| number = ML073512034
| number = ML073512034
| issue date = 01/30/2008
| issue date = 01/30/2008
| title = Monticello, Issuance of Amendment Regarding Output Requirement of the Division 2 Battery Charger
| title = Issuance of Amendment Regarding Output Requirement of the Division 2 Battery Charger
| author name = Tam P S
| author name = Tam P
| author affiliation = NRC/NRR/ADRO/DORL/LPLIII-1
| author affiliation = NRC/NRR/ADRO/DORL/LPLIII-1
| addressee name = O'Connor T J
| addressee name = O'Connor T
| addressee affiliation = Nuclear Management Co, LLC
| addressee affiliation = Nuclear Management Co, LLC
| docket = 05000263
| docket = 05000263
| license number = DPR-022
| license number = DPR-022
| contact person = tam P S, NRR/ADRO/DORL, 415-1451
| contact person = tam P, NRR/ADRO/DORL, 415-1451
| case reference number = TAC MD4438
| case reference number = TAC MD4438
| package number = ML080070014
| package number = ML080070014
Line 19: Line 19:


=Text=
=Text=
{{#Wiki_filter:January 30, 2008 Timothy J. O
{{#Wiki_filter:January 30, 2008 Timothy J. O=Connor Site Vice President Monticello Nuclear Generating Plant Nuclear Management Company, LLC 2807 West County Road 75 Monticello, MN 55362-9637
=Connor Site Vice President Monticello Nuclear Generating Plant Nuclear Management Company, LLC 2807 West County Road 75 Monticello, MN 55362-9637  


==SUBJECT:==
==SUBJECT:==
MONTICELLO NUCLEAR GENERATING PLANT - ISSUANCE OF AMENDMENT RE: OUTPUT REQUIREMENT OF THE DIVISION 2 BATTERY CHARGER (TAC NO. MD4438)
MONTICELLO NUCLEAR GENERATING PLANT - ISSUANCE OF AMENDMENT RE: OUTPUT REQUIREMENT OF THE DIVISION 2 BATTERY CHARGER (TAC NO. MD4438)
Dear Mr. O
=Connor:
The Commission has issued the enclosed Amendment No. 153 to Renewed Facility Operating License No. DPR-22 for Monticello Nuclear Generating Plant (MNGP), in response to your application dated February 15, 2007, as supplemented by letter dated November 30, 2007.


The amendment revised the Technical Specifications Surveillance Requirement (SR) 3.8.4.2, "DC [Direct Current] Sources - Operating," to specify that the Division 1 battery chargers are verified to supply 150 amps and the Division 2 battery chargers are verified to supply 110 amps.
==Dear Mr. O=Connor:==
A copy of our related safety evaluation is also enclosed. The Notice of Issuance will be included in the Commission's biweekly Federal Register notice.        Sincerely, 


  /RA Chawla for/
The Commission has issued the enclosed Amendment No. 153 to Renewed Facility Operating License No. DPR-22 for Monticello Nuclear Generating Plant (MNGP), in response to your application dated February 15, 2007, as supplemented by letter dated November 30, 2007.
Peter S. Tam, Senior Project Manager       Plant Licensing Branch III-1 Division of Operating Reactor Licensing       Office of Nuclear Reactor Regulation Docket No. 50-263  
The amendment revised the Technical Specifications Surveillance Requirement (SR) 3.8.4.2, DC [Direct Current] Sources - Operating, to specify that the Division 1 battery chargers are verified to supply 150 amps and the Division 2 battery chargers are verified to supply 110 amps.
A copy of our related safety evaluation is also enclosed. The Notice of Issuance will be included in the Commissions biweekly Federal Register notice.
Sincerely,
                                            /RA Chawla for/
Peter S. Tam, Senior Project Manager Plant Licensing Branch III-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-263


==Enclosures:==
==Enclosures:==
: 1. Amendment No. 153 to DPR-22  
: 1. Amendment No. 153 to DPR-22
: 2. Safety Evaluation cc w/encls: See next page January 30, 2008 Timothy J. O
: 2. Safety Evaluation cc w/encls: See next page
=Connor Site Vice President Monticello Nuclear Generating Plant Nuclear Management Company, LLC 2807 West County Road 75 Monticello, MN 55362-9637  
 
January 30, 2008 Timothy J. O=Connor Site Vice President Monticello Nuclear Generating Plant Nuclear Management Company, LLC 2807 West County Road 75 Monticello, MN 55362-9637


==SUBJECT:==
==SUBJECT:==
MONTICELLO NUCLEAR GENERATING PLANT - ISSUANCE OF AMENDMENT RE: OUTPUT REQUIREMENT OF THE DIVISION 2 BATTERY CHARGER (TAC NO. MD4438)
MONTICELLO NUCLEAR GENERATING PLANT - ISSUANCE OF AMENDMENT RE: OUTPUT REQUIREMENT OF THE DIVISION 2 BATTERY CHARGER (TAC NO. MD4438)
Dear Mr. O
=Connor:  The Commission has issued the enclosed Amendment No. 153 to Renewed Facility Operating License No. DPR-22 for Monticello Nuclear Generating Plant (MNGP), in response to your application dated February 15, 2007, as supplemented by letter dated November 30, 2007.


The amendment revised the Technical Specifications Surveillance Requirement (SR) 3.8.4.2, "DC [Direct Current] Sources - Operating," to specify that the Division 1 battery chargers are verified to supply 150 amps and the Division 2 battery chargers are verified to supply 110 amps.
==Dear Mr. O=Connor:==
A copy of our related safety evaluation is also enclosed. The Notice of Issuance will be included in the Commission's biweekly Federal Register notice.       Sincerely,
 
      /RA Chawla for/       Peter S. Tam, Senior Project Manager       Plant Licensing Branch III-1       Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-263  
The Commission has issued the enclosed Amendment No. 153 to Renewed Facility Operating License No. DPR-22 for Monticello Nuclear Generating Plant (MNGP), in response to your application dated February 15, 2007, as supplemented by letter dated November 30, 2007.
The amendment revised the Technical Specifications Surveillance Requirement (SR) 3.8.4.2, DC [Direct Current] Sources - Operating, to specify that the Division 1 battery chargers are verified to supply 150 amps and the Division 2 battery chargers are verified to supply 110 amps.
A copy of our related safety evaluation is also enclosed. The Notice of Issuance will be included in the Commissions biweekly Federal Register notice.
Sincerely,
                                              /RA Chawla for/
Peter S. Tam, Senior Project Manager Plant Licensing Branch III-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-263


