{{#Wiki_filter:Job Performance Measure (JPM)  1  SITE: BFN JPM TITLE:
{{#Wiki_filter:Job Performance Measure (JPM)  1  SITE: BFN JPM TITLE:
RESPOND TO A CONTROL ROD DRIFT IN JPM NUMBER:
RESPOND TO A CONTROL ROD DRIFT IN JPM NUMBER:
80A U2 REVISION:
80 A U2 REVISION: 1  TASK APPLICABILITY:
1  TASK APPLICABILITY:
SRO STA UO NAUO TASK NUMBER / TASK TITLE(S):
SRO STA UO NAUO TASK NUMBER / TASK TITLE(S):
U-085-AB-05/ Respond to a Control Rod Drift In K/A RATINGS:
U-085-AB-05/ Respond to a Control Rod Drift In K/A RATINGS:
Line 25: Line 24:
Risk Significant SAFETY FUNCTION:
Risk Significant SAFETY FUNCTION:
1  EVALUATION LOCATION:
1  EVALUATION LOCATION:
In-Plant  Simulator Control Room Lab  Other - List  APPLICABLE METHOD OF TESTING:  Discussion  Simulate/Walkthrough  Perform TIME FOR COMPLETION:      NA      TIME CRITICAL (Y/N)      ALTERNATE PATH (Y/N)
In-Plant  Simulator Control R oom Lab  Other - List  APPLICABLE METHOD OF TESTING:  Discussion  Simulate/Walkthrough  Perform   TIME FOR COMPLETION:      NA      TIME CRITICAL (Y/N)      ALTERNATE PATH (Y/N)
Developed by:
Developed by:
Developer Date  (Ensure validator is briefed on exam security per NPG
Developer Date  (Ensure validator is briefed on exam security per NPG
-SPP-17.8.1)                (See JPM Validation Checklist in NPG
-SPP-17.8.1)                (See JPM Validation Checklist in NPG
-SPP-17.8.2)      Validated by:
-SPP-17.8.2)      Validated by:
Approved by:
Approved by:
Validator Date  Approved by:
Validator   Date  Approved by:
Site Training Management Date  Site Training Program Owner Date      N Y Job Performance Measure (JPM)  2  OPERATOR:  ________________________________
Site Training Management Date  Site Training Program Owner Date      N Y Job Performance Measure (JPM)  2  OPERATOR:  ________________________________
JPM Number:  __
JPM Number:  __
Line 44: Line 43:
OF-2 Controlling plant evolutions precisely.
OF-2 Controlling plant evolutions precisely.
PRA: NA REFERENCES/PROCEDURES NEEDED:
PRA: NA REFERENCES/PROCEDURES NEEDED:
2-AOI-85-5, 2-AOI-100-1 VALIDATIONTIME:  18 min    PERFORMANCE TIME:
2-AOI-85-5 , 2-AOI-100-1 VALIDATIONTIME:  18 min    PERFORMANCE TIME:
COMMENTS:  
COMMENTS:  


Line 61: Line 60:
:NRC JPM A U2  
:NRC JPM A U2  
-Control Rod Drift In Verify all triggers and overrides are correct Place the simulator in RUN to ensure stable conditions Start Rod Display on RWM Screen Provide Initial Rod Data Sheet
-Control Rod Drift In Verify all triggers and overrides are correct Place the simulator in RUN to ensure stable conditions Start Rod Display on RWM Screen Provide Initial Rod Data Sheet
  -PRLOG  When prompted by the examiner, INSERT  
  -PRLOG  When prompted by the examiner, INSERT -  Event 1 to Drift Control Rod 02
-  Event 1 to Drift Control Rod 02
-31 into the core When prompted by the examiner, INSERT -  Event 2 to Drift Control Rod Multiple Control Rods into the core Malfunctions Description Event Severity Delay Initial set rd07r0231 Drifts rod 02
-31 into the core When prompted by the examiner, INSERT  
-  Event 2 to Drift Control Rod Multiple Control Rods into the core Malfunctions Description Event Severity Delay Initial set rd07r0231 Drifts rod 02
-31 into core 1 NA 35 sec NA rd07r2223 Drifts rod 22
-31 into core 1 NA 35 sec NA rd07r2223 Drifts rod 22
-23 into core 2 NA 10 sec NA rd07r3031 Drifts rod 30
-23 into core 2 NA 10 sec NA rd07r 303 1 Drifts rod 30
-31 into core 2 NA 25 sec NA rd07r4635 Drifts rod 46
-31 into core 2 NA 25 sec NA rd07r4635 Drifts rod 46
-35  into core 2 NA 20 sec NA rd07r2619 Drifts rod 26
-35  into core 2 NA 20 sec NA rd07r2619 Drifts rod 26
Line 82: Line 79:
:  The Unit Supervisor directs you to perform Surveillance 3.1.3.3 step 7.3, Control Rod Exercise Test for Withdrawn Control Rods, for partially withdrawn control rods.
:  The Unit Supervisor directs you to perform Surveillance 3.1.3.3 step 7.3, Control Rod Exercise Test for Withdrawn Control Rods, for partially withdrawn control rods.


Job Performance Measure (JPM)  7  START TIME
Job Performance Measure (JPM)  7  START TIME:    STEP / STANDARD SAT / UNSAT Step 1:  NOTE 1) Problem details of any control rod issues observed during the performance of this surveillance must be recorded on Attachment 3 for further review and possible corrective maintenance. Slow/fast rod movements or settle times should be noted in the remarks section.
:    STEP / STANDARD SAT / UNSAT Step 1:  NOTE 1) Problem details of any control rod issues observed during the performance of this surveillance must be recorded on Attachment 3 for further review and possible corrective maintenance. Slow/fast rod movements or settle times should be noted in the remarks section.
: 2) Section 7.3 is performed for all Partially Withdrawn Control Rods and performance of steps is represented by initialing the appropriate CRD exercised on Attachment 1.
: 2) Section 7.3 is performed for all Partially Withdrawn Control Rods and performance of steps is represented by initialing the appropriate CRD exercised on Attachment 1.
CAUTIONS 1) Any mispositioned control rod events will be dispositioned by following the direction contained within 2
CAUTIONS 1) Any mispositioned control rod events will be dispositioned by following the direction contained within 2
Line 97: Line 93:
CHECK white light on the Full Core Display is ILLUMINATED.
CHECK white light on the Full Core Display is ILLUMINATED.
CHECK Rod Out Permit light is ILLUMINATED.
CHECK Rod Out Permit light is ILLUMINATED.
Standard:
Standard:     Selects a withdrawn control rod Critical Step
Selects a withdrawn control rod Critical Step


SAT UNSAT N/A Note to Examiner:  May select any partially withdrawn control rod in any order
SAT UNSAT N/A Note to Examiner:  May select any partially withdrawn control rod in any order
Line 106: Line 101:
-HS-85-48 in ROD IN andRELEASE.
-HS-85-48 in ROD IN andRELEASE.
   [3.2] OBSERVE control rod settles into the desired position andROD SETTLE light extinguishes.
   [3.2] OBSERVE control rod settles into the desired position andROD SETTLE light extinguishes.
Standard:
Standard:   Inserts withdrawn control rod one notch Critical Step
Inserts withdrawn control rod one notch Critical Step


SAT UNSAT N/A Step 3:     
SAT UNSAT N/A Step 3:     
Line 115: Line 109:


[4.2] OBSERVE control rod settles into the desired position and ROD SETTLE light extinguishes.
[4.2] OBSERVE control rod settles into the desired position and ROD SETTLE light extinguishes.
Standard:
Standard: Withdraws withdrawn control rod one notch Critical Step
Withdraws withdrawn control rod one notch Critical Step


SAT UNSAT N/A  Step 4:     
SAT UNSAT N/A  Step 4:     
Line 124: Line 117:
ENSURE rod inserted and returned to its original position.
ENSURE rod inserted and returned to its original position.
INITIAL Attachment 2 (Control Rod Concurrent Verifier (CV)Check) in the box corresponding to the control rod coordinates forthe rod just exercised.
INITIAL Attachment 2 (Control Rod Concurrent Verifier (CV)Check) in the box corresponding to the control rod coordinates forthe rod just exercised.
SAT UNSAT N/A Job Performance Measure (JPM)  9  STEP / STANDARD SAT / UNSAT Standard:
SAT UNSAT N/A Job Performance Measure (JPM)  9  STEP / STANDARD SAT / UNSAT Standard: Initials Attachment 1 for exercised control rod and continues to exercise rods.
Initials Attachment 1 for exercised control rod and continues to exercise rods.
Note to Examiner:   Perform above actions for @ least two control rods
Note to Examiner:
Perform above actions for @ least two control rods
. When satisfied with the number of rod manipulations direct Simulator Booth Operator to insert trigger #1 for Control Rod 02
. When satisfied with the number of rod manipulations direct Simulator Booth Operator to insert trigger #1 for Control Rod 02
-31 Drift In Note to Simulator Booth Operator:
-31 Drift In Note to Simulator Booth Operator:
Line 138: Line 129:
CONTINUOUS IN. (Otherwise N/A)
CONTINUOUS IN. (Otherwise N/A)
  [3] IF a Control Rod Block occurs during rod insertion due to Rod Worth Minimizer, THEN BYPASS the RWM per step 4.2[1] above. (Otherwise N/A)
  [3] IF a Control Rod Block occurs during rod insertion due to Rod Worth Minimizer, THEN BYPASS the RWM per step 4.2[1] above. (Otherwise N/A)
Standard:
Standard: Responds per 2-AOI-85-5 and inserts control rod 02
Responds per 2-AOI-85-5 and inserts control rod 02
-31 to full in position as indicated by position 00 indication.
-31 to full in position as indicated by position 00 indication.
Critical Step SAT UNSAT N/A  CUE: When report to US, state "Respond per 2
Critical Step SAT UNSAT N/A  CUE: When report to US, state "Respond per 2
-AOI-85-5, Control Rod Drift In.
-AOI-85-5 , Control Rod Drift In.
Step 6:     
Step 6:     
[4] NOTIFY the Reactor Engineer to Evaluate Core Thermal Limits and Preconditioning Limits for the current Control Rod pattern. Standard:
[4] NOTIFY the Reactor Engineer to Evaluate Core Thermal Limits and Preconditioning Limits for the current Control Rod pattern. Standard: Candidate notifies Reactor Engineer to Evaluate Core Thermal limits and Preconditioning Limits for the current Control Rod Pattern SAT UNSAT N/A  Cue: Understand Reactor Engineering notified to evaluate Core Thermal andPreconditioning Limits
Candidate notifies Reactor Engineer to Evaluate Core Thermal limits and Preconditioning Limits for the current Control Rod Pattern SAT UNSAT N/A  Cue: Understand Reactor Engineering notified to evaluate Core Thermal andPreconditioning Limits


Job Performance Measure (JPM)  10  STEP / STANDARD SAT / UNSAT Step 7:    [5] IF another Control Rod Drift occurs before Reactor Engineering completes the evaluation,  
Job Performance Measure (JPM)  10  STEP / STANDARD SAT / UNSAT Step 7:    [5] IF another Control Rod Drift occurs before Reactor Engineering completes the evaluation, THEN MANUALLY SCRAM Reactor and enter 2
 
THEN MANUALLY SCRAM Reactor and enter 2
-AOI-100-1.   
-AOI-100-1.   
[6] CHECK Thermal Limits on ICS (RUNMON).
[6] CHECK Thermal Limits on ICS (RUNMON).
Note to NRC Examiner:
Note to NRC Examiner:
Step [6] performed by Reactor Engineer"ing.
Step [6] performed by Reactor Engineer"ing.
Standard:
Standard: Reviews step and asks for guidance from US or RE SAT  UNSAT  N/A CUE: As Shift Manager, state "RE has evaluated Core Thermal and Preconditioning Limits and has determined that the Control Rod Exercise may continue and that any other Control Rod Drift will be considered the first.
Reviews step and asks for guidance from US or RE SAT  UNSAT  N/A CUE: As Shift Manager, state "RE has evaluated Core Thermal and Preconditioning Limits and has determined that the Control Rod Exercise may continue and that any other Control Rod Drift will be considered the first.
Student will continue with Control Rod Exercise.
Student will continue with Control Rod Exercise.
Step 8:
Step 8:
Line 166: Line 152:
CHECK white light on the Full Core Display is ILLUMINATED.
CHECK white light on the Full Core Display is ILLUMINATED.
CHECK Rod Out Permit light is ILLUMINATED.
CHECK Rod Out Permit light is ILLUMINATED.
Standard:
Standard:     Selects a withdrawn control rod Critical Step SAT  UNSAT  N/A Job Performance Measure (JPM)  11  STEP / STANDARD SAT / UNSAT Step 9:  [3] INSERT control rod one notch by performing the following:
Selects a withdrawn control rod Critical Step SAT  UNSAT  N/A Job Performance Measure (JPM)  11  STEP / STANDARD SAT / UNSAT Step 9:  [3] INSERT control rod one notch by performing the following:
   [3.1] PLACE CRD CONTROL SWITCH, 2
   [3.1] PLACE CRD CONTROL SWITCH, 2
-HS-85-48 in ROD IN andRELEASE.
-HS-85-48 in ROD IN andRELEASE.
   [3.2] OBSERVE control rod settles into the desired position andROD SETTLE light extinguishes.
   [3.2] OBSERVE control rod settles into the desired position andROD SETTLE light extinguishes.
Standard:
Standard:   Inserts withdrawn control rod one notch Critical Step
Inserts withdrawn control rod one notch Critical Step


SAT UNSAT N/A Step 10:     
SAT UNSAT N/A Step 10:     
Line 179: Line 163:
-HS-85-48 in ROD OUT NOTCHand RELEASE.   
-HS-85-48 in ROD OUT NOTCHand RELEASE.   
[4.2] OBSERVE control rod settles into the desired position and ROD SETTLE light extinguishes.
[4.2] OBSERVE control rod settles into the desired position and ROD SETTLE light extinguishes.
Standard:
Standard: Withdraws withdrawn control rod one notch Critical Step
Withdraws withdrawn control rod one notch Critical Step
 
SAT UNSAT N/A  Note to Examiner:
When satisfied with the number of rod manipulations direct Simulator Booth Operator to insert trigger #2 for Multiple Control Rods Drifting In Step 11:    Multiple Control Rods Drifting In Standard:


SAT UNSAT N/A  Note to Examiner:  When satisfied with the number of rod manipulations direct Simulator Booth Operator to insert trigger #2 for Multiple Control Rods Drifting In Step 11:    Multiple Control Rods Drifting In Standard:
Recognizes Multiple Control Rods Drift into the Core and Manually Scrams the Reactor per 2-AOI-85-5. Depresses both SCRAM Pushbuttons Places mode switch in shutdown Verifies All Rods in
Recognizes Multiple Control Rods Drift into the Core and Manually Scrams the Reactor per 2-AOI-85-5. Depresses both SCRAM Pushbuttons Places mode switch in shutdown Verifies All Rods in


Line 201: Line 182:
Job Performance Measure (JPM)  13  Provide to Applicant
Job Performance Measure (JPM)  13  Provide to Applicant
   ****************************************************************************************************
   ****************************************************************************************************
***  IN-SIMULATOR:  I will explain the initial conditions and state the task to be performed. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's Correct".  (OR "That's Incorrect", if applicable). When you have completed your assigned task, you will say, "my task is complete" and I will acknowledge that your task is complete.
***  IN-SIMULATOR:  I will explain the initial conditions and state the task to be performed. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's Correct".  (OR "That's Incorrect", if applicable). When you have completed your assigned task, you will say, "my task is complete" and I will acknowledge that your task is complete.
 
*******************************************************************************************************
*******************************************************************************************************


Line 216: Line 196:
Job Performance Measure (JPM)  1  SITE: BFN JPM TITLE:
Job Performance Measure (JPM)  1  SITE: BFN JPM TITLE:
RESPOND TO A CONTROL ROD DRIFT IN JPM NUMBER:
RESPOND TO A CONTROL ROD DRIFT IN JPM NUMBER:
80A U3 REVISION:
80 A U 3 REVISION: 1  TASK APPLICABILITY:
1  TASK APPLICABILITY:
SRO STA UO NAUO TASK NUMBER / TASK TITLE(S):
SRO STA UO NAUO TASK NUMBER / TASK TITLE(S):
U-085-AB-05/ Respond to a Control Rod Drift In K/A RATINGS:
U-085-AB-05/ Respond to a Control Rod Drift In K/A RATINGS:
Line 224: Line 203:
Risk Significant SAFETY FUNCTION:
Risk Significant SAFETY FUNCTION:
1  EVALUATION LOCATION:
1  EVALUATION LOCATION:
In-Plant  Simulator Control Room Lab  Other - List  APPLICABLE METHOD OF TESTING:  Discussion  Simulate/Walkthrough  Perform TIME FOR COMPLETION:      NA      TIME CRITICAL (Y/N)      ALTERNATE PATH (Y/N)
In-Plant  Simulator Control R oom Lab  Other - List  APPLICABLE METHOD OF TESTING:  Discussion  Simulate/Walkthrough  Perform   TIME FOR COMPLETION:      NA      TIME CRITICAL (Y/N)      ALTERNATE PATH (Y/N)
Developed by:
Developed by:
Developer Date  (Ensure validator is briefed on exam security per NPG
Developer Date  (Ensure validator is briefed on exam security per NPG
-SPP-17.8.1)                (See JPM Validation Checklist in NPG
-SPP-17.8.1)                (See JPM Validation Checklist in NPG
-SPP-17.8.2)      Validated by:
-SPP-17.8.2)      Validated by:
Approved by:
Approved by:
Validator Date  Approved by:
Validator   Date  Approved by:
Site Training Management Date  Site Training Program Owner Date      N Y Job Performance Measure (JPM)  2  OPERATOR:  ________________________________
Site Training Management Date  Site Training Program Owner Date      N Y Job Performance Measure (JPM)  2  OPERATOR:  ________________________________
JPM Number:  _80A U3_  RO  SRO  DATE: _______
JPM Number:  _80A U3_  RO  SRO  DATE: _______
Line 241: Line 220:
OF-2 Controlling plant evolutions precisely.
OF-2 Controlling plant evolutions precisely.
PRA: NA REFERENCES/PROCEDURES NEEDED:
PRA: NA REFERENCES/PROCEDURES NEEDED:
3-AOI-85-5, 3-AOI-100-1  VALIDATIONTIME:      PERFORMANCE TIME:
3-AOI-85-5 , 3-AOI-100-1  VALIDATIONTIME:      PERFORMANCE TIME:
COMMENTS:  
COMMENTS:  


Line 258: Line 237:
Job Performance Measure (JPM)  4  SIMULATOR SETUP IC 28 Exam IC 280    Console Operator Instructions Reset IC 28 or Exam IC if written in above Run schedule file: NRC JPM A U3  
Job Performance Measure (JPM)  4  SIMULATOR SETUP IC 28 Exam IC 280    Console Operator Instructions Reset IC 28 or Exam IC if written in above Run schedule file: NRC JPM A U3  
-Control Rod Drift In Verify all triggers and overrides are correct Place the simulator in RUN to ensure stable conditions Start Rod Display on RWM Screen Provide Initial Rod Data Sheet  
-Control Rod Drift In Verify all triggers and overrides are correct Place the simulator in RUN to ensure stable conditions Start Rod Display on RWM Screen Provide Initial Rod Data Sheet  
-PRLOG  When prompted by the examiner, INSERT  
-PRLOG  When prompted by the examiner, INSERT -  Event 1 to Drift Control Rod 02
-  Event 1 to Drift Control Rod 02
-31 into the core When prompted by the examiner, INSERT -  Event 2 to Drift Control Rod Multiple Control Rods into the core Malfunctions Description Event Severity Delay Initial set rd07r0231 Drifts rod 02
-31 into the core When prompted by the examiner, INSERT  
-  Event 2 to Drift Control Rod Multiple Control Rods into the core Malfunctions Description Event Severity Delay Initial set rd07r0231 Drifts rod 02
-31 into core 1 NA 35 sec NA rd07r2223 Drifts rod 22
-31 into core 1 NA 35 sec NA rd07r2223 Drifts rod 22
-23 into core 2 NA 10 sec NA rd07r3031 Drifts rod 30
-23 into core 2 NA 10 sec NA rd07r 303 1 Drifts rod 30
-31 into core 2 NA 25 sec NA rd07r4635 Drifts rod 46
-31 into core 2 NA 25 sec NA rd07r4635 Drifts rod 46
-35  into core 2 NA 20 sec NA rd07r2619 Drifts rod 26
-35  into core 2 NA 20 sec NA rd07r2619 Drifts rod 26
Line 280: Line 257:
:  The Unit Supervisor directs you to perform Surveillance 3.1.3.3 step 7.3, Control Rod Exercise Test for Withdrawn Control Rods, for partially withdrawn control rods.
:  The Unit Supervisor directs you to perform Surveillance 3.1.3.3 step 7.3, Control Rod Exercise Test for Withdrawn Control Rods, for partially withdrawn control rods.


Job Performance Measure (JPM)  7  START TIME
Job Performance Measure (JPM)  7  START TIME:    STEP / STANDARD SAT / UNSAT Step 1:  NOTE 1) Problem details of any control rod issues observed during the performance of this surveillance must be recorded on Attachment 3 for further review and possible corrective maintenance. Slow/fast rod movements or settle times should be noted in the remarks section.
:    STEP / STANDARD SAT / UNSAT Step 1:  NOTE 1) Problem details of any control rod issues observed during the performance of this surveillance must be recorded on Attachment 3 for further review and possible corrective maintenance. Slow/fast rod movements or settle times should be noted in the remarks section.
: 2) Section 7.3 is performed for all Partially Withdrawn Control Rods and performance of steps is represented by initialing the appropriate CRD exercised on Attachment 1.
: 2) Section 7.3 is performed for all Partially Withdrawn Control Rods and performance of steps is represented by initialing the appropriate CRD exercised on Attachment 1.
CAUTIONS 3) Any mispositioned control rod events will be dispositioned by following the direction contained within 3-AOI-85-7.   
CAUTIONS 3) Any mispositioned control rod events will be dispositioned by following the direction contained within 3-AOI-85-7.   
Line 294: Line 270:
CHECK white light on the Full Core Display is ILLUMINATED.
CHECK white light on the Full Core Display is ILLUMINATED.
CHECK Rod Out Permit light is ILLUMINATED.
CHECK Rod Out Permit light is ILLUMINATED.
Standard:
Standard:     Selects a withdrawn control rod Critical Step
Selects a withdrawn control rod Critical Step


SAT UNSAT N/A Note to Examiner:  May select any partially withdrawn control rod in any order
SAT UNSAT N/A Note to Examiner:  May select any partially withdrawn control rod in any order
Line 301: Line 276:
Job Performance Measure (JPM)  8  STEP / STANDARD SAT / UNSAT Step 2:  [3] INSERT control rod one notch by performing the following:
Job Performance Measure (JPM)  8  STEP / STANDARD SAT / UNSAT Step 2:  [3] INSERT control rod one notch by performing the following:
   [3.1] PLACE CRD CONTROL SWITCH, 3-HS-85-48 in ROD IN andRELEASE.  [3.2] OBSERVE control rod settles into the desired position andROD SETTLE light extinguishes.
   [3.1] PLACE CRD CONTROL SWITCH, 3-HS-85-48 in ROD IN andRELEASE.  [3.2] OBSERVE control rod settles into the desired position andROD SETTLE light extinguishes.
Standard:
Standard:   Inserts withdrawn control rod one notch Critical Step
Inserts withdrawn control rod one notch Critical Step


SAT UNSAT N/A Step 3:     
SAT UNSAT N/A Step 3:     
Line 308: Line 282:
  [4.1] PLACE CRD CONTROL SWITCH, 3-HS-85-48 in ROD OUT NOTCHand RELEASE.   
  [4.1] PLACE CRD CONTROL SWITCH, 3-HS-85-48 in ROD OUT NOTCHand RELEASE.   
[4.2] OBSERVE control rod settles into the desired position and ROD SETTLE light extinguishes.
[4.2] OBSERVE control rod settles into the desired position and ROD SETTLE light extinguishes.
Standard:
Standard: Withdraws withdrawn control rod one notch Critical Step
Withdraws withdrawn control rod one notch Critical Step


SAT UNSAT N/A  Step 4:     
SAT UNSAT N/A  Step 4:     
Line 317: Line 290:
ENSURE rod inserted and returned to its original position.
ENSURE rod inserted and returned to its original position.
INITIAL Attachment 2 (Control Rod Concurrent Verifier (CV)Check) in the box corresponding to the control rod coordinates forthe rod just exercised.
INITIAL Attachment 2 (Control Rod Concurrent Verifier (CV)Check) in the box corresponding to the control rod coordinates forthe rod just exercised.
SAT  UNSAT N/A Job Performance Measure (JPM)  9  STEP / STANDARD SAT / UNSAT Standard:
SAT  UNSAT N/A Job Performance Measure (JPM)  9  STEP / STANDARD SAT / UNSAT Standard:   Initials Attachment 1 for exercised control rod and continues to exercise rods.
Initials Attachment 1 for exercised control rod and continues to exercise rods.
Note to Examiner:   Perform above actions for @ least two control rods
Note to Examiner:
Perform above actions for @ least two control rods
. When satisfied with the number of rod manipulations direct Simulator Booth Operator to insert trigger #1 for Control Rod 02
. When satisfied with the number of rod manipulations direct Simulator Booth Operator to insert trigger #1 for Control Rod 02
-31 Drift In Note to Simulator Booth Operator:
-31 Drift In Note to Simulator Booth Operator:
Line 331: Line 302:
CONTINUOUS IN. (Otherwise N/A)
CONTINUOUS IN. (Otherwise N/A)
  [3] IF a Control Rod Block occurs during rod insertion due to Rod Worth Minimizer, THEN BYPASS the RWM per step 4.2[1] above. (Otherwise N/A)
  [3] IF a Control Rod Block occurs during rod insertion due to Rod Worth Minimizer, THEN BYPASS the RWM per step 4.2[1] above. (Otherwise N/A)
Standard:
Standard:   Responds per 3-AOI-85-5 and inserts control rod 02
Responds per 3-AOI-85-5 and inserts control rod 02
-31 to full in position as indicated by position 00 indication. Critical Step
-31 to full in position as indicated by position 00 indication. Critical Step


SAT UNSAT N/A  CUE: When report to US, state "Respond per 3-AOI-85-5, Control Rod Drift In.
SAT UNSAT N/A  CUE: When report to US, state "Respond per 3-AOI-85-5, Control Rod Drift In.
Step 6:     
Step 6:     
[4] NOTIFY the Reactor Engineer to Evaluate Core Thermal Limits and Preconditioning Limits for the current Control Rod pattern. Standard:
[4] NOTIFY the Reactor Engineer to Evaluate Core Thermal Limits and Preconditioning Limits for the current Control Rod pattern. Standard: Candidate notifies Reactor Engineer to Evaluate Core Thermal limits and Preconditioning Limits for the current Control Rod Pattern SAT UNSAT N/A  Cue: Understand Reactor Engineering notified to evaluate Core Thermal andPreconditioning Limits
Candidate notifies Reactor Engineer to Evaluate Core Thermal limits and Preconditioning Limits for the current Control Rod Pattern SAT UNSAT N/A  Cue: Understand Reactor Engineering notified to evaluate Core Thermal andPreconditioning Limits


Job Performance Measure (JPM)  10  STEP / STANDARD SAT / UNSAT Step 7:    [5] IF another Control Rod Drift occurs before Reactor Engineering completes the evaluation,  
Job Performance Measure (JPM)  10  STEP / STANDARD SAT / UNSAT Step 7:    [5] IF another Control Rod Drift occurs before Reactor Engineering completes the evaluation, THEN MANUALLY SCRAM Reactor and enter 2
 
THEN MANUALLY SCRAM Reactor and enter 2
-AOI-100-1.   
-AOI-100-1.   
[6] CHECK Thermal Limits on ICS (RUNMON).
[6] CHECK Thermal Limits on ICS (RUNMON).
Note to NRC Examiner:
Note to NRC Examiner:
Step [6] performed by Reactor Engineer"ing.
Step [6] performed by Reactor Engineer"ing.
Standard:
Standard: Reviews step and asks for guidance from US or RE SAT  UNSAT  N/A CUE: As Shift Manager, state "RE has evaluated Core Thermal and Preconditioning Limits and has determined that the Control Rod Exercise may continue and that any other Control Rod Drift will be considered the first.
Reviews step and asks for guidance from US or RE SAT  UNSAT  N/A CUE: As Shift Manager, state "RE has evaluated Core Thermal and Preconditioning Limits and has determined that the Control Rod Exercise may continue and that any other Control Rod Drift will be considered the first.
Student will continue with Control Rod Exercise.
Student will continue with Control Rod Exercise.
Step 8:
Step 8:
Line 358: Line 324:
CHECK CRD ROD SELECT pushbutton is brightly ILLUMINATED.
CHECK CRD ROD SELECT pushbutton is brightly ILLUMINATED.
CHECK white light on the Full Core Display is ILLUMINATED.
CHECK white light on the Full Core Display is ILLUMINATED.
CHECK Rod Out Permit light is ILLUMINATED. Standard:
CHECK Rod Out Permit light is ILLUMINATED. Standard:     Selects a withdrawn control rod Critical Step SAT  UNSAT  N/A Job Performance Measure (JPM)  11  STEP / STANDARD SAT / UNSAT Step 9:  [3] INSERT control rod one notch by performing the following:
Selects a withdrawn control rod Critical Step SAT  UNSAT  N/A Job Performance Measure (JPM)  11  STEP / STANDARD SAT / UNSAT Step 9:  [3] INSERT control rod one notch by performing the following:
   [3.1] PLACE CRD CONTROL SWITCH, 2
   [3.1] PLACE CRD CONTROL SWITCH, 2
-HS-85-48 in ROD IN andRELEASE.
-HS-85-48 in ROD IN andRELEASE.
   [3.2] OBSERVE control rod settles into the desired position andROD SETTLE light extinguishes.
   [3.2] OBSERVE control rod settles into the desired position andROD SETTLE light extinguishes.
Standard:
Standard:   Inserts withdrawn control rod one notch Critical Step
Inserts withdrawn control rod one notch Critical Step


SAT UNSAT N/A Step 10:     
SAT UNSAT N/A Step 10:     
Line 372: Line 336:


[4.2] OBSERVE control rod settles into the desired position and ROD SETTLE light extinguishes.
[4.2] OBSERVE control rod settles into the desired position and ROD SETTLE light extinguishes.
Standard:
Standard: Withdraws withdrawn control rod one notch Critical Step
Withdraws withdrawn control rod one notch Critical Step
 
SAT UNSAT N/A  Note to Examiner:
When satisfied with the number of rod manipulations direct Simulator BoothOperator to insert trigger #2 for Multiple Control Rods Drifting In Step 11:    Multiple Control Rods Drifting In Standard:


SAT UNSAT N/A  Note to Examiner:  When satisfied with the number of rod manipulations direct Simulator BoothOperator to insert trigger #2 for Multiple Control Rods Drifting In Step 11:    Multiple Control Rods Drifting In Standard:
Recognizes Multiple Control Rods Drift into the Core and Manually Scrams the Reactor per 3
Recognizes Multiple Control Rods Drift into the Core and Manually Scrams the Reactor per 3
-AOI-85-5. Depresses both SCRAM Pushbuttons Places mode switch in shutdown Verifies All Rods in Critical Step
-AOI-85-5. Depresses both SCRAM Pushbuttons Places mode switch in shutdown Verifies All Rods in Critical Step
Line 397: Line 358:
*******************************************************************************************************
*******************************************************************************************************


INITIAL CONDITIONS:  
INITIAL CONDITIONS:
 
You are an Operator on Unit  
You are an Operator on Unit  
: 3. The Reactor is at 100% power
: 3. The Reactor is at 100% power
Line 407: Line 367:
Job Performance Measure (JPM)  1  SITE: BFN JPM TITLE:
Job Performance Measure (JPM)  1  SITE: BFN JPM TITLE:
EHC Auto Cooldown JPM NUMBER:
EHC Auto Cooldown JPM NUMBER:
276 U2 REVISION:
276 U2 REVISION: 1  TASK APPLICABILITY:
1  TASK APPLICABILITY:
SRO STA UO NAUO TASK NUMBER / TASK TITLE(S):
SRO STA UO NAUO TASK NUMBER / TASK TITLE(S):
U-000-NO-32 Perform Reactor Cooldown U-000-NO-34 Perform a Reactor Cooldown from Hot Standby Conditions K/A RATINGS:
U-000-NO-32 Perform Reactor Cooldown U-000-NO-34 Perform a Reactor Cooldown from Hot Standby Conditions K/A RATINGS:
Line 415: Line 374:
Risk Significant SAFETY FUNCTION:
Risk Significant SAFETY FUNCTION:
4  EVALUATION LOCATION:
4  EVALUATION LOCATION:
In-Plant  Simulator Control Room Lab  Other - List  APPLICABLE METHOD OF TESTING:  Discussion  Simulate/Walkthrough  Perform TIME FOR COMPLETION:      NA      TIME CRITICAL (Y/N)      ALTERNATE PATH (Y/N)
In-Plant  Simulator Control R oom Lab  Other - List  APPLICABLE METHOD OF TESTING:  Discussion  Simulate/Walkthrough  Perform   TIME FOR COMPLETION:      NA      TIME CRITICAL (Y/N)      ALTERNATE PATH (Y/N)
Developed by:
Developed by:
Developer Date  (Ensure validator is briefed on exam security per NPG
Developer Date  (Ensure validator is briefed on exam security per NPG
-SPP-17.8.1)                (See JPM Validation Checklist in NPG
-SPP-17.8.1)                (See JPM Validation Checklist in NPG
-SPP-17.8.2)      Validated by:
-SPP-17.8.2)      Validated by:
Approved by:
Approved by:
Validator Date  Approved by:
Validator   Date  Approved by:
Site Training Management Date  Site Training Program Owner Date      N N Job Performance Measure (JPM)  2  OPERATOR:  ________________________________
Site Training Management Date  Site Training Program Owner Date      N N Job Performance Measure (JPM)  2  OPERATOR:  ________________________________
JPM Number:  _276 U2  RO  SRO  DATE: _______
JPM Number:  _276 U2  RO  SRO  DATE: _______
Line 445: Line 404:
SIGNATURE: ___________________________
SIGNATURE: ___________________________
DATE: __________
DATE: __________
EXAMINER Job Performance Measure (JPM)  3  Revision Summary Rev No. Effective Date Pages Affected Description 0 06/19/12 All Initial issue 1 07/22/15 All General revision & re
EXAMINER Job Performance Measure (JPM)  3  Revision Summary Rev No. Effective Date Pages Affected Description 0 06/1 9/12 All Initial issue 1 07/22/15 All General revision & re
-format Job Performance Measure (JPM)  4  SIMULATOR SETUP IC 40 Exam IC 281    Console Operator Instructions Reset IC 40 or Exam IC if written in above Ensure RFP is in Manual on PDS controller with plant parameters stable.      Malfunctions Description Event Severity Delay Initial set            Remotes Description Event Severity Delay Initial set            Overrides Description Event Severity Delay Initial set Schedule File(s):
-format Job Performance Measure (JPM)  4  SIMULATOR SETUP IC 40 Exam IC 281    Console Operator Instructions Reset IC 40 or Exam IC if written in above Ensure RFP is in Manual on PDS controller with plant parameters stable.      Malfunctions Description Event Severity Delay Initial set            Remotes Description Event Severity Delay Initial set            Overrides Description Event Severity Delay Initial set Schedule File(s): None   
None   


Job Performance Measure (JPM)  5  IN-SIMULATOR:  I will explain the initial conditions and state the task to be performed. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's Correct".  (OR "That's Incorrect", if applicable). When you have completed your assigned task, you will say, "my task is complete" and I will acknowledge that your task is complete.
Job Performance Measure (JPM)  5  IN-SIMULATOR:  I will explain the initial conditions and state the task to be performed. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's Correct".  (OR "That's Incorrect", if applicable). When you have completed your assigned task, you will say, "my task is complete" and I will acknowledge that your task is complete.
Line 461: Line 419:
-Generator System, Section 8.1.2, starting at step [6].
-Generator System, Section 8.1.2, starting at step [6].


Job Performance Measure (JPM)  6  START TIME
Job Performance Measure (JPM)  6  START TIME:    STEP / STANDARD SAT / UNSAT Step 1:    [6] VERIFY EHC is in Pressure Control using 2-HS-47-204. Standard:
:    STEP / STANDARD SAT / UNSAT Step 1:    [6] VERIFY EHC is in Pressure Control using 2-HS-47-204. Standard:
 
Observes light on for EHC Pressure Control on 2
Observes light on for EHC Pressure Control on 2
-HS-47-204. SAT UNSAT N/A Step 2:   
-HS-47-204. SAT UNSAT N/A Step 2:   
[7] On the EHC Work Station on Panel 9
[7] On the EHC Work Station on Panel 9
-7:  [7.1]    SELECT Main Menu from the toolbar at bottom of the screen.  [7.2]    SELECT Log In on Display Screen and ENTER "OPS"  for name and "OPS" for Password.  
-7:  [7.1]    SELECT Main Menu from the toolbar at bottom of the screen.  [7.2]    SELECT Log In on Display Screen and ENTER "OPS"  for name and "OPS" for Password.  
   [7.3]    SELECT Auto Cooldown from list of function on the screen. Standard:
   [7.3]    SELECT Auto Cooldown from list of function on the screen. Standard: Candidate logs into EHC workstation and selects Auto Cooldown from the list of functions on the screen. Critical Step SAT  UNSAT  N/A Step 3:     
Candidate logs into EHC workstation and selects Auto Cooldown from the list of functions on the screen. Critical Step SAT  UNSAT  N/A Step 3:     
[8] On the Auto Cooldown Display Screen
[8] On the Auto Cooldown Display Screen


Line 477: Line 432:
Rx Press Ctrl  
Rx Press Ctrl  
- indicates Reset.
- indicates Reset.
Standard:
Standard:   Candidate checks the Turbine Tripped or All Valves Closed  
Candidate checks the Turbine Tripped or All Valves Closed  


-indicates Reset.
-indicates Reset.
Line 484: Line 438:
- indicates Reset.
- indicates Reset.
SAT  UNSAT  N/A Job Performance Measure (JPM)  7  STEP / STANDARD SAT / UNSAT Step 4:    [9] On the Auto Cooldown Screen SET the desired Final Pressure for cooldown as follows:
SAT  UNSAT  N/A Job Performance Measure (JPM)  7  STEP / STANDARD SAT / UNSAT Step 4:    [9] On the Auto Cooldown Screen SET the desired Final Pressure for cooldown as follows:
   [9.1] SELECT the block above the "FINAL PRESSURE TARGET".  
   [9.1] SELECT the block above the "FINAL PRESSURE TARGET".  [9.2] ENTER the desired pressure using the Display Screen or Key Board.  
   [9.2] ENTER the desired pressure using the Display Screen or Key Board.  


[9.3] WHEN desired Pressure is entered SELECT "OK"  Standard:
[9.3] WHEN desired Pressure is entered SELECT "OK"  Standard: Candidate sets the desired final target pressure of 20psig (given in initial conditions).
Candidate sets the desired final target pressure of 20psig (given in initial conditions).
Critical Step SAT  UNSAT  N/A  Step 5:    [10] WHEN Cooldown is ready to commence, THEN   
Critical Step SAT  UNSAT  N/A  Step 5:    [10] WHEN Cooldown is ready to commence, THEN   
[10.1] VERIFY Reactor Pressure is stable and being controlled by EHC Pressure Control with at least one Bypass Valve opened. (Adjust setpoint as necessary)  
[10.1] VERIFY Reactor Pressure is stable and being controlled by EHC Pressure Control with at least one Bypass Valve opened. (Adjust setpoint as necessary)  
   [10.2] DEPRESS the "START" button on the Auto Cooldown Display Screen.
   [10.2] DEPRESS the "START" button on the Auto Cooldown Display Screen.
   [11] WHEN Caution "Are You Sure You Want to Initiate Auto Cooldown?" appears SELECT "Yes" Screen Button to start the cooldown.
   [11] WHEN Caution "Are You Sure You Want to Initiate Auto Cooldown?" appears SELECT "Yes" Screen Button to start the cooldown.
Standard:
Standard: Candidate depresses START and acknowledges "YES' to commence auto cooldown.
Candidate depresses START and acknowledges "YES' to commence auto cooldown.
Critical Step SAT  UNSAT  N/A Job Performance Measure (JPM)  8  STEP / STANDARD SAT / UNSAT Step 6:    [12] CHECK the following:
Critical Step SAT  UNSAT  N/A Job Performance Measure (JPM)  8  STEP / STANDARD SAT / UNSAT Step 6:    [12] CHECK the following:
EHC PRESSURE SETPOINT, 2
EHC PRESSURE SETPOINT, 2
-PI-47-162, is lowering.
-PI-47-162, is lowering.
EHC AUTO COOLDOWN displays "IN PROGRESS" Standard:
EHC AUTO COOLDOWN displays "IN PROGRESS" Standard: Candidate monitors EHC pressure and the auto cooldown is "IN PROGRESS".  
Candidate monitors EHC pressure and the auto cooldown is "IN PROGRESS".  


SAT  UNSAT  N/A Cue: The Unit Supervisor directs you to adjust the Final Pressure Target to 100 psig. Step 7:   
SAT  UNSAT  N/A Cue: The Unit Supervisor directs you to adjust the Final Pressure Target to 100 psig. Step 7:   
Line 505: Line 455:


[13.1] SELECT the block above the "FINAL PRESSURE TARGET"  [13.2] ENTER the desired pressure using the Display Screen or Key Board.  
[13.1] SELECT the block above the "FINAL PRESSURE TARGET"  [13.2] ENTER the desired pressure using the Display Screen or Key Board.  
   [13.3] WHEN desired Pressure is entered SELECT "OK"  Standard:
   [13.3] WHEN desired Pressure is entered SELECT "OK"  Standard: Candidate adjusts "FINAL PRESSURE TARGET" to 100 psig and recommences the auto cooldown.
Candidate adjusts "FINAL PRESSURE TARGET" to 100 psig and recommences the auto cooldown.
Critical Step SAT  UNSAT  N/A Evaluator Cue: Another operator will continue to monitor the cooldown. This completes your task.
Critical Step SAT  UNSAT  N/A Evaluator Cue: Another operator will continue to monitor the cooldown. This completes your task.
STOP TIME:       
STOP TIME:       
Line 529: Line 478:
Job Performance Measure (JPM)  1  SITE: BFN JPM TITLE:
Job Performance Measure (JPM)  1  SITE: BFN JPM TITLE:
EHC Auto Cooldown JPM NUMBER:
EHC Auto Cooldown JPM NUMBER:
276 U3 REVISION:
276 U 3 REVISION: 1  TASK APPLICABILITY:
1  TASK APPLICABILITY:
SRO STA UO NAUO TASK NUMBER / TASK TITLE(S):
SRO STA UO NAUO TASK NUMBER / TASK TITLE(S):
U-000-NO-32 Perform Reactor Cooldown U-000-NO-34 Perform a Reactor Cooldown from Hot Standby Conditions K/A RATINGS:
U-000-NO-32 Perform Reactor Cooldown U-000-NO-34 Perform a Reactor Cooldown from Hot Standby Conditions K/A RATINGS:
Line 537: Line 485:
Risk Significant SAFETY FUNCTION:
Risk Significant SAFETY FUNCTION:
4  EVALUATION LOCATION:
4  EVALUATION LOCATION:
In-Plant  Simulator Control Room Lab  Other - List  APPLICABLE METHOD OF TESTING:  Discussion  Simulate/Walkthrough  Perform TIME FOR COMPLETION:      NA      TIME CRITICAL (Y/N)      ALTERNATE PATH (Y/N)
In-Plant  Simulator Control R oom Lab  Other - List  APPLICABLE METHOD OF TESTING:  Discussion  Simulate/Walkthrough  Perform   TIME FOR COMPLETION:      NA      TIME CRITICAL (Y/N)      ALTERNATE PATH (Y/N)
Developed by:
Developed by:
Developer Date  (Ensure validator is briefed on exam security per NPG
Developer Date  (Ensure validator is briefed on exam security per NPG
-SPP-17.8.1)                (See JPM Validation Checklist in NPG
-SPP-17.8.1)                (See JPM Validation Checklist in NPG
-SPP-17.8.2)      Validated by:
-SPP-17.8.2)      Validated by:
Approved by:
Approved by:
Validator Date  Approved by:
Validator   Date  Approved by:
Site Training Management Date  Site Training Program Owner Date      N N Job Performance Measure (JPM)  2  OPERATOR:  ________________________________
Site Training Management Date  Site Training Program Owner Date      N N Job Performance Measure (JPM)  2  OPERATOR:  ________________________________
JPM Number:  _276 U3_  RO  SRO  DATE: _______
JPM Number:  _276 U3_  RO  SRO  DATE: _______
Line 567: Line 515:
SIGNATURE: ___________________________
SIGNATURE: ___________________________
DATE: __________
DATE: __________
EXAMINER Job Performance Measure (JPM)  3  Revision Summary Rev No. Effective Date Pages Affected Description 0 06/19/12 All Initial issue 1 07/22/15 All General revision & re
EXAMINER Job Performance Measure (JPM)  3  Revision Summary Rev No. Effective Date Pages Affected Description 0 06/1 9/12 All Initial issue 1 07/22/15 All General revision & re
-format Job Performance Measure (JPM)  4  SIMULATOR SETUP IC 40 Exam IC 281    Console Operator Instructions Reset IC 40 or Exam IC if written in above Ensure RFP is in Manual on PDS controller with plant parameters stable.      Malfunctions Description Event Severity Delay Initial set            Remotes Description Event Severity Delay Initial set            Overrides Description Event Severity Delay Initial set Schedule File(s):
-format Job Performance Measure (JPM)  4  SIMULATOR SETUP IC 40 Exam IC 281    Console Operator Instructions Reset IC 40 or Exam IC if written in above Ensure RFP is in Manual on PDS controller with plant parameters stable.      Malfunctions Description Event Severity Delay Initial set            Remotes Description Event Severity Delay Initial set            Overrides Description Event Severity Delay Initial set Schedule File(s): None   
None   


Job Performance Measure (JPM)  5  IN-SIMULATOR:  I will explain the initial conditions and state the task to be performed. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's Correct".  (OR "That's Incorrect", if applicable). When you have completed your assigned task, you will say, "my task is complete" and I will acknowledge that your task is complete.
Job Performance Measure (JPM)  5  IN-SIMULATOR:  I will explain the initial conditions and state the task to be performed. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's Correct".  (OR "That's Incorrect", if applicable). When you have completed your assigned task, you will say, "my task is complete" and I will acknowledge that your task is complete.
Line 575: Line 522:
INITIAL CONDITIONS:  
INITIAL CONDITIONS:  


You are an Operator on Unit 3
You are an Operator on Unit 3. The Plant has been shutdown in preparation for a refueling outage. The Main Turbine is tripped. Reactor Water Level is stable and under control. Reactor Pressure is stable and being controlled by bypass valves.
. The Plant has been shutdown in preparation for a refueling outage. The Main Turbine is tripped. Reactor Water Level is stable and under control. Reactor Pressure is stable and being controlled by bypass valves.
INITIATING CUES
INITIATING CUES
:
:
Line 582: Line 528:
-Generator System, Section 8.1.2, starting at step [6].
-Generator System, Section 8.1.2, starting at step [6].


Job Performance Measure (JPM)  6  START TIME
Job Performance Measure (JPM)  6  START TIME:    STEP / STANDARD SAT / UNSAT Step 1:    [6] VERIFY EHC is in Pressure Control using 3
:    STEP / STANDARD SAT / UNSAT Step 1:    [6] VERIFY EHC is in Pressure Control using 3
-HS-47-204. Standard:
-HS-47-204. Standard:
Observes light on for EHC Pressure Control on 3
Observes light on for EHC Pressure Control on 3
-HS-47-204. SAT  UNSAT  N/A Step 2:   
-HS-47-204. SAT  UNSAT  N/A Step 2:   
[7] On the EHC Work Station on Panel 9
[7] On the EHC Work Station on Panel 9
-7:  [7.1]    SELECT Main Menu from the toolbar at bottom of the screen.  [7.2]    SELECT Log In on Display Screen and ENTER "OPS"  for name and "OPS" for Password.  
-7:  [7.1]    SELECT Main Menu from the toolbar at bottom of the screen.  [7.2]    SELECT Log In on Display Screen and ENTER "OPS"  for name and "OPS" for Password.  
   [7.3]    SELECT Auto Cooldown from list of function on the screen. Standard:
   [7.3]    SELECT Auto Cooldown from list of function on the screen. Standard: Candidate logs into EHC workstation and selects Auto Cooldown from the list of functions on the screen.
Candidate logs into EHC workstation and selects Auto Cooldown from the list of functions on the screen.
Critical Step SAT  UNSAT  N/A Step 3:     
Critical Step SAT  UNSAT  N/A Step 3:     
[8] On the Auto Cooldown Display Screen
[8] On the Auto Cooldown Display Screen
Line 600: Line 543:
Rx Press Ctrl  
Rx Press Ctrl  
- indicates Reset.
- indicates Reset.
Standard:
Standard:   Candidate checks the Turbine Tripped or All Valves Closed  
Candidate checks the Turbine Tripped or All Valves Closed  


-indicates Reset.
-indicates Reset.
Line 607: Line 549:
- indicates Reset.
- indicates Reset.
SAT  UNSAT  N/A Job Performance Measure (JPM)  7  Step 4:    [9] On the Auto Cooldown Screen SET the desired Final Pressure for cooldown as follows:
SAT  UNSAT  N/A Job Performance Measure (JPM)  7  Step 4:    [9] On the Auto Cooldown Screen SET the desired Final Pressure for cooldown as follows:
   [9.1] SELECT the block above the "FINAL PRESSURE TARGET".  
   [9.1] SELECT the block above the "FINAL PRESSURE TARGET".  [9.2] ENTER the desired pressure using the Display Screen or Key Board.  
   [9.2] ENTER the desired pressure using the Display Screen or Key Board.  


[9.3] WHEN desired Pressure is entered SELECT "OK"  Standard:
[9.3] WHEN desired Pressure is entered SELECT "OK"  Standard: Candidate sets the desired final target pressure of 20psig (given in initial conditions).
Candidate sets the desired final target pressure of 20psig (given in initial conditions).
Critical Step SAT  UNSAT  N/A  Step 5:    [10] WHEN Cooldown is ready to commence, THEN   
Critical Step SAT  UNSAT  N/A  Step 5:    [10] WHEN Cooldown is ready to commence, THEN   
[10.1] VERIFY Reactor Pressure is stable and being controlled by EHC Pressure Control with at least one Bypass Valve opened. (Adjust setpoint as necessary)  
[10.1] VERIFY Reactor Pressure is stable and being controlled by EHC Pressure Control with at least one Bypass Valve opened. (Adjust setpoint as necessary)  
   [10.2] DEPRESS the "START" button on the Auto Cooldown Display Screen.
   [10.2] DEPRESS the "START" button on the Auto Cooldown Display Screen.
   [11] WHEN Caution "Are You Sure You Want to Initiate Auto Cooldown?" appears SELECT "Yes" Screen Button to start the cooldown.
   [11] WHEN Caution "Are You Sure You Want to Initiate Auto Cooldown?" appears SELECT "Yes" Screen Button to start the cooldown.
Standard:
Standard: Candidate depresses START and acknowledges "YES' to commence auto cooldown.
Candidate depresses START and acknowledges "YES' to commence auto cooldown.
Critical Step SAT  UNSAT  N/A Job Performance Measure (JPM)  8  Step 6:    [12] CHECK the following:
Critical Step SAT  UNSAT  N/A Job Performance Measure (JPM)  8  Step 6:    [12] CHECK the following:
EHC PRESSURE SETPOINT, 3
EHC PRESSURE SETPOINT, 3
-PI-47-162, is lowering.
-PI-47-162, is lowering.
EHC AUTO COOLDOWN displays "IN PROGRESS" Standard:
EHC AUTO COOLDOWN displays "IN PROGRESS" Standard: Candidate monitors EHC pressure and the auto cooldown is "IN PROGRESS".  
Candidate monitors EHC pressure and the auto cooldown is "IN PROGRESS".  


SAT  UNSAT  N/A Cue: The Unit Supervisor directs you to adjust the Final Pressure Target to 100 psig. Step 7:   
SAT  UNSAT  N/A Cue: The Unit Supervisor directs you to adjust the Final Pressure Target to 100 psig. Step 7:   
Line 628: Line 566:


[13.1] SELECT the block above the "FINAL PRESSURE TARGET"  [13.2] ENTER the desired pressure using the Display Screen or Key Board.  
[13.1] SELECT the block above the "FINAL PRESSURE TARGET"  [13.2] ENTER the desired pressure using the Display Screen or Key Board.  
   [13.3] WHEN desired Pressure is entered SELECT "OK"  Standard:
   [13.3] WHEN desired Pressure is entered SELECT "OK"  Standard: Candidate adjusts "FINAL PRESSURE TARGET" to 100 psig and recommences the auto cooldown.
Candidate adjusts "FINAL PRESSURE TARGET" to 100 psig and recommences the auto cooldown.
Critical Step SAT  UNSAT  N/A Evaluator Cue: Another operator will continue to monitor the cooldown. This completes your task.
Critical Step SAT  UNSAT  N/A Evaluator Cue: Another operator will continue to monitor the cooldown. This completes your task.
STOP TIME:       
STOP TIME:       
Line 641: Line 578:
INITIAL CONDITIONS:  
INITIAL CONDITIONS:  


You are an Operator on Unit 3
You are an Operator on Unit 3. The Plant has been shutdown in preparation for a refueling outage. The Main Turbine is tripped. Reactor Water Level is stable and under control. Reactor Pressure is stable and being controlled by bypass valves.   
. The Plant has been shutdown in preparation for a refueling outage. The Main Turbine is tripped. Reactor Water Level is stable and under control. Reactor Pressure is stable and being controlled by bypass valves.   


