ML11285A478: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
(2 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML11285A478
| number = ML11285A478
| issue date = 09/12/2011
| issue date = 09/12/2011
| title = 2011/09/12 Watts Bar 2 OL - NRC PM Open Items List 9-13-11 R1.docx
| title = OL - NRC PM Open Items List 9-13-11 R1.docx
| author name =  
| author name =  
| author affiliation = - No Known Affiliation
| author affiliation = - No Known Affiliation
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:1 WBN2Public Resource From: Boyd, Desiree L [dlboyd@tva.gov]
{{#Wiki_filter:1 WBN2Public Resource From:
Sent: Monday, September 12, 2011 2:35 PM To: Poole, Justin; Milano, Patrick; Campbell, Stephen; Epperson, Dan Cc: Arent, Gordon; Smith, James D; Bryan, Rober t H Jr; Smith, James D; Crouch, William D
Boyd, Desiree L [dlboyd@tva.gov]
Sent:
Monday, September 12, 2011 2:35 PM To:
Poole, Justin; Milano, Patrick; Campbell, Stephen; Epperson, Dan Cc:
Arent, Gordon; Smith, James D; Bryan, Robert H Jr; Smith, James D; Crouch, William D


==Subject:==
==Subject:==
NRC PM Open Items List 9-13-11 R1.docx Attachments:
NRC PM Open Items List 9-13-11 R1.docx Attachments:
NRC PM Open Items List 9-13-11 R1.docxUpdated - Rev 1. For next phone call.  
NRC PM Open Items List 9-13-11 R1.docx Updated - Rev 1. For next phone call.
 
Thank you,  
Thank you,
~*~*~*~*~*~*~*~*~*~*~*~
  ~*~*~*~*~*~*~*~*~*~*~*~
Désireé L. Boyd WBN 2 Licensing Support Sun Technical Services dlboyd@tva.gov 423-365-8764  
Désireé L. Boyd WBN 2 Licensing Support Sun Technical Services dlboyd@tva.gov 423-365-8764  


Hearing Identifier: Watts_Bar_2_Operating_LA_Public Email Number: 523   Mail Envelope Properties   (7AB41F650F76BD44B5BCAB7C0CCABFAF22EC0EB8)
Hearing Identifier:
Watts_Bar_2_Operating_LA_Public Email Number:
523 Mail Envelope Properties (7AB41F650F76BD44B5BCAB7C0CCABFAF22EC0EB8)  


==Subject:==
==Subject:==
NRC PM Open Items List 9-13-11 R1.docx Sent Date:   9/12/2011 2:35:16 PM Received Date: 9/12/2011 2:35:20 PM From:   Boyd, Desiree L Created By:   dlboyd@tva.gov Recipients:     "Arent, Gordon" <garent@tva.gov>
NRC PM Open Items List 9-13-11 R1.docx Sent Date:
Tracking Status: None "Smith, James D" <jdsmith@tva.gov>
9/12/2011 2:35:16 PM Received Date:
Tracking Status: None "Bryan, Robert H Jr" <rhbryan@tva.gov> Tracking Status: None "Smith, James D" <smith1jd@westinghouse.com> Tracking Status: None "Crouch, William D" <wdcrouch@tva.gov> Tracking Status: None "Poole, Justin" <Justin.Poole@nrc.gov> Tracking Status: None "Milano, Patrick" <Patrick.Milano@nrc.gov> Tracking Status: None "Campbell, Stephen" <Stephen.Campbell@nrc.gov>
9/12/2011 2:35:20 PM From:
Tracking Status: None "Epperson, Dan" <Dan.Epperson@nrc.gov> Tracking Status: None Post Office:   TVANUCXVS2.main.tva.gov
Boyd, Desiree L Created By:
dlboyd@tva.gov Recipients:  
"Arent, Gordon" <garent@tva.gov>
Tracking Status: None "Smith, James D" <jdsmith@tva.gov>
Tracking Status: None "Bryan, Robert H Jr" <rhbryan@tva.gov>
Tracking Status: None "Smith, James D" <smith1jd@westinghouse.com>
Tracking Status: None "Crouch, William D" <wdcrouch@tva.gov>
Tracking Status: None "Poole, Justin" <Justin.Poole@nrc.gov>
Tracking Status: None "Milano, Patrick" <Patrick.Milano@nrc.gov>
Tracking Status: None "Campbell, Stephen" <Stephen.Campbell@nrc.gov>
Tracking Status: None "Epperson, Dan" <Dan.Epperson@nrc.gov>
Tracking Status: None Post Office:
TVANUCXVS2.main.tva.gov Files Size Date & Time MESSAGE 272 9/12/2011 2:35:20 PM NRC PM Open Items List 9-13-11 R1.docx 31614 Options Priority:
Standard Return Notification:
No Reply Requested:
No Sensitivity:
Normal Expiration Date:
Recipients Received:


