Correction of Amendment No. 194, Issuance of Amendment to Adopt F Tstf 545, Revision 3, Ts Inservice Testing Program Removal & Clarify Sr Usage Rule Application to Section 5.5 Testing
ML17172A431
Person / Time
Site: Monticello Xcel Energy icon.png
Issue date: 06/23/2017
From: Robert Kuntz
Plant Licensing Branch III
To: Gardner P
Northern States Power Co
KUNTZ/ 415-3733
References
CAC MF8217
Download: ML17172A431 (5)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 June 23, 2017 Mr. Peter A. Gardner Site Vice President Monticello Nuclear Generating Plant Northern States Power Company - Minnesota (NSPM) 2807 West County Road 75 Monticello, MN 55362-9637

SUBJECT:

MONTICELLO NUCLEAR GENERATING PLANT-CORRECTION OF AMENDMENT NO. 194, ISSUANCE OF AMENDMENT TO ADOPT TSTF-545, REVISION 3, "TS INSERVICE TESTING PROGRAM REMOVAL & CLARIFY SR USAGE RULE APPLICATION TO SECTION 5.5 TESTING" (CAC NO. MF8217)

Dear Mr. Gardner:

By letter dated June 16, 2017 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML17123A321) the U.S. Nuclear Regulatory Commission (NRC) issued Amendment No.194 to Renewed Facility Operating License No. DPR-22 for the Monticello Nuclear Generating Plant. The amendment adopted TSTF-545, Revision 3, "TS lnservice Testing Program Removal & Clarify SR [surveillance requirements] Usage Rule Application to Section 5.5 Testing."

During a conversation between Mr. Shane Jurek of your staff and the NRC staff, it was noted that Technical Specification (TS) page 3.6.2.3-2 issued with amendment 194 contained an error.

The error is the numbering of the second SR on the page and was unrelated to the license amendment (i.e., the SR was not to be changed by the license amendment). The issued amendment page numbered this SR as SR 3.6.3.2.3. The SR was numbered SR 3.6.2.3.3 prior to the issuance of amendment 194 and is the proper numbering. The marked-up TS pages submitted with the license amendment request dated July 28, 2016 (ADAMS Accession No. ML16210A030), contained the proper number. The NRC staff concludes that the error was inadvertently introduced during the preparation of the license amendment. To correct the error, a revised TS page 3.6.2.3-2 for DPR-22 is enclosed. Please replace TS page 3.6.2.3-2 for DPR-22 that was issued by amendment 194 issued by letter dated June 16, 2017, with the enclosed page.

This administrative error does not affect the staffs overall conclusions associated with approval of Amendment No. 194. The changes are within the scope of the application as originally noticed in the Federal Register on October 11, 2016 (81FR70181).

P. Gardner If you have any questions, please call me at 301-415-3733 or via e-mail at Robert.Kuntz@nrc.gov.

Sincerely, I

Robert F. Kuntz, enior Project Manager Plant Licensing Branch 111 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-263

Enclosure:

Technical Specification Page 3.6.2.3-2 cc w/encl.: Distribution via Listserv

ENCLOSURE TECHNICAL SPECIFICATION PAGE 3.6.2.3-2 NORTHERN STATES POWER COMPANY MONTICELLO NUCLEAR GENERATING PLANT DOCKET NO. 50-263

RHR Suppression Pool Cooling 3.6.2.3 SURVEILLANCE REQUIREMENTS (continued)

SURVEILLANCE FREQUENCY SR 3.6.2.3.2 Verify each required RHR pump develops a flow In accordance rate~ 3870 gpm through the associated heat with the exchanger while operating in the suppression pool INSERVICE cooling mode. TESTING PROGRAM SR 3.6.2.3.3 Verify RHR suppression pool cooling subsystem 31 days locations susceptible to gas accumulation are sufficiently filled with water Monticello 3.6.2.3-2 Amendment No. 146, 1BQ, 194 I

ML17172A431 OFFICE DORL/LPL3/PM DORL/LPL3/LA DORL/LPL3/BC DORL/LPL3/PM NAME RKuntz SRohrer DWrona RKuntz DATE 06/22/17 06/22/17 06/23/17 06/23/17