==Enclosures:==
==Enclosures:==
: 1. Amendment No. 153 to DPR-22 2. Safety Evaluation cc w/encls: See next page DISTRIBUTION:
: 1. Amendment No. 153 to DPR-22
PUBLIC LPL3-1 r/f RidsNrrDorlLpl3-1 RidsNrrPMPTam RidsNrrLATHarris RidsOgcRp RidsAcrsAcnwMailCenter RidsNrrDirsltsb G. Hill, OIS K. Miller, NRR RidsRgn3MailCenter RidsNrrDorlDpr RidsNrrLABTully Package Accession No. ML080070014 Amendment Accession Number: ML073512034     TS Page Accession No. ML080280601 OFFICE LPL3-1/PM LPL3-1/LA EEEB/BC TSB/BC OGC/NLO LPL3-1/(A)BC  
: 2. Safety Evaluation cc w/encls: See next page DISTRIBUTION:
PUBLIC                 LPL3-1 r/f             RidsNrrDorlLpl3-1             RidsNrrPMPTam RidsNrrLATHarris       RidsOgcRp             RidsAcrsAcnwMailCenter       RidsNrrDirsltsb G. Hill, OIS           K. Miller, NRR         RidsRgn3MailCenter           RidsNrrDorlDpr RidsNrrLABTully Package Accession No. ML080070014 Amendment Accession Number: ML073512034               TS Page Accession   No. ML080280601 OFFICE     LPL3-1/PM     LPL3-1/LA       EEEB/BC       TSB/BC           OGC/NLO         LPL3-1/(A)BC JMW for NAME        PTam          THarris        GWilson*      TKobetz          MLoftus        PMilano JC for DATE        1/28/08      1/29/08        12/13/07*      1/30/08          1/24/08        1/30/08
*SE transmitted by memo of 12/13/07.
OFFICIAL RECORD COPY


NAME  PTam  THarris  GWilson* JMW for TKobetz  MLoftus  PMilano JC for
NUCLEAR MANAGEMENT COMPANY, LLC DOCKET NO. 50-263 MONTICELLO NUCLEAR GENERATING PLANT AMENDMENT TO RENEWED FACILITY OPERATING LICENSE Amendment No.153 License No. DPR-22
 
DATE  1/28/08  1/29/08  12/13/07*
1/30/08  1/24/08  1/30/08 *SE transmitted by memo of 12/13/07.
OFFICIAL RECORD COPY 
 
NUCLEAR MANAGEMENT COMPANY, LLC DOCKET NO. 50-263 MONTICELLO NUCLEAR GENERATING PLANT AMENDMENT TO RENEWED FACILITY OPERATING LICENSE
 
Amendment No.153                               License No. DPR-22  
: 1. The Nuclear Regulatory Commission (the Commission) has found that:
: 1. The Nuclear Regulatory Commission (the Commission) has found that:
A. The application for amendment by Nuclear Management Company, LLC (the licensee), dated February 15, 2007, as supplemented by letter of   November 30, 2007, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I; B. The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C. There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D. The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.  
A. The application for amendment by Nuclear Management Company, LLC (the licensee), dated February 15, 2007, as supplemented by letter of November 30, 2007, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I; B. The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C. There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D. The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
: 2. Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.2 of Facility Operating License No. DPR-22 is hereby amended to read as follows:
: 2. Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.2 of Facility Operating License No. DPR-22 is hereby amended to read as follows:
Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment No. 153 are hereby incorporated in the license. NMC shall operate the facility in accordance with the Technical Specifications.
Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment No. 153 are hereby incorporated in the license. NMC shall operate the facility in accordance with the Technical Specifications.
: 3. This license amendment is effective as of its date of issuance and shall be implemented within 60 days of issuance.
: 3. This license amendment is effective as of its date of issuance and shall be implemented within 60 days of issuance.
FOR THE NUCLEAR REGULATORY COMMISSION  
FOR THE NUCLEAR REGULATORY COMMISSION
  /RA J Cushing for/
                                              /RA J Cushing for/
Patrick D. Milano, Acting Chief Plant Licensing Branch III-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation  
Patrick D. Milano, Acting Chief Plant Licensing Branch III-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation


==Attachment:==
==Attachment:==
Changes to the Facility Operating License           and Technical Specifications Date of Issuance: January 30, 2008 ATTACHMENT TO OPERATING LICENSE AMENDMENT NO. 153 RENEWED FACILITY OPERATING LICENSE NO. DPR-22 DOCKET NO. 50-263
Changes to the Facility Operating License and Technical Specifications Date of Issuance: January 30, 2008


Replace the following page of Renewed Facility Operating License DPR-22 with the attached revised page. The revised page is identified by amendment number and contains a marginal line indicating the area of change.
ATTACHMENT TO OPERATING LICENSE AMENDMENT NO. 153 RENEWED FACILITY OPERATING LICENSE NO. DPR-22 DOCKET NO. 50-263 Replace the following page of Renewed Facility Operating License DPR-22 with the attached revised page. The revised page is identified by amendment number and contains a marginal line indicating the area of change.
REMOVE                          INSERT Page 3                          Page 3 Replace the following page of Appendix A (Technical Specifications) with the attached revised page. The revised page is identified by amendment number and contains a marginal line indicating the area of change.
REMOVE                          INSERT 3.8.4-2                          3.8.4-2
: 2.      Pursuant to the Act and 10 CFR Part 70, NMC to receive, possess, and use at any time special nuclear material as reactor fuel, in accordance with the limitations for storage and amounts required for reactor operations, as described in the Final Safety Analysis Report, as supplemented and amended, and the licensee=s filings dated August 16, 1974 (those portions dealing with handling of reactor fuel) and August 17, 1977 (those portions dealing with fuel assembly storage capacity);
: 3.      Pursuant to the Act and 10 CFR Parts 30, 40 and 70, NMC to receive, possess, and use at any time any byproduct, source and special nuclear material as sealed neutron sources for reactor startup, sealed sources for reactor instrumentation and radiation monitoring equipment calibration, and as fission detectors in amounts as required;
: 4.      Pursuant to the Act and 10 CFR Parts 30, 40 and 70, NMC to receive, possess, and use in amounts as required any byproduct, source or special nuclear material without restriction to chemical or physical form, for sample analysis or instrument calibration or associated with radioactive apparatus or components; and
: 5.      Pursuant to the Act and 10 CFR Parts 30 and 70, NMC to possess, but not separate, such byproduct and special nuclear material as may be produced by operation of the facility.
C. This renewed operating license shall be deemed to contain and is subject to the conditions specified in the Commission=s regulations in 10 CFR Chapter I and is subject to all applicable provisions of the Act and to the rules, regulations, and orders of the Commission, now or hereafter in effect; and is subject to the additional conditions specified or incorporated below:
: 1.      Maximum Power Level NMC is authorized to operate the facility at steady state reactor core power levels not in excess of 1775 megawatts (thermal).
: 2.      Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment No. 153, are hereby incorporated in the license. NMC shall operate the facility in accordance with the Technical Specifications.
: 3.      Physical Protection NMC shall implement and maintain in effect all provisions of the Commission-approved physical security, guard training and qualification, and safeguards contingency plans including amendments made pursuant to provisions of the Miscellaneous Amendments and Search Renewed License No. DPR-22 Amendment No. 1 thru 153


REMOVE    INSERT Page 3 Page 3 Replace the following page of Appendix A (Technical Specifications) with the attached revised page. The revised page is identified by amendment number and contains a marginal line indicating the area of change.
SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION AMENDMENT NO. 153 TO RENEWED FACILITY OPERATING LICENSE NO. DPR-22 NUCLEAR MANAGEMENT COMPANY, LLC MONTICELLO NUCLEAR GENERATING PLANT DOCKET NO. 50-263