Files    Size      Date & Time MESSAGE    272      9/12/2011 2:35:20 PM  NRC PM Open Items List 9-13-11 R1.docx    31614 Options  Priority:    Standard  Return Notification:    No  Reply Requested:    No  Sensitivity:    Normal  Expiration Date:      Recipients Received:
Page 1 of 4 NRC PM Open Items List 9/13/11 (423) 751-7777 ID 4233652004#
Page 1 of 4     NRC PM Open Items List 9/13/11 (423) 751-7777 ID 4233652004#
No.
No. Description Status Additional Comments Resp Org/Person 1. Cyber Security Plan/Controls and Implementation NRC TI issued TBD NRC Table Top/Pilot  
Description Status Additional Comments Resp Org/Person
 
: 1.
Oct 2011 Procedures complete 9/30/11 Pre-inspection TBD  
Cyber Security Plan/Controls and Implementation NRC TI issued TBD NRC Table Top/Pilot Oct 2011 Procedures complete 9/30/11 Pre-inspection TBD Inspection Dec 2011 NRC Inspection in 2011 To be discussed at the next ACRS meeting (October 5th - closed portion).
 
Set up follow-up meeting 9/20 or 9/21 Heinrich/Snyder (Bryan)
Inspection  
: 2.
 
Instrumentation RAI List (Knuettel)
Dec 2011 NRC Inspection in 2011 To be discussed at the next ACRS meeting (October  
 
5 th - closed portion).  
 