INITIATING CUES
INITIATING CUES
Line 650: Line 586:
Job Performance Measure (JPM)  1  SITE: BFN JPM TITLE:
Job Performance Measure (JPM)  1  SITE: BFN JPM TITLE:
LOSS OF REFERENCE APRM TO ROD BLOCK MONITOR JPM NUMBER:
LOSS OF REFERENCE APRM TO ROD BLOCK MONITOR JPM NUMBER:
672A U2 REVISION:
672A U2 REVISION: 0  TASK APPLICABILITY:
0  TASK APPLICABILITY:
SRO STA UO NAUO TASK NUMBER / TASK TITLE(S):
SRO STA UO NAUO TASK NUMBER / TASK TITLE(S):
U-085-AL-03 RESPOND TO CONTROL ROD WITHDRAWL BLOCK K/A RATINGS:
U-085-AL-03 RESPOND TO CONTROL ROD WITHDRAWL BLOCK K/A RATINGS:
Line 658: Line 593:
-3,4,5 RELATED PRA INFORMATION:
-3,4,5 RELATED PRA INFORMATION:
Risk Significant SAFETY FUNCTION:
Risk Significant SAFETY FUNCTION:
7  EVALUATION LOCATION:
7  EVALUATION LOCATION: In-Plant  Simulator Control R oom Lab  Other - List  APPLICABLE METHOD OF TESTING:  Discussion  Simulate/Walkthrough  Perform   TIME FOR COMPLETION:      NA      TIME CRITICAL (Y/N)
In-Plant  Simulator Control Room Lab  Other - List  APPLICABLE METHOD OF TESTING:  Discussion  Simulate/Walkthrough  Perform TIME FOR COMPLETION:      NA      TIME CRITICAL (Y/N)
ALTERNATE PATH (Y/N)
ALTERNATE PATH (Y/N)
Developed by:
Developed by:
Developer Date  (Ensure validator is briefed on exam security per NPG
Developer Date  (Ensure validator is briefed on exam security per NPG
-SPP-17.8.1)                (See JPM Validation Checklist in NPG
-SPP-17.8.1)                (See JPM Validation Checklist in NPG
-SPP-17.8.2)      Validated by:
-SPP-17.8.2)      Validated by:
Approved by:
Approved by:
Validator Date  Approved by:
Validator   Date  Approved by:
Site Training Management Date  Site Training Program Owner Date    N Y Job Performance Measure (JPM)  2  OPERATOR:  ________________________________
Site Training Management Date  Site Training Program Owner Date    N Y Job Performance Measure (JPM)  2  OPERATOR:  ________________________________
JPM Number:  _672A U2_  RO  SRO  DATE: _______
JPM Number:  _672A U2_  RO  SRO  DATE: _______
Line 693: Line 627:
EXAMINER Job Performance Measure (JPM)  3  Revision Summary Rev No. Effective Date Pages Affected Description 0 09/01/15 All Initial issue
EXAMINER Job Performance Measure (JPM)  3  Revision Summary Rev No. Effective Date Pages Affected Description 0 09/01/15 All Initial issue


Job Performance Measure (JPM)  4  SIMULATOR SETUP IC 39 Exam IC 282    Console Operator Instructions Reset  to IC-39 to ~ 30% Reactor Power  Open Schedule File: NRC JPM C U2  
Job Performance Measure (JPM)  4  SIMULATOR SETUP IC 39 Exam IC 282    Console Operator Instructions Reset  to IC-39 to ~ 3 0% Reactor Power  Open Schedule File: NRC JPM C U2  
-RBM APRM Fail Downscale.sch Open Event File: NRC JPM C U2  
-RBM APRM Fail Downscale.sch Open Event File: NRC JPM C U2  
-RBM APRM Fail Downscale.evt Malfunctions Description Event Severity Delay Initial set NM07L3233C LPRM AMPLIFIER FAILURE 32 C 15 0 N/A N/A NM07L4025B LPRM AMPLIFIER FAILURE 40 B 15 0 N/A N/A NM07L4033D LPRM AMPLIFIER FAILURE 40 D 15 0 N/A N/A NM07L0817B LPRM AMPLIFIER FAILURE 08 B 15 0 N/A N/A NM07L4017B LPRM AMPLIFIER FAILURE 40 B 15 0 N/A N/A NM07L4041D LPRM AMPLIFIER FAILURE 40 D 15 0 N/A N/A NM07L4049B LPRM AMPLIFIER FAILURE 40 B 15 0 N/A N/A NM07L4057B LPRM AMPLIFIER FAILURE 40 B 15 0 N/A N/A NM07L4817C LPRM AMPLIFIER FAILURE 48 C 15 0 N/A N/A NM07L4825C LPRM AMPLIFIER FAILURE 48 C 15 0 N/A N/A NM07L4833A LPRM AMPLIFIER FAILURE 48 A 15 0 N/A N/A NM07L4841A LPRM AMPLIFIER FAILURE 48 A 15 0 N/A N/A NM07L4849C LPRM AMPLIFIER FAILURE 48 C 15 0 N/A N/A NM07L0825B LPRM AMPLIFIER FAILURE 08 B 15 0 N/A N/A Job Performance Measure (JPM)  5  NM07L0833D LPRM AMPLIFIER FAILURE 08 D 15 0 N/A N/A NM07L0841D LPRM AMPLIFIER FAILURE 08 D 15 0 N/A N/A NM07L0849B LPRM AMPLIFIER FAILURE 08 B 15 0 N/A N/A NM07L2409B LPRM AMPLIFIER FAILURE 24 B 15 0 N/A N/A NM07L2417D LPRM AMPLIFIER FAILURE 24 D 15 0 N/A N/A NM07L2425D LPRM AMPLIFIER FAILURE 24 D 15 0 N/A N/A NM07L2433B LPRM AMPLIFIER FAILURE 24 B 15 0 N/A N/A NM07L2449D LPRM AMPLIFIER FAILURE 24 D 15 0 N/A N/A NM07L2457D LPRM AMPLIFIER FAILURE 24 D 15 0 N/A N/A NM07L1617C LPRM AMPLIFIER FAILURE 16 C 15 0 N/A N/A NM07L1625C LPRM AMPLIFIER FAILURE 16 C 15 0 N/A N/A NM07L1633A LPRM AMPLIFIER FAILURE 16 A 15 0 N/A N/A NM07L1641A LPRM AMPLIFIER FAILURE 16 A 15 0 N/A N/A NM07L1649C LPRM AMPLIFIER FAILURE 16 C 15 0 N/A N/A NM07L1657C LPRM AMPLIFIER FAILURE 16 C 15 0 N/A N/A NM07L1609A LPRM AMPLIFIER FAILURE 16 A 15 0 N/A N/A NM07L3209C LPRM AMPLIFIER FAILURE 32 C 15 0 N/A N/A NM07L3217A LPRM AMPLIFIER FAILURE 32 A 15 0 N/A N/A NM07L3225A LPRM AMPLIFIER FAILURE 32 A 15 0 N/A N/A NM07L3249A LPRM AMPLIFIER FAILURE 32 A 15 0 N/A N/A NM07L3257A LPRM AMPLIFIER FAILURE 32 A 15 0 N/A N/A NM07L4009D LPRM AMPLIFIER FAILURE 40 D 15 0 N/A N/A NM07L4809A LPRM AMPLIFIER 15 0 N/A N/A Job Performance Measure (JPM)  6  FAILURE 48 A NM07L5617D LPRM AMPLIFIER FAILURE 56 D 15 0 N/A N/A NM07L5633B LPRM AMPLIFIER FAILURE 56 B 15 0 N/A N/A NM07L5641B LPRM AMPLIFIER FAILURE 56 B 15 0 N/A N/A NM07L3241C LPRM AMPLIFIER FAILURE 32 C 15 0 N/A N/A            Remotes Description Event Severity Delay Initial set                  Overrides Description Event Severity Delay Initial set ZLO4631LGREENT(1)
-RBM APRM Fail Downscale.evt Malfunctions Description Event Severity Delay Initial set NM07L3233C LPRM AMPLIFIER FAILURE 32 C 15 0 N/A N/A NM07L4025B LPRM AMPLIFIER FAILURE 40 B 15 0 N/A N/A NM07L4033D LPRM AMPLIFIER FAILURE 40 D 15 0 N/A N/A NM07L0817B LPRM AMPLIFIER FAILURE 08 B 15 0 N/A N/A NM07L4017B LPRM AMPLIFIER FAILURE 40 B 15 0 N/A N/A NM07L4041D LPRM AMPLIFIER FAILURE 40 D 15 0 N/A N/A NM07L4049B LPRM AMPLIFIER FAILURE 40 B 15 0 N/A N/A NM07L4057B LPRM AMPLIFIER FAILURE 40 B 15 0 N/A N/A NM07L4817C LPRM AMPLIFIER FAILURE 48 C 15 0 N/A N/A NM07L4825C LPRM AMPLIFIER FAILURE 48 C 15 0 N/A N/A NM07L4833A LPRM AMPLIFIER FAILURE 48 A 15 0 N/A N/A NM07L4841A LPRM AMPLIFIER FAILURE 48 A 15 0 N/A N/A NM07L4849C LPRM AMPLIFIER FAILURE 48 C 15 0 N/A N/A NM07L0825B LPRM AMPLIFIER FAILURE 08 B 15 0 N/A N/A Job Performance Measure (JPM)  5  NM07L0833D LPRM AMPLIFIER FAILURE 08 D 15 0 N/A N/A NM07L0841D LPRM AMPLIFIER FAILURE 08 D 15 0 N/A N/A NM07L0849B LPRM AMPLIFIER FAILURE 08 B 15 0 N/A N/A NM07L2409B LPRM AMPLIFIER FAILURE 24 B 15 0 N/A N/A NM07L2417D LPRM AMPLIFIER FAILURE 24 D 15 0 N/A N/A NM07L2425D LPRM AMPLIFIER FAILURE 24 D 15 0 N/A N/A NM07L2433B LPRM AMPLIFIER FAILURE 24 B 15 0 N/A N/A NM07L2449D LPRM AMPLIFIER FAILURE 24 D 15 0 N/A N/A NM07L2457D LPRM AMPLIFIER FAILURE 24 D 15 0 N/A N/A NM07L1617C LPRM AMPLIFIER FAILURE 16 C 15 0 N/A N/A NM07L1625C LPRM AMPLIFIER FAILURE 16 C 15 0 N/A N/A NM07L1633A LPRM AMPLIFIER FAILURE 16 A 15 0 N/A N/A NM07L1641A LPRM AMPLIFIER FAILURE 16 A 15 0 N/A N/A NM07L1649C LPRM AMPLIFIER FAILURE 16 C 15 0 N/A N/A NM07L1657C LPRM AMPLIFIER FAILURE 16 C 15 0 N/A N/A NM07L1609A LPRM AMPLIFIER FAILURE 16 A 15 0 N/A N/A NM07L3209C LPRM AMPLIFIER FAILURE 32 C 15 0 N/A N/A NM07L3217A LPRM AMPLIFIER FAILURE 32 A 15 0 N/A N/A NM07L3225A LPRM AMPLIFIER FAILURE 32 A 15 0 N/A N/A NM07L3249A LPRM AMPLIFIER FAILURE 32 A 15 0 N/A N/A NM07L3257A LPRM AMPLIFIER FAILURE 32 A 15 0 N/A N/A NM07L4009D LPRM AMPLIFIER FAILURE 40 D 15 0 N/A N/A NM07L4809A LPRM AMPLIFIER 15 0 N/A N/A Job Performance Measure (JPM)  6  FAILURE 48 A NM07L5617D LPRM AMPLIFIER FAILURE 56 D 15 0 N/A N/A NM07L5633B LPRM AMPLIFIER FAILURE 56 B 15 0 N/A N/A NM07L5641B LPRM AMPLIFIER FAILURE 56 B 15 0 N/A N/A NM07L3241C LPRM AMPLIFIER FAILURE 32 C 15 0 N/A N/A            Remotes Description Event Severity Delay Initial set                  Overrides Description Event Severity Delay Initial set ZLO4631LGREENT(1)
Control Rod 46-31 GREEN INDICATION 15 0 N/A N/A              Schedule File(s):  
Control Rod 46-31 GREEN INDICATION 15 0 N/A N/A              Schedule File(s):
 
Event File: NRC JPM C U2  
Event File: NRC JPM C U2  
-RBM APRM Fail Downscale.evt; <TRIGGER id="15" description="APRM Ch 2 Fail Downscale">ZLO4631LGREENT(1) == 0</TRIGGER>
-RBM APRM Fail Downscale.evt; <TRIGGER id="15" description="APRM Ch 2 Fail Downscale">ZLO4631LGREENT(1) == 0</TRIGGER>
Line 715: Line 648:
-31.   
-31.   


Job Performance Measure (JPM)  8  START TIME
Job Performance Measure (JPM)  8  START TIME:    STEP / STANDARD SAT / UNSAT Step 1:    [1] SELECT the desired control rod by depressing the appropriate CRD ROD SELECT pushbutton, 2-XS-85-40. Standard:     Selects Control Rod by depressing CRD ROD SELECT pushbutton.
:    STEP / STANDARD SAT / UNSAT Step 1:    [1] SELECT the desired control rod by depressing the appropriate CRD ROD SELECT pushbutton, 2-XS-85-40. Standard:
Selects Control Rod by depressing CRD ROD SELECT pushbutton.
Critical Step
Critical Step


Line 725: Line 656:
-HS-85-23A. (Otherwise N/A)
-HS-85-23A. (Otherwise N/A)
Standard:
Standard:
Determines that step in N/A SAT UNSAT N/A Step 3:     
Determines that step in N/A SAT UNSAT N/A Step 3:     
[3] OBSERVE the following for the selected control rod:
[3] OBSERVE the following for the selected control rod:
CRD ROD SELECT pushbutton is brightly ILLUMINATED White light on the Full Core Display ILLUMINATED Rod Out Permit light ILLUMINATED Standard:
CRD ROD SELECT pushbutton is brightly ILLUMINATED White light on the Full Core Display ILLUMINATED Rod Out Permit light ILLUMINATED Standard:   VERIFIES  CRD ROD SELECT pushbutton is brightly ILLUMINATED White light on the Full Core Display ILLUMINATED Rod Out Permit light ILLUMINATED SAT UNSAT N/A Job Performance Measure (JPM)  9  STEP / STANDARD SAT / UNSAT Step 4:    [4] VERIFY Rod Worth Minimizer is operable and LATCHED into the correct ROD GROUP when the Rod Worth Minimizer is enforcing Standard: STEP is N/A due to Rod Block Monitor is Enforcing SAT UNSAT  N/A  Step 5:    [5] PLACE CRD CONTROL SWITCH, 2-HS-85-48, in ROD OUT NOTCH, and RELEASE.   
VERIFIES  CRD ROD SELECT pushbutton is brightly ILLUMINATED White light on the Full Core Display ILLUMINATED Rod Out Permit light ILLUMINATED SAT UNSAT N/A Job Performance Measure (JPM)  9  STEP / STANDARD SAT / UNSAT Step 4:    [4] VERIFY Rod Worth Minimizer is operable and LATCHED into the correct ROD GROUP when the Rod Worth Minimizer is enforcing Standard:
STEP is N/A due to Rod Block Monitor is Enforcing SAT UNSAT  N/A  Step 5:    [5] PLACE CRD CONTROL SWITCH, 2-HS-85-48, in ROD OUT NOTCH, and RELEASE.   
[6] OBSERVE the control rod settles into the desired position and the ROD SETTLE light extinguishes.
[6] OBSERVE the control rod settles into the desired position and the ROD SETTLE light extinguishes.
Standard:
Standard:
PLACED CRD CONTROL SWITCH, 2-85-48 in ROD OUT NOTCH position and RELEASED control switch to move Control Rod to Position 04 as indicated on Full Core Display. Critical Step
PLACED CRD CONTROL SWITCH, 2-85-48 in ROD OUT NOTCH position and RELEASED control switch to move Control Rod to Position 04 as indicated on Full Core Display. Critical Step


SAT UNSAT N/A  Note to Examiner: Step is repeated to get Control Rod to Position 04 Step 6:     
SAT UNSAT N/A  Note to Examiner: Step is repeated to get Control Rod to Position 04 Step 6:     
[1] SELECT the desired control rod by depressing the appropriate CRD ROD SELECT pushbutton, 2-XS-85-40. Standard:
[1] SELECT the desired control rod by depressing the appropriate CRD ROD SELECT pushbutton, 2-XS-85-40. Standard:     Selects Control Rod by depressing CRD ROD SELECT pushbutton.
Selects Control Rod by depressing CRD ROD SELECT pushbutton.
Critical Step
Critical Step


Line 745: Line 671:
-HS-85-23A. (Otherwise N/A)
-HS-85-23A. (Otherwise N/A)
Standard:
Standard:
Determines that step in N/A SAT  UNSAT  N/A Step 8:     
Determines that step in N/A SAT  UNSAT  N/A Step 8:     
[3] OBSERVE the following for the selected control rod:
[3] OBSERVE the following for the selected control rod:
CRD ROD SELECT pushbutton is brightly ILLUMINATED White light on the Full Core Display ILLUMINATED Rod Out Permit light ILLUMINATED Standard:
CRD ROD SELECT pushbutton is brightly ILLUMINATED White light on the Full Core Display ILLUMINATED Rod Out Permit light ILLUMINATED Standard:   VERIFIES  CRD ROD SELECT pushbutton is brightly ILLUMINATED White light on the Full Core Display ILLUMINATED Rod Out Permit light ILLUMINATED SAT UNSAT N/A  Step 9:     
VERIFIES  CRD ROD SELECT pushbutton is brightly ILLUMINATED White light on the Full Core Display ILLUMINATED Rod Out Permit light ILLUMINATED SAT UNSAT N/A  Step 9:     
[4] VERIFY Rod Worth Minimizer is operable and LATCHED into the correct ROD GROUP when the Rod Worth Minimizer is enforcing Standard: STEP is N/A due to Rod Block Monitor is Enforcing SAT UNSAT  N/A Job Performance Measure (JPM)  11  STEP / STANDARD SAT / UNSAT Step 10:    [5] PLACE CRD CONTROL SWITCH, 2-HS-85-48, in ROD OUT NOTCH, and RELEASE.   
[4] VERIFY Rod Worth Minimizer is operable and LATCHED into the correct ROD GROUP when the Rod Worth Minimizer is enforcing Standard:
STEP is N/A due to Rod Block Monitor is Enforcing SAT UNSAT  N/A Job Performance Measure (JPM)  11  STEP / STANDARD SAT / UNSAT Step 10:    [5] PLACE CRD CONTROL SWITCH, 2-HS-85-48, in ROD OUT NOTCH, and RELEASE.   
[6] OBSERVE the control rod settles into the desired position and the ROD SETTLE light extinguishes.
[6] OBSERVE the control rod settles into the desired position and the ROD SETTLE light extinguishes.
Standard:
Standard:
PLACED CRD CONTROL SWITCH, 2-85-48 in ROD OUT NOTCH position and RELEASED control switch to move Control Rod to Position 04 as indicated on Full Core Display
PLACED CRD CONTROL SWITCH, 2-85-48 in ROD OUT NOTCH position and RELEASED control switch to move Control Rod to Position 04 as indicated on Full Core Display
. Critical Step
. Critical Step


SAT UNSAT N/A  Note to Examiner: Step is repeated to get Control Rod to Position 04 Step 11:     
SAT UNSAT N/A  Note to Examiner: Step is repeated to get Control Rod to Position 04 Step 11:     
[1] SELECT the desired control rod by depressing the appropriate CRD ROD SELECT pushbutton, 2-XS-85-40. Standard:
[1] SELECT the desired control rod by depressing the appropriate CRD ROD SELECT pushbutton, 2-XS-85-40. Standard:     Selects Control Rod by depressing CRD ROD SELECT pushbutton.
Selects Control Rod by depressing CRD ROD SELECT pushbutton.
Critical Step
Critical Step


SAT UNSAT N/A  Step 12:     
SAT UNSAT N/A  Step 1 2:     
[2] IF selected control rod has been identified as a "fast notching" control rod by engineering, THEN  THROTTLE OPEN 2
[2] IF selected control rod has been identified as a "fast notching" control rod by engineering, THEN  THROTTLE OPEN 2
-PCV-085-0023 CRD, CRD DRIVE WATER PRESS CONTROL VLV, to as low as 180 psid using 2
-PCV-085-0023 CRD, CRD DRIVE WATER PRESS CONTROL VLV, to as low as 180 psid using 2
-HS-85-23A. (Otherwise N/A)
-HS-85-23A. (Otherwise N/A)
Standard:
Standard:
 
Determines that step in N/A SAT  UNSAT  N/A Job Performance Measure (JPM)  12  STEP / STANDARD SAT / UNSAT Step 1 3:    [3] OBSERVE the following for the selected control rod:
Determines that step in N/A SAT  UNSAT  N/A Job Performance Measure (JPM)  12  STEP / STANDARD SAT / UNSAT Step 13:    [3] OBSERVE the following for the selected control rod:
CRD ROD SELECT pushbutton is brightly ILLUMINATED White light on the Full Core Display ILLUMINATED Rod Out Permit light ILLUMINATED Standard:   VERIFIES  CRD ROD SELECT pushbutton is brightly ILLUMINATED White light on the Full Core Display ILLUMINATED Rod Out Permit light ILLUMINATED SAT UNSAT N/A  Step 1 4:     
CRD ROD SELECT pushbutton is brightly ILLUMINATED White light on the Full Core Display ILLUMINATED Rod Out Permit light ILLUMINATED Standard:
[4] VERIFY Rod Worth Minimizer is operable and LATCHED into the correct ROD GROUP when the Rod Worth Minimizer is enforcing Standard: STEP is N/A due to Rod Block Monitor is Enforcing SAT UNSAT N/A  Step 1 5:     
VERIFIES  CRD ROD SELECT pushbutton is brightly ILLUMINATED White light on the Full Core Display ILLUMINATED Rod Out Permit light ILLUMINATED SAT UNSAT N/A  Step 14:     
[4] VERIFY Rod Worth Minimizer is operable and LATCHED into the correct ROD GROUP when the Rod Worth Minimizer is enforcing Standard:
STEP is N/A due to Rod Block Monitor is Enforcing SAT UNSAT N/A  Step 15:     
[5] PLACE CRD CONTROL SWITCH, 2-HS-85-48, in ROD OUT NOTCH, and RELEASE.   
[5] PLACE CRD CONTROL SWITCH, 2-HS-85-48, in ROD OUT NOTCH, and RELEASE.   
[6] OBSERVE the control rod settles into the desired position and the ROD SETTLE light extinguishes.
[6] OBSERVE the control rod settles into the desired position and the ROD SETTLE light extinguishes.
Standard:
Standard:
PLACED CRD CONTROL SWITCH, 2-85-48 in ROD OUT NOTCH position and RELEASED control switch to move Control Rod to Position 04 as indicated on Full Core Display. Critical Step
PLACED CRD CONTROL SWITCH, 2-85-48 in ROD OUT NOTCH position and RELEASED control switch to move Control Rod to Position 04 as indicated on Full Core Display. Critical Step


Line 784: Line 701:
Job Performance Measure (JPM)  13  STEP / STANDARD SAT / UNSAT Note to Examiner:
Job Performance Measure (JPM)  13  STEP / STANDARD SAT / UNSAT Note to Examiner:
This begins the Alternate Path section of JPM Simulator Booth Operator:  Insert Event Trigger #1 to fail APRM 2 Downscale.
This begins the Alternate Path section of JPM Simulator Booth Operator:  Insert Event Trigger #1 to fail APRM 2 Downscale.
Step 16:                                                      Sensor/Trip Point:
Step 1 6:                                                      Sensor/Trip Point:
APRM Downscale: <=5%                                                    OPRM Inop:  Less than 23 operable cells
APRM Downscale: <=5%                                                    OPRM Inop:  Less than 23 operable cells


Line 792: Line 709:
C. Unit shutdown (Mode 3 or 4).
C. Unit shutdown (Mode 3 or 4).
D. Failed sensor.
D. Failed sensor.
Automatic
Automatic Action: A. Rod withdrawal block with Rx Mode Sw. in RUN.(APRM only)
 
Action: A. Rod withdrawal block with Rx Mode Sw. in RUN.(APRM only)
Operator Action: A. DETERMINE which APRM/OPRM channel is downscale/inop.
Operator Action: A. DETERMINE which APRM/OPRM channel is downscale/inop.
B. IF APRM failed downscale, THEN BYPASS channel. REFER TO 2-OI-92B.     
B. IF APRM failed downscale, THEN BYPASS channel. REFER TO 2-OI-92B.     
Line 801: Line 716:


SAT UNSAT N/A APRM DOWNSCALE/
SAT UNSAT N/A APRM DOWNSCALE/
OPRM INOP 4
OPRM INOP     4 Job Performance Measure (JPM)  14  STEP / STANDARD SAT / UNSAT Step 1 6(continued)
Job Performance Measure (JPM)  14  STEP / STANDARD SAT / UNSAT Step 16(continued)
Sensor/Trip Point:
Sensor/Trip Point:
Relays:
Relays:
3A-K1 Nuclear Instrumentation 3A-K2 Refuel Equipment in Use High Level in Scram Discharge Volume Scram Discharge Volume High Water Level Bypass Rx Mode Switch in SHUTDOWN PRNM (ANY APRM OPRM or RBM)  Sensor Location:
3 A-K1 Nuclear Instrumentation 3 A-K2 Refuel Equipment in Use High Level in Scram Discharge Volume Scram Discharge Volume High Water Level Bypass Rx Mode Switch in SHUTDOWN PRNM (ANY APRM OPRM or RBM)  Sensor Location:
Panel 2-9-28 Elevation 593' Aux Instr Room Probable Cause:  A. One or more sensors at or above set point.
Panel 2-9-28 Elevation 593' Aux Instr Room Probable Cause:  A. One or more sensors at or above set point.
B. Malfunction of sensor.
B. Malfunction of sensor.
C. Control rod drop accident Automatic Action: Rod withdrawal block Operator Action:  A. DETERMINE initiating condition from corresponding rod withdrawal block alarm(s) and REFER TO operator action for alarm(s).
C. Control rod drop accident Automatic Action: Rod withdrawal block Operator Action:  A. DETERMINE initiating condition from corresponding rod withdrawal block alarm(s) and REFER TO operator action for alarm(s). Standard:     Reference 2-ARP-9-5A and identifies APRM Ch 2 is down scale and proceeds to bypass APRM Ch 2 per 2-OI-92B  CUE: Respond as stated in Alarm Response Instruction and Bypass APRM Ch 2 per 3-OI-92B. CONTROL ROD WITHDRAWAL BLOCK    7 Job Performance Measure (JPM)  15  STEP / STANDARD SAT / UNSAT Step 1 7:     
Standard:
Reference 2-ARP-9-5A and identifies APRM Ch 2 is down scale and proceeds to bypass APRM Ch 2 per 2-OI-92B  CUE: Respond as stated in Alarm Response Instruction and Bypass APRM Ch 2 per 3-OI-92B. CONTROL ROD WITHDRAWAL BLOCK    7 Job Performance Measure (JPM)  15  STEP / STANDARD SAT / UNSAT Step 17:     


6.1 Bypassing APRM/OPRM Channel
6.1 Bypassing APRM/OPRM Channel
         [1] REVIEW all precautions and limitations. REFER TO Section 3.0.
         [1] REVIEW all precautions and limitations. REFER TO Section 3.0.
Standard:
Standard:   Demonstrates reviewing precautions and limitations section 3.0.
Demonstrates reviewing precautions and limitations section 3.0.
SAT  UNSAT N/A Step 1 8:     
SAT  UNSAT N/A Step 18:     
[2] PLACE APRM BYPASS, 2-HS-92-7B/S3, to desired channel to be bypassed.
[2] PLACE APRM BYPASS, 2-HS-92-7B/S3, to desired channel to be bypassed.
Standard:
Standard:   PLACE APRM BYPASS, 2-HS-92-7B/S3, to APRM CH 2 Critical Step
PLACE APRM BYPASS, 2-HS-92-7B/S3, to APRM CH 2 Critical Step


SAT UNSAT N/A NOTES 1) Only one APRM/OPRM in each trip system can be bypassed at a time. 2) All operations are performed on Panel 2 5 unless specifically stated otherwise.
SAT UNSAT N/A NOTES 1) Only one APRM/OPRM in each trip system can be bypassed at a time. 2) All operations are performed on Panel 2 5 unless specifically stated otherwise.
Line 826: Line 736:
-14 Voters are required to be illuminated prior to testing, operating, or working on that channel.
-14 Voters are required to be illuminated prior to testing, operating, or working on that channel.
CAUTION [QA/C] SPP-10.4 requires approval of the Plant Manager or his designee prior to any planned operation with APRMs bypassed unless bypassing is specifically allowed within approved procedures. [ISE-HPS-92-RO1]
CAUTION [QA/C] SPP-10.4 requires approval of the Plant Manager or his designee prior to any planned operation with APRMs bypassed unless bypassing is specifically allowed within approved procedures. [ISE-HPS-92-RO1]
Job Performance Measure (JPM)  16  STEP / STANDARD SAT / UNSAT Step 19:    [3] CHECK BLUE BYPASSED lights illuminated on Panel 2-9-14 Voters. Standard:
Job Performance Measure (JPM)  16  STEP / STANDARD SAT / UNSAT Step 1 9:    [3] CHECK BLUE BYPASSED lights illuminated on Panel 2-9-14 Voters. Standard:
 
Observes BLUE BYPASS light illuminated on Panel 2-9-14 for APRM CH 2. SAT UNSAT N/A Step 20:     
Observes BLUE BYPASS light illuminated on Panel 2-9-14 for APRM CH 2
. SAT UNSAT N/A Step 20:     
[4] VERIFY white bypass light on Panel 2-9-5 is illuminated.
[4] VERIFY white bypass light on Panel 2-9-5 is illuminated.
Standard:
Standard:   Observes WHITE BYPASS light illuminated on Panel 2-9-5. SAT  UNSAT N/A Note to Examiner: If needed, cue student to proceed with actions required to continue rod movements.
Observes WHITE BYPASS light illuminated on Panel 2-9-5. SAT  UNSAT N/A Note to Examiner: If needed, cue student to proceed with actions required to continue rod movements.
Student may continue at step 21 or 24.
Student may continue at step 21 or 24.
Step 21:
Step 2 1:
6.6.2 Actions Required During and Following Control Rod Withdrawal (continued)
6.6.2 Actions Required During and Following Control Rod Withdrawal (continued)
   [6] IF Control Rod movement was stopped to keep from exceeding a RBM setpoint or was caused by a RBM Rod Block, THEN  PERFORM the following at the Unit Supervisor's discretion to "REINITIALIZE" the RBM:   
   [6] IF Control Rod movement was stopped to keep from exceeding a RBM setpoint or was caused by a RBM Rod Block, THEN  PERFORM the following at the Unit Supervisor's discretion to "REINITIALIZE" the RBM:   
[6.1] PLACE CRD POWER, 2-HS-85-46 in the OFF position to deselect the Control Rod.
[6.1] PLACE CRD POWER, 2-HS-85-46 in the OFF position to deselect the Control Rod.
Standard:
Standard:   CRD POWER, 2-HS-85-46 in the OFF position. SAT UNSAT N/A Job Performance Measure (JPM)  17  STEP / STANDARD SAT / UNSAT Step 22:    [6.2] PLACE CRD POWER, 2-HS-85-46, in the ON position.
CRD POWER, 2-HS-85-46 in the OFF position
Standard:   PLACED CRD POWER, 2-HS-85-46, in the ON position.
. SAT UNSAT N/A Job Performance Measure (JPM)  17  STEP / STANDARD SAT / UNSAT Step 22:    [6.2] PLACE CRD POWER, 2-HS-85-46, in the ON position.
SAT  UNSAT N/A Step 2 3:     
Standard:
PLACED CRD POWER, 2-HS-85-46, in the ON position.
SAT  UNSAT N/A Step 23:     
[6.3] IF desired, THEN CONTINUE to withdrawal Control Rods and PERFORM applicable section for Control Rod withdrawal.
[6.3] IF desired, THEN CONTINUE to withdrawal Control Rods and PERFORM applicable section for Control Rod withdrawal.
Standard:
Standard:   Continues with Control Rod Movement
Continues with Control Rod Movement


SAT UNSAT  N/A CUE: Proceed with Control Rod Movement.
SAT UNSAT  N/A CUE: Proceed with Control Rod Movement.
Step 24:    [1] SELECT the desired control rod by depressing the appropriate CRD ROD SELECT pushbutton, 2-XS-85-40. Standard:
Step 2 4:    [1] SELECT the desired control rod by depressing the appropriate CRD ROD SELECT pushbutton, 2-XS-85-40. Standard:     Selects Control Rod by depressing CRD ROD SELECT pushbutton.
Selects Control Rod by depressing CRD ROD SELECT pushbutton.
Critical Step SAT UNSAT  N/A Job Performance Measure (JPM)  18  STEP / STANDARD SAT / UNSAT Step 2 5:    [2] IF selected control rod has been identified as a "fast notching" control rod by engineering, THEN  THROTTLE OPEN 2
Critical Step SAT UNSAT  N/A Job Performance Measure (JPM)  18  STEP / STANDARD SAT / UNSAT Step 25:    [2] IF selected control rod has been identified as a "fast notching" control rod by engineering, THEN  THROTTLE OPEN 2
-PCV-085-0023 CRD, CRD DRIVE WATER PRESS CONTROL VLV, to as low as 180 psid using 2
-PCV-085-0023 CRD, CRD DRIVE WATER PRESS CONTROL VLV, to as low as 180 psid using 2
-HS-85-23A. (Otherwise N/A)
-HS-85-23A. (Otherwise N/A)
Standard:
Standard:
 
Determines that step in N/A SAT  UNSAT  N/A Step 2 6:     
Determines that step in N/A SAT  UNSAT  N/A Step 26:     
[3] OBSERVE the following for the selected control rod:
[3] OBSERVE the following for the selected control rod:
CRD ROD SELECT pushbutton is brightly ILLUMINATED White light on the Full Core Display ILLUMINATED Rod Out Permit light ILLUMINATED Standard:
CRD ROD SELECT pushbutton is brightly ILLUMINATED White light on the Full Core Display ILLUMINATED Rod Out Permit light ILLUMINATED Standard: VERIFIES  CRD ROD SELECT pushbutton is brightly ILLUMINATED White light on the Full Core Display ILLUMINATED Rod Out Permit light ILLUMINATED SAT UNSAT N/A  Step 2 7:     
VERIFIES  CRD ROD SELECT pushbutton is brightly ILLUMINATED White light on the Full Core Display ILLUMINATED Rod Out Permit light ILLUMINATED SAT UNSAT N/A  Step 27:     
[4] VERIFY Rod Worth Minimizer is operable and LATCHED into the correct ROD GROUP when the Rod Worth Minimizer is enforcing Standard: STEP is N/A due to Rod Block Monitor is Enforcing SAT UNSAT  N/A Job Performance Measure (JPM)  19  STEP / STANDARD SAT / UNSAT Step 2 8:    [5] PLACE CRD CONTROL SWITCH, 2-HS-85-48, in ROD OUT NOTCH, and RELEASE.   
[4] VERIFY Rod Worth Minimizer is operable and LATCHED into the correct ROD GROUP when the Rod Worth Minimizer is enforcing Standard:
STEP is N/A due to Rod Block Monitor is Enforcing SAT UNSAT  N/A Job Performance Measure (JPM)  19  STEP / STANDARD SAT / UNSAT Step 28:    [5] PLACE CRD CONTROL SWITCH, 2-HS-85-48, in ROD OUT NOTCH, and RELEASE.   
[6] OBSERVE the control rod settles into the desired position and the ROD SETTLE light extinguishes.
[6] OBSERVE the control rod settles into the desired position and the ROD SETTLE light extinguishes.
Standard:
Standard:
PLACED CRD CONTROL SWITCH, 2-85-48 in ROD OUT NOTCH position and RELEASED control switch to move Control Rod to Position 04 as indicated on Full Core Display
PLACED CRD CONTROL SWITCH, 2-85-48 in ROD OUT NOTCH position and RELEASED control switch to move Control Rod to Position 04 as indicated on Full Core Display
. Critical Step
. Critical Step
Line 877: Line 775:
*******************************************************************************************************
*******************************************************************************************************


INITIAL CONDITIONS:  
INITIAL CONDITIONS:
 
You are an Operator on Unit  
You are an Operator on Unit  
: 2. The Reactor is at 30% power Startup Sequence Control Rod Movement Data Sheet 2
: 2. The Reactor is at 30% power Startup Sequence Control Rod Movement Data Sheet 2
Line 889: Line 786:
Job Performance Measure (JPM)  1  SITE: BFN JPM TITLE:
Job Performance Measure (JPM)  1  SITE: BFN JPM TITLE:
LOSS OF REFERENCE APRM TO ROD BLOCK MONITOR JPM NUMBER:
LOSS OF REFERENCE APRM TO ROD BLOCK MONITOR JPM NUMBER:
672A U3 REVISION:
672A U3 REVISION: 0  TASK APPLICABILITY:
0  TASK APPLICABILITY:
SRO STA UO NAUO TASK NUMBER / TASK TITLE(S):
SRO STA UO NAUO TASK NUMBER / TASK TITLE(S):
U-085-AL-03 RESPOND TO CONTROL ROD WITHDRAWL BLOCK K/A RATINGS:
U-085-AL-03 RESPOND TO CONTROL ROD WITHDRAWL BLOCK K/A RATINGS:
Line 897: Line 793:
-3,4,5 RELATED PRA INFORMATION:
-3,4,5 RELATED PRA INFORMATION:
Risk Significant SAFETY FUNCTION:
Risk Significant SAFETY FUNCTION:
7  EVALUATION LOCATION:
7  EVALUATION LOCATION: In-Plant  Simulator Control R oom Lab  Other - List  APPLICABLE METHOD OF TESTING:  Discussion  Simulate/Walkthrough  Perform   TIME FOR COMPLETION:      NA      TIME CRITICAL (Y/N)      ALTERNATE PATH (Y/N)
In-Plant  Simulator Control Room Lab  Other - List  APPLICABLE METHOD OF TESTING:  Discussion  Simulate/Walkthrough  Perform TIME FOR COMPLETION:      NA      TIME CRITICAL (Y/N)      ALTERNATE PATH (Y/N)
Developed by:
Developed by:
Developer Date  (Ensure validator is briefed on exam security per NPG
Developer Date  (Ensure validator is briefed on exam security per NPG
-SPP-17.8.1)                (See JPM Validation Checklist in NPG
-SPP-17.8.1)                (See JPM Validation Checklist in NPG
-SPP-17.8.2)      Validated by:
-SPP-17.8.2)      Validated by:
Approved by:
Approved by:
Validator Date  Approved by:
Validator   Date  Approved by:
Site Training Management Date  Site Training Program Owner Date    N Y Job Performance Measure (JPM)  2  OPERATOR:  ________________________________
Site Training Management Date  Site Training Program Owner Date    N Y Job Performance Measure (JPM)  2  OPERATOR:  ________________________________
JPM Number:  _672A U3_  RO  SRO  DATE: _______
JPM Number:  _672A U3_  RO  SRO  DATE: _______
Line 931: Line 826:
EXAMINER Job Performance Measure (JPM)  3  Revision Summary Rev No. Effective Date Pages Affected Description 0 04/30/15 All Initial issue
EXAMINER Job Performance Measure (JPM)  3  Revision Summary Rev No. Effective Date Pages Affected Description 0 04/30/15 All Initial issue


Job Performance Measure (JPM)  4  SIMULATOR SETUP IC 39 Exam IC 282      Console Operator Instructions Reset IC-39to ~ 30% Reactor Power Open Schedule File: NRC JPM C U3  
Job Performance Measure (JPM)  4  SIMULATOR SETUP IC 39 Exam IC 282      Console Operator Instructions Reset IC-39to ~ 3 0% Reactor Power Open Schedule File: NRC JPM C U3  
-RBM APRM Fail Downscale.sch Open Event File: NRC JPM C U3  
-RBM APRM Fail Downscale.sch Open Event File: NRC JPM C U3  
-RBM APRM Fail Downscale.evt Malfunctions Description Event Severity Delay Initial set NM07L3233C LPRM AMPLIFIER FAILURE 32 C 15 0 N/A N/A NM07L4025B LPRM AMPLIFIER FAILURE 40 B 15 0 N/A N/A NM07L4033D LPRM AMPLIFIER FAILURE 40 D 15 0 N/A N/A NM07L0817B LPRM AMPLIFIER FAILURE 08 B 15 0 N/A N/A NM07L4017B LPRM AMPLIFIER FAILURE 40 B 15 0 N/A N/A NM07L4041D LPRM AMPLIFIER FAILURE 40 D 15 0 N/A N/A NM07L4049B LPRM AMPLIFIER FAILURE 40 B 15 0 N/A N/A NM07L4057B LPRM AMPLIFIER FAILURE 40 B 15 0 N/A N/A NM07L4817C LPRM AMPLIFIER FAILURE 48 C 15 0 N/A N/A NM07L4825C LPRM AMPLIFIER FAILURE 48 C 15 0 N/A N/A NM07L4833A LPRM AMPLIFIER FAILURE 48 A 15 0 N/A N/A NM07L4841A LPRM AMPLIFIER FAILURE 48 A 15 0 N/A N/A NM07L4849C LPRM AMPLIFIER FAILURE 48 C 15 0 N/A N/A NM07L0825B LPRM AMPLIFIER FAILURE 08 B 15 0 N/A N/A Job Performance Measure (JPM)  5  NM07L0833D LPRM AMPLIFIER FAILURE 08 D 15 0 N/A N/A NM07L0841D LPRM AMPLIFIER FAILURE 08 D 15 0 N/A N/A NM07L0849B LPRM AMPLIFIER FAILURE 08 B 15 0 N/A N/A NM07L2409B LPRM AMPLIFIER FAILURE 24 B 15 0 N/A N/A NM07L2417D LPRM AMPLIFIER FAILURE 24 D 15 0 N/A N/A NM07L2425D LPRM AMPLIFIER FAILURE 24 D 15 0 N/A N/A NM07L2433B LPRM AMPLIFIER FAILURE 24 B 15 0 N/A N/A NM07L2449D LPRM AMPLIFIER FAILURE 24 D 15 0 N/A N/A NM07L2457D LPRM AMPLIFIER FAILURE 24 D 15 0 N/A N/A NM07L1617C LPRM AMPLIFIER FAILURE 16 C 15 0 N/A N/A NM07L1625C LPRM AMPLIFIER FAILURE 16 C 15 0 N/A N/A NM07L1633A LPRM AMPLIFIER FAILURE 16 A 15 0 N/A N/A NM07L1641A LPRM AMPLIFIER FAILURE 16 A 15 0 N/A N/A NM07L1649C LPRM AMPLIFIER FAILURE 16 C 15 0 N/A N/A NM07L1657C LPRM AMPLIFIER FAILURE 16 C 15 0 N/A N/A NM07L1609A LPRM AMPLIFIER FAILURE 16 A 15 0 N/A N/A NM07L3209C LPRM AMPLIFIER FAILURE 32 C 15 0 N/A N/A NM07L3217A LPRM AMPLIFIER FAILURE 32 A 15 0 N/A N/A NM07L3225A LPRM AMPLIFIER FAILURE 32 A 15 0 N/A N/A NM07L3249A LPRM AMPLIFIER FAILURE 32 A 15 0 N/A N/A NM07L3257A LPRM AMPLIFIER FAILURE 32 A 15 0 N/A N/A NM07L4009D LPRM AMPLIFIER FAILURE 40 D 15 0 N/A N/A NM07L4809A LPRM AMPLIFIER 15 0 N/A N/A Job Performance Measure (JPM)  6  FAILURE 48 A NM07L5617D LPRM AMPLIFIER FAILURE 56 D 15 0 N/A N/A NM07L5633B LPRM AMPLIFIER FAILURE 56 B 15 0 N/A N/A NM07L5641B LPRM AMPLIFIER FAILURE 56 B 15 0 N/A N/A NM07L3241C LPRM AMPLIFIER FAILURE 32 C 15 0 N/A N/A                  Remotes Description Event Severity Delay Initial set                  Overrides Description Event Severity Delay Initial set ZLO4631LGREENT(1)
-RBM APRM Fail Downscale.evt Malfunctions Description Event Severity Delay Initial set NM07L3233C LPRM AMPLIFIER FAILURE 32 C 15 0 N/A N/A NM07L4025B LPRM AMPLIFIER FAILURE 40 B 15 0 N/A N/A NM07L4033D LPRM AMPLIFIER FAILURE 40 D 15 0 N/A N/A NM07L0817B LPRM AMPLIFIER FAILURE 08 B 15 0 N/A N/A NM07L4017B LPRM AMPLIFIER FAILURE 40 B 15 0 N/A N/A NM07L4041D LPRM AMPLIFIER FAILURE 40 D 15 0 N/A N/A NM07L4049B LPRM AMPLIFIER FAILURE 40 B 15 0 N/A N/A NM07L4057B LPRM AMPLIFIER FAILURE 40 B 15 0 N/A N/A NM07L4817C LPRM AMPLIFIER FAILURE 48 C 15 0 N/A N/A NM07L4825C LPRM AMPLIFIER FAILURE 48 C 15 0 N/A N/A NM07L4833A LPRM AMPLIFIER FAILURE 48 A 15 0 N/A N/A NM07L4841A LPRM AMPLIFIER FAILURE 48 A 15 0 N/A N/A NM07L4849C LPRM AMPLIFIER FAILURE 48 C 15 0 N/A N/A NM07L0825B LPRM AMPLIFIER FAILURE 08 B 15 0 N/A N/A Job Performance Measure (JPM)  5  NM07L0833D LPRM AMPLIFIER FAILURE 08 D 15 0 N/A N/A NM07L0841D LPRM AMPLIFIER FAILURE 08 D 15 0 N/A N/A NM07L0849B LPRM AMPLIFIER FAILURE 08 B 15 0 N/A N/A NM07L2409B LPRM AMPLIFIER FAILURE 24 B 15 0 N/A N/A NM07L2417D LPRM AMPLIFIER FAILURE 24 D 15 0 N/A N/A NM07L2425D LPRM AMPLIFIER FAILURE 24 D 15 0 N/A N/A NM07L2433B LPRM AMPLIFIER FAILURE 24 B 15 0 N/A N/A NM07L2449D LPRM AMPLIFIER FAILURE 24 D 15 0 N/A N/A NM07L2457D LPRM AMPLIFIER FAILURE 24 D 15 0 N/A N/A NM07L1617C LPRM AMPLIFIER FAILURE 16 C 15 0 N/A N/A NM07L1625C LPRM AMPLIFIER FAILURE 16 C 15 0 N/A N/A NM07L1633A LPRM AMPLIFIER FAILURE 16 A 15 0 N/A N/A NM07L1641A LPRM AMPLIFIER FAILURE 16 A 15 0 N/A N/A NM07L1649C LPRM AMPLIFIER FAILURE 16 C 15 0 N/A N/A NM07L1657C LPRM AMPLIFIER FAILURE 16 C 15 0 N/A N/A NM07L1609A LPRM AMPLIFIER FAILURE 16 A 15 0 N/A N/A NM07L3209C LPRM AMPLIFIER FAILURE 32 C 15 0 N/A N/A NM07L3217A LPRM AMPLIFIER FAILURE 32 A 15 0 N/A N/A NM07L3225A LPRM AMPLIFIER FAILURE 32 A 15 0 N/A N/A NM07L3249A LPRM AMPLIFIER FAILURE 32 A 15 0 N/A N/A NM07L3257A LPRM AMPLIFIER FAILURE 32 A 15 0 N/A N/A NM07L4009D LPRM AMPLIFIER FAILURE 40 D 15 0 N/A N/A NM07L4809A LPRM AMPLIFIER 15 0 N/A N/A Job Performance Measure (JPM)  6  FAILURE 48 A NM07L5617D LPRM AMPLIFIER FAILURE 56 D 15 0 N/A N/A NM07L5633B LPRM AMPLIFIER FAILURE 56 B 15 0 N/A N/A NM07L5641B LPRM AMPLIFIER FAILURE 56 B 15 0 N/A N/A NM07L3241C LPRM AMPLIFIER FAILURE 32 C 15 0 N/A N/A                  Remotes Description Event Severity Delay Initial set                  Overrides Description Event Severity Delay Initial set ZLO4631LGREENT(1)
Control Rod 46
Control Rod 46
-31 GREEN INDICATION 15 0 N/A N/A        Schedule File(s):  
-31 GREEN INDICATION 15 0 N/A N/A        Schedule File(s):
 
Event File: NRC JPM C U3  
Event File: NRC JPM C U3  
-RBM APRM Fail Downscale.evt; <TRIGGER id="15" description="APRM Ch 2 Fail Downscale">ZLO4631LGREENT(1) == 0</TRIGGER>
-RBM APRM Fail Downscale.evt; <TRIGGER id="15" description="APRM Ch 2 Fail Downscale">ZLO4631LGREENT(1) == 0</TRIGGER>
Line 954: Line 848:
-SR-3.1.3.5(A) in preparation for placing Feedwater Heaters and Moisture Separator Drain System in service. Start on Group 59; Control Rod 22
-SR-3.1.3.5(A) in preparation for placing Feedwater Heaters and Moisture Separator Drain System in service. Start on Group 59; Control Rod 22
-39.
-39.
Job Performance Measure (JPM)  8  START TIME
Job Performance Measure (JPM)  8  START TIME:    STEP / STANDARD SAT / UNSAT Step 1:    [1] SELECT the desired control rod by depressing the appropriate CRD ROD SELECT pushbutton, 3
:    STEP / STANDARD SAT / UNSAT Step 1:    [1] SELECT the desired control rod by depressing the appropriate CRD ROD SELECT pushbutton, 3
-XS-85-40. Standard:   Selects Control Rod by depressing CRD ROD SELECT pushbutton.
-XS-85-40. Standard:
Selects Control Rod by depressing CRD ROD SELECT pushbutton.
Critical Step
Critical Step


SAT UNSAT N/A  Step 2:     
SAT UNSAT N/A  Step 2:     
[2] OBSERVE the following for the selected control rod:
[2] OBSERVE the following for the selected control rod:
CRD ROD SELECT pushbutton is brightly ILLUMINATED White light on the Full Core Display ILLUMINATED Rod Out Permit light ILLUMINATED Standard:
CRD ROD SELECT pushbutton is brightly ILLUMINATED White light on the Full Core Display ILLUMINATED Rod Out Permit light ILLUMINATED Standard:   VERIFIES  CRD ROD SELECT pushbutton is brightly ILLUMINATED White light on the Full Core Display ILLUMINATED Rod Out Permit light ILLUMINATED SAT UNSAT N/A  Step 3:     
VERIFIES  CRD ROD SELECT pushbutton is brightly ILLUMINATED White light on the Full Core Display ILLUMINATED Rod Out Permit light ILLUMINATED SAT UNSAT N/A  Step 3:     
[3] VERIFY Rod Worth Minimizer is operable and LATCHED into the correct ROD GROUP when the Rod Worth Minimizer is enforcing Standard: STEP is N/A due to Rod Block Monitor is Enforcing SAT UNSAT  N/A Job Performance Measure (JPM)  9  STEP / STANDARD SAT / UNSAT Step 4:    [4] PLACE CRD CONTROL SWITCH, 3
[3] VERIFY Rod Worth Minimizer is operable and LATCHED into the correct ROD GROUP when the Rod Worth Minimizer is enforcing Standard:
STEP is N/A due to Rod Block Monitor is Enforcing SAT UNSAT  N/A Job Performance Measure (JPM)  9  STEP / STANDARD SAT / UNSAT Step 4:    [4] PLACE CRD CONTROL SWITCH, 3
-HS-85-48, in ROD OUT NOTCH, and RELEASE.   
-HS-85-48, in ROD OUT NOTCH, and RELEASE.   
[5] OBSERVE the control rod settles into the desired position and the ROD SETTLE light extinguishes.
[5] OBSERVE the control rod settles into the desired position and the ROD SETTLE light extinguishes.
Standard:
Standard:
PLACED CRD CONTROL SWITCH, 3 48 in ROD OUT NOTCH position and RELEASED control switch to move Control Rod to Position 04 as indicated on Full Core Display
PLACED CRD CONTROL SWITCH, 3 48 in ROD OUT NOTCH position and RELEASED control switch to move Control Rod to Position 04 as indicated on Full Core Display
. Critical Step
. Critical Step
Line 975: Line 864:
SAT UNSAT N/A  Note to Examiner: Step is repeated to get Control Rod to Position 04 Step 5:     
SAT UNSAT N/A  Note to Examiner: Step is repeated to get Control Rod to Position 04 Step 5:     
[1] SELECT the desired control rod by depressing the appropriate CRD ROD SELECT pushbutton, 3
[1] SELECT the desired control rod by depressing the appropriate CRD ROD SELECT pushbutton, 3
-XS-85-40. Standard:
-XS-85-40. Standard:   Selects Control Rod by depressing CRD ROD SELECT pushbutton.
Selects Control Rod by depressing CRD ROD SELECT pushbutton.
Critical Step
Critical Step


SAT UNSAT N/A  Step 6:     
SAT UNSAT N/A  Step 6:     
[2] OBSERVE the following for the selected control rod:
[2] OBSERVE the following for the selected control rod:
CRD ROD SELECT pushbutton is brightly ILLUMINATED White light on the Full Core Display ILLUMINATED Rod Out Permit light ILLUMINATED Standard:
CRD ROD SELECT pushbutton is brightly ILLUMINATED White light on the Full Core Display ILLUMINATED Rod Out Permit light ILLUMINATED Standard:   VERIFIES  CRD ROD SELECT pushbutton is brightly ILLUMINATED White light on the Full Core Display ILLUMINATED Rod Out Permit light ILLUMINATED SAT UNSAT N/A Job Performance Measure (JPM)  10  STEP / STANDARD SAT / UNSAT Step 7:    [3] VERIFY Rod Worth Minimizer is operable and LATCHED into the correct ROD GROUP when the Rod Worth Minimizer is enforcing Standard: STEP is N/A due to Rod Block Monitor is Enforcing SAT UNSAT  N/A  Step 8:    [4] PLACE CRD CONTROL SWITCH, 3
VERIFIES  CRD ROD SELECT pushbutton is brightly ILLUMINATED White light on the Full Core Display ILLUMINATED Rod Out Permit light ILLUMINATED SAT UNSAT N/A Job Performance Measure (JPM)  10  STEP / STANDARD SAT / UNSAT Step 7:    [3] VERIFY Rod Worth Minimizer is operable and LATCHED into the correct ROD GROUP when the Rod Worth Minimizer is enforcing Standard:
STEP is N/A due to Rod Block Monitor is Enforcing SAT UNSAT  N/A  Step 8:    [4] PLACE CRD CONTROL SWITCH, 3
-HS-85-48, in ROD OUT NOTCH, and RELEASE.   
-HS-85-48, in ROD OUT NOTCH, and RELEASE.   
[5] OBSERVE the control rod settles into the desired position and the ROD SETTLE light extinguishes.
[5] OBSERVE the control rod settles into the desired position and the ROD SETTLE light extinguishes.
Standard:
Standard:
PLACED CRD CONTROL SWITCH, 3 48 in ROD OUT NOTCH position and RELEASED control switch to move Control Rod to Position 04 as indicated on Full Core Display
PLACED CRD CONTROL SWITCH, 3 48 in ROD OUT NOTCH position and RELEASED control switch to move Control Rod to Position 04 as indicated on Full Core Display
. Critical Step
. Critical Step
Line 993: Line 878:
SAT UNSAT N/A  Note to Examiner: Step is repeated to get Control Rod to Position 04 Step 9:     
SAT UNSAT N/A  Note to Examiner: Step is repeated to get Control Rod to Position 04 Step 9:     
[1] SELECT the desired control rod by depressing the appropriate CRD ROD SELECT pushbutton, 3
[1] SELECT the desired control rod by depressing the appropriate CRD ROD SELECT pushbutton, 3
-XS-85-40. Standard:
-XS-85-40. Standard:   Selects Control Rod by depressing CRD ROD SELECT pushbutton.
Selects Control Rod by depressing CRD ROD SELECT pushbutton.
Critical Step
Critical Step


SAT UNSAT N/A Job Performance Measure (JPM)  11  STEP / STANDARD SAT / UNSAT Step 10:    [2] OBSERVE the following for the selected control rod:
SAT UNSAT N/A Job Performance Measure (JPM)  11  STEP / STANDARD SAT / UNSAT Step 10:    [2] OBSERVE the following for the selected control rod:
CRD ROD SELECT pushbutton is brightly ILLUMINATED White light on the Full Core Display ILLUMINATED Rod Out Permit light ILLUMINATED Standard:
CRD ROD SELECT pushbutton is brightly ILLUMINATED White light on the Full Core Display ILLUMINATED Rod Out Permit light ILLUMINATED Standard:   VERIFIES  CRD ROD SELECT pushbutton is brightly ILLUMINATED White light on the Full Core Display ILLUMINATED Rod Out Permit light ILLUMINATED SAT UNSAT N/A  Step 11:     
VERIFIES  CRD ROD SELECT pushbutton is brightly ILLUMINATED White light on the Full Core Display ILLUMINATED Rod Out Permit light ILLUMINATED SAT UNSAT N/A  Step 11:     
[3] VERIFY Rod Worth Minimizer is operable and LATCHED into the correct ROD GROUP when the Rod Worth Minimizer is enforcing Standard: STEP is N/A due to Rod Block Monitor is Enforcing SAT UNSAT N/A  Step 12:     
[3] VERIFY Rod Worth Minimizer is operable and LATCHED into the correct ROD GROUP when the Rod Worth Minimizer is enforcing Standard:
STEP is N/A due to Rod Block Monitor is Enforcing SAT UNSAT N/A  Step 12:     
[4] PLACE CRD CONTROL SWITCH, 3
[4] PLACE CRD CONTROL SWITCH, 3
-HS-85-48, in ROD OUT NOTCH, and RELEASE.   
-HS-85-48, in ROD OUT NOTCH, and RELEASE.   
[5] OBSERVE the control rod settles into the desired position and the ROD SETTLE light extinguishes.
[5] OBSERVE the control rod settles into the desired position and the ROD SETTLE light extinguishes.
Standard:
Standard:
PLACED CRD CONTROL SWITCH, 3 48 in ROD OUT NOTCH position and RELEASED control switch to move Control Rod to Position 04 as indicated on Full Core Display
PLACED CRD CONTROL SWITCH, 3 48 in ROD OUT NOTCH position and RELEASED control switch to move Control Rod to Position 04 as indicated on Full Core Display
. Critical Step
. Critical Step
Line 1,022: Line 903:
C. Unit shutdown (Mode 3 or 4).
C. Unit shutdown (Mode 3 or 4).
D. Failed sensor.
D. Failed sensor.
Automatic
Automatic Action: A. Rod withdrawal block with Rx Mode Sw. in RUN.(APRM only)
 
Action: A. Rod withdrawal block with Rx Mode Sw. in RUN.(APRM only)
Operator Action: A. DETERMINE which APRM/OPRM channel is downscale/inop.
Operator Action: A. DETERMINE which APRM/OPRM channel is downscale/inop.
B. IF APRM failed downscale, THEN BYPASS channel. REFER TO 3-OI-92B.   
B. IF APRM failed downscale, THEN BYPASS channel. REFER TO 3-OI-92B.   
Line 1,031: Line 910:


