inside ContainmentI Relief Alternate Suction From RHR Pump to C SI Pump 15 15 3508 3509 3510 3511 3512 3513 3514 3515 4653 4654 RV 1-B S/G PRV RV 1-A S/G PRV RV 1-B S/G PRV RV 1-A S/G PRV RV 1-A S/G PRV RV 1-A S/G PRV RV 1-B S/G PRV RV 1-A S/G PRV, 4 RV Service Water Relief RV Service Water Relief 15 15 15 15 15 15 15 15 15
.~g, 0 7 l\
QUALITY ASSURANCE MANUAL GINNA STATION TITLE APPENDIX C Pump and Valve Testing Program DATE 2/1/81 PAGE 24 OF 28 Valve I~Te Note Test Freer 4657 RV Service Water Relief 15 5134 RV Diesel Fire Pump Disch R.V.15 5135 RV Motor Fire Pump Disch R.V.15 4.11 Inservice Valve Testing Notes Note 1-Valves 304A, 304B and 313 cannot be stroked during normal plant operation on a quarterly basis because they would interrupt coolant flow to the reactor coolant pump seals.These valves will be stroked at cold shutdowns and refuel-ing outages.Note 2-Valve 370B cannot be stroked during normal plant operation on a quarterly basis because this test would interrupt charging pump flow.This valve will be stroked at cold shutdowns and refueling outages.Note 3-Valves 371 and 427 cannot be stroked during normal plant operation on a quarterly basis because this test would interrupt the letdown (CVCS)system.These valves will be stroked at cold shutdowns and refueling outages.Note 4-Valve 383B cannot be stroked during normal plant operation on a quarterly basis because this test would result in substantial radiation exposure,to test personnel.
Surveys in the area of the test connection during plant operation indicate neutron fields of approximately 500 mr/hr and a gamma fields of 250 mr/hr.Total whole body dosage to test personnel is estimated to be 375 mrem.This valve will be stroked at cold shutdowns and refueling outages.
0 a 0 ,y c'C h l'II l~'UALITY ASSURANCE MANUAL GINNA STATION TITLE: APPENDIX C Pump and Valve Testing Program PAGE 2/1/81 RE V.25 OP 28 Note 5-Note 6-Note 7-Valves 750A, 750B, 759A and 759B cannot be stroked during normal plant operation on a quarterly basis because this testwould require the reactor coolant.pumps to be shut down to eliminate the flow through these checks and MOVs.These valves will be stroked at, cold shutdowns and refueling outages.Valves 813 and 814 cannot be stroked during normal plant operation on a quarterly basis because this test would remove the coolant to the reactor vessel supports and cavity wall.These valves will be stroked at cold shutdowns and refueling outages.Valve 879 is a manual valve in the safety injection test line and is kept locked shut.This valve is not required to change position to perform a safety func-tion.The only requirement is that leak-age through valve 879 be acceptably 1'ow.Therefore, the quarterly stroke test has been deleted.This passive valve will be only leak tested at refueling outages consistent with IWV-3700-1.
Note 8-Note 9 Valves 700 and 721 cannot be stroked during normal plant operation on a quarterly basis because there is an interlock system which.prevents these valves from opening when the primary system is at operating pressure.Valves 700, 701, 720,and 721 separate a high pressure system from a low pressure system.These valves will be stroked at cold shutdowns and refueling outages.Valves 825A, 825B, 856, 896A, and 896B should not be stroked during normal opera-tion on a quarterly basis because this would cause a temporary los's of system function of the ECCS.These valves pro-vide the suction from the refueling water QUALITY AS SURANCE MANUAL GINNA STATION TITLE: APPENDIX C Pump and Valve Testing Program PAGE 2/1/81 RE Y.26 OP 28 Note 10-Note ll-Note 12-Note 13-storage tank to the safety injection and residual heat removal pumps.These valves will be stroked at cold shutdowns and re-fueling outages.Valves 853A and 853B cannot be stroked during normal plant operation on a quarterly basis because this test, require would pressurizing the RHR system to the primary system operation pressure.These valves will be stroked at refueling outages.Valves 1076A, 1076B, 1080A, 1084A, 1084B, IV-3A, IV-3B, IV-5A, IV-5B, IV-2A, IV-2B, 1811A, 1811B, 6151, 6175, 7141, 7226, 7443 7444, 7445, 8418 and 8419 are considered passive valves which are not required to change position to acccomplish their specific function.Stroking these valves would serve no useful function and will therefore not be done as per IWV-3700-1.
Valve 866A cannot be stroke tested during normal plant operation on a quarterly basis because this test.would result in a substantial radiation expo-sure to test personnel.
Stroke testing at this location resulted in approxi-mately 400 mrem whole body exposure to the test personnel.
This valve will be stroked at cold shutdowns and refueling outages.Valves 867A, 867B, 878G, and 878J cannot be stroked during normal operation on a quarterly basis or at cold shutdown condition when the primary system is full.This test may only be done when the plant is in a refueling shutdown condition with a partially full primary system in order to prevent an over-pressurization.
~v~l I'1 P l,f''I!
QUALITY ASSURANCE MANUAL GINNA STATION TITLE: APPENDIX C Pump and Valve Testing Program 2/1/81 RE V.PAGE 27 OP 28 C Note 14-Valves 3516 and 3517 cannot be stroked during normal plant operation on a quarterly basis because they are the main steam swing check stop valves.These valves'are stroked during each plant startup.Note 15-Category C Reli'ef Valves shall be tested in accordance with the extent and fre-quency requirements of Paragraph IWV-3510 of Article IWV of Section XI of the Code.No te l6-Valves 430 and 43lC are the power" operated relief valves associated with the overpressurization system.These valves shall not be stroked quarterly as they need not.be operable when the plant is at, normal system pressure.Operability of these valves shall be verified as follows: (1)Full stroke exercising during cool down prior to achieving water solid condition in Ne pressurizer and during cold shutdown prior to heat up.(2)Stroke timing to be performed as a minimum once each refueling cycle as a part of the channel calibration specified by Technical Specifications 4.16.1b.(3)Fail safe actuation testing is permitted by the code to be per-formed at each cold shutdown if valve cannot be tested during power operation.
(4).Technical specification 4.16.1a and 4.16.1c delineate additional re-quirements for operability verifi-cation of the PORV actuation channel and valve position.Note 17-Valve stroking will be'normally ac-complished monthly, except during cold and refueling shutdowns, consistent with the monthly Technical Specification requirement.
I'(
I'(
QUALITY ASSURANCE MANUAL GINNA STATION TITLE: APPENDIX C Pump and Valve Testing Program DATE PAGE 2/1/81 28 DP 28 Note 18-Valves 852A and 852B cannot be stroked during normal plant operation as these valves, when cycled, could subject the Residual Heat Removal System to a pressure in excess of its design pressure.These valves will be stroked at cold shutdowns and refueling outages.Note 19-Stroking Valves 5392 and 5393 during operation and cold shutdown would inter-rupt instrument air to containment and be disruptive to air operated valves inside.These valves will be stroked at refueling outages.Note 20-Note 21-Note 22-PVT 5.0 Records Valve 959 is normally closed and in the containment isolating position during normal operation.
TITLE:                                DATE QUALITY                                                   2/1/81 ASSURANCE                   APPENDIX C PAGE MANUAL                    Pump and   Valve GINNA STATION              Testing Program                   28 DP 28 Note 18- Valves 852A and 852B cannot be stroked during normal plant operation as these valves,   when cycled, could subject the Residual Heat Removal System to a pressure in excess of its design pressure. These valves will be stroked at cold shutdowns and refueling outages.
These valves will be stroked at cold shutdown and refueling outages.Valve 1786 is not required to function per FSAR Chapter 5 but valve receives a"T"i Signal.Category A valves 5869, 5870, 5878 and 5879 are normally closed and in the containment isolating position during normal operation.
Note 19- Stroking Valves 5392 and 5393 during operation and cold shutdown would inter-rupt instrument air to containment and be disruptive to air operated valves inside. These valves will be stroked at refueling outages.
Leak tightness of these valves is reverified following reclosure after each use in accordance with Section 4.4.2.4 of Technical Speci-fications.
Note 20- Valve 959 is normally closed and in the containment isolating position during normal operation. These valves will be stroked at cold shutdown and refueling outages.
The valves shall be stroked at least each cold shutdown.In addition, if the valves are opened for purging, they shall be stroked at least once each quarter during which they have been opened.5.1 II Records for the Inservice Pump Testing Program shall be developed and maintained in accordance with Article IWP-6000 of Section XI of the Code.5.2 Records for the Inservice Valve Testing Program shall be developed and maintained
Note 21- Valve 1786 is not required to function per FSAR Chapter 5 but valve receives a "T"i Signal.
'in accordance with Article IWV-6000 of Section XI of the Code.
Note 22- Category A valves 5869, 5870, 5878 and 5879 are normally closed and in the containment isolating position during normal operation. Leak tightness of these valves is reverified following reclosure after each use in accordance with Section 4.4.2.4 of Technical Speci-fications. The valves shall be stroked at least each cold shutdown. In addition, if the valves are opened for purging, they shall be stroked at least once each quarter during which they have been opened.
h~V , N R 4 h*N r h V, h~V I)hh R I}}
PVT  5.0    Records II 5.1   Records   for the Inservice Pump Testing Program shall be developed and maintained in accordance with Article IWP-6000 of Section XI of the Code.
5.2   Records for the Inservice Valve Testing Program shall be developed and maintained 'in accordance with Article IWV-6000 of Section XI of the Code.
 