Set up follow-up meeting 9/20 or 9/21 Heinrich/Snyder (Bryan) 2. Instrumentation RAI List (Knuettel)
: 1. Item 3 for GA-ESI RM-1000 RAD Monitors.
: 1. Item 3 for GA-ESI RM-1000 RAD Monitors.
: 2. GA proprietary, non-proprietary and affidavits for withholding submittals
: 2. GA proprietary, non-proprietary and affidavits for withholding submittals
(~12 documents.)
(~12 documents.)
: 3. NRC comments on procedures to GA-ESI 4. RM1000 EMI/RFI questions
: 3. NRC comments on procedures to GA-ESI
: 4. RM1000 EMI/RFI questions
: 5. Submit non-prop/affidavits
: 5. Submit non-prop/affidavits
: 1. 9/23/11 2. Various - see status
: 1. 9/23/11
: 3. 9/26/11 4. 10/1/11 5. 11/30/11 RAI Responses
: 2. Various -
see status
: 3. 9/26/11
: 4. 10/1/11
: 5. 11/30/11 RAI Responses
* Item 1 GA/ESI is preparing a report to document the conformance of their CGD program to NRC requirements based on NRC telecom on 8/30/11.
* Item 1 GA/ESI is preparing a report to document the conformance of their CGD program to NRC requirements based on NRC telecom on 8/30/11.
* Item 2 - 04038903-1SP - Prop due 9/30/11 04038903-2SP - Prop due 10/6/11 04038903-4SP - Prop due 10/21/11 04038903-QSR - Prop due 9/30/11
Item 2 - 04038903-1SP - Prop due 9/30/11 04038903-2SP - Prop due 10/6/11 04038903-4SP - Prop due 10/21/11 04038903-QSR - Prop due 9/30/11 Item 3 OP-7.3-240 - Prop due 9/26/11
* Item 3 OP-7.3-240 - Prop due 9/26/11
* Item 4 Create new bridge document 04038800-1SP - Prop due 10/1/11 Eng/Hilmes (Smith)
* Item 4 Create new bridge document 04038800-1SP - Prop due 10/1/11 Eng/Hilmes (Smith) 3. Verify MACCs values for SAMA Cost Benefit Evaluation 1. 9/8/11A 2. 9/13/11 3. 9/20/11 1. Non-conservatisms in some values identified. Discuss updated results with NRC 2. Submitted revised tables 3. Submit revised RAI responses ENG/Koontz Page 2 of 4     No. Description Status Additional Comments Resp Org/Person 4. Exemption to 10CFR50.49 for some Category II cables 9/23/11 Hilmes (Stockton) 5. Complete Implementation (Hemmer)
: 3.
Pump Relocation 5/30/12 Bldg Plan 9/23/11   Inspection - June 2012 Phase I commitments 10/1/11 Additional clarification to Phase I actions will be needed. Fleet wide issue. Substantial building to complete and equipment in May. Provide document of mitigating equipment and location for unit 2. Hemmer (Smith) 6. Chapter 15.5 RAIs 9/21/11 Includes FHA calc. X/Q discussion for each accident, corrections to previously submitted dose calcs, and a complete 15.5 markup. Potential meeting following submittal. Look at splitting submittal up. Wastrack (Bryan) 7. Fire Protection Report Questions regarding OMA 1. 10/24-28/11 2.9/30/11 3.10/1/11 4. 11/4/11 5. 11/30/11
Verify MACCs values for SAMA Cost Benefit Evaluation
: 6. TBD 1. Audit 2. Group 7 RAI response 3. Receive Group 8 RAIs
: 1. 9/8/11A
: 4. Response to Group 8 5. Submit As-designed U1/U2 FPR
: 2. 9/13/11
: 6. Fire Protection Program Audit Frequency ENG/Hilmes (Crouch) 8. Tech Spec Revisions from latest T/S markup and NRC Review comments
: 3. 9/20/11
: 1. Non-conservatisms in some values identified.
Discuss updated results with NRC
: 2. Submitted revised tables
: 3. Submit revised RAI responses ENG/Koontz  
 