REMOVE    INSERT 3.8.4-2    3.8.4-2
==1.0      INTRODUCTION==
: 2. Pursuant to the Act and 10 CFR Part 70, NMC to receive, possess, and use at any time special nuclear material as reactor fuel, in accordance with the limitations for storage and amounts required for reactor operations, as described in the Final Safety Analysis Report, as supplemented and amended, and the licensee
=s filings dated August 16, 1974 (those portions dealing with handling of reactor fuel) and August 17, 1977 (those portions dealing with fuel assembly storage capacity);
: 3. Pursuant to the Act and 10 CFR Parts 30, 40 and 70, NMC to receive, possess, and use at any time any byproduct, source and special nuclear material as sealed neutron sources for reactor startup, sealed sources for reactor instrumentation and radiation monitoring equipment calibration, and as fission detectors in amounts as required;
: 4. Pursuant to the Act and 10 CFR Parts 30, 40 and 70, NMC to receive, possess, and use in amounts as required any byproduct, source or special nuclear material without restriction to chemical or physical form, for sample analysis or instrument calibration or associated with radioactive apparatus or components; and
: 5. Pursuant to the Act and 10 CFR Parts 30 and 70, NMC to possess, but not separate, such byproduct and special nuclear material as may be produced by operation of the facility.
C. This renewed operating license shall be deemed to contain and is subject to the conditions specified in the Commission
=s regulations in 10 CFR Chapter I and is subject to all applicable provisions of the Act and to the rules, regulations, and orders of the Commission, now or hereafter in effect; and is subject to the additional conditions specified or incorporated below:
: 1. Maximum Power Level NMC is authorized to operate the facility at steady state reactor core power levels not in excess of 1775 megawatts (thermal). 
: 2. Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment No. 153, are hereby incorporated in the license. NMC shall operate the facility in accordance with the Technical Specifications.
: 3. Physical Protection NMC shall implement and maintain in effect all provisions of the Commission-approved physical security, guard training and qualification, and safeguards contingency plans including amendments made pursuant to provisions of the Miscellaneous Amendments and Search Renewed License No. DPR-22 Amendment No. 1 thru 153 SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION AMENDMENT NO. 153 TO RENEWED FACILITY OPERATING LICENSE NO. DPR-22 NUCLEAR MANAGEMENT COMPANY, LLC MONTICELLO NUCLEAR GENERATING PLANT DOCKET NO. 50-263


==1.0 INTRODUCTION==
By letter dated February 15, 2007 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML070460545), Nuclear Management Company, LLC (NMC) (the licensee) submitted an application for amendment regarding Monticello Nuclear Generating Plant (MNGP) Technical Specifications (TS). The proposed amendment would revise Surveillance Requirement (SR) 3.8.4.2, DC [Direct Current] Sources - Operating, to require that the Division 1 battery chargers are verified to supply 150 amps and the Division 2 battery chargers are verified to supply 110 amps. The Division 2 battery chargers output current limiter is field adjusted to supply 120 to 125 amps in order to stay within the electrical circuit breaker ratings in the associated distribution cabinet. The purpose of the proposed change is to correct an administrative error introduced during the conversion of the MNGP custom TS to the current Improved Standard Technical Specifications (ITS) format. The proposed changes are founded on the findings of deterministic perspectives.
The application was supplemented by a letter from the licensee dated November 30, 2007 (ADAMS Accession No. ML073450331). This supplement provided additional information that clarified the application, did not expand the scope of the application as originally noticed, and did not change the NRC staff's original proposed no significant hazards consideration determination as published in the Federal Register on April 24, 2007 (72 FR 20384).
The Nuclear Regulatory Commission (NRC) staffs evaluation of the licensees application is set forth in the following sections.


By letter dated February 15, 2007 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML070460545), Nuclear Management Company, LLC (NMC) (the licensee) submitted an application for amendment regarding Monticello Nuclear Generating Plant (MNGP) Technical Specifications (TS). The proposed amendment would revise Surveillance Requirement (SR) 3.8.4.2, "DC [Direct Current] Sources - Operating," to require that the Division 1 battery chargers are verified to supply 150 amps and the Division 2 battery chargers are verified to supply 110 amps. The Division 2 battery chargers output current limiter is field adjusted to supply 120 to 125 amps in order to stay within the electrical circuit breaker ratings in the associated distribution cabinet. The purpose of the proposed change is to correct an administrative error introduced during the conversion of the MNGP custom TS to the current Improved Standard Technical Specifications (ITS) format. The proposed changes are founded on the findings of deterministic perspectives.
==2.0       REGULATORY EVALUATION==
The application was supplemented by a letter from the licensee dated November 30, 2007 (ADAMS Accession No. ML073450331). This supplement provided additional information that clarified the application, did not expand the scope of the application as originally noticed, and did not change the NRC staff's original proposed no significant hazards consideration determination as published in the Federal Register on April 24, 2007 (72 FR 20384).
 
The Nuclear Regulatory Commission (NRC) staff's evaluation of the licensee's application is set forth in the following sections.
 
==2.0 REGULATORY EVALUATION==


Title 10 of the Code of Federal Regulations, Part 50, Section 36 requires that each license authorizing operation of a production or utilization facility include TSs. In particular, one type of TS is a limiting condition for operation. The regulation at 10 CFR 50.36(d)(2), requires the establishment of limiting conditions for operation by a license of a utilization or production facility; limiting conditions for operation include completion times for equipment that is required for safe operation of the facility. In addition, surveillance requirements, as set forth in 10 CFR 50.36(d)(3), are a type of TS that relates to testing, calibration or inspection to assure that the necessary quality of systems and components is maintained, that facility operation will be within safety limits, and that the limiting conditions for operation will be met.
Title 10 of the Code of Federal Regulations, Part 50, Section 36 requires that each license authorizing operation of a production or utilization facility include TSs. In particular, one type of TS is a limiting condition for operation. The regulation at 10 CFR 50.36(d)(2), requires the establishment of limiting conditions for operation by a license of a utilization or production facility; limiting conditions for operation include completion times for equipment that is required for safe operation of the facility. In addition, surveillance requirements, as set forth in 10 CFR 50.36(d)(3), are a type of TS that relates to testing, calibration or inspection to assure that the necessary quality of systems and components is maintained, that facility operation will be within safety limits, and that the limiting conditions for operation will be met.
The requirements at Appendix A of 10 CFR 50, General Design Criterion (GDC) 17, "Electric power systems," requires, in part, that nuclear power plants have onsite and offsite electric power systems to permit the functioning of structures, systems, and components that are  important to safety. The onsite system is required to have sufficient independence, redundancy, and testability to perform its safety function, assuming a single failure. The offsite power system is required to be supplied by two physically independent circuits that are designed and located so as to minimize, to the extent practical, the likelihood of their simultaneous failure under operating and postulated accident and environmental conditions. In addition, this criterion requires provisions to minimize the probability of losing electric power from the remaining electric power supplies as a result of loss of power from the unit, the offsite transmission network, or the onsite power supplies.
GDC 18, "Inspection and testing of electric power systems," requires that electric power systems that are important to safety must be designed to permit appropriate periodic inspection and testing. 