h ~
V
        , N R
4 h
N r
h V,               h I ) hh V
R I
~}}

Latest revision as of 10:11, 4 February 2020

to App C-Ginna Station Inservice Pump & Valve Testing Program for 810101 Through 901230.
ML17258A746
Person / Time
Site: Ginna Constellation icon.png
Issue date: 01/29/1981
From: Anderson C
ROCHESTER GAS & ELECTRIC CORP.
To:
Shared Package
ML17258A745 List:
References
NUDOCS 8102030272
Download: ML17258A746 (51)


Text

'UALITY

.c ASSURANCE ltANUAL RE Y. PAGE GINNA STATION 1 DF 28 EFFECTIVE DATE.

OCHESTER GAS 6 ELECTRIC CORPORATION 5'ebruary 1, 1981 SIGNATURE DATE TITLE: PREPARED BY Appendix C Ginna Station Inservice Pump and Valve Testing Program for the January 1, 1981 REVIEW through December 31, 1990 Period APPROVED BY Program Table of Contents ntroduction: Discussion efinitions:

rogram: PVT 1.0 Scope and Responsibility PVT 2.0 Code Edition and Testing Interval PVT 3.0 Inseryice Pump Testing Program PVT 4.0 Inservice Valve Testing Program PVT 5.0 Records 810 '.0 8077k,

r.s e

~,

0 . j ( ~

42 ~ 5R C TITLE: DATE QUALITY 2/1/81 ASSURANCE APPENDIX C MANUAL Pump and Valve PAGE GINNA STATXON Testing Program 2 OF 28 Xntroduction This appendix to the Quality Assurance Manual defines the Inservice Pump and~Valve( Testing Program for the ten year period starting January 1, 1981 through December 31, 1990. Included in this program are the Quality Groups A, B and C Pumps which are provided with a'n emergency power source and those Quality Groups A, B and C Valves which are required to shut down the reactor or to mitigate the consequences of an accident and maintain the reactor in a safe shutdown condition.

This program has been developed as required by Section

  • 50.55a(g) of 10CFR50 following the guidance of the ASME Boiler and Pressure Vessel Code Section XI "Rules for Inservice Inspection of Nuclear Power Plant Components,"

(hereafter referred to as the "Code" ) excluding the controls of the Authorized Inspector, Enforcement Authority, Report-ing Systems and N-Stamp Symbol. The inservice testing pro-gram shall be controlled by the Ginna Station Quality Assur-ance Program for Station Operation. Quality Groups A, B and C components correspond to those defined in NRC Regula-tory Guide 1.26.

Further addenda and editions of Section XI of the Code shall be used for clarification of test requirements and performance.

The Inservice Pump and Valve Testing Program does not affect the pump and valve surveillance program required by Technical Specifications. Technical Specification re-quirements shall continue to be implemented at the required frequency.

