Letter Sequence Approval |
---|
EPID:L-2021-LLR-0063, 10 CFR 50.55a Request Associated with the Monticello Sixth Inservice Testing Ten-Year Interval VR-05 (L-MT-21-041) (Approved, Closed) |
|
|
|
---|
Category:Code Relief or Alternative
MONTHYEARML24222A1822024-08-27027 August 2024 – Proposed Alternative Request VR-09 to the Inservice Testing Requirements of the ASME OM Code for Main Steam Safety Relief Valves ML23248A2092023-09-18018 September 2023 – Proposed Alternative VR-11 to the Requirements of the ASME OM Code Associated with Periodic Verification Testing of MO-2397, Reactor Water Cleanup Inboard Isolation Valve ML23123A4222023-05-16016 May 2023 – Request RR 001 to Use Later Edition of ASME BPV Section XI Code for Cisi Program ML23107A2852023-04-25025 April 2023 Authorization and Safety Evaluation for Alternative Request PR-08 ML23017A2222023-01-13013 January 2023 Verbal Authorization of Proposed Alternative PR-08 Regarding Inservice Testing Requirements of Certain High Pressure Coolant Injection System Components (EPID L-2022-LLR-0088) (Email) ML22314A2162022-11-16016 November 2022 Withdrawal of Alternative Request VR-08 ML22270A2312022-09-30030 September 2022 Authorization and Safety Evaluation for Alternative Request No. VR-10 ML22208A1952022-08-0303 August 2022 Summary of July 26, 2022, Meeting with Northern States Power Company, Doing Business as Xcel Energy, Related to the Alternative Request for Excess Flow Check Valves at Monticello Nuclear Generating Plant ML22126A1052022-06-21021 June 2022 Authorization and Safety Evaluation for Alternative Request No. VR-01 ML22154A5502022-06-0707 June 2022 Authorization and Safety Evaluation for Alternative Request No. PR-02 ML22126A1342022-05-12012 May 2022 Authorization and Safety Evaluation for Alternative Request No. PR-05 ML22130A6562022-05-11011 May 2022 Authorization and Safety Evaluation for Alternative Request No. PR-04 ML22098A1272022-05-0202 May 2022 Authorization and Safety Evaluation for Alternative Request No. VR-02 ML22110A1232022-04-25025 April 2022 Withdrawal of Relief Requests PR-09 and VR-07 (Epids: L 2021 Llr 0095 and L 2022 Llr 0021) ML22018A1772022-01-21021 January 2022 Authorization and Safety Evaluation for Alternative Request No. VR-05 ML20307A0172020-11-0202 November 2020 Request for Alternative for Core Support Structure Weld Examination ML20174A5452020-07-15015 July 2020 Request for Alternative for Pressure Isolation Valve Testing ML20135G9922020-05-29029 May 2020 and Prairie Island Nuclear Generating Plant, Units 1 and 2 - Relief from the Requirements of the ASME Code ML18270A0152018-10-19019 October 2018 and Prairie Island Nuclear Generating Plant, Units 1 and 2 - Relief from the Requirements of the ASME OM Code L-MT-18-023, 10 CFR 50.55a Request RR-012: Inservice Inspection Impracticality in Accordance with 10 CFR 50 .55a(g)(5)(iii) During the Fifth Ten-Year Interval2018-05-11011 May 2018 10 CFR 50.55a Request RR-012: Inservice Inspection Impracticality in Accordance with 10 CFR 50 .55a(g)(5)(iii) During the Fifth Ten-Year Interval ML17122A1572017-05-15015 May 2017 Request for Alternative to Use Code Case OMN-20 for the Fifth 10-Year Inservice Testing Interval ML16208A4622016-08-0303 August 2016 Safety Evaluation for Request for Alternative Associated with Reactor Pressure Vessel Internals and Components Inspection for the Fifth 10-Year Interval L-MT-15-083, 10 CFR 50.55a Request No. RR-010: Request for Approval of an Alternative to Apply the BWRVIP Guidelines in Lieu of Specific ASME Section XI Code Requirements for Reactor Pressure Vessel Internals and Components Inspection2015-11-20020 November 2015 10 CFR 50.55a Request