The regulation in 10 CFR 50.63, "Loss of all alternating current power," requires that each light-water cooled nuclear power plant licensed to operate must be able to withstand for a specified duration and recover from a station blackout (SBO).  
The requirements at Appendix A of 10 CFR 50, General Design Criterion (GDC) 17, Electric power systems, requires, in part, that nuclear power plants have onsite and offsite electric power systems to permit the functioning of structures, systems, and components that are important to safety. The onsite system is required to have sufficient independence, redundancy, and testability to perform its safety function, assuming a single failure. The offsite power system is required to be supplied by two physically independent circuits that are designed and located so as to minimize, to the extent practical, the likelihood of their simultaneous failure under operating and postulated accident and environmental conditions. In addition, this criterion requires provisions to minimize the probability of losing electric power from the remaining electric power supplies as a result of loss of power from the unit, the offsite transmission network, or the onsite power supplies.
GDC 18, Inspection and testing of electric power systems, requires that electric power systems that are important to safety must be designed to permit appropriate periodic inspection and testing.
The regulation in 10 CFR 50.63, Loss of all alternating current power, requires that each light-water cooled nuclear power plant licensed to operate must be able to withstand for a specified duration and recover from a station blackout (SBO).


==3.0 TECHNICAL EVALUATION==
==3.0     TECHNICAL EVALUATION==


The MNGP 250-volt (V) DC electrical power system consists of two independent safety-related Class 1E DC electrical power divisions. Each division consists of one dedicated 120-cell 250-V DC battery, two dedicated battery chargers and a swing charger (that can functionally replace either of the dedicated chargers), and all the associated switchgear, control equipment, and interconnecting cabling. The chargers are sized such that together they can re-charge a battery while supplying the normal continuous DC loads (in accordance with IEEE Standard 946-1985, "IEEE Recommended Practice for the Design of Safety-Related DC Auxiliary Power Systems for Nuclear Power Generating Stations"). For Division 1, with each charger providing 150 amps, the sizing requirements are met. For Division 2, the DC load profile is less severe such that with each charger providing 110 Amps, the sizing requirements are met. Also, the Division 2 chargers' current limiters are set to limit each charger's output to between 120 and 125 Amps to ensure that the current is within the ratings of the circuit breakers in the associated Division 2 distribution cabinet (Division 1 circuit breakers have a higher current limit, therefore, charger current limiting is not necessary). The current limit setting on the Division 2 chargers is a permanent adjustment. The setting is periodically verified in accordance with preventative maintenance procedures.
The MNGP 250-volt (V) DC electrical power system consists of two independent safety-related Class 1E DC electrical power divisions. Each division consists of one dedicated 120-cell 250-V DC battery, two dedicated battery chargers and a swing charger (that can functionally replace either of the dedicated chargers), and all the associated switchgear, control equipment, and interconnecting cabling. The chargers are sized such that together they can re-charge a battery while supplying the normal continuous DC loads (in accordance with IEEE Standard 946-1985, IEEE Recommended Practice for the Design of Safety-Related DC Auxiliary Power Systems for Nuclear Power Generating Stations). For Division 1, with each charger providing 150 amps, the sizing requirements are met. For Division 2, the DC load profile is less severe such that with each charger providing 110 Amps, the sizing requirements are met. Also, the Division 2 chargers current limiters are set to limit each chargers output to between 120 and 125 Amps to ensure that the current is within the ratings of the circuit breakers in the associated Division 2 distribution cabinet (Division 1 circuit breakers have a higher current limit, therefore, charger current limiting is not necessary). The current limit setting on the Division 2 chargers is a permanent adjustment. The setting is periodically verified in accordance with preventative maintenance procedures.
During normal operation, the 250-V DC load is powered from the battery chargers with the batteries floating on the system. In case of loss of normal power to the battery chargers, the DC load is automatically powered from the station batteries. Each MNGP battery is designed to have adequate storage capacity to carry the required load continuously for at least 4 hours with adequate voltage to mitigate an SBO event. The DC load profile during an SBO event is the most limiting case of all the design-basis events.
During normal operation, the 250-V DC load is powered from the battery chargers with the batteries floating on the system. In case of loss of normal power to the battery chargers, the DC load is automatically powered from the station batteries. Each MNGP battery is designed to have adequate storage capacity to carry the required load continuously for at least 4 hours with adequate voltage to mitigate an SBO event. The DC load profile during an SBO event is the most limiting case of all the design-basis events.
Both 250-V DC divisions are required to be operable to ensure the availability of the required power to shut down the reactor and maintain it in a safe condition after an anticipated operational occurrence or a postulated design-basis event. Loss of any one 250-V DC electrical power division does not prevent the minimum safety function from being performed.
Both 250-V DC divisions are required to be operable to ensure the availability of the required power to shut down the reactor and maintain it in a safe condition after an anticipated operational occurrence or a postulated design-basis event. Loss of any one 250-V DC electrical power division does not prevent the minimum safety function from being performed.
An operable 250-V DC electrical power division requires the battery and its normal chargers, or with its backup charger in place of a normal charger, to be operating and connected to the associated 250-V DC bus.
===3.1 Evaluation===
of Proposed Change to SR 3.8.4.2 In its application, the licensee proposed to revise TS SR 3.8.4.2. Currently this SR specifies that the chargers (i.e., both Division 1 and 2) are verified to supply "150 amps for 250 VDC subsystems."  The proposed changes would revise SR 3.8.4.2 to specify that the Division 1 battery chargers are verified to supply 150 amps, and the Division 2 battery chargers are verified to supply 110 amps. Thus, the proposed requirement change applies to Division 2 chargers only. As such, the licensee stated that the "Division 2 battery chargers output current limiter is field adjusted to supply 120 to 125 amps in order to stay within the electrical circuit breaker ratings in the associated distribution cabinet."  The licensee also stated that its calculation shows that with the Division 2 charger limit set at 110 amps, it will take each of the 250-V battery chargers less than 8 hours to recharge the Division 2 battery, which is well within the 24 hour limit specified in the TS.
The proposed changes to SR 3.8.4.2 address an error inadvertently introduced during the conversion of MNGPs custom TS to the current ITS format. The revised SR will ensure that the licensee properly verifies the design capacity of the chargers by specifying the Division 1 and 2 250-V DC chargers' design-required output current of 150 amps and 110 amps, respectively.
The NRC staff was concerned about how the battery chargers, under all conditions, including during charger current limit operation, satisfy the design voltage range. The licensee provided additional information in its November 30, 2007, letter, responding to Question (3), stating that the voltage of Division 2 250 V-DC system will continue to be properly maintained based on the sizing of the batteries, which determines the operating voltage depending on the batteries' state of discharge. In the same letter, as response to Question (4), the licensee stated that the Division 2 chargers provide sufficient current (at current limit value) to supply the necessary 250-V DC system loads while supplying the necessary charging current for the battery. The NRC staff accepts the licensee's explanation in the November 30, 2007, letter.
Based on the above evaluation, the NRC staff finds the proposed revision to SR 3.8.4.2  provide reasonable assurance of the continued availability of the Division 2 250-V DC battery chargers to maintain the operability of the 250-V DC system, and hence, the safety systems it supplies to shut down the reactor and to maintain the reactor in a safe condition after an anticipated operational occurrence or a postulated design-basis accident. In addition, the NRC staff concludes that there is reasonable assurance of the continued availability of the chargers to ensure that the 250-V DC system will be able to provide for the recovery from an SBO in  accordance with 10 CFR 50.63. The NRC staff also concludes that the proposed TS changes are in accordance with 10 CFR 50.36 and the requirements of GDC 17 and 18. Therefore, the staff finds the proposed changes acceptable.
==4.0 STATE CONSULTATION==