0 5

4

'f

42 52C TITLEs DATE QUALITY 2/1/81 ASSURANCE APPENDIX C MANUAL Pump and Valve PAGE GINNA STATION Testing Program 3 OF 28 Definitions AFP Auxiliary Feedwater Pump AOV, Air Operated Valve APV Air Operated Piston Valve .

BA Boric Acid Code American Society of Mechanical E ngxneers Boiler and Pressure'Vessel Code CC Component Cooling CS Containment Spray CSP Containment Spray Pump CV Check Valve C/R Cold Shutdown and Refueling ECCS Emergency Core Cooling System FCV Flow Control Valve GA Gas Analyzer GDT Gas Decay Tank HCV Hand Control Valve HX Heat Exchanger LCV Level Control. Valve MAFP Motor Driven Auxiliary Feedwater Pump MOV Motor Operated Valve

. MV Manual Valve PCV Pressure Control Valve PIV Primary Isolation Valve PORV Power Operated Relief Valve PRT Pressurizer Relief Tank PRV Pressure Relief Valve PVT Pump and Valve Testing Q Quarterly R Refueling Outage RCDT Reactor Coolant Drain Tank RCP Reactor Coolant Pump RCV Radiation Control Valve RHR Residual Heat Removal RMW Reactor Makeup Water RV Relief Valve RWST Refueling Water Storage Tank RX Reactor Vessel S/G Steam Generator SAFWP Standby Auxiliary Feedwater Pump SI Safety Injection SIV Secondary Isolation Valve SOV Solenoid Operated Valve SW Service Water

' I l

)

l f

42 52C TITLE: DATE QUALITY 2/1/81 ASSURANCE APPENDIX C PAGE MANUAL Pump and Valve GINNA STATION Testing Program 4 DP 28 Definitions TAFP Turbine Driven Auxiliary Feedwater Pump VC Volume Control VCT Volume Control Tank VH Vent Header

'e l ~ ~

42 52C TITLE: DATE QUALITY 2/1/81 ASSURANCE APPENDIX, C PAGE MANUAL Pump and Valve GINNA STATION Testing Program 5 DP 28 PVT 1.0 'co Pum and Valve e and Res Testin onsibilit Pro ram The inservice testing program defines the testing program for Quality Groups A, B and C Pumps and Valves in accordance with the requirements of Articles IWP and IWV of Section XI of the Code.

The results of these tests are to assure the operational readiness of pumps and valves.

1.2 It is the responsibility of the Ginna Station Test and Results Supervisor to implement this test program and develop inservice test proce-dures which will outline the specific test for each pump.and valve included in the program.

1.3 When a valve, pump or its control system has been replaced or repaired or has undergone maintenance that could affect its performance, and prior to

=

the time it is returned to service, it shall be tested as necessary to demonstrate that the per-formance parameters which could have been affected by the replacement, repair, or maintenance are within acceptable limits.

PVT 2.0 Code Edition and Testin Interval 2.1 The Inservice Pump and Valve Testing Program for the ten (10) year period starting January 1, 1981 through December 31, 1990 was developed utilizing the 1977 Edition of Section XI of the Code through the Summer 1978 Addenda.

PVT 3.0 Inservice Pum Testinq Pro ram 3.1 The.Inservice Pump Testing Program was developed in accordance with the requirements of Article IWP of Section XI of the Code. This program includes all Quality Group A, B and C pumps which are provided with an emergency power source and are required'to perform a specific function in shutting down a reactor or in mitigating the consequences of an accident and maintain the reactor in a safe shutdown condition.

~

~

l ~

) ~

42 52C TITLE: DATE QUALITY 2/1/81 ASSURANCE APPENDIX C MANUAL Pump and Valve PAGE GINNA STATION Testing Program 6 OF 28 3.2 The following pumps shall be tested in accord-ance with Article IWP of Section XI:

(a) lA Component Cooling (b) 1B Component Cooling (c) 1A Safety Injection (d) lB Safety Injection (e) 1C Safety Injection (f) lA Residual Heat Removal (g) lB Residual Heat Removal (h) lA Containment Spray (i) 1B Containment Spray (j) lA Motor Driven Auxiliary Feedwater (k) 1B Motor Driven Auxiliary Feedwater (1) Turbine Driven Auxiliary Feedwater (m) 1A Service Water (n) 1B Service Water (o) 1C Service Water (p) 1D Service Water (q) 1C Standby Auxiliary Feedwater (r) 1D Standby Auxiliary Feedwater 3.3 Flow rates will not be accurate for the residual heat removal pumps because the bypass test loop can'only pass 200 gpm. This bypass test loop is a fixed resistance system; therefore, hydraulic resistance remains unchanged from test to test.

3.4 Bearing temperatures will not be available for the Service Water pumps. These pumps and their bearings are submersed in forty feet of water, making it, impossible to take measurements. Be-cause they are submersed, the bearing temperatures stay very close to the temperature of the intake water.

PVT 4.0 Inservice-Valve Testin Pro ram 4.1 The Inservice Valve Testing Program was developed in accordance with the requirements of Article

'IWV of Section XI of the Code. All those valves that are required to perform a specific function either to shut down the reactor to the cold shut-down condition or in mitigating the consequences of an accident and maintain the reactor in a safe shutdown condition are included in the program.

~ <<'I

' ) i ~

42 52C TlTLEt DATE QUALITY 2/1/81 ASSURANCE APPENDIX C MANUAL Pump and Valve PAGE GINNA STATION Testing Program 7 OF 28 4.2 The Inservice Valve Testing Program Requirements for Category A and B Valves are in Tables PVT 4.7 and 4.8, respectively. Category C Valves are broken down into two categories, Check Valves and Relief Valves, which are in Tables PVT 4.9 and 4.10, respectively. Category D Valves are not included in this testing program because there are none included in Ginna Station design.

4.3 Some exceptions and exemptions to the testing re-quirements of Article I07V have been taken based on operational interference, placing the plant in an unsafe condition and Technical Specification requirements. All exceptions and exemptions are listed on the, valve tables and explained in the referenced notes, PVT .4.11.