No. RR-010: Request for Approval of an Alternative to Apply the BWRVIP Guidelines in Lieu of Specific ASME Section XI Code Requirements for Reactor Pressure Vessel Internals and Components Inspection ML15028A1522015-02-19019 February 2015 Relief Request RR-009 Regarding Relief from Examination Coverage Requirements of Section XI of the ASME Code for the Fifth 10-Year Inservice Inspection Program Interval ML15013A0362015-01-23023 January 2015 Relief Request RR-008 Alternative to ASME Code, Section XI, Examination Requirements for the Reactor Pressure Vessel Shroud Support Plate Welds H8 and H9 for the Fifth 10-Year ISI Interval ML14223A5812014-08-27027 August 2014 Alternative Request Vr 05 to the Testing Requirements of the ASME OM Code for the Fifth 10-Year Inservice Inspection Program Interval ML12244A2722012-09-26026 September 2012 Relief from the Requirements of ASME OM Code for the Fifth Ten-Year IST Program Interval (TAC Nos. ME8067, ME8088 Through ME8096) ML12180A5882012-07-12012 July 2012 Approval of ISI Relief Request RR-007 for the Fifth 10-year Interval ML1020006722010-07-28028 July 2010 Approval of Alternative to Use ASME Code Case N-705 to Address Cracks at the Standby Liquid Control Tank L-MT-10-014, Request 10 CFR 50.55a Request 17: Extension of Permanent Relief from Volumetric Examination of Reactor Pressure Vessel Circumferential Shell Welds for the Renewed Operating License Term2010-03-12012 March 2010 Request 10 CFR 50.55a Request 17: Extension of Permanent Relief from Volumetric Examination of Reactor Pressure Vessel Circumferential Shell Welds for the Renewed Operating License Term ML0617103642006-07-0303 July 2006 Monticello Nuclear Generating Plant, Palisades Nuclear Plant, Point Beach Nuclear Plant Units 1 and 2, Prairie Island Nuclear Generating Plant, Units 1 and 2 - Use of ASME Code Case N-513-2 L-MT-05-074, Request to Use Subsequent Edition and Addenda of ASME Code for Inservice Testing2005-07-29029 July 2005 Request to Use Subsequent Edition and Addenda of ASME Code for Inservice Testing ML0505600492005-03-0808 March 2005 Fourth 10-Year Inservice Inspection Interval Request for Relief to Use Code Case N-661 ML0436300192005-01-0606 January 2005 Relief, Fourth 10-year Inservice Inspection Interval Request for Relief No. 4, MC2222 ML0407004152004-03-25025 March 2004 Third 10-Year Interval Inservice Inspection Request for Relief RR-17, Involving Repair/Replacement Activity on the Topworks of Main Steam Safety Relief Valve (SRV) G ML0401607382004-02-26026 February 2004 Prairie, Units 1 and 2, Kewaunee, Point Beach, Units 1 and 2, Palisades, Re Request for Alternatives to ASME Section XI, Appendix Viii, Supplement 10 ML0320401572003-10-0303 October 2003 Relief Request No. 7, Fourth 10-Year Interval Inservice Inspection Program Plan L-MT-03-045, Request for Approval of Inservice Inspection Program Third 10-Year Interval Relief Request No. 172003-08-27027 August 2003 Request for Approval of Inservice Inspection Program Third 10-Year Interval Relief Request No. 17 ML0320605802003-08-0707 August 2003 Relief, Fourth 10-Year Interval Inservice Testing Program ML0317002092003-07-17017 July 2003 Relief Request, Nos. PR-01, PR-02, PR-03, PR-04, PR-05, and VR-02 Related to the Fourth 10-Year Interval Inservice Testing Program L-MT-03-048, Request for Authorization of Inservice Inspection Program Fourth 10-Year Interval Relief Request No. 82003-06-12012 June 2003 Request for Authorization of Inservice Inspection Program Fourth 10-Year Interval Relief Request No. 8 ML0316008642003-06-0909 June 2003 Relief Request, Fourth 10-Year Interval Inservice Inspection Program Plan Relief Request No. 5, TAC No. MB6956 ML0314001192003-05-19019 May 2003 Relief, Third 10-Year Interval Inservice Inspection Relief Request No 16, Parts a, B, and C L-MT-03-001, Relief Request No. Pr 06 for Fourth 10-Year Inservice Testing Interval - High Pressure Coolant Injection Pump Testing2003-05-0606 May 2003 Relief Request No. Pr 06 for Fourth 10-Year Inservice Testing Interval - High Pressure Coolant Injection Pump Testing 2024-08-27
