Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML21012A26912 January 2021Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2021Generic Fundamentals Examination
COVID-19
ML20072L21912 March 2020Response to Regulatory Issue Summary 2020-01, Preparation and Scheduling of Operator Licensing Examinations
ML19352D65716 December 2019Announcement 0f Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2020Generic Fundamentals Examination
ML19211C77430 July 2019Requalification Program Inspection
ML19135A66415 May 2019Units 2 & 3; River Bend, and Waterford 3 - Response to RIS 2019-02, Preparation and Scheduling of Operator Licensing Examinations
ML19029B31928 January 2019Operator Licensing Operating Test Approval
ML18159A3515 June 2018Final Operating Test (Sections a, B, and C) - JPM C, D, K Corrected (Folder 3)Safe Shutdown
Boric Acid
Job Performance Measure
ML18047A1693 January 2018Final Qa/Related Forms (Folder 1)
ML18005A4203 January 2018Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2018Generic Fundamentals Examination
ML18047A1707 November 2017Handouts to Applicants (Folder 3)
ML17297A64324 October 2017Initial Operator Licensing Written Examination Approval - Indian Point Energy Center, Unit 3
ML17297A01323 October 2017Initial Operator Licensing Operating Test Approval - Indian Point Energy Center, Unit 3
NL-17-080, Operator Licensing Examination Data28 June 2017Operator Licensing Examination DataGeneric Fundamentals Examination
ML17018A28217 January 2017Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2017Generic Fundamentals Examination
ML16365A04431 October 2016Final Operating Test (Sections a, B, and C) (Folder 3)Safe Shutdown
Boric Acid
Job Performance Measure
Downpower
ML17206A44231 October 2016Final Qa/Related Forms - Form ES-401-6 (Folder 1)
ML17206A44531 October 2016Final Qa/Related Forms (Folder 1)Job Performance Measure
ML17069A28431 October 2016Final Outlines Update ES-401-2, ES-401-3Power change
ML16365A04231 October 2016Final Written Examination with Answer Key (401-5 Format) (Folder 3)Safe Shutdown
Boric Acid
Shutdown Margin
Loop seal
Time to boil
Offsite Circuit
ML16365A04131 October 2016Final Outlines (Folder 3)
ML16365A04331 October 2016Handouts to Applicants (Folder 3)
ML16301A28827 October 2016Initial Operator Licensing Written Examination Approval - Indian Point Energy Center, Unit 2
ML16298A01620 October 2016Initial Operator Licensing Operating Test Approval - Indian Point Energy Center, Unit 2
ML17047A5973 October 2016NRC Comments on Draft Facility-Developed Written Exam (Folder 2)
ML17047A5983 October 2016NRC Comments on Draft Facility-Developed Operating Test (Folder 2)
ML17047A6001 September 2016Draft Written Exam (Folder 2)Safe Shutdown
Boric Acid
Shutdown Margin
Loop seal
Time to boil
Offsite Circuit
ML17047A6011 September 2016Draft Operating Exam (Section a, B, and C) (Folder 2)Safe Shutdown
Unanalyzed Condition
Boric Acid
Fitness for Duty
Shutdown Margin
Offsite Dose Calculation Manual
FLEX
Job Performance Measure
Downpower
ML17047A59918 July 2016Draft - Outlines (Folder 2) (Facility Letter Dtd - 07/18/2016)Power change
Downpower
NL-16-073, Operator Licensing Examination Data7 July 2016Operator Licensing Examination DataGeneric Fundamentals Examination
ML16119A00127 April 2016Senior Reactor and Reactor Operator Initial License Examinations-Indian Point Energy Center, Unit 2
ML15223A01610 August 2015Requalification Program Inspection-Indian Point Energy Ctr, Unit 3
IR 05000286/201530124 June 2015Er 05000286/2015301; 5/11/2015 to 6/18/2015; Indian Point Energy Center, Unit 3: Initial Operator Licensing Examination Report
ML15163A2314 June 2015Draft Written Exam (Folder 2)Fire Barrier
Fuel cladding
Pressure Boundary Leakage
Continuous fire watch
Hourly Fire Watch
ML15163A2324 June 2015Draft Operating Exam (Sections a, B, and C) (Folder 2)Boric Acid
Packing leak
Stroke time
Time to boil
Job Performance Measure
ML15160A4564 June 2015Handouts to Applicants (Folder 3)Safe Shutdown
Fire Barrier
Continuous fire watch
Fire Protection Program
Hourly Fire Watch
ML15163A2304 June 2015Draft - Outlines (Folder 2)Shutdown Margin
Grab sample
ML15163A2294 June 2015All Comments on Draft NRC-Developed Exam (Operating) (Folder 2)Shutdown Margin
ML15160A4094 June 2015Final Written Examination with Answer Key (401-5 Format) (Folder 2)Grab sample
Fire Barrier
Fuel cladding
Pressure Boundary Leakage
Continuous fire watch
Hourly Fire Watch
ML15160A4704 June 2015Final Outlines (Folder 3)
ML15160A4644 June 2015Final Operating Exam (Sections a, B, and C) (Folder 3)Boric Acid
Packing leak
Stroke time
Time to boil
Job Performance Measure
ML15282A3071 June 2015Final Qa/Related Forms (Folder 1)
ML14308A05229 October 2014Final Outlines (Folder 3)Grab sample
Job Performance Measure
Fire Watch
ML14307B56529 October 2014Draft Operating Exam (Section a) (Folder 2)Grab sample
Job Performance Measure
ML14307B52129 October 2014Draft-Outlines (Folder 2)
ML14307B38529 October 2014NRC Comments on Draft Licensee-Developed Exam (Operating) (Folder 2)
ML14308A25129 October 2014Final Operating Exam (Section a) (Folder 3)Grab sample
Job Performance Measure
Fire Watch
ML14251A2408 September 2014Operator Licensing Retake Operating Examination Approval-Indian Point Unit 2
ML14195A09014 July 2014Requalification Program Inspection-Indian Point Station, Unit 2
IR 05000247/201430131 March 2014Er 05000247-14-301; 2/10/2014 to 2/19/2014; Indian Point, Units 2; Initial Operator Licensing Examination Report
ML14091A69231 March 2014Er 05000247-14-301; 2/10/2014 to 2/19/2014; Indian Point, Units 2; Initial Operator Licensing Examination Report