SAT UNSAT N/A APRM DOWNSCALE/
SAT UNSAT N/A APRM DOWNSCALE/
OPRM INOP 4
OPRM INOP     4 Job Performance Measure (JPM)  13  STEP / STANDARD SAT / UNSAT Step 13(continued)
Job Performance Measure (JPM)  13  STEP / STANDARD SAT / UNSAT Step 13(continued)
Sensor/Trip Point:
Sensor/Trip Point:
Relays:3A-K1 Nuclear Instrumentation 3A-K2 Refuel Equipment in Use High Level in Scram Discharge Volume Scram Discharge Volume High Water Level Bypass Rx Mode Switch in SHUTDOWN PRNM (ANY APRM OPRM or RBM) Sensor Location:
Relays: 3A-K1 Nuclear Instrumentation 3A-K2 Refuel Equipment in Use High Level in Scram Discharge Volume Scram Discharge Volume High Water Level Bypass Rx Mode Switch in SHUTDOWN PRNM (ANY APRM OPRM or RBM) Sensor Location:
Panel 3-9-28 Elevation 593' Aux Instr Room Probable Cause:  A. One or more sensors at or above set point. B. Malfunction of sensor.
Panel 3-9-28 Elevation 593' Aux Instr Room Probable Cause:  A. One or more sensors at or above set point. B. Malfunction of sensor.
C. Control rod drop accident Automatic Action: Rod withdrawal block Operator Action:  A. DETERMINE initiating condition from corresponding rod withdrawalblock alarm(s) and REFER TO operator action for alarm(s).
C. Control rod drop accident Automatic Action: Rod withdrawal block Operator Action:  A. DETERMINE initiating condition from corresponding rod withdrawalblock alarm(s) and REFER TO operator action for alarm(s). Standard:   Reference 3
Standard:
-ARP-9-5A and identifies APRM Ch 2 is down scale and proceeds to bypass APRM Ch 2 per 3-OI-92B  CUE:Respond as stated in Alarm Response Instruction and Bypass APRM Ch 2 per 3-OI-92B. CONTROL ROD WITHDRAWAL BLOCK    7 Job Performance Measure (JPM)  14  STEP / STANDARD SAT / UNSAT Step 1 4:     
Reference 3
-ARP-9-5A and identifies APRM Ch 2 is down scale and proceeds to bypass APRM Ch 2 per 3-OI-92B  CUE:Respond as stated in Alarm Response Instruction and Bypass APRM Ch 2 per 3-OI-92B. CONTROL ROD WITHDRAWAL BLOCK    7 Job Performance Measure (JPM)  14  STEP / STANDARD SAT / UNSAT Step 14:     


6.1 Bypassing APRM/OPRM Channel
6.1 Bypassing APRM/OPRM Channel
         [1] REVIEW all precautions and limitations. REFER TO Section 3.0.
         [1] REVIEW all precautions and limitations. REFER TO Section 3.0.
Standard:
Standard:   Demonstrates reviewing precautions and limitations section 3.0.
Demonstrates reviewing precautions and limitations section 3.0.
SAT UNSAT N/A CUE: If asked per note 2 above, "Panel 9-14 Voter BLUE LIGHTS are extinguished".
SAT UNSAT N/A CUE: If asked per note 2 above, "Panel 9-14 Voter BLUE LIGHTS are extinguished".
Step 1 5:     
Step 15:     
[2] PLACE APRM BYPASS, 3
[2] PLACE APRM BYPASS, 3
-HS-92-7B/S3, to desired channel to be bypassed.
-HS-92-7B/S3, to desired channel to be bypassed.
Standard:
Standard:
PLACE APRM BYPASS, 3
PLACE APRM BYPASS, 3
-HS-92-7B/S3, to APRM CH 2 Critical Step
-HS-92-7B/S3, to APRM CH 2 Critical Step


SAT UNSAT N/A NOTES 1) Only one APRM/OPRM in each trip system can be bypassed at a time. 2) All operations are performed on Panel 3 5 unless specifically stated otherwise.
SAT UNSAT N/A NOTES 1) Only one APRM/OPRM in each trip system can be bypassed at a time. 2) All operations are performed on Panel 3 5 unless specifically stated otherwise.
Line 1,059: Line 933:
-14 Voters are required to be illuminated prior to testing, operating, or working on that channel.
-14 Voters are required to be illuminated prior to testing, operating, or working on that channel.
CAUTION [QA/C] SPP-10.4 requires approval of the Plant Manager or his designee prior to any planned operation with APRMs bypassed unless bypassing is specifically allowed within approved procedures. [ISE-HPS-92-RO1]
CAUTION [QA/C] SPP-10.4 requires approval of the Plant Manager or his designee prior to any planned operation with APRMs bypassed unless bypassing is specifically allowed within approved procedures. [ISE-HPS-92-RO1]
Job Performance Measure (JPM)  15  STEP / STANDARD SAT / UNSAT Step 16:    [3] CHECK BLUE BYPASSED lights illuminated on Panel 3 14 Voters. Standard:
Job Performance Measure (JPM)  15  STEP / STANDARD SAT / UNSAT Step 1 6:    [3] CHECK BLUE BYPASSED lights illuminated on Panel 3 14 Voters. Standard:
 
Simulates observing BLUE BYPASS light illuminated on Panel 3 14 for APRM CH 2
Simulates observing BLUE BYPASS light illuminated on Panel 3 14 for APRM CH 2
. SAT UNSAT N/A Cue: Blue Light is illuminated on Panel 3 14 for APRM CH 2.
. SAT UNSAT N/A Cue: Blue Light is illuminated on Panel 3 14 for APRM CH 2.
Step 17:     
Step 1 7:     
[4] VERIFY white bypass light on Panel 3 5 is illuminated.
[4] VERIFY white bypass light on Panel 3 5 is illuminated.
Standard:
Standard:
Observes WHITE BYPASS light illuminated on Panel 3 5.
Observes WHITE BYPASS light illuminated on Panel 3 5.
SAT  UNSAT  N/A Note to NRC Examiner: If needed, cue student to proceed with actions required to continue rod movements.Student may continue at step 18 or 21.
SAT  UNSAT  N/A Note to NRC Examiner: If needed, cue student to proceed with actions required to continue rod movements.Student may continue at step 18 or 21.
Line 1,075: Line 947:
-HS-85-46 in the OFF position to deselect the Control Rod.
-HS-85-46 in the OFF position to deselect the Control Rod.
Standard:
Standard:
CRD POWER, 3
CRD POWER, 3
-HS-85-46 in the OFF position
-HS-85-46 in the OFF position. SAT UNSAT N/A Job Performance Measure (JPM)  16  STEP / STANDARD SAT / UNSAT Step 19:    [6.2] PLACE CRD POWER, 3
. SAT UNSAT N/A Job Performance Measure (JPM)  16  STEP / STANDARD SAT / UNSAT Step 19:    [6.2] PLACE CRD POWER, 3
-HS-85-46, in the ON position.
-HS-85-46, in the ON position.
Standard:
Standard:   PLACED CRD POWER, 3-HS-85-46, in the ON position.
PLACED CRD POWER, 3-HS-85-46, in the ON position.
SAT UNSAT N/A Step 20:     
SAT UNSAT N/A Step 20:     
[6.3] IF desired, THEN CONTINUE to withdrawal Control Rods and PERFORM applicable section for Control Rod withdrawal.
[6.3] IF desired, THEN CONTINUE to withdrawal Control Rods and PERFORM applicable section for Control Rod withdrawal.
Standard:
Standard:
Continues with Control Rod Movement
Continues with Control Rod Movement


SAT UNSAT  N/A Cue:If asked, Proceed with Control Rod Movement.
SAT UNSAT  N/A Cue:If asked, Proceed with Control Rod Movement.
Step 21:    [1] SELECT the desired control rod by depressing the appropriate CRD ROD SELECT pushbutton, 3
Step 21:    [1] SELECT the desired control rod by depressing the appropriate CRD ROD SELECT pushbutton, 3
-XS-85-40. Standard:
-XS-85-40. Standard:   Selects Control Rod by depressing CRD ROD SELECT pushbutton.
Selects Control Rod by depressing CRD ROD SELECT pushbutton.
Critical Step SAT UNSAT  N/A Job Performance Measure (JPM)  17  STEP / STANDARD SAT / UNSAT Step 22:    [2] OBSERVE the following for the selected control rod:
Critical Step SAT UNSAT  N/A Job Performance Measure (JPM)  17  STEP / STANDARD SAT / UNSAT Step 22:    [2] OBSERVE the following for the selected control rod:
CRD ROD SELECT pushbutton is brightly ILLUMINATED White light on the Full Core Display ILLUMINATED Rod Out Permit light ILLUMINATED Standard:
CRD ROD SELECT pushbutton is brightly ILLUMINATED White light on the Full Core Display ILLUMINATED Rod Out Permit light ILLUMINATED Standard: VERIFIES  CRD ROD SELECT pushbutton is brightly ILLUMINATED White light on the Full Core Display ILLUMINATED Rod Out Permit light ILLUMINATED SAT UNSAT N/A  Step 23:     
VERIFIES  CRD ROD SELECT pushbutton is brightly ILLUMINATED White light on the Full Core Display ILLUMINATED Rod Out Permit light ILLUMINATED SAT UNSAT N/A  Step 23:     
[3] VERIFY Rod Worth Minimizer is operable and LATCHED into the correct ROD GROUP when the Rod Worth Minimizer is enforcing Standard: STEP is N/A due to Rod Block Monitor is Enforcing SAT  UNSAT  N/A  Step 24:    [4] PLACE CRD CONTROL SWITCH, 3
[3] VERIFY Rod Worth Minimizer is operable and LATCHED into the correct ROD GROUP when the Rod Worth Minimizer is enforcing Standard:
STEP is N/A due to Rod Block Monitor is Enforcing SAT  UNSAT  N/A  Step 24:    [4] PLACE CRD CONTROL SWITCH, 3
-HS-85-48, in ROD OUT NOTCH, and RELEASE.   
-HS-85-48, in ROD OUT NOTCH, and RELEASE.   
[5] OBSERVE the control rod settles into the desired position and the ROD SETTLE light extinguishes.
[5] OBSERVE the control rod settles into the desired position and the ROD SETTLE light extinguishes.
Standard:
Standard:
PLACED CRD CONTROL SWITCH, 3 48 in ROD OUT NOTCH position and RELEASED control switch to move Control Rod to Position 04 as indicated on Full Core Display. Critical Step
PLACED CRD CONTROL SWITCH, 3 48 in ROD OUT NOTCH position and RELEASED control switch to move Control Rod to Position 04 as indicated on Full Core Display. Critical Step


Line 1,123: Line 987:
2-EOI APPENDIX
2-EOI APPENDIX
-6E INJECTION SUBSYSTEM LINEUP CS SYSTEM II JPM NUMBER:
-6E INJECTION SUBSYSTEM LINEUP CS SYSTEM II JPM NUMBER:
257A U2 REVISION:
257 A U 2 REVISION: 1  TASK APPLICABILITY:
1  TASK APPLICABILITY:
SRO STA UO NAUO TASK NUMBER / TASK TITLE(S): U-000-EM-35/ Lineup Injection Subsystem
SRO STA UO NAUO TASK NUMBER / TASK TITLE(S):
U-000-EM-35/ Lineup Injection Subsystem
-Core Spray Loop I(II) in Accordance with EOI Appendix 6D(E) K/A RATINGS:
-Core Spray Loop I(II) in Accordance with EOI Appendix 6D(E) K/A RATINGS:
RO:  3.9    SRO:  3.9 K/A No. &STATEMENT:
RO:  3.9    SRO:  3.9 K/A No. &STATEMENT:
Line 1,132: Line 994:
Risk Significant SAFETY FUNCTION:
Risk Significant SAFETY FUNCTION:
2  EVALUATION LOCATION:
2  EVALUATION LOCATION:
In-Plant  Simulator Control Room Lab  Other - List  APPLICABLE METHOD OF TESTING:  Discussion  Simulate/Walkthrough  Perform TIME FOR COMPLETION:      NA      TIME CRITICAL (Y/N)      ALTERNATE PATH (Y/N)
In-Plant  Simulator Control R oom Lab  Other - List  APPLICABLE METHOD OF TESTING:  Discussion  Simulate/Walkthrough  Perform   TIME FOR COMPLETION:      NA      TIME CRITICAL (Y/N)      ALTERNATE PATH (Y/N)
Developed by:
Developed by:
Developer Date  (Ensure validator is briefed on exam security per NPG
Developer Date  (Ensure validator is briefed on exam security per NPG
-SPP-17.8.1)                (See JPM Validation Checklist in NPG
-SPP-17.8.1)                (See JPM Validation Checklist in NPG
-SPP-17.8.2)      Validated by:
-SPP-17.8.2)      Validated by:
Approved by:
Approved by:
Validator Date  Approved by:
Validator   Date  Approved by:
Site Training Management Date  Site Training Program Owner Date    N Y Job Performance Measure (JPM)  2  OPERATOR:
Site Training Management Date  Site Training Program Owner Date    N Y Job Performance Measure (JPM)  2  OPERATOR: ________________________________
________________________________
JPM Number:  _257A U2_  RO  SRO  DATE: _______
JPM Number:  _257A U2_  RO  SRO  DATE: _______


Line 1,168: Line 1,029:
: 3. Reset to IC-28and take out of freeze
: 3. Reset to IC-28and take out of freeze
. 4. CLOSE 2-FCV-75-51 5. OPEN 2-FCV-75-53 6. Man Scram Rx and place MS to SD. 7. Open 6 ADS Valves
. 4. CLOSE 2-FCV-75-51 5. OPEN 2-FCV-75-53 6. Man Scram Rx and place MS to SD. 7. Open 6 ADS Valves
. 8. Wait until various alarms with Supp Pool Temp High come in to save IC.      Malfunctions Description Event Severity Delay Initial set TH22 COOLANT LEAK INSIDE DRYWELL 15 75% 5 Yes CS04A CORE SPRAY LOGIC POWER FAILURE DIV I 15 N/A N/A Yes CS04B CORE SPRAY LOGIC POWER FAILURE DIV II 15 N/A N/A Yes CS02B CS INBOARD INJECTION VALVE AUTO OPENING FAILURE (FCV-75-53) 15 N/A N/A Yes RH06A RHR LOGIC POWER FAILURE DIV I 15 N/A N/A Yes RH06B RHR LOGIC POWER FAILURE DIV II 15 N/A N/A Yes RC01 RCIC TURBINE TRIP SYSTEM FAILURE 15 N/A N/A Yes HP04 HPCI STEAM SUPPLY VALVE AUTO OPENING FAILURE 15 N/A N/A Yes FW01A CONDENSATE PUMP TRIP 2A 15 N/A 10 Yes Job Performance Measure (JPM)  5  FW01B CONDENSATE PUMP TRIP 2B 15 N/A 10 Yes FW01C CONDENSATE PUMP TRIP 2C 15 N/A 10 Yes            Remotes Description Event Severity Delay Initial set                        Overrides Description Event Severity Delay Initial set Schedule File(s): JPM 257A U2 Core Spray Alt Inj.sch
. 8. Wait until various alarms with Supp Pool Temp High come in to save IC.      Malfunctions Description Event Severity Delay Initial set TH22 COOLANT LEAK INSIDE DRYWELL 1 5 75% 5 Yes CS04A CORE SPRAY LOGIC POWER FAILURE DIV I 15 N/A N/A Yes CS04B CORE SPRAY LOGIC POWER FAILURE DIV II 15 N/A N/A Yes CS02B CS INBOARD INJECTION VALVE AUTO OPENING FAILURE (FCV-75-53) 15 N/A N/A Yes RH06A RHR LOGIC POWER FAILURE DIV I 15 N/A N/A Yes RH06B RHR LOGIC POWER FAILURE DIV II 15 N/A N/A Yes RC01 RCIC TURBINE TRIP SYSTEM FAILURE 15 N/A N/A Yes HP04 HPCI STEAM SUPPLY VALVE AUTO OPENING FAILURE 15 N/A N/A Yes FW01A CONDENSATE PUMP TRIP 2A 15 N/A 10 Yes Job Performance Measure (JPM)  5  FW01B CONDENSATE PUMP TRIP 2B 15 N/A 10 Yes FW01C CONDENSATE PUMP TRIP 2C 15 N/A 10 Yes            Remotes Description Event Severity Delay Initial set                        Overrides Description Event Severity Delay Initial set Schedule File(s): JPM 257A U2 Core Spray Alt Inj.sch


Event File(s): JPM 257A U2 Core Spray Alt Inj.evt
Event File(s): JPM 257A U2 Core Spray Alt Inj.evt
Line 1,184: Line 1,045:
:  The Unit Supervisor directs you to inject water into the RPV to restore RPV water level above (-)162 inches (TAF) using Core Spray System II as directed by 2-EOI Appendix
:  The Unit Supervisor directs you to inject water into the RPV to restore RPV water level above (-)162 inches (TAF) using Core Spray System II as directed by 2-EOI Appendix
-6E, Injection Subsystems Lineup Core Spray System II.
-6E, Injection Subsystems Lineup Core Spray System II.
Job Performance Measure (JPM)  7  START TIME
Job Performance Measure (JPM)  7  START TIME:    STEP / STANDARD SAT / UNSAT Step 1:    Location: Unit 2 Control Room Attachments: 1. NPSH Monitoring
:    STEP / STANDARD SAT / UNSAT Step 1:    Location: Unit 2 Control Room Attachments: 1. NPSH Monitoring


[1] VERIFY OPEN the following valves:
[1] VERIFY OPEN the following valves:
2-FCV-75-30, CORE SPRAY PUMP 2B SUPPR POOL SUCT VLV  2-FCV-75-39, CORE SPRAY PUMP 2D SUPPR POOL SUCT VLV  Standard:
2-FCV-75-30, CORE SPRAY PUMP 2B SUPPR POOL SUCT VLV  2-FCV-75-39, CORE SPRAY PUMP 2D SUPPR POOL SUCT VLV  Standard: Verifie s 2-FCV-75-30 and 2-FCV-75-39 are open. SAT UNSAT N/A  Step 2:   
Verifies2-FCV-75-30 and 2-FCV-75-39 are open. SAT UNSAT N/A  Step 2:   
[1] (continued)VERIFY OPEN the following valves:
[1] (continued)VERIFY OPEN the following valves:
2-FCV-75-51, CORE SPRAY SYS II OUTBD INJECT VALVE.
2-FCV-75-51, CORE SPRAY SYS II OUTBD INJECT VALVE.


Standard:
Standard:
Recognizes 2-FCV-75-51 is closed and 2-FCV-75-53 is open, valve closes 2-FCV-75-53 and Opens 2-FCV-75-51. Critical Step
Recognizes 2-FCV-75-51 is closed and 2-FCV-75-53 is open, valve closes 2-FCV-75-53 and Opens 2-FCV-75-51. Critical Step


Line 1,201: Line 1,059:


Job Performance Measure (JPM)  8  STEP / STANDARD SAT / UNSAT Step 3:    [2] VERIFY CLOSED 2-FCV-75-50, CORE SPRAY SYS II TESTVALVE.
Job Performance Measure (JPM)  8  STEP / STANDARD SAT / UNSAT Step 3:    [2] VERIFY CLOSED 2-FCV-75-50, CORE SPRAY SYS II TESTVALVE.
Standard:
Standard: Verifies 2-FCV-75-50 closed SAT UNSAT N/A  Step 4:     
Verifies 2-FCV-75-50 closed SAT UNSAT N/A  Step 4:     
[3] VERIFY CS Pump 2B and/or 2D running.
[3] VERIFY CS Pump 2B and/or 2D running.
Standard:
Standard: Starts Core Pumps 2B and/or 2 D (Only starting one pump is Critical, the second pump is optional).
Starts Core Pumps 2B and/or 2D (Only starting one pump is Critical, the second pump is optional).
Critical Step
Critical Step


SAT UNSAT N/A Step 6:     
SAT UNSAT N/A Step 6:     
[4] WHEN RPV pressure is below 450 psig, THEN THROTTLE2-FCV-75-53, CORE SPRAY SYS II INBDINJECT VALVE, as necessary to control injection at or below4000 gpm per pump.
[4] WHEN RPV pressure is below 450 psig, THEN THROTTLE 2-FCV-75-53, CORE SPRAY SYS II INBDINJECT VALVE, as necessary to control injection at or below4000 gpm per pump.
Standard:
Standard: Verifies pressure < 450 psig and opens 2-FCV-75-53 and commences injection. (And verify flow <4000 gpm for 1 pump or  
Verifies pressure < 450 psig and opens 2-FCV-75-53 and commences injection. (And verify flow <4000 gpm for 1 pump or  
<8000 gpm for 2 pumps).
<8000 gpm for 2 pumps).
Critical Step SAT  UNSAT N/A Step 7:  CAUTION Continuous operation with inadequate NPSH may result in pump damage or pump inoperability.  
Critical Step SAT  UNSAT N/A Step 7:  CAUTION Continuous operation with inadequate NPSH may result in pump damage or pump inoperability.  
[5] MONITOR Core Spray Pump NPSH using Attachment 1.
[5] MONITOR Core Spray Pump NPSH using Attachment 1.
Standard:
Standard: Operator comparesCore Spray Pump flow rate with Suppression Pool temperature and Suppression Pool pressure and Determined adequate NPSH.
Operator comparesCore Spray Pump flow rate with Suppression Pool temperature and Suppression Pool pressure and Determined adequate NPSH.


SAT UNSAT N/A  Termination Criteria:  Once rector Water Level is > TAF JPM may be terminated. IF student fails to recover reactor water level above TAF (
SAT UNSAT N/A  Termination Criteria:  Once rector Water Level is > TAF JPM may be terminated. IF student fails to recover reactor water level above TAF (-162 inches), it will be considered a failure.
-162 inches), it will be considered a failure.
STOP TIME:
STOP TIME:
Job Performance Measure (JPM)  9  Provide to Applicant
Job Performance Measure (JPM)  9  Provide to Applicant
Line 1,241: Line 1,094:
3-EOI APPENDIX
3-EOI APPENDIX
-6E INJECTION SUBSYSTEM LINEUP CS SYSTEM II JPM NUMBER:
-6E INJECTION SUBSYSTEM LINEUP CS SYSTEM II JPM NUMBER:
257A U3 REVISION:
257 A U3 REVISION: 1  TASK APPLICABILITY:
1  TASK APPLICABILITY:
SRO STA UO NAUO TASK NUMBER / TASK TITLE(S): U-000-EM-35/ Lineup Injection Subsystem
SRO STA UO NAUO TASK NUMBER / TASK TITLE(S):
U-000-EM-35/ Lineup Injection Subsystem
-Core Spray Loop I(II) in Accordance with EOI Appendix 6D(E) K/A RATINGS:
-Core Spray Loop I(II) in Accordance with EOI Appendix 6D(E) K/A RATINGS:
RO:  3.9    SRO:  3.9 K/A No. &STATEMENT:
RO:  3.9    SRO:  3.9 K/A No. &STATEMENT:
Line 1,250: Line 1,101:
Risk Significant SAFETY FUNCTION:
Risk Significant SAFETY FUNCTION:
2  EVALUATION LOCATION:
2  EVALUATION LOCATION:
In-Plant  Simulator Control Room Lab  Other - List  APPLICABLE METHOD OF TESTING:  Discussion  Simulate/Walkthrough  Perform TIME FOR COMPLETION:      NA      TIME CRITICAL (Y/N)      ALTERNATE PATH (Y/N)
In-Plant  Simulator Control R oom Lab  Other - List  APPLICABLE METHOD OF TESTING:  Discussion  Simulate/Walkthrough  Perform   TIME FOR COMPLETION:      NA      TIME CRITICAL (Y/N)      ALTERNATE PATH (Y/N)
Developed by:
Developed by:
Developer Date  (Ensure validator is briefed on exam security per NPG
Developer Date  (Ensure validator is briefed on exam security per NPG
-SPP-17.8.1)                (See JPM Validation Checklist in NPG
-SPP-17.8.1)                (See JPM Validation Checklist in NPG
-SPP-17.8.2)      Validated by:
-SPP-17.8.2)      Validated by:
Approved by:
Approved by:
Validator Date  Approved by:
Validator   Date  Approved by:
Site Training Management Date  Site Training Program Owner Date    N Y Job Performance Measure (JPM)  2  OPERATOR:
Site Training Management Date  Site Training Program Owner Date    N Y Job Performance Measure (JPM)  2  OPERATOR: ________________________________
________________________________
JPM Number:  _257A U3_  RO  SRO    DATE: _______
JPM Number:  _257A U3_  RO  SRO    DATE: _______
TASK STANDARD:
TASK STANDARD:
Line 1,300: Line 1,150:
:  The Unit Supervisor directs you to inject water into the RPV to restore RPV water level above (-)162 inches (TAF) using Core Spray System II as directed by 3-EOI Appendix
:  The Unit Supervisor directs you to inject water into the RPV to restore RPV water level above (-)162 inches (TAF) using Core Spray System II as directed by 3-EOI Appendix
-6E, Injection Subsystems Lineup Core Spray System II.
-6E, Injection Subsystems Lineup Core Spray System II.
Job Performance Measure (JPM)  7  START TIME
Job Performance Measure (JPM)  7  START TIME:    STEP / STANDARD SAT / UNSAT Step 1:    Location: Unit 3 Control Room Attachments: 1. NPSH Monitoring
:    STEP / STANDARD SAT / UNSAT Step 1:    Location: Unit 3 Control Room Attachments: 1. NPSH Monitoring


[1] VERIFY OPEN the following valves:
[1] VERIFY OPEN the following valves:
3-FCV-75-30, CORE SPRAY PUMP 3B SUPPR POOL SUCT VLV  3-FCV-75-39, CORE SPRAY PUMP 3D SUPPR POOL SUCT VLV  Standard:
3-FCV-75-30, CORE SPRAY PUMP 3B SUPPR POOL SUCT VLV  3-FCV-75-39, CORE SPRAY PUMP 3D SUPPR POOL SUCT VLV  Standard: Verifie s 3-FCV-75-30 and 3-FCV-75-39 are open. SAT UNSAT N/A  Step 2:   
Verifies3-FCV-75-30 and 3-FCV-75-39 are open. SAT UNSAT N/A  Step 2:   
[1] (continued) VERIFY OPEN the following valves:
[1] (continued) VERIFY OPEN the following valves:
3-FCV-75-51, CORE SPRAY SYS II OUTBD INJECT VALVE.
3-FCV-75-51, CORE SPRAY SYS II OUTBD INJECT VALVE.


Standard:
Standard:   Recognizes 3
Recognizes 3
-FCV-75-51 is closed and 3
-FCV-75-51 is closed and 3
-FCV-75-53 is open, closes 3-FCV-75-53 and Opens 3
-FCV-75-53 is open, closes 3-FCV-75-53 and Opens 3
Line 1,318: Line 1,165:
-75, Core Spray System line up.
-75, Core Spray System line up.


Job Performance Measure (JPM)  8  STEP / STANDARD SAT / UNSAT Step 3:    [2] VERIFY CLOSED 3-FCV-75-50, CORE SPRAY SYS II TEST VALVE. Standard:
Job Performance Measure (JPM)  8  STEP / STANDARD SAT / UNSAT Step 3:    [2] VERIFY CLOSED 3-FCV-75-50, CORE SPRAY SYS II TEST VALVE. Standard: Verifies 3
Verifies 3
-FCV-75-50 closed SAT UNSAT N/A  Step 4:     
-FCV-75-50 closed SAT UNSAT N/A  Step 4:     
[3] VERIFY CS Pump 3B and/or 3D running.
[3] VERIFY CS Pump 3B and/or 3D running.
Standard:
Standard: Starts Core Pumps 3B and/or 3D (Only starting one pump is Critical, the second pump is optional).
Starts Core Pumps 3B and/or 3D (Only starting one pump is Critical, the second pump is optional).
Critical Step
Critical Step


SAT UNSAT  N/A Step 6:    [4] WHEN RPV pressure is below 450 psig, THEN THROTTLE 3-FCV-75-53, CORE SPRAY SYS II INBDINJECT VALVE, as necessary to control injection at or below4000 gpm per pump.
SAT UNSAT  N/A Step 6:    [4] WHEN RPV pressure is below 450 psig, THEN THROTTLE 3-FCV-75-53, CORE SPRAY SYS II INBDINJECT VALVE, as necessary to control injection at or below4000 gpm per pump.
Standard:
Standard: Verifies pressure < 450 psig and opens 3
Verifies pressure < 450 psig and opens 3
-FCV-75-53 and commences injection. (And verify flow <4000 gpm for 1 pump or  
-FCV-75-53 and commences injection. (And verify flow <4000 gpm for 1 pump or  
<8000 gpm for 2 pumps).
<8000 gpm for 2 pumps).
Line 1,335: Line 1,179:
SAT UNSAT N/A Step 7:  CAUTION Continuous operation with inadequate NPSH may result in pump damage or pump inoperability.  
SAT UNSAT N/A Step 7:  CAUTION Continuous operation with inadequate NPSH may result in pump damage or pump inoperability.  
[5] MONITOR Core Spray Pump NPSH using Attachment 1.
[5] MONITOR Core Spray Pump NPSH using Attachment 1.
Standard:
Standard: Operator compares Core Spray pump flow rate with Suppression Pool temperature and Suppression Pool pressure and Determined adequate NPSH.
Operator compares Core Spray pump flow rate with Suppression Pool temperature and Suppression Pool pressure and Determined adequate NPSH.


SAT UNSAT N/A  Termination Criteria:  Once rector Water Level is >
SAT UNSAT N/A  Termination Criteria:  Once rector Water Level is >
TAF JPM may be terminated. IF student fails to recover reactor water level above TAF (
TAF JPM may be terminated. IF student fails to recover reactor water level above TAF (-162 inches), it will be considered a failure.
-162 inches), it will be considered a failure.
STOP TIME:
STOP TIME:
Job Performance Measure (JPM)  9  Provide to Applicant
Job Performance Measure (JPM)  9  Provide to Applicant
Line 1,352: Line 1,194:
INITIAL CONDITIONS:  
INITIAL CONDITIONS:  


You are an Operator on Unit 3
You are an Operator on Unit 3. The Reactor is Shutdown RPV Water Level is lowering slowly.
. The Reactor is Shutdown RPV Water Level is lowering slowly.
1-EOI-1 has been entered and followed to RC
1-EOI-1 has been entered and followed to RC
-L6.   
-L6.   
Line 1,365: Line 1,206:
2-EOI Appendix
2-EOI Appendix
-11F Alternate RPV Pressure Control Systems: RFPT On Minimum Flow JPM NUMBER:
-11F Alternate RPV Pressure Control Systems: RFPT On Minimum Flow JPM NUMBER:
670A U2 REVISION:
670A U2 REVISION: 0  TASK APPLICABILITY:
0  TASK APPLICABILITY:
SRO STA UO NAUO TASK NUMBER / TASK TITLE(S):
SRO STA UO NAUO TASK NUMBER / TASK TITLE(S):
U-000-EM-58 Lineup Alternate RPV Pressure Control Systems- RFPT on Minimum Flow IAW EOI Appendix 11F K/A RATINGS:
U-000-EM-58 Lineup Alternate RPV Pressure Control Systems- RFPT on Minimum Flow IAW EOI Appendix 11F K/A RATINGS:
Line 1,373: Line 1,213:
None SAFETY FUNCTION:
None SAFETY FUNCTION:
3  EVALUATION LOCATION:
3  EVALUATION LOCATION:
In-Plant Simulator Control Room   Lab  Other - List  APPLICABLE METHOD OF TESTING:
In-Plant Simulator Control R oom   Lab  Other - List  APPLICABLE METHOD OF TESTING:
Discussion Simulate/Walkthrough Perform    TIME FOR COMPLETION:      NA      TIME CRITICAL (Y/N)      ALTERNATE PATH (Y/N)
Discussion Simulate/Walkthrough Perform    TIME FOR COMPLETION:      NA      TIME CRITICAL (Y/N)      ALTERNATE PATH (Y/N)
Developed by:
Developed by:
Developer Date  (Ensure validator is briefed on exam security per NPG
Developer Date  (Ensure validator is briefed on exam security per NPG
-SPP-17.8.1)  (See JPM Validation Checklist in NPG-SPP-17.8.2)      Validated by:
-SPP-17.8.1)  (See JPM Validation Checklist in NPG-SPP-17.8.2)      Validated by:
Approved by:
Approved by:
Validator Date  Approved by:
Validator   Date  Approved by:
Site Training Management Date  Site Training Program Owner Date    N Y Job Performance Measure (JPM)  2  OPERATOR:  ________________________________
Site Training Management Date  Site Training Program Owner Date    N Y Job Performance Measure (JPM)  2  OPERATOR:  ________________________________
JPM Number:  _670A U2_  RO  SRO  DATE: _______
JPM Number:  _670A U2_  RO  SRO  DATE: _______
Line 1,388: Line 1,228:
-11F.
-11F.
Operator Fundamental evaluated: Monitoring plant conditions and indications closely and controlling plant evolutions precisely. PRA: NA REFERENCES/PROCEDURES NEEDED:
Operator Fundamental evaluated: Monitoring plant conditions and indications closely and controlling plant evolutions precisely. PRA: NA REFERENCES/PROCEDURES NEEDED:
Procedure
Procedure:  2-EOI-APPENDIX-11F VERIFICATION TIME:  12 min    PERFORMANCE TIME:
:  2-EOI-APPENDIX-11F VERIFICATION TIME:  12 min    PERFORMANCE TIME:
COMMENTS:  
COMMENTS:  


Line 1,400: Line 1,239:
SIGNATURE: ___________________________
SIGNATURE: ___________________________
DATE: __________
DATE: __________
EXAMINER Job Performance Measure (JPM)  3  SIMULATOR SETUP IC 28 Exam IC 284        Malfunctions Description Event Severity Delay Initial set fw15a SPURIOUS RFP BEARING LOW OIL PRESSURE 15 N/A 0 N/A tc03a-j Fail Bypass Valves closed 1 0% 0 N/A ad01e 20 SRV 1-31 stuck open 20% 1 20% 0 N/A                  Remotes Description Event Severity Delay Initial set            Overrides Description Event Severity Delay Initial set        Initial Setup:
EXAMINER Job Performance Measure (JPM)  3  SIMULATOR SETUP IC 28 Exam IC 284        Malfunctions Description Event Severity Delay Initial set fw15a SPURIOUS RFP BEARING LOW OIL PRESSURE 1 5 N/A 0 N/A tc03a-j Fail Bypass Valves closed 1 0% 0 N/A ad01e 20 SRV 1-31 stuck open 20% 1 2 0% 0 N/A                  Remotes Description Event Severity Delay Initial set            Overrides Description Event Severity Delay Initial set        Initial Setup:
: 1. Reset to IC 28
: 1. Reset to IC 28
: 2. Manually Scram RX
: 2. Manually Scram RX
Line 1,429: Line 1,268:
-EOI-APPENDIX-11F and lower Reactor Pressure to low in the pressure band of 800 to 1000 psig.   
-EOI-APPENDIX-11F and lower Reactor Pressure to low in the pressure band of 800 to 1000 psig.   


Job Performance Measure (JPM)  6  START TIME STEP / STANDARD SAT / UNSAT Step 1:    [1] IF BOTH of the following exist:
Job Performance Measure (JPM)  6  START TIME STEP / STANDARD SAT / UNSAT Step 1:    [1] IF BOTH of the following exist:
Emergency RPV Depressurization is required,
Emergency RPV Depressurization is required, AND  Group 1 Isolation Signal exists, THEN  EXIT this procedure and ENTER EOI Appendix 11H.  
 
AND  Group 1 Isolation Signal exists, THEN  EXIT this procedure and ENTER EOI Appendix 11H.  


Standard:
Standard:
Verifies that a Group 1 Isolation signal Does Not exist by observing illuminated RED PCIS Group I lights and/or Verified MSIVs are open by observing illuminated RED valve position indicating lights for each valve.
Verifies that a Group 1 Isolation signal Does Not exist by observing illuminated RED PCIS Group I lights and/or Verified MSIVs are open by observing illuminated RED valve position indicating lights for each valve.


Line 1,441: Line 1,277:
[2] VERIFY MSIVs open.
[2] VERIFY MSIVs open.
Standard:
Standard:
Verifies MSIVs OPEN SAT  UNSAT  N/A Job Performance Measure (JPM)  7  STEP / STANDARD SAT / UNSAT Step 3:    [3] VERIFY Hotwell Pressure at or below  
Verifies MSIVs OPEN SAT  UNSAT  N/A Job Performance Measure (JPM)  7  STEP / STANDARD SAT / UNSAT Step 3:    [3] VERIFY Hotwell Pressure at or below  
-7 in. Hg.
-7 in. Hg. Standard:
Standard:
 
Verifies Hotwell Pressure at or below  
Verifies Hotwell Pressure at or below  
-7 in. Hg    SAT  UNSAT  N/A Step 4:     
-7 in. Hg    SAT  UNSAT  N/A Step 4:     
Line 1,452: Line 1,285:
  [4.1.1] At least one condensate pump running. [4.1.2] At least one condensate booster pump running. [4.1.3] Condensate System aligned to supply suction toRFPs.
  [4.1.1] At least one condensate pump running. [4.1.2] At least one condensate booster pump running. [4.1.3] Condensate System aligned to supply suction toRFPs.
Standard:
Standard:
Verifies one condensate pump and one condensate booster pump running, verifies condensate system aligned to supply suction to RFPs.
Verifies one condensate pump and one condensate booster pump running, verifies condensate system aligned to supply suction to RFPs.
SAT  UNSAT  N/A Step 5:     
SAT  UNSAT  N/A Step 5:     
[4.2] VERIFY Main Oil Pump running for each RFPT to bestarted.
[4.2] VERIFY Main Oil Pump running for each RFPT to bestarted.
Standard:
Standard:
Verifies main oil pump running for RFPT 2A SAT  UNSAT  N/A Step 6:     
Verifies main oil pump running for RFPT 2A SAT  UNSAT  N/A Step 6:     
[4.3] VERIFY CLOSED 2-FCV-3-19, RFP 2ADISCHARGE VALVE.
[4.3] VERIFY CLOSED 2-FCV-3-19, RFP 2ADISCHARGE VALVE.
Standard:
Standard:
VERIFY CLOSED 2-FCV-3-19, RFP 2A DISCHARGE VALVE.
VERIFY CLOSED 2-FCV-3-19, RFP 2A DISCHARGE VALVE.
Critical Step SAT  UNSAT  N/A Job Performance Measure (JPM)  8  STEP / STANDARD SAT / UNSAT Step 7:    [4.4] DEPRESS 2-HS-46-8A RFPT 2A SPEED CONT RAISE/LOWER, and VERIFY amber lightis illuminated.
Critical Step SAT  UNSAT  N/A Job Performance Measure (JPM)  8  STEP / STANDARD SAT / UNSAT Step 7:    [4.4] DEPRESS 2-HS-46-8A RFPT 2A SPEED CONT RAISE/LOWER, and VERIFY amber lightis illuminated.
Standard:
Standard:
Depresses 2
Depresses 2
-HS-46-8A  Critical Step SAT  UNSAT N/A Step 8:     
-HS-46-8A  Critical Step SAT  UNSA T N/A Step 8:     
[4.5] DEPRESS 2-HS-3-124A, RFPT 2A TRIP RESET.
[4.5] DEPRESS 2-HS-3-124A , RFPT 2A TRIP RESET.
Standard:
Standard:
Depresses 2
Depresses 2
-HS-3-124A and verifies the 2
-HS-3-124A and verifies the 2
-Z1-1-123 LP Stop Valve and 2-Z1-127 HP Stop Valve comes OPEN.
-Z1-1-123 LP Stop Valve and 2-Z1-127 HP Stop Valve comes OPEN.
Critical Step SAT  UNSAT N/A Step 9:     
Critical Step SAT  UNSA T N/A Step 9:     
[4.6] PLACE 2-HS-46-112A RFPT 2A START/LOCAL ENABLE, in START. Standard:
[4.6] PLACE 2-HS-46-112A RFPT 2A START/LOCAL ENABLE, in START. Standard:
 
Places 2-HS-46-112A in START  Critical Step SAT  UNSA T N/A Note to Examiner:
Places 2-HS-46-112A in START  Critical Step SAT  UNSAT N/A Note to Examiner:
RFPT A will Trip due to Low Bearing Oil Pressure at > 350 RPM Step 10:   
RFPT A will Trip due to Low Bearing Oil Pressure at > 350 RPM Step 10:   
[4.7] CHECK RFPT 2A speed increases to approximately 600 rpm.
[4.7] CHECK RFPT 2A speed increases to approximately 600 rpm.
Standard:
Standard:
Operator responds to RFPT A Trip and reports to US and begins to use B RFP for RPV Pressure Control per 2-EOI-APPENDIX-11F. Critical Step SAT  UNSAT  N/A CUE:  US: Proceed as directed per 2
Operator responds to RFPT A Trip and reports to US and begins to use B RFP for RPV Pressure Control per 2-EOI-APPENDIX-11F. Critical Step SAT  UNSAT  N/A CUE:  US: Proceed as directed per 2
-EOI-APPENDIX-11F. AO: Reports an oil leak of ~5 gpm on RFPT A bearings.
-EOI-APPENDIX-11F. AO: Reports an oil leak of ~5 gpm on RFPT A bearings.
 
Job Performance Measure (JPM)  9    STEP / STANDARD SAT / UNSAT Step 1 1:     
Job Performance Measure (JPM)  9    STEP / STANDARD SAT / UNSAT Step 11:     
[1] IF BOTH of the following exist:
[1] IF BOTH of the following exist:
Emergency RPV Depressurization is required, AND  Group 1 Isolation Signal exists, THEN EXIT this procedure and ENTER EOI Appendix 11H.  
Emergency RPV Depressurization is required, AND  Group 1 Isolation Signal exists, THEN EXIT this procedure and ENTER EOI Appendix 11H.  


Standard:
Standard:
Verifies that a Group 1 Isolation signal Does Not exist by observing illuminated RED PCIS Group I lights and/or Verified MSIVs are open by observing illuminated RED valve position indicating lights for each valve.
Verifies that a Group 1 Isolation signal Does Not exist by observing illuminated RED PCIS Group I lights and/or Verified MSIVs are open by observing illuminated RED valve position indicating lights for each valve.


SAT  UNSAT  N/A Step 12:     
SAT  UNSAT  N/A Step 1 2:     
[2] VERIFY MSIVs open.
[2] VERIFY MSIVs open.
Standard:
Standard:
 
Verifies MSIVs OPEN SAT  UNSAT  N/A Job Performance Measure (JPM)  10  STEP / STANDARD SAT / UNSAT Step 1 3:    [3] VERIFY Hotwell Pressure at or below  
Verifies MSIVs OPEN SAT  UNSAT  N/A Job Performance Measure (JPM)  10  STEP / STANDARD SAT / UNSAT Step 13:    [3] VERIFY Hotwell Pressure at or below  
-7 in. Hg. Standard:
-7 in. Hg.
Standard:
 
Verifies Hotwell Pressure at or below  
Verifies Hotwell Pressure at or below  
-7 in. Hg    SAT  UNSAT  N/A Step 14:     
-7 in. Hg    SAT  UNSAT  N/A Step 1 4:     
[4] PLACE RFPTs in service as follows:
[4] PLACE RFPTs in service as follows:
   [4.1] VERIFY the following:
   [4.1] VERIFY the following:
  [4.1.1] At least one condensate pump running. [4.1.2] At least one condensate booster pump running. [4.1.3] Condensate System aligned to supply suction toRFPs.
  [4.1.1] At least one condensate pump running. [4.1.2] At least one condensate booster pump running. [4.1.3] Condensate System aligned to supply suction toRFPs.
Standard:
Standard:
Verifies one condensate pump and one condensate booster pump running, verifies condensate system aligned to supply suction to RFPs.
Verifies one condensate pump and one condensate booster pump running, verifies condensate system aligned to supply suction to RFPs.
SAT  UNSAT  N/A Step 15:     
SAT  UNSAT  N/A Step 1 5:     
[4.2] VERIFY Main Oil Pump running for each RFPT to be started. Standard:
[4.2] VERIFY Main Oil Pump running for each RFPT to be started. Standard:
 
Verifies main oil pump running for RFPT 2B  SAT  UNSAT  N/A Step 1 6:     
Verifies main oil pump running for RFPT 2B  SAT  UNSAT  N/A Step 16:     
[4.3] VERIFY CLOSED 2-FCV-3-12, RFP 2B DISCHARGE VALVE.
[4.3] VERIFY CLOSED 2-FCV-3-12, RFP 2B DISCHARGE VALVE.
Standard:
Standard:
VERIFY CLOSED 2-FCV-3-12, RFP 2B DISCHARGE VALVE.
VERIFY CLOSED 2-FCV-3-12, RFP 2B DISCHARGE VALVE.
Critical Step SAT  UNSAT  N/A Job Performance Measure (JPM)  11  STEP / STANDARD SAT / UNSAT Step 17:    [4.4] DEPRESS 2-HS-46-9A, RFPT 2BSPEED CONT RAISE/LOWER, and VERIFY amber light is illuminated.
Critical Step SAT  UNSAT  N/A Job Performance Measure (JPM)  11  STEP / STANDARD SAT / UNSAT Step 1 7:    [4.4] DEPRESS 2-HS-46-9A, RFPT 2BSPEED CONT RAISE/LOWER, and VERIFY amber light is illuminated.
Standard:
Standard:
Depresses 2
Depresses 2
-HS-46-9A Critical Step SAT  UNSAT  N/A Step 18:     
-HS-46-9A Critical Step SAT  UNSAT  N/A Step 1 8:     
[4.5] DEPRESS 2-HS-3-150A, RFPT 2B TRIP RESET.
[4.5] DEPRESS 2-HS-3-150A , RFPT 2B TRIP RESET.
Standard:
Standard:
Depresses 2
Depresses 2
-HS-3-150A and verifies the 2
-HS-3-150A and verifies the 2
-ZI-1-133 LP Stop Valve and 2
-ZI-1-1 33 LP Stop Valve and 2
-FCV-135 HP Stop Valve comes OPEN.
-FCV-1 35 HP Stop Valve comes OPEN.
Critical Step SAT  UNSAT  N/A Step 19:     
Critical Step SAT  UNSAT  N/A Step 1 9:     
[4.6] PLACE 2-HS-46-138A, RFPT 2B START/LOCAL ENABLE, in START. Standard:
[4.6] PLACE 2-HS-46-138A, RFPT 2B START/LOCAL ENABLE, in START. Standard:
 
Places 2-HS-46-138A in START  Critical Step SAT  UNSAT  N/A Step 2 0:   
Places 2-HS-46-138A in START  Critical Step SAT  UNSAT  N/A Step 20:   
[4.7] CHECK RFPT 2B speed increases to approximately 600 rpm.
[4.7] CHECK RFPT 2B speed increases to approximately 600 rpm.
Standard:
Standard:
Verifies RFPT 2B speed increases to approximately 600 rpm SAT  UNSAT  N/A Job Performance Measure (JPM)  12  STEP / STANDARD SAT / UNSAT Step 21:    [4.8] VERIFY OPEN 2-FCV-3-13, RFP2B MIN FLOW VALVE.
Verifies RFPT 2B speed increases to approximately 600 rpm SAT  UNSAT  N/A Job Performance Measure (JPM)  12  STEP / STANDARD SAT / UNSAT Step 21:    [4.8] VERIFY OPEN 2-FCV-3-13, RFP2B MIN FLOW VALVE.
Standard:
Standard:
Verifies 2-FCV-3-13 OPEN  SAT  UNSAT  N/A Step 21:  CAUTION RFP discharge pressure is limited to below 1250 psig to avoid system damage.   
Verifies 2-FCV-3-13 OPEN  SAT  UNSAT  N/A Step 21:  CAUTION RFP discharge pressure is limited to below 1250 psig to avoid system damage.   
[4.9] PLACE 2-HS-46-9A, RFPT 2B SPEED CONT RAISE/LOWER in RAISE to raise RFPT speed, maintaining discharge pressure less than 1250 psig. Standard:
[4.9] PLACE 2-HS-46-9A, RFPT 2B SPEED CONT RAISE/LOWER in RAISE to raise RFPT speed, maintaining discharge pressure less than 1250 psig. Standard:
Raises RFPT speed using Manual Speed Control Handswitch, maintaining discharge pressure <1250 psig as indicated on 2-PI-3-9A RFPT 2B (Only Critical if exceeds 1250 psig, any pressure <1250 psig is acceptable).
Raises RFPT speed using Manual Speed Control Handswitch, maintaining discharge pressure <1250 psig as indicated on 2-PI-3-9A RFPT 2B (Only Critical if exceeds 1250 psig, any pressure <1250 psig is acceptable).
Critical Step SAT  UNSAT  N/A  STOP TIME  
Critical Step SAT  UNSAT  N/A  STOP TIME END OF TASK
 
END OF TASK


Job Performance Measure (JPM)  13  Provide to Applicant IN-SIMULATOR:  I will explain the initial conditions and state the task to be performed. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's Correct".  (OR "That's Incorrect", if applicable). When you have completed your assigned task, you will say, "my task is complete" and I will acknowledge that your task is complete.
Job Performance Measure (JPM)  13  Provide to Applicant IN-SIMULATOR:  I will explain the initial conditions and state the task to be performed. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's Correct".  (OR "That's Incorrect", if applicable). When you have completed your assigned task, you will say, "my task is complete" and I will acknowledge that your task is complete.
Line 1,562: Line 1,372:
3-EOI Appendix
3-EOI Appendix
-11F Alternate RPV Pressure Control Systems: RFPT On Minimum Flow JPM NUMBER:
-11F Alternate RPV Pressure Control Systems: RFPT On Minimum Flow JPM NUMBER:
JPM 670A U3 REVISION:
JPM 670A U 3 REVISION: 0  TASK APPLICABILITY:
0  TASK APPLICABILITY:
SRO      STA      UO        NAUO TASK NUMBER / TASK TITLE(S):
SRO      STA      UO        NAUO TASK NUMBER / TASK TITLE(S):
U-000-EM-58 Lineup Alternate RPV Pressure Control Systems- RFPT on Minimum Flow IAW EOI Appendix 11F K/A RATINGS:
U-000-EM-58 Lineup Alternate RPV Pressure Control Systems- RFPT on Minimum Flow IAW EOI Appendix 11F K/A RATINGS:
RO: 3.6  SRO: 3.6 K/A No. & STATEMENT:
RO: 3.6  SRO: 3.6 K/A No. & STATEMENT:
239001 Main and Reheat Steam System A1.01 Ability to predict and/or monitor changes in parameters associated with operating the MAIN AND REHEAT STEAM SYSTEM controls including: Main steam pressure RELATED PRA INFORMATION:
239001 Main and Reheat Steam System A1.01 Ability to predict and/or monitor changes in parameters associated with operating the MAIN AND REHEAT STEAM SYSTEM controls including: Main steam pressure RELATED PRA INFORMATION:
None SAFETY FUNCTION:
None SAFETY FUNCTION: 3  EVALUATION LOCATION:
3  EVALUATION LOCATION:
In-Plant  Simulator   Control R oom   Lab    Other - List  APPLICABLE METHOD OF TESTING:
In-Plant  Simulator Control Room   Lab    Other - List  APPLICABLE METHOD OF TESTING:
Discussion Simulate/Walkthrough Perform   TIME FOR COMPLETION:      NA      TIME CRITICAL (Y/N)
Discussion Simulate/Walkthrough Perform TIME FOR COMPLETION:      NA      TIME CRITICAL (Y/N)
ALTERNATE PATH (Y/N)
ALTERNATE PATH (Y/N)
Developed by:
Developed by:
Developer Date  (Ensure validator is briefed on exam security per NPG
Developer Date  (Ensure validator is briefed on exam security per NPG
-SPP-17.8.1)                (See JPM Validation Checklist in NPG
-SPP-17.8.1)                (See JPM Validation Checklist in NPG
-SPP-17.8.2)      Validated by:
-SPP-17.8.2)      Validated by:
Approved by:
Approved by:
Validator Date  Approved by:
Validator   Date  Approved by:
Site Training Management Date  Site Training Program Owner Date    N Y Job Performance Measure (JPM)  2  OPERATOR:  ________________________________
Site Training Management Date  Site Training Program Owner Date    N Y Job Performance Measure (JPM)  2  OPERATOR:  ________________________________
JPM Number:  __
JPM Number:  __
Line 1,588: Line 1,396:
Operator Fundamental evaluated: Monitoring plant conditions and indications closely and controlling plant evolutions precisely.
Operator Fundamental evaluated: Monitoring plant conditions and indications closely and controlling plant evolutions precisely.
PRA: NA REFERENCES/PROCEDURES NEEDED:
PRA: NA REFERENCES/PROCEDURES NEEDED:
Procedure
Procedure:  3-EOI-APPENDIX-11F  VERIFICATION TIME:          PERFORMANCE TIME:
:  3-EOI-APPENDIX-11F  VERIFICATION TIME:          PERFORMANCE TIME:
COMMENTS:  
COMMENTS:  


Line 1,601: Line 1,408:
DATE: __________
DATE: __________


EXAMINER Job Performance Measure (JPM)  3  SIMULATOR SETUP IC 28 Exam IC 284        Malfunctions Description Event Severity Delay Initial set fw15a SPURIOUS RFP BEARING LOW OIL PRESSURE 15 N/A 0 N/A tc03a-j  Fail Bypass Valves closed 1 0% 0 N/A ad01e  SRV 1-31 stuck open 1 26% 0 N/A                                    Remotes Description Event Severity Delay Initial set                        Overrides Description Event Severity Delay Initial set                           
EXAMINER Job Performance Measure (JPM)  3  SIMULATOR SETUP IC 28 Exam IC 284        Malfunctions Description Event Severity Delay Initial set fw15a SPURIOUS RFP BEARING LOW OIL PRESSURE 1 5 N/A 0 N/A tc03a-j  Fail Bypass Valves closed 1 0% 0 N/A ad01e  SRV 1-31 stuck open 1 26% 0 N/A                                    Remotes Description Event Severity Delay Initial set                        Overrides Description Event Severity Delay Initial set                           


Job Performance Measure (JPM)  4  Initial Setup:
Job Performance Measure (JPM)  4  Initial Setup:
Line 1,627: Line 1,434:
You are an Operator on Unit  
You are an Operator on Unit  
: 3. The Unit 3 reactor has scrammed and the turbine bypass valves are not responding for pressure control due to a loss of EHC fluid. EO I-1 has been followed to RC/P
: 3. The Unit 3 reactor has scrammed and the turbine bypass valves are not responding for pressure control due to a loss of EHC fluid. EO I-1 has been followed to RC/P
-4. Reactor water level control is in automatic on RFPT 3C.   
-4. Reactor water level control is in automatic on RFPT 3 C.   


INITIATING CUES
INITIATING CUES
Line 1,634: Line 1,441:


Job Performance Measure (JPM)  7  START TIME STEP / STANDARD SAT / UNSAT Step 1:    [1] IF BOTH of the following exist:
Job Performance Measure (JPM)  7  START TIME STEP / STANDARD SAT / UNSAT Step 1:    [1] IF BOTH of the following exist:
Emergency RPV Depressurization is required,
Emergency RPV Depressurization is required, AND  Group 1 Isolation Signal exists, THEN  EXIT this procedure and ENTER EOI Appendix 11H.  
 
AND  Group 1 Isolation Signal exists, THEN  EXIT this procedure and ENTER EOI Appendix 11H.  


Standard:
Standard:
Verifies that a Group 1 Isolation signal Does Not exist by observing illuminated RED PCIS Group I lights and/or Verified MSIVs are open by observing illuminated RED valve position indicating lights for each valve.
Verifies that a Group 1 Isolation signal Does Not exist by observing illuminated RED PCIS Group I lights and/or Verified MSIVs are open by observing illuminated RED valve position indicating lights for each valve.


