IR 05000286/2015301: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 26: Line 26:


SUBJECT: INDIAN POINT ENERGY CENTER, UNIT 3
SUBJECT: INDIAN POINT ENERGY CENTER, UNIT 3
  - NRC INITIAL OPERATOR LICENSING EXAMINATION REPORT 05000 286/2015301
  - NRC INITIAL OPERATOR LICENSING EXAMINATION REPORT 05000 286/20 1 5 30 1


==Dear Mr. Coyle:==
==Dear Mr. Coyle:==
On May 15, 2015, the U.S. Nuclear Regulatory Commission (NRC) completed an examination at the Indian Point Energy Center, Unit 3. The enclosed examination report documents the examination results, which were discussed on June 18, 2015, with Mr. Nick Lizzo, Training Manager, and other members of your staff.
On May 15, 20 1 5, the U.S. Nuclear Regulatory Commission (NRC) completed an examination at the Indian Point Energy Center, Unit 3. The enclosed examination report documents the examination results, which were discussed on June 18, 20 1 5 , with Mr. Nick Lizzo, Training Manager, and other members of your staff.


The examination included the evaluation of one applicant for a reactor operator license, and four applicant s for instant senior reactor operator license s. The written and operating examinations were developed using NUREG
The examination included the evaluation of one applicant for a reactor operator license, and four applicant s for instant senior reactor operator license s. The written and operating examinations were developed using NUREG
-1021, "Operator Licensing Examination Standards for Power Reactors," Revision 9, Supplement 1
-1021, "Operator Licensing Examination Standards for Power Reactors," Revision 9, Supplement 1. The license examiners determined that all applicants satisfied the requirements of Title 10 of the Code of Federal Regulations (10 CFR) Part 55, and the appropriate licenses were issued on June 18, 2015.
. The license examiners determined that all applicants satisfied the requirements of Title 10 of the Code of Federal Regulations (10 CFR) Part 55, and the appropriate licenses were issued on June 18, 2015.


No findings were identified during this examination In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Documents Access Management System (ADAMS). ADAMS is accessible from the NRC Web site http://www.nrc.gov/reading
No findings were identified during this examination In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Document s Access Management System (ADAMS). ADAMS is accessible from the NRC Web site http://www.nrc.gov/reading
-rm/adams.html#web
-rm/adams.html#web
-based-adams (the Public Electronic Reading Room).
-based-adams (the Public Electronic Reading Room).
Line 53: Line 52:


The examination included the evaluation of one applicant for a reactor operator license, and four applicant s for instant senior reactor operator licenses. The written and operating examinations were developed using NUREG
The examination included the evaluation of one applicant for a reactor operator license, and four applicant s for instant senior reactor operator licenses. The written and operating examinations were developed using NUREG
-1021, "Operator Licensing Examination Standards for Power Reactors," Revision 9, Supplement 1. The license examiners determined that all applicants satisfied the requirements of Title 10 of the Code of Federal Regulations (10 CFR) Part 55, and the appropriate licenses were issued on June 18, 2015.
-1021, "Operator Licensing Examination Standards for Power Reactors," Revision 9, Supplement 1. The license examiners determined that all applicants satisfied the requirements of Title 10 of the Code of Federal Regulations (10 CFR) Part 55, and the appropriate licenses were issued on June 18, 2015. No findings were identified during this examination In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Documents Access Management System (ADAMS). ADAMS is accessible from the NRC Web site http://www.nrc.gov/reading
 
No findings were identified during this examination In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Documents Access Management System (ADAMS). ADAMS is accessible from the NRC Web site http://www.nrc.gov/reading
-rm/adams.html#web
-rm/adams.html#web
-based-adams (the Public Electronic Reading Room).
-based-adams (the Public Electronic Reading Room).
Line 85: Line 82:
-1 Resource ROPReports Resources
-1 Resource ROPReports Resources


i    Enclosure EXAMINATION REPORT U.S. NUCLEAR REGULATORY COMMISSION REGION I Docket: 50-286 License: DPR-64 Report : 05000286/2015301 Licensee:
i    Enclosure EXAMINATION REPORT U.S. NUCLEAR REGULATORY COMMISSION REGION I Docket: 50-286 License: DPR-64 Report : 05000 286/20 15 30 1 Licensee: Entergy Nuclear Operations, Inc.
Entergy Nuclear Operations, Inc.