Page 2 of 4 No.
Description Status Additional Comments Resp Org/Person
: 4.
Exemption to 10CFR50.49 for some Category II cables 9/23/11 Hilmes (Stockton)
: 5.
Complete Implementation (Hemmer)
Pump Relocation 5/30/12 Bldg Plan 9/23/11 Inspection -
June 2012 Phase I commitments 10/1/11 Additional clarification to Phase I actions will be needed. Fleet wide issue.
Substantial building to complete and equipment in May.
Provide document of mitigating equipment and location for unit 2.
Hemmer (Smith)
: 6.
Chapter 15.5 RAIs 9/21/11 Includes FHA calc. X/Q discussion for each accident, corrections to previously submitted dose calcs, and a complete 15.5 markup. Potential meeting following submittal. Look at splitting submittal up.
Wastrack (Bryan)
: 7.
Fire Protection Report Questions regarding OMA
: 1. 10/24-28/11 2.9/30/11 3.10/1/11
: 4. 11/4/11
: 5. 11/30/11
: 6. TBD
: 1. Audit
: 2. Group 7 RAI response
: 3. Receive Group 8 RAIs
: 4. Response to Group 8
: 5. Submit As-designed U1/U2 FPR
: 6. Fire Protection Program Audit Frequency ENG/Hilmes (Crouch)
: 8.
Tech Spec Revisions from latest T/S markup and NRC Review comments
: 1. Oct, 2011
: 1. Oct, 2011
: 2. Sept, 2011
: 2. Sept, 2011
: 3. Oct, 2011
: 3. Oct, 2011
: 4. TBD 1. CSST A & B - discretionary
: 4. TBD
: 1. CSST A & B - discretionary
: 2. I-131 DEI
: 2. I-131 DEI
: 3. Diesel Generator Frequency
: 3. Diesel Generator Frequency
: 4. Unit 1 AST FHA Licensing/Elton (Bryan) 9. ACRS Topics 10/5/11 Cyber, Chapter 15 except dose, Chapter 4 (Fuels), WINCISE, Hydrology, process for FSAR drawing documentation update, Gordon 10. SSER 22/23/24 Open Items Response 9/16/11 9/16 is the target date for the next SSER update. The expanded HH list and status is covered periodically. Licensing Page 3 of 4     No. Description Status Additional Comments Resp Org/Person 11. Transient Analysis issues Boron dilution RAI response 9/16/11 Question on RG revision and modes 3, 4, & 5. TVA to provide write up explaining NRC acceptance (CLB) of unit1 for modes 3, 4, & 5. ENG/Koontz WEC/Morgan 12. FSAR A106 9/16/11 Target date. Correction - change note 17 of Table 7.1.1 to Reg Guide 1.152 R 3 instead of R 2 How will note on FSAR figure 9.2-23 change for two unit operation when the CCS C-S and 2B pumps are realigned Lic/Stockton 13. Develop list of planned License Conditions, Exemptions and Relief Requests (Crouch) 1. 11/1/112. TBD 1. Review Unit 1 SER for exemptions. Sand baskets, cyber security, physical security, PAD 4.0 2. NRR to review current exemptions NRR/TVA (Bryan) 14. Verify Tech Spec Setpoints match calcs TS certification 1. 10/4/11
: 4. Unit 1 AST FHA Licensing/Elton (Bryan)
: 2. TBD 1. 6 SSDs remaining to be issued. Possible submittal if any number changes.
: 9.
: 2. TS certification Eng/Hilmes (Bryan) 15. Issue two Unit Offsite Dose Calculation Manual (Beach) Review TS Chapter 5 programs also 3/1/12 Determine actual need date Chemistry/
ACRS Topics 10/5/11 Cyber, Chapter 15 except dose, Chapter 4 (Fuels),
Woods (Bryan) 16. Issue Unit 2 Completion Letter (Crouch) 8/1/12 Licensing 17. Submit final as-constructed FSAR figures 7/1/12 Licensing/ Stockton 18. TMI action items 7/1/12 TVA to provide letter when TMI actions are field complete.
WINCISE, Hydrology, process for FSAR drawing documentation update, Gordon
Licensing (Gordon) 19. ASME N-801 & N-802 code cases March 2012` NRC response to relief request submitted 9/1/11. NRR 0. Discretionary Actions
: 10.
: 1. Letter to terminate Part 30/40 License after receipt of Part 50 License 4/1/12 Licensing (Crouch) 2. Combined U1/U2 FSAR (Stockton) 3/1/13 Licensing 3. Status of GSI 199 Eastern Seismicity (Crouch) Fall 2011 No action pending upcoming Generic Letter Related information on GSI 194 may need input TVA/NRR 4. Letter to notify NRC when Vital Area Boundary returned to original location 12/1/11 Security Plan Update - Boundary to be restored by 9/30/11 Lic/Crouch Page 4 of 4     No. Description Status Additional Comments Resp Org/Person 5. IEB 88-02 SG Tube Cracking TBD Tubes are assumed locked in the WEC analysis. Waiting for NRC concurrence.
SSER 22/23/24 Open Items Response 9/16/11 9/16 is the target date for the next SSER update. The expanded HH list and status is covered periodically.
Corp SG/ Webber ISI/Tinley}}
Licensing  
 
