ML062430390: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
(One intermediate revision by the same user not shown)
Line 2: Line 2:
| number = ML062430390
| number = ML062430390
| issue date = 08/31/2006
| issue date = 08/31/2006
| title = Shearon Harris, Mid-Cycle Performance Review and Inspection Plan, 08/01/06 - 07/31/07
| title = Mid-Cycle Performance Review and Inspection Plan, 08/01/06 - 07/31/07
| author name = Desai B B
| author name = Desai B
| author affiliation = NRC/RGN-II/DRP/RPB4
| author affiliation = NRC/RGN-II/DRP/RPB4
| addressee name = Gannon C J
| addressee name = Gannon C
| addressee affiliation = Carolina Power & Light Co
| addressee affiliation = Carolina Power & Light Co
| docket = 05000400
| docket = 05000400
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:Harris Inspection / Activity Plan 08/01/2006
{{#Wiki_filter:Page 1 of 1                                                                                      Harris 08/30/2006    14:24:48                                                                Inspection / Activity Plan Report 22 08/01/2006 - 07/31/2007 Unit                                                                                                                          No. of Staff   Planned Dates          Inspection Number      Inspection Activity                                                    Title                                        on Site       Start    End              Type 2515/169       - TI 2515/169 - MSPI VERIFICATION                                                                           2 1              IP 2515/169              Mitigating Systems Performance Index Verification                                                    08/01/2006 12/31/2006 Safety Issues EB1-CDB       - COMPONENT DESIGN BASES INSPECTION                                                                         6 1              IP 7111121              Component Design Bases Inspection                                                                    09/18/2006 09/22/2006 Baseline Inspections 1             IP 7111121               Component Design Bases Inspection                                                                   10/02/2006 10/06/2006 Baseline Inspections 1             IP 7111121               Component Design Bases Inspection                                                                   10/16/2006 10/20/2006 Baseline Inspections 1             IP 7111121               Component Design Bases Inspection                                                                   10/30/2006 11/03/2006 Baseline Inspections PSB1-RP       - RP PUBLIC PRE - INSP VISIT                                                                               1 1              IP 7112101              Access Control to Radiologically Significant Areas                                                  12/18/2006 12/20/2006 Baseline Inspections OL RQ         - REQUAL INSPECTION                                                                                         3 1              IP 7111111B              Licensed Operator Requalification Program                                                            03/19/2007 03/23/2007 Baseline Inspections PS2-EP         - EP EXERCISE                                                                                               3 1             IP 7111401               Exercise Evaluation                                                                                 04/09/2007 04/13/2007 Baseline Inspections 1             IP 7111404               Emergency Action Level and Emergency Plan Changes                                                   04/09/2007 04/13/2007 Baseline Inspections 1             IP 71151                 Performance Indicator Verification                                                                   04/09/2007 04/13/2007 Baseline Inspections EB3-HS         - HEAT SINK                                                                                                 3 1              IP 7111107B              Heat Sink Performance                                                                                06/04/2007 06/08/2007 Baseline Inspections PSB1-RP       - RP PUBLIC PRE-INSP. VISIT                                                                                 1 1              IP 7112101              Access Control to Radiologically Significant Areas                                                  06/11/2007 06/13/2007 Baseline Inspections OL PREP       - INITIAL EXAM PREP                                                                                         4 1                 V23259               HARRIS/JULY 2007 EXAM AT POWER FACILIITES                                                           07/09/2007 07/13/2007 Not Applicable PSB1-RP        - RP PUBLIC BASELINE INSP                                                                                  4 1             IP 7112101               Access Control to Radiologically Significant Areas                                                   07/09/2007 07/13/2007 Baseline Inspections 1             IP 7112103               Radiation Monitoring Instrumentation and Protective Equipment                                       07/09/2007 07/13/2007 Baseline Inspections 1             IP 7112201               Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems                             07/09/2007 07/13/2007 Baseline Inspections 1             IP 7112203               Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control P             07/09/2007 07/13/2007 Baseline Inspections 1             IP 71151                 Performance Indicator Verification                                                                   07/09/2007 07/13/2007 Baseline Inspections LIC RENE       - LICENSE RENEWAL INSPECTION                                                                               5 1              IP 71002                License Renewal Inspection                                                                          07/16/2007 07/27/2007 License Renewal Insp OL EXAM       - INITIAL EXAM                                                                                             4 1                V23259                HARRIS/JULY 2007 EXAM AT POWER FACILIITES                                                            07/30/2007 08/10/2007 Not Applicable This report does not include INPO and OUTAGE activities.                                                                                                 Enclosure This report shows only on-site and announced inspection procedures.}}
-07/31/2007 Inspection Type Inspection Activity Planned Dates Start          End No. of Staff on Site Title Unit Number Page 1 of 1 08/30/2006 14:24:48 Report 22 2 2515/169-TI 2515/169 - MSPI VERIFICATION Safety Issues 08/01/2006 12/31/2006 1    2515/169 IP Mitigating Systems Performance Index Verification 6 EB1-CDB-COMPONENT DESIGN BASES INSPECTION Baseline Inspections 09/18/2006 09/22/2006 1     7111121 IP Component Design Bases Inspection Baseline Inspections 10/02/2006 10/06/2006 1     7111121 IP Component Design Bases Inspection Baseline Inspections 10/16/2006 10/20/2006 1     7111121 IP Component Design Bases Inspection Baseline Inspections 10/30/2006 11/03/2006 1    7111121 IP Component Design Bases Inspection 1 PSB1-RP-RP PUBLIC PRE - INSP VISIT Baseline Inspections 12/18/2006 12/20/2006 1    7112101 IP A ccess Control to Radiologically Significant Areas 3 OL RQ-REQUAL INSPECTION Baseline Inspections 03/19/2007 03/23/2007 1    7111111B IP Licensed Operator Requalification Program 3 PS2-EP-EP EXERCISE Baseline Inspections 04/09/2007 04/13/2007 1     7111401 IP Exercise Evaluation Baseline Inspections 04/09/2007 04/13/2007 1     7111404 IP Emergency Action Level and Emergency Plan Changes Baseline Inspections 04/09/2007 04/13/2007 1     71151 IP Performance Indicator Verification 3 EB3-HS-HEAT SINK Baseline Inspections 06/04/2007 06/08/2007 1    7111107B IP Heat Sink Performance 1 PSB1-RP-RP PUBLIC PRE-INSP. VISIT Baseline Inspections 06/11/2007 06/13/2007 1    7112101 IP A ccess Control to Radiologically Significant Areas 4 OL PREP-INITIAL EXAM PREP Not Applicable 07/09/2007 07/13/2007 1     V23259 HARRIS/JULY 2007 EXAM AT POWER FACILIITES 4 PSB1-RP-RP PUBLIC BASELINE INSP Baseline Inspections 07/09/2007 07/13/2007 1     7112101 IP A ccess Control to Radiologically Significant Areas Baseline Inspections 07/09/2007 07/13/2007 1     7112103 IP Radiation Monitoring Instrumentation and Protective Equipment Baseline Inspections 07/09/2007 07/13/2007 1     7112201 IP Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems Baseline Inspections 07/09/2007 07/13/2007 1     7112203 IP Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control P Baseline Inspections 07/09/2007 07/13/2007 1     71151 IP Performance Indicator Verification 5 LIC RENE-LICENSE RENEWAL INSPECTION License Renewal Ins p 07/16/2007 07/27/2007 1    71002 IP License Renewal Inspection 4 OL EXAM-INITIAL EXAM Not Applicable 07/30/2007 08/10/2007 1    V23259 HARRIS/JULY 2007 EXAM AT POWER FACILIITES This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.}}