4.4 The exercising program for Category A and B Valves, with the exception of check valves, shall require a complete stroking of each valve per the valve testing tables. All check valves, including Category C Valves, shall be exercised to the posi-tion required to fulfilltheir function. These functional tests shall be verified by the operation of the required system.

4.5 Category A and B valves operation shall be timed each time they are stroked utilizing switch initiation and the position indicators, which are accessible during plant operation. During each refueling outage a visual verification shall be made to confirm direct correspondence between valve operators and the position indicators.

0

,) ~

a. ~

' > l ~

42 5RC TITLE: DATE QUALITY 2/1/81 ASSURANCE APPEl'3DlX C MANUAL Pump and Valve PAGE

. GINNA STATION Testing Program 8 OF 28 4.6 The testing of valves required at cold shutdown and refueling outages will normally take four (4) days to complete. When cold shutdowns are of a shorter duration (2-3 days), test personnel shall attempt to test as many valves as possible without holding up the startup of the unit with testing'eginning no longer than 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> after the plant reaches cold shutdown (as defined in Technical Specification 1.2). For very short cold shutdowns (less than 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br />), it would be impossible to mobilize test personnel to implement the testing program under the required procedural controls, therefore no valves would be tested.

It is possible that,load during a four (4) day cold on test personnel may shutdown, the work preclude their completion of all the required valve tests prior to startup. Valve testing during cold shutdowns need not be more frequent than one test per quarter for each valve in the test program.

4.7 Category A Valves Valve ¹ ~Te Note 'est Freer 304A CV 1-A RCP Seal Injection 1 Stroke C/R Leak R 304B 'V 1-B RCP Seal Injection 1 Stroke Leak C/R R

313 MOV Seal Water Return 1 Stroke C/R Isolation Leak R 370B CV Charging Line Isolation 2 Stroke C/R Leak R 371 AOV Letdown Isolation 3 Stroke C/R Leak R 383B CV Alternate Charging Line Stroke C/R Leak R 508 AOV RMW to Containment Vessel Stroke Q Stop Leak R

J 0

'P a

~ l i ~

E r

42 52C TITLE: DATE QUALITY 2/1/81 ASSURANCE APPENDIX C MANUAL Pump and Valve PAGE GINNA STATION Testing Program 28 OF Note Test Freer 528 CV N Supply to PRT Stroke Q Leak R 529 CV RMW to PRT Stroke Q Leak R 539 AOV PRT Stop Valve to Gas Stroke Q Analyzer Leak R 743 CV CC From Excess Letdown HX. Stroke Q Leak R 745 AOV Return From Excess Let- Stroke 0 down HX. Leak R 750A CV CC,to A RCP Stroke C/R Leak R 750B CV CC to B RCP Stroke C/R Leak R 7 59A MOV Containment'top CC From Stroke C/R Loop A RCP Leak R 7 59B MOV Containment Stop CC From Stroke C/R Loop B RCP Leak R 813 MOV Supply CC to RX Support Stroke C/R Coolers Leak R 814 MOV Return CC to RX Support Stroke C/R Coolers Leak R 846 AOV N2 Supply to Accumulators Stroke Q Leak R 862A CV 1-A CSP Disch Stroke Q Leak R 862B CV 1-B CSP Disch Stroke Leak

t

~ I y ~

42 52C TITLE: DATE QUALITY 2/1/81 ASSURANCE APPENDIX C MANUAL Pump and Valve PAGE GINNA STATION Testing Program 10 OF 28 Va 1ve I ~Te Descri tion Note Test Freer 870A CV 1-A to 1-C SI Pump Disch Stroke Q Leak R 870B CV .1-B to 1-C SI Pump Disch Stroke Q Leak R 879 MV SI Test Line Isolation Stroke Leak 8 89A CV 1-A SI Pump Disch Stroke Q Leak R 889B CV 1-B SI Pump Disch Stroke Leak 956A MV Pressurizer Liquid Space Stroke Containment Isolation Leak 956B Loop A and Loop B Hot Leg Stroke Containment, Isolation Leak 956C MV Pressurizer'team Space Stroke Containment Isolation Leak 966A AOV Pressurizer Steam Space Stroke Containment Isolation Leak 96 6B AOV Pressurizer Liquid Space Stroke Containment Isolation Leak 966C AOV Loop A and B Hot Leg Stroke Containment Isolation Leak 1003A LCV 1-A RCDT Pump Suction Stroke Q Leak R 1003B LCV 1-B RCDT Pump Suction Stroke Q Leak R 1076A MV Hydrogen to", "A" Recombiner 11 Stroke Pilot Containment Isolation Leak IV-3A SOV Hydrogen to "A" Recombiner 11 Stroke Pilot Containment SIV Leak

v J'

~ ~

l h

f I

4 II"

I TITLE: DATE QUALITY 2/1/81 ASSURANCE APPENDIX C MANUAL Pump and Valve PAGE GINNA STATION Testing Program 11 OF 28 Valve 1 ~Te Note Test Fr~cr 1076B MV Hydrogen to "B" Recombiner 11 Stroke Pilot Containment Isolation Leak IV-3B SOV Hydrogen to~ "B" Recombiner 11 Stroke Pilot Containment SIV Leak 1080A MV Oxygen Make Up to Contain- 11 Stroke ment PIV Leak IV-2A Oxygen Make Up to Contain- 11 Stroke ment SIV (A Recombiner) Leak, IV-2B Oxygen Make Up to Contain- 11 Stroke ment SIV (B Recombiner) Leak 1084A MV Hydrogen to "A" Recombiner 11 Stroke Main Burner Containment PIV Leak IV-5A SOV Hydrogen to "A" Recombiner 11 Stroke Main Burner Containment SIV Leak 1084B Hydrogen to'; "B" Recombiner '11 Stroke Main Burner'ontainment PIV Leak IV-5B SOV Hydrogen to "B" Recombiner 11 Stroke Main Burner Containment SIV Leak 1596 MV Radiation Monitor Supply Stroke Q Leak R 1597 AOV Radiation Monitor Supply Stroke Q Leak . R 1598 AOV Radiation Monitor Exhaust Stroke Q Leak R 1599 CV Radiation Monitor Exhaust Stroke Q Inside Containment Leak R 1713 CV N2 to RCDT Check Stroke Q Leak R 1721 AOV Suction line to RCDT Stroke 9 Leak R