In accordance with the Commission's regulations, the Minnesota State official was notified of the proposed issuance of the amendment. The State official had no comments.  
An operable 250-V DC electrical power division requires the battery and its normal chargers, or with its backup charger in place of a normal charger, to be operating and connected to the associated 250-V DC bus.
3.1      Evaluation of Proposed Change to SR 3.8.4.2 In its application, the licensee proposed to revise TS SR 3.8.4.2. Currently this SR specifies that the chargers (i.e., both Division 1 and 2) are verified to supply 150 amps for 250 VDC subsystems. The proposed changes would revise SR 3.8.4.2 to specify that the Division 1 battery chargers are verified to supply 150 amps, and the Division 2 battery chargers are verified to supply 110 amps. Thus, the proposed requirement change applies to Division 2 chargers only. As such, the licensee stated that the Division 2 battery chargers output current limiter is field adjusted to supply 120 to 125 amps in order to stay within the electrical circuit breaker ratings in the associated distribution cabinet. The licensee also stated that its calculation shows that with the Division 2 charger limit set at 110 amps, it will take each of the 250-V battery chargers less than 8 hours to recharge the Division 2 battery, which is well within the 24 hour limit specified in the TS.
The proposed changes to SR 3.8.4.2 address an error inadvertently introduced during the conversion of MNGPs custom TS to the current ITS format. The revised SR will ensure that the licensee properly verifies the design capacity of the chargers by specifying the Division 1 and 2 250-V DC chargers design-required output current of 150 amps and 110 amps, respectively.
The NRC staff was concerned about how the battery chargers, under all conditions, including during charger current limit operation, satisfy the design voltage range. The licensee provided additional information in its November 30, 2007, letter, responding to Question (3), stating that the voltage of Division 2 250 V-DC system will continue to be properly maintained based on the sizing of the batteries, which determines the operating voltage depending on the batteries state of discharge. In the same letter, as response to Question (4), the licensee stated that the Division 2 chargers provide sufficient current (at current limit value) to supply the necessary 250-V DC system loads while supplying the necessary charging current for the battery. The NRC staff accepts the licensees explanation in the November 30, 2007, letter.
Based on the above evaluation, the NRC staff finds the proposed revision to SR 3.8.4.2 provide reasonable assurance of the continued availability of the Division 2 250-V DC battery chargers to maintain the operability of the 250-V DC system, and hence, the safety systems it supplies to shut down the reactor and to maintain the reactor in a safe condition after an anticipated operational occurrence or a postulated design-basis accident. In addition, the NRC staff concludes that there is reasonable assurance of the continued availability of the chargers to ensure that the 250-V DC system will be able to provide for the recovery from an SBO in accordance with 10 CFR 50.63. The NRC staff also concludes that the proposed TS changes are in accordance with 10 CFR 50.36 and the requirements of GDC 17 and 18. Therefore, the staff finds the proposed changes acceptable.


==5.0 ENVIRONMENTAL CONSIDERATION==
==4.0     STATE CONSULTATION==
The amendment changes the requirements with respect to use of facility components located within the restricted area as defined in 10 CFR Part 20, and changes the associated surveillance requirements. The NRC staff has determined that the amendment involves no significant increase in the amounts, and no significant change in the types, of any effluents that may be released offsite, and that there is no significant increase in individual or cumulative occupational radiation exposure. The Commission has previously issued a proposed finding that the amendment involves no significant hazards consideration and there has been no public comment on such finding (72 FR 20384). Accordingly, the amendment meets the eligibility criteria for categorical exclusion set forth in 10 CFR 51.22(c)(9). Pursuant to 10 CFR 51.22(b), no environmental impact statement or environmental assessment need be prepared in connection with the issuance of the amendment.


==6.0  CONCLUSION==
In accordance with the Commission's regulations, the Minnesota State official was notified of the proposed issuance of the amendment. The State official had no comments.


The NRC staff has concluded, based on the considerations discussed above, that:  (1) there is reasonable assurance that the health and safety of the public will not be endangered by operation in the proposed manner, (2) such activities will be conducted in compliance with the Commission's regulations, and (3) the issuance of the amendment will not be inimical to the common defense and security or to the health and safety of the public. Moreover, the proposed modification will allow TS SR 3.8.4.2 to maintain conformity with 10 CFR 50.36(d)(3).
==5.0      ENVIRONMENTAL CONSIDERATION==
Principal Contributor:  K. Miller, NRR Date:  January 30, 2008


Monticello Nuclear Generating Plant cc:  Jonathan Rogoff, Esquire Vice President, Counsel & Secretary Nuclear Management Company, LLC 700 First Street Hudson, WI  54016 U.S. Nuclear Regulatory Commission Resident Inspector's Office 2807 W. County Road 75 Monticello, MN  55362 Manager, Nuclear Safety Assessment Monticello Nuclear Generating Plant Nuclear Management Company, LLC 2807 West County Road 75 Monticello, MN  55362-9637 Commissioner Minnesota Pollution Control Agency 520 Lafayette Road St. Paul, MN  55155-4194 Commissioner Minnesota Department of Health 717 Delaware Street, S. E. Minneapolis, MN  55440 Douglas M. Gruber, Auditor/Treasurer Wright County Government Center 10 NW Second Street Buffalo, MN  55313 Commissioner Minnesota Department of Commerce 85 7th Place East, Suite 500 St. Paul, MN  55101-2198 Manager - Environmental Protection Division Minnesota Attorney General
The amendment changes the requirements with respect to use of facility components located within the restricted area as defined in 10 CFR Part 20, and changes the associated surveillance requirements. The NRC staff has determined that the amendment involves no significant increase in the amounts, and no significant change in the types, of any effluents that may be released offsite, and that there is no significant increase in individual or cumulative occupational radiation exposure. The Commission has previously issued a proposed finding that the amendment involves no significant hazards consideration and there has been no public comment on such finding (72 FR 20384). Accordingly, the amendment meets the eligibility criteria for categorical exclusion set forth in 10 CFR 51.22(c)(9). Pursuant to 10 CFR 51.22(b),
=s Office 445 Minnesota St., Suite 900 St. Paul, MN  55101-2127
no environmental impact statement or environmental assessment need be prepared in connection with the issuance of the amendment.