[Table view] Category:Safety Evaluation
MONTHYEARML24199A1752024-10-0101 October 2024 Issuance of Amendment No. 212 Revise Technical Specification 3.8.6, Battery Parameters, Surveillance Requirement 3.8.6.6 ML24222A1822024-08-27027 August 2024 – Proposed Alternative Request VR-09 to the Inservice Testing Requirements of the ASME OM Code for Main Steam Safety Relief Valves ML24138A1212024-07-0202 July 2024 Alternative Request RR-002 ML24077A0012024-03-18018 March 2024 Safety Evaluation to the SLRA of Monticello Nuclear Generating Plant, Unit 1 ML23248A2092023-09-18018 September 2023 – Proposed Alternative VR-11 to the Requirements of the ASME OM Code Associated with Periodic Verification Testing of MO-2397, Reactor Water Cleanup Inboard Isolation Valve ML23107A2852023-04-25025 April 2023 Authorization and Safety Evaluation for Alternative Request PR-08 ML23079A0742023-04-11011 April 2023 Request RR-003 to Use Later Edition of ASME Section XI Code for ISI Code of Record ML22357A1002023-03-31031 March 2023 And Prairie Island Nuclear Generating Plant, Units 1 and 2 - Issuance of Amendments Standard Emergency Plan and Consolidated Emergency Operations Facility ML23012A1562023-01-13013 January 2023 Issuance of Amendment No. 210 Re Revised Methodologies for Determining the Core Operating Limits (EPID L-2021-LLA-0144) - Non-proprietary ML22318A2152022-12-27027 December 2022 Issuance of Amendment No. 209 Ten-Year Inspection of the Diesel Generator Fuel Oil Storage Tank ML22264A1062022-10-31031 October 2022 Issuance of Amendment No. 208 Residual Heat Removal Drywell Spray Header and Nozzle Surveillance Frequency ML22270A2312022-09-30030 September 2022 Authorization and Safety Evaluation for Alternative Request No. VR-10 ML22154A5502022-06-0707 June 2022 Authorization and Safety Evaluation for Alternative Request No. PR-02 ML22126A1342022-05-12012 May 2022 Authorization and Safety Evaluation for Alternative Request No. PR-05 ML22098A1272022-05-0202 May 2022 Authorization and Safety Evaluation for Alternative Request No. VR-02 ML22018A1772022-01-21021 January 2022 Authorization and Safety Evaluation for Alternative Request No. VR-05 ML21223A2802021-10-15015 October 2021 Issuance of Amendment No. 207 Adoption of TSTF-564 Safety Limit MCPR ML21148A2742021-07-12012 July 2021 Issuance of Amendment No. 206 TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b ML20352A3492021-01-0808 January 2021 Issuance of Amendment No. 205, Revise Technical Specifications to Adopt Technical Specifications Task Force (TSTF) Traveler TSTF-582, RPV WIC Enhancements, and TSTF-583-T, TSTF-582 Diesel Generator Variation ML20346A0972020-12-21021 December 2020 Request for Alternative for Examination of Reactor Pressure Vessel Threads in Flange ML20336A1602020-12-0909 December 2020 Request to Use a Provision of a Later Edition of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI ML20307A0172020-11-0202 November 2020 Request for Alternative for Core Support Structure Weld Examination ML20210M0142020-09-0808 September 2020 and Prairie Island Nuclear Generating Plant, Units 1 and 2 - Issuance of Amendment Nos. 204, 231, and 219 TSTF-529 Clarify Use and Application Rules ML20153A8042020-07-31031 July 2020 Co. - Issuance of Amendments Revising