Page 3 of 4 No.
Description Status Additional Comments Resp Org/Person
: 11.
Transient Analysis issues Boron dilution RAI response 9/16/11 Question on RG revision and modes 3, 4, & 5. TVA to provide write up explaining NRC acceptance (CLB) of unit1 for modes 3, 4, & 5.
ENG/Koontz WEC/Morgan
: 12.
FSAR A106 9/16/11 Target date.
Correction - change note 17 of Table 7.1.1 to Reg Guide 1.152 R 3 instead of R 2 How will note on FSAR figure 9.2-23 change for two unit operation when the CCS C-S and 2B pumps are realigned Lic/Stockton
: 13.
Develop list of planned License Conditions, Exemptions and Relief Requests (Crouch)
: 1. 11/1/11
: 2. TBD
: 1. Review Unit 1 SER for exemptions. Sand baskets, cyber security, physical security, PAD 4.0
: 2. NRR to review current exemptions NRR/TVA (Bryan)
: 14.
Verify Tech Spec Setpoints match calcs TS certification
: 1. 10/4/11
: 2. TBD
: 1. 6 SSDs remaining to be issued. Possible submittal if any number changes.
: 2. TS certification Eng/Hilmes (Bryan)
: 15.
Issue two Unit Offsite Dose Calculation Manual (Beach) Review TS Chapter 5 programs also 3/1/12 Determine actual need date Chemistry/
Woods (Bryan)
: 16.
Issue Unit 2 Completion Letter (Crouch) 8/1/12 Licensing
: 17.
Submit final as-constructed FSAR figures 7/1/12 Licensing/
Stockton
: 18.
TMI action items 7/1/12 TVA to provide letter when TMI actions are field complete.
Licensing (Gordon)
: 19.
ASME N-801 & N-802 code cases March 2012`
NRC response to relief request submitted 9/1/11.
NRR
: 0.
Discretionary Actions
: 1.
Letter to terminate Part 30/40 License after receipt of Part 50 License 4/1/12 Licensing (Crouch)
: 2.
Combined U1/U2 FSAR (Stockton) 3/1/13 Licensing
: 3.
Status of GSI 199 Eastern Seismicity (Crouch)
Fall 2011 No action pending upcoming Generic Letter Related information on GSI 194 may need input TVA/NRR
: 4.
Letter to notify NRC when Vital Area Boundary returned to original location 12/1/11 Security Plan Update - Boundary to be restored by 9/30/11 Lic/Crouch  
 
Page 4 of 4 No.
Description Status Additional Comments Resp Org/Person
: 5.
IEB 88-02 SG Tube Cracking TBD Tubes are assumed locked in the WEC analysis.
Waiting for NRC concurrence.
Corp SG/
Webber ISI/Tinley}}

Latest revision as of 01:38, 13 January 2025

OL - NRC PM Open Items List 9-13-11 R1.docx
ML11285A478
Person / Time
Site: Watts Bar Tennessee Valley Authority icon.png
Issue date: 09/12/2011
From:
- No Known Affiliation
To:
Division of Operating Reactor Licensing
References
Download: ML11285A478 (6)


Text

1 WBN2Public Resource From:

Boyd, Desiree L [dlboyd@tva.gov]

Sent:

Monday, September 12, 2011 2:35 PM To:

Poole, Justin; Milano, Patrick; Campbell, Stephen; Epperson, Dan Cc:

Arent, Gordon; Smith, James D; Bryan, Robert H Jr; Smith, James D; Crouch, William D

Subject:

NRC PM Open Items List 9-13-11 R1.docx Attachments:

NRC PM Open Items List 9-13-11 R1.docx Updated - Rev 1. For next phone call.