Facility:
Facility: Indian Point Energy Center, Unit 3 Location: Buchanan, NY 10511
Indian Point Energy Center, Unit 3 Location:
Buchanan, NY 10511
-0249 Dates: May 11 - 14, 2015 (Operating Test Administration)
-0249 Dates: May 11 - 14, 2015 (Operating Test Administration)
May 18, 2015 (Written Examination Administration)
May 18, 2015 (Written Examination Administration)
Line 96: Line 90:
June 18, 2015 (Completion of NRC Examination Grading)
June 18, 2015 (Completion of NRC Examination Grading)
June 18, 2015 (Licenses Issued)
June 18, 2015 (Licenses Issued)
Examiners
Examiners: J. D'Antonio, Chief Examiner, Operations Branch (OB) P. Presby, Senior Operations Engineer , OB C. Lally, Operations Engineer, OB Approved By:
: J. D'Antonio, Chief Examiner, Operations Branch (OB) P. Presby, Senior Operations Engineer
, OB C. Lally, Operations Engineer, OB Approved By:
Donald E. Jackson, Chief Operations Branch Division of Reactor Safety
Donald E. Jackson, Chief Operations Branch Division of Reactor Safety


ii    Enclosure SUMMARY ER 05000286/2015301; 5/11/2015  
ii    Enclosure SUMMARY ER 05000 286/201 5301; 5/11/2015  
- 6/18/2015; Indian Point Energy Center, Unit 3; Initial Operator Licensing Examination Report
- 6/18/2015; Indian Point Energy Center, Unit 3; Initial Operator Licensing Examination Report


Three NRC examiners evaluated the competency of one applicant for a reactor operator license and four applicant s for senior reactor operator license s at Indian Point Energy Center, Unit 3. The Nuclear Regulatory Commission developed the examinations using NUREG
Three NRC examiners evaluated the competency of one applicant for a reactor operator license and four applicant s for senior reactor operator license s at Indian Point Energy Center, Unit 3. The Nuclear Regulatory Commission developed the examinations using NUREG
-1021, "Operator Licensing Examination Standards for Power Reactors," Revision 9, Supplement 1
-1021, "Operator Licensing Examination Standards for Power Reactors," Revision 9, Supplement 1. The written examination was administered by the facility on May 18 , 201 5. NRC examiner s administered the operating tests on M ay 11-14 , 201 5. The NRC examiner s determined that all applicant s satisfied the requirements of Title 10 of the Code of Federal Regulations (10 CFR) Part 55, and the appropriate licenses have been issued.
. The written examination was administered by the facility on May 18, 2015. NRC examiner s administered the operating tests on May 11-14, 2015. The NRC examiners determined that all applicant s satisfied the requirements of Title 10 of the Code of Federal Regulations (10 CFR) Part 55, and the appropriate licenses have been issued.


No finding s were identified.
No finding s were identified.
Line 122: Line 113:
.2 Operator Knowledge and Performance
.2 Operator Knowledge and Performance


a. Examination Scope On May 18, 2015, the licensee proctored the administration of the written examinations to all five applicants. The licensee staff graded the written examinations, analyzed the results, and presented their analysis to the NRC on May 28, 2015.
a. Examination Scope On May 18 , 201 5, the licensee proctored the administration of the written examinations to all five applicants. The licensee staff graded the written examinations, analyzed the results, and presented their analysis to the NRC on May 28 , 2 01 5.


The NRC examination team administered the various portions of the operating examination to all applicants on May 11-14, 2015. The one applicant for a reactor operator license participated in two dynamic simulator scenarios, in a control room and facilities walkthrough test consisting of eleven system tasks, and an administrative test consisting of four administrative tasks. The four applicants seeking an instant senior reactor operator license participated in two or three dynamic simulator scenarios, a control room and facilities walkthrough test consisting of ten system tasks, and an administrative test consisting of five administrative tasks.
The NRC examination team administered the various portions of the operating examination to all applicants on May 11-14 , 201 5. The one applicant for a reactor operator license participated in two dynamic simulator scenarios, in a control room and facilities walkthrough test consisting of eleven system tasks, and an administrative test consisting of four administrative tasks. The four applicants seeking an instant senior reactor operator license participated in two or three dynamic simulator scenarios, a control room and facilities walkthrough test consisting of ten system tasks, and an administrative test consisting of five administrative tasks.