~

g

' ~ ~

I

~ ~

,\

42 52C TITLE: DATE QUALITY 2/1/81 ASSURANCE APPENDIX C MANUAL Pump and Valve PAGE GINNA STATION Testing Program 12 28 f OF Va lve I ~Te Descri tion Note Test Free 1723 AOV A Containment Sump Disch Stroke Q Stop to Waste Holdup Tank Leak R 1728 AOV A Containment Sump Disch Stroke Q Stop to Waste Holdup Tank Leak R 1786 AOV RCDT to VH 21 Stroke Q Leak R 1787 AOV RCDT to VH Stroke Q Leak R 1789 AOV RCDT to GA Containment. Stroke Q Isolation Leak R 5392 AOV Instrument Air to Contain- 19 Stroke R ment Isolation Leak R 5393 CV Instrument to Containment 19 Stroke R Isolation Leak R 5735 AOV "A" S/G Blowdown Sample Stroke Q Isolation Leak R 5736 AOV "B" S/G Blowdown Sample Stroke Isolation Leak 5737 AOV "B" S/G Blowdown Isolation Stroke Q Leak R 5738 AOV "A" S/G Blowdown Isolation . Stroke Q Leak R 5869 APV Containment Purge Supply 22 Stroke Isolation Leak 5870 APV Containment Purge Supply 22 Stroke Isolation Leak 5878 APV Containment, Purge Exhaust 22 Stroke Isolation Leak 5879 APV Containment Purge Exhaust 22 Stroke Isolation Leak

  • See Note 22

0 ~ ~

~

l 42 52C TITLE: DATE QUALITY 2/1/81 APPENDIX

'ote ASSURANCE C MANUAL Pump and Valve PAGE GINNA STATION Testing Program 13 28 OF Valve 5 ~Te Te st Freer 6151 MV Heating Steam to Stroke Containment Leak 6175 MV Condensate Return from Stroke Containment Leak 7141 MV Service Air Isolation Stroke Outside Containment 'eak 7226 CV Service Air Isolation Stroke Inside Containment Leak 7443 MOV Containment Air Test Stroke Supply Leak 7444 MOV Containment Air Test Vent 11 Stroke Leak 7445 MOV Containment, Air Test Vent 11 Stroke Leak 7970 AOV Containment Depressuri- Stroke zation Valve, Leak 7971 AOV Containment Depressuri- Stroke zation Valve Leak 8418 AOV Demin. Water to Contain- Stroke ment Is'olation Leak 8419 CV Demin. Water to Contain- Stroke ment Isolation Leak 4.8 Category B Valves Va 1ve 0 ~Te Descri tion Note Test Free 014 RCV Aux Building GDT Release Stroke Q h

017 RCV Comp Cool Surge Tank Vent Stroke

TITLE> DATE QUALITY 2/1/81 ASSURANCE APPENDIX C MANUAL Pump and Valve PAGE GINNA STATION Testing Program 14 OF 28 Valve N ~Te Descri tion Note Test ~Fre 081 APV Control Room Ventilation Stroke Q Damper 082 APV Control Room Ventilation Stroke Q Damper 083 APV Control Room Ventilation Stroke Q Damper 084 APV Control Room Ventilation Stroke Q Damper 085 APV Control Room Ventilation Stroke Q Damper 086 APV Control Room Ventilation Stroke Damper 112B LCV Emergency Makeup RWST to Stroke Q Charging Purqp e

112C LCV Outlet I'CT Stroke Q 427 AOV Letdown From Loop B Stroke C/R 430 PORV Reactor Coolant System 16 Stroke C/R Pressure Relief 431C PORV Reactor Coolant System 16 Stroke C/R Pressure Relief 624 HCV 1-B RHR HX Outlet Stroke Q 625 HCV 1-A RHR HX Outlet Stroke Q 626 FCV RHR Loop Return Stroke Q 700 MOV Suction Stop From Loop A Stroke C/R to RHR Pumps 701 MOV Suction Stop From Loop A Stroke C/R to RHR Pumps 704A MOV Suction 1-A RHR Pump Stroke Q

~

~

'T

~

~

4.,

1 I

TITLEt DATE QUALITY 2/1/81 ASSURANCE APPENDIX C MANUAL Pump and Valve PAGE GINNA STATION Testing Program 15 OF 28 Valve ¹ ~T pe Descri tion Note Test Freer 704B MOV Suction.l-B II RHR Pump Stroke Q I

720 MOV 10"-Discharge to B Loop 8 Stroke C/R From RHR Pumps 721 MOV 10" Disch to B Loop From 8 Stroke C/R RHR Pumps 738A MOV CC to l-A RHR HX Stroke Q 738B MOV CC to l-B RHR HX Stroke Q 825A MOV SI Pump Suction From RWST 9 Stroke C/R 825B MOV SI Pump Suction From RWST 9 Stroke C/R 826A MOV SI Pump Suction From BA Tank Stroke Q 826B MOV SI Pump Suction From BA Tank Stroke Q 826C MOV SI Pump Suction From BA Tank Stroke Q 826D MOV SI Pump Suction From BA Tank Stroke P 836A HCV Spray Additive Tank Dis- 17 Stroke Q charge 836B HCV Spray Additive Tank Dis- 17 Stroke Q charge 850A MOV Sump B to RHR Pumps Stroke Q 850B MOV Sump B to RHR Pumps Stroke Q 852A MOV RHR Pumps to Reactor Vessel 18 Stroke C/R 852B MOV RHR Pumps to Reactor Vessel 18 Stroke C/R 856 MOV RWST to RHR-Pumps Stroke C/R 857A MOV Isolate lB RHR HX From Stroke Q CS and SI Pumps

~

r ~

~

TITLEi DATE QUALITY 2/1/81 ASSURANCE APPENDIX C MANUAL Pump and Valve PAGE GINNA STATION Testing Program 16 OF 28 Va 1ve 1 ~Te Descri tion Note Test Freq 857B MOV Isolate lA RHR HX From Stroke Q CS and SI Pumps 857C MOV Isolate lA RHR HX From Stroke Q