Line 1,645: Line 1,449:
[2] VERIFY MSIVs open.
[2] VERIFY MSIVs open.
Standard:
Standard:
Verifies MSIVs OPEN
Verifies MSIVs OPEN


SAT  UNSAT  N/A Job Performance Measure (JPM)  8  STEP / STANDARD SAT / UNSAT Step 3:    [3] VERIFY Hotwell Pressure at or below  
SAT  UNSAT  N/A Job Performance Measure (JPM)  8  STEP / STANDARD SAT / UNSAT Step 3:    [3] VERIFY Hotwell Pressure at or below  
-7 in. Hg.
-7 in. Hg. Standard:
Standard:
 
Verifies Hotwell Pressure at or below  
Verifies Hotwell Pressure at or below  
-7 in. Hg    SAT  UNSAT  N/A Step 4:     
-7 in. Hg    SAT  UNSAT  N/A Step 4:     
Line 1,657: Line 1,458:
   [4.1] VERIFY the following:
   [4.1] VERIFY the following:
  [4.1.1] At least one condensate pump running. [4.1.2] At least one condensate booster pump running. [4.1.3] Condensate System aligned to supply suction to RFPs. Standard:
  [4.1.1] At least one condensate pump running. [4.1.2] At least one condensate booster pump running. [4.1.3] Condensate System aligned to supply suction to RFPs. Standard:
Verifies one condensate pump and one condensate booster pump running, verifies condensate system aligned to supply suction to RFPs.
Verifies one condensate pump and one condensate booster pump running, verifies condensate system aligned to supply suction to RFPs.
SAT  UNSAT  N/A Step 5:     
SAT  UNSAT  N/A Step 5:     
[4.2] VERIFY Main Oil Pump running for each RFPT to be started. Standard:
[4.2] VERIFY Main Oil Pump running for each RFPT to be started. Standard:
 
Verifies main oil pump running for RFPT 3 A SAT  UNSAT  N/A Step 6:     
Verifies main oil pump running for RFPT 3A SAT  UNSAT  N/A Step 6:     
[4.3] VERIFY CLOSED 3-FCV-3-19, RFP 3 A DISCHARGE VALVE.
[4.3] VERIFY CLOSED 3-FCV-3-19, RFP 3A DISCHARGE VALVE.
Standard:
Standard:
 
VERIFY CLOSED 3-FCV-3-19, RFP 3 A DISCHARGE VALVE.
VERIFY CLOSED 3-FCV-3-19, RFP 3A DISCHARGE VALVE.
Critical Step
Critical Step


SAT  UNSAT  N/A Job Performance Measure (JPM)  9  STEP / STANDARD SAT / UNSAT Step 7:    [4.4] DEPRESS 3-HS-46-8A, RFPT 3A SPEED CONT RAISE/LOWER, and VERIFY amber light is illuminated.
SAT  UNSAT  N/A Job Performance Measure (JPM)  9  STEP / STANDARD SAT / UNSAT Step 7:    [4.4] DEPRESS 3-HS-46-8A, RFPT 3 A SPEED CONT RAISE/LOWER, and VERIFY amber light is illuminated.
Standard:
Standard:
Depresses 3-HS-46-8A  Critical Step SAT  UNSAT  N/A Step 8:     
Depresses 3-HS-46-8A  Critical Step SAT  UNSAT  N/A Step 8:     
[4.5] DEPRESS 3-HS-3-124A, RFPT 3A TRIP RESET.
[4.5] DEPRESS 3-HS-3-124A , RFPT 3 A TRIP RESET.
Standard:
Standard:
Depresses 3
Depresses 3
-HS-3-124A and resets RFPT Trip and verifies the 3
-HS-3-124A and resets RFPT Trip and verifies the 3
Line 1,681: Line 1,477:
-ZI-127 HP Stop Valve comes OPEN.
-ZI-127 HP Stop Valve comes OPEN.
Critical Step SAT  UNSAT  N/A Step 9:     
Critical Step SAT  UNSAT  N/A Step 9:     
[4.6] PLACE 3-HS-46-112A RFPT 3A START/LOCAL ENABLE, in START. Standard:
[4.6] PLACE 3-HS-46-112A RFPT 3 A START/LOCAL ENABLE, in START. Standard:
 
Places 3-HS-46-112A in START Critical Step SAT  UNSAT  N/A Note to Examiner:
Places 3-HS-46-112A in START Critical Step SAT  UNSAT  N/A Note to Examiner:
RFPT A will Trip due to Low Bearing Oil Pressure at > 350 RPM Step 10:    [4.7] CHECK RFPT 3A speed increases to approximately 600 rpm.
RFPT A will Trip due to Low Bearing Oil Pressure at > 350 RPM Step 10:    [4.7] CHECK RFPT 3 A speed increases to approximately 600 rpm.
Standard:
Standard:
Operator responds to RFPT A Trip and reports to US and begins to use B RFP for RPV Pressure Control per 3-EOI-APPENDIX-11F. SAT  UNSAT  N/A CUE:  US: Proceed as directed per 3-EOI-APPENDIX-11F. AO: Reports an oil leak of ~5 gpm on RFPT A bearings.
Operator responds to RFPT A Trip and reports to US and begins to use B RFP for RPV Pressure Control per 3-EOI-APPENDIX-11F. SAT  UNSAT  N/A CUE:  US: Proceed as directed per 3-EOI-APPENDIX-11F. AO: Reports an oil leak of ~5 gpm on RFPT A bearings.
 
Job Performance Measure (JPM)  10 STEP / STANDARD SAT / UNSAT Step 1 1:    [1] IF BOTH of the following exist:
Job Performance Measure (JPM)  10 STEP / STANDARD SAT / UNSAT Step 11:    [1] IF BOTH of the following exist:
Emergency RPV Depressurization is required, AND  Group 1 Isolation Signal exists, THEN EXIT this procedure and ENTER EOI Appendix 11H.  
Emergency RPV Depressurization is required, AND  Group 1 Isolation Signal exists, THEN EXIT this procedure and ENTER EOI Appendix 11H.  


Standard:
Standard:
Verifies that a Group 1 Isolation signal Does Not exist by observing illuminated RED PCIS Group I lights and/or Verified MSIVs are open by observing illuminated RED valve position indicating lights for each valve.
Verifies that a Group 1 Isolation signal Does Not exist by observing illuminated RED PCIS Group I lights and/or Verified MSIVs are open by observing illuminated RED valve position indicating lights for each valve.


SAT  UNSAT  N/A Step 12:     
SAT  UNSAT  N/A Step 1 2:     
[2] VERIFY MSIVs open.
[2] VERIFY MSIVs open.
Standard:
Standard:
 
Verifies MSIVs OPEN SAT  UNSAT  N/A Job Performance Measure (JPM)  11  STEP / STANDARD SAT / UNSAT Step 1 3:    [3] VERIFY Hotwell Pressure at or below  
Verifies MSIVs OPEN SAT  UNSAT  N/A Job Performance Measure (JPM)  11  STEP / STANDARD SAT / UNSAT Step 13:    [3] VERIFY Hotwell Pressure at or below  
-7 in. Hg. Standard:
-7 in. Hg.
Standard:
 
Verifies Hotwell Pressure at or below  
Verifies Hotwell Pressure at or below  
-7 in. Hg    SAT  UNSAT  N/A Step 14:     
-7 in. Hg    SAT  UNSAT  N/A Step 1 4:     
[4] PLACE RFPTs in service as follows:
[4] PLACE RFPTs in service as follows:
   [4.1] VERIFY the following:
   [4.1] VERIFY the following:
  [4.1.1] At least one condensate pump running. [4.1.2] At least one condensate booster pump running. [4.1.3] Condensate System aligned to supply suction to RFPs. Standard:
  [4.1.1] At least one condensate pump running. [4.1.2] At least one condensate booster pump running. [4.1.3] Condensate System aligned to supply suction to RFPs. Standard:
Verifies one condensate pump and one condensate booster pump running, verifies condensate system aligned to supply suction to RFPs.
Verifies one condensate pump and one condensate booster pump running, verifies condensate system aligned to supply suction to RFPs.


SAT  UNSAT  N/A Step 15:     
SAT  UNSAT  N/A Step 1 5:     
[4.2] VERIFY Main Oil Pump running for each RFPT to be started. Standard:
[4.2] VERIFY Main Oil Pump running for each RFPT to be started. Standard:
 
Verifies main oil pump running for RFPT 3 B SAT  UNSAT  N/A Step 1 6:     
Verifies main oil pump running for RFPT 3B SAT  UNSAT  N/A Step 16:     
[4.3] VERIFY CLOSED 3-FCV-3-12, RFP 3 B DISCHARGE VALVE.
[4.3] VERIFY CLOSED 3-FCV-3-12, RFP 3B DISCHARGE VALVE.
Standard:
Standard:
 
VERIFY CLOSED 3-FCV-3-12, RFP 3 B DISCHARGE VALVE.
VERIFY CLOSED 3-FCV-3-12, RFP 3B DISCHARGE VALVE.
Critical Step
Critical Step


SAT  UNSAT  N/A Job Performance Measure (JPM)  12  STEP / STANDARD SAT / UNSAT Step 17:    [4.4] DEPRESS 3-HS-46-9A, RFPT 3B SPEED CONT RAISE/LOWER, and VERIFY amber light is illuminated.
SAT  UNSAT  N/A Job Performance Measure (JPM)  12  STEP / STANDARD SAT / UNSAT Step 1 7:    [4.4] DEPRESS 3-HS-46-9A, RFPT 3 B SPEED CONT RAISE/LOWER, and VERIFY amber light is illuminated.
Standard:
Standard:
 
Depresses 3-HS-46-9A  Critical Step SAT  UNSAT  N/A Step 1 8:     
Depresses 3-HS-46-9A  Critical Step SAT  UNSAT  N/A Step 18:     
[4.5] DEPRESS 3-HS-3-150A , RFPT 3B TRIP RESET.
[4.5] DEPRESS 3-HS-3-150A, RFPT 3B TRIP RESET.
Standard:
Standard:
Depresses 3
Depresses 3
-HS-3-150A and verifies the 3-ZI-1-133 LP Stop Valve and 3
-HS-3-150A and verifies the 3-ZI-1-133 LP Stop Valve and 3
-FCV-135 HP Stop Valve comes OPEN.
-FCV-135 HP Stop Valve comes OPEN.
Critical Step SAT  UNSAT  N/A Step 19:     
Critical Step SAT  UNSAT  N/A Step 1 9:     
[4.6] PLACE 3-HS-46-138A, RFPT 3B START/LOCAL ENABLE, in START. Standard:
[4.6] PLACE 3-HS-46-138A, RFPT 3B START/LOCAL ENABLE, in START. Standard:
 
Places 3-HS-46-138A in START  Critical Step SAT  UNSAT  N/A Step 2 0:    [4.7] CHECK RFPT 3B speed increases to approximately 600 rpm.
Places 3-HS-46-138A in START  Critical Step SAT  UNSAT  N/A Step 20:    [4.7] CHECK RFPT 3B speed increases to approximately 600 rpm.
Standard:
Standard:
Verifies RFPT 3B speed increases to approximately 600 rpm SAT  UNSAT  N/A Job Performance Measure (JPM)  13  STEP / STANDARD SAT / UNSAT Step 21:    [4.8] VERIFY OPEN 3-FCV-3-13, RFP 3B MIN FLOW VALVE.
Verifies RFPT 3B speed increases to approximately 600 rpm SAT  UNSAT  N/A Job Performance Measure (JPM)  13  STEP / STANDARD SAT / UNSAT Step 21:    [4.8] VERIFY OPEN 3-FCV-3-13, RFP 3B MIN FLOW VALVE.
Standard:
Standard:
Verifies 3-FCV-3-13 OPEN  Critical Step SAT  UNSAT  N/A Step 21:  CAUTION RFP discharge pressure is limited to below 1250 psig to avoid system damage.   
Verifies 3-FCV-3-13 OPEN  Critical Step SAT  UNSAT  N/A Step 21:  CAUTION RFP discharge pressure is limited to below 1250 psig to avoid system damage.   
[4.9] PLACE 3-HS-46-9A, RFPT 3B SPEED CONT RAISE/LOWER in RAISE to raise RFPT speed, maintaining discharge pressure less than 1250 psig. Standard:
[4.9] PLACE 3-HS-46-9A, RFPT 3 B SPEED CONT RAISE/LOWER in RAISE to raise RFPT speed, maintaining discharge pressure less than 1250 psig. Standard:
 
Raises RFPT speed using Manual Speed Control Handswitch, maintaining discharge pressure <1250 psig as indicated on 3-PI-3-9A RFPT 3B (Only Critical if exceeds 1250 psig, any pressure <1250 psig is acceptable).
Raises RFPT speed using Manual Speed Control Handswitch, maintaining discharge pressure <1250 psig as indicated on 3-PI-3-9A RFPT 3B (Only Critical if exceeds 1250 psig, any pressure <1250 psig is acceptable).
Critical Step SAT  UNSAT  N/A  STOP TIME END OF TASK
Critical Step SAT  UNSAT  N/A  STOP TIME END OF TASK
Line 1,753: Line 1,533:
You are an Operator on Unit  
You are an Operator on Unit  
: 3. The Unit 3 reactor has scrammed and the turbine bypa ss valves are not responding for pressure control due to a loss of EHC fluid. EO I-1 has been followed to RC/P
: 3. The Unit 3 reactor has scrammed and the turbine bypa ss valves are not responding for pressure control due to a loss of EHC fluid. EO I-1 has been followed to RC/P
-4. Reactor water level control is in automatic on RFPT 3C.   
-4. Reactor water level control is in automatic on RFPT 3 C.   


INITIATING CUES
INITIATING CUES
Line 1,760: Line 1,540:


Job Performance Measure (JPM)  1  SITE: BFN JPM TITLE:
Job Performance Measure (JPM)  1  SITE: BFN JPM TITLE:
N2 MAKEUP TO PRIMARY CONTAINMENT WITH 2-EOI-APPENDIX-14A JPM NUMBER:
N2 MAKEUP TO PRIMARY CONTAINMENT WITH         2-EOI-APPENDIX-14A JPM NUMBER:
669 U2 REVISION:
669 U2 REVISION: 0  TASK APPLICABILITY:
0  TASK APPLICABILITY:
SRO STA UO NAUO TASK NUMBER / TASK TITLE(S):
SRO STA UO NAUO TASK NUMBER / TASK TITLE(S):
U-000-EM-77 Lineup nitrogen Makeup to primary Containment IAW EOI
U-000-EM-77 Lineup nitrogen Makeup to primary Containment IAW EOI
Line 1,771: Line 1,550:
None SAFETY FUNCTION:
None SAFETY FUNCTION:
5  EVALUATION LOCATION:
5  EVALUATION LOCATION:
In-Plant Simulator Control Room   Lab  Other - List  APPLICABLE METHOD OF TESTING:
In-Plant Simulator Control R oom   Lab  Other - List  APPLICABLE METHOD OF TESTING:
Discussion Simulate/Walkthrough Perform    TIME FOR COMPLETION:      NA      TIME CRITICAL (Y/N)      ALTERNATE PATH (Y/N)
Discussion Simulate/Walkthrough Perform    TIME FOR COMPLETION:      NA      TIME CRITICAL (Y/N)      ALTERNATE PATH (Y/N)
Developed by:
Developed by:
Developer Date  (Ensure validator is briefed on exam security per NPG
Developer Date  (Ensure validator is briefed on exam security per NPG
-SPP-17.8.1)  (See JPM Validation Checklist in NPG-SPP-17.8.2)      Validated by:
-SPP-17.8.1)  (See JPM Validation Checklist in NPG-SPP-17.8.2)      Validated by:
Approved by:
Approved by:
Validator Date  Approved by:
Validator   Date  Approved by:
Site Training Management Date  Site Training Program Owner Date    N N Job Performance Measure (JPM)  2  OPERATOR:  ________________________________
Site Training Management Date  Site Training Program Owner Date    N N Job Performance Measure (JPM)  2  OPERATOR:  ________________________________
JPM Number:
JPM Number:
Line 1,786: Line 1,565:
Operator Fundamental evaluated: Monitoring plant conditions and indications closely and controlling plant evolutions precisely.
Operator Fundamental evaluated: Monitoring plant conditions and indications closely and controlling plant evolutions precisely.
PRA: NA REFERENCES/PROCEDURES NEEDED:
PRA: NA REFERENCES/PROCEDURES NEEDED:
Procedure
Procedure:  2-EOI-APPENDIX-14A VERIFICATION TIME: 15  min    PERFORMANCE TIME:
:  2-EOI-APPENDIX-14A VERIFICATION TIME: 15  min    PERFORMANCE TIME:
COMMENTS:  
COMMENTS:  


Line 1,807: Line 1,585:
: 6. Fire Trigger 2
: 6. Fire Trigger 2
: 7. Place H2/O2 Analyzer in service with H2/O2 ISOL BYP Keylock Switch in BYPASS per EOI APPDX 19
: 7. Place H2/O2 Analyzer in service with H2/O2 ISOL BYP Keylock Switch in BYPASS per EOI APPDX 19
: 8. Place DW Vent in Service per EOI APPX 12
: 8. Place DW Vent in Service per EOI APPX 12 9. Wait for Group 6 schedule file to time out and alrms to settle
: 9. Wait for Group 6 schedule file to time out and alrms to settle
: 10. Freeze simulator and save IC.
: 10. Freeze simulator and save IC.
Malfunctions Description Event Severity Delay Initial set  TH22 COOLANT LEAK INSIDE DRYWELL 2 100 0 Yes TH23 FUEL CLADDING DAMAGE 2 100% 0 N/A RC08 RCIC STEAM SUPPLY VALVE AUTO OPENING FAILURE 1 N/A 0 N/A HP04 HPCI STEAM SUPPLY VALVE AUTO OPENING FAILURE 1 N/A 0 N/A CS04A CORE SPRAY LOGIC POWER FAILURE DIV I 1 N/A 0 N/A CS04B CORE SPRAY LOGIC POWER FAILURE DIV II 1 N/A 0 N/A RD01A CRD PUMP TRIP 2A 1 N/A 0 N/A RD01B CRD PUMP TRIP 2B 1 N/A 0 N/A FW01A CONDENSATE PUMP TRIP 2A 1 N/A 0 N/A FW01B CONDENSATE 1 N/A 0 N/A Job Performance Measure (JPM)  4  PUMP TRIP 2B FW01C CONDENSATE PUMP TRIP 2C 1 N/A 0 N/A PC08 H2 IN DRYWELL_
Malfunctions Description Event Severity Delay Initial set  TH22 COOLANT LEAK INSIDE DRYWELL 2 100 0 Yes TH23 FUEL CLADDING DAMAGE 2 100% 0 N/A RC08 RCIC STEAM SUPPLY VALVE AUTO OPENING FAILURE 1 N/A 0 N/A HP04 HPCI STEAM SUPPLY VALVE AUTO OPENING FAILURE 1 N/A 0 N/A CS04A CORE SPRAY LOGIC POWER FAILURE DIV I 1 N/A 0 N/A CS04B CORE SPRAY LOGIC POWER FAILURE DIV II 1 N/A 0 N/A RD01A CRD PUMP TRIP 2A 1 N/A 0 N/A RD01B CRD PUMP TRIP 2B 1 N/A 0 N/A FW01A CONDENSATE PUMP TRIP 2A 1 N/A 0 N/A FW01B CONDENSATE 1 N/A 0 N/A Job Performance Measure (JPM)  4  PUMP TRIP 2B FW01C CONDENSATE PUMP TRIP 2C 1 N/A 0 N/A PC08 H2 IN DRYWELL_
Line 1,821: Line 1,598:
You are an Operator on Unit 2.
You are an Operator on Unit 2.
The Reactor is shutdown.
The Reactor is shutdown.
2-EOI-APPENDIX-12has been completed 2-EOI-APPENDIX-19 has been completed.
2-EOI-APPENDIX-12has been completed 2-EOI-APPENDIX-19 has been completed.
PCIS Group 6 has been overridden per 2
PCIS Group 6 has been overridden per 2
-EOI-APPENDIX-8E.   
-EOI-APPENDIX-8E.   
Line 1,831: Line 1,608:
.   
.   


Job Performance Measure (JPM)  7  START TIME  STEP / STANDARD SAT / UNSAT Step 1:  2. MONITOR Drywell and Suppression Chamber H 2 and O2concentrations on one or more of the following displays(2
Job Performance Measure (JPM)  7  START TIME  STEP / STANDARD SAT / UNSAT Step 1:  2. MONITOR Drywell and Suppression Chamber H 2 and O 2concentrations on one or more of the following displays(2
-EOI Appendix 19):
-EOI Appendix 19):
2-MON-76-110, H2/O2 ANALYZER (Panel 2 55)  2-XR-76-110, H2/O2 CONCENTRATION (Panel 2-9-54)  Standard:
2-MON-76-110, H2/O2 ANALYZER (Panel 2 55)  2-XR-76-110, H2/O2 CONCENTRATION (Panel 2-9-54)  Standard:
Verifies H2 and O2 concentrations  
Verifies H2 and O2 concentrations  


SAT  UNSAT  N/A Step 2:     
SAT  UNSAT  N/A Step 2:     
: 3. IF ................. Drywell/Suppression Chamber H 2 /O2 analyzer is or becomes inoperable, THEN ...........NOTIFY Chemistry Lab to sample Drywell andSuppression Chamber for H 2 and O2 using CI-644. Standard:
: 3. IF ................. Drywell/Suppression Chamber H 2 /O 2 analyzer is or becomes inoperable, THEN ...........NOTIFY Chemistry Lab to sample Drywell andSuppression Chamber for H 2 and O 2 using CI-644. Standard:
 
Verifies Drywell/Suppression Chamber H 2 /O 2 analyzers are Operable SAT  UNSAT  N/A Job Performance Measure (JPM)  8  STEP / STANDARD SAT / UNSAT Step 3:    4.WHEN ......... Drywell or Suppression Chamber H 2 or O 2 concentration is increasing,THEN ........... CONTINUE in this procedure.
Verifies Drywell/Suppression Chamber H 2 /O2 analyzers are Operable SAT  UNSAT  N/A Job Performance Measure (JPM)  8  STEP / STANDARD SAT / UNSAT Step 3:    4.WHEN ......... Drywell or Suppression Chamber H 2 or O2 concentration is increasing,THEN ........... CONTINUE in this procedure.
Standard:
Standard:
Observes a rise in Drywell H2 Concentration and continues with procedure.
Observes a rise in Drywell H2 Concentration and continues with procedure.
SAT  UNSAT  N/A Step 4:  NOTE This procedure assumes that the normal makeup is from N 2 Storage Tank B. 5. DISPATCH personnel to N2 Storage Tank B to CHECK 0-PI-76-331, N2 TANK B PRESSURE INDICATOR between 160 and 190 psig.
SAT  UNSAT  N/A Step 4:  NOTE This procedure assumes that the normal makeup is from N 2 Storage Tank B. 5. DISPATCH personnel to N 2 Storage Tank B to CHECK 0-PI-76-331, N2 TANK B PRESSURE INDICATOR between 160 and 190 psig.
Standard:
Standard: Dispatches UO to verify N 2 Storage Tank B Pressure  SAT  UNSAT  N/A  CUE: N 2 Storage Tank B Pressure is reading 180 psig Step 5:     
Dispatches UO to verify N2 Storage Tank B Pressure  SAT  UNSAT  N/A  CUE: N2 Storage Tank B Pressure is reading 180 psig Step 5:     
: 6. DETERMINE area with highest H 2 and/or O 2 concentrations and INFORM SRO. Standard:
: 6. DETERMINE area with highest H 2 and/or O2 concentrations and INFORM SRO. Standard:
 
Correctly determines highest concentration is in the drywell and informs  
Correctly determines highest concentration is in the drywell and informs  


Line 1,854: Line 1,626:


Job Performance Measure (JPM)  9  STEP / STANDARD SAT / UNSAT Step 6:    7. VERIFY PCIS RESET (Panel 2 4). Standard:
Job Performance Measure (JPM)  9  STEP / STANDARD SAT / UNSAT Step 6:    7. VERIFY PCIS RESET (Panel 2 4). Standard:
Verifies PCIS RESET on Panel 2 4  Critical Step SAT  UNSAT  N/A Step 7:     
Verifies PCIS RESET on Panel 2 4  Critical Step SAT  UNSAT  N/A Step 7:     
: 8. IF ................. It is desired to makeup N 2 to the Suppression Chamber,THEN ...........CONTINUE in this procedure at Step 10.
: 8. IF ................. It is desired to makeup N 2 to the Suppression Chamber,THEN ...........CONTINUE in this procedure at Step 10.
Standard:
Standard:
Correctly determine step is not applicable and proceeds to step 9.
Correctly determine step is not applicable and proceeds to step 9.
Critical Step SAT  UNSAT  N/A Step 8:   
Critical Step SAT  UNSAT  N/A Step 8:   
: 9. CONTROL Drywell H 2 and O2 as follows:
: 9. CONTROL Drywell H 2 and O 2 as follows:
: a. OPEN the following valves to admit N 2 to Drywell (Panel 2-9-3):  2-FCV-76-18, DRYWELL N2 MAKEUP INBDISOLATION VLV 2-FCV-76-17, PRI CTMT N2 MAKEUP OUTBDISOLATION VLV.
: a. OPEN the following valves to admit N 2 to Drywell (Panel 2-9-3):  2-FCV-76-18, DRYWELL N2 MAKEUP INBDISOLATION VLV 2-FCV-76-17, PRI CTMT N2 MAKEUP OUTBDISOLATION VLV.
Standard:
Standard: OPENS 2-FCV-76-18, DRYWELL N2 MAKEUP INBD ISOLATION VLV &
OPENS 2-FCV-76-18, DRYWELL N2 MAKEUP INBD ISOLATION VLV &
2-FCV-76-17, PRI CTMT N2 MAKEUP OUTBD ISOLATION VLV Critical Step SAT  UNSAT  N/A Step 9:     
2-FCV-76-17, PRI CTMT N2 MAKEUP OUTBD ISOLATION VLV Critical Step SAT  UNSAT  N/A Step 9:     
: b. SLOWLY ADJUST 2-PC-76-14, DW/SUPPR CHBR N2 MU PRESS CONTROL (Panel 2 3), to maintain flow > 55 and
: b. SLOWLY ADJUST 2-PC-76-14, DW/SUPPR CHBR N2 MU PRESS CONTROL (Panel 2 3), to maintain flow > 55 and
  <60 scfm on 2
  <60 scfm on 2
-XR-76-14, DW/SUPPR CHBR N2 MAKEUP FLOW/PRESS (Panel 2 3), or as directed by SRO if SAMG execution is in progress.
-XR-76-14, DW/SUPPR CHBR N2 MAKEUP FLOW/PRESS (Panel 2 3), or as directed by SRO if SAMG execution is in progress.
Standard:  Achieves a flowrate between 55
-60 scfm and monitors Drywell Hydrogen Concentration Lowering Critical Step SAT  UNSAT  N/A Job Performance Measure (JPM)  10  STEP / STANDARD SAT / UNSAT Step 10:    c. CONTINUE N 2 admission to the Drywell UNTIL Drywell H 2 andO 2 are below desired values.
Standard:
Standard:
Achieves a flowrate between 55
-60 scfm and monitors Drywell Hydrogen Concentration Lowering Critical Step SAT  UNSAT  N/A Job Performance Measure (JPM)  10  STEP / STANDARD SAT / UNSAT Step 10:    c. CONTINUEN2 admission to the Drywell UNTIL Drywell H 2 andO2 are below desired values.
Standard:
Monitors Drywell Hydrogen Concentration SAT  UNSAT  N/A  Note to Examiner:  Once satisfied with N2 Flow established between 55  
Monitors Drywell Hydrogen Concentration SAT  UNSAT  N/A  Note to Examiner:  Once satisfied with N2 Flow established between 55  
- 60 scfm with a downward trend on H2 Concentration in the Drywell. End of task.
- 60 scfm with a downward trend on H2 Concentration in the Drywell. End of task.
Pass/ Fail Criteria: Establish N2 Flow> 55 scfm and H2 Concentration on a downward trend.
Pass/ Fail Criteria: Establish N2 Flow> 55 scfm and H2 Concentration on a downward trend.
STOP TIME  
STOP TIME END OF TASK
 
END OF TASK


Job Performance Measure (JPM)  11  Provide to Applicant IN-SIMULATOR:  I will explain the initial conditions and state the task to be performed. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's Correct".  (OR "That's Incorrect", if applicable). When you have completed your assigned task, you will say, "my task is complete" and I will acknowledge that your task is complete.
Job Performance Measure (JPM)  11  Provide to Applicant IN-SIMULATOR:  I will explain the initial conditions and state the task to be performed. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's Correct".  (OR "That's Incorrect", if applicable). When you have completed your assigned task, you will say, "my task is complete" and I will acknowledge that your task is complete.
Line 1,899: Line 1,664:
Job Performance Measure (JPM)  1  SITE: BFN JPM TITLE:
Job Performance Measure (JPM)  1  SITE: BFN JPM TITLE:
N2 MAKEUP TO PRIMARY CONTAINMENT WITH 3-EOI-APPENDIX-14A JPM NUMBER:
N2 MAKEUP TO PRIMARY CONTAINMENT WITH 3-EOI-APPENDIX-14A JPM NUMBER:
670 U3 REVISION:
670 U 3 REVISION: 0  TASK APPLICABILITY:
0  TASK APPLICABILITY:
SRO STA UO NAUO TASK NUMBER / TASK TITLE(S):
SRO STA UO NAUO TASK NUMBER / TASK TITLE(S):
U-000-EM-77 Lineup nitrogen Makeup to primary Containment IAW EOI
U-000-EM-77 Lineup nitrogen Makeup to primary Containment IAW EOI
Line 1,908: Line 1,672:
None SAFETY FUNCTION:
None SAFETY FUNCTION:
5  EVALUATION LOCATION:
5  EVALUATION LOCATION:
In-Plant Simulator Control Room   Lab  Other - List  APPLICABLE METHOD OF TESTING:
In-Plant Simulator Control R oom   Lab  Other - List  APPLICABLE METHOD OF TESTING:
Discussion Simulate/Walkthrough Perform TIME FOR COMPLETION:      NA      TIME CRITICAL (Y/N)      ALTERNATE PATH (Y/N)  Developed by:
Discussion Simulate/Walkthrough Perform   TIME FOR COMPLETION:      NA      TIME CRITICAL (Y/N)      ALTERNATE PATH (Y/N)  Developed by:
Developer Date  (Ensure validator is briefed on exam security per NPG
Developer Date  (Ensure validator is briefed on exam security per NPG
-SPP-17.8.1)  (See JPM Validation Checklist in NPG
-SPP-17.8.1)  (See JPM Validation Checklist in NPG
-SPP-17.8.2)      Validated by:
-SPP-17.8.2)      Validated by:
Approved by:
Approved by:
Validator Date  Approved by:
Validator   Date  Approved by:
Site Training Management Date  Site Training Program Owner Date    N N Job Performance Measure (JPM)  2  OPERATOR:  ________________________________
Site Training Management Date  Site Training Program Owner Date    N N Job Performance Measure (JPM)  2  OPERATOR:  ________________________________
JPM Number:
JPM Number:
Line 1,924: Line 1,688:
Operator Fundamental evaluated: Monitoring plant conditions and indications closely and controlling plant evolutions precisely.
Operator Fundamental evaluated: Monitoring plant conditions and indications closely and controlling plant evolutions precisely.
PRA: NA REFERENCES/PROCEDURES NEEDED:
PRA: NA REFERENCES/PROCEDURES NEEDED:
Procedure
Procedure:  3-EOI-APPENDIX-14 A VERIFICATION TIME:    PERFORMANCE TIME:
:  3-EOI-APPENDIX-14A VERIFICATION TIME:    PERFORMANCE TIME:
COMMENTS:  
COMMENTS:  


Line 1,951: Line 1,714:
2 29 0 N/A PC09 OXYGEN IN DRYWELL_ 2 2.8 0 N/A PC10 H2 IN SUPPRESSION POOL_ 2 18 0 N/A PC11 OXYGEN IN SUPPRESSION POOL_ 2 1.5 0 N/A      Overrides Description Event Severity Delay Initial set ZLOXA554C9 DW EQUIP DRAIN SUMP LEVEL ABNORMAL 2 N/A N/A ON                    Schedule File(s):
2 29 0 N/A PC09 OXYGEN IN DRYWELL_ 2 2.8 0 N/A PC10 H2 IN SUPPRESSION POOL_ 2 18 0 N/A PC11 OXYGEN IN SUPPRESSION POOL_ 2 1.5 0 N/A      Overrides Description Event Severity Delay Initial set ZLOXA554C9 DW EQUIP DRAIN SUMP LEVEL ABNORMAL 2 N/A N/A ON                    Schedule File(s):
JPM 669 U3 N2 Makeup to Primary Containment 2
JPM 669 U3 N2 Makeup to Primary Containment 2
-EOI-APPENDIX-14A.sch Appendix\App. 8E.sch JPM 669 U3 N2 Makeup to Primary Containment 2
-EOI-APPENDIX-14A.sch   Appendix\App. 8E.sch JPM 669 U3 N2 Makeup to Primary Containment 2
-EOI-APPENDIX-14A.evt Job Performance Measure (JPM)  5  Revision Summary Rev No. Effective Date Pages Affected Description 0 05/27/15 All Initial issue
-EOI-APPENDIX-14A.evt Job Performance Measure (JPM)  5  Revision Summary Rev No. Effective Date Pages Affected Description 0 05/27/15 All Initial issue


Line 1,970: Line 1,733:
.   
.   


Job Performance Measure (JPM)  7  START TIME STEP / STANDARD SAT / UNSAT Step 1:  3. MONITOR Drywell and Suppression Chamber H 2 and O2concentrations on one or more of the following displays(
Job Performance Measure (JPM)  7  START TIME STEP / STANDARD SAT / UNSAT Step 1:  3. MONITOR Drywell and Suppression Chamber H 2 and O 2concentrations on one or more of the following displays(3-EOI Appendix 19):
3-EOI Appendix 19):
3-MON-76-110, H2/O2 ANALYZER (Panel 3-9-55)  3-XR-76-110, H2/O2 CONCENTRATION (Panel 3-9-54)  Standard:
3-MON-76-110, H2/O2 ANALYZER (Panel 3-9-55)  3-XR-76-110, H2/O2 CONCENTRATION (Panel 3-9-54)  Standard:
Verifies H2 and O2 concentrations  
Verifies H2 and O2 concentrations  


SAT  UNSAT  N/A Step 2:     
SAT  UNSAT  N/A Step 2:     
: 3. IF ................. Drywell/Suppression Chamber H 2 /O2 analyzer is or becomes inoperable, THEN ...........NOTIFY Chemistry Lab to sample Drywell andSuppression Chamber for H 2 and O2 using CI-644. Standard:
: 3. IF ................. Drywell/Suppression Chamber H 2 /O 2 analyzer is or becomes inoperable, THEN ...........NOTIFY Chemistry Lab to sample Drywell andSuppression Chamber for H 2 and O 2 using CI-644. Standard:
Verifies Drywell/Suppression Chamber H 2 /O 2 analyzers are Operable 


Verifies Drywell/Suppression Chamber H 2 /O2 analyzers are Operable 
SAT UNSAT N/A Job Performance Measure (JPM)  8  STEP / STANDARD SAT / UNSAT Step 3:    4. WHEN ......... Drywell or Suppression Chamber H 2 or O 2 concentration is increasing,THEN ........... CONTINUE in this procedure.
 
SAT UNSAT N/A Job Performance Measure (JPM)  8  STEP / STANDARD SAT / UNSAT Step 3:    4. WHEN ......... Drywell or Suppression Chamber H 2 or O2 concentration is increasing,THEN ........... CONTINUE in this procedure.
Standard:
Standard:
Observes a rise in Drywell H2 Concentration and continues with procedure.
Observes a rise in Drywell H2 Concentration and continues with procedure.
SAT  UNSAT  N/A Step 4:  NOTE This procedure assumes that the normal makeup is from N 2 Storage Tank B. 5. DISPATCH personnel to N 2 Storage Tank B to CHECK 0-PI-76-331, N2 TANK B PRESSURE INDICATOR between 160 and 190 psig.
SAT  UNSAT  N/A Step 4:  NOTE This procedure assumes that the normal makeup is from N 2 Storage Tank B. 5. DISPATCH personnel to N 2 Storage Tank B to CHECK 0-PI-76-331, N2 TANK B PRESSURE INDICATOR between 160 and 190 psig.
Standard:
Standard: Dispatches UO to verify N 2 Storage Tank B Pressure  SAT  UNSAT  N/A  CUE: N 2 Storage Tank B Pressure is reading 180 psig Step 5:     
Dispatches UO to verify N2 Storage Tank B Pressure  SAT  UNSAT  N/A  CUE: N2 Storage Tank B Pressure is reading 180 psig Step 5:     
: 6. DETERMINE area with highest H 2 and/or O 2 concentrations and INFORM SRO. Standard:
: 6. DETERMINE area with highest H 2 and/or O2 concentrations and INFORM SRO. Standard:
 
Correctly determines highest concentration is in the drywell and informs  
Correctly determines highest concentration is in the drywell and informs  


Line 1,995: Line 1,752:


Job Performance Measure (JPM)  9  STEP / STANDARD SAT / UNSAT Step 6:    7. VERIFY PCIS RESET (Panel 3-9-4). Standard:
Job Performance Measure (JPM)  9  STEP / STANDARD SAT / UNSAT Step 6:    7. VERIFY PCIS RESET (Panel 3-9-4). Standard:
Verifies PCIS RESET on Panel 3-9-4  Critical Step SAT  UNSAT  N/A Step 7:     
Verifies PCIS RESET on Panel 3-9-4  Critical Step SAT  UNSAT  N/A Step 7:     
: 8. IF ................. It is desired to makeup N 2 to the Suppression Chamber,THEN ...........CONTINUE in this procedure at Step 10.
: 8. IF ................. It is desired to makeup N 2 to the Suppression Chamber,THEN ...........CONTINUE in this procedure at Step 10.
Standard:
Standard:
Correctly determine step is not applicable and proceeds to step 9.
Correctly determine step is not applicable and proceeds to step 9.
Critical Step SAT  UNSAT  N/A Step 8:   
Critical Step SAT  UNSAT  N/A Step 8:   
: 9. CONTROL Drywell H 2 and O2 as follows:
: 9. CONTROL Drywell H 2 and O 2 as follows:
: a. OPEN the following valves to admit N 2 to Drywell (Panel 3-9-3):  3-FCV-76-18, DRYWELL N2 MAKEUP INBDISOLATION VLV 3-FCV-76-17, PRI CTMT N2 MAKEUP OUTBDISOLATION VLV.
: a. OPEN the following valves to admit N 2 to Drywell (Panel 3-9-3):  3-FCV-76-18, DRYWELL N2 MAKEUP INBDISOLATION VLV 3-FCV-76-17, PRI CTMT N2 MAKEUP OUTBDISOLATION VLV.
Standard:
Standard:
OPENS 3-FCV-76-18, DRYWELL N2 MAKEUP INBD ISOLATION VLV  
OPENS 3-FCV-76-18, DRYWELL N2 MAKEUP INBD ISOLATION VLV  
&3-FCV-76-17, PRI CTMT N2 MAKEUP OUTBD ISOLATION VLV Critical Step SAT  UNSAT  N/A Step 9:     
&3-FCV-76-17, PRI CTMT N2 MAKEUP OUTBD ISOLATION VLV Critical Step SAT  UNSAT  N/A Step 9:     
: b. SLOWLY ADJUST 3-PC-76-14, DW/SUPPR CHBR N2 MUPRESS CONTROL (Panel 3-9-3), to maintain flow between 55 and60 scfm on 3-XR-76-14, DW/SUPPR CHBR N2 MAKEUPFLOW/PRESS (Panel 3-9-3), or as directed by SRO if SAMGexecution is in progress.
: b. SLOWLY ADJUST 3-PC-76-14, DW/SUPPR CHBR N2 MUPRESS CONTROL (Panel 3-9-3), to maintain flow between 55 and60 scfm on 3-XR-76-14, DW/SUPPR CHBR N2 MAKEUPFLOW/PRESS (Panel 3-9-3), or as directed by SRO if SAMGexecution is in progress.
Standard:
Standard:
Achieves a flowrate between 55
Achieves a flowrate between 55
-60 scfm and monitors Drywell Hydrogen Concentration Lowering Critical Step SAT  UNSAT  N/A Job Performance Measure (JPM)  10  STEP / STANDARD SAT / UNSAT Step 10:    c. CONTINUE N2 admission to the Drywell UNTIL Drywell H 2 and O2 are below desired values.
-60 scfm and monitors Drywell Hydrogen Concentration Lowering Critical Step SAT  UNSAT  N/A Job Performance Measure (JPM)  10  STEP / STANDARD SAT / UNSAT Step 10:    c. CONTINUE N 2 admission to the Drywell UNTIL Drywell H 2 and O 2 are below desired values.
Standard:
Standard:
Monitors Drywell Hydrogen Concentration SAT  UNSAT  N/A  Note to Examiner:  Once satisfied with N2 Flow established between 55  
Monitors Drywell Hydrogen Concentration SAT  UNSAT  N/A  Note to Examiner:  Once satisfied with N2 Flow established between 55  
- 60 scfm with a downward trend on H2 Concentration in the Drywell. End of task.
- 60 scfm with a downward trend on H2 Concentration in the Drywell. End of task.
Pass/ Fail Criteria: Establish N2 Flow > 55 scfm and H2 Concentration on a downward trend.
Pass/ Fail Criteria: Establish N2 Flow > 55 scfm and H2 Concentration on a downward trend.
STOP TIME  
STOP TIME END OF TASK
 
END OF TASK


Job Performance Measure (JPM)  11  Provide to Applicant IN-SIMULATOR:  I will explain the initial conditions and state the task to be performed. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's Correct".  (OR "That's Incorrect", if applicable). When you have completed your assigned task, you will say, "my task is complete" and I will acknowledge that your task is complete.
Job Performance Measure (JPM)  11  Provide to Applicant IN-SIMULATOR:  I will explain the initial conditions and state the task to be performed. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's Correct".  (OR "That's Incorrect", if applicable). When you have completed your assigned task, you will say, "my task is complete" and I will acknowledge that your task is complete.
Line 2,029: Line 1,779:
: 3. The Reactor is shutdown.
: 3. The Reactor is shutdown.
3-EOI-APPENDIX-12 has been completed.
3-EOI-APPENDIX-12 has been completed.
3-EOI-APPENDIX-19 has been completed.
3-EOI-APPENDIX-19 h as been completed.
PCIS Group 6 has been overridden per 3
PCIS Group 6 has been overridden per 3
-EOI-APPENDIX-8E.   
-EOI-APPENDIX-8E.   
Line 2,040: Line 1,790:
Job Performance Measure (JPM)  1  SITE: BFN JPM TITLE:
Job Performance Measure (JPM)  1  SITE: BFN JPM TITLE:
Restore Offsite Power to 4KV shutdown board at PNL 9-23 JPM NUMBER:
Restore Offsite Power to 4KV shutdown board at PNL 9-23 JPM NUMBER:
631 U2 REVISION:
631 U2 REVISION: 0  TASK APPLICABILITY:
0  TASK APPLICABILITY:
SRO            STA UO          NAUO TASK NUMBER / TASK TITLE(S):
SRO            STA UO          NAUO TASK NUMBER / TASK TITLE(S):
U-082-NO-09 / Restore Offsite Power to 4KV shutdown board at PNL 9
U-082-NO-09 / Restore Offsite Power to 4KV shutdown board at PNL 9
Line 2,049: Line 1,798:
N/A SAFETY FUNCTION:
N/A SAFETY FUNCTION:
6  EVALUATION LOCATION
6  EVALUATION LOCATION
:      In-Plant     Simulator   Control Roo m      Lab       Other - List   APPLICABLE METHOD OF TESTING:      Discussion      Simulate/Walkthrough        Perform TIME FOR COMPLETION:
:      In-Plan t     Simulato r   Control Roo m      La b       Other - Lis t   APPLICABLE METHOD OF TESTING:      Discussion      Simulate/Walkthrough        Perform TIME FOR COMPLETION:
NATIME CRITICAL (Y/N)        ALTERNATE PATH (Y/N)
NA TIME CRITICAL (Y/N)        ALTERNATE PATH (Y/N)
Developed by:
Developed by:
Developer Date  (Ensure validator is briefed on exam security per NPG
Developer Date  (Ensure validator is briefed on exam security per NPG
-SPP-17.8.1)                (See JPM Validation Checklist in NPG
-SPP-17.8.1)                (See JPM Validation Checklist in NPG
-SPP-17.8.2)      Validated by:
-SPP-17.8.2)      Validated by:
Approved by:
Approved by:
Validator Date  Approved by:
Validator   Date  Approved by:
Site Training Management Date  Site Training Program Owner Date  N N Job Performance Measure (JPM)  2  OPERATOR:  ________________________________
Site Training Management Date  Site Training Program Owner Date  N N Job Performance Measure (JPM)  2  OPERATOR:  ________________________________
JPM Number:
JPM Number:
Line 2,083: Line 1,832:


You are an Operator on Unit 2.
You are an Operator on Unit 2.
No Inclement weather currently exists in the area 8 hours ago, 4 KV Shutdown Board A was separated from Offsite Power in accordance with 0
No Inclement weather currently exists in the area 8 hour s ago, 4 KV Shutdown Board A was separated from Offsite Power in accordance with 0
-OI-82, Standby Diesel Generator System.
-OI-82, Standby Diesel Generator System.


Line 2,093: Line 1,842:
-23.   
-23.   


Job Performance Measure (JPM)  5  START TIME STEP / STANDARD SAT / UNSAT Step 1:    0-OI-82 Standby Diesel Generator System
Job Performance Measure (JPM)  5  START TIME STEP / STANDARD SAT / UNSAT Step 1:    0-OI-82 Standby Diesel Generator System


Section 8.3 Restoring Offsite Power to 4
Section 8.3 Restoring Offsite Power to 4
Line 2,101: Line 1,850:


[1]  VERIFY 4-kV Shutdown Board A is being supplied power by its respective Diesel Generator as the only source of power.
[1]  VERIFY 4-kV Shutdown Board A is being supplied power by its respective Diesel Generator as the only source of power.
Standard:
Standard:   Verifies 4
Verifies 4
-kV Shutdown Board A is being supplied by DG A
-kV Shutdown Board A is being supplied by DG A
. SAT
. SAT
__UNSAT N/A  Step 2:     
__UNSA T N/A  Step 2:     
[2]  VERIFY the associated 4kV shutdown board auto transfer lockout relay is tripped to MANUAL.
[2]  VERIFY the associated 4kV shutdown board auto transfer lockout relay is tripped to MANUAL.
Diesel Handswitch Name Handswitch No. Panel A 4KV SD BD A AUTO/LOCKOUT RESET 0-211-3EA 0-9-23-7  Standard:
Diesel Handswitch Name Handswitch No. Panel A 4KV SD BD A AUTO/LOCKOUT RESET 0-211-3EA 0-9-23-7  Standard: Verifies 4KV SD BD A AUTO/LOCKOUT RESET, HS 211-A, is tripped to manua
Verifies 4KV SD BD A AUTO/LOCKOUT RESET, HS 211-A, is tripped to manua
: l. SAT  UNSAT  N/A Job Performance Measure (JPM)  6  STEP / STANDARD SAT / UNSAT Step 3:    [3]  PLACE the synchroscope switch for the 4
: l. SAT  UNSAT  N/A Job Performance Measure (JPM)  6  STEP / STANDARD SAT / UNSAT Step 3:    [3]  PLACE the synchroscope switch for the 4
-kV shutdown board feeder breaker that is to be paralleled with the Diesel Generator in ON. Standard:
-kV shutdown board feeder breaker that is to be paralleled with the Diesel Generator in ON. Standard: Places Synchroscope switch for 4
Places Synchroscope switch for 4
-kV Shutdown Board A normal feeder breaker 1614 to ON
-kV Shutdown Board A normal feeder breaker 1614 to ON
. Critical Step
. Critical Step
Line 2,117: Line 1,863:
SAT UNSAT N/A  Step 4:     
SAT UNSAT N/A  Step 4:     
[4]  VERIFY 4-kV Shutdown Bus 1(2) voltage is between 3950 Volts and 4400 Volts and NOT undergoing abnormal voltage transients.
[4]  VERIFY 4-kV Shutdown Bus 1(2) voltage is between 3950 Volts and 4400 Volts and NOT undergoing abnormal voltage transients.
Standard:
Standard: Verifies 4
Verifies 4
-kV Shutdown Bus 1 voltage is between 3950 Volts and 4400 Volts and NOT undergoing abnormal voltage transients.  
-kV Shutdown Bus 1 voltage is between 3950 Volts and 4400 Volts and NOT undergoing abnormal voltage transients.  


Line 2,124: Line 1,869:
[5]  VERIFY associated incoming frequency is between 59 Hertz and 61 Hertz and NOT undergoing abnormal frequency transients.
[5]  VERIFY associated incoming frequency is between 59 Hertz and 61 Hertz and NOT undergoing abnormal frequency transients.
Shutdown Bd Instrument Name Instrument No.
Shutdown Bd Instrument Name Instrument No.
Panel A or B GEN SYNC FREQUENCY 0-SI-82-0AB 0-9-23-7 C or D GEN SYNC FREQUENCY 0-SI-82-0CD 0-9-23-8  Standard:
Panel A or B GEN SYNC FREQUENCY 0-SI-82-0 AB 0-9-23-7 C or D GEN SYNC FREQUENCY 0-SI-82-0 CD 0-9-23-8  Standard:   Verifies incoming frequency is between 59 Hertz and 61 Hertz and NOT undergoing abnormal frequency transients using GEN SYNC FREQUENCY,0
Verifies incoming frequency is between 59 Hertz and 61 Hertz and NOT undergoing abnormal frequency transients using GEN SYNC FREQUENCY,0
-SI-82-AB.
-SI-82-AB.
SAT UNSAT N/A Job Performance Measure (JPM)  7  STEP / STANDARD SAT / UNSAT Step 6:    CAUTION DO NOT parallel the Diesel Generators with an unstable offsite source or during inclementweather (e.g., lightning, heavy winds).
SAT UNSAT N/A Job Performance Measure (JPM)  7  STEP / STANDARD SAT / UNSAT Step 6:    CAUTION DO NOT parallel the Diesel Generators with an unstable offsite source or during inclementweather (e.g., lightning, heavy winds).
   [6]  IF 4-kV Shutdown Bus 1 (2) is experiencing abnormal voltage or frequency conditions, THEN PERFORM the following:
   [6]  IF 4-kV Shutdown Bus 1 (2) is experiencing abnormal voltage or frequency conditions, THEN PERFORM the following:
Standard:
Standard:   STEP N/A SAT UNSAT N/A Step 7:    CAUTION Only one Unit 1 and 2 Diesel Generator at a time is allowed to be operated in parallel with system.
STEP N/A SAT UNSAT N/A Step 7:    CAUTION Only one Unit 1 and 2 Diesel Generator at a time is allowed to be operated in parallel with system.


[7]  PULL and PLACE the associated Diesel Generator mode selector switch in PARALLELED WITH SYSTEM.
[7]  PULL and PLACE the associated Diesel Generator mode selector switch in PARALLELED WITH SYSTEM.
Diesel Handswitch Name Handswitch No. Panel A DG A MODE SELECT 0-HS-82-A/5A 0-9-23-7  Standard:
Diesel Handswitch Name Handswitch No. Panel A DG A MODE SELECT 0-HS-82-A/5A 0-9-23-7  Standard:   Pulls DG A MODE SELECT switch 0-HS-82-A/5A and places it in PARALLELED WITH SYSTEM
Pulls DG A MODE SELECT switch 0-HS-82-A/5A and places it in PARALLELED WITH SYSTEM
. Critical Step
. Critical Step


SAT UNSAT N/A Job Performance Measure (JPM)  8  STEP / STANDARD SAT / UNSAT Step 8:    CAUTION Failure of the PARALLELED WITH SYSTEM light to illuminate in the following step could indicate that the DG is still in SINGLE UNIT operation and result in overload when the DG output breaker is closed.   
SAT UNSAT N/A Job Performance Measure (JPM)  8  STEP / STANDARD SAT / UNSAT Step 8:    CAUTION Failure of the PARALLELED WITH SYSTEM light to illuminate in the following step could indicate that the DG is still in SINGLE UNIT operation and result in overload when the DG output breaker is closed.   
[8]  RELEASE the Diesel Generator mode selector switch and OBSERVE PARALLELED WITH SYSTEM light illuminated.
[8]  RELEASE the Diesel Generator mode selector switch and OBSERVE PARALLELED WITH SYSTEM light illuminated.
Standard:
Standard: Releases the Diesel Generator A mode selector switch, 0-HS-82-A/5A and observesPARALLELED WITH SYSTEM light is illuminated
Releases the Diesel Generator A mode selector switch, 0-HS-82-A/5A and observesPARALLELED WITH SYSTEM light is illuminated
.
.
SAT UNSAT N/A Step 9:   
SAT UNSAT N/A Step 9:   
[9]  ADJUST Diesel Generator frequency using the associated Diesel Generator governor control switch to obtain a synchroscope needle rotation of one revolution every 15 to 20 seconds in the SLOW direction.
[9]  ADJUST Diesel Generator frequency using the associated Diesel Generator governor control switch to obtain a synchroscope needle rotation of one revolution every 15 to 20 seconds in the SLOW direction.
Diesel Handswitch Name Handswitch No. Panel A DG A GOVERNOR CONTROL 0-HS-82-A/3A 0-9-23-7  Standard:
Diesel Handswitch Name Handswitch No. Panel A DG A GOVERNOR CONTROL 0-HS-82-A/3A 0-9-23-7  Standard: AdjustsDiesel Generator A frequency using Diesel Generator governor control switch, 3-HS-82-A/3A, (in lower direction) to obtain a synchroscope needle rotation of one revolution every 15 to 20 seconds in the SLOW direction.
AdjustsDiesel Generator A frequency using Diesel Generator governor control switch, 3-HS-82-A/3A, (in lower direction) to obtain a synchroscope needle rotation of one revolution every 15 to 20 seconds in the SLOW direction.
Critical Step
Critical Step


SAT UNSAT N/A Job Performance Measure (JPM)  9  STEP / STANDARD SAT / UNSAT Step 10:    [10]  USE the associated Diesel Generator voltage regulator control switch to match Diesel Generator and System voltages.
SAT UNSAT N/A Job Performance Measure (JPM)  9  STEP / STANDARD SAT / UNSAT Step 10:    [10]  USE the associated Diesel Generator voltage regulator control switch to match Diesel Generator and System voltages.
Diesel Instrument Name Inst No. Panel A DG A VOLT REGULATOR CONT 0-HS-82-A/2A 0-9-23-7 GEN SYNC REF VOLTAGE 0-EI-82-AB SYSTEM SYNC REF VOLTAGE 0-EI-211-0AB Standard:
Diesel Instrument Name Inst No. Panel A DG A VOLT REGULATOR CONT 0-HS-82-A/2A 0-9-23-7 GEN SYNC REF VOLTAGE 0-EI-82-AB SYSTEM SYNC REF VOLTAGE 0-EI-211-0 AB Standard:
 
Matches DG A voltage with system voltage using DG A VOLT REGULATOR CONT switch 0-HS-82-A/2 A.
Matches DG A voltage with system voltage using DG A VOLT REGULATOR CONT switch 0-HS-82-A/2A.
SAT UNSAT N/A Step 11:     
SAT UNSAT N/A Step 11:     
[11]  WHEN the synchroscope needle is approximately 2 minutes on the right hand side of the 12 o'clock position, THEN  CLOSE the 4-kV shutdown board feeder breaker that is to be paralleled with the Diesel Generator.
[11]  WHEN the synchroscope needle is approximately 2 minutes on the right hand side of the 12 o'clock position, THEN  CLOSE the 4-kV shutdown board feeder breaker that is to be paralleled with the Diesel Generator.
Standard:
Standard: Closesthe 4-kV shutdown board feeder breaker 1614 when the synchroscope needle is approximately 2 minutes on the right hand side of the 12 o'clock position.
Closesthe 4-kV shutdown board feeder breaker 1614 when the synchroscope needle is approximately 2 minutes on the right hand side of the 12 o'clock position.
Critical Step
Critical Step


Line 2,161: Line 1,899:
[12]  PLACE the synchroscope switch for the 4
[12]  PLACE the synchroscope switch for the 4
-kV shutdown board feeder breaker that was paralleled with the Diesel Generator in OFF. Standard:
-kV shutdown board feeder breaker that was paralleled with the Diesel Generator in OFF. Standard:
Places the synchroscope switch for BKR 1614 in OFF.
Places the synchroscope switch for BKR 1614 in OFF.
SAT  UNSAT  N/A Job Performance Measure (JPM)  10  STEP / STANDARD SAT / UNSAT Step 13:    NOTE If diesel operates greater than 4 hours at less than 50% load, the diesel should be loaded to full load for at least 30 minutes prior to engine shutdown. This will allow the engine to clean out any oil accumulations from the exhaust manifolds.
SAT  UNSAT  N/A Job Performance Measure (JPM)  10  STEP / STANDARD SAT / UNSAT Step 13:    NOTE If diesel operates greater than 4 hours at less than 50% load, the diesel should be loaded to full load for at least 30 minutes prior to engine shutdown. This will allow the engine to clean out any oil accumulations from the exhaust manifolds.
Line 2,168: Line 1,905:


toINCREASE kW and kVAR load, in increments of 100kWevery 15 minutes.
toINCREASE kW and kVAR load, in increments of 100kWevery 15 minutes.
Diesel Handswitch Name Handswitch No. Panel A DG A GOVERNOR CONTROL 0-HS-82-A/3A 0-9-23-7 DG A VOLT REGULATOR CONTROL 0-HS-82-A/2A [13.2] OBSERVE the exhaust stack smoke concentration from outside the DG room after each incremental increase.
Diesel Handswitch Name Handswitch No. Panel A DG A GOVERNOR CONTROL 0-HS-82-A/3A 0-9-23-7 DG A VOLT REGULATOR CONTROL 0-HS-82-A/2 A [13.2] OBSERVE the exhaust stack smoke concentration from outside the DG room after each incremental increase.
  [13.3] STEP N/A [13.4] WHEN smoke becomes relatively clear, CONTINUE to load DG engine to 100% if possible.
  [13.3] STEP N/A [13.4] WHEN smoke becomes relatively clear, CONTINUE to load DG engine to 100% if possible.
  [13.5] MAINTAIN 100% load for a minimum of 30 minutes.
  [13.5] MAINTAIN 100% load for a minimum of 30 minutes.
Standard:
Standard: Loads DG to 2600 kW and 185 0 kVAR by using 0-HS-82-A/3A and 0-HS-82-A/2A handswitches.
Loads DG to 2600 kW and 185 0 kVAR by using 0-HS-82-A/3A and 0-HS-82-A/2A handswitches.
Critical Step SAT UNSAT N/A CUE: After first 100 kW load adjustment state "15 minutes have elapsed and no observable black smoke from exhaust stack for time compression and continue to full load
Critical Step SAT UNSAT N/A CUE: After first 100 kW load adjustment state "15 minutes have elapsed and no observable black smoke from exhaust stack for time compression and continue to full load
."
."
Job Performance Measure (JPM)  11  STEP / STANDARD SAT / UNSAT Step 14:    NOTE Lagging VARs should be maintained when adjusting kW load (rising or lowering). This may require kW load adjustment to be stopped periodically to allow for adjusting kVAR load. Once desired kW load is achieved, Illustration 1 should be referred to for determination of kVAR loading required to obtain a power factor (pf) of 0.8 lagging. Diesel generator kVAR load should then be adjusted to obtain a 0.8 pf lagging. IF system conditions will NOT permit the kVAR loading required to obtain a 0.8 pf lagging, kVAR load should be adjusted to the maximum kVAR lagging the system will allow.
Job Performance Measure (JPM)  11  STEP / STANDARD SAT / UNSAT Step 1 4:    NOTE Lagging VARs should be maintained when adjusting kW load (rising or lowering). This may require kW load adjustment to be stopped periodically to allow for adjusting kVAR load. Once desired kW load is achieved, Illustration 1 should be referred to for determination of kVAR loading required to obtain a power factor (pf) of 0.8 lagging. Diesel generator kVAR load should then be adjusted to obtain a 0.8 pf lagging. IF system conditions will NOT permit the kVAR loading required to obtain a 0.8 pf lagging, kVAR load should be adjusted to the maximum kVAR lagging the system will allow.  
 