b. Findings All applicants passed the written examination and operating test. For the written examinations, the one reactor operator applicant's score was 92 percent, the senior operator applicants' average score was 88.25 percent and ranged from 82 to 94 percent. The overall written examination average was 89 percent. The text of th e
b. Findings All applicants passed the written examination and operating test. For the written examinations, the one reactor operator applicant's score was 92 percent, the senior operator applicants' average score was 88.25 percent and ranged from 82 to 94 percent. The overall written examination average was 89 percent. The text of th e
2 Enclosure examination questions and the licensee's examination analysis may be accessed in the ADAMS system under the accession numbers noted in Attachment 1. In accordance with current NRC policy, the release of this written examination in ADAMS to the public will be delayed for 2 years. The NRC examiners completed the final grading of the written examination on June 1, 2015, and conducted a review of each missed question to determine the accuracy and validity of the examination questions.
2 Enclosure examination questions and the licensee's examination analysis may be accessed in the ADAMS system under the accession numbers noted in Attachment 1. In accordance with current NRC policy, the release of this written examination in ADAMS to the public will be delayed for 2 years. The NRC examiners completed the final grading of the written examination on June 1 , 201 5 , and conducted a review of each missed question to determine the accuracy and validity of the examination questions.


Chapter ES
Chapter ES
Line 134: Line 125:


.3 Initial Licensing Examination Development a. Examination Scope The NRC developed the examinations in accordance with NUREG
.3 Initial Licensing Examination Development a. Examination Scope The NRC developed the examinations in accordance with NUREG
-1021, Revision 9
-1021, Revision 9 , Supplement 1. All licensee facility training and operations staff involved in examination preparation and validation were listed on a security agreement. The NRC conducted a final onsite validation of the operating examinations and written examination review during the week of January 26 , 2 01 5. b. Findings No findings were identified.
, Supplement 1. All licensee facility training and operations staff involved in examination preparation and validation were listed on a security agreement. The NRC conducted a final onsite validation of the operating examinations and written examination review during the week of January 26
, 2015. b. Findings No findings were identified.


.4 Simulation Facility Performance a. Examination Scope The examiners observed simulator performance with regard to plant fidelity during the examination validation and administration.
.4 Simulation Facility Performance a. Examination Scope The examiners observed simulator performance with regard to plant fidelity during the examination validation and administration.
Line 142: Line 131:
b. Findings No findings were identified.
b. Findings No findings were identified.


3 Enclosure
3 Enclosure .5 Examination Security a. Examination Scope The examiners reviewed examination security for examination development and during both the onsite preparation week and examination administration week for compliance with NUREG
.5 Examination Security a. Examination Scope The examiners reviewed examination security for examination development and during both the onsite preparation week and examination administration week for compliance with NUREG
-1021 requirements. Plans for simulator security and applicant control were reviewed and discussed with licensee personnel. b. Findings No findings were identified.
-1021 requirements. Plans for simulator security and applicant control were reviewed and discussed with licensee personnel
. b. Findings No findings were identified.


4OA6 Meetings, Including Exit The chief examiner presented the examination results to Mr
4OA6 Meetings, Including Exit The chief examiner presented the examination results to Mr. Nick Lizzo, Training Manager, and other members of the licensee's management staff on June 18 , 201 5. The licensee acknowledged the findings presented.
. Nick Lizzo, Training Manager, and other members of the licensee's management staff on June 18, 2015. The licensee acknowledged the findings presented.


The licensee did not identify any information or materials used during the examination as proprietary.
The licensee did not identify any information or materials used during the examination as proprietary.
Line 154: Line 140:
Attachment s: 1. Supplementary Information 2. Simulator Fidelity Report
Attachment s: 1. Supplementary Information 2. Simulator Fidelity Report


A-1 Attachment SUPPLEMENTA RY INFORMATION KEY POINTS OF CONTACT Licensee Personnel J. Herrera, ILO Training Superintendent (Acting)
A-1 Attachment SUPPLEMENTA RY INFORMATION KEY POINTS OF CONTACT Licensee Personnel J. Herrera , ILO Training Superintendent (Acting)
C. Koscis, Nuclear Training Instructor D. Dewey, Shift Manager  
C. Koscis, Nuclear Training Instructor D. Dewey , Shift Manager  
- Operations Training
- Operations Training


