 Issue dateTitleTopic
ML17263A32230 April 1993Reactor Containment Bldg Integrated Leakage Rate Apr 1993, Ginna Nuclear Station.
ML17250B02231 May 1989Reactor Containment Bldg Integrated Leakage Rate.
ML17251A79131 March 1986Reactor Containment Bldg Integrated Leakage Rate Test.
ML17309A35315 August 19841984 Steam Generator Eddy Current Exam Summary Rept. W/850306 Ltr
ML17254A89026 June 1984Startup Physics Testing Program.Shutdown Margin
ML17255A71831 January 1984Containment Vessel Tendons, 1983 Surveillance Final Rept
ML17255A71931 December 1983Containment Vessel Tendons Stress Relaxation Properties of Retensioned Wires.
ML17256A68315 April 1983Level Control Valve 427 Fuse Coordination - Ginna Station.
ML17256A42815 December 1982Reactor Containment Bldg Integrated Leak Rate Test,May 1982.
ML17255A68916 November 1982Dynamic Collapse of Steam Generator Tubes.
ML17256A97718 May 1982Addendum 1, Lab Collapse Tests, Revision 0,to Steam Generator Evaluation,Ginna Steam Tube Failure Incident, 820125,RE Ginna Nuclear Power Plant.
ML17256A98118 May 1982Addendum 3, Phase II Metallurgical Exams, Revision 0,to Steam Generator Evaluation,Ginna Steam Generator Tube Failure Incident,820125,RE Ginna Nuclear Power Plant.
ML17256A98318 May 1982Addendum 4, External Tube Loading Test, Revision 1 to Steam Generator Evaluation,Ginna Steam Generator Tube Failure Incident,820125,RE Ginna Nuclear Power Plant.Hydrostatic
ML17256A97918 May 1982Addendum 2, Lab Fatigue Testing, Revision 0,to Steam Generator Evaluation,Ginna Steam Generator Tube Failure Incident,820125,RE Ginna Nuclear Power Plant.
ML17256A85426 April 1982Steam Generator Evaluation,Ginna Steam Tube Rupture Incident,820125,RE Ginna Nuclear Power Plant.
ML17258A20421 September 1981Adequacy of Station Electric Distribution Sys Voltages.
ML17258A74629 January 1981to App C-Ginna Station Inservice Pump & Valve Testing Program for 810101 Through 901230.Safe Shutdown
Boric Acid
ML17250A59931 July 1980Piping Stress Analysis Rept,Rhr Sys,Section 200.Earthquake
Stolen
ML17250A59031 July 1980Re Ginna Nuclear Power Plant,Seismic Upgrading Program Piping Stress Analysis,Main Steam Sys,Section 200. Main Steam Containment Drawing EnclEarthquake
ML17250A58631 July 1980Piping Stress Analysis Rept,Rhr Sys,Section 250.Earthquake
ML17249A91011 April 1980Revised Pages 4,6 & I-2,Table 3 & Figure 1-A for Evaluation of Prestressed Tendon Forces.
ML17249A33720 November 1979Evaluation of Prestressed Tendon Forces.Earthquake
ML20081C03128 February 1976Reactor Containment Bldg Integrated Leak Rate Test
ML17258A13512 November 1973Qualification Tests for Modular Penetration 5 Diameter (Prototype B1).Boric Acid
ML17244A57816 September 1966Submits Info Re Seismic Qualification of Mechanical & Electrical Equipment & Fluid & Electric Distribution Sys. Includes Test Repts,Tech Specs & Oversized DrawingsBoric Acid
Hydrostatic
Earthquake
Liquid penetrant