Thank you,

~*~*~*~*~*~*~*~*~*~*~*~

Désireé L. Boyd WBN 2 Licensing Support Sun Technical Services dlboyd@tva.gov 423-365-8764

Hearing Identifier:

Watts_Bar_2_Operating_LA_Public Email Number:

523 Mail Envelope Properties (7AB41F650F76BD44B5BCAB7C0CCABFAF22EC0EB8)

Subject:

NRC PM Open Items List 9-13-11 R1.docx Sent Date:

9/12/2011 2:35:16 PM Received Date:

9/12/2011 2:35:20 PM From:

Boyd, Desiree L Created By:

dlboyd@tva.gov Recipients:

"Arent, Gordon" <garent@tva.gov>

Tracking Status: None "Smith, James D" <jdsmith@tva.gov>

Tracking Status: None "Bryan, Robert H Jr" <rhbryan@tva.gov>

Tracking Status: None "Smith, James D" <smith1jd@westinghouse.com>

Tracking Status: None "Crouch, William D" <wdcrouch@tva.gov>

Tracking Status: None "Poole, Justin" <Justin.Poole@nrc.gov>

Tracking Status: None "Milano, Patrick" <Patrick.Milano@nrc.gov>

Tracking Status: None "Campbell, Stephen" <Stephen.Campbell@nrc.gov>

Tracking Status: None "Epperson, Dan" <Dan.Epperson@nrc.gov>

Tracking Status: None Post Office:

TVANUCXVS2.main.tva.gov Files Size Date & Time MESSAGE 272 9/12/2011 2:35:20 PM NRC PM Open Items List 9-13-11 R1.docx 31614 Options Priority:

Standard Return Notification:

No Reply Requested:

No Sensitivity:

Normal Expiration Date:

Recipients Received:

Page 1 of 4 NRC PM Open Items List 9/13/11 (423) 751-7777 ID 4233652004#

No.

Description Status Additional Comments Resp Org/Person

1.

Cyber Security Plan/Controls and Implementation NRC TI issued TBD NRC Table Top/Pilot Oct 2011 Procedures complete 9/30/11 Pre-inspection TBD Inspection Dec 2011 NRC Inspection in 2011 To be discussed at the next ACRS meeting (October 5th - closed portion).

Set up follow-up meeting 9/20 or 9/21 Heinrich/Snyder (Bryan)

2.

Instrumentation RAI List (Knuettel)

1. Item 3 for GA-ESI RM-1000 RAD Monitors.
2. GA proprietary, non-proprietary and affidavits for withholding submittals

(~12 documents.)

3. NRC comments on procedures to GA-ESI
4. RM1000 EMI/RFI questions
5. Submit non-prop/affidavits
1. 9/23/11
2. Various -

see status

3. 9/26/11
4. 10/1/11
5. 11/30/11 RAI Responses
  • Item 1 GA/ESI is preparing a report to document the conformance of their CGD program to NRC requirements based on NRC telecom on 8/30/11.

Item 2 - 04038903-1SP - Prop due 9/30/11 04038903-2SP - Prop due 10/6/11 04038903-4SP - Prop due 10/21/11 04038903-QSR - Prop due 9/30/11 Item 3 OP-7.3-240 - Prop due 9/26/11

  • Item 4 Create new bridge document 04038800-1SP - Prop due 10/1/11 Eng/Hilmes (Smith)
3.

Verify MACCs values for SAMA Cost Benefit Evaluation

1. 9/8/11A
2. 9/13/11
3. 9/20/11
1. Non-conservatisms in some values identified.

Discuss updated results with NRC

2. Submitted revised tables
3. Submit revised RAI responses ENG/Koontz

Page 2 of 4 No.

Description Status Additional Comments Resp Org/Person

4.

Exemption to 10CFR50.49 for some Category II cables 9/23/11 Hilmes (Stockton)

5.

Complete Implementation (Hemmer)

Pump Relocation 5/30/12 Bldg Plan 9/23/11 Inspection -

June 2012 Phase I commitments 10/1/11 Additional clarification to Phase I actions will be needed. Fleet wide issue.

Substantial building to complete and equipment in May.

Provide document of mitigating equipment and location for unit 2.

Hemmer (Smith)

6.