Line 161: Line 147:
, Chief Examiner ITEMS OPENED, CLOSED, AND DISCUSSED Opened NONE Opened and Closed NONE Closed NONE Discussed NONE ADAMS DOCUMENTS REFERENCED
, Chief Examiner ITEMS OPENED, CLOSED, AND DISCUSSED Opened NONE Opened and Closed NONE Closed NONE Discussed NONE ADAMS DOCUMENTS REFERENCED


Accession No
Accession No. ML15160A409 - FINAL-Written Exam (Note: In accordance with current NRC policy, the release of this written examination in ADAMS to the public will be delayed for 2 years.) Accession No. ML15160A464 - FINAL-Operating Exam
. ML15160A409
- FINAL-Written Exam (Note: In accordance with current NRC policy, the release of this written examination in ADAMS to the public will be delayed for 2 years.) Accession No. ML15160A464
- FINAL-Operating Exam


A-2 Attachment Use for all previously undocumented deficiencies encountered on the simulator. If none, then delete this page.
A-2 Attachment Use for all previously undocumented deficiencies encountered on the simulator. If none, then delete this page.

Revision as of 02:19, 9 July 2018

Er 05000286/2015301; 5/11/2015 to 6/18/2015; Indian Point Energy Center, Unit 3: Initial Operator Licensing Examination Report
ML15175A298
Person / Time
Site: Indian Point Entergy icon.png
Issue date: 06/24/2015
From: Jackson D E
Operations Branch I
To: Coyle L
Entergy Nuclear Operations
Shared Package
ML14352A136 List:
References
50-286/15-301
Download: ML15175A298 (11)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BLVD., SUITE 100 KING OF PRUSSIA, PA 19406

-2713 June 24, 2015 Mr. Lawrence Coyle Site Vice President Entergy Nuclear Operations, Inc.

Indian Point Energy Center 450 Broadway, GSB P.O. Box 249 Buchanan, NY 10511

-0249

SUBJECT: INDIAN POINT ENERGY CENTER, UNIT 3

- NRC INITIAL OPERATOR LICENSING EXAMINATION REPORT 05000 286/20 1 5 30 1

Dear Mr. Coyle:

On May 15, 20 1 5, the U.S. Nuclear Regulatory Commission (NRC) completed an examination at the Indian Point Energy Center, Unit 3. The enclosed examination report documents the examination results, which were discussed on June 18, 20 1 5 , with Mr. Nick Lizzo, Training Manager, and other members of your staff.

The examination included the evaluation of one applicant for a reactor operator license, and four applicant s for instant senior reactor operator license s. The written and operating examinations were developed using NUREG

-1021, "Operator Licensing Examination Standards for Power Reactors," Revision 9, Supplement 1. The license examiners determined that all applicants satisfied the requirements of Title 10 of the Code of Federal Regulations (10 CFR) Part 55, and the appropriate licenses were issued on June 18, 2015.

No findings were identified during this examination In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Document s Access Management System (ADAMS). ADAMS is accessible from the NRC Web site http://www.nrc.gov/reading

-rm/adams.html#web

-based-adams (the Public Electronic Reading Room).

Sincerely,/RA/

Donald E. Jackson, Chief Operations Branch Division of Reactor Safety

Mr. Lawrence Coyle Site Vice President Entergy Nuclear Operations, Inc.

Indian Point Energy Center 450 Broadway, GSB P.O. Box 249 Buchanan, NY 10511

-0249

SUBJECT: INDIAN POINT ENERGY CENTER, UNIT 3 - NRC INITIAL OPERATOR LICENSING EXAMINATION REPORT 05000286/2015301

Dear Mr. Coyle:

On May 15, 2015, the U.S. Nuclear Regulatory Commission (NRC) completed an examination at the Indian Point Energy Center, Unit 3. The enclosed examination report documents the examination results, which were discussed on June 18, 2015, with Mr. Nick Lizzo, Training Manager, and other members of your staff.

The examination included the evaluation of one applicant for a reactor operator license, and four applicant s for instant senior reactor operator licenses. The written and operating examinations were developed using NUREG

-1021, "Operator Licensing Examination Standards for Power Reactors," Revision 9, Supplement 1. The license examiners determined that all applicants satisfied the requirements of Title 10 of the Code of Federal Regulations (10 CFR) Part 55, and the appropriate licenses were issued on June 18, 2015. No findings were identified during this examination In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Documents Access Management System (ADAMS). ADAMS is accessible from the NRC Web site http://www.nrc.gov/reading

-rm/adams.html#web

-based-adams (the Public Electronic Reading Room).