Michael B. Sellman President and Chief Executive Officer Nuclear Management Company, LLC 700 First Street Hudson, MI  54016
==6.0      CONCLUSION==


Nuclear Asset Manager Xcel Energy, Inc. 414 Nicollet Mall, R.S. 8 Minneapolis, MN  55401
The NRC staff has concluded, based on the considerations discussed above, that: (1) there is reasonable assurance that the health and safety of the public will not be endangered by operation in the proposed manner, (2) such activities will be conducted in compliance with the Commission's regulations, and (3) the issuance of the amendment will not be inimical to the common defense and security or to the health and safety of the public. Moreover, the proposed modification will allow TS SR 3.8.4.2 to maintain conformity with 10 CFR 50.36(d)(3).
Principal Contributor: K. Miller, NRR Date: January 30, 2008


Dennis L. Koehl Chief Nuclear Officer Nuclear Management Company, LLC 700 First Street Hudson, WI 54016}}
Monticello Nuclear Generating Plant cc:
Jonathan Rogoff, Esquire            Commissioner Vice President, Counsel & Secretary  Minnesota Department of Commerce Nuclear Management Company, LLC      85 7th Place East, Suite 500 700 First Street                    St. Paul, MN 55101-2198 Hudson, WI 54016 Manager - Environmental Protection U.S. Nuclear Regulatory Commission  Division Resident Inspector's Office          Minnesota Attorney General=s Office 2807 W. County Road 75              445 Minnesota St., Suite 900 Monticello, MN 55362                St. Paul, MN 55101-2127 Manager, Nuclear Safety Assessment  Michael B. Sellman Monticello Nuclear Generating Plant  President and Chief Executive Officer Nuclear Management Company, LLC      Nuclear Management Company, LLC 2807 West County Road 75            700 First Street Monticello, MN 55362-9637            Hudson, MI 54016 Commissioner                        Nuclear Asset Manager Minnesota Pollution Control Agency  Xcel Energy, Inc.
520 Lafayette Road                  414 Nicollet Mall, R.S. 8 St. Paul, MN 55155-4194              Minneapolis, MN 55401 Commissioner                        Dennis L. Koehl Minnesota Department of Health      Chief Nuclear Officer 717 Delaware Street, S. E.          Nuclear Management Company, LLC Minneapolis, MN 55440                700 First Street Hudson, WI 54016 Douglas M. Gruber, Auditor/Treasurer Wright County Government Center 10 NW Second Street Buffalo, MN 55313}}

Latest revision as of 00:52, 23 November 2019

Issuance of Amendment Regarding Output Requirement of the Division 2 Battery Charger
ML073512034
Person / Time
Site: Monticello Xcel Energy icon.png
Issue date: 01/30/2008
From: Tam P
NRC/NRR/ADRO/DORL/LPLIII-1
To: O'Connor T
Nuclear Management Co
tam P, NRR/ADRO/DORL, 415-1451
Shared Package
ML080070014 List:
References
TAC MD4438
Download: ML073512034 (11)


Text

January 30, 2008 Timothy J. O=Connor Site Vice President Monticello Nuclear Generating Plant Nuclear Management Company, LLC 2807 West County Road 75 Monticello, MN 55362-9637

SUBJECT:

MONTICELLO NUCLEAR GENERATING PLANT - ISSUANCE OF AMENDMENT RE: OUTPUT REQUIREMENT OF THE DIVISION 2 BATTERY CHARGER (TAC NO. MD4438)

Dear Mr. O=Connor:

The Commission has issued the enclosed Amendment No. 153 to Renewed Facility Operating License No. DPR-22 for Monticello Nuclear Generating Plant (MNGP), in response to your application dated February 15, 2007, as supplemented by letter dated November 30, 2007.

The amendment revised the Technical Specifications Surveillance Requirement (SR) 3.8.4.2, DC [Direct Current] Sources - Operating, to specify that the Division 1 battery chargers are verified to supply 150 amps and the Division 2 battery chargers are verified to supply 110 amps.

A copy of our related safety evaluation is also enclosed. The Notice of Issuance will be included in the Commissions biweekly Federal Register notice.

Sincerely,

/RA Chawla for/

Peter S. Tam, Senior Project Manager Plant Licensing Branch III-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-263

Enclosures:

1. Amendment No. 153 to DPR-22
2. Safety Evaluation cc w/encls: See next page

January 30, 2008 Timothy J. O=Connor Site Vice President Monticello Nuclear Generating Plant Nuclear Management Company, LLC 2807 West County Road 75 Monticello, MN 55362-9637

SUBJECT:

MONTICELLO NUCLEAR GENERATING PLANT - ISSUANCE OF AMENDMENT RE: OUTPUT REQUIREMENT OF THE DIVISION 2 BATTERY CHARGER (TAC NO. MD4438)

Dear Mr. O=Connor:

The Commission has issued the enclosed Amendment No. 153 to Renewed Facility Operating License No. DPR-22 for Monticello Nuclear Generating Plant (MNGP), in response to your application dated February 15, 2007, as supplemented by letter dated November 30, 2007.

The amendment revised the Technical Specifications Surveillance Requirement (SR) 3.8.4.2, DC [Direct Current] Sources - Operating, to specify that the Division 1 battery chargers are verified to supply 150 amps and the Division 2 battery chargers are verified to supply 110 amps.

A copy of our related safety evaluation is also enclosed. The Notice of Issuance will be included in the Commissions biweekly Federal Register notice.

Sincerely,

/RA Chawla for/

Peter S. Tam, Senior Project Manager Plant Licensing Branch III-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-263

Enclosures:

1. Amendment No. 153 to DPR-22
2. Safety Evaluation cc w/encls: See next page DISTRIBUTION:

PUBLIC LPL3-1 r/f RidsNrrDorlLpl3-1 RidsNrrPMPTam RidsNrrLATHarris RidsOgcRp RidsAcrsAcnwMailCenter RidsNrrDirsltsb G. Hill, OIS K. Miller, NRR RidsRgn3MailCenter RidsNrrDorlDpr RidsNrrLABTully Package Accession No. ML080070014 Amendment Accession Number: ML073512034 TS Page Accession No. ML080280601 OFFICE LPL3-1/PM LPL3-1/LA EEEB/BC TSB/BC OGC/NLO LPL3-1/(A)BC JMW for NAME PTam THarris GWilson* TKobetz MLoftus PMilano JC for DATE 1/28/08 1/29/08 12/13/07* 1/30/08 1/24/08 1/30/08

  • SE transmitted by memo of 12/13/07.

OFFICIAL RECORD COPY

NUCLEAR MANAGEMENT COMPANY, LLC DOCKET NO. 50-263 MONTICELLO NUCLEAR GENERATING PLANT AMENDMENT TO RENEWED FACILITY OPERATING LICENSE Amendment No.153 License No. DPR-22

1. The Nuclear Regulatory Commission (the Commission) has found that:

A. The application for amendment by Nuclear Management Company, LLC (the licensee), dated February 15, 2007, as supplemented by letter of November 30, 2007, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I; B. The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C. There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D. The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.

2. Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.2 of Facility Operating License No. DPR-22 is hereby amended to read as follows:

Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment No. 153 are hereby incorporated in the license. NMC shall operate the facility in accordance with the Technical Specifications.

3. This license amendment is effective as of its date of issuance and shall be implemented within 60 days of issuance.

FOR THE NUCLEAR REGULATORY COMMISSION

/RA J Cushing for/

Patrick D. Milano, Acting Chief Plant Licensing Branch III-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation

Attachment:

Changes to the Facility Operating License and Technical Specifications Date of Issuance: January 30, 2008

ATTACHMENT TO OPERATING LICENSE AMENDMENT NO. 153 RENEWED FACILITY OPERATING LICENSE NO. DPR-22 DOCKET NO. 50-263 Replace the following page of Renewed Facility Operating License DPR-22 with the attached revised page. The revised page is identified by amendment number and contains a marginal line indicating the area of change.

REMOVE INSERT Page 3 Page 3 Replace the following page of Appendix A (Technical Specifications) with the attached revised page. The revised page is identified by amendment number and contains a marginal line indicating the area of change.

REMOVE INSERT 3.8.4-2 3.8.4-2

2. Pursuant to the Act and 10 CFR Part 70, NMC to receive, possess, and use at any time special nuclear material as reactor fuel, in accordance with the limitations for storage and amounts required for reactor operations, as described in the Final Safety Analysis Report, as supplemented and amended, and the licensee=s filings dated August 16, 1974 (those portions dealing with handling of reactor fuel) and August 17, 1977 (those portions dealing with fuel assembly storage capacity);
3. Pursuant to the Act and 10 CFR Parts 30, 40 and 70, NMC to receive, possess, and use at any time any byproduct, source and special nuclear material as sealed neutron sources for reactor startup, sealed sources for reactor instrumentation and radiation monitoring equipment calibration, and as fission detectors in amounts as required;
4. Pursuant to the Act and 10 CFR Parts 30, 40 and 70, NMC to receive, possess, and use in amounts as required any byproduct, source or special nuclear material without restriction to chemical or physical form, for sample analysis or instrument calibration or associated with radioactive apparatus or components; and
5. Pursuant to the Act and 10 CFR Parts 30 and 70, NMC to possess, but not separate, such byproduct and special nuclear material as may be produced by operation of the facility.

C. This renewed operating license shall be deemed to contain and is subject to the conditions specified in the Commission=s regulations in 10 CFR Chapter I and is subject to all applicable provisions of the Act and to the rules, regulations, and orders of the Commission, now or hereafter in effect; and is subject to the additional conditions specified or incorporated below:

1. Maximum Power Level NMC is authorized to operate the facility at steady state reactor core power levels not in excess of 1775 megawatts (thermal).
2. Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment No. 153, are hereby incorporated in the license. NMC shall operate the facility in accordance with the Technical Specifications.
3. Physical Protection NMC shall implement and maintain in effect all provisions of the Commission-approved physical security, guard training and qualification, and safeguards contingency plans including amendments made pursuant to provisions of the Miscellaneous Amendments and Search Renewed License No. DPR-22 Amendment No. 1 thru 153

SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION AMENDMENT NO. 153 TO RENEWED FACILITY OPERATING LICENSE NO. DPR-22 NUCLEAR MANAGEMENT COMPANY, LLC MONTICELLO NUCLEAR GENERATING PLANT DOCKET NO. 50-263

1.0 INTRODUCTION

By letter dated February 15, 2007 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML070460545), Nuclear Management Company, LLC (NMC) (the licensee) submitted an application for amendment regarding Monticello Nuclear Generating Plant (MNGP) Technical Specifications (TS). The proposed amendment would revise Surveillance Requirement (SR) 3.8.4.2, DC [Direct Current] Sources - Operating, to require that the Division 1 battery chargers are verified to supply 150 amps and the Division 2 battery chargers are verified to supply 110 amps. The Division 2 battery chargers output current limiter is field adjusted to supply 120 to 125 amps in order to stay within the electrical circuit breaker ratings in the associated distribution cabinet. The purpose of the proposed change is to correct an administrative error introduced during the conversion of the MNGP custom TS to the current Improved Standard Technical Specifications (ITS) format. The proposed changes are founded on the findings of deterministic perspectives.

The application was supplemented by a letter from the licensee dated November 30, 2007 (ADAMS Accession No. ML073450331). This supplement provided additional information that clarified the application, did not expand the scope of the application as originally noticed, and did not change the NRC staff's original proposed no significant hazards consideration determination as published in the Federal Register on April 24, 2007 (72 FR 20384).

The Nuclear Regulatory Commission (NRC) staffs evaluation of the licensees application is set forth in the following sections.

2.0 REGULATORY EVALUATION

Title 10 of the Code of Federal Regulations, Part 50, Section 36 requires that each license authorizing operation of a production or utilization facility include TSs. In particular, one type of TS is a limiting condition for operation. The regulation at 10 CFR 50.36(d)(2), requires the establishment of limiting conditions for operation by a license of a utilization or production facility; limiting conditions for operation include completion times for equipment that is required for safe operation of the facility. In addition, surveillance requirements, as set forth in 10 CFR 50.36(d)(3), are a type of TS that relates to testing, calibration or inspection to assure that the necessary quality of systems and components is maintained, that facility operation will be within safety limits, and that the limiting conditions for operation will be met.

The requirements at Appendix A of 10 CFR 50, General Design Criterion (GDC) 17, Electric power systems, requires, in part, that nuclear power plants have onsite and offsite electric power systems to permit the functioning of structures, systems, and components that are important to safety. The onsite system is required to have sufficient independence, redundancy, and testability to perform its safety function, assuming a single failure. The offsite power system is required to be supplied by two physically independent circuits that are designed and located so as to minimize, to the extent practical, the likelihood of their simultaneous failure under operating and postulated accident and environmental conditions. In addition, this criterion requires provisions to minimize the probability of losing electric power from the remaining electric power supplies as a result of loss of power from the unit, the offsite transmission network, or the onsite power supplies.

GDC 18, Inspection and testing of electric power systems, requires that electric power systems that are important to safety must be designed to permit appropriate periodic inspection and testing.

The regulation in 10 CFR 50.63, Loss of all alternating current power, requires that each light-water cooled nuclear power plant licensed to operate must be able to withstand for a specified duration and recover from a station blackout (SBO).