[14]  USE the associated Diesel Generator's governor control switch and voltage regulator control switch to obtain desired kW and kVAR load.
[14]  USE the associated Diesel Generator's governor control switch and voltage regulator control switch to obtain desired kW and kVAR load.


Standard:
Standard: Obtains desired kW and kVAR load using DG A Governor Control switch, 0-HS-82-A/3A and DG Volt Regulator Cont switch, 0
Obtains desired kW and kVAR load using DG A Governor Control switch, 0-HS-82-A/3A and DG Volt Regulator Cont switch, 0
-HS-82-A/2A. Diesel Handswitch Name Handswitch No.
-HS-82-A/2A. Diesel Handswitch Name Handswitch No.
Panel A DG A GOVERNOR CONTROL 0-HS-82-A/3A 0-9-23-7 DG A VOLT REGULATOR CONT 0-HS-82-A/2A SAT UNSAT N/A CUE: state "30 minutes have elapsed continue with procedure."
Panel A DG A GOVERNOR CONTROL 0-HS-82-A/3A 0-9-23-7 DG A VOLT REGULATOR CONT 0-HS-82-A/2A SAT UNSAT N/A CUE: state "30 minutes have elapsed continue with procedure."
Step 15:     
Step 1 5:     
[15]  MONITOR the offsite source that is paralleled with the Diesel Generator.
[15]  MONITOR the offsite source that is paralleled with the Diesel Generator.


[16]  IF abnormal voltage or frequency transients are experienced, THEN  Standard:
[16]  IF abnormal voltage or frequency transients are experienced, THEN  Standard: Step is N/A  SAT UNSAT N/A Job Performance Measure (JPM)  12  STEP / STANDARD SAT / UNSAT Step 1 6:    [17]  WHEN Parallel with System operation is no longer desired, THEN UNLOAD the Diesel Generator as follows:
Step is N/A  SAT UNSAT N/A Job Performance Measure (JPM)  12  STEP / STANDARD SAT / UNSAT Step 16:    [17]  WHEN Parallel with System operation is no longer desired, THEN UNLOAD the Diesel Generator as follows:
CAUTION When unloading the Diesel Generator, failure to slowly approach the 300 kW/250 kVARlimit may result in a reverse power trip of the Diesel Generator output breaker.  
CAUTION When unloading the Diesel Generator, failure to slowly approach the 300 kW/250 kVARlimit may result in a reverse power trip of the Diesel Generator output breaker.  
   [17.1]  USE the associated Diesel Generator's governor control switch and voltage regulator control switch to reduce generator load to approximately 300 kW and 250 kVAR:
   [17.1]  USE the associated Diesel Generator's governor control switch and voltage regulator control switch to reduce generator load to approximately 300 kW and 250 kVAR: Diesel Instrument Name Inst No. Panel  A DG A GOVERNOR CONTROL 0-HS-82-A/3 A 0-9-23-7 DG A VOLTAGE REGULATOR CONTROL 0-HS-82-A/2A DG A KILOWATTS 0-JI-82-A/A  DG A KILOVARS 0-VAR-82-A/A  Standard: Unloads the DG to approximately 300 KW and 250 kVAR
Diesel Instrument Name Inst No. Panel  A DG A GOVERNOR CONTROL 0-HS-82-A/3A 0-9-23-7 DG A VOLTAGE REGULATOR CONTROL 0-HS-82-A/2A DG A KILOWATTS 0-JI-82-A/A  DG A KILOVARS 0-VAR-82-A/A  Standard:
Unloads the DG to approximately 300 KW and 250 kVAR
. Critical Step
. Critical Step


SAT  UNSAT  N/A Step 17 [17.2]  PLACE the associated Diesel Generator breaker control switch in TRIP Diesel Handswitch Name Handswitch No.
SAT  UNSAT  N/A Step 1 7 [17.2]  PLACE the associated Diesel Generator breaker control switch in TRIP Diesel Handswitch Name Handswitch No.
Panel A DG A BKR 1818 0-HS-211-A/22A 0-9-23-7  Standard:
Panel A DG A BKR 1818 0-HS-211-A/22 A 0-9-23-7  Standard: Trips Diesel Generator breaker 1818
Trips Diesel Generator breaker 1818
. Critical Step SAT  UNSAT N/A Job Performance Measure (JPM)  13  STEP / STANDARD SAT / UNSAT Step 1 8:    [17.3]  PULL and PLACE the associated Diesel Generator mode selector switch in SINGLE UNIT.
. Critical Step SAT  UNSAT N/A Job Performance Measure (JPM)  13  STEP / STANDARD SAT / UNSAT Step 18:    [17.3]  PULL and PLACE the associated Diesel Generator mode selector switch in SINGLE UNIT.
Diesel Handswitch Name Handswitch No.
Diesel Handswitch Name Handswitch No.
Panel A DG A MODE SELECT 0-HS-211-A/5A 0-9-23-7 Standard:
Panel A DG A MODE SELECT 0-HS-211-A/5 A 0-9-23-7 Standard: Pulls and places 0
Pulls and places 0
-HS-211-A/5A to Single Unit
-HS-211-A/5A to Single Unit
. Critical Step SAT  UNSAT N/A Step 19:    [17.4]  RELEASE the Diesel Generator mode selector switch and OBSERVE the SINGLE UNIT light illuminated.
. Critical Step SAT  UNSAT N/A Step 19:    [17.4]  RELEASE the Diesel Generator mode selector switch and OBSERVE the SINGLE UNIT light illuminated.
Standard:
Standard: Verifies Single Unit light illuminated
Verifies Single Unit light illuminated
.
.
SAT  UNSAT N/A CUE:  ANOTHER OPERATOR WILL CONTINUE FROM HERE STOP TIME END OF TASK
SAT  UNSAT N/A CUE:  ANOTHER OPERATOR WILL CONTINUE FROM HERE STOP TIME END OF TASK
Line 2,211: Line 1,939:


You are an Operator on Unit 2.
You are an Operator on Unit 2.
No Inclement weather currently exists in the area 8 hours ago, 4 KV Shutdown Board A was separated from Offsite Power in accordance with 0
No Inclement weather currently exists in the area 8 hour s ago, 4 KV Shutdown Board A was separated from Offsite Power in accordance with 0
-OI-82, Standby Diesel Generator System.
-OI-82, Standby Diesel Generator System.


Line 2,224: Line 1,952:
Restore Offsite Power to 4KV shutdown board at PNL 9
Restore Offsite Power to 4KV shutdown board at PNL 9
-23      U-3 JPM NUMBER:
-23      U-3 JPM NUMBER:
631 REVISION:
631 REVISION: 0  TASK APPLICABILITY:
0  TASK APPLICABILITY:
SRO            STA UO          NAUO TASK NUMBER / TASK TITLE(S):
SRO            STA UO          NAUO TASK NUMBER / TASK TITLE(S):
U-082-NO-09 / Restore Offsite Power to 4KV shutdown board at PNL 9
U-082-NO-09 / Restore Offsite Power to 4KV shutdown board at PNL 9
Line 2,233: Line 1,960:
N/A SAFETY FUNCTION:
N/A SAFETY FUNCTION:
6  EVALUATION LOCATION
6  EVALUATION LOCATION
:      In-Plant     Simulator   Control Roo m      Lab       Other - List   APPLICABLE METHOD OF TESTING:      Discussion      Simulate/Walkthrough        Perform TIME FOR COMPLETION:
:      In-Plan t     Simulato r   Control Roo m      La b       Other - Lis t   APPLICABLE METHOD OF TESTING:      Discussion      Simulate/Walkthrough        Perform TIME FOR COMPLETION:
NA    TIME CRITICAL (Y/N)        ALTERNATE PATH (Y/N)
NA    TIME CRITICAL (Y/N)        ALTERNATE PATH (Y/N)
Developed by:
Developed by:
Developer Date  (Ensure validator is briefed on exam security per NPG
Developer Date  (Ensure validator is briefed on exam security per NPG
-SPP-17.8.1)                (See JPM Validation Checklist in NPG
-SPP-17.8.1)                (See JPM Validation Checklist in NPG
-SPP-17.8.2)      Validated by:
-SPP-17.8.2)      Validated by:
Approved by:
Approved by:
Validator Date  Approved by:
Validator   Date  Approved by:
Site Training Management Date  Site Training Program Owner Date  N N Job Performance Measure (JPM)  2  OPERATOR:  ________________________________
Site Training Management Date  Site Training Program Owner Date  N N Job Performance Measure (JPM)  2  OPERATOR:  ________________________________
JPM Number:
JPM Number:
Line 2,271: Line 1,998:


You are an Operator on Unit 3
You are an Operator on Unit 3
. No Inclement weather currently exists in the area 8 hours ago, 4 KV Shutdown Board 3EC was separated from Offsite Power in accordance with 3
. No Inclement weather currently exists in the area 8 hour s ago, 4 KV Shutdown Board 3EC was separated from Offsite Power in accordance with 3
-OI-82, Standby Diesel Generator System.
-OI-82, Standby Diesel Generator System.


Line 2,286: Line 2,013:
-kV Shutdown Board at Panel 9-23  NOTE The following list of 4
-kV Shutdown Board at Panel 9-23  NOTE The following list of 4
-kV shutdown board normal and alternate feeder breakers may be useful when performing this section:
-kV shutdown board normal and alternate feeder breakers may be useful when performing this section:
Shutdown Board 3EA 3EB 3EC 3ED Norm Feed Bkr 1334 1336 1338 1342 Alt Feed Bkr 1726 1728 1626 1628  
Shutdown Board 3E A 3E B 3E C 3E D Norm Feed Bkr 1334 1336 1338 1342 Alt Feed Bkr 1726 17 28 16 26 16 28  


[1]  VERIFY 4-kV Shutdown Board 3EC is being supplied power by its respective Diesel Generator as the only source of power.
[1]  VERIFY 4-kV Shutdown Board 3EC is being supplied power by its respective Diesel Generator as the only source of power.
Standard:
Standard:   Verifies 4
Verifies 4
-kV Shutdown Board E C is being supplied by DG C  SAT  UNSA T N/A Step 2:     
-kV Shutdown Board EC is being supplied by DG C  SAT  UNSAT N/A Step 2:     
[2]  VERIFY the associated 4kV shutdown board auto transfer lockout relay is tripped to MANUAL.
[2]  VERIFY the associated 4kV shutdown board auto transfer lockout relay is tripped to MANUAL.
Diesel Handswitch Name Handswitch No.
Diesel Handswitch Name Handswitch No.
Panel 3C 4KV SD BD 3EC AUTO/LOCKOUT RESET 3-43-211-3EC 3-9-23  Standard:
Panel 3C 4KV SD BD 3EC AUTO/LOCKOUT RESET 3-43-211-3EC 3-9-23  Standard: Verifies 4KV SD BD 3EC AUTO/LOCKOUT RESET, 3 211-3EC, is tripped to manua
Verifies 4KV SD BD 3EC AUTO/LOCKOUT RESET, 3 211-3EC, is tripped to manua
: l. SAT  UNSAT  N/A Job Performance Measure (JPM)  6  STEP / STANDARD SAT / UNSAT Step 3:    [3]  PLACE the synchroscope switch for the 4
: l. SAT  UNSAT  N/A Job Performance Measure (JPM)  6  STEP / STANDARD SAT / UNSAT Step 3:    [3]  PLACE the synchroscope switch for the 4
-kV shutdown board feeder breaker that is to be paralleled with the Diesel Generator in ON. Standard:
-kV shutdown board feeder breaker that is to be paralleled with the Diesel Generator in ON. Standard: Places Synchroscope switch for 4
Places Synchroscope switch for 4
-kV Shutdown Board EC normal feeder breaker 1338 to ON  Critical Step SAT  UNSAT  N/A Step 4:     
-kV Shutdown Board EC normal feeder breaker 1338 to ON  Critical Step SAT  UNSAT  N/A Step 4:     
[4]  CHECK the applicable 4
[4]  CHECK the applicable 4
-kV unit board (4
-kV unit board (4
-kV bus tie board) voltage is between 3950 VOLTS and 4400 VOLTS and NOT undergoing abnormal voltage transients.
-kV bus tie board) voltage is between 3950 VOLTS and 4400 VOLTS and NOT undergoing abnormal voltage transients.
Standard:
Standard: Verifies 4
Verifies 4
-kV Unit Board voltage is between 3950 Volts and 4400 Volts and NOT undergoing abnormal voltage transients.
-kV Unit Board voltage is between 3950 Volts and 4400 Volts and NOT undergoing abnormal voltage transients.
SAT  UNSAT  N/A Step 5:   
SAT  UNSAT  N/A Step 5:   
[5]  VERIFY associated incoming frequency is between 59 HERTZ and 61 HERTZ and NOT undergoing abnormal frequency transients.
[5]  VERIFY associated incoming frequency is between 59 HERTZ and 61 HERTZ and NOT undergoing abnormal frequency transients.
Shutdown Bd Instrument Name Instrument No.
Shutdown Bd Instrument Name Instrument No.
Panel 3EA or 3EB GEN SYNC FREQUENCY 3-SI-82-3AB 3-9-23 3EC or 3ED GEN SYNC FREQUENCY 3-SI-82-3CD 3-9-23  Standard:
Panel 3E A or 3E B GEN SYNC FREQUENCY 3-SI-82-3 AB 3-9-23 3EC or 3E D GEN SYNC FREQUENCY 3-SI-82-3 CD 3-9-23  Standard:   Verifies incoming frequency is between 59 Hertz and 61 Hertz and NOT undergoing abnormal frequency transients using GEN SYNC FREQUENCY, 3-SI-82-CD . SAT  UNSAT  N/A Job Performance Measure (JPM)  7  STEP / STANDARD SAT / UNSAT Step 6:    CAUTION DO NOT parallel the Diesel Generators with an unstable offsite source or during inclement weather (e.g., lightning, heavy winds).
Verifies incoming frequency is between 59 Hertz and 61 Hertz and NOT undergoing abnormal frequency transients using GEN SYNC FREQUENCY, 3-SI-82-CD . SAT  UNSAT  N/A Job Performance Measure (JPM)  7  STEP / STANDARD SAT / UNSAT Step 6:    CAUTION DO NOT parallel the Diesel Generators with an unstable offsite source or during inclement weather (e.g., lightning, heavy winds).
   [6]  IF 4-kV unit board (4
   [6]  IF 4-kV unit board (4
-kV bus tie board) is experiencing abnormal voltage or frequency conditions, THEN PERFORM the following:
-kV bus tie board) is experiencing abnormal voltage or frequency conditions, THEN PERFORM the following:
Standard:
Standard:   N/A  SAT  UNSAT  N/A Step 7:    CAUTION Only one Unit 1 and 2 Diesel Generator at a time is allowed to be operated in parallel with system.
N/A  SAT  UNSAT  N/A Step 7:    CAUTION Only one Unit 1 and 2 Diesel Generator at a time is allowed to be operated in parallel with system.


[7]  PULL and PLACE the associated Diesel Generator mode selector switch in PARALLELED WITH SYSTEM.
[7]  PULL and PLACE the associated Diesel Generator mode selector switch in PARALLELED WITH SYSTEM.
Diesel Handswitch Name Handswitch No. Panel 3C DG 3C MODE SELECT 3-HS-82-3C/5A 3-9-23  Standard:
Diesel Handswitch Name Handswitch No. Panel 3C DG 3C MODE SELECT 3-HS-82-3C/5 A 3-9-23  Standard:   Pulls DG 3C MODE SELECT switch 3-HS-82-3C/5 A and places it in PARALLELED WITH SYSTEM Critical Step SAT  UNSAT  N/A Job Performance Measure (JPM)  8  STEP / STANDARD SAT / UNSAT Step 8:    CAUTION Failure of the PARALLELED WITH SYSTEM light to illuminate in the following step could indicate that the DG is still in SINGLE UNIT operation and result in overload when the DG output breaker is closed.   
Pulls DG 3C MODE SELECT switch 3-HS-82-3C/5A and places it in PARALLELED WITH SYSTEM Critical Step SAT  UNSAT  N/A Job Performance Measure (JPM)  8  STEP / STANDARD SAT / UNSAT Step 8:    CAUTION Failure of the PARALLELED WITH SYSTEM light to illuminate in the following step could indicate that the DG is still in SINGLE UNIT operation and result in overload when the DG output breaker is closed.   
[8]  RELEASE the Diesel Generator mode selector switch and OBSERVE PARALLELED WITH SYSTEM light illuminated.
[8]  RELEASE the Diesel Generator mode selector switch and OBSERVE PARALLELED WITH SYSTEM light illuminated.
Standard:
Standard: Releases the Diesel Generator 3C mode selector switch, 3-HS-82-3C/5C and observes PARALLELED WITH SYSTEM light is illuminated
Releases the Diesel Generator 3C mode selector switch, 3-HS-82-3C/5C and observes PARALLELED WITH SYSTEM light is illuminated
. SAT  UNSAT  N/A Step 9:   
. SAT  UNSAT  N/A Step 9:   
[9]  ADJUST Diesel Generator frequency using the associated Diesel Generator governor control switch to obtain a synchroscope needle rotation of one revolution every 15 to 20 seconds in the SLOW direction.
[9]  ADJUST Diesel Generator frequency using the associated Diesel Generator governor control switch to obtain a synchroscope needle rotation of one revolution every 15 to 20 seconds in the SLOW direction.
Diesel Handswitch Name Handswitch No. Panel 3C DG 3C GOVERNOR CONTROL 3-HS-82-3C/3A 3-9-23  Standard:
Diesel Handswitch Name Handswitch No. Panel 3C DG 3C GOVERNOR CONTROL 3-HS-82-3C/3 A 3-9-23  Standard: Adjusts Diesel Generator 3C frequency using Diesel Generator governor control switch, 3-HS-82-3C/3 A (in lower direction) to obtain a synchroscope needle rotation of one revolution every 15 to 20 seconds in the SLOW direction.
Adjusts Diesel Generator 3C frequency using Diesel Generator governor control switch, 3-HS-82-3C/3A (in lower direction) to obtain a synchroscope needle rotation of one revolution every 15 to 20 seconds in the SLOW direction.
Critical Step SAT  UNSAT  N/A Job Performance Measure (JPM)  9  STEP / STANDARD SAT / UNSAT Step 10:    [10]  USE the associated Diesel Generator voltage regulator control switch to match Diesel Generator and System voltages.
Critical Step SAT  UNSAT  N/A Job Performance Measure (JPM)  9  STEP / STANDARD SAT / UNSAT Step 10:    [10]  USE the associated Diesel Generator voltage regulator control switch to match Diesel Generator and System voltages.
Diesel Instrument Name Inst No. Panel 3C DG 3C VOLT REGULATOR CONT 3-HS-82-3C/2A 3-9-23 GEN SYNC REF VOLTAGE 3-EI-82-3CD SYSTEM SYNC REF VOLTAGE 3-EI-211-3ECB/B  Standard:
Dies el Instrument Name Inst No. Panel 3C DG 3C VOLT REGULATOR CONT 3-HS-82-3C/2 A 3-9-23 GEN SYNC REF VOLTAGE 3-EI-82-3CD SYSTEM SYNC REF VOLTAGE 3-EI-211-3EC B/B  Standard:
 
Matches DG C voltage with system voltage using DG 3C VOLT REGULATOR CONT switch 3-HS-82-3C/2 A SAT  UNSAT  N/A Step 11:     
Matches DG C voltage with system voltage using DG 3C VOLT REGULATOR CONT switch 3-HS-82-3C/2A SAT  UNSAT  N/A Step 11:     
[11]  WHEN the synchroscope needle is approximately 2 minutes on the right hand side of the 12 o'clock position, THEN  CLOSE the 4-kV shutdown board feeder breaker that is to be paralleled with the Diesel Generator.
[11]  WHEN the synchroscope needle is approximately 2 minutes on the right hand side of the 12 o'clock position, THEN  CLOSE the 4-kV shutdown board feeder breaker that is to be paralleled with the Diesel Generator.
Standard:
Standard: Closes the 4-kV shutdown board normal feeder breaker 1338 when the synchroscope needle is approximately 2 minutes on the right hand side of the 12 o'clock position.
Closes the 4-kV shutdown board normal feeder breaker 1338 when the synchroscope needle is approximately 2 minutes on the right hand side of the 12 o'clock position.
Critical Step SAT  UNSAT  N/A Step 12:     
Critical Step SAT  UNSAT  N/A Step 12:     
[12]  PLACE the synchroscope switch for the 4
[12]  PLACE the synchroscope switch for the 4
-kV shutdown board feeder breaker that was paralleled with the Diesel Generator in OFF. Standard:
-kV shutdown board feeder breaker that was paralleled with the Diesel Generator in OFF. Standard:
Places the synchroscope switch for BKR 1338 in OFF SAT  UNSAT  N/A Job Performance Measure (JPM)  10  STEP / STANDARD SAT / UNSAT Step 13:    [13]  IF the normal feeder breaker is supplying the 4
Places the synchroscope switch for BKR 1338 in OFF SAT  UNSAT  N/A Job Performance Measure (JPM)  10  STEP / STANDARD SAT / UNSAT Step 13:    [13]  IF the normal feeder breaker is supplying the 4
-kV shutdown board, THEN  RESET the associated 4kV shutdown board auto transfer lockout relay. Diesel Handswitch Name Handswitch No. Panel 3C 4KV SD BD 3EC AUTO/LOCKOUT RESET 3-43-211-3EC 3-9-23 Standard:
-kV shutdown board, THEN  RESET the associated 4kV shutdown board auto transfer lockout relay. Diesel Handswitch Name Handswitch No. Panel 3C 4KV SD BD 3EC AUTO/LOCKOUT RESET 3-43-211-3EC 3-9-23 Standard: Resets 4KV SD BD 3EC Auto Transfer Lockout Relay Critical Step SAT  UNSAT  N/A Step 1 4:  NOTE If diesel operates greater than 4 hours at less than 50% load, the diesel should be loaded to full load for at least 30 minutes prior to engine shutdown. This will allow the engine to clean out any oil accumulations from the exhaust manifolds.
Resets 4KV SD BD 3EC Auto Transfer Lockout Relay Critical Step SAT  UNSAT  N/A Step 14:  NOTE If diesel operates greater than 4 hours at less than 50% load, the diesel should be loaded to full load for at least 30 minutes prior to engine shutdown. This will allow the engine to clean out any oil accumulations from the exhaust manifolds.


[14]  IF DG has been operating at a low
[14]  IF DG has been operating at a low
Line 2,347: Line 2,061:
  [14.3] STEP N/A [14.4] WHEN smoke becomes relatively clear, CONTINUE to load DG engine to 100% if possible.
  [14.3] STEP N/A [14.4] WHEN smoke becomes relatively clear, CONTINUE to load DG engine to 100% if possible.
  [14.5] MAINTAIN 100% load for a minimum of 30 minutes.
  [14.5] MAINTAIN 100% load for a minimum of 30 minutes.
Standard:
Standard: Loads DG to 2600 kW and 1850 kVAR by using 0
Loads DG to 2600 kW and 1850 kVAR by using 0
-HS-82-A/3A and 0-HS-82-A/2A handswitches.
-HS-82-A/3A and 0-HS-82-A/2A handswitches.
CUE: After first 100 kW load adjustment state "15 minutes have elapsed and no observable black smoke from exhaust stack for time compression and continue to full load.
CUE: After first 100 kW load adjustment state "15 minutes have elapsed and no observable black smoke from exhaust stack for time compression and continue to full load.
"  Step 15:    NOTE VARs lagging should be maintained when adjusting kW load (rising or lowering). This may require kW load adjustment to be stopped periodically to allow for adjusting kVAR load. Once desired kW load is achieved, Illustration 1 should be referred to for determination of kVAR loading required to obtain a power factor (pf) of 0.8 lagging. Diesel generator kVAR load should then be adjusted to obtain a 0.8 pf lagging. IF system conditions will NOT permit the kVAR loading required to obtain a 0.8 pf lagging, kVAR load should be adjusted to the maximum kVAR lagging the system will allow.
"  Step 1 5:    NOTE VARs lagging should be maintained when adjusting kW load (rising or lowering). This may require kW load adjustment to be stopped periodically to allow for adjusting kVAR load. Once desired kW load is achieved, Illustration 1 should be referred to for determination of kVAR loading required to obtain a power factor (pf) of 0.8 lagging. Diesel generator kVAR load should then be adjusted to obtain a 0.8 pf lagging. IF system conditions will NOT permit the kVAR loading required to obtain a 0.8 pf lagging, kVAR load should be adjusted to the maximum kVAR lagging the system will allow.  
 
[15]  USE the associated Diesel Generator's governor control switch and voltage regulator control switch to obtain desired kW and kVAR load.
[15]  USE the associated Diesel Generator's governor control switch and voltage regulator control switch to obtain desired kW and kVAR load.
Diesel Handswitch Name Handswitch No.
Diesel Handswitch Name Handswitch No.
Panel 3C DG 3C GOVERNOR CONTROL 3-HS-82-3C/3A 3-9-23 DG 3C VOLT REGULATOR CONT 3-HS-82-3C/2A SAT  UNSAT  N/A Job Performance Measure (JPM)  12  STEP / STANDARD SAT / UNSAT Standard:
Panel 3C DG 3C GOVERNOR CONTROL 3-HS-82-3C/3 A 3-9-23 DG 3C VOLT REGULATOR CONT 3-HS-82-3C/2 A SAT  UNSAT  N/A Job Performance Measure (JPM)  12  STEP / STANDARD SAT / UNSAT Standard: Obtains desired kW and kVAR load using DG 3C Governor Control switch, 3-HS-82-3C/3 A and DG Volt Regulator Control switch, 3
Obtains desired kW and kVAR load using DG 3C Governor Control switch, 3-HS-82-3C/3A and DG Volt Regulator Control switch, 3
-HS-82-3C/2 A CUE: state "30 minutes have elapsed continue with procedure."
-HS-82-3C/2A CUE: state "30 minutes have elapsed continue with procedure."
Step 1 6:    [16]  MONITOR the offsite source that is paralleled with the Diesel Generator.
Step 16:    [16]  MONITOR the offsite source that is paralleled with the Diesel Generator.


[17]  IF abnormal voltage or frequency transients are experienced, THEN  Standard:
[17]  IF abnormal voltage or frequency transients are experienced, THEN  Standard: Step is N/A SAT  UNSAT  N/A Step 1 7:     
Step is N/A SAT  UNSAT  N/A Step 17:     
[18]  WHEN Parallel with System operation is no longer desired, THEN UNLOAD the Diesel Generator as follows:
[18]  WHEN Parallel with System operation is no longer desired, THEN UNLOAD the Diesel Generator as follows:
CAUTION When unloading the Diesel Generator, failure to slowly approach the 300 kW/250 kVAR limit may result in a reverse power trip of the Diesel Generator output breaker.  
CAUTION When unloading the Diesel Generator, failure to slowly approach the 300 kW/250 kVAR limit may result in a reverse power trip of the Diesel Generator output breaker.  
   [18.1]  USE the associated Diesel Generator's governor control switch and voltage regulator control switch to reduce generator load to approximately 300 kW and 250 kVAR:
   [18.1]  USE the associated Diesel Generator's governor control switch and voltage regulator control switch to reduce generator load to approximately 300 kW and 250 kVAR: Diesel Instrument Name Inst No. Panel 3C DG 3C GOVERNOR CONTROL 3-HS-82-3C/3 A 3-9-23 DG 3C VOLT REGULATOR CONT 3-HS-82-3C/2 A DG 3C KILOWATTS 3-JI-82-3C/A  DG 3C KILOVARS 3-VAR-82-3C/A  Critical Step SAT  UNSAT  N/A Job Performance Measure (JPM)  13  STEP / STANDARD SAT / UNSAT  Step 17 continued
Diesel Instrument Name Inst No. Panel 3C DG 3C GOVERNOR CONTROL 3-HS-82-3C/3A 3-9-23 DG 3C VOLT REGULATOR CONT 3-HS-82-3C/2A DG 3C KILOWATTS 3-JI-82-3C/A  DG 3C KILOVARS 3-VAR-82-3C/A  Critical Step SAT  UNSAT  N/A Job Performance Measure (JPM)  13  STEP / STANDARD SAT / UNSAT  Step 17 continued
:  Standard: Unloads the DG to approximately 300 KW and 250 kVAR Step 1 8:    [18.2]  PLACE the associated Diesel Generator breaker control switch in TRIP.
:  Standard:
Unloads the DG to approximately 300 KW and 250 kVAR Step 18:    [18.2]  PLACE the associated Diesel Generator breaker control switch in TRIP.
Diesel Handswitch Name Handswitch No.
Diesel Handswitch Name Handswitch No.
Panel 3C DG 3C BKR 1832 3-HS-211-3EC/10A 3-9-23  Standard:
Panel 3C DG 3C BKR 1832 3-HS-211-3EC/10A 3-9-23  Standard: Trips breaker DG 3C BKR 1832 Critical Step SAT  UNSAT  N/A Step 1 9:    [18.3]  PULL and PLACE the associated Diesel Generator mode selector switch in SINGLE UNIT.
Trips breaker DG 3C BKR 1832 Critical Step SAT  UNSAT  N/A Step 19:    [18.3]  PULL and PLACE the associated Diesel Generator mode selector switch in SINGLE UNIT.
Diesel Handswitch Name Handswitch No.
Diesel Handswitch Name Handswitch No.
Panel 3C DG 3C MODE SELECT 3-HS-82-3C/5A 0-9-23  Standard:
Panel 3C DG 3C MODE SELECT 3-HS-82-3C/5 A 0-9-23  Standard: Pulls and places 3
Pulls and places 3
-HS-82-3C/5 A to Single Unit Critical Step SAT  UNSAT  N/A Step 20:    [18.4]  RELEASE the Diesel Generator mode selector switch and OBSERVE the SINGLE UNIT light illuminated.
-HS-82-3C/5A to Single Unit Critical Step SAT  UNSAT  N/A Step 20:    [18.4]  RELEASE the Diesel Generator mode selector switch and OBSERVE the SINGLE UNIT light illuminated.
Standard: Verifies Single Unit light illuminated SAT  UNSAT  N/A CUE:  ANOTHER OPERATOR WILL CONTINUE FROM HERE STOP TIME              END OF TASK
Standard:
Verifies Single Unit light illuminated SAT  UNSAT  N/A CUE:  ANOTHER OPERATOR WILL CONTINUE FROM HERE STOP TIME              END OF TASK


Job Performance Measure (JPM)  14  Provide to Applicant INITIAL CONDITIONS:
Job Performance Measure (JPM)  14  Provide to Applicant INITIAL CONDITIONS:


You are an Operator on Unit 3
You are an Operator on Unit 3
. No Inclement weather currently exists in the area 8 hours ago, 4 KV Shutdown Board 3EC was separated from Offsite Power in accordance with 3
. No Inclement weather currently exists in the area 8 hour s ago, 4 KV Shutdown Board 3EC was separated from Offsite Power in accordance with 3
-OI-82, Standby Diesel Generator System.
-OI-82, Standby Diesel Generator System.


Line 2,395: Line 2,100:
-Gas Post Treatment Radiation HI
-Gas Post Treatment Radiation HI
-HI-HI JPM NUMBER:
-HI-HI JPM NUMBER:
190 U2 REVISION:
190 U2 REVISION: 0  TASK APPLICABILITY:
0  TASK APPLICABILITY:
SRO STA UO NAUO TASK NUMBER / TASK TITLE(S):
SRO STA UO NAUO TASK NUMBER / TASK TITLE(S):
U-066-AB-02 -Respond to Off
U-066-AB-02 -Respond to Off
Line 2,405: Line 2,109:
N/A SAFETY FUNCTION:
N/A SAFETY FUNCTION:
9  EVALUATION LOCATION:
9  EVALUATION LOCATION:
In-Plant    Simulator Control Room Lab      Other - List  APPLICABLE METHOD OF TESTING:      Discussion        Simulate/Walkthrough        Perform TIME FOR COMPLETION: N/A        TIME CRITICAL (Y/N)      ALTERNATE PATH (Y/N)
In-Plant    Simulator   Control Room Lab      Other - List  APPLICABLE METHOD OF TESTING:      Discussion        Simulate/Walkthrough        Perform TIME FOR COMPLETION: N/A        TIME CRITICAL (Y/N)      ALTERNATE PATH (Y/N)
Developed by:
Developed by:
Developer Date  (Ensure validator is briefed on exam security per NPG
Developer Date  (Ensure validator is briefed on exam security per NPG
-SPP-17.8.1)  (See JPM Validation Checklist in NPG
-SPP-17.8.1)  (See JPM Validation Checklist in NPG
-SPP-17.8.2)      Validated by:
-SPP-17.8.2)      Validated by:
Approved by:
Approved by:
Validator Date  Approved by:
Validator   Date  Approved by:
Site Training Management Date  Site Training Program Owner Date      N Y Job Performance Measure (JPM)  2  OPERATOR:  ________________________________
Site Training Management Date  Site Training Program Owner Date      N Y Job Performance Measure (JPM)  2  OPERATOR:  ________________________________
JPM Number:
JPM Number:
Line 2,434: Line 2,138:
: 1. Reset to IC 28
: 1. Reset to IC 28
: 2. Fire Manual Trigger 2 3. Fire Manual Trigger 1
: 2. Fire Manual Trigger 2 3. Fire Manual Trigger 1
: 4. Station 2 nd operator to respond to alarms Malfunctions Description Event Severity Delay Initial set TH23 FUEL CLADDING DAMAGE 1 50 N/A YES RM14C OFFGAS RAD MONITOR FAILURERM 265A 1 1E6 CPS N/A YES RM14D OFFGAS RAD MONITOR FAILURE RM-90-266A 1 1E6 CPS N/A YES      Remotes Description Event Severity Delay Initial set OG06 Bypass FCV 28 Post Treatment Hi
: 4. Station 2 nd operator to respond to alarms Malfunctions Description Event Severity Delay Initial set TH23 FUEL CLADDING DAMAGE 1 50 N/A YES RM14C OFFGAS RAD MONITOR FAILURERM-90-265A 1 1E6 CPS N/A YES RM14D OFFGAS RAD MONITOR FAILURE RM-90-266A 1 1E6 CPS N/A YES      Remotes Description Event Severity Delay Initial set OG06 Bypass FCV 28 Post Treatment Hi
-Hi-Hi Rad Isol 2 N/A N/A BYP            Overrides Description Event Severity Delay Initial set ZAORI9014A RX BLDG AREA RAD 1 2.5 N/A YES ZAORI9017A RX BLDG AREA RAD 1 2.6 N/A YES ZAORM90265A 90-265 METER UPSCALE 1 6.0 N/A YES ZAORM90266A 90-266 METER UPSCALE 1 6.0 N/A YES ZAORR90135R1 90-135 RECORDER UPSCALE PEN 1 1 6.0 N/A YES ZAORR90135R2 90-135 RECORDER UPSCALE PEN 2 1 6.0 N/A YES ZLORM90265A_1 90-265 DRAW LITE 1 N/A N/A YES Job Performance Measure (JPM)  4  ZLORM90265A_2 90-265 DRAW LITE 1 N/A N/A YES ZLORM90265A_3 90-265 DRAW LITE 1 N/A N/A YES ZLORM90265A_4 90-265 DRAW LITE 1 N/A N/A YES ZLORM90266A_1 90-265 DRAW LITE 1 N/A N/A YES ZLORM90266A_2 90-265 DRAW LITE 1 N/A N/A YES ZLORM90266A_3 90-265 DRAW LITE 1 N/A N/A YES ZLORM90266A_4 90-265 DRAW LITE 1 N/A N/A YES XA553A5 OG PRETREAT RAD HI 1 N/A N/A YES XA553A6 STACK GAS RAD HI HI 1 N/A N/A YES XA553A7 MSL RAD HI 1 N/A N/A YES XA553A13 STACK GAS RAD HI 1 N/A N/A YES XA553A27 MSL RAD HI HI 1 N/A N/A YES XA554C26 CARBON BED VAULT RAD HI 1 N/A N/A YES XA554C27 OG ANNUAL RELEASE LIMIT EXCEEDED 1 N/A N/A YES XA554C33 OG POST TREAT RAD HI 1 N/A N/A YES XA554C34 OG POST TREAT RAD HI HI 1 N/A N/A YES XA554C35 OG POST TREAT RAD HI HIHI 1 N/A N/A YES ZDIHS6628 66-28 VALVE CLOSED 1 N/A N/A YES ZAORR90265R1 90-265 RECORDER UPSCALE PEN 1 1 6.0 N/A YES ZAORR90265R2 90-265 RECORDER UPSCALE PEN 2 1 6.0 N/A YES ZAORR90160R1 OG PRETREAT RECORDER UPSCALE 1 -2.0 N/A YES XA554B2 RWCU FILTER INLET CNDT HIGH 1 N/A N/A YES  Schedule File(s):
-Hi-Hi Rad Isol 2 N/A N/A BYP            Overrides Description Event Severity Delay Initial set ZAORI9014A RX BLDG AREA RAD 1 2.5 N/A YES ZAORI9017A RX BLDG AREA RAD 1 2.6 N/A YES ZAORM90265A 90-265 METER UPSCALE 1 6.0 N/A YES ZAORM90266A 90-266 METER UPSCALE 1 6.0 N/A YES ZAORR90135R1 90-135 RECORDER UPSCALE PEN 1 1 6.0 N/A YES ZAORR90135R2 90-135 RECORDER UPSCALE PEN 2 1 6.0 N/A YES ZLORM90265A_1 90-265 DRAW LITE 1 N/A N/A YES Job Performance Measure (JPM)  4  ZLORM90265A_2 90-265 DRAW LITE 1 N/A N/A YES ZLORM90265A_3 90-265 DRAW LITE 1 N/A N/A YES ZLORM90265A_4 90-265 DRAW LITE 1 N/A N/A YES ZLORM90266A_1 90-265 DRAW LITE 1 N/A N/A YES ZLORM90266A_2 90-265 DRAW LITE 1 N/A N/A YES ZLORM90266A_3 90-265 DRAW LITE 1 N/A N/A YES ZLORM90266A_4 90-265 DRAW LITE 1 N/A N/A YES XA553A5 OG PRETREAT RAD HI 1 N/A N/A YES XA553A6 STACK GAS RAD HI HI 1 N/A N/A YES XA553A7 MSL RAD HI 1 N/A N/A YES XA553A13 STACK GAS RAD HI 1 N/A N/A YES XA553A27 MSL RAD HI HI 1 N/A N/A YES XA554C26 CARBON BED VAULT RAD HI 1 N/A N/A YES XA554C27 OG ANNUAL RELEASE LIMIT EXCEEDED 1 N/A N/A YES XA554C33 OG POST TREAT RAD HI 1 N/A N/A YES XA554C34 OG POST TREAT RAD HI HI 1 N/A N/A YES XA554C35 OG POST TREAT RAD HI HIHI 1 N/A N/A YES ZDIHS6628 66-28 VALVE CLOSED 1 N/A N/A YES ZAORR90265R1 90-265 RECORDER UPSCALE PEN 1 1 6.0 N/A YES ZAORR90265R2 90-265 RECORDER UPSCALE PEN 2 1 6.0 N/A YES ZAORR90160R1 OG PRETREAT RECORDER UPSCALE 1 -2.0 N/A YES XA554B2 RWCU FILTER INLET CNDT HIGH 1 N/A N/A YES  Schedule File(s):
JPM 190 U2 OG Post treat Rad HI HIHI
JPM 190 U2 OG Post treat Rad HI HIHI
Line 2,440: Line 2,144:
Job Performance Measure (JPM)  5  IN-SIMULATOR:   
Job Performance Measure (JPM)  5  IN-SIMULATOR:   


I will explain the initial conditions and state the task to be performed. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's Correct".  (OR "That's Incorrect", if applicable). When you have completed your assigned task, you will say, "my task is complete" and I will acknowledge that your task is complete.
I will explain the initial conditions and state the task to be performed. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's Correct".  (OR "That's Incorrect", if applicable). When you have completed your assigned task, you will say, "my task is complete" and I will acknowledge that your task is complete.


INITIAL CONDITIONS:
INITIAL CONDITIONS:
Line 2,452: Line 2,156:
-XA-55-4C, window 35.
-XA-55-4C, window 35.


Job Performance Measure (JPM)  6  START TIME STEP / STANDARD SAT / UNSAT Performance Step 1:    When directed, identify/obtain copy of ARP 4C, window 35.
Job Performance Measure (JPM)  6  START TIME   STEP / STANDARD SAT / UNSAT Performance Step 1:    When directed, identify/obtain copy of ARP 4C, window 35.
Standard:
Standard:
Obtains copy of 2
Obtains copy of 2
-ARP-9-4C, window 35 SAT  UNSAT  N/A Examiner Note: Candidate may recognize the annunciator as an entry condition and go directly to 2
-ARP-9-4C, window 35 SAT  UNSAT  N/A Examiner Note: Candidate may recognize the annunciator as an entry condition and go directly to 2
Line 2,461: Line 2,164:
2-ARP-9-4C window 35 Operator Action:
2-ARP-9-4C window 35 Operator Action:


A. VERIFY alarm condition on the following OFFGAS POST-TREATMENT RADIATION recorder, 2-RR-90-265 on Panel 2 2. OG POST-TREATMENT CHAN A RAD MON RTMR radiationmonitor, 2
A. VERIFY alarm condition on the following OFFGAS POST-TREATMENT RADIATION recorder, 2-RR-90-265 on Panel 2 2. OG POST-TREATMENT CHAN A RAD MON RTMR radiationmonitor, 2
-RM-90-266A on Panel 2 10. OG POST-TREATMENT CHAN B RAD MON RTMR radiationmonitor, 2
-RM-90-266A on Panel 2 10. OG POST-TREATMENT CHAN B RAD MON RTMR radiationmonitor, 2
-RM-90-265A on Panel 2 10. Standard:
-RM-90-265A on Panel 2 10. Standard: Verified alarm condition on 2
Verified alarm condition on 2
-RR-90-265 and 2-RM-265/266. SAT  UNSAT  N/A Performance Step 3:        B. VERIFY OFF-GAS SYSTEM ISOLATION VALVE, 2
-RR-90-265 and 2
-RM-265/266. SAT  UNSAT  N/A Performance Step 3:        B. VERIFY OFF-GAS SYSTEM ISOLATION VALVE, 2
-FCV-66-28 has the Mechanical Restraint DISENGAGED and 2-FCV-66-28 isCLOSED.
-FCV-66-28 has the Mechanical Restraint DISENGAGED and 2-FCV-66-28 isCLOSED.
Standard:
Standard: Takes handswitch 2-FCV-66-28 to close and observes green light illuminated and red light out.
Takes handswitch 2-FCV-66-28 to close and observes green light illuminated and red light out.
Critical Step SAT  UNSAT  N/A Cue: If asked, the Offgas Isolation Valve, 2
Critical Step SAT  UNSAT  N/A Cue: If asked, the Offgas Isolation Valve, 2
-FCV-66-28 is NOT mechanically restrained.
-FCV-66-28 is NOT mechanically restrained.


Job Performance Measure (JPM)  7  STEP / STANDARD SAT / UNSAT Performance Step 4:      C. REFER to 2-AOI-66-2, Off-gas Post-treatment Radiation Hi
Job Performance Measure (JPM)  7  STEP / STANDARD SAT / UNSAT Performance Step 4:      C. REFER to 2-AOI-66-2, Off-gas Post-treatment Radiation Hi
-Hi-Hi  Standard:
-Hi-Hi  Standard:   Refers to 2-AOI-66-2, Off-gas Post-treatment Radiation Hi
Refers to 2-AOI-66-2, Off-gas Post-treatment Radiation Hi
-Hi-Hi  S AT UNSAT  N/A Performance Step 5:    2-AOI-66-2 4.0 OPERATOR ACTIONS 4.1  Immediate Actions
-Hi-Hi  SAT UNSAT  N/A Performance Step 5:    2-AOI-66-2 4.0 OPERATOR ACTIONS 4.1  Immediate Actions
   [1]  IF scram has not occurred, THEN      PERFORM the following:
   [1]  IF scram has not occurred, THEN      PERFORM the following:
     [1.1] IF core flow is above 60%, THEN    REDUCE core flow to between 50
     [1.1] IF core flow is above 60%, THEN    REDUCE core flow to between 50
-60%. Standard:
-60%. Standard:   Reduced core flow to between 50
Reduced core flow to between 50
-60% with recirc system.
-60% with recirc system.
Critical Step SAT  UNSAT  N/A Performance Step  6:    [1.2]  MANUALLY SCRAM the Reactor. (Reference 2
Critical Step SAT  UNSAT  N/A Performance Step  6:    [1.2]  MANUALLY SCRAM the Reactor. (Reference 2
-AOI-100-1). Standard:
-AOI-100-1). Standard:   Depresses both SCRAM Pushbuttons Places mode switch in shutdown Verifies All Rods in Performs a Scram Announcement o Rx Mode Switch Position: Shutdown o Rod Position: All Full In o Reactor Water Level ____ & Trend ___ o Reactor Pressure ____ & Trend ___
Depresses both SCRAM Pushbuttons Places mode switch in shutdown Verifies All Rods in Performs a Scram Announcement o Rx Mode Switch Position: Shutdown o Rod Position: All Full In o Reactor Water Level ____ & Trend ___
o Reactor Pressure ____ & Trend ___
o MSIV Position: OPEN o Rx Power: <5%
o MSIV Position: OPEN o Rx Power: <5%
Critical Step SAT  UNSAT  N/A Examiner Note
Critical Step SAT  UNSAT  N/A Examiner Note
: The scram report and referring to 2
: The scram report and referring to 2
-AOI-100-1 are not considered critical.
-AOI-100-1 are not considered critical.
Job Performance Measure (JPM)  8  STEP / STANDARD SAT / UNSAT CUE: Proceed with subsequent actions of 2
Job Performance Measure (JPM)  8  STEP / STANDARD SAT / UNSAT CUE: Proceed with subsequent actions of 2
-AOI-66-2, Off-gas Post-treatment Radiation Hi
-AOI-66-2, Off-gas Post-treatment Radiation Hi
-Hi-Hi Performance Step 7:    4.2 Subsequent Actions
-Hi-Hi Performance Step 7:    4.2 Subsequent Actions
   [1]  IF OFFGAS SYSTEM ISOLATION VALVE, 2
   [1]  IF OFFGAS SYSTEM ISOLATION VALVE, 2
-FCV-066-0028has been mechanically restrained open due to plant conditionsTHEN DISENGAGE 2-FCV-066-0028 mechanical restraint by rotating the restraining handwheel fully in the  counterclockwisedirection, locally at the Stack. (Otherwise N/A)  Standard:
-FCV-066-0028has been mechanically restrained open due to plant conditionsTHEN DISENGAGE 2-FCV-066-0028 mechanical restraint by rotating the restraining handwheel fully in the  counterclockwisedirection, locally at the Stack. (Otherwise N/A)  Standard: Verifies that 2
Verifies that 2
-FCV-066-0028 in NOT mechanically restrained.
-FCV-066-0028 in NOT mechanically restrained.
SAT  UNSAT  N/A Cue: 2-FCV-066 is NOT mechanically restrained.
SAT  UNSAT  N/A Cue: 2-FCV-066 is NOT mechanically restrained.
Performance Step 8:    [2]  VERIFY CLOSED OFFGAS SYSTEM ISOLATION VALVE, 2-FCV-66-28 on Panel 2 53 or locally.
Performance Step 8:    [2]  VERIFY CLOSED OFFGAS SYSTEM ISOLATION VALVE,   2-FCV-66-28 on Panel 2 53 or locally.
Standard:
Standard:
 
Verifies 2-FCV-66-28 is closed at panel 9
Verifies 2
-FCV-66-28 is closed at panel 9
-53 by Verifying RED light above handswitch extinguished and GREEN light above handswitch illuminated. (May have already verified valve closed from the ARP).
-53 by Verifying RED light above handswitch extinguished and GREEN light above handswitch illuminated. (May have already verified valve closed from the ARP).
Critical Step SAT  UNSAT  N/A Examiner Note: May have already verified valve closed from the ARP Performance Step 9:   
Critical Step SAT  UNSAT  N/A Examiner Note: May have already verified valve closed from the ARP Performance Step 9:   
  [3]  MONITOR area radiation levels at Panel: 2 11. Standard:
  [3]  MONITOR area radiation levels at Panel: 2 11. Standard:
Monitored radiation levels at Panel 9
Monitored radiation levels at Panel 9
-11. SAT  UNSAT  N/A Cue: Another operator will monitor and evaluate Area Radiation Levels.
-11. SAT  UNSAT  N/A Cue: Another operator will monitor and evaluate Area Radiation Levels.


Job Performance Measure (JPM)  9  STEP / STANDARD SAT / UNSAT Performance Step 10:  [4]  REFER TO EPIP-1 for emergency classification level and response.
Job Performance Measure (JPM)  9  STEP / STANDARD SAT / UNSAT Performance Step 10:  [4]  REFER TO EPIP-1 for emergency classification level and response. Standard;   Notifies SM to implement EPIP
Standard; Notifies SM to implement EPIP
-1. SAT  UNSAT  N/A Cue: The Shift Manager is implementing the EPIPs as needed.
-1. SAT  UNSAT  N/A Cue: The Shift Manager is implementing the EPIPs as needed.
Performance Step 11:
Performance Step 11:
Line 2,521: Line 2,211:
-RR-90-157, Pnl 2 2. C. OFFGAS POST-TREATMENT RADIATION 2RR
-RR-90-157, Pnl 2 2. C. OFFGAS POST-TREATMENT RADIATION 2RR
-  90-265, Pnl 2 2 D. STACK GAS RADIATION, 0
-  90-265, Pnl 2 2 D. STACK GAS RADIATION, 0
-RR-90-147, Unit 1 Panel 1-9-2. Standard;
-RR-90-147, Unit 1 Panel 1-9-2. Standard; Monitors  90
 
Monitors  90
-135, 157, and 265. Calls Unit 1 operator for a reading on 0-RR-90-147. SAT  UNSAT  N/A Cue: As Unit 1 Operator, Stack Gas Radiation, 0
-135, 157, and 265. Calls Unit 1 operator for a reading on 0-RR-90-147. SAT  UNSAT  N/A Cue: As Unit 1 Operator, Stack Gas Radiation, 0
-RR-90-147 is reading 5X10E6 cps.
-RR-90-147 is reading 5X10E6 cps.
Line 2,535: Line 2,223:
Acknowledge closing of MSIVs.
Acknowledge closing of MSIVs.
Examiner Note:
Examiner Note:
Closing 1
Closing 1-55 and 1-56 is not considered critical.
-55 and 1-56 is not considered critical.
Performance Step 13:
Performance Step 13:


NOTE Placing additional Stack Dilution Air Fans in service should keep 0
NOTE Placing additional Stack Dilution Air Fans in service should keep 0
-RM-90-147and 0-RM-90-148 on scale.
-RM-90-147and 0-RM-90-148 on scale.
   [7]  PLACE STACK DILUTION FAN SEL control switch, 2-XS-66-29, Panel 2-9-8, in OFF.
   [7]  PLACE STACK DILUTION FAN SEL control switch,   2-XS-66-29, Panel 2-9-8, in OFF.
   [8]  START standby STACK DILUTION FAN 2B(2A) using controlswitch, 2
   [8]  START standby STACK DILUTION FAN 2B(2A) using controlswitch, 2
-HS-66-31A(29A), Panel 2 8. Standard:
-HS-66-31A(29A), Panel 2 8. Standard:
Places 2-XS-66-29 in OFF and Starts standby Stack Dilution fan 2B, using 2
Places 2-XS-66-29 in OFF and Starts standby Stack Dilution fan 2B, using 2
-HS-66-31A  SAT  UNSAT  N/A Cue: That completes this task.
-HS-66-31A  SAT  UNSAT  N/A Cue: That completes this task.


STOP TIME
STOP TIME _______        END OF TASK
_______        END OF TASK


Job Performance Measure (JPM)  11  Provide to Applicant IN-SIMULATOR:
Job Performance Measure (JPM)  11  Provide to Applicant IN-SIMULATOR:
Line 2,560: Line 2,245:
INITIATING CUE:   
INITIATING CUE:   


The Unit Supervisor directs you to respond to an OFF-GAS POST TREATMENT RADIATION HI
The Unit Supervisor directs you to respond to a n OFF-GAS POST TREATMENT RADIATION HI
-HI-HI annunciator, 2
-HI-HI annunciator, 2
-XA-55-4C, window 35.
-XA-55-4C, window 35.
Line 2,568: Line 2,253:
-Gas Post Treatment Radiation HI
-Gas Post Treatment Radiation HI
-HI-HI JPM NUMBER:
-HI-HI JPM NUMBER:
190 U3 REVISION:
190 U3 REVISION: 0  TASK APPLICABILITY:
0  TASK APPLICABILITY:
SRO STA UO NAUO TASK NUMBER / TASK TITLE(S):
SRO STA UO NAUO TASK NUMBER / TASK TITLE(S):
U-066-AB-02 -Respond to Off
U-066-AB-02 -Respond to Off
Line 2,579: Line 2,263:
N/A SAFETY FUNCTION:
N/A SAFETY FUNCTION:
9  EVALUATION LOCATION:
9  EVALUATION LOCATION:
In-Plant    Simulator Control Room Lab      Other - List  APPLICABLE METHOD OF TESTING:      Discussion        Simulate/Walkthrough        Perform TIME FOR COMPLETION: N/A        TIME CRITICAL (Y/N)      ALTERNATE PATH (Y/N)
In-Plant    Simulator   Control Room Lab      Other - List  APPLICABLE METHOD OF TESTING:      Discussion        Simulate/Walkthrough        Perform TIME FOR COMPLETION: N/A        TIME CRITICAL (Y/N)      ALTERNATE PATH (Y/N)
Developed by:
Developed by:
Developer Date  (Ensure validator is briefed on exam security per NPG
Developer Date  (Ensure validator is briefed on exam security per NPG
-SPP-17.8.1)  (See JPM Validation Checklist in NPG
-SPP-17.8.1)  (See JPM Validation Checklist in NPG
-SPP-17.8.2)      Validated by:
-SPP-17.8.2)      Validated by:
Approved by:
Approved by:
Validator Date  Approved by:
Validator   Date  Approved by:
Site Training Management Date  Site Training Program Owner Date    N Y Job Performance Measure (JPM)  2  OPERATOR:  ________________________________
Site Training Management Date  Site Training Program Owner Date    N Y Job Performance Measure (JPM)  2  OPERATOR:  ________________________________
JPM Number:
JPM Number:
Line 2,605: Line 2,289:
SIGNATURE: ___________________________
SIGNATURE: ___________________________
DATE: __________
DATE: __________
EXAMINER Job Performance Measure (JPM)  3  SIMULATOR SETUP IC 28 Exam IC 288   Console Operator Instructions
EXAMINER Job Performance Measure (JPM)  3  SIMULATOR SETUP IC 28 Exam IC 28 8   Console Operator Instructions
: 1. Reset to IC 28
: 1. Reset to IC 28
: 2. Fire Manual Trigger 2 3. Fire Manual Trigger 1
: 2. Fire Manual Trigger 2 3. Fire Manual Trigger 1
Line 2,624: Line 2,308:
-HI-HI annunciator, 3-XA-55-4C, window 35.
-HI-HI annunciator, 3-XA-55-4C, window 35.