Sincerely,/RA/

Donald E. Jackson, Chief Operations Branch Division of Reactor Safety Distribution: See Next Page DOCUMENT NAME:

G:\DRS\Operations Branch

\DANTONIO\Exam 15 - IP3 May 10 (U01908)

\IP3 EXAM REPORT.docx ADAMS PKG.: ML14352A136 ADAMS ACCESSION NUMBER:

ML15175A298 SUNSI Review Non-Sensitive Sensitive Publicly Available Non-Publicly Available OFFICE RI/DRS RI/DRS NAME JD'Antonio DJackson DATE 6/23/15 6/24/15 OFFICIAL RECORD CO PY Docket No.:

50-286 License No.:

DPR-64

Enclosure:

Examination Report 05000286/2015301

w/Attachment:

Supplementary Information

cc w/encl: Distribution via ListServ Distribution w/encl

(via E-mail) D. Dorman, RA (R1ORAMAIL RESOURCE)

D. Lew, DRA (R1ORAMAIL RESOURCE)

H. Nieh, DRP (R1DRPMAIL RESOURCE)

M. Scott, DRP (R1DRPMAIL RESOURCE)

R. Lorson, DRS (R1DRSMAIL RESOURCE)

J. Trapp, DRS (R1DRSMAIL RESOURCE)

A. Burritt, DRP T. Setzer, DRP J. Petch, DRP J. Schussler, DRP S. Stewart, DRP, SRI G. Newman, DRP, RI A. Bolger, DRP, RI (Acting)

D. Hochmuth, DRP, AA K. MorganButler, RI OEDO RidsNrrPMIndianPoint Resource RidsNrrDorlLpl1

-1 Resource ROPReports Resources

i Enclosure EXAMINATION REPORT U.S. NUCLEAR REGULATORY COMMISSION REGION I Docket: 50-286 License: DPR-64 Report : 05000 286/20 15 30 1 Licensee: Entergy Nuclear Operations, Inc.

Facility: Indian Point Energy Center, Unit 3 Location: Buchanan, NY 10511

-0249 Dates: May 11 - 14, 2015 (Operating Test Administration)

May 18, 2015 (Written Examination Administration)

May 28, 2015 (Licensee Submitted Post Exam Package)

June 18, 2015 (Completion of NRC Examination Grading)

June 18, 2015 (Licenses Issued)

Examiners: J. D'Antonio, Chief Examiner, Operations Branch (OB) P. Presby, Senior Operations Engineer , OB C. Lally, Operations Engineer, OB Approved By:

Donald E. Jackson, Chief Operations Branch Division of Reactor Safety

ii Enclosure SUMMARY ER 05000 286/201 5301; 5/11/2015

- 6/18/2015; Indian Point Energy Center, Unit 3; Initial Operator Licensing Examination Report

Three NRC examiners evaluated the competency of one applicant for a reactor operator license and four applicant s for senior reactor operator license s at Indian Point Energy Center, Unit 3. The Nuclear Regulatory Commission developed the examinations using NUREG

-1021, "Operator Licensing Examination Standards for Power Reactors," Revision 9, Supplement 1. The written examination was administered by the facility on May 18 , 201 5. NRC examiner s administered the operating tests on M ay 11-14 , 201 5. The NRC examiner s determined that all applicant s satisfied the requirements of Title 10 of the Code of Federal Regulations (10 CFR) Part 55, and the appropriate licenses have been issued.

No finding s were identified.

Enclosure REPORT DETAILS 4. OTHER ACTIVITIES (OA)

4OA5 Other Activities (Initial Operator License Examination

)

.1 License Applications

a. Scope The examiners reviewed all the license applications submitted by the licensee to ensure the applications reflected that each applicant satisfied relevant license eligibility requirements. The applications were submitted on NRC Form 398, "Personal Qualification Statement," and NRC Form 396, "Certification of Medical Examination by Facility Licensee." The examiner s also audited all of the license application s in detail to confirm that they accurately reflected the subject applicant's qualifications. This audit focused on the applicant's experience and on

-the-job training, including control manipulations that provided significant reactivity changes.

b. Findings No findings were identified.

