IR 05000247/2015011
| ML15323A026 | |
| Person / Time | |
|---|---|
| Site: | Indian Point |
| Issue date: | 11/19/2015 |
| From: | Modes M C Engineering Region 1 Branch 1 |
| To: | Coyle L Entergy Nuclear Operations |
| Gray M E | |
| References | |
| IR 2015011 | |
| Download: ML15323A026 (19) | |
Text
L. Coyl L. Coyle - 2 -
Distribution: (See next page) DOCUMENT NAME: G:\DRS\Engineering Branch 1\-- Modes\20151117b 05000286_2015011 Indian Point IP 71013.docx ADAMS ACCESSION NUMBER: ML15323A026 SUNSI Review Non-Sensitive Publicly Available OFFICE RI/DRS RI/DRP RI/DRS NAME MModes GDental MGray DATE 11/18/2015 11/09/2015 11/19/2015 OFFICIAL RECORD COPY L. Coyle - 2 - Distribution w/encl: (via e-mail) DDorman, RA DLew, DRA MScott, DRP JColaccino, DRP RLorson, DRS GSuber, DRS GDentel, DRP MDraxton, DRP (actg to 12/12/15) JSchussler, DRP BPinson, DRP BHaagensen, DRP, SRI GNewman, DRP, RI SRich, DRP, RI MModes, DRS MGray, DRS MWentzel, NRR DHochmuth, DRP, AA JJessie, RI OEDO RidsNrrPMIndianPoint Resource RidsNrrDorlLpl1-1 Resource ROPReports Resources i Enclosure U.S. NUCLEAR REGULATORY COMMISSION ii .1 2 .2 .3 .4 .5 5 The inspector reviewed 59 underground piping examinations implemented for Unit 3 and noted that corrective actions for coating degradation were implemented in 23 cases (39%). The inspector selected a number of the corrective actions and an ultrasonic test report for revie The inspector noted the ultrasonic thickness test (Report IP3-UT-15-line 408 over the discharge canal resulted in thickness readings below nominal of -IP3-2015-04410 recommended the coating be repaired to prevent further corrosio Condition Reports CR-IP3-2014-02382, -02878, and -03244 were also reviewe .6 A-1 Attachment A-2 A-3 A-4 ressurized Thermal Shock Pressurized Thermal Shock Reference Temperature