CS and SI Pumps 860A MOV Parallel Discharge MOV Stroke Q

'From 1-A CSP 860B MOV Parallel Discharge MOV Stroke Q From 1-A CSP 860C MOV Parallel Discharge MOV Stroke Q From 1-B CSP 860D MOV Parallel Discharge MOV Stroke Q From 1-B CSP 871A MOV 1-A to 1-C SI Pump Discharge Stroke Q 871B MOV 1-B to 1-C SI Pump Discharge Stroke 9 875A MOV Parallel MOV From CS Pumps Stroke 9 to 1A Charcoal Filter Deluge 875B MOV Parallel MOV From CS Pumps Stroke Q to 1A Charcoal Filter Deluge 876A MOV Parallel MOV From CS Pumps Stroke Q to 1B Charcoal Filter Deluge 876B MOV Parallel MOV From CS Pumps Stroke Q to 1B Charcoal Filter Deluge 896A MOV RWST to CS and SI Pumps 9 Stroke C/R 896B MOV RWST to CS and SI Pumps 9 Stroke C/R 951 AOV Pressurizer, Steam Space Stroke Q Sample 953 AOV Pressurizer Liquid Space Stroke Q Sample

0 .0 7ITLEi DATE QUALITY 2/1/81 ASSURANCE APPENDIX C MANUAL Pump and Valve PAGE GINNA STATION Testing Program 17 OF 28 Valve N TvVe Descri tion Note Test, Freer 955 AOV "B" Loop Hot Leg Sample Stroke Q 959 AOV RHR Loop Sample 20 'troke C/R 1811A Reator Coolant Drain Tank 11 Isolation to RHR System 1811B Reactor Coolant Drain Tank 11 Isolation to RHR System 1815A MOV C-SI Pump Suction From RWST Stroke Q l815B MOV C-SI Pump Suction From RWST Stroke Q 3504 MOV Main Steam to TAFP From l-B Stroke Q S/G 3505 MOV Main Steam to TAFP From l-A Stroke Q S/G 3652 MV Main Steam Throttle Valve Stroke Q to TAFP 3996 MOV TAFP Discharge Stroke Q 4000A MOV Cross Over Valve For MAFP Stroke Q 4000B MOV Cross Over Valve For MAFP Stroke Q 4007 MOV l-A MAFP Discharge Stroke Q 4008 MOV l-B MAFP Discharge Stroke Q 4013 MOV TAFP Service Water Supply Stroke Q Isolation 4027 MOV 1-A MAFP Service Water Stroke Q Isolation 4028 MOV l-B MAFP Service Water Stroke Q Isolation 4291 AOV TAFP Recir. Line Stroke Q 4297 AOV TAFP Discharge to 1-A S/G Stroke Q

0 0 I ~

I

TITLEt DATE QUALITY 2/1/81 ASSURANCE APPENDIX C MANUAL Pump and Valve PAGE GINNA STATION Testing Program 18 OF 28 Va lve N ~Te Descri tion Note Test Prep 4298 AOV TAFP Discharge to- 1-B S/G Stroke Q 4304 . AOV 1-A MAFP Recirculation Stroke Q Control 4310 AOV .,1-B MAFP Recirculation Stroke Q Control 4561 AOV Containment Vent Recirc. Stroke Q Fans Discharge Flow Con-trol 4562 AOV Containment Vent Recirc. Stroke Q Fans Discharge Flow Con-trol Bypass 4609 MOV lA1'creen House SW Stroke Q

'solation 4613 MOV 1B2 Turbine <Building SW Stroke Q Isolation 4614 MOV lAl Turbine Building SW . Stroke Q Isolation 4615 MOV lBl Aux. Building SW Stroke g Isolation 4616 MOV 1Al Aux. Building SW Stroke Q Isolation 4663 MOV lA1 Air Cond. Chillers SW Stroke Q Isolation 4664 MOV 1A2 Turbine Building SW Stroke Q Isolation 4670 MOV 1B1 Turbine Building SW Stroke Q Isolation 4733 MOV 1A2 Air Cond. Chillers SW Stroke Q Isolation 4734 MOV 1B2 Aux. Build. SW Isolation Stroke Q

' 1 0

42 52C TITLE) DATE QUALITY 2/1/81 ASSURANCE APPENDIX C MANUAL Pump and Valve PAGE GINNA STATION Testing Program 19 OF 28 Valve 1 ~Te Descri tion IJote Test Freq 4735 MOV 1A2 Aux. Build. SW Isolation Stroke 4780 MOV 1A2 Screen House SW Stroke Isolation 5171 MOV Turbine Build. Fire Water Stroke Loop Supply Isolation 5871 APV Containment Post Accident Stroke Filter Damper 5872 APV Containment Post Accident Stroke Filter Damper 5873 APV Containment. Post Accident Stroke Filter Damper 5874 APV Containment Post. Accident Stroke Filter Damper 5875 APV Containment; Post, Accident Stroke Filter Damper 5876 APV Containment Post Accident Stroke Filter Damper 9629A MOV 1C SAFP Servi'ce. Water Stroke Q Isolation 9629B MOV 1D SAFP Service Water Stroke Q Isolation 9701A MOV 1C SAFP Discharge Stroke Q 9701B MOV 1D SAFP Discharge Stroke Q 9703A MOV SAFP Cross Over Stroke Q 970 3B MOV SAFP Cross Over Stroke Q 9704A MOV 1C SAFP Containment Stroke Q Isolation 9704B MOV 1D SAFP Containment Stroke Q Isolation