.2 Operator Knowledge and Performance

a. Examination Scope On May 18 , 201 5, the licensee proctored the administration of the written examinations to all five applicants. The licensee staff graded the written examinations, analyzed the results, and presented their analysis to the NRC on May 28 , 2 01 5.

The NRC examination team administered the various portions of the operating examination to all applicants on May 11-14 , 201 5. The one applicant for a reactor operator license participated in two dynamic simulator scenarios, in a control room and facilities walkthrough test consisting of eleven system tasks, and an administrative test consisting of four administrative tasks. The four applicants seeking an instant senior reactor operator license participated in two or three dynamic simulator scenarios, a control room and facilities walkthrough test consisting of ten system tasks, and an administrative test consisting of five administrative tasks.

b. Findings All applicants passed the written examination and operating test. For the written examinations, the one reactor operator applicant's score was 92 percent, the senior operator applicants' average score was 88.25 percent and ranged from 82 to 94 percent. The overall written examination average was 89 percent. The text of th e

2 Enclosure examination questions and the licensee's examination analysis may be accessed in the ADAMS system under the accession numbers noted in Attachment 1. In accordance with current NRC policy, the release of this written examination in ADAMS to the public will be delayed for 2 years. The NRC examiners completed the final grading of the written examination on June 1 , 201 5 , and conducted a review of each missed question to determine the accuracy and validity of the examination questions.

Chapter ES

-403 and Form ES-403-1 of NUREG 1021 require the licensee to analyze the validity of any written examination questions that were missed by half or more of the applicants. The licensee conducted this performance analysis for all questions that met these criteria and submitted the analysis to the chief examiner

. No post exam comments were submitted.

.3 Initial Licensing Examination Development a. Examination Scope The NRC developed the examinations in accordance with NUREG

-1021, Revision 9 , Supplement 1. All licensee facility training and operations staff involved in examination preparation and validation were listed on a security agreement. The NRC conducted a final onsite validation of the operating examinations and written examination review during the week of January 26 , 2 01 5. b. Findings No findings were identified.

.4 Simulation Facility Performance a. Examination Scope The examiners observed simulator performance with regard to plant fidelity during the examination validation and administration.

b. Findings No findings were identified.

3 Enclosure .5 Examination Security a. Examination Scope The examiners reviewed examination security for examination development and during both the onsite preparation week and examination administration week for compliance with NUREG

-1021 requirements. Plans for simulator security and applicant control were reviewed and discussed with licensee personnel. b. Findings No findings were identified.

4OA6 Meetings, Including Exit The chief examiner presented the examination results to Mr. Nick Lizzo, Training Manager, and other members of the licensee's management staff on June 18 , 201 5. The licensee acknowledged the findings presented.

The licensee did not identify any information or materials used during the examination as proprietary.

Attachment s: 1. Supplementary Information 2. Simulator Fidelity Report

A-1 Attachment SUPPLEMENTA RY INFORMATION KEY POINTS OF CONTACT Licensee Personnel J. Herrera , ILO Training Superintendent (Acting)

C. Koscis, Nuclear Training Instructor D. Dewey , Shift Manager

- Operations Training

NRC Personnel J. D'Antonio

, Chief Examiner ITEMS OPENED, CLOSED, AND DISCUSSED Opened NONE Opened and Closed NONE Closed NONE Discussed NONE ADAMS DOCUMENTS REFERENCED

Accession No. ML15160A409 - FINAL-Written Exam (Note: In accordance with current NRC policy, the release of this written examination in ADAMS to the public will be delayed for 2 years.) Accession No. ML15160A464 - FINAL-Operating Exam

A-2 Attachment Use for all previously undocumented deficiencies encountered on the simulator. If none, then delete this page.

ES-501 Simulator Fidelity Report Attachment 2 Facility Licensee:

Entergy Facility Docket No.:

50-286 Operating Test Administered on: 5/11/2015

- 5/14/2015 This form is to be used only to report observations. These observations do not constitute audit or inspection findings and, without further verification and review in accordance with IP 71111.11, are not indicative of noncompliance with 10 CFR 55.46. No licensee action is required in response to these observations.

While conducting the simulator portion of the operating tests, examiners observed the following items: Item Description 1 RCDT size incorrectly modelled as 3500 vs 350 gallons.

2 SIT pressure drop when upstream vent opened appears excessive.