Job Performance Measure (JPM)  6  START TIME STEP / STANDARD SAT / UNSAT Performance Step 1:    When directed, identify/obtain copy of ARP 4C, window 35.
Job Performance Measure (JPM)  6  START TIME   STEP / STANDARD SAT / UNSAT Performance Step 1:    When directed, identify/obtain copy of ARP 4C, window 35.
Standard:
Standard:
Obtains copy of 3-ARP-9-4C, window 35 SAT  UNSAT  N/A Examiner Note: Candidate may recognize the annunciator as an entry condition and go directly to 3-AOI-66-2. In that event, continue at Performance Step  
Obtains copy of 3-ARP-9-4C, window 35 SAT  UNSAT  N/A Examiner Note: Candidate may recognize the annunciator as an entry condition and go directly to 3-AOI-66-2. In that event, continue at Performance Step  
: 5. Performance Step 2:
: 5. Performance Step 2:
3-ARP-9-4C window 35 Operator Action:
3-ARP-9-4C window 35 Operator Action:


A. VERIFY alarm condition on the following OFFGAS POST-TREATMENT RADIATION recorder, 3-RR-90-265 on Panel 3-9-2. OG POST-TREATMENT CHAN A RAD MON RTMR radiationmonitor, 3-RM-90-266A on Panel 3-9-10. OG POST-TREATMENT CHAN B RAD MON RTMR radiationmonitor, 3-RM-90-265A on Panel 3-9-10. Standard:
A. VERIFY alarm condition on the following OFFGAS POST-TREATMENT RADIATION recorder, 3-RR-90-265 on Panel 3-9-2. OG POST-TREATMENT CHAN A RAD MON RTMR radiationmonitor, 3-RM-90-266A on Panel 3-9-10. OG POST-TREATMENT CHAN B RAD MON RTMR radiationmonitor, 3-RM-90-265A on Panel 3-9-10. Standard: Verified alarm condition on 3-RR-90-265 and 3-RM-265/266. SAT  UNSAT  N/A Performance Step 3:        B. VERIFY OFF-GAS SYSTEM ISOLATION VALVE, 3-FCV-66-28 has the Mechanical Restraint DISENGAGED and 3-FCV-66-28 isCLOSED.
Verified alarm condition on 3-RR-90-265 and 3-RM-265/266. SAT  UNSAT  N/A Performance Step 3:        B. VERIFY OFF-GAS SYSTEM ISOLATION VALVE, 3-FCV-66-28 has the Mechanical Restraint DISENGAGED and 3-FCV-66-28 isCLOSED.
Standard: Takes handswitch 3-FCV-66-28 to close and observes green light illuminated and red light out.
Standard:
Takes handswitch 3-FCV-66-28 to close and observes green light illuminated and red light out.
Critical Step SAT  UNSAT  N/A Cue: If asked, the Offgas Isolation Valve, 3-FCV-66-28 is NOT mechanically restrained.
Critical Step SAT  UNSAT  N/A Cue: If asked, the Offgas Isolation Valve, 3-FCV-66-28 is NOT mechanically restrained.


Job Performance Measure (JPM)  7  STEP / STANDARD SAT / UNSAT Performance Step 4:      C. REFER to 3-AOI-66-2, Off-gas Post-treatment Radiation Hi
Job Performance Measure (JPM)  7  STEP / STANDARD SAT / UNSAT Performance Step 4:      C. REFER to 3-AOI-66-2 , Off-gas Post-treatment Radiation Hi
-Hi-Hi  Standard:
-Hi-Hi  Standard:   Refers to 3-AOI-66-2, Off-gas Post-treatment Radiation Hi
Refers to 3-AOI-66-2, Off-gas Post-treatment Radiation Hi
-Hi-Hi SAT  UNSAT  N/A Performance Step 5:    3-AOI-66-2 4.0 OPERATOR ACTIONS 4.1  Immediate Actions
-Hi-Hi SAT  UNSAT  N/A Performance Step 5:    3-AOI-66-2 4.0 OPERATOR ACTIONS 4.1  Immediate Actions
   [1]  IF scram has not occurred, THEN      PERFORM the following:
   [1]  IF scram has not occurred, THEN      PERFORM the following:
     [1.1] IF core flow is above 60%, THEN    REDUCE core flow to between 50
     [1.1] IF core flow is above 60%, THEN    REDUCE core flow to between 50
-60%. Standard:
-60%. Standard:   Reduced core flow to between 50
Reduced core flow to between 50
-60% with recirc system.
-60% with recirc system.
Critical Step SAT  UNSAT  N/A Performance Step  6:    [1.2]  MANUALLY SCRAM the Reactor. (Reference 3
Critical Step SAT  UNSAT  N/A Performance Step  6:    [1.2]  MANUALLY SCRAM the Reactor. (Reference 3
-AOI-100-1). Standard:
-AOI-100-1). Standard:   Depresses both SCRAM Pushbuttons Places mode switch in shutdown Verifies All Rods in Performs a Scram Announcement o Rx Mode Switch Position: Shutdown o Rod Position: All Full In o Reactor Water Level ____ & Trend ___ o Reactor Pressure ____ & Trend ___
Depresses both SCRAM Pushbuttons Places mode switch in shutdown Verifies All Rods in Performs a Scram Announcement o Rx Mode Switch Position: Shutdown o Rod Position: All Full In o Reactor Water Level ____ & Trend ___
o Reactor Pressure ____ & Trend ___
o MSIV Position: OPEN o Rx Power: <5%
o MSIV Position: OPEN o Rx Power: <5%
Critical Step SAT  UNSAT  N/A Examiner Note
Critical Step SAT  UNSAT  N/A Examiner Note
: The scram report and referring to 3-AOI-100-1 are not considered critical.
: The scram report and referring to 3-AOI-100-1 are not considered critical.
Job Performance Measure (JPM)  8  STEP / STANDARD SAT / UNSAT CUE: Proceed with subsequent actions of 3
Job Performance Measure (JPM)  8  STEP / STANDARD SAT / UNSAT CUE: Proceed with subsequent actions of 3
-AOI-66-2, Off-gas Post-treatment Radiation Hi
-AOI-66-2, Off-gas Post-treatment Radiation Hi
-Hi-Hi Performance Step 7:    4.2 Subsequent Actions
-Hi-Hi Performance Step 7:    4.2 Subsequent Actions
   [1]  IF OFFGAS SYSTEM ISOLATION VALVE, 3-FCV-066-0028has been mechanically restrained open due to plant conditionsTHEN DISENGAGE 3-FCV-066-0028 mechanical restraint by rotating the restraining handwheel fully in the  counterclockwisedirection, locally at the Stack. (Otherwise N/A)  Standard:
   [1]  IF OFFGAS SYSTEM ISOLATION VALVE, 3-FCV-066-0028has been mechanically restrained open due to plant conditionsTHEN DISENGAGE 3-FCV-066-0028 mechanical restraint by rotating the restraining handwheel fully in the  counterclockwisedirection, locally at the Stack. (Otherwise N/A)  Standard: Verifies that 3-FCV-066-0028 in NOT mechanically restrained.
Verifies that 3-FCV-066-0028 in NOT mechanically restrained.
SAT  UNSAT  N/A Cue: 3-FCV-066 is NOT mechanically restrained.
SAT  UNSAT  N/A Cue: 3-FCV-066 is NOT mechanically restrained.
Performance Step 8:    [2]  VERIFY CLOSED OFFGAS SYSTEM ISOLATION VALVE, 3-FCV-66-28 on Panel 3-9-53 or locally.
Performance Step 8:    [2]  VERIFY CLOSED OFFGAS SYSTEM ISOLATION VALVE,   3-FCV-66-28 on Panel 3-9-53 or locally.
Standard:
Standard:
Verifies 3-FCV-66-28 is closed at panel 9
Verifies 3-FCV-66-28 is closed at panel 9
-53 by Verifying RED light above handswitch extinguished and GREEN light above handswitch illuminated. (May have already verified valve closed from the ARP).
-53 by Verifying RED light above handswitch extinguished and GREEN light above handswitch illuminated. (May have already verified valve closed from the ARP).
Line 2,668: Line 2,342:
  [3]  MONITOR area radiation levels at Panel:
  [3]  MONITOR area radiation levels at Panel:
3-9-11. Standard:
3-9-11. Standard:
Monitored radiation levels at Panel 9
Monitored radiation levels at Panel 9
-11. SAT  UNSAT  N/A Cue: Another operator will monitor and evaluate Area Radiation Levels.
-11. SAT  UNSAT  N/A Cue: Another operator will monitor and evaluate Area Radiation Levels.


Job Performance Measure (JPM)  9  STEP / STANDARD SAT / UNSAT Performance Step 10:  [4]  REFER TO EPIP-1 for emergency classification level and response.
Job Performance Measure (JPM)  9  STEP / STANDARD SAT / UNSAT Performance Step 10:  [4]  REFER TO EPIP-1 for emergency classification level and response. Standard;   Notifies SM to implement EPIP
Standard; Notifies SM to implement EPIP
-1. SAT  UNSAT  N/A Cue: The Shift Manager is implementing the EPIPs as needed.
-1. SAT  UNSAT  N/A Cue: The Shift Manager is implementing the EPIPs as needed.
Performance Step 11:
Performance Step 11:
   [5]  MONITOR the following parameters:
   [5]  MONITOR the following parameters:
A. MAIN STEAM LINE RADIATION, 3-RR-90-135,  Panel 3-9-2.
A. MAIN STEAM LINE RADIATION, 3-RR-90-135,  Panel 3-9-2.
B. OFFGAS PRETREATMENT RADIATION 3-RR-90-157, Pnl3-9-2. C. OFFGAS POST-TREATMENT RADIATION 3-RR-  90-265, Pnl3-9-2 D. STACK GAS RADIATION, 0
B. OFFGAS PRETREATMENT RADIATION 3-RR-90-157, Pnl 3-9-2. C. OFFGAS POST-TREATMENT RADIATION 3-RR-  90-265, Pnl 3-9-2 D. STACK GAS RADIATION, 0
-RR-90-147, Unit 1 Panel 1-9-2. Standard;
-RR-90-147, Unit 1 Panel 1-9-2. Standard; Monitors  90
 
Monitors  90
-135, 157, and 265. Calls Unit 1 operator for a reading on 0-RR-90-147. SAT  UNSAT  N/A Cue: As Unit 1 Operator, Stack Gas Radiation, 0
-135, 157, and 265. Calls Unit 1 operator for a reading on 0-RR-90-147. SAT  UNSAT  N/A Cue: As Unit 1 Operator, Stack Gas Radiation, 0
-RR-90-147 is reading 5X10E6 cps.
-RR-90-147 is reading 5X10E6 cps.
Line 2,687: Line 2,357:
Job Performance Measure (JPM)  10  STEP / STANDARD SAT / UNSAT Performance Step 12:
Job Performance Measure (JPM)  10  STEP / STANDARD SAT / UNSAT Performance Step 12:
   [6]  IF after five minutes from scram the Offgas Post Treatment activity is not less than 6 x 10 E5 cps as indicated on OFFGASRADIATION recorder 3-RR-90-265 on panel 3-9-2, THEN  CLOSE all Main Steam Isolation Valves and Main Steam LineDrain Valves, 3-FCV-1-55 and 3-FCV-1-56. Standard:  Recognizes that the Off
   [6]  IF after five minutes from scram the Offgas Post Treatment activity is not less than 6 x 10 E5 cps as indicated on OFFGASRADIATION recorder 3-RR-90-265 on panel 3-9-2, THEN  CLOSE all Main Steam Isolation Valves and Main Steam LineDrain Valves, 3-FCV-1-55 and 3-FCV-1-56. Standard:  Recognizes that the Off
-Gas Post Treatment activity is >6 X 10E 5 and closes all Main Steam Isolation Valves and Main Steam Line Drain Valves (
-Gas Post Treatment activity is >6 X 10E 5 and closes all Main Steam Isolation Valves and Main Steam Line Drain Valves (3-FCV-1-55/56)  Critical Step SAT  UNSAT  N/A Cue: The Unit has been scrammed for 5 minutes.
3-FCV-1-55/56)  Critical Step SAT  UNSAT  N/A Cue: The Unit has been scrammed for 5 minutes.
Acknowledge closing of MSIVs.
Acknowledge closing of MSIVs.
Examiner Note: Closing 1
Examiner Note: Closing 1-55 and 1-56 is not considered critical.
-55 and 1-56 is not considered critical.
Performance Step 13:
Performance Step 13:


NOTE Placing additional Stack Dilution Air Fans in service should keep 0
NOTE Placing additional Stack Dilution Air Fans in service should keep 0
-RM-90-147and 0-RM-90-148 on scale.
-RM-90-147and 0-RM-90-148 on scale.
   [7]  PLACE STACK DILUTION FAN SEL control switch, 3-XS-66-29, Panel 3-9-8, in OFF.
   [7]  PLACE STACK DILUTION FAN SEL control switch,   3-XS-66-29, Panel 3-9-8, in OFF.
   [8]  START standby STACK DILUTION FAN 3B(3A) using controlswitch, 3-HS-66-31A(29A), Panel 3-9-8. Standard:
   [8]  START standby STACK DILUTION FAN 3 B(3A) using controlswitch, 3-HS-66-31A(29A), Panel 3-9-8. Standard:
 
Places 3-XS-66-29 in OFF and Starts standby Stack Dilution fan 3B, using 3-HS-66-31A  SAT  UNSAT  N/A Cue: That completes this task.
Places 3-XS-66-29 in OFF and Starts standby Stack Dilution fan 3B, using 3-HS-66-31A  SAT  UNSAT  N/A Cue: That completes this task.


STOP TIME
STOP TIME ________
________
END OF TASK
END OF TASK


Line 2,719: Line 2,385:
Job Performance Measure (JPM)  1  SITE: BFN JPM TITLE:
Job Performance Measure (JPM)  1  SITE: BFN JPM TITLE:
AUTOMATIC START FAILURE OF A & C FIRE PUMP S JPM NUMBER:
AUTOMATIC START FAILURE OF A & C FIRE PUMP S JPM NUMBER:
673 REVISION:
673 REVISION: 0  TASK APPLICABILITY:
0  TASK APPLICABILITY:
SRO STA UO NAUO TASK NUMBER / TASK TITLE(S):
SRO STA UO NAUO TASK NUMBER / TASK TITLE(S):
U-026-NO-01/ MONITOR AUTO START OF FIRE PUMP  K/A RATINGS:
U-026-NO-01/ MONITOR AUTO START OF FIRE PUMP  K/A RATINGS:
Line 2,727: Line 2,392:
Risk Significant SAFETY FUNCTION:
Risk Significant SAFETY FUNCTION:
8  EVALUATION LOCATION:
8  EVALUATION LOCATION:
In-Plant  Simulator Control Room Lab  Other - List  APPLICABLE METHOD OF TESTING:  Discussion  Simulate/Walkthrough  Perform TIME FOR COMPLETION:      NA      TIME CRITICAL (Y/N)
In-Plant  Simulator Control R oom Lab  Other - List  APPLICABLE METHOD OF TESTING:  Discussion  Simulate/Walkthrough  Perform   TIME FOR COMPLETION:      NA      TIME CRITICAL (Y/N)
ALTERNATE PATH (Y/N)
ALTERNATE PATH (Y/N)
Developed by:      Developer Date  (Ensure validator is briefed on exam security per NPG
Developed by:      Developer Date  (Ensure validator is briefed on exam security per NPG
-SPP-17.8.1)                (See JPM Validation Checklist in NPG
-SPP-17.8.1)                (See JPM Validation Checklist in NPG
-SPP-17.8.2)      Validated by:
-SPP-17.8.2)      Validated by:
Approved by:
Approved by:
Validator Date  Approved by:
Validator   Date  Approved by:
Site Training Management Date  Site Training Program Owner Date      N Y Job Performance Measure (JPM)  2  OPERATOR:  ________________________________
Site Training Management Date  Site Training Program Owner Date      N Y Job Performance Measure (JPM)  2  OPERATOR:  ________________________________
JPM Number:  _673A___ RO  SRO  DATE: _______
JPM Number:  _673 A___ RO  SRO  DATE: _______


TASK STANDARD:
TASK STANDARD:
Line 2,758: Line 2,423:
EXAMINER Job Performance Measure (JPM)  3  Revision Summary Rev No. Effective Date Pages Affected Description 0 04/28/15 All Initial issue
EXAMINER Job Performance Measure (JPM)  3  Revision Summary Rev No. Effective Date Pages Affected Description 0 04/28/15 All Initial issue


Job Performance Measure (JPM)  4  IN-PLANT: I will explain the initial conditions and state the task to be performed. ALL STEPS WILL BE SIMULATED. Do NOT operate any plant equipment. Touch STAAR may be carried out to the point of touching a label. If it becomes necessary to physically touch a control switch, use a non
Job Performance Measure (JPM)  4  IN-PLANT: I will explain the initial conditions and state the task to be performed. ALL STEPS WILL BE SIMULATED. Do NOT operate any plant equipment. Touch STAAR may be carried out to the point of touching a label. If it becomes necessary to physically touch a control switch, use a non-conductive pointing device. I will provide initiating cues and indicate any steps to be discussed. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's correct" (or That's incorrect", if applicable). When you have completed your assigned task, you will say, "My task is complete" and I will acknowledge that your task is complete.
-conductive pointing device. I will provide initiating cues and indicate any steps to be discussed. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's correct" (or That's incorrect", if applicable). When you have completed your assigned task, you will say, "My task is complete" and I will acknowledge that your task is complete.


INITIAL CONDITIONS:  
INITIAL CONDITIONS:  


You are an Operator on Unit 1
You are an Operator on Unit 1. The Reactor Power at 70%
. The Reactor Power at 70%
A Fire Exists on B Reactor Feed Pump Lube Oil Reservoir. Fire OPS has been dispatched to the scene.
A Fire Exists on B Reactor Feed Pump Lube Oil Reservoir
. Fire OPS has been dispatched to the scene.
Fire Pump B Tagged Out for Maintenance A and C Fire Pumps failed to Auto Start.
Fire Pump B Tagged Out for Maintenance A and C Fire Pumps failed to Auto Start.


Line 2,777: Line 2,439:
CAUTION: DO NOT OPERATE ANY PLANT EQUIPMENT!
CAUTION: DO NOT OPERATE ANY PLANT EQUIPMENT!


Job Performance Measure (JPM)  5  START TIME
Job Performance Measure (JPM)  5  START TIME:    STEP / STANDARD SAT / UNSAT Step 1:    [1] PLACE the FIRE PUMP A TRANSFER switch, 0
:    STEP / STANDARD SAT / UNSAT Step 1:    [1] PLACE the FIRE PUMP A TRANSFER switch, 0
-XS-26-1 in EMERGENCY position, at the respective switchgear.
-XS-26-1 in EMERGENCY position, at the respective switchgear.
Pump Board Compt A 4160V Shutdown Bd A 11 C 4160V Shutdown Bd C 10  Standard:
Pump Board Compt A 4160V Shutdown Bd A 11 C 4160V Shutdown Bd C 10  Standard: Simulates placing FIRE PUMP A TRANSFER switch 0
Simulates placing FIRE PUMP A TRANSFER switch 0
-XS-26-3 in EMERGENCY position at 4160 Shutdown Board A, Compartment  
-XS-26-3 in EMERGENCY position at 4160 Shutdown Board A, Compartment  


Line 2,788: Line 2,448:
SAT UNSAT N/A  CUE:  FIRE PUMP A TRANSFER switch 0
SAT UNSAT N/A  CUE:  FIRE PUMP A TRANSFER switch 0
-XS-26-1 is in the EMERGENCY position Step 2:  [2] CLOSE the breaker by placing the FIRE PUMP A CONTROL switch, 0-HS-26-1C to CLOSE.
-XS-26-1 is in the EMERGENCY position Step 2:  [2] CLOSE the breaker by placing the FIRE PUMP A CONTROL switch, 0-HS-26-1C to CLOSE.
Standard:
Standard: Simulates placing FIRE PUMP A CONTROL switch, 0
Simulates placing FIRE PUMP A CONTROL switch, 0
-HS-26-1C to CLOSE position.
-HS-26-1C to CLOSE position.
Critical Step
Critical Step
Line 2,801: Line 2,460:
[1] PLACE the FIRE PUMP C TRANSFER switch, 0
[1] PLACE the FIRE PUMP C TRANSFER switch, 0
-XS-26-3 in EMERGENCY position, at the respective switchgear.
-XS-26-3 in EMERGENCY position, at the respective switchgear.
Pump Board Compt A 4160V Shutdown Bd A 11 C 4160V Shutdown Bd C 10  Standard:
Pump Board Compt A 4160V Shutdown Bd A 11 C 4160V Shutdown Bd C 10  Standard: Simulates placing FIRE PUMP C TRANSFER switch 0
Simulates placing FIRE PUMP C TRANSFER switch 0
-XS-26-3 in EMERGENCY position at 4160 Shutdown Board C, Compartment  
-XS-26-3 in EMERGENCY position at 4160 Shutdown Board C, Compartment  


Line 2,809: Line 2,467:
SAT UNSAT N/A  CUE:  FIRE PUMP C TRANSFER switch 0
SAT UNSAT N/A  CUE:  FIRE PUMP C TRANSFER switch 0
-XS-26-3 is in the EMERGENCY position Step 5:   
-XS-26-3 is in the EMERGENCY position Step 5:   
[2] CLOSE the breaker by placing the FIRE PUMP C CONTROL switch, 0
[2] CLOSE the breaker by placing the FIRE PUMP C CONTROL switch, 0-HS-26-3C to CLOSE.
-HS-26-3C to CLOSE.
Standard: Simulates placing FIRE PUMP C CONTROL switch, 0
Standard:
Simulates placing FIRE PUMP C CONTROL switch, 0
-HS-26-3C to CLOSE position.
-HS-26-3C to CLOSE position.
Critical Step
Critical Step
Line 2,823: Line 2,479:
Standard  PLACES the NORM/EMERG Switch in NORMAL for FIRE PUMP C. SAT UNSAT N/A  CUE: FIRE PUMP C NORM/EMERG Switch is in NORMAL and this completes the JPM. Termination Criteria:  When two Fire Pumps are in service the JPM is complete.
Standard  PLACES the NORM/EMERG Switch in NORMAL for FIRE PUMP C. SAT UNSAT N/A  CUE: FIRE PUMP C NORM/EMERG Switch is in NORMAL and this completes the JPM. Termination Criteria:  When two Fire Pumps are in service the JPM is complete.
STOP TIME:
STOP TIME:
Job Performance Measure (JPM)  8  Provide to Applicant IN-PLANT: I will explain the initial conditions and state the task to be performed. ALL STEPS WILL BE SIMULATED. Do NOT operate any plant equipment. Touch STAAR may be carried out to the point of touching a label. If it becomes necessary to physically touch a control switch, use a non
Job Performance Measure (JPM)  8  Provide to Applicant IN-PLANT: I will explain the initial conditions and state the task to be performed. ALL STEPS WILL BE SIMULATED. Do NOT operate any plant equipment. Touch STAAR may be carried out to the point of touching a label. If it becomes necessary to physically touch a control switch, use a non-conductive pointing device. I will provide initiating cues and indicate any steps to be discussed. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's correct" (or That's incorrect", if applicable). When you have completed your assigned task, you will say, "My task is complete" and I will acknowledge that your task is complete.
-conductive pointing device. I will provide initiating cues and indicate any steps to be discussed. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's correct" (or That's incorrect", if applicable). When you have completed your assigned task, you will say, "My task is complete" and I will acknowledge that your task is complete.


INITIAL CONDITIONS:  
INITIAL CONDITIONS:  


You are an Operator on Unit 1
You are an Operator on Unit 1. The Reactor Power at 70%
. The Reactor Power at 70%
A Fire Exists on B Reactor Feed Pump Lube Oil Reservoir. Fire OPS has been dispatched to the scene.
A Fire Exists on B Reactor Feed Pump Lube Oil Reservoir. Fire OPS has been dispatched to the scene.
Fire Pump B Tagged Out for Maintenance A and C Fire Pumps failed to Auto Start.
Fire Pump B Tagged Out for Maintenance A and C Fire Pumps failed to Auto Start.
Line 2,841: Line 2,495:
Job Performance Measure (JPM)  1  SITE: BFN JPM TITLE:
Job Performance Measure (JPM)  1  SITE: BFN JPM TITLE:
ALIGNING EMERGENCY EECW MAKEUP TO SPENT FUEL POOL JPM NUMBER:
ALIGNING EMERGENCY EECW MAKEUP TO SPENT FUEL POOL JPM NUMBER:
674 REVISION:
674 REVISION: 0  TASK APPLICABILITY:
0  TASK APPLICABILITY:
SRO STA UO NAUO TASK NUMBER / TASK TITLE(S):
SRO STA UO NAUO TASK NUMBER / TASK TITLE(S):
U-000-EM-95/ Make-Up To SFP By EECW With Fire Hose (Internal Make
U-000-EM-95/ Make-Up To SFP By EECW With Fire Hose (Internal Make
Line 2,848: Line 2,501:
RO:  3.1    SRO:  3.3 K/A No. &STATEMENT:
RO:  3.1    SRO:  3.3 K/A No. &STATEMENT:
233000 Fuel Pool Cooling and Clean
233000 Fuel Pool Cooling and Clean
-up; A2.02; Ability to (a) predict the impacts of the following on the FUEL POOL COOLING AND CLEAN-UP ; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those abnormal conditions or operations:
-up; A2.02; Ability to (a) predict the impacts of the following on the FUEL POOL COOLING AND CL EAN-UP ; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those abnormal conditions or operations:
Low pool level RELATED PRA INFORMATION:
Low pool level RELATED PRA INFORMATION:
Risk Significant SAFETY FUNCTION:
Risk Significant SAFETY FUNCTION:
9  EVALUATION LOCATION:
9  EVALUATION LOCATION: In-Plant  Simulator Control R oom Lab  Other - List  APPLICABLE METHOD OF TESTING:  Discussion  Simulate/Walkthrough  Perform   TIME FOR COMPLETION:      NA      TIME CRITICAL (Y/N)
In-Plant  Simulator Control Room Lab  Other - List  APPLICABLE METHOD OF TESTING:  Discussion  Simulate/Walkthrough  Perform TIME FOR COMPLETION:      NA      TIME CRITICAL (Y/N)
ALTERNATE PATH (Y/N)
ALTERNATE PATH (Y/N)
Developed by:
Developed by:
Developer Date  (Ensure validator is briefed on exam security per NPG
Developer Date  (Ensure validator is briefed on exam security per NPG
-SPP-17.8.1)                (See JPM Validation Checklist in NPG
-SPP-17.8.1)                (See JPM Validation Checklist in NPG
-SPP-17.8.2)      Validated by:
-SPP-17.8.2)      Validated by:
Approved by:
Approved by:
Validator Date  Approved by: Site Training Management Date  Site Training Program Owner Date  N N Job Performance Measure (JPM)  2  OPERATOR:  ________________________________
Validator   Date  Approved by: Site Training Management Date  Site Training Program Owner Date  N N Job Performance Measure (JPM)  2  OPERATOR:  ________________________________
JPM Number:  __674__  RO  SRO  DATE: _______
JPM Number:  __674__  RO  SRO  DATE: _______


Line 2,883: Line 2,535:
EXAMINER Job Performance Measure (JPM)  3  Revision Summary Rev No. Effective Date Pages Affected Description 0 09/01/15 All Initial issue
EXAMINER Job Performance Measure (JPM)  3  Revision Summary Rev No. Effective Date Pages Affected Description 0 09/01/15 All Initial issue


Job Performance Measure (JPM)  4  IN-PLANT: I will explain the initial conditions and state the task to be performed. ALL STEPS WILL BE SIMULATED. Do NOT operate any plant equipment. Touch STAAR may be carried out to the point of touching a label. If it becomes necessary to physically touch a control switch, use a non
Job Performance Measure (JPM)  4  IN-PLANT: I will explain the initial conditions and state the task to be performed. ALL STEPS WILL BE SIMULATED. Do NOT operate any plant equipment. Touch STAAR may be carried out to the point of touching a label. If it becomes necessary to physically touch a control switch, use a non-conductive pointing device. I will provide initiating cues and indicate any steps to be discussed. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's correct" (or That's incorrect", if applicable). When you have completed your assigned task, you will say, "My task is complete" and I will acknowledge that your task is complete.
-conductive pointing device. I will provide initiating cues and indicate any steps to be discussed. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's correct" (or That's incorrect", if applicable). When you have completed your assigned task, you will say, "My task is complete" and I will acknowledge that your task is complete.


INITIAL CONDITIONS:  
INITIAL CONDITIONS:  
Line 2,893: Line 2,544:
INITIATING CUES
INITIATING CUES
:
:
The Unit Supervisor directs you to align EECW Makeup to Unit 2 Spent Fuel Pool per 2
The Unit Supervisor directs you to align EECW Makeup to Unit 2 Spent Fuel Pool per 2-AOI-78-1 Attachment 2 starting at step [3]
-AOI-78-1 Attachment 2 starting at step [3]
.   
.   


CAUTION: DO NOT OPERATE ANY PLANT EQUIPMENT!
CAUTION: DO NOT OPERATE ANY PLANT EQUIPMENT!


Job Performance Measure (JPM)  5  START TIME
Job Performance Measure (JPM)  5  START TIME:    STEP / STANDARD SAT / UNSAT Step 1:                    [3] UNLOCK and OPEN the following valves:
:    STEP / STANDARD SAT / UNSAT Step 1:                    [3] UNLOCK and OPEN the following valves:
NORTH HDR SPLY TO EMER FUEL POOL MU, 1
NORTH HDR SPLY TO EMER FUEL POOL MU, 1
-SHV-067-0792. SOUTH HDR SPLY TO EMER FUEL POOL MU, 1
-SHV-067-0792. SOUTH HDR SPLY TO EMER FUEL POOL MU, 1
-SHV-067-0793. Standard:
-SHV-067-0793. Standard: Simulates opening NORTH HDR SPLY TO EMER FUEL POOL MU, 1-SHV-067-0792 and SOUTH HDR SPLY TO EMER FUEL POOL MU, 1
Simulates opening NORTH HDR SPLY TO EMER FUEL POOL MU, 1-SHV-067-0792 and SOUTH HDR SPLY TO EMER FUEL POOL MU, 1
-SHV-067-0793 by demonstrating opening each valve cou nter-clockwise and breaking seal
-SHV-067-0793 by demonstrating opening each valve counter-clockwise and breaking seal
. Critical Step SAT  UNSAT  N/A  CUE:  NORTH HDR SPLY TO EMER FUEL POOL MU, 1
. Critical Step SAT  UNSAT  N/A  CUE:  NORTH HDR SPLY TO EMER FUEL POOL MU, 1
-SHV-067-0792 is OPEN and SOUTH HDR SPLY TO EMER FUEL POOL MU, 1
-SHV-067-0792 is OPEN and SOUTH HDR SPLY TO EMER FUEL POOL MU, 1
Line 2,918: Line 2,566:
Job Performance Measure (JPM)  6  STEP / STANDARD SAT / UNSAT Step 3:    [4] VERIFY charged hoses in stairwell are not obstructing stairway access and/or kinked.
Job Performance Measure (JPM)  6  STEP / STANDARD SAT / UNSAT Step 3:    [4] VERIFY charged hoses in stairwell are not obstructing stairway access and/or kinked.
  [4.1] ADJUST hose straps, as necessary.
  [4.1] ADJUST hose straps, as necessary.
Standard:
Standard: VERIFIES hoses in stairwell are not kinked SAT UNSAT N/A  Note to Examiner:
VERIFIES hoses in stairwell are not kinked SAT UNSAT N/A  Note to Examiner:
Hoses are already run along the stairwell. Applicant should verify hoses not kinked and connected.
Hoses are already run along the stairwell. Applicant should verify hoses not kinked and connected.
Step 4:    [5] VERIFY hose connected from NORTH HDR SPLY TO EMER FUEL POOL MU, 1
Step 4:    [5] VERIFY hose connected from NORTH HDR SPLY TO EMER FUEL POOL MU, 1
-SHV-067-0796 and route to Unit 2 Spent Fuel Pool (El 664', Refuel Floor, R6
-SHV-067-0796 and route to Unit 2 Spent Fuel Pool (El 664', Refuel Floor, R6
-U Line). Standard:
-U Line). Standard: VERIFY hose connected from NORTH HDR SPLY TO EMER FUEL POOL MU, 1
VERIFY hose connected from NORTH HDR SPLY TO EMER FUEL POOL MU, 1
-SHV-067-0796 and route to Unit 2 Spent Fuel Pool (El 664', Refuel Floor, R6
-SHV-067-0796 and route to Unit 2 Spent Fuel Pool (El 664', Refuel Floor, R6
-U Line). Critical Step SAT  UNSAT  N/A  Note to Examiner:
-U Line). Critical Step SAT  UNSAT  N/A  Note to Examiner:
Line 2,932: Line 2,578:
Step 5:    [6] VERIFY hose connected from SOUTH HDR SPLY TO EMER FUEL POOL MU, 1
Step 5:    [6] VERIFY hose connected from SOUTH HDR SPLY TO EMER FUEL POOL MU, 1
-SHV-067-0797 and route to Unit 2 Spent Fuel Pool (El 664', Refuel Floor, R6
-SHV-067-0797 and route to Unit 2 Spent Fuel Pool (El 664', Refuel Floor, R6
-U Line)  Standard:
-U Line)  Standard: VERIFY hose connected from SOUTH HDR SPLY TO EMER FUEL POOL MU, 1
VERIFY hose connected from SOUTH HDR SPLY TO EMER FUEL POOL MU, 1
-SHV-067-0797 and route to Unit 2 Spent Fuel Pool (El 664', Refuel Floor, R6
-SHV-067-0797 and route to Unit 2 Spent Fuel Pool (El 664', Refuel Floor, R6
-U Line)    Critical Step SAT  UNSAT  N/A Job Performance Measure (JPM)  7  STEP / STANDARD SAT / UNSAT Note to Examiner:
-U Line)    Critical Step SAT  UNSAT  N/A Job Performance Measure (JPM)  7  STEP / STANDARD SAT / UNSAT Note to Examiner:
Line 2,942: Line 2,587:
NORTH HDR SPLY TO EMER FUEL POOL MU, 1
NORTH HDR SPLY TO EMER FUEL POOL MU, 1
-SHV-067-0796. SOUTH HDR SPLY TO EMER FUEL POOL MU, 1
-SHV-067-0796. SOUTH HDR SPLY TO EMER FUEL POOL MU, 1
-SHV-067-0797. Standard:
-SHV-067-0797. Standard: Simulates opening NORTH HDR SPLY TO EMER FUEL POOL MU, 1-SHV-067-0796 and SOUTH HDR SPLY TO EMER FUEL POOL MU, 1
Simulates opening NORTH HDR SPLY TO EMER FUEL POOL MU, 1-SHV-067-0796 and SOUTH HDR SPLY TO EMER FUEL POOL MU, 1
-SHV-067-0797 by demonstrating opening each valve cou nter-clockwise.
-SHV-067-0797 by demonstrating opening each valve counter-clockwise.
Critical Step SAT  UNSAT  N/A  CUE:  NORTH HDR SPLY TO EMER FUEL POOL MU, 1
Critical Step SAT  UNSAT  N/A  CUE:  NORTH HDR SPLY TO EMER FUEL POOL MU, 1
-SHV-067-0796 is OPEN and SOUTH HDR SPLY TO EMER FUEL POOL MU, 1
-SHV-067-0796 is OPEN and SOUTH HDR SPLY TO EMER FUEL POOL MU, 1
-SHV-067-0797 is OPEN  Location: Refuel Floor Elevation 664 ft, R U Line.
-SHV-067-0797 is OPEN  Location: Refuel Floor Elevation 664 ft, R U Line.
Step 7:    [8] VERIFY charged hoses on the Refuel Floor are not kinked.
Step 7:    [8] VERIFY charged hoses on the Refuel Floor are not kinked.
Standard:
Standard: VERIFY charged hoses on the Refuel Floor are not kinked
VERIFY charged hoses on the Refuel Floor are not kinked


SAT UNSAT N/A  Termination Criteria:  NORTH and SOUTH Header are aligned then the JPM is complete. State another operator will perform the remaining steps. STOP TIME:
SAT UNSAT N/A  Termination Criteria:  NORTH and SOUTH Header are aligned then the JPM is complete. State another operator will perform the remaining steps. STOP TIME:
Job Performance Measure (JPM)  8  Provide to Applicant IN-PLANT: I will explain the initial conditions and state the task to be performed. ALL STEPS WILL BE SIMULATED. Do NOT operate any plant equipment. Touch STAAR may be carried out to the point of touching a label. If it becomes necessary to physically touch a control switch, use a non
Job Performance Measure (JPM)  8  Provide to Applicant IN-PLANT: I will explain the initial conditions and state the task to be performed. ALL STEPS WILL BE SIMULATED. Do NOT operate any plant equipment. Touch STAAR may be carried out to the point of touching a label. If it becomes necessary to physically touch a control switch, use a non-conductive pointing device. I will provide initiating cues and indicate any steps to be discussed. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's correct" (or That's incorrect", if applicable). When you have completed your assigned task, you will say, "My task is complete" and I will acknowledge that your task is complete.
-conductive pointing device. I will provide initiating cues and indicate any steps to be discussed. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's correct" (or That's incorrect", if applicable). When you have completed your assigned task, you will say, "My task is complete" and I will acknowledge that your task is complete.


INITIAL CONDITIONS:  
INITIAL CONDITIONS:  


You are an Operator on Unit 2
You are an Operator on Unit 2. The Reactor is in cold shutdown The Unit 2 Spent Fuel Pool water level is lowering.
. The Reactor is in cold shutdown The Unit 2 Spent Fuel Pool water level is lowering.
Fire Protection is available to assist INITIATING CUES
Fire Protection is available to assist INITIATING CUES
:
:
Line 2,968: Line 2,609:
Job Performance Measure (JPM)  1  SITE: BFN JPM TITLE:
Job Performance Measure (JPM)  1  SITE: BFN JPM TITLE:
START UP AND SYNCHRONIZE UNIT 3 PREFERRED MMG SET JPM NUMBER:
START UP AND SYNCHRONIZE UNIT 3 PREFERRED MMG SET JPM NUMBER:
307 REVISION:
307 REVISION: 6  TASK APPLICABILITY:
6  TASK APPLICABILITY:
SRO STA UO NAUO TASK NUMBER / TASK TITLE(S):
SRO STA UO NAUO TASK NUMBER / TASK TITLE(S):
S-57C-NO-04  K/A RATINGS:
S-57C-NO-04  K/A RATINGS:
Line 2,977: Line 2,617:
Risk Significant SAFETY FUNCTION:
Risk Significant SAFETY FUNCTION:
6  EVALUATION LOCATION:
6  EVALUATION LOCATION:
In-Plant  Simulator Control Room Lab  Other - List  APPLICABLE METHOD OF TESTING:  Discussion  Simulate/Walkthrough Perform TIME FOR COMPLETION:      NA      TIME CRITICAL (Y/N)
In-Plant  Simulator Control R oom Lab  Other - List  APPLICABLE METHOD OF TESTING:  Discussion  Simulate/Walkthrough Perform   TIME FOR COMPLETION:      NA      TIME CRITICAL (Y/N)
ALTERNATE PATH (Y/N)
ALTERNATE PATH (Y/N)
Developed by:
Developed by:
Developer Date  (Ensure validator is briefed on exam security per NPG
Developer Date  (Ensure validator is briefed on exam security per NPG
-SPP-17.8.1)                (See JPM Validation Checklist in NPG
-SPP-17.8.1)                (See JPM Validation Checklist in NPG
-SPP-17.8.2)      Validated by:
-SPP-17.8.2)      Validated by:
Approved by:
Approved by:
Validator Date  Approved by:
Validator   Date  Approved by:
Site Training Management Date  Site Training Program Owner Date      N N Job Performance Measure (JPM)  2  OPERATOR:  ________________________________
Site Training Management Date  Site Training Program Owner Date      N N Job Performance Measure (JPM)  2  OPERATOR:  ________________________________
JPM Number:  _307___  RO  SRO  DATE: _______
JPM Number:  _307___  RO  SRO  DATE: _______
Line 3,004: Line 2,644:
SIGNATURE: ___________________________
SIGNATURE: ___________________________
DATE: __________
DATE: __________
EXAMINER Job Performance Measure (JPM)  3  Revision Summary Rev No. Effective Date Pages Affected Description 1 10/26/94 ALL GENERAL REVISION 2 05/07/95 ALL GENERAL REVISION 3 10/15/97 ALL FORMAT, PROCEDURE REVISION, ADDED PLANT WORK EXPECTATIONS TOUCH STAAR, SAFETY, AND 3
EXAMINER Job Performance Measure (JPM)  3  Revision Summary Rev No. Effective Date Pages Affected Description 1 10/26/94 A LL GENERAL REVISION 2 05/07/95 ALL GENERAL REVISION 3 10/15/97 ALL FORMAT, PROCEDURE REVISION, ADDED PLANT WORK EXPECTATIONS TOUCH STAAR, SAFETY, AND 3
-WAY COMM.
-WAY COMM. 4 11/10/99 ALL PROCEDURE REVISION, FORMAT DOCUMENT 5 10/03/01 ALL PROCEDURE REVISION 6 04/28/15 ALL UPDATE TO NEW FORMAT
4 11/10/99 ALL PROCEDURE REVISION, FORMAT DOCUMENT 5 10/03/01 ALL PROCEDURE REVISION 6 04/28/15 ALL UPDATE TO NEW FORMAT


Job Performance Measure (JPM)  4  IN-PLANT: I will explain the initial conditions and state the task to be performed. ALL STEPS WILL BE SIMULATED. Do NOT operate any plant equipment. Touch STAAR may be carried out to the point of touching a label. If it becomes necessary to physically touch a control switch, use a non
Job Performance Measure (JPM)  4  IN-PLANT: I will explain the initial conditions and state the task to be performed. ALL STEPS WILL BE SIMULATED. Do NOT operate any plant equipment. Touch STAAR may be carried out to the point of touching a label. If it becomes necessary to physically touch a control switch, use a non-conductive pointing device. I will provide initiating cues and indicate any steps to be discussed. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's correct" (or That's incorrect", if applicable). When you have completed your assigned task, you will say, "My task is complete" and I will acknowledge that your task is complete.
-conductive pointing device. I will provide initiating cues and indicate any steps to be discussed. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's correct" (or That's incorrect", if applicable). When you have completed your assigned task, you will say, "My task is complete" and I will acknowledge that your task is complete.


INITIAL CONDITIONS:  
INITIAL CONDITIONS:  
Line 3,025: Line 2,663:
CAUTION: DO NOT OPERATE ANY PLANT EQUIPMENT!
CAUTION: DO NOT OPERATE ANY PLANT EQUIPMENT!


Job Performance Measure (JPM)  5  START TIME
Job Performance Measure (JPM)  5  START TIME:    STEP / STANDARD SAT / UNSAT Step 1:   
:    STEP / STANDARD SAT / UNSAT Step 1:   


[16] PLACE UNIT 3 MMG OPERATING MODE, 3
[16] PLACE UNIT 3 MMG OPERATING MODE, 3
-HS-252-02AB in AUTO. Standard:
-HS-252-02AB in AUTO. Standard: VERIFIED/SIMULATED PLACING the Unit 3 MMG SET OPERATING MODE 3
VERIFIED/SIMULATED PLACING the Unit 3 MMG SET OPERATING MODE 3
-HS-252-02AB in AUTO.
-HS-252-02AB in AUTO.
Critical Step
Critical Step
Line 3,040: Line 2,676:
-REMOTE CONTROL, 3
-REMOTE CONTROL, 3
-XS-252-02A in REMOTE.
-XS-252-02A in REMOTE.
Standard:
Standard: SIMULATED PLACING the Unit 3 MMG SET LOCAL
SIMULATED PLACING the Unit 3 MMG SET LOCAL
-REMOTE CONTROL 3-XS-252-02A in the REMOTE position.
-REMOTE CONTROL 3
-XS-252-02A in the REMOTE position.
Critical Step
Critical Step


Line 3,051: Line 2,685:
Step 3:   
Step 3:   
[18] PLACE UNIT 3 PFD SYSTEM GENERATOR SOURCE SYNC SWITCH SS
[18] PLACE UNIT 3 PFD SYSTEM GENERATOR SOURCE SYNC SWITCH SS
-7, 3-HS-252-03/SS-7 in ON. Standard:
-7, 3-HS-252-03/SS-7 in ON. Standard: SIMULATED PLACING UNIT 3 PFD SYSTEM GENERATOR SOURCE SYNC SWITCH, SS
SIMULATED PLACING UNIT 3 PFD SYSTEM GENERATOR SOURCE SYNC SWITCH, SS
-7, 3-HS-252-03/SS-7, in the ON position. Critical Step
-7, 3-HS-252-03/SS-7, in the ON position.
Critical Step


SAT UNSAT N/A NOTE Steps 5.5[16] through 5.5[26] are performed from Battery Board Room 2 UNIT PFD Sync. & Speed Control Panel.
SAT UNSAT N/A NOTE Steps 5.5[16] through 5.5[26] are performed from Battery Board Room 2 UNIT PFD Sync. & Speed Control Panel.


Job Performance Measure (JPM)  6  STEP / STANDARD SAT / UNSAT Cue:  The Unit 3 PFD SYSTEM GENERATOR SOURCE SYNC SS
Job Performance Measure (JPM)  6  STEP / STANDARD SAT / UNSAT Cue:  The Unit 3 PFD SYSTEM GENERATOR SOURCE SYNC SS
-7, SWITCH 3-HS-252-003/SS-7 is in the ON position.
-7, SWITCH 3-HS-252-003/SS-7 is in the ON position. Step 4:   
Step 4:   


[19] MATCH Incoming to Running AC volts using UNIT 3 MMG VOLTAGE ADJUST, 3
[19] MATCH Incoming to Running AC volts using UNIT 3 MMG VOLTAGE ADJUST, 3
-HS-252-02CD. Standard:
-HS-252-02CD. Standard: SIMULATED MANIPULATING UNIT 3 MMG VOLTAGE ADJUST, 3-HS 252-02CD until cued that incoming and running AC volts are matched. Critical Step
SIMULATED MANIPULATING UNIT 3 MMG VOLTAGE ADJUST,  
 
3-HS 252-02CD until cued that incoming and running AC volts are matched. Critical Step


SAT UNSAT N/A Cue:  INCOMING and RUNNING VOLTAGES are EQUAL at 122 Volts Step 5:   
SAT UNSAT N/A Cue:  INCOMING and RUNNING VOLTAGES are EQUAL at 122 Volts Step 5:   
[20] ADJUST MMG speed using UNIT 3 MMG FREQUENCY ADJUST, 3-HS-252-02CF to obtain a synchroscope slowly rotating in the SLOW (counter-clockwise) direction (10 to 15 second rotation) as indicated on SYNCHROSCOPE, 0
[20] ADJUST MMG speed using UNIT 3 MMG FREQUENCY ADJUST, 3-HS-252-02CF to obtain a synchroscope slowly rotating in the SLOW (counter-clockwise) direction (10 to 15 second rotation) as indicated on SYNCHROSCOPE, 0
-SCP-252-000A/B. Standard:
-SCP-252-000A/B. Standard: SIMULATED ADJUSTING UNIT 3 MMG FREQUENCY ADJUST 3-HS-252-02CF speed control switch until cued that synchroscope indicator rotating in the counterclockwise direction at 10 to 15 seconds per revolution.
SIMULATED ADJUSTING UNIT 3 MMG FREQUENCY ADJUST 3-HS-252-02CF speed control switch until cued that synchroscope indicator rotating in the counterclockwise direction at 10 to 15 seconds per revolution.
Critical Step
Critical Step


SAT UNSAT N/A  Cue: State: "The Initial Synchroscope indicator is standing still at the 5 o'clock position."  Note: If student raises frequency the state: "Synchroscope indicator is rotating in the CLOCKWISE direction at 12 seconds per revolution."
SAT UNSAT N/A  Cue: State: "T he Initial Synchroscope indicator is standing still at the 5 o'clock position."  Note: If student raises frequency the state: "Synchroscope indicator is rotating in the CLOCKWISE direction at 12 seconds per revolution."
Note: If student lowers frequency the state: "Synchroscope indicator is rotating in the COUNTERCLOCKWISE direction at 12 seconds per revolution."
Note: If student lowers frequency the state: "Synchroscope indicator is rotating in the COUNTERCLOCKWISE direction at 12 seconds per revolution."
NOTE MMG voltage and hertz are read as INCOMING.
NOTE MMG voltage and hertz are read as INCOMING.
Line 3,084: Line 2,711:
-clockwise direction, THEN PERFORM the following expeditiously:
-clockwise direction, THEN PERFORM the following expeditiously:
   [21.1] CLOSE UNIT 3 BKR 1001, using 0
   [21.1] CLOSE UNIT 3 BKR 1001, using 0
-HS-280-003/1001.  [21.2] ENSURE CLOSED UNIT 3 BKR 1001.
-HS-280-003/1001.  [21.2] ENSURE CLOSED UNIT 3 BKR 1001. Critical Step
Critical Step


SAT UNSAT N/A NOTES 1) Section 5.5[21] should be performed expeditiously (within about 15 seconds) to minimize the time AC Systems are paralleled to prevent tripping the MMG set. Voltage and amps is expected to fluctuate while the AC systems are paralleled and the MMG set will trip if the AC systems are paralleled for approximately 30 seconds.  
SAT UNSAT N/A NOTES 1) Section 5.5[21] should be performed expeditiously (within about 15 seconds) to minimize the time AC Systems are paralleled to prevent tripping the MMG set. Voltage and amps is expected to fluctuate while the AC systems are paralleled and the MMG set will trip if the AC systems are paralleled for approximately 30 seconds.  
Line 3,106: Line 2,732:
. Step 7:   
. Step 7:   
[21.3] OPEN the UNIT 3)BKR 1002, using 0
[21.3] OPEN the UNIT 3)BKR 1002, using 0
-HS-280-003/1002.
-HS-280-003/1002.


Standard:
Standard: SIMULATED UNIT 3 BKR 1002, 0-HS-282-003/1002in the OPEN position. Critical Step
SIMULATED UNIT 3 BKR 1002, 0-HS-282-003/1002in the OPEN position.
Critical Step


SAT UNSAT N/A  CUE: UNIT 3 BKR 1002, 0
SAT UNSAT N/A  C UE: UNIT 3 BKR 1002, 0
-HS-282-003/1002 IS IN THE OPEN POSITION WITH RED LIGHT ILLUMINATED.
-HS-282-003/1002 IS IN THE OPEN POSITION WITH RED LIGHT ILLUMINATED.
NOTE:  DO NOT ALLOW THE EXAMINEE TO OPERATE THE AMMETER SELECTOR SWITCH FOR THE FOLLOWING STEP.
NOTE:  DO NOT ALLOW THE EXAMINEE TO OPERATE THE AMMETER SELECTOR SWITCH FOR THE FOLLOWING STEP.
Line 3,119: Line 2,743:
-II-252-02C/1AMR L2 rise, "N" should be approximately the difference of L1& L2 (UNIT 3 MMG GENERATOR amps, 3-HS-252-02CH positions 1, 2, & 3 are respective to L1, L2 & N). SAT UNSAT N/A End of Critical Step(s)
-II-252-02C/1AMR L2 rise, "N" should be approximately the difference of L1& L2 (UNIT 3 MMG GENERATOR amps, 3-HS-252-02CH positions 1, 2, & 3 are respective to L1, L2 & N). SAT UNSAT N/A End of Critical Step(s)


Job Performance Measure (JPM)  9  STEP / STANDARD SAT / UNSAT Standard:
Job Performance Measure (JPM)  9  STEP / STANDARD SAT / UNSAT Standard: CHECKED amp indicators L1 MINUS L2 approximately equals n.
CHECKED amp indicators L1 MINUS L2 approximately equals n.
Cue: L1, L2 , N AMPS INDICATIONS HAVE RISEN and L1-L2 = N. Note: Selector Switch positions are labeled as follows: Position 1 is L1, position 2 is L2 and Position 3 is N.
Cue: L1, L2, N AMPS INDICATIONS HAVE RISEN and L1-L2 = N. Note: Selector Switch positions are labeled as follows: Position 1 is L1, position 2 is L2 and Position 3 is N.
Step 9:  [23] ENSURE OPEN UNIT 3 BKR 1003, 0
Step 9:  [23] ENSURE OPEN UNIT 3 BKR 1003, 0
-HS-280-003/1003  Standard:
-HS-280-003/1003  Standard: VERIFIED ILLUMINATED GREEN position indicating light above 0
VERIFIED ILLUMINATED GREEN position indicating light above 0
-HS-282-003/1003.
-HS-282-003/1003.
SAT UNSAT  N/A  Cue: Unit 3 Breaker 1003 0
SAT UNSAT  N/A  Cue: Unit 3 Breaker 1003 0
Line 3,130: Line 2,752:
Step 10:  [24] On Unit 2 Unit Preferred MMG Set Local Control Panel, ENSURE OPEN the following fused disconnect switches:
Step 10:  [24] On Unit 2 Unit Preferred MMG Set Local Control Panel, ENSURE OPEN the following fused disconnect switches:
BACKUP SOURCE TO BAT BD 1 BKR 1003, 1
BACKUP SOURCE TO BAT BD 1 BKR 1003, 1
-FUDS-280-001/1003 BACKUP SOURCE TO BAT BD 3 BKR 1003, 3
-FUDS-280-001/1003   BACKUP SOURCE TO BAT BD 3 BKR 1003, 3
-FUDS-280-003/1003 Standard:
-FUDS-280-003/1003 Standard: At Unit 2 Unit Preferred MMG Set Local Control Panel VERIFIED 1-FUDS-280-001/1003 AND 3
At Unit 2 Unit Preferred MMG Set Local Control Panel VERIFIED 1-FUDS-280-001/1003 AND 3
-FUDS-280-003/1003 in the OPEN POSITION. SAT UNSAT N/A Cue: 1-FUDS-280-001/1003 and 3-FUDS-280-003/1003 are in the OPEN position.
-FUDS-280-003/1003 in the OPEN POSITION.
SAT UNSAT N/A Cue: 1-FUDS-280-001/1003 and 3-FUDS-280-003/1003 are in the OPEN position.


Job Performance Measure (JPM)  10  STEP / STANDARD SAT / UNSAT Step 11:  [25] On Unit 3 Unit Preferred MMG Set Local Control Panel, ENSURE the BACKUP SOURCE TO BAT BD 2 BKR 1003, 2-FUDS-280-002/1003 fused disconnect switch is open:
Job Performance Measure (JPM)  10  STEP / STANDARD SAT / UNSAT Step 11:  [25] On Unit 3 Unit Preferred MMG Set Local Control Panel, ENSURE the BACKUP SOURCE TO BAT BD 2 BKR 1003, 2-FUDS-280-002/1003 fused disconnect switch is open:
Standard:
Standard: On Unit 3 Unit Preferred MMG Set Local Control Panel, VERIFIED 2-FUDS-280-002/1003 in the OPEN position.
On Unit 3 Unit Preferred MMG Set Local Control Panel, VERIFIED 2-FUDS-280-002/1003 in the OPEN position.
SAT UNSAT N/A Cue: 2-FUDS-280-002/1003 is in the OPEN position.
SAT UNSAT N/A Cue: 2-FUDS-280-002/1003 is in the OPEN position.
Step 12:   
Step 12:   
[26] On Battery Board 2:
[26] On Battery Board 2:


PLACE UNIT 3 PFD SYSTEM GENERATOR SOURCE SYNC SWITCH SS-7, 1-HS-252-03/SS-7 in OFF. Standard:
PLACE UNIT 3 PFD SYSTEM GENERATOR SOURCE SYNC SWITCH SS-7, 1-HS-252-03/SS-7 in OFF. Standard: SIMULATED PLACING UNIT 3 PFD SYSTEM GENERATOR SOURCE SYNC SWITCH, SS
SIMULATED PLACING UNIT 3 PFD SYSTEM GENERATOR SOURCE SYNC SWITCH, SS
-7, 1-HS-252-03/SS-7 in the OFF position. SAT UNSAT N/A Cue: UNIT 3 PFD SYSTEM GENERATOR SOURCE SYNC SWITCH, SS
-7, 1-HS-252-03/SS-7 in the OFF position.
SAT UNSAT N/A Cue: UNIT 3 PFD SYSTEM GENERATOR SOURCE SYNC SWITCH, SS
-7, 1-HS-252-03/SS-7 is in the OFF position.
-7, 1-HS-252-03/SS-7 is in the OFF position.
Step 13:   
Step 13:   
[27] On Battery Board 2:
[27] On Battery Board 2:


DEPRESS UNIT 3 MMG AC MOTOR START, 3-HS-252-02AD to return to Normal AC power from DC drive. Standard:
DEPRESS UNIT 3 MMG AC MOTOR START, 3-HS-252-02AD to return to Normal AC power from DC drive. Standard: SIMULATED DEPRESSING and RELEASING UNIT 3 MMG AC MOTOR START , 3-HS-252-02AD pushbutton.
SIMULATED DEPRESSING and RELEASING UNIT 3 MMG AC MOTOR START ,
3-HS-252-02AD pushbutton.
Critical Step
Critical Step


Line 3,159: Line 2,774:
State Another Operator will continue with procedure and this will end the task.
State Another Operator will continue with procedure and this will end the task.
STOP TIME:
STOP TIME:
Job Performance Measure (JPM)  11  Provide to Applicant IN-PLANT: I will explain the initial conditions and state the task to be performed. ALL STEPS WILL BE SIMULATED. Do NOT operate any plant equipment. Touch STAAR may be carried out to the point of touching a label. If it becomes necessary to physically touch a control switch, use a non
Job Performance Measure (JPM)  11  Provide to Applicant IN-PLANT: I will explain the initial conditions and state the task to be performed. ALL STEPS WILL BE SIMULATED. Do NOT operate any plant equipment. Touch STAAR may be carried out to the point of touching a label. If it becomes necessary to physically touch a control switch, use a non-conductive pointing device. I will provide initiating cues and indicate any steps to be discussed. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's correct" (or That's incorrect", if applicable). When you have completed your assigned task, you will say, "My task is complete" and I will acknowledge that your task is complete.
-conductive pointing device. I will provide initiating cues and indicate any steps to be discussed. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's correct" (or That's incorrect", if applicable). When you have completed your assigned task, you will say, "My task is complete" and I will acknowledge that your task is complete.