Chapter 15.5 RAIs 9/21/11 Includes FHA calc. X/Q discussion for each accident, corrections to previously submitted dose calcs, and a complete 15.5 markup. Potential meeting following submittal. Look at splitting submittal up.

Wastrack (Bryan)

7.

Fire Protection Report Questions regarding OMA

1. 10/24-28/11 2.9/30/11 3.10/1/11
4. 11/4/11
5. 11/30/11
6. TBD
1. Audit
2. Group 7 RAI response
3. Receive Group 8 RAIs
4. Response to Group 8
5. Submit As-designed U1/U2 FPR
6. Fire Protection Program Audit Frequency ENG/Hilmes (Crouch)
8.

Tech Spec Revisions from latest T/S markup and NRC Review comments

1. Oct, 2011
2. Sept, 2011
3. Oct, 2011
4. TBD
1. CSST A & B - discretionary
2. I-131 DEI
3. Diesel Generator Frequency
4. Unit 1 AST FHA Licensing/Elton (Bryan)
9.

ACRS Topics 10/5/11 Cyber, Chapter 15 except dose, Chapter 4 (Fuels),

WINCISE, Hydrology, process for FSAR drawing documentation update, Gordon

10.

SSER 22/23/24 Open Items Response 9/16/11 9/16 is the target date for the next SSER update. The expanded HH list and status is covered periodically.

Licensing

Page 3 of 4 No.

Description Status Additional Comments Resp Org/Person

11.

Transient Analysis issues Boron dilution RAI response 9/16/11 Question on RG revision and modes 3, 4, & 5. TVA to provide write up explaining NRC acceptance (CLB) of unit1 for modes 3, 4, & 5.

ENG/Koontz WEC/Morgan

12.

FSAR A106 9/16/11 Target date.

Correction - change note 17 of Table 7.1.1 to Reg Guide 1.152 R 3 instead of R 2 How will note on FSAR figure 9.2-23 change for two unit operation when the CCS C-S and 2B pumps are realigned Lic/Stockton

13.

Develop list of planned License Conditions, Exemptions and Relief Requests (Crouch)

1. 11/1/11
2. TBD
1. Review Unit 1 SER for exemptions. Sand baskets, cyber security, physical security, PAD 4.0
2. NRR to review current exemptions NRR/TVA (Bryan)
14.

Verify Tech Spec Setpoints match calcs TS certification

1. 10/4/11
2. TBD
1. 6 SSDs remaining to be issued. Possible submittal if any number changes.
2. TS certification Eng/Hilmes (Bryan)
15.

Issue two Unit Offsite Dose Calculation Manual (Beach) Review TS Chapter 5 programs also 3/1/12 Determine actual need date Chemistry/

Woods (Bryan)

16.

Issue Unit 2 Completion Letter (Crouch) 8/1/12 Licensing

17.

Submit final as-constructed FSAR figures 7/1/12 Licensing/

Stockton

18.

TMI action items 7/1/12 TVA to provide letter when TMI actions are field complete.

Licensing (Gordon)

19.

ASME N-801 & N-802 code cases March 2012`

NRC response to relief request submitted 9/1/11.

NRR

0.

Discretionary Actions

1.

Letter to terminate Part 30/40 License after receipt of Part 50 License 4/1/12 Licensing (Crouch)

2.

Combined U1/U2 FSAR (Stockton) 3/1/13 Licensing

3.

Status of GSI 199 Eastern Seismicity (Crouch)

Fall 2011 No action pending upcoming Generic Letter Related information on GSI 194 may need input TVA/NRR

4.

Letter to notify NRC when Vital Area Boundary returned to original location 12/1/11 Security Plan Update - Boundary to be restored by 9/30/11 Lic/Crouch

Page 4 of 4 No.

Description Status Additional Comments Resp Org/Person

5.

IEB 88-02 SG Tube Cracking TBD Tubes are assumed locked in the WEC analysis.

Waiting for NRC concurrence.

Corp SG/

Webber ISI/Tinley