TITLE: DATE QUALITY 2/1/81 ASSURANCE APPENDIX C MANUAL Pump and Valve PAGE GINNA STATION Testing Program 20 OF 28 Valve I ~Te Note Test Frea I 971 0A AOV 1C 'SAFP Recirc. Control Stroke 9710a AOV 1D SAFP Recirc. Control Stroke 4.9 Category C Check Valves Valve 0 ~T pe Note Test Freer 710A CV 1-A RHR Pump Discharge Stroke Q 710B CV 1-B RHR Pump Discharge Stroke Q 723A CV 1-A CC Pump Discharge Stroke Q 723B CV-. 1-B CC Pump Discharge Stroke Q 842A CV First Check Valve in Loop Stroke Q A Accumulator Dump Line 842B CV First Check<Valve in Loop Stroke Q B Accumulator Dump Line 847A CV A-CSP From Spray Additive Stroke Q Tank to Eductor 847B CV B-CSP From Spray Additive Stroke 9 Tank to Eductor 853A CV Core Deluge Check 10 Stroke C/R 853B CV Core Deluge Check 10 Stroke C/R 854 CV RWST to RHR Pump Check Stroke Q 8 66A CV CS Pump 1-A to Charcoal 12 Stroke C/R Filter Deluge 866B CV CS Pump 1-B to Charcoal Stroke Q Filter Deluge

'f 3

867A CV Accumulator.- Dump and SI 13 Stroke R to Cold Leg Loop B 867B CV Accumulator Dump and SI 13 Stroke R to Cold Leg Loop A

t 4i ~

I ~

TITLE DATE QUALITY 2/1/81 ASSURANCE APPENDIX C MANUAL Pump and Valve PAGE GINNA STATION Testing Program 21 28 OF Va 1ve 0 ape Descri tion Note Test Freq 878G CV 1-A SI Pump to Cold Leg 13 Stroke R Loop B After MOV 878B 878J CV l-B SI Pump to Cold Leg 13 Stroke R Loop A After MOV 878D 3516 CV 1B S/G Main Steam Swing 14 , Stroke Start-Check Stop Valve up 3517 CV lA S/G Main Steam Swing 14 Stroke Start-Check Stop Valve up 3998 CV TAFP Discharge Check Stroke Q 4000C CV lA MAFP Discharge Stroke Q Downstream MOV-4007 4000D CV lB MAFP Discharge Stroke .Q Downstream MOV-4008 4003 CV TAFP to S/G lA Stroke Q 4004 CV TAFP to S/G lB Stroke 4009 CV lA MAFP to S/G lA Stroke Q 4010 CV 1B MAFP to S/G 1B Stroke Q 4014 CV TAFP Condensate Suction Stroke Q 4016 CV 1B MAFP Suction Stroke 9 4017 CV 1A MAFP Suction Stroke Q 4023 CV TAFP Recirculation Stroke Q 4601 CV lA Service Water Pump Stroke Q Discharge 4602 CV 1B Service Water Pump Stroke Q Discharge

'I 1

I' t'

42 52C TITLE: DATE QUALITY 2/1/81 ASSURANCE APPENDIX C MANUAL Pump and Valve PAGE GINNA STATION Testing Program 22 28 OF Valve ¹ ~Te Note Test Frey 4603 CV 1C Service Mater Pump Stroke Discharge 4604 CV 1D Service Water Pump Stroke Q Discharge 5133 CV Diesel Fire Pump Disch. Stroke Q 5136 CV Motor Fire Pump Discharge Stroke Q 9627A CV 1C SAFP SW Suction Stroke Q 9627B CV 1D SAFP Slf Suction Stroke Q 9700A CV 1C SAFP Discharge Stroke Q 9700B CV 'D SAFP Discharge Stroke Q 9705A CV 1C SAFP to S/G 1A Stroke ,

Q 9705B CV 1D SAFP to S/G 1B Stroke 0 4.10 Category C Relief Valve Va lve ¹ ~Te Descri tion Note Test Freer 203 RV Letdown High Pressure 15 Safety Relief 209 RV Letdown Low Pressure 15 Safety Relief 434 RV Pressurizer Safety Relief 15 435 RV Pressurizer Safety Relief 15 732 RV CC Surge Tank Relief 15

0 I ~

ir

42 $ 2C TITLE: DATE QUALITY 2/1/81 ASSURANCE APPENDIX C MANUAL Pump and Valve PAGE GINNA STATION Testing Program 23 OF 28 Va lve I ~Te Descri tion Note Test Freer 744 RV CC From Excess Letdown 15 Heat Exchan er 755A RV CC From A RCP Thermal 15 Barrier 755B RV CC From B RCP Thermal 15 Barrier 758A RV CC From A-RCP Oil Coolers 15 758B RV CC From B-RCP Oil Coolers 15 818 RV CC From Reactor Support 15 Coolers 861 RV 1-B CS Pump Suction Relief 15 887 RV SI Test Line Inside 15 ContainmentI Relief 1817 RV Alternate Suction From 15 RHR Pump to C SI Pump 3508 RV 1-B S/G PRV 15 3509 RV 1-A S/G PRV 15 3510 RV 1-B S/G PRV 15 3511 RV 1-A S/G PRV 15 3512 RV 1-A S/G PRV 15 3513 RV 1-A S/G PRV 3514 RV 1-B S/G PRV 15 3515 RV 1-A S/G PRV, 15 4

4653 RV Service Water Relief 15 4654 RV Service Water Relief 15

g, 0 7

. ~

l

\

TITLE DATE QUALITY 2/1/81 ASSURANCE APPENDIX C MANUAL Pump and Valve PAGE GINNA STATION Testing Program 24 OF 28 Valve I ~Te Note Test Freer 4657 RV Service Water Relief 15 5134 RV Diesel Fire Pump Disch R.V. 15 5135 RV Motor Fire Pump Disch R.V. 15 4.11 Inservice Valve Testing Notes Note 1 Valves 304A, 304B and 313 cannot be stroked during normal plant operation on a quarterly basis because they would interrupt coolant flow to the reactor coolant pump seals. These valves will be stroked at cold shutdowns and refuel-ing outages.

Note 2 Valve 370B cannot be stroked during normal plant operation on a quarterly basis because this test would interrupt charging pump flow. This valve will be stroked at cold shutdowns and refueling outages.

Note 3 Valves 371 and 427 cannot be stroked during normal plant operation on a quarterly basis because this test would interrupt the letdown (CVCS) system. These valves will be stroked at cold shutdowns and refueling outages.

Note 4 Valve 383B cannot be stroked during normal plant operation on a quarterly basis because this test would result in substantial radiation exposure,to test personnel. Surveys in the area of the test connection during plant operation indicate neutron fields of approximately 500 mr/hr and a gamma fields of 250 mr/hr.