Emergency Action RA3 ML20174A5452020-07-15015 July 2020 Request for Alternative for Pressure Isolation Valve Testing ML20153A4012020-06-0101 June 2020 and Prairie Island Nuclear Generating Plant, Units 1 and 2 - Relief from the Requirements of the ASME Code ML20134H9582020-05-29029 May 2020 and Prairie Island Nuclear Generating Plant, Units 1 and 2 - Relief from the Requirements of the ASME Code ML20135G9922020-05-29029 May 2020 and Prairie Island Nuclear Generating Plant, Units 1 and 2 - Relief from the Requirements of the ASME Code ML19255F5822019-10-0101 October 2019 Safety Evaluation Regarding Implementation of Hardened Containment Vents Capable of Operation Under Severe Accident Conditions Related to Order EA-13-109 (CAC No. MF4376; EPID No. L-2014-JLD-0052) ML19162A0932019-07-30030 July 2019 Issuance of Amendment No, 202 Regarding Deletion of the Note Associated with Technical Specification 3.5.1., Erccs - Operating ML19074A2692019-04-22022 April 2019 Non-Proprietary - Issuance of Amendment Revision to Technical Specifications 2.1.2 Safety Limit Minimum Critical Power Ratio ML19052A1422019-03-11011 March 2019 Correction to License Amendment No. 198 Related to Adoption of TSTF-542, Reactor Pressure Vessel Water Inventory Control ML19065A2002019-03-11011 March 2019 Correction to License Amendment No. 200 Related to Adoption of TSTF-425, Relocated Surveillance Frequencies to Licensee Control - RITSTF Initiative 5B ML19007A0902019-01-28028 January 2019 Issuance of Amendment Adoption of TSTF-425, Relocate Surveillance Frequencies to Licensee Control-RITSTF Initiative 5B ML18291B2142018-11-26026 November 2018 Issuance of Amendment Adoption of TSTF-551 Revise Secondary Containment Surveillance Requirements ML18250A0752018-10-29029 October 2018 Issuance of Amendment Adoption of TSTF-542, Reactor Pressure Vessel Water Inventory Control ML18270A0152018-10-19019 October 2018 and Prairie Island Nuclear Generating Plant, Units 1 and 2 - Relief from the Requirements of the ASME OM Code ML17345A0462018-03-0606 March 2018 Issuance of Amendment No. 197 to Adopt Changes to the Emergency Plan (CAC No. MF9560; EPID L-2017-LLA-0184) ML17319A5912017-12-10010 December 2017 Safety Evaluation Regarding Implementation of Mitigating Strategies and Reliable Spent Fuel Pool Instrumentation Related to Orders EA-12-049 and EA-12-051 ML17310B2392017-11-28028 November 2017 and Prairie Island Nuclear Generating Plant, Units 1 and 2 - Issuance of Amendment Unit Staff Qualifications (CAC Nos. MF9545, MF9546, and MF9547; EPID L-2017-LLA-0195) ML17123A3212017-06-16016 June 2017 Issuance of Amendment Adoption of TSTF-545, Revision 3, TS Inservice Testing Program Removal and Clarify SR Usage Rule Application to Section 5.5 Testing ML17122A1572017-05-15015 May 2017 Request for Alternative to Use Code Case OMN-20 for the Fifth 10-Year Inservice Testing Interval ML17103A2352017-04-25025 April 2017 Issuance of Amendment Technical Specification 5.5.11 Primary Containment Leakage Rate Testing Program ML17013A4352017-02-27027 February 2017 Issuance of Amendment Revision to Technical Specification Surveillance Requirement 3.8.4.2 ML17054C3942017-02-23023 February 2017 Non-Proprietary Issuance of Amendment Extended Flow Window ML16320A0212016-11-28028 November 2016 and Prairie Island Nuclear Generating Plant, Units 1 and 2 - Review of Changes to the Northern States Power Company Quality Assurance Topical Report ML16244A1202016-09-0606 September 2016 Generation Plant - Interim Staff Evaluation Relating to Overall Integrated Plan in Response to Phase 2 of Order EA-13-109 (Severe Accident Capable Hardened Vents) ML16208A4622016-08-0303 August 2016 Safety