NRC Security Inspection Report 05000298-13-404. Cover Letter
ML13149A226
Person / Time
Site: Cooper Entergy icon.png
Issue date: 05/28/2013
From: Mark Haire
Plant Support Branch-1
To: Limpias O
Nebraska Public Power District (NPPD)
References
IR-13-404
Download: ML13149A226 (3)


Text

UNITE D S TATE S NUC LEAR RE GULATOR Y C OMMI S SI ON May 28, 2013

SUBJECT:

COOPER NUCLEAR STATION - NRC SECURITY INSPECTION REPORT 05000298/2013404

Dear Mr. Limpias:

On May 9, 2013, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Cooper Nuclear Station. The inspection covered one or more of the key attributes of the security cornerstone of the NRC's Reactor Oversight Process. The enclosed inspection report documents the inspection results, which were discussed on May 9, 2013, with Mr. K.

Higginbotham, General Manager, Plant Operations, and other members of your staff.

The inspection examined activities conducted under your license as they relate to security and compliance with the Commissions rules and regulations and with the conditions of your license.

The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.

There were no findings identified during this inspection.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Document Access and Management System (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, the material enclosed herewith contains Security-Related Information in accordance with 10 CFR 2.390(d)(1) and its disclosure to unauthorized individuals could present a security vulnerability. Therefore, the material in the enclosure will not be made available electronically for public inspection in the NRC Public Document Room or from the PARS component of NRC's ADAMS. If you choose to provide a response and Security-Related Information is necessary to provide an acceptable response, please mark your entire response Security-Related Information - Withhold from Public Disclosure under 10 CFR 2.390 in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1).

In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response.

Sincerely,

/RA/

Mark S. Haire, Chief Plant Support Branch 1 Division of Reactor Safety Docket: 50-298 License: DPR-46 Nonpublic Enclosure:

NRC Inspection Report 05000298/2013404 w/Attachment: Supplemental Information cc w/enclosure:

Mr. Jerry Bebb Security Manager Nebraska Public Power District Cooper Nuclear Station 72676 648A Avenue P.O. Box 98 Brownville, NE 68321 cc w/o enclosure:

Electronic Distribution for Cooper Nuclear Station Electronic Distribution by RIV w/o enclosure:

Regional Administrator (Art.Howell@nrc.gov)

Acting Deputy Regional Administrator (Robert.Lewis@nrc.gov)

DRP Director (Kriss.Kennedy@nrc.gov)

DRS Director (Tom.Blount@nrc.gov)

Acting DRS Deputy Director (Jeff.Clark@nrc.gov)

Resident Inspector (Chris.Henderson@nrc.gov)

Branch Chief, DRP/C (David.Proulx@nrc.gov)

Senior Project Engineer, DRP/C (Bob.Hagar@nrc.gov)

Project Engineer, DRP/C (Rayomand.Kumana@nrc.gov)

CNS Administrative Assistant (Amy.Elam@nrc.gov)

Public Affairs Officer (Victor.Dricks@nrc.gov)

Public Affairs Officer (Lara.Uselding@nrc.gov)

Project Manager (Lynnea.Wilkins@nrc.gov)

Branch Chief, DRS/TSB (Ray.Kellar@nrc.gov)

ACES (R4Enforcement.Resource@nrc.gov)

RITS Coordinator (Marisa.Herrera@nrc.gov)

Regional Counsel (Karla.Fuller@nrc.gov)

Technical Support Assistant (Loretta.Williams@nrc.gov)

Congressional Affairs Officer (Jenny.Weil@nrc.gov)

RIV/ETA: OEDO (Doug.Huyck@nrc.gov)

ML13149A226 Cover Letter Only Non Sensitive Publicly Available SUNSI Review DAH Sensitive DAH Non-Publicly Available DAH KEYWORD: SUNSI Review Complete PSI:PSB1 SPSI:PSB1 PSI:PSB1 C:PSB1 C:DRP/C C:PSB1 DHolman JLarsen MBrooks MHaire DProulx MHaire

/RA/ /RA/ /RA/ /RA/ /RA/ /RA/

5/21/13 5/22/13 5/28/13 5/28/13 5/28/13 5/28/13