Total whole body dosage to test personnel is estimated to be 375 mrem. This valve will be stroked at cold shutdowns and refueling outages.

0 c' 0

a C

,y h

l'II

l ~

'UALITY TITLE:

2/1/81 RE V.

ASSURANCE APPENDIX C MANUAL Pump and Valve PAGE GINNA STATION Testing Program 25 OP 28 Note 5Valves 750A, 750B, 759A and 759B cannot be stroked during normal plant operation on a quarterly basis because this test would require the reactor coolant. pumps to be shut down to eliminate the flow through these checks and MOVs. These valves will be stroked at, cold shutdowns and refueling outages.

Note 6- Valves 813 and 814 cannot be stroked during normal plant operation on a quarterly basis because this test would remove the coolant to the reactor vessel supports and cavity wall. These valves will be stroked at cold shutdowns and refueling outages.

Note 7Valve 879 is a manual valve in the safety injection test line and is kept locked shut. This valve is not required to change position to perform a safety func-tion. The only requirement is that leak-age through valve 879 be acceptably 1'ow.

Therefore, the quarterly stroke test has been deleted. This passive valve will be only leak tested at refueling outages consistent with IWV-3700-1.

Note 8 Valves 700 and 721 cannot be stroked during normal plant operation on a quarterly basis because there is an interlock system which. prevents these valves from opening when the primary system is at operating pressure. Valves 700, 701, 720,and 721 separate a high pressure system from a low pressure system. These valves will be stroked at cold shutdowns and refueling outages.

Note 9 Valves 825A, 825B, 856, 896A, and 896B should not be stroked during normal opera-tion on a quarterly basis because this would cause a temporary los's of system function of the ECCS. These valves pro-vide the suction from the refueling water

TITLE: RE Y.

QUALITY 2/1/81 AS SURANCE APPENDIX C MANUAL Pump and Valve PAGE GINNA STATION Testing Program 26 OP 28 storage tank to the safety injection and residual heat removal pumps. These valves will be stroked at cold shutdowns and re-fueling outages.

Note 10- Valves 853A and 853B cannot be stroked during normal plant operation on a quarterly basis because this test, require would pressurizing the RHR system to the primary system operation pressure. These valves will be stroked at refueling outages.

Note ll- Valves 1076A, IV-3A, IV-3B, 1076B, 1080A, 1084A, 1084B, IV-5A, IV-5B, IV-2A, IV-2B, 1811A, 1811B, 6151, 6175, 7141, 7226, 7443 7444, 7445, 8418 and 8419 are considered passive valves which are not required to change position to acccomplish their specific function. Stroking these valves would serve no useful function and will therefore not be done as per IWV-3700-1.

Note 12- Valve 866A cannot be stroke tested during normal plant operation on a quarterly basis because this test. would result in a substantial radiation expo-sure to test personnel. Stroke testing at this location resulted in approxi-mately 400 mrem whole body exposure to the test personnel. This valve will be stroked at cold shutdowns and refueling outages.

Note 13- Valves 867A, 867B, 878G, and 878J cannot be stroked during normal operation on a quarterly basis or at cold shutdown condition when the primary system is full. This test may only be done when the plant is in a refueling shutdown condition with a partially full primary system in order to prevent an over-pressurization.

v l ~

~

I

'1 P l,f

'I!

TITLE: RE V.

QUALITY 2/1/81 ASSURANCE APPENDIX C MANUAL Pump and Valve PAGE GINNA STATION Testing Program 27 OP 28 C

Note 14- Valves 3516 and 3517 cannot be stroked during normal plant operation on a quarterly basis because they are the main steam swing check stop valves.

These valves 'are stroked during each plant startup.

Note 15- Category C Reli'ef Valves shall be tested in accordance with the extent and fre-quency requirements of Paragraph IWV-3510 of Article IWV of Section XI of the Code.

No te l6- Valves 430 and 43lC are the power operated relief valves associated with the overpressurization system. These valves shall not be stroked quarterly as they need not. be operable when the plant is at, normal system pressure.

Operability of these valves shall be verified as follows:

(1) Full stroke exercising during cool down prior to achieving water solid condition in Ne pressurizer and during cold shutdown prior to heat up.

(2) Stroke timing to be performed as a minimum once each refueling cycle as a part of the channel calibration specified by Technical Specifications 4.16.1b.

(3) Fail safe actuation testing is permitted by the code to be per-formed at each cold shutdown if valve cannot be tested during power operation.

(4) Technical specification 4.16.1a and 4.16.1c delineate additional re-quirements for operability verifi-cation of the PORV actuation channel and valve position.

Note 17- Valve stroking will be'normally ac-complished monthly, except during cold and refueling shutdowns, consistent with the monthly Technical Specification requirement.

I'(

TITLE: DATE QUALITY 2/1/81 ASSURANCE APPENDIX C PAGE MANUAL Pump and Valve GINNA STATION Testing Program 28 DP 28 Note 18- Valves 852A and 852B cannot be stroked during normal plant operation as these valves, when cycled, could subject the Residual Heat Removal System to a pressure in excess of its design pressure. These valves will be stroked at cold shutdowns and refueling outages.

Note 19- Stroking Valves 5392 and 5393 during operation and cold shutdown would inter-rupt instrument air to containment and be disruptive to air operated valves inside. These valves will be stroked at refueling outages.

Note 20- Valve 959 is normally closed and in the containment isolating position during normal operation. These valves will be stroked at cold shutdown and refueling outages.

Note 21- Valve 1786 is not required to function per FSAR Chapter 5 but valve receives a "T"i Signal.

Note 22- Category A valves 5869, 5870, 5878 and 5879 are normally closed and in the containment isolating position during normal operation. Leak tightness of these valves is reverified following reclosure after each use in accordance with Section 4.4.2.4 of Technical Speci-fications. The valves shall be stroked at least each cold shutdown. In addition, if the valves are opened for purging, they shall be stroked at least once each quarter during which they have been opened.

PVT 5.0 Records II 5.1 Records for the Inservice Pump Testing Program shall be developed and maintained in accordance with Article IWP-6000 of Section XI of the Code.

5.2 Records for the Inservice Valve Testing Program shall be developed and maintained 'in accordance with Article IWV-6000 of Section XI of the Code.