Evaluation for Request for Alternative Associated with Reactor Pressure Vessel Internals and Components Inspection for the Fifth 10-Year Interval ML16196A3032016-08-0101 August 2016 Issuance of Amendment Technical Specifications Surveillance Requirement 3.5.1.3 B to Correct Alternative Nitrogen System Pressure (Cac. No. MF6704) ML16125A1652016-06-21021 June 2016 Issuance of Amendment Technical Specifications Task Force (TSTF) Standard Technical Specifications (STS) Change Traveler TSTF-523, Revision 2 Generic Letter 2008-01, Managing Gas Accumulation 2024-08-27
[Table view] |
Text
January 21, 2022
MONTICELLO NUCLEAR GENERATING PLANT - AUTHORIZATION AND SAFETY EVALUATION FOR ALTERNATIVE REQUEST NO. VR-05 (EPID L-2021-LLR-0 063)
LICENSEE INFORMATION
Recipients Name and Address: Mr. Thomas A. Conboy Site Vice President Northern States Power Company - Minnesota Monticello Nuclear Generating Plant 2807 West County Road 75 Monticello, MN 55362
Licensee: Northern States Power Company
Plant Name: Monticello Nuclear Generating Plant
Docket No.: 50-263
APPLICATION INFORMATION
Submittal Date: August 31, 2021
Submittal Agencywide Documents Access and Management System (AD AMS) Accession No.: ML21243A299
Alternative Provision: The applicant requested an alternative under Title 10 of the Code of Federal Regulations (10 CFR), paragraph 50.55a(z)(1).
Applicable Code Edition and Addenda: American Society of Mechanical Engineers (ASME),
Operation and Maintenance of Nuclear Power Plants (OM) Code, 2017 Edition with no Addenda.
Applicable Inservice Inspection (ISI) or Inservice Testing (IST ) Program Interval and Interval Start/End Dates: Sixth 10-year IST interval currently scheduled to begin on October 1, 2022, and end on May 31, 2032.
IST Requirement: ASME OM Code, Subsection ISTC, paragraph ISTC-3522, Category C, Check Valves, states, in part, Category C check valves shall b e exercised as follows: (a)
During operation at power, each check valve shall be exercised or examined in a manner that verifies obturator travel by using the methods in paragraph IST C-5221 (c) If exercising is not practicable during operation at power and cold shutdown outages, it shall be performed during refueling outages [RFOs]. ASME OM Code, Subsection ISTC, para graph ISTC-3630, Leakage Rate for Other Than Containment Isolation Valves, states, in pa rt, Category A valves with a leakage requirement not based on an Owner s 10 CFR 50, Appendi x J, program, shall be
tested to verify their seat leakages within acceptable limits. Valve closure before seat leakage testing shall be by using the valve operator with no additional closing force applied. ASME OM Code, Subsection ISTC, paragraph ISTC-3630(a), Frequency, state s, "Tests shall be conducted at least once every 2 yr."
Brief Description of the Proposed Alternative: Northern States Power Company, a Minnesota corporation, doing business as Xcel Energy (hereafter NSPM or the licensee),
hereby requests the U.S. Nuclear Regulatory Commission (NRC) au thorization of this 10 CFR 50.55a request to support the implementation of the sixth IST i nterval for Monticello Nuclear Generating Plant (Monticello). Proposed Alternative No. VR-05 requests authorization for an alternative to the conduct of pressure isolation valve (PIV) te sting each RFO and instead proposes to adopt a performance-based testing approach similar to that established under 10 CFR 50, Appendix J, "Primary Reactor Containment Leakage Tes ting for Water-Cooled Power Reactors," Option B, "Performance-Based Requirements."
For additional details on the licensees request, please refer to the document located at the ADAMS Accession No. identified above.