3.0 TECHNICAL EVALUATION

The MNGP 250-volt (V) DC electrical power system consists of two independent safety-related Class 1E DC electrical power divisions. Each division consists of one dedicated 120-cell 250-V DC battery, two dedicated battery chargers and a swing charger (that can functionally replace either of the dedicated chargers), and all the associated switchgear, control equipment, and interconnecting cabling. The chargers are sized such that together they can re-charge a battery while supplying the normal continuous DC loads (in accordance with IEEE Standard 946-1985, IEEE Recommended Practice for the Design of Safety-Related DC Auxiliary Power Systems for Nuclear Power Generating Stations). For Division 1, with each charger providing 150 amps, the sizing requirements are met. For Division 2, the DC load profile is less severe such that with each charger providing 110 Amps, the sizing requirements are met. Also, the Division 2 chargers current limiters are set to limit each chargers output to between 120 and 125 Amps to ensure that the current is within the ratings of the circuit breakers in the associated Division 2 distribution cabinet (Division 1 circuit breakers have a higher current limit, therefore, charger current limiting is not necessary). The current limit setting on the Division 2 chargers is a permanent adjustment. The setting is periodically verified in accordance with preventative maintenance procedures.

During normal operation, the 250-V DC load is powered from the battery chargers with the batteries floating on the system. In case of loss of normal power to the battery chargers, the DC load is automatically powered from the station batteries. Each MNGP battery is designed to have adequate storage capacity to carry the required load continuously for at least 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> with adequate voltage to mitigate an SBO event. The DC load profile during an SBO event is the most limiting case of all the design-basis events.

Both 250-V DC divisions are required to be operable to ensure the availability of the required power to shut down the reactor and maintain it in a safe condition after an anticipated operational occurrence or a postulated design-basis event. Loss of any one 250-V DC electrical power division does not prevent the minimum safety function from being performed.

An operable 250-V DC electrical power division requires the battery and its normal chargers, or with its backup charger in place of a normal charger, to be operating and connected to the associated 250-V DC bus.

3.1 Evaluation of Proposed Change to SR 3.8.4.2 In its application, the licensee proposed to revise TS SR 3.8.4.2. Currently this SR specifies that the chargers (i.e., both Division 1 and 2) are verified to supply 150 amps for 250 VDC subsystems. The proposed changes would revise SR 3.8.4.2 to specify that the Division 1 battery chargers are verified to supply 150 amps, and the Division 2 battery chargers are verified to supply 110 amps. Thus, the proposed requirement change applies to Division 2 chargers only. As such, the licensee stated that the Division 2 battery chargers output current limiter is field adjusted to supply 120 to 125 amps in order to stay within the electrical circuit breaker ratings in the associated distribution cabinet. The licensee also stated that its calculation shows that with the Division 2 charger limit set at 110 amps, it will take each of the 250-V battery chargers less than 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> to recharge the Division 2 battery, which is well within the 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> limit specified in the TS.

The proposed changes to SR 3.8.4.2 address an error inadvertently introduced during the conversion of MNGPs custom TS to the current ITS format. The revised SR will ensure that the licensee properly verifies the design capacity of the chargers by specifying the Division 1 and 2 250-V DC chargers design-required output current of 150 amps and 110 amps, respectively.

The NRC staff was concerned about how the battery chargers, under all conditions, including during charger current limit operation, satisfy the design voltage range. The licensee provided additional information in its November 30, 2007, letter, responding to Question (3), stating that the voltage of Division 2 250 V-DC system will continue to be properly maintained based on the sizing of the batteries, which determines the operating voltage depending on the batteries state of discharge. In the same letter, as response to Question (4), the licensee stated that the Division 2 chargers provide sufficient current (at current limit value) to supply the necessary 250-V DC system loads while supplying the necessary charging current for the battery. The NRC staff accepts the licensees explanation in the November 30, 2007, letter.

Based on the above evaluation, the NRC staff finds the proposed revision to SR 3.8.4.2 provide reasonable assurance of the continued availability of the Division 2 250-V DC battery chargers to maintain the operability of the 250-V DC system, and hence, the safety systems it supplies to shut down the reactor and to maintain the reactor in a safe condition after an anticipated operational occurrence or a postulated design-basis accident. In addition, the NRC staff concludes that there is reasonable assurance of the continued availability of the chargers to ensure that the 250-V DC system will be able to provide for the recovery from an SBO in accordance with 10 CFR 50.63. The NRC staff also concludes that the proposed TS changes are in accordance with 10 CFR 50.36 and the requirements of GDC 17 and 18. Therefore, the staff finds the proposed changes acceptable.

4.0 STATE CONSULTATION

In accordance with the Commission's regulations, the Minnesota State official was notified of the proposed issuance of the amendment. The State official had no comments.

5.0 ENVIRONMENTAL CONSIDERATION

The amendment changes the requirements with respect to use of facility components located within the restricted area as defined in 10 CFR Part 20, and changes the associated surveillance requirements. The NRC staff has determined that the amendment involves no significant increase in the amounts, and no significant change in the types, of any effluents that may be released offsite, and that there is no significant increase in individual or cumulative occupational radiation exposure. The Commission has previously issued a proposed finding that the amendment involves no significant hazards consideration and there has been no public comment on such finding (72 FR 20384). Accordingly, the amendment meets the eligibility criteria for categorical exclusion set forth in 10 CFR 51.22(c)(9). Pursuant to 10 CFR 51.22(b),

no environmental impact statement or environmental assessment need be prepared in connection with the issuance of the amendment.

6.0 CONCLUSION

The NRC staff has concluded, based on the considerations discussed above, that: (1) there is reasonable assurance that the health and safety of the public will not be endangered by operation in the proposed manner, (2) such activities will be conducted in compliance with the Commission's regulations, and (3) the issuance of the amendment will not be inimical to the common defense and security or to the health and safety of the public. Moreover, the proposed modification will allow TS SR 3.8.4.2 to maintain conformity with 10 CFR 50.36(d)(3).

Principal Contributor: K. Miller, NRR Date: January 30, 2008

Monticello Nuclear Generating Plant cc:

Jonathan Rogoff, Esquire Commissioner Vice President, Counsel & Secretary Minnesota Department of Commerce Nuclear Management Company, LLC 85 7th Place East, Suite 500 700 First Street St. Paul, MN 55101-2198 Hudson, WI 54016 Manager - Environmental Protection U.S. Nuclear Regulatory Commission Division Resident Inspector's Office Minnesota Attorney General=s Office 2807 W. County Road 75 445 Minnesota St., Suite 900 Monticello, MN 55362 St. Paul, MN 55101-2127 Manager, Nuclear Safety Assessment Michael B. Sellman Monticello Nuclear Generating Plant President and Chief Executive Officer Nuclear Management Company, LLC Nuclear Management Company, LLC 2807 West County Road 75 700 First Street Monticello, MN 55362-9637 Hudson, MI 54016 Commissioner Nuclear Asset Manager Minnesota Pollution Control Agency Xcel Energy, Inc.

520 Lafayette Road 414 Nicollet Mall, R.S. 8 St. Paul, MN 55155-4194 Minneapolis, MN 55401 Commissioner Dennis L. Koehl Minnesota Department of Health Chief Nuclear Officer 717 Delaware Street, S. E. Nuclear Management Company, LLC Minneapolis, MN 55440 700 First Street Hudson, WI 54016 Douglas M. Gruber, Auditor/Treasurer Wright County Government Center 10 NW Second Street Buffalo, MN 55313