Latest revision as of 15:33, 23 November 2019

Mid-Cycle Performance Review and Inspection Plan, 08/01/06 - 07/31/07
ML062430390
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 08/31/2006
From: Binoy Desai
NRC/RGN-II/DRP/RPB4
To: Gannon C
Carolina Power & Light Co
Shared Package
ML062430386 List:
References
Download: ML062430390 (1)


Text

Page 1 of 1 Harris 08/30/2006 14:24:48 Inspection / Activity Plan Report 22 08/01/2006 - 07/31/2007 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type 2515/169 - TI 2515/169 - MSPI VERIFICATION 2 1 IP 2515/169 Mitigating Systems Performance Index Verification 08/01/2006 12/31/2006 Safety Issues EB1-CDB - COMPONENT DESIGN BASES INSPECTION 6 1 IP 7111121 Component Design Bases Inspection 09/18/2006 09/22/2006 Baseline Inspections 1 IP 7111121 Component Design Bases Inspection 10/02/2006 10/06/2006 Baseline Inspections 1 IP 7111121 Component Design Bases Inspection 10/16/2006 10/20/2006 Baseline Inspections 1 IP 7111121 Component Design Bases Inspection 10/30/2006 11/03/2006 Baseline Inspections PSB1-RP - RP PUBLIC PRE - INSP VISIT 1 1 IP 7112101 Access Control to Radiologically Significant Areas 12/18/2006 12/20/2006 Baseline Inspections OL RQ - REQUAL INSPECTION 3 1 IP 7111111B Licensed Operator Requalification Program 03/19/2007 03/23/2007 Baseline Inspections PS2-EP - EP EXERCISE 3 1 IP 7111401 Exercise Evaluation 04/09/2007 04/13/2007 Baseline Inspections 1 IP 7111404 Emergency Action Level and Emergency Plan Changes 04/09/2007 04/13/2007 Baseline Inspections 1 IP 71151 Performance Indicator Verification 04/09/2007 04/13/2007 Baseline Inspections EB3-HS - HEAT SINK 3 1 IP 7111107B Heat Sink Performance 06/04/2007 06/08/2007 Baseline Inspections PSB1-RP - RP PUBLIC PRE-INSP. VISIT 1 1 IP 7112101 Access Control to Radiologically Significant Areas 06/11/2007 06/13/2007 Baseline Inspections OL PREP - INITIAL EXAM PREP 4 1 V23259 HARRIS/JULY 2007 EXAM AT POWER FACILIITES 07/09/2007 07/13/2007 Not Applicable PSB1-RP - RP PUBLIC BASELINE INSP 4 1 IP 7112101 Access Control to Radiologically Significant Areas 07/09/2007 07/13/2007 Baseline Inspections 1 IP 7112103 Radiation Monitoring Instrumentation and Protective Equipment 07/09/2007 07/13/2007 Baseline Inspections 1 IP 7112201 Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems 07/09/2007 07/13/2007 Baseline Inspections 1 IP 7112203 Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control P 07/09/2007 07/13/2007 Baseline Inspections 1 IP 71151 Performance Indicator Verification 07/09/2007 07/13/2007 Baseline Inspections LIC RENE - LICENSE RENEWAL INSPECTION 5 1 IP 71002 License Renewal Inspection 07/16/2007 07/27/2007 License Renewal Insp OL EXAM - INITIAL EXAM 4 1 V23259 HARRIS/JULY 2007 EXAM AT POWER FACILIITES 07/30/2007 08/10/2007 Not Applicable This report does not include INPO and OUTAGE activities. Enclosure This report shows only on-site and announced inspection procedures.