STAFF EVALUATION
ASME OM Code 2017 Edition, paragraph ISTC-3630(a), requires tha t valves within the scope of the ASME OM Code that have specific leakage criteria (other tha n containment isolation valves that are tested in accordance with 10 CFR Part 50, Appendix J) are required to be leak rate tested at least once every 2 years. The request proposed an al ternative test in lieu of this requirement for the 11 specific pressure isolation valves liste d. Specifically, the request proposes to functionally test and verify the leakage rate of 11 valves using a 10 CFR Part 50, Appendix J, Option B, performance-based schedule. Valves would initially be tested at the required interval schedule which is currently every RFO or 2 ye ars as specified by ASME OM Code, Subsection ISTC, paragraph ISTC-3630(a). Valves that hav e demonstrated good performance for two consecutive cycles may have their test inte rval extended to 75 months with a permissible extension for non-routine emergent conditions of 9 months (84 months total). Any valve leakage test failure would require the component to retur n to the initial interval of every 30 months until good performance can again be established.
Regulation 10 CFR Part 50, Appendix J, Option B, is a performan ce-based containment leakage test program. Guidance for implementation of acceptable leakag e rate test methods, procedures, and analyses, is provided in NRC Regulatory Guide ( RG) 1.163, Performance Based Containment Leak Test Pr ogram (ADAMS Accession No. ML003740058). RG 1.163 endorses Nuclear Energy Institute (NEI) Topical Report (TR) 94- 01, Revision 0, Industry Guideline for Implementing Performance Based Option of 10 CFR 5 0, Appendix J, dated July 26, 1995, with the limitation that Type C components test interval cannot extend greater than 60 months. The current version of NEI 94-01 is Revision 3 -A (ADAMS Accession No. ML12221A202), which allows Type C containment isolation valves test intervals to be extended to 75 months with a permissible extension for non-routine emerg ent conditions of 9 months (84 months total). In letters dated June 8, 2021, and December 6, 2012, the NRC staff found the guidance in NEI 94-01 Revision 3-A, to be acceptable (see ADAMS Accession Nos.
ML121030286 and ML12226A546, respectively) with the following c onditions:
- 1) Extended interval for Type C local leak rate tests (LLRTs) m ay be increased to 75 months with the requirement that a licensees post-outage repor t include the margin between Type B and Type C leakage rate summation and its regula tory limit. In
addition, a corrective action plan shall be developed to restor e the margin to an acceptable level. Extensions of up to 9 months (total maximum interval of 84 months for Type C tests) are permissible only for non-routine emergent con ditions. This provision (9-month extension) does not apply to valves that are restricte d and/or limited to 30-month intervals in Section 10.2 (such as BWR (boiling-water reactor) main steam isolation valves) or to valves held to the base interval (30 mo nths) due to unsatisfactory LLRT performance.
- 2) When routinely scheduling any LLRT valve interval beyond 60- months and up to 75-months, the primary containment leakage rate testing program trending or monitoring must include an estimate of the amount of understatement in the Type B & C total and must be included in a licensees post-outage report. The repor t must include the reasoning and determination of the acceptability of the extensi on, demonstrating that the LLRT totals calculated represent the actual leakage potential o f the penetrations.
This same alternative request was recently authorized on July 1 5, 2020 (ADAMS Accession No. ML20174A545), for the remainder of Monticello fifth IST interva l which is currently scheduled to end on September 30, 2022. The NRC staff review completed for the sixth IST interval at Monticello, along with this previous authorization, remains the same with no additional comments or conditions. Based on its review the NRC staff finds that proposed alternative VR-05 for a process to justify an extension of the leakage test ing intervals for these PIVs at Monticello provides an acceptable level of quality and safety i n accordance with 10 CFR 50.55a(z)(1).
CONCLUSION
The NRC staff has determined that the proposed alternative in t he licensees request referenced above would provide an acceptable level of quality and safety.
The NRC staff concludes that the licensee has adequately addressed the regulatory requirements set forth in 10 CFR 50.55a(z)(1).
The NRC staff authorizes the use of proposed alternative VR-05 at Monticello for the sixth 10-year IST interval currently scheduled to begin on October 1, 2022, and end on May 31, 2032.
All other ASME OM Code requirements for which an alternative wa s not specifically requested and approved remain applicable.
Principal Contributor: Michael F. Farnan
Date: January 21, 2022
Nancy L. Salgado, Chief Plant Licensing Branch III Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation