{{#Wiki_filter:" " UNITED STATESNUCLEAR REGULATORY COMMISSIONREGION IV1600 EAST LAMAR BLVD ARLINGTON, TEXAS 76011-4511  September 5, 2013 Mr. Mark E. Reddemann Chief Executive Officer Energy Northwest P.O. Box 968 (Mail Drop 1023)
{{#Wiki_filter:" " U N I T E D S T A T E S N U C L E A R R E G U L A T O R Y C O M M I S S I O N R E G I O N I V1600 EAST LAMAR BLVD A R L I N G T O N , T E X A S 7 6 0 1 1-4511  September 5, 2013 Mr. Mark Chief Executive Officer Energy Northwest P.O. Box 968 (Mail Drop 1023)
Richland, WA 99352
Richland, WA 99352
-0968
-0968


SUBJECT: COLUMBIA GENERATING STATION - TEMPORARY INSTRUCTION 2515/186, "INSPECTION OF PROCEDURES AND PROCESS FOR RESPONDING TO POTENTIAL AIRCRAFT THREATS
SUBJECT: COLUMBIA GENERATING STATION - TEMPORARY INSTRUCTION 2515/186 , "INSPECTION OF PROCEDURES AND PROCESS FOR RESPONDING TO POTENTIAL AIRCRAFT THREATS
;" INSPECTION REPORT NUMBER 05000397/2013407 Dear Mr. Reddemann
;" INSPECTION REPORT NUMBER 05000397/201340 7
: On July 24, 2013, the U.S. Nuclear Regulatory Commission (NRC) completed a n inspection at your Columbia Generating Station using Temporary Instruction 2515/186, "Inspection of Procedures and Processes for Responding to Potential Aircraft Threat s." The enclosed inspection report documents the results of the inspection, which were discussed during an exit meeting on [[Exit meeting date::July 24, 2013]], with members of your staf The objective of this inspection was to assess the implementation procedures and processes of your Columbia Generating Station that are required by Title 10 of the Code of Federal Regulations (CFR) 50.54(hh)(1), which provides the requirements for responding to a potential aircraft threa The results from this inspection, along with the results from this inspection performed at other operating commercial nuclear plants in the United States
 
, will be used to evaluate the U.S. nuclear industry's readiness to safely respond to similar event These results will also help the NRC to determine if additional regulatory actions are warrante The inspection examined activities conducted under your license as they relate to the implementation of 10 CFR 50.54(hh)(
==Dear Mr. Reddemann:==
1), your compliance with the Commission
On July 24, 20 13, the U.S. Nuclear Regulatory Commission (NRC) completed a n inspection at your Columbia Generating Station using Temporary Instruction 2515/186, "Inspection of Procedures and Processes for Responding to Potential Aircraft Threat s." The enclosed inspection report documents the results of the inspection, which were discussed during an exit meeting on July 24 , 2013 , with members of your staff.
's rules and regulations, and with the conditions of your operating license Within these areas, the inspection involved examination of selected procedures and representative records, observations of activities, and interviews with personne Based on results of this inspection, no NRC-identified or self
 
The objective of this inspection was to assess the implementation procedures and processes of y our Columbia Generating Station that are required by Title 10 of the Code of Federal Regulations (CFR) 50.54(hh)(1), which provides the requirements for responding to a potential aircraft threat.
 
The results from this inspection, along with the results from this inspection performed at other operating commercial nuclear plants in the United States
, will be used to evaluate the U.S. nuclear industry's readiness to safely respond to similar events. These results will also help the NRC to determine if additional regulatory actions are warranted.
 
The inspection examined activities conducted under your license as they relate to the implementation of 10 CFR 50.54(hh)(1), your compliance with the Commission
's rules and regulations, and with the conditions of your operating licenses. Within these areas, the inspection involved examination of selected procedures and representative records, observations of activities, and interviews with personnel.
 
Based on results of this inspection, no NRC-identified or self
-revealed findings were identified
-revealed findings were identified
. M. Reddemann
. If you contest any finding or the subject in this report, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the Nuclear Regulatory Commission, ATTN:
 
- 2 If you contest any finding or the subject in this report, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the Nuclear Regulatory Commission, ATTN:
Document Control Desk, Washington DC 20555
Document Control Desk, Washington DC 20555
-0001, with copies to the Regional Administrator, Region IV; the Director, Office of Enforcement, United States Nuclear Regulatory Commission, Washington, DC 20555-0001; and the NRC Resident Inspector at Columbia Generating Station
-0001, with copies to the Regional Administrator, Region IV; the Director, Office of Enforcement, United States Nuclear Regulatory Commission, Washington, DC 20555-0001; and the NRC Resident Inspector at Columbia Generating Station
Line 38: Line 45:


However, the material enclosed herewith contains Security
However, the material enclosed herewith contains Security
-Related Information in accordance with 10 CFR 2.390(d)(1) and its disclosure to unauthorized individuals could present a security vulnerabilit Therefore, the material in the enclosure will not be made available electronically for public inspection in the NRC Public Document Room or from the PARS component of NRC's ADAM If you choose to provide a response and Security
-Related Information in accordance with 10 CFR 2.390(d)(1) and its disclosure to unauthorized individuals could present a security vulnerability.
 
Therefore, the material in the enclosure will not be made available electronically for public inspection in the NRC Public Document Room or from the PARS component of NRC's ADAMS. If you choose to provide a response and Security
-Related Information is necessary to provide an acceptable response, please mark your entire response "Security
-Related Information is necessary to provide an acceptable response, please mark your entire response "Security
-Related Information  
-Related Information  
- Withhold from public disclosure under 10 CFR 2.390" in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390 (b)(1).
- Withhold from public disclosure under 10 CFR 2.390" in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390 (b)(1).


In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your resp onse. Should you have any questions regarding this inspection, we will be pleased to discuss the issues with yo
In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your resp onse. Should you have any questions regarding this inspection, we will be pleased to discuss the issues with you.


Sincerely,/RA/
Sincerely,/RA/
Line 51: Line 60:


===Enclosure:===
===Enclosure:===
Inspection Report 05000397/2013407
Inspection Report 05000397/201340 7


===w/Attachment:===
===w/Attachment:===
Supplemental Information cc: Electronic Distribution for Columbia Generating Station
Supplemental Information cc: Electronic Distribution for Columbia Generating Station
}}
}}

Revision as of 01:02, 14 July 2018

Columbia Generating Station - Temporary Instruction 2515/186, Inspection of Procedures and Process for Responding to Potential Aircraft Threats; Inspection Report Number 05000298-13-407
ML13252A042
Person / Time
Site: Cooper, Columbia Energy Northwest icon.png
Issue date: 09/05/2013
From: Vincent Gaddy
Operations Branch IV
To: Reddemann M E
Energy Northwest
References
IR-13-407
Download: ML13252A042 (3)


Text

" " U N I T E D S T A T E S N U C L E A R R E G U L A T O R Y C O M M I S S I O N R E G I O N I V1600 EAST LAMAR BLVD A R L I N G T O N , T E X A S 7 6 0 1 1-4511 September 5, 2013 Mr. Mark Chief Executive Officer Energy Northwest P.O. Box 968 (Mail Drop 1023)

Richland, WA 99352

-0968

SUBJECT: COLUMBIA GENERATING STATION - TEMPORARY INSTRUCTION 2515/186 , "INSPECTION OF PROCEDURES AND PROCESS FOR RESPONDING TO POTENTIAL AIRCRAFT THREATS

" INSPECTION REPORT NUMBER 05000397/201340 7

Dear Mr. Reddemann:

On July 24, 20 13, the U.S. Nuclear Regulatory Commission (NRC) completed a n inspection at your Columbia Generating Station using Temporary Instruction 2515/186, "Inspection of Procedures and Processes for Responding to Potential Aircraft Threat s." The enclosed inspection report documents the results of the inspection, which were discussed during an exit meeting on July 24 , 2013 , with members of your staff.

The objective of this inspection was to assess the implementation procedures and processes of y our Columbia Generating Station that are required by Title 10 of the Code of Federal Regulations (CFR) 50.54(hh)(1), which provides the requirements for responding to a potential aircraft threat.

The results from this inspection, along with the results from this inspection performed at other operating commercial nuclear plants in the United States

, will be used to evaluate the U.S. nuclear industry's readiness to safely respond to similar events. These results will also help the NRC to determine if additional regulatory actions are warranted.

The inspection examined activities conducted under your license as they relate to the implementation of 10 CFR 50.54(hh)(1), your compliance with the Commission

's rules and regulations, and with the conditions of your operating licenses. Within these areas, the inspection involved examination of selected procedures and representative records, observations of activities, and interviews with personnel.

Based on results of this inspection, no NRC-identified or self

-revealed findings were identified

. If you contest any finding or the subject in this report, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the Nuclear Regulatory Commission, ATTN:

Document Control Desk, Washington DC 20555

-0001, with copies to the Regional Administrator, Region IV; the Director, Office of Enforcement, United States Nuclear Regulatory Commission, Washington, DC 20555-0001; and the NRC Resident Inspector at Columbia Generating Station

. In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading

-rm/adams.html (the Public Electronic Reading Room).

However, the material enclosed herewith contains Security

-Related Information in accordance with 10 CFR 2.390(d)(1) and its disclosure to unauthorized individuals could present a security vulnerability.

Therefore, the material in the enclosure will not be made available electronically for public inspection in the NRC Public Document Room or from the PARS component of NRC's ADAMS. If you choose to provide a response and Security

-Related Information is necessary to provide an acceptable response, please mark your entire response "Security

-Related Information

- Withhold from public disclosure under 10 CFR 2.390" in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390 (b)(1).

In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your resp onse. Should you have any questions regarding this inspection, we will be pleased to discuss the issues with you.

Sincerely,/RA/

Vincent G. Gaddy, Chief Operations Branch Division of Reactor Safety Docket: 50

-397 License: NPF

-21 Nonpublic

Enclosure:

Inspection Report 05000397/201340 7

w/Attachment:

Supplemental Information cc: Electronic Distribution for Columbia Generating Station