INITIAL CONDITIONS:  
INITIAL CONDITIONS:  


You are an Operator on Unit 3
You are an Operator on Unit 3. The Reactor is in cold shutdown The Unit 3 Unit Preferred Bus is being supplied from the Unit 3 Unit Preferred Transformer in accordance with Section 8.1.
. The Reactor is in cold shutdown The Unit 3 Unit Preferred Bus is being supplied from the Unit 3 Unit Preferred Transformer in accordance with Section 8.1.
Maintenance has been completed on the Unit 3 Unit Preferred MMG Set.
Maintenance has been completed on the Unit 3 Unit Preferred MMG Set.


INITIATING CUES
INITIATING CUES
:  The SM directs you to start up and synchronize the Unit 3 Unit Preferred MMG Set as directed by 0-OI-57C per section 5.5 step 5.5[16
:  The SM directs you to start up and synchronize the Unit 3 Unit Preferred MMG Set as directed by 0-O I-57C per section 5.5 step 5.5[16
]. NOTE:  PERFORMER WILL NEED GGMKA KEY.
]. NOTE:  PERFORMER WILL NEED GGMKA KEY.
CAUTION: DO NOT OPERATE ANY PLANT EQUIPMENT!
CAUTION: DO NOT OPERATE ANY PLANT EQUIPMENT!
Line 3,175: Line 2,788:
Job Performance Measure (JPM)  1  SITE: BFN JPM TITLE:
Job Performance Measure (JPM)  1  SITE: BFN JPM TITLE:
RESPOND TO A CONTROL ROD DRIFT IN JPM NUMBER:
RESPOND TO A CONTROL ROD DRIFT IN JPM NUMBER:
80A U2 REVISION:
80 A U2 REVISION: 1  TASK APPLICABILITY:
1  TASK APPLICABILITY:
SRO STA UO NAUO TASK NUMBER / TASK TITLE(S):
SRO STA UO NAUO TASK NUMBER / TASK TITLE(S):
U-085-AB-05/ Respond to a Control Rod Drift In K/A RATINGS:
U-085-AB-05/ Respond to a Control Rod Drift In K/A RATINGS:
Line 3,183: Line 2,795:
Risk Significant SAFETY FUNCTION:
Risk Significant SAFETY FUNCTION:
1  EVALUATION LOCATION:
1  EVALUATION LOCATION:
In-Plant  Simulator Control Room Lab  Other - List  APPLICABLE METHOD OF TESTING:  Discussion  Simulate/Walkthrough  Perform TIME FOR COMPLETION:      NA      TIME CRITICAL (Y/N)      ALTERNATE PATH (Y/N)
In-Plant  Simulator Control R oom Lab  Other - List  APPLICABLE METHOD OF TESTING:  Discussion  Simulate/Walkthrough  Perform   TIME FOR COMPLETION:      NA      TIME CRITICAL (Y/N)      ALTERNATE PATH (Y/N)
Developed by:
Developed by:
Developer Date  (Ensure validator is briefed on exam security per NPG
Developer Date  (Ensure validator is briefed on exam security per NPG
-SPP-17.8.1)                (See JPM Validation Checklist in NPG
-SPP-17.8.1)                (See JPM Validation Checklist in NPG
-SPP-17.8.2)      Validated by:
-SPP-17.8.2)      Validated by:
Approved by:
Approved by:
Validator Date  Approved by:
Validator   Date  Approved by:
Site Training Management Date  Site Training Program Owner Date      N Y Job Performance Measure (JPM)  2  OPERATOR:  ________________________________
Site Training Management Date  Site Training Program Owner Date      N Y Job Performance Measure (JPM)  2  OPERATOR:  ________________________________
JPM Number:  __
JPM Number:  __
Line 3,202: Line 2,814:
OF-2 Controlling plant evolutions precisely.
OF-2 Controlling plant evolutions precisely.
PRA: NA REFERENCES/PROCEDURES NEEDED:
PRA: NA REFERENCES/PROCEDURES NEEDED:
2-AOI-85-5, 2-AOI-100-1 VALIDATIONTIME:  18 min    PERFORMANCE TIME:
2-AOI-85-5 , 2-AOI-100-1 VALIDATIONTIME:  18 min    PERFORMANCE TIME:
COMMENTS:  
COMMENTS:  


Line 3,219: Line 2,831:
:NRC JPM A U2  
:NRC JPM A U2  
-Control Rod Drift In Verify all triggers and overrides are correct Place the simulator in RUN to ensure stable conditions Start Rod Display on RWM Screen Provide Initial Rod Data Sheet
-Control Rod Drift In Verify all triggers and overrides are correct Place the simulator in RUN to ensure stable conditions Start Rod Display on RWM Screen Provide Initial Rod Data Sheet
  -PRLOG  When prompted by the examiner, INSERT  
  -PRLOG  When prompted by the examiner, INSERT -  Event 1 to Drift Control Rod 02
-  Event 1 to Drift Control Rod 02
-31 into the core When prompted by the examiner, INSERT -  Event 2 to Drift Control Rod Multiple Control Rods into the core Malfunctions Description Event Severity Delay Initial set rd07r0231 Drifts rod 02
-31 into the core When prompted by the examiner, INSERT  
-  Event 2 to Drift Control Rod Multiple Control Rods into the core Malfunctions Description Event Severity Delay Initial set rd07r0231 Drifts rod 02
-31 into core 1 NA 35 sec NA rd07r2223 Drifts rod 22
-31 into core 1 NA 35 sec NA rd07r2223 Drifts rod 22
-23 into core 2 NA 10 sec NA rd07r3031 Drifts rod 30
-23 into core 2 NA 10 sec NA rd07r 303 1 Drifts rod 30
-31 into core 2 NA 25 sec NA rd07r4635 Drifts rod 46
-31 into core 2 NA 25 sec NA rd07r4635 Drifts rod 46
-35  into core 2 NA 20 sec NA rd07r2619 Drifts rod 26
-35  into core 2 NA 20 sec NA rd07r2619 Drifts rod 26
Line 3,240: Line 2,850:
:  The Unit Supervisor directs you to perform Surveillance 3.1.3.3 step 7.3, Control Rod Exercise Test for Withdrawn Control Rods, for partially withdrawn control rods.
:  The Unit Supervisor directs you to perform Surveillance 3.1.3.3 step 7.3, Control Rod Exercise Test for Withdrawn Control Rods, for partially withdrawn control rods.


Job Performance Measure (JPM)  7  START TIME
Job Performance Measure (JPM)  7  START TIME:    STEP / STANDARD SAT / UNSAT Step 1:  NOTE 1) Problem details of any control rod issues observed during the performance of this surveillance must be recorded on Attachment 3 for further review and possible corrective maintenance. Slow/fast rod movements or settle times should be noted in the remarks section.
:    STEP / STANDARD SAT / UNSAT Step 1:  NOTE 1) Problem details of any control rod issues observed during the performance of this surveillance must be recorded on Attachment 3 for further review and possible corrective maintenance. Slow/fast rod movements or settle times should be noted in the remarks section.
: 2) Section 7.3 is performed for all Partially Withdrawn Control Rods and performance of steps is represented by initialing the appropriate CRD exercised on Attachment 1.
: 2) Section 7.3 is performed for all Partially Withdrawn Control Rods and performance of steps is represented by initialing the appropriate CRD exercised on Attachment 1.
CAUTIONS 1) Any mispositioned control rod events will be dispositioned by following the direction contained within 2
CAUTIONS 1) Any mispositioned control rod events will be dispositioned by following the direction contained within 2
Line 3,255: Line 2,864:
CHECK white light on the Full Core Display is ILLUMINATED.
CHECK white light on the Full Core Display is ILLUMINATED.
CHECK Rod Out Permit light is ILLUMINATED.
CHECK Rod Out Permit light is ILLUMINATED.
Standard:
Standard:     Selects a withdrawn control rod Critical Step
Selects a withdrawn control rod Critical Step


SAT UNSAT N/A Note to Examiner:  May select any partially withdrawn control rod in any order
SAT UNSAT N/A Note to Examiner:  May select any partially withdrawn control rod in any order
Line 3,264: Line 2,872:
-HS-85-48 in ROD IN andRELEASE.
-HS-85-48 in ROD IN andRELEASE.
   [3.2] OBSERVE control rod settles into the desired position andROD SETTLE light extinguishes.
   [3.2] OBSERVE control rod settles into the desired position andROD SETTLE light extinguishes.
Standard:
Standard:   Inserts withdrawn control rod one notch Critical Step
Inserts withdrawn control rod one notch Critical Step


SAT UNSAT N/A Step 3:     
SAT UNSAT N/A Step 3:     
Line 3,273: Line 2,880:


[4.2] OBSERVE control rod settles into the desired position and ROD SETTLE light extinguishes.
[4.2] OBSERVE control rod settles into the desired position and ROD SETTLE light extinguishes.
Standard:
Standard: Withdraws withdrawn control rod one notch Critical Step
Withdraws withdrawn control rod one notch Critical Step


SAT UNSAT N/A  Step 4:     
SAT UNSAT N/A  Step 4:     
Line 3,282: Line 2,888:
ENSURE rod inserted and returned to its original position.
ENSURE rod inserted and returned to its original position.
INITIAL Attachment 2 (Control Rod Concurrent Verifier (CV)Check) in the box corresponding to the control rod coordinates forthe rod just exercised.
INITIAL Attachment 2 (Control Rod Concurrent Verifier (CV)Check) in the box corresponding to the control rod coordinates forthe rod just exercised.
SAT UNSAT N/A Job Performance Measure (JPM)  9  STEP / STANDARD SAT / UNSAT Standard:
SAT UNSAT N/A Job Performance Measure (JPM)  9  STEP / STANDARD SAT / UNSAT Standard: Initials Attachment 1 for exercised control rod and continues to exercise rods.
Initials Attachment 1 for exercised control rod and continues to exercise rods.
Note to Examiner:   Perform above actions for @ least two control rods
Note to Examiner:
Perform above actions for @ least two control rods
. When satisfied with the number of rod manipulations direct Simulator Booth Operator to insert trigger #1 for Control Rod 02
. When satisfied with the number of rod manipulations direct Simulator Booth Operator to insert trigger #1 for Control Rod 02
-31 Drift In Note to Simulator Booth Operator:
-31 Drift In Note to Simulator Booth Operator:
Line 3,296: Line 2,900:
CONTINUOUS IN. (Otherwise N/A)
CONTINUOUS IN. (Otherwise N/A)
  [3] IF a Control Rod Block occurs during rod insertion due to Rod Worth Minimizer, THEN BYPASS the RWM per step 4.2[1] above. (Otherwise N/A)
  [3] IF a Control Rod Block occurs during rod insertion due to Rod Worth Minimizer, THEN BYPASS the RWM per step 4.2[1] above. (Otherwise N/A)
Standard:
Standard: Responds per 2-AOI-85-5 and inserts control rod 02
Responds per 2-AOI-85-5 and inserts control rod 02
-31 to full in position as indicated by position 00 indication.
-31 to full in position as indicated by position 00 indication.
Critical Step SAT UNSAT N/A  CUE: When report to US, state "Respond per 2
Critical Step SAT UNSAT N/A  CUE: When report to US, state "Respond per 2
-AOI-85-5, Control Rod Drift In.
-AOI-85-5 , Control Rod Drift In.
Step 6:     
Step 6:     
[4] NOTIFY the Reactor Engineer to Evaluate Core Thermal Limits and Preconditioning Limits for the current Control Rod pattern. Standard:
[4] NOTIFY the Reactor Engineer to Evaluate Core Thermal Limits and Preconditioning Limits for the current Control Rod pattern. Standard: Candidate notifies Reactor Engineer to Evaluate Core Thermal limits and Preconditioning Limits for the current Control Rod Pattern SAT UNSAT N/A  Cue: Understand Reactor Engineering notified to evaluate Core Thermal andPreconditioning Limits
Candidate notifies Reactor Engineer to Evaluate Core Thermal limits and Preconditioning Limits for the current Control Rod Pattern SAT UNSAT N/A  Cue: Understand Reactor Engineering notified to evaluate Core Thermal andPreconditioning Limits
 
Job Performance Measure (JPM)  10  STEP / STANDARD SAT / UNSAT Step 7:    [5] IF another Control Rod Drift occurs before Reactor Engineering completes the evaluation,


THEN MANUALLY SCRAM Reactor and enter 2
Job Performance Measure (JPM)  10  STEP / STANDARD SAT / UNSAT Step 7:    [5] IF another Control Rod Drift occurs before Reactor Engineering completes the evaluation, THEN MANUALLY SCRAM Reactor and enter 2
-AOI-100-1.   
-AOI-100-1.   
[6] CHECK Thermal Limits on ICS (RUNMON).
[6] CHECK Thermal Limits on ICS (RUNMON).
Note to NRC Examiner:
Note to NRC Examiner:
Step [6] performed by Reactor Engineer"ing.
Step [6] performed by Reactor Engineer"ing.
Standard:
Standard: Reviews step and asks for guidance from US or RE SAT  UNSAT  N/A CUE: As Shift Manager, state "RE has evaluated Core Thermal and Preconditioning Limits and has determined that the Control Rod Exercise may continue and that any other Control Rod Drift will be considered the first.
Reviews step and asks for guidance from US or RE SAT  UNSAT  N/A CUE: As Shift Manager, state "RE has evaluated Core Thermal and Preconditioning Limits and has determined that the Control Rod Exercise may continue and that any other Control Rod Drift will be considered the first.
Student will continue with Control Rod Exercise.
Student will continue with Control Rod Exercise.
Step 8:
Step 8:
Line 3,324: Line 2,923:
CHECK white light on the Full Core Display is ILLUMINATED.
CHECK white light on the Full Core Display is ILLUMINATED.
CHECK Rod Out Permit light is ILLUMINATED.
CHECK Rod Out Permit light is ILLUMINATED.
Standard:
Standard:     Selects a withdrawn control rod Critical Step SAT  UNSAT  N/A Job Performance Measure (JPM)  11  STEP / STANDARD SAT / UNSAT Step 9:  [3] INSERT control rod one notch by performing the following:
Selects a withdrawn control rod Critical Step SAT  UNSAT  N/A Job Performance Measure (JPM)  11  STEP / STANDARD SAT / UNSAT Step 9:  [3] INSERT control rod one notch by performing the following:
   [3.1] PLACE CRD CONTROL SWITCH, 2
   [3.1] PLACE CRD CONTROL SWITCH, 2
-HS-85-48 in ROD IN andRELEASE.
-HS-85-48 in ROD IN andRELEASE.
   [3.2] OBSERVE control rod settles into the desired position andROD SETTLE light extinguishes.
   [3.2] OBSERVE control rod settles into the desired position andROD SETTLE light extinguishes.
Standard:
Standard:   Inserts withdrawn control rod one notch Critical Step
Inserts withdrawn control rod one notch Critical Step


SAT UNSAT N/A Step 10:     
SAT UNSAT N/A Step 10:     
Line 3,337: Line 2,934:
-HS-85-48 in ROD OUT NOTCHand RELEASE.   
-HS-85-48 in ROD OUT NOTCHand RELEASE.   
[4.2] OBSERVE control rod settles into the desired position and ROD SETTLE light extinguishes.
[4.2] OBSERVE control rod settles into the desired position and ROD SETTLE light extinguishes.
Standard:
Standard: Withdraws withdrawn control rod one notch Critical Step
Withdraws withdrawn control rod one notch Critical Step
 
SAT UNSAT N/A  Note to Examiner:
When satisfied with the number of rod manipulations direct Simulator Booth Operator to insert trigger #2 for Multiple Control Rods Drifting In Step 11:    Multiple Control Rods Drifting In Standard:


SAT UNSAT N/A  Note to Examiner:  When satisfied with the number of rod manipulations direct Simulator Booth Operator to insert trigger #2 for Multiple Control Rods Drifting In Step 11:    Multiple Control Rods Drifting In Standard:
Recognizes Multiple Control Rods Drift into the Core and Manually Scrams the Reactor per 2-AOI-85-5. Depresses both SCRAM Pushbuttons Places mode switch in shutdown Verifies All Rods in
Recognizes Multiple Control Rods Drift into the Core and Manually Scrams the Reactor per 2-AOI-85-5. Depresses both SCRAM Pushbuttons Places mode switch in shutdown Verifies All Rods in


Line 3,359: Line 2,953:
Job Performance Measure (JPM)  13  Provide to Applicant
Job Performance Measure (JPM)  13  Provide to Applicant
   ****************************************************************************************************
   ****************************************************************************************************
***  IN-SIMULATOR:  I will explain the initial conditions and state the task to be performed. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's Correct".  (OR "That's Incorrect", if applicable). When you have completed your assigned task, you will say, "my task is complete" and I will acknowledge that your task is complete.
***  IN-SIMULATOR:  I will explain the initial conditions and state the task to be performed. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's Correct".  (OR "That's Incorrect", if applicable). When you have completed your assigned task, you will say, "my task is complete" and I will acknowledge that your task is complete.
 
*******************************************************************************************************
*******************************************************************************************************


Line 3,374: Line 2,967:
Job Performance Measure (JPM)  1  SITE: BFN JPM TITLE:
Job Performance Measure (JPM)  1  SITE: BFN JPM TITLE:
RESPOND TO A CONTROL ROD DRIFT IN JPM NUMBER:
RESPOND TO A CONTROL ROD DRIFT IN JPM NUMBER:
80A U3 REVISION:
80 A U 3 REVISION: 1  TASK APPLICABILITY:
1  TASK APPLICABILITY:
SRO STA UO NAUO TASK NUMBER / TASK TITLE(S):
SRO STA UO NAUO TASK NUMBER / TASK TITLE(S):
U-085-AB-05/ Respond to a Control Rod Drift In K/A RATINGS:
U-085-AB-05/ Respond to a Control Rod Drift In K/A RATINGS:
Line 3,382: Line 2,974:
Risk Significant SAFETY FUNCTION:
Risk Significant SAFETY FUNCTION:
1  EVALUATION LOCATION:
1  EVALUATION LOCATION:
In-Plant  Simulator Control Room Lab  Other - List  APPLICABLE METHOD OF TESTING:  Discussion  Simulate/Walkthrough  Perform TIME FOR COMPLETION:      NA      TIME CRITICAL (Y/N)      ALTERNATE PATH (Y/N)
In-Plant  Simulator Control R oom Lab  Other - List  APPLICABLE METHOD OF TESTING:  Discussion  Simulate/Walkthrough  Perform   TIME FOR COMPLETION:      NA      TIME CRITICAL (Y/N)      ALTERNATE PATH (Y/N)
Developed by:
Developed by:
Developer Date  (Ensure validator is briefed on exam security per NPG
Developer Date  (Ensure validator is briefed on exam security per NPG
-SPP-17.8.1)                (See JPM Validation Checklist in NPG
-SPP-17.8.1)                (See JPM Validation Checklist in NPG
-SPP-17.8.2)      Validated by:
-SPP-17.8.2)      Validated by:
Approved by:
Approved by:
Validator Date  Approved by:
Validator   Date  Approved by:
Site Training Management Date  Site Training Program Owner Date      N Y Job Performance Measure (JPM)  2  OPERATOR:  ________________________________
Site Training Management Date  Site Training Program Owner Date      N Y Job Performance Measure (JPM)  2  OPERATOR:  ________________________________
JPM Number:  _80A U3_  RO  SRO  DATE: _______
JPM Number:  _80A U3_  RO  SRO  DATE: _______
Line 3,399: Line 2,991:
OF-2 Controlling plant evolutions precisely.
OF-2 Controlling plant evolutions precisely.
PRA: NA REFERENCES/PROCEDURES NEEDED:
PRA: NA REFERENCES/PROCEDURES NEEDED:
3-AOI-85-5, 3-AOI-100-1  VALIDATIONTIME:      PERFORMANCE TIME:
3-AOI-85-5 , 3-AOI-100-1  VALIDATIONTIME:      PERFORMANCE TIME:
COMMENTS:  
COMMENTS:  


Line 3,416: Line 3,008:
Job Performance Measure (JPM)  4  SIMULATOR SETUP IC 28 Exam IC 280    Console Operator Instructions Reset IC 28 or Exam IC if written in above Run schedule file: NRC JPM A U3  
Job Performance Measure (JPM)  4  SIMULATOR SETUP IC 28 Exam IC 280    Console Operator Instructions Reset IC 28 or Exam IC if written in above Run schedule file: NRC JPM A U3  
-Control Rod Drift In Verify all triggers and overrides are correct Place the simulator in RUN to ensure stable conditions Start Rod Display on RWM Screen Provide Initial Rod Data Sheet  
-Control Rod Drift In Verify all triggers and overrides are correct Place the simulator in RUN to ensure stable conditions Start Rod Display on RWM Screen Provide Initial Rod Data Sheet  
-PRLOG  When prompted by the examiner, INSERT  
-PRLOG  When prompted by the examiner, INSERT -  Event 1 to Drift Control Rod 02
-  Event 1 to Drift Control Rod 02
-31 into the core When prompted by the examiner, INSERT -  Event 2 to Drift Control Rod Multiple Control Rods into the core Malfunctions Description Event Severity Delay Initial set rd07r0231 Drifts rod 02
-31 into the core When prompted by the examiner, INSERT  
-  Event 2 to Drift Control Rod Multiple Control Rods into the core Malfunctions Description Event Severity Delay Initial set rd07r0231 Drifts rod 02
-31 into core 1 NA 35 sec NA rd07r2223 Drifts rod 22
-31 into core 1 NA 35 sec NA rd07r2223 Drifts rod 22
-23 into core 2 NA 10 sec NA rd07r3031 Drifts rod 30
-23 into core 2 NA 10 sec NA rd07r 303 1 Drifts rod 30
-31 into core 2 NA 25 sec NA rd07r4635 Drifts rod 46
-31 into core 2 NA 25 sec NA rd07r4635 Drifts rod 46
-35  into core 2 NA 20 sec NA rd07r2619 Drifts rod 26
-35  into core 2 NA 20 sec NA rd07r2619 Drifts rod 26
Line 3,438: Line 3,028:
:  The Unit Supervisor directs you to perform Surveillance 3.1.3.3 step 7.3, Control Rod Exercise Test for Withdrawn Control Rods, for partially withdrawn control rods.
:  The Unit Supervisor directs you to perform Surveillance 3.1.3.3 step 7.3, Control Rod Exercise Test for Withdrawn Control Rods, for partially withdrawn control rods.


Job Performance Measure (JPM)  7  START TIME
Job Performance Measure (JPM)  7  START TIME:    STEP / STANDARD SAT / UNSAT Step 1:  NOTE 1) Problem details of any control rod issues observed during the performance of this surveillance must be recorded on Attachment 3 for further review and possible corrective maintenance. Slow/fast rod movements or settle times should be noted in the remarks section.
:    STEP / STANDARD SAT / UNSAT Step 1:  NOTE 1) Problem details of any control rod issues observed during the performance of this surveillance must be recorded on Attachment 3 for further review and possible corrective maintenance. Slow/fast rod movements or settle times should be noted in the remarks section.
: 2) Section 7.3 is performed for all Partially Withdrawn Control Rods and performance of steps is represented by initialing the appropriate CRD exercised on Attachment 1.
: 2) Section 7.3 is performed for all Partially Withdrawn Control Rods and performance of steps is represented by initialing the appropriate CRD exercised on Attachment 1.
CAUTIONS 3) Any mispositioned control rod events will be dispositioned by following the direction contained within 3-AOI-85-7.   
CAUTIONS 3) Any mispositioned control rod events will be dispositioned by following the direction contained within 3-AOI-85-7.   
Line 3,452: Line 3,041:
CHECK white light on the Full Core Display is ILLUMINATED.
CHECK white light on the Full Core Display is ILLUMINATED.
CHECK Rod Out Permit light is ILLUMINATED.
CHECK Rod Out Permit light is ILLUMINATED.
Standard:
Standard:     Selects a withdrawn control rod Critical Step
Selects a withdrawn control rod Critical Step


SAT UNSAT N/A Note to Examiner:  May select any partially withdrawn control rod in any order
SAT UNSAT N/A Note to Examiner:  May select any partially withdrawn control rod in any order
Line 3,459: Line 3,047:
Job Performance Measure (JPM)  8  STEP / STANDARD SAT / UNSAT Step 2:  [3] INSERT control rod one notch by performing the following:
Job Performance Measure (JPM)  8  STEP / STANDARD SAT / UNSAT Step 2:  [3] INSERT control rod one notch by performing the following:
   [3.1] PLACE CRD CONTROL SWITCH, 3-HS-85-48 in ROD IN andRELEASE.  [3.2] OBSERVE control rod settles into the desired position andROD SETTLE light extinguishes.
   [3.1] PLACE CRD CONTROL SWITCH, 3-HS-85-48 in ROD IN andRELEASE.  [3.2] OBSERVE control rod settles into the desired position andROD SETTLE light extinguishes.
Standard:
Standard:   Inserts withdrawn control rod one notch Critical Step
Inserts withdrawn control rod one notch Critical Step


SAT UNSAT N/A Step 3:     
SAT UNSAT N/A Step 3:     
Line 3,466: Line 3,053:
  [4.1] PLACE CRD CONTROL SWITCH, 3-HS-85-48 in ROD OUT NOTCHand RELEASE.   
  [4.1] PLACE CRD CONTROL SWITCH, 3-HS-85-48 in ROD OUT NOTCHand RELEASE.   
[4.2] OBSERVE control rod settles into the desired position and ROD SETTLE light extinguishes.
[4.2] OBSERVE control rod settles into the desired position and ROD SETTLE light extinguishes.
Standard:
Standard: Withdraws withdrawn control rod one notch Critical Step
Withdraws withdrawn control rod one notch Critical Step


SAT UNSAT N/A  Step 4:     
SAT UNSAT N/A  Step 4:     
Line 3,475: Line 3,061:
ENSURE rod inserted and returned to its original position.
ENSURE rod inserted and returned to its original position.
INITIAL Attachment 2 (Control Rod Concurrent Verifier (CV)Check) in the box corresponding to the control rod coordinates forthe rod just exercised.
INITIAL Attachment 2 (Control Rod Concurrent Verifier (CV)Check) in the box corresponding to the control rod coordinates forthe rod just exercised.
SAT  UNSAT N/A Job Performance Measure (JPM)  9  STEP / STANDARD SAT / UNSAT Standard:
SAT  UNSAT N/A Job Performance Measure (JPM)  9  STEP / STANDARD SAT / UNSAT Standard:   Initials Attachment 1 for exercised control rod and continues to exercise rods.
Initials Attachment 1 for exercised control rod and continues to exercise rods.
Note to Examiner:   Perform above actions for @ least two control rods
Note to Examiner:
Perform above actions for @ least two control rods
. When satisfied with the number of rod manipulations direct Simulator Booth Operator to insert trigger #1 for Control Rod 02
. When satisfied with the number of rod manipulations direct Simulator Booth Operator to insert trigger #1 for Control Rod 02
-31 Drift In Note to Simulator Booth Operator:
-31 Drift In Note to Simulator Booth Operator:
Line 3,489: Line 3,073:
CONTINUOUS IN. (Otherwise N/A)
CONTINUOUS IN. (Otherwise N/A)
  [3] IF a Control Rod Block occurs during rod insertion due to Rod Worth Minimizer, THEN BYPASS the RWM per step 4.2[1] above. (Otherwise N/A)
  [3] IF a Control Rod Block occurs during rod insertion due to Rod Worth Minimizer, THEN BYPASS the RWM per step 4.2[1] above. (Otherwise N/A)
Standard:
Standard:   Responds per 3-AOI-85-5 and inserts control rod 02
Responds per 3-AOI-85-5 and inserts control rod 02
-31 to full in position as indicated by position 00 indication. Critical Step
-31 to full in position as indicated by position 00 indication. Critical Step


SAT UNSAT N/A  CUE: When report to US, state "Respond per 3-AOI-85-5, Control Rod Drift In.
SAT UNSAT N/A  CUE: When report to US, state "Respond per 3-AOI-85-5, Control Rod Drift In.
Step 6:     
Step 6:     
[4] NOTIFY the Reactor Engineer to Evaluate Core Thermal Limits and Preconditioning Limits for the current Control Rod pattern. Standard:
[4] NOTIFY the Reactor Engineer to Evaluate Core Thermal Limits and Preconditioning Limits for the current Control Rod pattern. Standard: Candidate notifies Reactor Engineer to Evaluate Core Thermal limits and Preconditioning Limits for the current Control Rod Pattern SAT UNSAT N/A  Cue: Understand Reactor Engineering notified to evaluate Core Thermal andPreconditioning Limits
Candidate notifies Reactor Engineer to Evaluate Core Thermal limits and Preconditioning Limits for the current Control Rod Pattern SAT UNSAT N/A  Cue: Understand Reactor Engineering notified to evaluate Core Thermal andPreconditioning Limits
 
Job Performance Measure (JPM)  10  STEP / STANDARD SAT / UNSAT Step 7:    [5] IF another Control Rod Drift occurs before Reactor Engineering completes the evaluation,


THEN MANUALLY SCRAM Reactor and enter 2
Job Performance Measure (JPM)  10  STEP / STANDARD SAT / UNSAT Step 7:    [5] IF another Control Rod Drift occurs before Reactor Engineering completes the evaluation, THEN MANUALLY SCRAM Reactor and enter 2
-AOI-100-1.   
-AOI-100-1.   
[6] CHECK Thermal Limits on ICS (RUNMON).
[6] CHECK Thermal Limits on ICS (RUNMON).
Note to NRC Examiner:
Note to NRC Examiner:
Step [6] performed by Reactor Engineer"ing.
Step [6] performed by Reactor Engineer"ing.
Standard:
Standard: Reviews step and asks for guidance from US or RE SAT  UNSAT  N/A CUE: As Shift Manager, state "RE has evaluated Core Thermal and Preconditioning Limits and has determined that the Control Rod Exercise may continue and that any other Control Rod Drift will be considered the first.
Reviews step and asks for guidance from US or RE SAT  UNSAT  N/A CUE: As Shift Manager, state "RE has evaluated Core Thermal and Preconditioning Limits and has determined that the Control Rod Exercise may continue and that any other Control Rod Drift will be considered the first.
Student will continue with Control Rod Exercise.
Student will continue with Control Rod Exercise.
Step 8:
Step 8:
Line 3,516: Line 3,095:
CHECK CRD ROD SELECT pushbutton is brightly ILLUMINATED.
CHECK CRD ROD SELECT pushbutton is brightly ILLUMINATED.
CHECK white light on the Full Core Display is ILLUMINATED.
CHECK white light on the Full Core Display is ILLUMINATED.
CHECK Rod Out Permit light is ILLUMINATED. Standard:
CHECK Rod Out Permit light is ILLUMINATED. Standard:     Selects a withdrawn control rod Critical Step SAT  UNSAT  N/A Job Performance Measure (JPM)  11  STEP / STANDARD SAT / UNSAT Step 9:  [3] INSERT control rod one notch by performing the following:
Selects a withdrawn control rod Critical Step SAT  UNSAT  N/A Job Performance Measure (JPM)  11  STEP / STANDARD SAT / UNSAT Step 9:  [3] INSERT control rod one notch by performing the following:
   [3.1] PLACE CRD CONTROL SWITCH, 2
   [3.1] PLACE CRD CONTROL SWITCH, 2
-HS-85-48 in ROD IN andRELEASE.
-HS-85-48 in ROD IN andRELEASE.
   [3.2] OBSERVE control rod settles into the desired position andROD SETTLE light extinguishes.
   [3.2] OBSERVE control rod settles into the desired position andROD SETTLE light extinguishes.
Standard:
Standard:   Inserts withdrawn control rod one notch Critical Step
Inserts withdrawn control rod one notch Critical Step


SAT UNSAT N/A Step 10:     
SAT UNSAT N/A Step 10:     
Line 3,530: Line 3,107:


[4.2] OBSERVE control rod settles into the desired position and ROD SETTLE light extinguishes.
[4.2] OBSERVE control rod settles into the desired position and ROD SETTLE light extinguishes.
Standard:
Standard: Withdraws withdrawn control rod one notch Critical Step
Withdraws withdrawn control rod one notch Critical Step
 
SAT UNSAT N/A  Note to Examiner:
When satisfied with the number of rod manipulations direct Simulator BoothOperator to insert trigger #2 for Multiple Control Rods Drifting In Step 11:    Multiple Control Rods Drifting In Standard:


SAT UNSAT N/A  Note to Examiner:  When satisfied with the number of rod manipulations direct Simulator BoothOperator to insert trigger #2 for Multiple Control Rods Drifting In Step 11:    Multiple Control Rods Drifting In Standard:
Recognizes Multiple Control Rods Drift into the Core and Manually Scrams the Reactor per 3
Recognizes Multiple Control Rods Drift into the Core and Manually Scrams the Reactor per 3
-AOI-85-5. Depresses both SCRAM Pushbuttons Places mode switch in shutdown Verifies All Rods in Critical Step
-AOI-85-5. Depresses both SCRAM Pushbuttons Places mode switch in shutdown Verifies All Rods in Critical Step
Line 3,555: Line 3,129:
*******************************************************************************************************
*******************************************************************************************************


INITIAL CONDITIONS:  
INITIAL CONDITIONS:
 
You are an Operator on Unit  
You are an Operator on Unit  
: 3. The Reactor is at 100% power
: 3. The Reactor is at 100% power
Line 3,565: Line 3,138:
Job Performance Measure (JPM)  1  SITE: BFN JPM TITLE:
Job Performance Measure (JPM)  1  SITE: BFN JPM TITLE:
EHC Auto Cooldown JPM NUMBER:
EHC Auto Cooldown JPM NUMBER:
276 U2 REVISION:
276 U2 REVISION: 1  TASK APPLICABILITY:
1  TASK APPLICABILITY:
SRO STA UO NAUO TASK NUMBER / TASK TITLE(S):
SRO STA UO NAUO TASK NUMBER / TASK TITLE(S):
U-000-NO-32 Perform Reactor Cooldown U-000-NO-34 Perform a Reactor Cooldown from Hot Standby Conditions K/A RATINGS:
U-000-NO-32 Perform Reactor Cooldown U-000-NO-34 Perform a Reactor Cooldown from Hot Standby Conditions K/A RATINGS:
Line 3,573: Line 3,145:
Risk Significant SAFETY FUNCTION:
Risk Significant SAFETY FUNCTION:
4  EVALUATION LOCATION:
4  EVALUATION LOCATION:
In-Plant  Simulator Control Room Lab  Other - List  APPLICABLE METHOD OF TESTING:  Discussion  Simulate/Walkthrough  Perform TIME FOR COMPLETION:      NA      TIME CRITICAL (Y/N)      ALTERNATE PATH (Y/N)
In-Plant  Simulator Control R oom Lab  Other - List  APPLICABLE METHOD OF TESTING:  Discussion  Simulate/Walkthrough  Perform   TIME FOR COMPLETION:      NA      TIME CRITICAL (Y/N)      ALTERNATE PATH (Y/N)
Developed by:
Developed by:
Developer Date  (Ensure validator is briefed on exam security per NPG
Developer Date  (Ensure validator is briefed on exam security per NPG
-SPP-17.8.1)                (See JPM Validation Checklist in NPG
-SPP-17.8.1)                (See JPM Validation Checklist in NPG
-SPP-17.8.2)      Validated by:
-SPP-17.8.2)      Validated by:
Approved by:
Approved by:
Validator Date  Approved by:
Validator   Date  Approved by:
Site Training Management Date  Site Training Program Owner Date      N N Job Performance Measure (JPM)  2  OPERATOR:  ________________________________
Site Training Management Date  Site Training Program Owner Date      N N Job Performance Measure (JPM)  2  OPERATOR:  ________________________________
JPM Number:  _276 U2  RO  SRO  DATE: _______
JPM Number:  _276 U2  RO  SRO  DATE: _______
Line 3,603: Line 3,175:
SIGNATURE: ___________________________
SIGNATURE: ___________________________
DATE: __________
DATE: __________
EXAMINER Job Performance Measure (JPM)  3  Revision Summary Rev No. Effective Date Pages Affected Description 0 06/19/12 All Initial issue 1 07/22/15 All General revision & re
EXAMINER Job Performance Measure (JPM)  3  Revision Summary Rev No. Effective Date Pages Affected Description 0 06/1 9/12 All Initial issue 1 07/22/15 All General revision & re
-format Job Performance Measure (JPM)  4  SIMULATOR SETUP IC 40 Exam IC 281    Console Operator Instructions Reset IC 40 or Exam IC if written in above Ensure RFP is in Manual on PDS controller with plant parameters stable.      Malfunctions Description Event Severity Delay Initial set            Remotes Description Event Severity Delay Initial set            Overrides Description Event Severity Delay Initial set Schedule File(s):
-format Job Performance Measure (JPM)  4  SIMULATOR SETUP IC 40 Exam IC 281    Console Operator Instructions Reset IC 40 or Exam IC if written in above Ensure RFP is in Manual on PDS controller with plant parameters stable.      Malfunctions Description Event Severity Delay Initial set            Remotes Description Event Severity Delay Initial set            Overrides Description Event Severity Delay Initial set Schedule File(s): None   
None   


Job Performance Measure (JPM)  5  IN-SIMULATOR:  I will explain the initial conditions and state the task to be performed. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's Correct".  (OR "That's Incorrect", if applicable). When you have completed your assigned task, you will say, "my task is complete" and I will acknowledge that your task is complete.
Job Performance Measure (JPM)  5  IN-SIMULATOR:  I will explain the initial conditions and state the task to be performed. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's Correct".  (OR "That's Incorrect", if applicable). When you have completed your assigned task, you will say, "my task is complete" and I will acknowledge that your task is complete.
Line 3,619: Line 3,190:
-Generator System, Section 8.1.2, starting at step [6].
-Generator System, Section 8.1.2, starting at step [6].


Job Performance Measure (JPM)  6  START TIME
Job Performance Measure (JPM)  6  START TIME:    STEP / STANDARD SAT / UNSAT Step 1:    [6] VERIFY EHC is in Pressure Control using 2-HS-47-204. Standard:
:    STEP / STANDARD SAT / UNSAT Step 1:    [6] VERIFY EHC is in Pressure Control using 2-HS-47-204. Standard:
 
Observes light on for EHC Pressure Control on 2
Observes light on for EHC Pressure Control on 2
-HS-47-204. SAT UNSAT N/A Step 2:   
-HS-47-204. SAT UNSAT N/A Step 2:   
[7] On the EHC Work Station on Panel 9
[7] On the EHC Work Station on Panel 9
-7:  [7.1]    SELECT Main Menu from the toolbar at bottom of the screen.  [7.2]    SELECT Log In on Display Screen and ENTER "OPS"  for name and "OPS" for Password.  
-7:  [7.1]    SELECT Main Menu from the toolbar at bottom of the screen.  [7.2]    SELECT Log In on Display Screen and ENTER "OPS"  for name and "OPS" for Password.  
   [7.3]    SELECT Auto Cooldown from list of function on the screen. Standard:
   [7.3]    SELECT Auto Cooldown from list of function on the screen. Standard: Candidate logs into EHC workstation and selects Auto Cooldown from the list of functions on the screen. Critical Step SAT  UNSAT  N/A Step 3:     
Candidate logs into EHC workstation and selects Auto Cooldown from the list of functions on the screen. Critical Step SAT  UNSAT  N/A Step 3:     
[8] On the Auto Cooldown Display Screen
[8] On the Auto Cooldown Display Screen


Line 3,635: Line 3,203:
Rx Press Ctrl  
Rx Press Ctrl  
- indicates Reset.
- indicates Reset.
Standard:
Standard:   Candidate checks the Turbine Tripped or All Valves Closed  
Candidate checks the Turbine Tripped or All Valves Closed  


-indicates Reset.
-indicates Reset.
Line 3,642: Line 3,209:
- indicates Reset.
- indicates Reset.
SAT  UNSAT  N/A Job Performance Measure (JPM)  7  STEP / STANDARD SAT / UNSAT Step 4:    [9] On the Auto Cooldown Screen SET the desired Final Pressure for cooldown as follows:
SAT  UNSAT  N/A Job Performance Measure (JPM)  7  STEP / STANDARD SAT / UNSAT Step 4:    [9] On the Auto Cooldown Screen SET the desired Final Pressure for cooldown as follows:
   [9.1] SELECT the block above the "FINAL PRESSURE TARGET".  
   [9.1] SELECT the block above the "FINAL PRESSURE TARGET".  [9.2] ENTER the desired pressure using the Display Screen or Key Board.  
   [9.2] ENTER the desired pressure using the Display Screen or Key Board.  


[9.3] WHEN desired Pressure is entered SELECT "OK"  Standard:
[9.3] WHEN desired Pressure is entered SELECT "OK"  Standard: Candidate sets the desired final target pressure of 20psig (given in initial conditions).
Candidate sets the desired final target pressure of 20psig (given in initial conditions).
Critical Step SAT  UNSAT  N/A  Step 5:    [10] WHEN Cooldown is ready to commence, THEN   
Critical Step SAT  UNSAT  N/A  Step 5:    [10] WHEN Cooldown is ready to commence, THEN   
[10.1] VERIFY Reactor Pressure is stable and being controlled by EHC Pressure Control with at least one Bypass Valve opened. (Adjust setpoint as necessary)  
[10.1] VERIFY Reactor Pressure is stable and being controlled by EHC Pressure Control with at least one Bypass Valve opened. (Adjust setpoint as necessary)  
   [10.2] DEPRESS the "START" button on the Auto Cooldown Display Screen.
   [10.2] DEPRESS the "START" button on the Auto Cooldown Display Screen.
   [11] WHEN Caution "Are You Sure You Want to Initiate Auto Cooldown?" appears SELECT "Yes" Screen Button to start the cooldown.
   [11] WHEN Caution "Are You Sure You Want to Initiate Auto Cooldown?" appears SELECT "Yes" Screen Button to start the cooldown.
Standard:
Standard: Candidate depresses START and acknowledges "YES' to commence auto cooldown.
Candidate depresses START and acknowledges "YES' to commence auto cooldown.
Critical Step SAT  UNSAT  N/A Job Performance Measure (JPM)  8  STEP / STANDARD SAT / UNSAT Step 6:    [12] CHECK the following:
Critical Step SAT  UNSAT  N/A Job Performance Measure (JPM)  8  STEP / STANDARD SAT / UNSAT Step 6:    [12] CHECK the following:
EHC PRESSURE SETPOINT, 2
EHC PRESSURE SETPOINT, 2
-PI-47-162, is lowering.
-PI-47-162, is lowering.
EHC AUTO COOLDOWN displays "IN PROGRESS" Standard:
EHC AUTO COOLDOWN displays "IN PROGRESS" Standard: Candidate monitors EHC pressure and the auto cooldown is "IN PROGRESS".  
Candidate monitors EHC pressure and the auto cooldown is "IN PROGRESS".  


SAT  UNSAT  N/A Cue: The Unit Supervisor directs you to adjust the Final Pressure Target to 100 psig. Step 7:   
SAT  UNSAT  N/A Cue: The Unit Supervisor directs you to adjust the Final Pressure Target to 100 psig. Step 7:   
Line 3,663: Line 3,226:


[13.1] SELECT the block above the "FINAL PRESSURE TARGET"  [13.2] ENTER the desired pressure using the Display Screen or Key Board.  
[13.1] SELECT the block above the "FINAL PRESSURE TARGET"  [13.2] ENTER the desired pressure using the Display Screen or Key Board.  
   [13.3] WHEN desired Pressure is entered SELECT "OK"  Standard:
   [13.3] WHEN desired Pressure is entered SELECT "OK"  Standard: Candidate adjusts "FINAL PRESSURE TARGET" to 100 psig and recommences the auto cooldown.
Candidate adjusts "FINAL PRESSURE TARGET" to 100 psig and recommences the auto cooldown.
Critical Step SAT  UNSAT  N/A Evaluator Cue: Another operator will continue to monitor the cooldown. This completes your task.
Critical Step SAT  UNSAT  N/A Evaluator Cue: Another operator will continue to monitor the cooldown. This completes your task.
STOP TIME:       
STOP TIME:       
Line 3,687: Line 3,249:
Job Performance Measure (JPM)  1  SITE: BFN JPM TITLE:
Job Performance Measure (JPM)  1  SITE: BFN JPM TITLE:
EHC Auto Cooldown JPM NUMBER:
EHC Auto Cooldown JPM NUMBER:
276 U3 REVISION:
276 U 3 REVISION: 1  TASK APPLICABILITY:
1  TASK APPLICABILITY:
SRO STA UO NAUO TASK NUMBER / TASK TITLE(S):
SRO STA UO NAUO TASK NUMBER / TASK TITLE(S):
U-000-NO-32 Perform Reactor Cooldown U-000-NO-34 Perform a Reactor Cooldown from Hot Standby Conditions K/A RATINGS:
U-000-NO-32 Perform Reactor Cooldown U-000-NO-34 Perform a Reactor Cooldown from Hot Standby Conditions K/A RATINGS:
Line 3,695: Line 3,256:
Risk Significant SAFETY FUNCTION:
Risk Significant SAFETY FUNCTION:
4  EVALUATION LOCATION:
4  EVALUATION LOCATION:
In-Plant  Simulator Control Room Lab  Other - List  APPLICABLE METHOD OF TESTING:  Discussion  Simulate/Walkthrough  Perform TIME FOR COMPLETION:      NA      TIME CRITICAL (Y/N)      ALTERNATE PATH (Y/N)
In-Plant  Simulator Control R oom Lab  Other - List  APPLICABLE METHOD OF TESTING:  Discussion  Simulate/Walkthrough  Perform   TIME FOR COMPLETION:      NA      TIME CRITICAL (Y/N)      ALTERNATE PATH (Y/N)
Developed by:
Developed by:
Developer Date  (Ensure validator is briefed on exam security per NPG
Developer Date  (Ensure validator is briefed on exam security per NPG
-SPP-17.8.1)                (See JPM Validation Checklist in NPG
-SPP-17.8.1)                (See JPM Validation Checklist in NPG
-SPP-17.8.2)      Validated by:
-SPP-17.8.2)      Validated by:
Approved by:
Approved by:
Validator Date  Approved by:
Validator   Date  Approved by:
Site Training Management Date  Site Training Program Owner Date      N N Job Performance Measure (JPM)  2  OPERATOR:  ________________________________
Site Training Management Date  Site Training Program Owner Date      N N Job Performance Measure (JPM)  2  OPERATOR:  ________________________________
JPM Number:  _276 U3_  RO  SRO  DATE: _______
JPM Number:  _276 U3_  RO  SRO  DATE: _______
Line 3,725: Line 3,286:
SIGNATURE: ___________________________
SIGNATURE: ___________________________
DATE: __________
DATE: __________
EXAMINER Job Performance Measure (JPM)  3  Revision Summary Rev No. Effective Date Pages Affected Description 0 06/19/12 All Initial issue 1 07/22/15 All General revision & re
EXAMINER Job Performance Measure (JPM)  3  Revision Summary Rev No. Effective Date Pages Affected Description 0 06/1 9/12 All Initial issue 1 07/22/15 All General revision & re
-format Job Performance Measure (JPM)  4  SIMULATOR SETUP IC 40 Exam IC 281    Console Operator Instructions Reset IC 40 or Exam IC if written in above Ensure RFP is in Manual on PDS controller with plant parameters stable.      Malfunctions Description Event Severity Delay Initial set            Remotes Description Event Severity Delay Initial set            Overrides Description Event Severity Delay Initial set Schedule File(s):
-format Job Performance Measure (JPM)  4  SIMULATOR SETUP IC 40 Exam IC 281    Console Operator Instructions Reset IC 40 or Exam IC if written in above Ensure RFP is in Manual on PDS controller with plant parameters stable.      Malfunctions Description Event Severity Delay Initial set            Remotes Description Event Severity Delay Initial set            Overrides Description Event Severity Delay Initial set Schedule File(s): None   
None   


Job Performance Measure (JPM)  5  IN-SIMULATOR:  I will explain the initial conditions and state the task to be performed. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's Correct".  (OR "That's Incorrect", if applicable). When you have completed your assigned task, you will say, "my task is complete" and I will acknowledge that your task is complete.
Job Performance Measure (JPM)  5  IN-SIMULATOR:  I will explain the initial conditions and state the task to be performed. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's Correct".  (OR "That's Incorrect", if applicable). When you have completed your assigned task, you will say, "my task is complete" and I will acknowledge that your task is complete.
Line 3,733: Line 3,293:
INITIAL CONDITIONS:  
INITIAL CONDITIONS:  


You are an Operator on Unit 3
You are an Operator on Unit 3. The Plant has been shutdown in preparation for a refueling outage. The Main Turbine is tripped. Reactor Water Level is stable and under control. Reactor Pressure is stable and being controlled by bypass valves.
. The Plant has been shutdown in preparation for a refueling outage. The Main Turbine is tripped. Reactor Water Level is stable and under control. Reactor Pressure is stable and being controlled by bypass valves.
INITIATING CUES
INITIATING CUES
:
:
Line 3,740: Line 3,299:
-Generator System, Section 8.1.2, starting at step [6].
-Generator System, Section 8.1.2, starting at step [6].


Job Performance Measure (JPM)  6  START TIME
Job Performance Measure (JPM)  6  START TIME:    STEP / STANDARD SAT / UNSAT Step 1:    [6] VERIFY EHC is in Pressure Control using 3
:    STEP / STANDARD SAT / UNSAT Step 1:    [6] VERIFY EHC is in Pressure Control using 3
-HS-47-204. Standard:
-HS-47-204. Standard:
Observes light on for EHC Pressure Control on 3
Observes light on for EHC Pressure Control on 3
-HS-47-204. SAT  UNSAT  N/A Step 2:   
-HS-47-204. SAT  UNSAT  N/A Step 2:   
[7] On the EHC Work Station on Panel 9
[7] On the EHC Work Station on Panel 9
-7:  [7.1]    SELECT Main Menu from the toolbar at bottom of the screen.  [7.2]    SELECT Log In on Display Screen and ENTER "OPS"  for name and "OPS" for Password.  
-7:  [7.1]    SELECT Main Menu from the toolbar at bottom of the screen.  [7.2]    SELECT Log In on Display Screen and ENTER "OPS"  for name and "OPS" for Password.  
   [7.3]    SELECT Auto Cooldown from list of function on the screen. Standard:
   [7.3]    SELECT Auto Cooldown from list of function on the screen. Standard: Candidate logs into EHC workstation and selects Auto Cooldown from the list of functions on the screen.
Candidate logs into EHC workstation and selects Auto Cooldown from the list of functions on the screen.
Critical Step SAT  UNSAT  N/A Step 3:     
Critical Step SAT  UNSAT  N/A Step 3:     
[8] On the Auto Cooldown Display Screen
[8] On the Auto Cooldown Display Screen
Line 3,758: Line 3,314:
Rx Press Ctrl  
Rx Press Ctrl  
- indicates Reset.
- indicates Reset.
Standard:
Standard:   Candidate checks the Turbine Tripped or All Valves Closed  
Candidate checks the Turbine Tripped or All Valves Closed  


-indicates Reset.
-indicates Reset.
Line 3,765: Line 3,320:
- indicates Reset.
- indicates Reset.
SAT  UNSAT  N/A Job Performance Measure (JPM)  7  Step 4:    [9] On the Auto Cooldown Screen SET the desired Final Pressure for cooldown as follows:
SAT  UNSAT  N/A Job Performance Measure (JPM)  7  Step 4:    [9] On the Auto Cooldown Screen SET the desired Final Pressure for cooldown as follows:
   [9.1] SELECT the block above the "FINAL PRESSURE TARGET".  
   [9.1] SELECT the block above the "FINAL PRESSURE TARGET".  [9.2] ENTER the desired pressure using the Display Screen or Key Board.  
   [9.2] ENTER the desired pressure using the Display Screen or Key Board.  


[9.3] WHEN desired Pressure is entered SELECT "OK"  Standard:
[9.3] WHEN desired Pressure is entered SELECT "OK"  Standard: Candidate sets the desired final target pressure of 20psig (given in initial conditions).
Candidate sets the desired final target pressure of 20psig (given in initial conditions).
Critical Step SAT  UNSAT  N/A  Step 5:    [10] WHEN Cooldown is ready to commence, THEN   
Critical Step SAT  UNSAT  N/A  Step 5:    [10] WHEN Cooldown is ready to commence, THEN   
[10.1] VERIFY Reactor Pressure is stable and being controlled by EHC Pressure Control with at least one Bypass Valve opened. (Adjust setpoint as necessary)  
[10.1] VERIFY Reactor Pressure is stable and being controlled by EHC Pressure Control with at least one Bypass Valve opened. (Adjust setpoint as necessary)  
   [10.2] DEPRESS the "START" button on the Auto Cooldown Display Screen.
   [10.2] DEPRESS the "START" button on the Auto Cooldown Display Screen.
   [11] WHEN Caution "Are You Sure You Want to Initiate Auto Cooldown?" appears SELECT "Yes" Screen Button to start the cooldown.
   [11] WHEN Caution "Are You Sure You Want to Initiate Auto Cooldown?" appears SELECT "Yes" Screen Button to start the cooldown.
Standard:
Standard: Candidate depresses START and acknowledges "YES' to commence auto cooldown.
Candidate depresses START and acknowledges "YES' to commence auto cooldown.
Critical Step SAT  UNSAT  N/A Job Performance Measure (JPM)  8  Step 6:    [12] CHECK the following:
Critical Step SAT  UNSAT  N/A Job Performance Measure (JPM)  8  Step 6:    [12] CHECK the following:
EHC PRESSURE SETPOINT, 3
EHC PRESSURE SETPOINT, 3
-PI-47-162, is lowering.
-PI-47-162, is lowering.
EHC AUTO COOLDOWN displays "IN PROGRESS" Standard:
EHC AUTO COOLDOWN displays "IN PROGRESS" Standard: Candidate monitors EHC pressure and the auto cooldown is "IN PROGRESS".  
Candidate monitors EHC pressure and the auto cooldown is "IN PROGRESS".  


SAT  UNSAT  N/A Cue: The Unit Supervisor directs you to adjust the Final Pressure Target to 100 psig. Step 7:   
SAT  UNSAT  N/A Cue: The Unit Supervisor directs you to adjust the Final Pressure Target to 100 psig. Step 7:   
Line 3,786: Line 3,337:


[13.1] SELECT the block above the "FINAL PRESSURE TARGET"  [13.2] ENTER the desired pressure using the Display Screen or Key Board.  
[13.1] SELECT the block above the "FINAL PRESSURE TARGET"  [13.2] ENTER the desired pressure using the Display Screen or Key Board.  
   [13.3] WHEN desired Pressure is entered SELECT "OK"  Standard:
   [13.3] WHEN desired Pressure is entered SELECT "OK"  Standard: Candidate adjusts "FINAL PRESSURE TARGET" to 100 psig and recommences the auto cooldown.
Candidate adjusts "FINAL PRESSURE TARGET" to 100 psig and recommences the auto cooldown.
Critical Step SAT  UNSAT  N/A Evaluator Cue: Another operator will continue to monitor the cooldown. This completes your task.
Critical Step SAT  UNSAT  N/A Evaluator Cue: Another operator will continue to monitor the cooldown. This completes your task.
STOP TIME:       
STOP TIME:       
Line 3,799: Line 3,349:
INITIAL CONDITIONS:  
INITIAL CONDITIONS:  


You are an Operator on Unit 3
You are an Operator on Unit 3. The Plant has been shutdown in preparation for a refueling outage. The Main Turbine is tripped. Reactor Water Level is stable and under control. Reactor Pressure is stable and being controlled by bypass valves.   
. The Plant has been shutdown in preparation for a refueling outage. The Main Turbine is tripped. Reactor Water Level is stable and under control. Reactor Pressure is stable and being controlled by bypass valves.   


INITIATING CUES
INITIATING CUES
Line 3,808: Line 3,357:
Job Performance Measure (JPM)  1  SITE: BFN JPM TITLE:
Job Performance Measure (JPM)  1  SITE: BFN JPM TITLE:
LOSS OF REFERENCE APRM TO ROD BLOCK MONITOR JPM NUMBER:
LOSS OF REFERENCE APRM TO ROD BLOCK MONITOR JPM NUMBER:
672A U2 REVISION:
672A U2 REVISION: 0  TASK APPLICABILITY:
0  TASK APPLICABILITY:
SRO STA UO NAUO TASK NUMBER / TASK TITLE(S):
SRO STA UO NAUO TASK NUMBER / TASK TITLE(S):
U-085-AL-03 RESPOND TO CONTROL ROD WITHDRAWL BLOCK K/A RATINGS:
U-085-AL-03 RESPOND TO CONTROL ROD WITHDRAWL BLOCK K/A RATINGS:
Line 3,816: Line 3,364:
-3,4,5 RELATED PRA INFORMATION:
-3,4,5 RELATED PRA INFORMATION:
Risk Significant SAFETY FUNCTION:
Risk Significant SAFETY FUNCTION:
7  EVALUATION LOCATION:
7  EVALUATION LOCATION: In-Plant  Simulator Control R oom Lab  Other - List  APPLICABLE METHOD OF TESTING:  Discussion  Simulate/Walkthrough  Perform   TIME FOR COMPLETION:      NA      TIME CRITICAL (Y/N)
In-Plant  Simulator Control Room Lab  Other - List  APPLICABLE METHOD OF TESTING:  Discussion  Simulate/Walkthrough  Perform TIME FOR COMPLETION:      NA      TIME CRITICAL (Y/N)
ALTERNATE PATH (Y/N)
ALTERNATE PATH (Y/N)
Developed by:
Developed by:
Developer Date  (Ensure validator is briefed on exam security per NPG
Developer Date  (Ensure validator is briefed on exam security per NPG
-SPP-17.8.1)                (See JPM Validation Checklist in NPG
-SPP-17.8.1)                (See JPM Validation Checklist in NPG
-SPP-17.8.2)      Validated by:
-SPP-17.8.2)      Validated by:
Approved by:
Approved by:
Validator Date  Approved by:
Validator   Date  Approved by:
Site Training Management Date  Site Training Program Owner Date    N Y Job Performance Measure (JPM)  2  OPERATOR:  ________________________________
Site Training Management Date  Site Training Program Owner Date    N Y Job Performance Measure (JPM)  2  OPERATOR:  ________________________________
JPM Number:  _672A U2_  RO  SRO  DATE: _______
JPM Number:  _672A U2_  RO  SRO  DATE: _______
Line 3,851: Line 3,398:
EXAMINER Job Performance Measure (JPM)  3  Revision Summary Rev No. Effective Date Pages Affected Description 0 09/01/15 All Initial issue
EXAMINER Job Performance Measure (JPM)  3  Revision Summary Rev No. Effective Date Pages Affected Description 0 09/01/15 All Initial issue


Job Performance Measure (JPM)  4  SIMULATOR SETUP IC 39 Exam IC 282    Console Operator Instructions Reset  to IC-39 to ~ 30% Reactor Power  Open Schedule File: NRC JPM C U2  
Job Performance Measure (JPM)  4  SIMULATOR SETUP IC 39 Exam IC 282    Console Operator Instructions Reset  to IC-39 to ~ 3 0% Reactor Power  Open Schedule File: NRC JPM C U2  
-RBM APRM Fail Downscale.sch Open Event File: NRC JPM C U2  
-RBM APRM Fail Downscale.sch Open Event File: NRC JPM C U2  
-RBM APRM Fail Downscale.evt Malfunctions Description Event Severity Delay Initial set NM07L3233C LPRM AMPLIFIER FAILURE 32 C 15 0 N/A N/A NM07L4025B LPRM AMPLIFIER FAILURE 40 B 15 0 N/A N/A NM07L4033D LPRM AMPLIFIER FAILURE 40 D 15 0 N/A N/A NM07L0817B LPRM AMPLIFIER FAILURE 08 B 15 0 N/A N/A NM07L4017B LPRM AMPLIFIER FAILURE 40 B 15 0 N/A N/A NM07L4041D LPRM AMPLIFIER FAILURE 40 D 15 0 N/A N/A NM07L4049B LPRM AMPLIFIER FAILURE 40 B 15 0 N/A N/A NM07L4057B LPRM AMPLIFIER FAILURE 40 B 15 0 N/A N/A NM07L4817C LPRM AMPLIFIER FAILURE 48 C 15 0 N/A N/A NM07L4825C LPRM AMPLIFIER FAILURE 48 C 15 0 N/A N/A NM07L4833A LPRM AMPLIFIER FAILURE 48 A 15 0 N/A N/A NM07L4841A LPRM AMPLIFIER FAILURE 48 A 15 0 N/A N/A NM07L4849C LPRM AMPLIFIER FAILURE 48 C 15 0 N/A N/A NM07L0825B LPRM AMPLIFIER FAILURE 08 B 15 0 N/A N/A Job Performance Measure (JPM)  5  NM07L0833D LPRM AMPLIFIER FAILURE 08 D 15 0 N/A N/A NM07L0841D LPRM AMPLIFIER FAILURE 08 D 15 0 N/A N/A NM07L0849B LPRM AMPLIFIER FAILURE 08 B 15 0 N/A N/A NM07L2409B LPRM AMPLIFIER FAILURE 24 B 15 0 N/A N/A NM07L2417D LPRM AMPLIFIER FAILURE 24 D 15 0 N/A N/A NM07L2425D LPRM AMPLIFIER FAILURE 24 D 15 0 N/A N/A NM07L2433B LPRM AMPLIFIER FAILURE 24 B 15 0 N/A N/A NM07L2449D LPRM AMPLIFIER FAILURE 24 D 15 0 N/A N/A NM07L2457D LPRM AMPLIFIER FAILURE 24 D 15 0 N/A N/A NM07L1617C LPRM AMPLIFIER FAILURE 16 C 15 0 N/A N/A NM07L1625C LPRM AMPLIFIER FAILURE 16 C 15 0 N/A N/A NM07L1633A LPRM AMPLIFIER FAILURE 16 A 15 0 N/A N/A NM07L1641A LPRM AMPLIFIER FAILURE 16 A 15 0 N/A N/A NM07L1649C LPRM AMPLIFIER FAILURE 16 C 15 0 N/A N/A NM07L1657C LPRM AMPLIFIER FAILURE 16 C 15 0 N/A N/A NM07L1609A LPRM AMPLIFIER FAILURE 16 A 15 0 N/A N/A NM07L3209C LPRM AMPLIFIER FAILURE 32 C 15 0 N/A N/A NM07L3217A LPRM AMPLIFIER FAILURE 32 A 15 0 N/A N/A NM07L3225A LPRM AMPLIFIER FAILURE 32 A 15 0 N/A N/A NM07L3249A LPRM AMPLIFIER FAILURE 32 A 15 0 N/A N/A NM07L3257A LPRM AMPLIFIER FAILURE 32 A 15 0 N/A N/A NM07L4009D LPRM AMPLIFIER FAILURE 40 D 15 0 N/A N/A NM07L4809A LPRM AMPLIFIER 15 0 N/A N/A Job Performance Measure (JPM)  6  FAILURE 48 A NM07L5617D LPRM AMPLIFIER FAILURE 56 D 15 0 N/A N/A NM07L5633B LPRM AMPLIFIER FAILURE 56 B 15 0 N/A N/A NM07L5641B LPRM AMPLIFIER FAILURE 56 B 15 0 N/A N/A NM07L3241C LPRM AMPLIFIER FAILURE 32 C 15 0 N/A N/A            Remotes Description Event Severity Delay Initial set                  Overrides Description Event Severity Delay Initial set ZLO4631LGREENT(1)
-RBM APRM Fail Downscale.evt Malfunctions Description Event Severity Delay Initial set NM07L3233C LPRM AMPLIFIER FAILURE 32 C 15 0 N/A N/A NM07L4025B LPRM AMPLIFIER FAILURE 40 B 15 0 N/A N/A NM07L4033D LPRM AMPLIFIER FAILURE 40 D 15 0 N/A N/A NM07L0817B LPRM AMPLIFIER FAILURE 08 B 15 0 N/A N/A NM07L4017B LPRM AMPLIFIER FAILURE 40 B 15 0 N/A N/A NM07L4041D LPRM AMPLIFIER FAILURE 40 D 15 0 N/A N/A NM07L4049B LPRM AMPLIFIER FAILURE 40 B 15 0 N/A N/A NM07L4057B LPRM AMPLIFIER FAILURE 40 B 15 0 N/A N/A NM07L4817C LPRM AMPLIFIER FAILURE 48 C 15 0 N/A N/A NM07L4825C LPRM AMPLIFIER FAILURE 48 C 15 0 N/A N/A NM07L4833A LPRM AMPLIFIER FAILURE 48 A 15 0 N/A N/A NM07L4841A LPRM AMPLIFIER FAILURE 48 A 15 0 N/A N/A NM07L4849C LPRM AMPLIFIER FAILURE 48 C 15 0 N/A N/A NM07L0825B LPRM AMPLIFIER FAILURE 08 B 15 0 N/A N/A Job Performance Measure (JPM)  5  NM07L0833D LPRM AMPLIFIER FAILURE 08 D 15 0 N/A N/A NM07L0841D LPRM AMPLIFIER FAILURE 08 D 15 0 N/A N/A NM07L0849B LPRM AMPLIFIER FAILURE 08 B 15 0 N/A N/A NM07L2409B LPRM AMPLIFIER FAILURE 24 B 15 0 N/A N/A NM07L2417D LPRM AMPLIFIER FAILURE 24 D 15 0 N/A N/A NM07L2425D LPRM AMPLIFIER FAILURE 24 D 15 0 N/A N/A NM07L2433B LPRM AMPLIFIER FAILURE 24 B 15 0 N/A N/A NM07L2449D LPRM AMPLIFIER FAILURE 24 D 15 0 N/A N/A NM07L2457D LPRM AMPLIFIER FAILURE 24 D 15 0 N/A N/A NM07L1617C LPRM AMPLIFIER FAILURE 16 C 15 0 N/A N/A NM07L1625C LPRM AMPLIFIER FAILURE 16 C 15 0 N/A N/A NM07L1633A LPRM AMPLIFIER FAILURE 16 A 15 0 N/A N/A NM07L1641A LPRM AMPLIFIER FAILURE 16 A 15 0 N/A N/A NM07L1649C LPRM AMPLIFIER FAILURE 16 C 15 0 N/A N/A NM07L1657C LPRM AMPLIFIER FAILURE 16 C 15 0 N/A N/A NM07L1609A LPRM AMPLIFIER FAILURE 16 A 15 0 N/A N/A NM07L3209C LPRM AMPLIFIER FAILURE 32 C 15 0 N/A N/A NM07L3217A LPRM AMPLIFIER FAILURE 32 A 15 0 N/A N/A NM07L3225A LPRM AMPLIFIER FAILURE 32 A 15 0 N/A N/A NM07L3249A LPRM AMPLIFIER FAILURE 32 A 15 0 N/A N/A NM07L3257A LPRM AMPLIFIER FAILURE 32 A 15 0 N/A N/A NM07L4009D LPRM AMPLIFIER FAILURE 40 D 15 0 N/A N/A NM07L4809A LPRM AMPLIFIER 15 0 N/A N/A Job Performance Measure (JPM)  6  FAILURE 48 A NM07L5617D LPRM AMPLIFIER FAILURE 56 D 15 0 N/A N/A NM07L5633B LPRM AMPLIFIER FAILURE 56 B 15 0 N/A N/A NM07L5641B LPRM AMPLIFIER FAILURE 56 B 15 0 N/A N/A NM07L3241C LPRM AMPLIFIER FAILURE 32 C 15 0 N/A N/A            Remotes Description Event Severity Delay Initial set                  Overrides Description Event Severity Delay Initial set ZLO4631LGREENT(1)
Control Rod 46-31 GREEN INDICATION 15 0 N/A N/A              Schedule File(s):  
Control Rod 46-31 GREEN INDICATION 15 0 N/A N/A              Schedule File(s):
 
Event File: NRC JPM C U2  
Event File: NRC JPM C U2  
-RBM APRM Fail Downscale.evt; <TRIGGER id="15" description="APRM Ch 2 Fail Downscale">ZLO4631LGREENT(1) == 0</TRIGGER>
-RBM APRM Fail Downscale.evt; <TRIGGER id="15" description="APRM Ch 2 Fail Downscale">ZLO4631LGREENT(1) == 0</TRIGGER>
Line 3,873: Line 3,419:
-31.   
-31.   


Job Performance Measure (JPM)  8  START TIME
Job Performance Measure (JPM)  8  START TIME:    STEP / STANDARD SAT / UNSAT Step 1:    [1] SELECT the desired control rod by depressing the appropriate CRD ROD SELECT pushbutton, 2-XS-85-40. Standard:     Selects Control Rod by depressing CRD ROD SELECT pushbutton.
:    STEP / STANDARD SAT / UNSAT Step 1:    [1] SELECT the desired control rod by depressing the appropriate CRD ROD SELECT pushbutton, 2-XS-85-40. Standard:
Selects Control Rod by depressing CRD ROD SELECT pushbutton.
Critical Step
Critical Step


Line 3,883: Line 3,427:
-HS-85-23A. (Otherwise N/A)
-HS-85-23A. (Otherwise N/A)
Standard:
Standard:
Determines that step in N/A SAT UNSAT N/A Step 3:     
Determines that step in N/A SAT UNSAT N/A Step 3:     
[3] OBSERVE the following for the selected control rod:
[3] OBSERVE the following for the selected control rod:
CRD ROD SELECT pushbutton is brightly ILLUMINATED White light on the Full Core Display ILLUMINATED Rod Out Permit light ILLUMINATED Standard:
CRD ROD SELECT pushbutton is brightly ILLUMINATED White light on the Full Core Display ILLUMINATED Rod Out Permit light ILLUMINATED Standard:   VERIFIES  CRD ROD SELECT pushbutton is brightly ILLUMINATED White light on the Full Core Display ILLUMINATED Rod Out Permit light ILLUMINATED SAT UNSAT N/A Job Performance Measure (JPM)  9  STEP / STANDARD SAT / UNSAT Step 4:    [4] VERIFY Rod Worth Minimizer is operable and LATCHED into the correct ROD GROUP when the Rod Worth Minimizer is enforcing Standard: STEP is N/A due to Rod Block Monitor is Enforcing SAT UNSAT  N/A  Step 5:    [5] PLACE CRD CONTROL SWITCH, 2-HS-85-48, in ROD OUT NOTCH, and RELEASE.   
VERIFIES  CRD ROD SELECT pushbutton is brightly ILLUMINATED White light on the Full Core Display ILLUMINATED Rod Out Permit light ILLUMINATED SAT UNSAT N/A Job Performance Measure (JPM)  9  STEP / STANDARD SAT / UNSAT Step 4:    [4] VERIFY Rod Worth Minimizer is operable and LATCHED into the correct ROD GROUP when the Rod Worth Minimizer is enforcing Standard:
STEP is N/A due to Rod Block Monitor is Enforcing SAT UNSAT  N/A  Step 5:    [5] PLACE CRD CONTROL SWITCH, 2-HS-85-48, in ROD OUT NOTCH, and RELEASE.   
[6] OBSERVE the control rod settles into the desired position and the ROD SETTLE light extinguishes.
[6] OBSERVE the control rod settles into the desired position and the ROD SETTLE light extinguishes.
Standard:
Standard:
PLACED CRD CONTROL SWITCH, 2-85-48 in ROD OUT NOTCH position and RELEASED control switch to move Control Rod to Position 04 as indicated on Full Core Display. Critical Step
PLACED CRD CONTROL SWITCH, 2-85-48 in ROD OUT NOTCH position and RELEASED control switch to move Control Rod to Position 04 as indicated on Full Core Display. Critical Step


SAT UNSAT N/A  Note to Examiner: Step is repeated to get Control Rod to Position 04 Step 6:     
SAT UNSAT N/A  Note to Examiner: Step is repeated to get Control Rod to Position 04 Step 6:     
[1] SELECT the desired control rod by depressing the appropriate CRD ROD SELECT pushbutton, 2-XS-85-40. Standard:
[1] SELECT the desired control rod by depressing the appropriate CRD ROD SELECT pushbutton, 2-XS-85-40. Standard:     Selects Control Rod by depressing CRD ROD SELECT pushbutton.
Selects Control Rod by depressing CRD ROD SELECT pushbutton.
Critical Step
Critical Step


Line 3,903: Line 3,442:
-HS-85-23A. (Otherwise N/A)
-HS-85-23A. (Otherwise N/A)
Standard:
Standard:
Determines that step in N/A SAT  UNSAT  N/A Step 8:     
Determines that step in N/A SAT  UNSAT  N/A Step 8:     
[3] OBSERVE the following for the selected control rod:
[3] OBSERVE the following for the selected control rod:
CRD ROD SELECT pushbutton is brightly ILLUMINATED White light on the Full Core Display ILLUMINATED Rod Out Permit light ILLUMINATED Standard:
CRD ROD SELECT pushbutton is brightly ILLUMINATED White light on the Full Core Display ILLUMINATED Rod Out Permit light ILLUMINATED Standard:   VERIFIES  CRD ROD SELECT pushbutton is brightly ILLUMINATED White light on the Full Core Display ILLUMINATED Rod Out Permit light ILLUMINATED SAT UNSAT N/A  Step 9:     
VERIFIES  CRD ROD SELECT pushbutton is brightly ILLUMINATED White light on the Full Core Display ILLUMINATED Rod Out Permit light ILLUMINATED SAT UNSAT N/A  Step 9:     
[4] VERIFY Rod Worth Minimizer is operable and LATCHED into the correct ROD GROUP when the Rod Worth Minimizer is enforcing Standard: STEP is N/A due to Rod Block Monitor is Enforcing SAT UNSAT  N/A Job Performance Measure (JPM)  11  STEP / STANDARD SAT / UNSAT Step 10:    [5] PLACE CRD CONTROL SWITCH, 2-HS-85-48, in ROD OUT NOTCH, and RELEASE.   
[4] VERIFY Rod Worth Minimizer is operable and LATCHED into the correct ROD GROUP when the Rod Worth Minimizer is enforcing Standard:
STEP is N/A due to Rod Block Monitor is Enforcing SAT UNSAT  N/A Job Performance Measure (JPM)  11  STEP / STANDARD SAT / UNSAT Step 10:    [5] PLACE CRD CONTROL SWITCH, 2-HS-85-48, in ROD OUT NOTCH, and RELEASE.   
[6] OBSERVE the control rod settles into the desired position and the ROD SETTLE light extinguishes.
[6] OBSERVE the control rod settles into the desired position and the ROD SETTLE light extinguishes.
Standard:
Standard:
PLACED CRD CONTROL SWITCH, 2-85-48 in ROD OUT NOTCH position and RELEASED control switch to move Control Rod to Position 04 as indicated on Full Core Display
PLACED CRD CONTROL SWITCH, 2-85-48 in ROD OUT NOTCH position and RELEASED control switch to move Control Rod to Position 04 as indicated on Full Core Display
. Critical Step
. Critical Step


SAT UNSAT N/A  Note to Examiner: Step is repeated to get Control Rod to Position 04 Step 11:     
SAT UNSAT N/A  Note to Examiner: Step is repeated to get Control Rod to Position 04 Step 11:     
[1] SELECT the desired control rod by depressing the appropriate CRD ROD SELECT pushbutton, 2-XS-85-40. Standard:
[1] SELECT the desired control rod by depressing the appropriate CRD ROD SELECT pushbutton, 2-XS-85-40. Standard:     Selects Control Rod by depressing CRD ROD SELECT pushbutton.
Selects Control Rod by depressing CRD ROD SELECT pushbutton.
Critical Step
Critical Step


SAT UNSAT N/A  Step 12:     
SAT UNSAT N/A  Step 1 2:     
[2] IF selected control rod has been identified as a "fast notching" control rod by engineering, THEN  THROTTLE OPEN 2
[2] IF selected control rod has been identified as a "fast notching" control rod by engineering, THEN  THROTTLE OPEN 2
-PCV-085-0023 CRD, CRD DRIVE WATER PRESS CONTROL VLV, to as low as 180 psid using 2
-PCV-085-0023 CRD, CRD DRIVE WATER PRESS CONTROL VLV, to as low as 180 psid using 2
-HS-85-23A. (Otherwise N/A)
-HS-85-23A. (Otherwise N/A)
Standard:
Standard:
 
Determines that step in N/A SAT  UNSAT  N/A Job Performance Measure (JPM)  12  STEP / STANDARD SAT / UNSAT Step 1 3:    [3] OBSERVE the following for the selected control rod:
Determines that step in N/A SAT  UNSAT  N/A Job Performance Measure (JPM)  12  STEP / STANDARD SAT / UNSAT Step 13:    [3] OBSERVE the following for the selected control rod:
CRD ROD SELECT pushbutton is brightly ILLUMINATED White light on the Full Core Display ILLUMINATED Rod Out Permit light ILLUMINATED Standard:   VERIFIES  CRD ROD SELECT pushbutton is brightly ILLUMINATED White light on the Full Core Display ILLUMINATED Rod Out Permit light ILLUMINATED SAT UNSAT N/A  Step 1 4:     
CRD ROD SELECT pushbutton is brightly ILLUMINATED White light on the Full Core Display ILLUMINATED Rod Out Permit light ILLUMINATED Standard:
[4] VERIFY Rod Worth Minimizer is operable and LATCHED into the correct ROD GROUP when the Rod Worth Minimizer is enforcing Standard: STEP is N/A due to Rod Block Monitor is Enforcing SAT UNSAT N/A  Step 1 5:     
VERIFIES  CRD ROD SELECT pushbutton is brightly ILLUMINATED White light on the Full Core Display ILLUMINATED Rod Out Permit light ILLUMINATED SAT UNSAT N/A  Step 14:     
[4] VERIFY Rod Worth Minimizer is operable and LATCHED into the correct ROD GROUP when the Rod Worth Minimizer is enforcing Standard:
STEP is N/A due to Rod Block Monitor is Enforcing SAT UNSAT N/A  Step 15:     
[5] PLACE CRD CONTROL SWITCH, 2-HS-85-48, in ROD OUT NOTCH, and RELEASE.   
[5] PLACE CRD CONTROL SWITCH, 2-HS-85-48, in ROD OUT NOTCH, and RELEASE.   
[6] OBSERVE the control rod settles into the desired position and the ROD SETTLE light extinguishes.
[6] OBSERVE the control rod settles into the desired position and the ROD SETTLE light extinguishes.
Standard:
Standard:
PLACED CRD CONTROL SWITCH, 2-85-48 in ROD OUT NOTCH position and RELEASED control switch to move Control Rod to Position 04 as indicated on Full Core Display. Critical Step
PLACED CRD CONTROL SWITCH, 2-85-48 in ROD OUT NOTCH position and RELEASED control switch to move Control Rod to Position 04 as indicated on Full Core Display. Critical Step


Line 3,942: Line 3,472:
Job Performance Measure (JPM)  13  STEP / STANDARD SAT / UNSAT Note to Examiner:
Job Performance Measure (JPM)  13  STEP / STANDARD SAT / UNSAT Note to Examiner:
This begins the Alternate Path section of JPM Simulator Booth Operator:  Insert Event Trigger #1 to fail APRM 2 Downscale.
This begins the Alternate Path section of JPM Simulator Booth Operator:  Insert Event Trigger #1 to fail APRM 2 Downscale.
Step 16:                                                      Sensor/Trip Point:
Step 1 6:                                                      Sensor/Trip Point:
APRM Downscale: <=5%                                                    OPRM Inop:  Less than 23 operable cells
APRM Downscale: <=5%                                                    OPRM Inop:  Less than 23 operable cells


Line 3,950: Line 3,480:
C. Unit shutdown (Mode 3 or 4).
C. Unit shutdown (Mode 3 or 4).
D. Failed sensor.
D. Failed sensor.
Automatic
Automatic Action: A. Rod withdrawal block with Rx Mode Sw. in RUN.(APRM only)
 
Action: A. Rod withdrawal block with Rx Mode Sw. in RUN.(APRM only)
Operator Action: A. DETERMINE which APRM/OPRM channel is downscale/inop.
Operator Action: A. DETERMINE which APRM/OPRM channel is downscale/inop.
B. IF APRM failed downscale, THEN BYPASS channel. REFER TO 2-OI-92B.     
B. IF APRM failed downscale, THEN BYPASS channel. REFER TO 2-OI-92B.     
Line 3,959: Line 3,487:


SAT UNSAT N/A APRM DOWNSCALE/
SAT UNSAT N/A APRM DOWNSCALE/
OPRM INOP 4
OPRM INOP     4 Job Performance Measure (JPM)  14  STEP / STANDARD SAT / UNSAT Step 1 6(continued)
Job Performance Measure (JPM)  14  STEP / STANDARD SAT / UNSAT Step 16(continued)
Sensor/Trip Point:
Sensor/Trip Point:
Relays:
Relays:
3A-K1 Nuclear Instrumentation 3A-K2 Refuel Equipment in Use High Level in Scram Discharge Volume Scram Discharge Volume High Water Level Bypass Rx Mode Switch in SHUTDOWN PRNM (ANY APRM OPRM or RBM)  Sensor Location:
3 A-K1 Nuclear Instrumentation 3 A-K2 Refuel Equipment in Use High Level in Scram Discharge Volume Scram Discharge Volume High Water Level Bypass Rx Mode Switch in SHUTDOWN PRNM (ANY APRM OPRM or RBM)  Sensor Location:
Panel 2-9-28 Elevation 593' Aux Instr Room Probable Cause:  A. One or more sensors at or above set point.
Panel 2-9-28 Elevation 593' Aux Instr Room Probable Cause:  A. One or more sensors at or above set point.
B. Malfunction of sensor.
B. Malfunction of sensor.
C. Control rod drop accident Automatic Action: Rod withdrawal block Operator Action:  A. DETERMINE initiating condition from corresponding rod withdrawal block alarm(s) and REFER TO operator action for alarm(s).
C. Control rod drop accident Automatic Action: Rod withdrawal block Operator Action:  A. DETERMINE initiating condition from corresponding rod withdrawal block alarm(s) and REFER TO operator action for alarm(s). Standard:     Reference 2-ARP-9-5A and identifies APRM Ch 2 is down scale and proceeds to bypass APRM Ch 2 per 2-OI-92B  CUE: Respond as stated in Alarm Response Instruction and Bypass APRM Ch 2 per 3-OI-92B. CONTROL ROD WITHDRAWAL BLOCK    7 Job Performance Measure (JPM)  15  STEP / STANDARD SAT / UNSAT Step 1 7:     
Standard:
Reference 2-ARP-9-5A and identifies APRM Ch 2 is down scale and proceeds to bypass APRM Ch 2 per 2-OI-92B  CUE: Respond as stated in Alarm Response Instruction and Bypass APRM Ch 2 per 3-OI-92B. CONTROL ROD WITHDRAWAL BLOCK    7 Job Performance Measure (JPM)  15  STEP / STANDARD SAT / UNSAT Step 17:     


6.1 Bypassing APRM/OPRM Channel
6.1 Bypassing APRM/OPRM Channel
         [1] REVIEW all precautions and limitations. REFER TO Section 3.0.
         [1] REVIEW all precautions and limitations. REFER TO Section 3.0.
Standard:
Standard:   Demonstrates reviewing precautions and limitations section 3.0.
Demonstrates reviewing precautions and limitations section 3.0.
SAT  UNSAT N/A Step 1 8:     
SAT  UNSAT N/A Step 18:     
[2] PLACE APRM BYPASS, 2-HS-92-7B/S3, to desired channel to be bypassed.
[2] PLACE APRM BYPASS, 2-HS-92-7B/S3, to desired channel to be bypassed.
Standard:
Standard:   PLACE APRM BYPASS, 2-HS-92-7B/S3, to APRM CH 2 Critical Step
PLACE APRM BYPASS, 2-HS-92-7B/S3, to APRM CH 2 Critical Step


SAT UNSAT N/A NOTES 1) Only one APRM/OPRM in each trip system can be bypassed at a time. 2) All operations are performed on Panel 2 5 unless specifically stated otherwise.
SAT UNSAT N/A NOTES 1) Only one APRM/OPRM in each trip system can be bypassed at a time. 2) All operations are performed on Panel 2 5 unless specifically stated otherwise.
Line 3,984: Line 3,507:
-14 Voters are required to be illuminated prior to testing, operating, or working on that channel.
-14 Voters are required to be illuminated prior to testing, operating, or working on that channel.
CAUTION [QA/C] SPP-10.4 requires approval of the Plant Manager or his designee prior to any planned operation with APRMs bypassed unless bypassing is specifically allowed within approved procedures. [ISE-HPS-92-RO1]
CAUTION [QA/C] SPP-10.4 requires approval of the Plant Manager or his designee prior to any planned operation with APRMs bypassed unless bypassing is specifically allowed within approved procedures. [ISE-HPS-92-RO1]
Job Performance Measure (JPM)  16  STEP / STANDARD SAT / UNSAT Step 19:    [3] CHECK BLUE BYPASSED lights illuminated on Panel 2-9-14 Voters. Standard:
Job Performance Measure (JPM)  16  STEP / STANDARD SAT / UNSAT Step 1 9:    [3] CHECK BLUE BYPASSED lights illuminated on Panel 2-9-14 Voters. Standard:
 
Observes BLUE BYPASS light illuminated on Panel 2-9-14 for APRM CH 2. SAT UNSAT N/A Step 20:     
Observes BLUE BYPASS light illuminated on Panel 2-9-14 for APRM CH 2
. SAT UNSAT N/A Step 20:     
[4] VERIFY white bypass light on Panel 2-9-5 is illuminated.
[4] VERIFY white bypass light on Panel 2-9-5 is illuminated.
Standard:
Standard:   Observes WHITE BYPASS light illuminated on Panel 2-9-5. SAT  UNSAT N/A Note to Examiner: If needed, cue student to proceed with actions required to continue rod movements.
Observes WHITE BYPASS light illuminated on Panel 2-9-5. SAT  UNSAT N/A Note to Examiner: If needed, cue student to proceed with actions required to continue rod movements.
Student may continue at step 21 or 24.
Student may continue at step 21 or 24.
Step 21:
Step 2 1:
6.6.2 Actions Required During and Following Control Rod Withdrawal (continued)
6.6.2 Actions Required During and Following Control Rod Withdrawal (continued)
   [6] IF Control Rod movement was stopped to keep from exceeding a RBM setpoint or was caused by a RBM Rod Block, THEN  PERFORM the following at the Unit Supervisor's discretion to "REINITIALIZE" the RBM:   
   [6] IF Control Rod movement was stopped to keep from exceeding a RBM setpoint or was caused by a RBM Rod Block, THEN  PERFORM the following at the Unit Supervisor's discretion to "REINITIALIZE" the RBM:   
[6.1] PLACE CRD POWER, 2-HS-85-46 in the OFF position to deselect the Control Rod.
[6.1] PLACE CRD POWER, 2-HS-85-46 in the OFF position to deselect the Control Rod.
Standard:
Standard:   CRD POWER, 2-HS-85-46 in the OFF position. SAT UNSAT N/A Job Performance Measure (JPM)  17  STEP / STANDARD SAT / UNSAT Step 22:    [6.2] PLACE CRD POWER, 2-HS-85-46, in the ON position.
CRD POWER, 2-HS-85-46 in the OFF position
Standard:   PLACED CRD POWER, 2-HS-85-46, in the ON position.
. SAT UNSAT N/A Job Performance Measure (JPM)  17  STEP / STANDARD SAT / UNSAT Step 22:    [6.2] PLACE CRD POWER, 2-HS-85-46, in the ON position.
SAT  UNSAT N/A Step 2 3:     
Standard:
[6.3] IF desired, THEN CONTINUE to withdrawal Control Rods and PERFORM applicable section for Control Rod withdrawal.
PLACED CRD POWER, 2-HS-85-46, in the ON position.
Standard:   Continues with Control Rod Movement
SAT  UNSAT N/A Step 23:     
[6.3] IF desired, THEN CONTINUE to withdrawal Control Rods and PERFORM applicable section for Control Rod withdrawal.
Standard:
Continues with Control Rod Movement


SAT UNSAT  N/A CUE: Proceed with Control Rod Movement.
SAT UNSAT  N/A CUE: Proceed with Control Rod Movement.
Step 24:    [1] SELECT the desired control rod by depressing the appropriate CRD ROD SELECT pushbutton, 2-XS-85-40. Standard:
Step 2 4:    [1] SELECT the desired control rod by depressing the appropriate CRD ROD SELECT pushbutton, 2-XS-85-40. Standard:     Selects Control Rod by depressing CRD ROD SELECT pushbutton.
Selects Control Rod by depressing CRD ROD SELECT pushbutton.
Critical Step SAT UNSAT  N/A Job Performance Measure (JPM)  18  STEP / STANDARD SAT / UNSAT Step 2 5:    [2] IF selected control rod has been identified as a "fast notching" control rod by engineering, THEN  THROTTLE OPEN 2
Critical Step SAT UNSAT  N/A Job Performance Measure (JPM)  18  STEP / STANDARD SAT / UNSAT Step 25:    [2] IF selected control rod has been identified as a "fast notching" control rod by engineering, THEN  THROTTLE OPEN 2
-PCV-085-0023 CRD, CRD DRIVE WATER PRESS CONTROL VLV, to as low as 180 psid using 2
-PCV-085-0023 CRD, CRD DRIVE WATER PRESS CONTROL VLV, to as low as 180 psid using 2
-HS-85-23A. (Otherwise N/A)
-HS-85-23A. (Otherwise N/A)
Standard:
Standard:
 
Determines that step in N/A SAT  UNSAT  N/A Step 2 6:     
Determines that step in N/A SAT  UNSAT  N/A Step 26:     
[3] OBSERVE the following for the selected control rod:
[3] OBSERVE the following for the selected control rod:
CRD ROD SELECT pushbutton is brightly ILLUMINATED White light on the Full Core Display ILLUMINATED Rod Out Permit light ILLUMINATED Standard:
CRD ROD SELECT pushbutton is brightly ILLUMINATED White light on the Full Core Display ILLUMINATED Rod Out Permit light ILLUMINATED Standard: VERIFIES  CRD ROD SELECT pushbutton is brightly ILLUMINATED White light on the Full Core Display ILLUMINATED Rod Out Permit light ILLUMINATED SAT UNSAT N/A  Step 2 7:     
VERIFIES  CRD ROD SELECT pushbutton is brightly ILLUMINATED White light on the Full Core Display ILLUMINATED Rod Out Permit light ILLUMINATED SAT UNSAT N/A  Step 27:     
[4] VERIFY Rod Worth Minimizer is operable and LATCHED into the correct ROD GROUP when the Rod Worth Minimizer is enforcing Standard: STEP is N/A due to Rod Block Monitor is Enforcing SAT UNSAT  N/A Job Performance Measure (JPM)  19  STEP / STANDARD SAT / UNSAT Step 2 8:    [5] PLACE CRD CONTROL SWITCH, 2-HS-85-48, in ROD OUT NOTCH, and RELEASE.   
[4] VERIFY Rod Worth Minimizer is operable and LATCHED into the correct ROD GROUP when the Rod Worth Minimizer is enforcing Standard:
STEP is N/A due to Rod Block Monitor is Enforcing SAT UNSAT  N/A Job Performance Measure (JPM)  19  STEP / STANDARD SAT / UNSAT Step 28:    [5] PLACE CRD CONTROL SWITCH, 2-HS-85-48, in ROD OUT NOTCH, and RELEASE.   
[6] OBSERVE the control rod settles into the desired position and the ROD SETTLE light extinguishes.
[6] OBSERVE the control rod settles into the desired position and the ROD SETTLE light extinguishes.
Standard:
Standard:
PLACED CRD CONTROL SWITCH, 2-85-48 in ROD OUT NOTCH position and RELEASED control switch to move Control Rod to Position 04 as indicated on Full Core Display
PLACED CRD CONTROL SWITCH, 2-85-48 in ROD OUT NOTCH position and RELEASED control switch to move Control Rod to Position 04 as indicated on Full Core Display
. Critical Step
. Critical Step
Line 4,035: Line 3,546:
*******************************************************************************************************
*******************************************************************************************************


INITIAL CONDITIONS:  
INITIAL CONDITIONS:
 
You are an Operator on Unit  
You are an Operator on Unit  
: 2. The Reactor is at 30% power Startup Sequence Control Rod Movement Data Sheet 2
: 2. The Reactor is at 30% power Startup Sequence Control Rod Movement Data Sheet 2
Line 4,047: Line 3,557:
Job Performance Measure (JPM)  1  SITE: BFN JPM TITLE:
Job Performance Measure (JPM)  1  SITE: BFN JPM TITLE:
LOSS OF REFERENCE APRM TO ROD BLOCK MONITOR JPM NUMBER:
LOSS OF REFERENCE APRM TO ROD BLOCK MONITOR JPM NUMBER:
672A U3 REVISION:
672A U3 REVISION: 0  TASK APPLICABILITY:
0  TASK APPLICABILITY:
SRO STA UO NAUO TASK NUMBER / TASK TITLE(S):
SRO STA UO NAUO TASK NUMBER / TASK TITLE(S):
U-085-AL-03 RESPOND TO CONTROL ROD WITHDRAWL BLOCK K/A RATINGS:
U-085-AL-03 RESPOND TO CONTROL ROD WITHDRAWL BLOCK K/A RATINGS:
Line 4,055: Line 3,564:
-3,4,5 RELATED PRA INFORMATION:
-3,4,5 RELATED PRA INFORMATION:
Risk Significant SAFETY FUNCTION:
Risk Significant SAFETY FUNCTION:
7  EVALUATION LOCATION:
7  EVALUATION LOCATION: In-Plant  Simulator Control R oom Lab  Other - List  APPLICABLE METHOD OF TESTING:  Discussion  Simulate/Walkthrough  Perform   TIME FOR COMPLETION:      NA      TIME CRITICAL (Y/N)      ALTERNATE PATH (Y/N)
In-Plant  Simulator Control Room Lab  Other - List  APPLICABLE METHOD OF TESTING:  Discussion  Simulate/Walkthrough  Perform TIME FOR COMPLETION:      NA      TIME CRITICAL (Y/N)      ALTERNATE PATH (Y/N)
Developed by:
Developed by:
Developer Date  (Ensure validator is briefed on exam security per NPG
Developer Date  (Ensure validator is briefed on exam security per NPG
-SPP-17.8.1)                (See JPM Validation Checklist in NPG
-SPP-17.8.1)                (See JPM Validation Checklist in NPG
-SPP-17.8.2)      Validated by:
-SPP-17.8.2)      Validated by:
Approved by:
Approved by:
Validator Date  Approved by:
Validator   Date  Approved by:
Site Training Management Date  Site Training Program Owner Date    N Y Job Performance Measure (JPM)  2  OPERATOR:  ________________________________
Site Training Management Date  Site Training Program Owner Date    N Y Job Performance Measure (JPM)  2  OPERATOR:  ________________________________
JPM Number:  _672A U3_  RO  SRO  DATE: _______
JPM Number:  _672A U3_  RO  SRO  DATE: _______
Line 4,089: Line 3,597:
EXAMINER Job Performance Measure (JPM)  3  Revision Summary Rev No. Effective Date Pages Affected Description 0 04/30/15 All Initial issue
EXAMINER Job Performance Measure (JPM)  3  Revision Summary Rev No. Effective Date Pages Affected Description 0 04/30/15 All Initial issue


Job Performance Measure (JPM)  4  SIMULATOR SETUP IC 39 Exam IC 282      Console Operator Instructions Reset IC-39to ~ 30% Reactor Power Open Schedule File: NRC JPM C U3  
Job Performance Measure (JPM)  4  SIMULATOR SETUP IC 39 Exam IC 282      Console Operator Instructions Reset IC-39to ~ 3 0% Reactor Power Open Schedule File: NRC JPM C U3  
-RBM APRM Fail Downscale.sch Open Event File: NRC JPM C U3  
-RBM APRM Fail Downscale.sch Open Event File: NRC JPM C U3  
-RBM APRM Fail Downscale.evt Malfunctions Description Event Severity Delay Initial set NM07L3233C LPRM AMPLIFIER FAILURE 32 C 15 0 N/A N/A NM07L4025B LPRM AMPLIFIER FAILURE 40 B 15 0 N/A N/A NM07L4033D LPRM AMPLIFIER FAILURE 40 D 15 0 N/A N/A NM07L0817B LPRM AMPLIFIER FAILURE 08 B 15 0 N/A N/A NM07L4017B LPRM AMPLIFIER FAILURE 40 B 15 0 N/A N/A NM07L4041D LPRM AMPLIFIER FAILURE 40 D 15 0 N/A N/A NM07L4049B LPRM AMPLIFIER FAILURE 40 B 15 0 N/A N/A NM07L4057B LPRM AMPLIFIER FAILURE 40 B 15 0 N/A N/A NM07L4817C LPRM AMPLIFIER FAILURE 48 C 15 0 N/A N/A NM07L4825C LPRM AMPLIFIER FAILURE 48 C 15 0 N/A N/A NM07L4833A LPRM AMPLIFIER FAILURE 48 A 15 0 N/A N/A NM07L4841A LPRM AMPLIFIER FAILURE 48 A 15 0 N/A N/A NM07L4849C LPRM AMPLIFIER FAILURE 48 C 15 0 N/A N/A NM07L0825B LPRM AMPLIFIER FAILURE 08 B 15 0 N/A N/A Job Performance Measure (JPM)  5  NM07L0833D LPRM AMPLIFIER FAILURE 08 D 15 0 N/A N/A NM07L0841D LPRM AMPLIFIER FAILURE 08 D 15 0 N/A N/A NM07L0849B LPRM AMPLIFIER FAILURE 08 B 15 0 N/A N/A NM07L2409B LPRM AMPLIFIER FAILURE 24 B 15 0 N/A N/A NM07L2417D LPRM AMPLIFIER FAILURE 24 D 15 0 N/A N/A NM07L2425D LPRM AMPLIFIER FAILURE 24 D 15 0 N/A N/A NM07L2433B LPRM AMPLIFIER FAILURE 24 B 15 0 N/A N/A NM07L2449D LPRM AMPLIFIER FAILURE 24 D 15 0 N/A N/A NM07L2457D LPRM AMPLIFIER FAILURE 24 D 15 0 N/A N/A NM07L1617C LPRM AMPLIFIER FAILURE 16 C 15 0 N/A N/A NM07L1625C LPRM AMPLIFIER FAILURE 16 C 15 0 N/A N/A NM07L1633A LPRM AMPLIFIER FAILURE 16 A 15 0 N/A N/A NM07L1641A LPRM AMPLIFIER FAILURE 16 A 15 0 N/A N/A NM07L1649C LPRM AMPLIFIER FAILURE 16 C 15 0 N/A N/A NM07L1657C LPRM AMPLIFIER FAILURE 16 C 15 0 N/A N/A NM07L1609A LPRM AMPLIFIER FAILURE 16 A 15 0 N/A N/A NM07L3209C LPRM AMPLIFIER FAILURE 32 C 15 0 N/A N/A NM07L3217A LPRM AMPLIFIER FAILURE 32 A 15 0 N/A N/A NM07L3225A LPRM AMPLIFIER FAILURE 32 A 15 0 N/A N/A NM07L3249A LPRM AMPLIFIER FAILURE 32 A 15 0 N/A N/A NM07L3257A LPRM AMPLIFIER FAILURE 32 A 15 0 N/A N/A NM07L4009D LPRM AMPLIFIER FAILURE 40 D 15 0 N/A N/A NM07L4809A LPRM AMPLIFIER 15 0 N/A N/A Job Performance Measure (JPM)  6  FAILURE 48 A NM07L5617D LPRM AMPLIFIER FAILURE 56 D 15 0 N/A N/A NM07L5633B LPRM AMPLIFIER FAILURE 56 B 15 0 N/A N/A NM07L5641B LPRM AMPLIFIER FAILURE 56 B 15 0 N/A N/A NM07L3241C LPRM AMPLIFIER FAILURE 32 C 15 0 N/A N/A                  Remotes Description Event Severity Delay Initial set                  Overrides Description Event Severity Delay Initial set ZLO4631LGREENT(1)
-RBM APRM Fail Downscale.evt Malfunctions Description Event Severity Delay Initial set NM07L3233C LPRM AMPLIFIER FAILURE 32 C 15 0 N/A N/A NM07L4025B LPRM AMPLIFIER FAILURE 40 B 15 0 N/A N/A NM07L4033D LPRM AMPLIFIER FAILURE 40 D 15 0 N/A N/A NM07L0817B LPRM AMPLIFIER FAILURE 08 B 15 0 N/A N/A NM07L4017B LPRM AMPLIFIER FAILURE 40 B 15 0 N/A N/A NM07L4041D LPRM AMPLIFIER FAILURE 40 D 15 0 N/A N/A NM07L4049B LPRM AMPLIFIER FAILURE 40 B 15 0 N/A N/A NM07L4057B LPRM AMPLIFIER FAILURE 40 B 15 0 N/A N/A NM07L4817C LPRM AMPLIFIER FAILURE 48 C 15 0 N/A N/A NM07L4825C LPRM AMPLIFIER FAILURE 48 C 15 0 N/A N/A NM07L4833A LPRM AMPLIFIER FAILURE 48 A 15 0 N/A N/A NM07L4841A LPRM AMPLIFIER FAILURE 48 A 15 0 N/A N/A NM07L4849C LPRM AMPLIFIER FAILURE 48 C 15 0 N/A N/A NM07L0825B LPRM AMPLIFIER FAILURE 08 B 15 0 N/A N/A Job Performance Measure (JPM)  5  NM07L0833D LPRM AMPLIFIER FAILURE 08 D 15 0 N/A N/A NM07L0841D LPRM AMPLIFIER FAILURE 08 D 15 0 N/A N/A NM07L0849B LPRM AMPLIFIER FAILURE 08 B 15 0 N/A N/A NM07L2409B LPRM AMPLIFIER FAILURE 24 B 15 0 N/A N/A NM07L2417D LPRM AMPLIFIER FAILURE 24 D 15 0 N/A N/A NM07L2425D LPRM AMPLIFIER FAILURE 24 D 15 0 N/A N/A NM07L2433B LPRM AMPLIFIER FAILURE 24 B 15 0 N/A N/A NM07L2449D LPRM AMPLIFIER FAILURE 24 D 15 0 N/A N/A NM07L2457D LPRM AMPLIFIER FAILURE 24 D 15 0 N/A N/A NM07L1617C LPRM AMPLIFIER FAILURE 16 C 15 0 N/A N/A NM07L1625C LPRM AMPLIFIER FAILURE 16 C 15 0 N/A N/A NM07L1633A LPRM AMPLIFIER FAILURE 16 A 15 0 N/A N/A NM07L1641A LPRM AMPLIFIER FAILURE 16 A 15 0 N/A N/A NM07L1649C LPRM AMPLIFIER FAILURE 16 C 15 0 N/A N/A NM07L1657C LPRM AMPLIFIER FAILURE 16 C 15 0 N/A N/A NM07L1609A LPRM AMPLIFIER FAILURE 16 A 15 0 N/A N/A NM07L3209C LPRM AMPLIFIER FAILURE 32 C 15 0 N/A N/A NM07L3217A LPRM AMPLIFIER FAILURE 32 A 15 0 N/A N/A NM07L3225A LPRM AMPLIFIER FAILURE 32 A 15 0 N/A N/A NM07L3249A LPRM AMPLIFIER FAILURE 32 A 15 0 N/A N/A NM07L3257A LPRM AMPLIFIER FAILURE 32 A 15 0 N/A N/A NM07L4009D LPRM AMPLIFIER FAILURE 40 D 15 0 N/A N/A NM07L4809A LPRM AMPLIFIER 15 0 N/A N/A Job Performance Measure (JPM)  6  FAILURE 48 A NM07L5617D LPRM AMPLIFIER FAILURE 56 D 15 0 N/A N/A NM07L5633B LPRM AMPLIFIER FAILURE 56 B 15 0 N/A N/A NM07L5641B LPRM AMPLIFIER FAILURE 56 B 15 0 N/A N/A NM07L3241C LPRM AMPLIFIER FAILURE 32 C 15 0 N/A N/A                  Remotes Description Event Severity Delay Initial set                  Overrides Description Event Severity Delay Initial set ZLO4631LGREENT(1)
Control Rod 46
Control Rod 46
-31 GREEN INDICATION 15 0 N/A N/A        Schedule File(s):  
-31 GREEN INDICATION 15 0 N/A N/A        Schedule File(s):
 
Event File: NRC JPM C U3  
Event File: NRC JPM C U3  
-RBM APRM Fail Downscale.evt; <TRIGGER id="15" description="APRM Ch 2 Fail Downscale">ZLO4631LGREENT(1) == 0</TRIGGER>
-RBM APRM Fail Downscale.evt; <TRIGGER id="15" description="APRM Ch 2 Fail Downscale">ZLO4631LGREENT(1) == 0</TRIGGER>
Line 4,112: Line 3,619:
-SR-3.1.3.5(A) in preparation for placing Feedwater Heaters and Moisture Separator Drain System in service. Start on Group 59; Control Rod 22
-SR-3.1.3.5(A) in preparation for placing Feedwater Heaters and Moisture Separator Drain System in service. Start on Group 59; Control Rod 22
-39.
-39.
Job Performance Measure (JPM)  8  START TIME
Job Performance Measure (JPM)  8  START TIME:    STEP / STANDARD SAT / UNSAT Step 1:    [1] SELECT the desired control rod by depressing the appropriate CRD ROD SELECT pushbutton, 3
:    STEP / STANDARD SAT / UNSAT Step 1:    [1] SELECT the desired control rod by depressing the appropriate CRD ROD SELECT pushbutton, 3
-XS-85-40. Standard:   Selects Control Rod by depressing CRD ROD SELECT pushbutton.
-XS-85-40. Standard:
Selects Control Rod by depressing CRD ROD SELECT pushbutton.
Critical Step
Critical Step


SAT UNSAT N/A  Step 2:     
SAT UNSAT N/A  Step 2:     
[2] OBSERVE the following for the selected control rod:
[2] OBSERVE the following for the selected control rod:
CRD ROD SELECT pushbutton is brightly ILLUMINATED White light on the Full Core Display ILLUMINATED Rod Out Permit light ILLUMINATED Standard:
CRD ROD SELECT pushbutton is brightly ILLUMINATED White light on the Full Core Display ILLUMINATED Rod Out Permit light ILLUMINATED Standard:   VERIFIES  CRD ROD SELECT pushbutton is brightly ILLUMINATED White light on the Full Core Display ILLUMINATED Rod Out Permit light ILLUMINATED SAT UNSAT N/A  Step 3:     
VERIFIES  CRD ROD SELECT pushbutton is brightly ILLUMINATED White light on the Full Core Display ILLUMINATED Rod Out Permit light ILLUMINATED SAT UNSAT N/A  Step 3:     
[3] VERIFY Rod Worth Minimizer is operable and LATCHED into the correct ROD GROUP when the Rod Worth Minimizer is enforcing Standard: STEP is N/A due to Rod Block Monitor is Enforcing SAT UNSAT  N/A Job Performance Measure (JPM)  9  STEP / STANDARD SAT / UNSAT Step 4:    [4] PLACE CRD CONTROL SWITCH, 3
[3] VERIFY Rod Worth Minimizer is operable and LATCHED into the correct ROD GROUP when the Rod Worth Minimizer is enforcing Standard:
STEP is N/A due to Rod Block Monitor is Enforcing SAT UNSAT  N/A Job Performance Measure (JPM)  9  STEP / STANDARD SAT / UNSAT Step 4:    [4] PLACE CRD CONTROL SWITCH, 3
-HS-85-48, in ROD OUT NOTCH, and RELEASE.   
-HS-85-48, in ROD OUT NOTCH, and RELEASE.   
[5] OBSERVE the control rod settles into the desired position and the ROD SETTLE light extinguishes.
[5] OBSERVE the control rod settles into the desired position and the ROD SETTLE light extinguishes.
Standard:
Standard:
PLACED CRD CONTROL SWITCH, 3 48 in ROD OUT NOTCH position and RELEASED control switch to move Control Rod to Position 04 as indicated on Full Core Display
PLACED CRD CONTROL SWITCH, 3 48 in ROD OUT NOTCH position and RELEASED control switch to move Control Rod to Position 04 as indicated on Full Core Display
. Critical Step
. Critical Step
Line 4,133: Line 3,635:
SAT UNSAT N/A  Note to Examiner: Step is repeated to get Control Rod to Position 04 Step 5:     
SAT UNSAT N/A  Note to Examiner: Step is repeated to get Control Rod to Position 04 Step 5:     
[1] SELECT the desired control rod by depressing the appropriate CRD ROD SELECT pushbutton, 3
[1] SELECT the desired control rod by depressing the appropriate CRD ROD SELECT pushbutton, 3
-XS-85-40. Standard:
-XS-85-40. Standard:   Selects Control Rod by depressing CRD ROD SELECT pushbutton.
Selects Control Rod by depressing CRD ROD SELECT pushbutton.
Critical Step
Critical Step


SAT UNSAT N/A  Step 6:     
SAT UNSAT N/A  Step 6:     
[2] OBSERVE the following for the selected control rod:
[2] OBSERVE the following for the selected control rod:
CRD ROD SELECT pushbutton is brightly ILLUMINATED White light on the Full Core Display ILLUMINATED Rod Out Permit light ILLUMINATED Standard:
CRD ROD SELECT pushbutton is brightly ILLUMINATED White light on the Full Core Display ILLUMINATED Rod Out Permit light ILLUMINATED Standard:   VERIFIES  CRD ROD SELECT pushbutton is brightly ILLUMINATED White light on the Full Core Display ILLUMINATED Rod Out Permit light ILLUMINATED SAT UNSAT N/A Job Performance Measure (JPM)  10  STEP / STANDARD SAT / UNSAT Step 7:    [3] VERIFY Rod Worth Minimizer is operable and LATCHED into the correct ROD GROUP when the Rod Worth Minimizer is enforcing Standard: STEP is N/A due to Rod Block Monitor is Enforcing SAT UNSAT  N/A  Step 8:    [4] PLACE CRD CONTROL SWITCH, 3
VERIFIES  CRD ROD SELECT pushbutton is brightly ILLUMINATED White light on the Full Core Display ILLUMINATED Rod Out Permit light ILLUMINATED SAT UNSAT N/A Job Performance Measure (JPM)  10  STEP / STANDARD SAT / UNSAT Step 7:    [3] VERIFY Rod Worth Minimizer is operable and LATCHED into the correct ROD GROUP when the Rod Worth Minimizer is enforcing Standard:
STEP is N/A due to Rod Block Monitor is Enforcing SAT UNSAT  N/A  Step 8:    [4] PLACE CRD CONTROL SWITCH, 3
-HS-85-48, in ROD OUT NOTCH, and RELEASE.   
-HS-85-48, in ROD OUT NOTCH, and RELEASE.   
[5] OBSERVE the control rod settles into the desired position and the ROD SETTLE light extinguishes.
[5] OBSERVE the control rod settles into the desired position and the ROD SETTLE light extinguishes.
Standard:
Standard:
PLACED CRD CONTROL SWITCH, 3 48 in ROD OUT NOTCH position and RELEASED control switch to move Control Rod to Position 04 as indicated on Full Core Display
PLACED CRD CONTROL SWITCH, 3 48 in ROD OUT NOTCH position and RELEASED control switch to move Control Rod to Position 04 as indicated on Full Core Display
. Critical Step
. Critical Step
Line 4,151: Line 3,649:
SAT UNSAT N/A  Note to Examiner: Step is repeated to get Control Rod to Position 04 Step 9:     
SAT UNSAT N/A  Note to Examiner: Step is repeated to get Control Rod to Position 04 Step 9:     
[1] SELECT the desired control rod by depressing the appropriate CRD ROD SELECT pushbutton, 3
[1] SELECT the desired control rod by depressing the appropriate CRD ROD SELECT pushbutton, 3
-XS-85-40. Standard:
-XS-85-40. Standard:   Selects Control Rod by depressing CRD ROD SELECT pushbutton.
Selects Control Rod by depressing CRD ROD SELECT pushbutton.
Critical Step
Critical Step


SAT UNSAT N/A Job Performance Measure (JPM)  11  STEP / STANDARD SAT / UNSAT Step 10:    [2] OBSERVE the following for the selected control rod:
SAT UNSAT N/A Job Performance Measure (JPM)  11  STEP / STANDARD SAT / UNSAT Step 10:    [2] OBSERVE the following for the selected control rod:
CRD ROD SELECT pushbutton is brightly ILLUMINATED White light on the Full Core Display ILLUMINATED Rod Out Permit light ILLUMINATED Standard:
CRD ROD SELECT pushbutton is brightly ILLUMINATED White light on the Full Core Display ILLUMINATED Rod Out Permit light ILLUMINATED Standard:   VERIFIES  CRD ROD SELECT pushbutton is brightly ILLUMINATED White light on the Full Core Display ILLUMINATED Rod Out Permit light ILLUMINATED SAT UNSAT N/A  Step 11:     
VERIFIES  CRD ROD SELECT pushbutton is brightly ILLUMINATED White light on the Full Core Display ILLUMINATED Rod Out Permit light ILLUMINATED SAT UNSAT N/A  Step 11:     
[3] VERIFY Rod Worth Minimizer is operable and LATCHED into the correct ROD GROUP when the Rod Worth Minimizer is enforcing Standard: STEP is N/A due to Rod Block Monitor is Enforcing SAT UNSAT N/A  Step 12:     
[3] VERIFY Rod Worth Minimizer is operable and LATCHED into the correct ROD GROUP when the Rod Worth Minimizer is enforcing Standard:
STEP is N/A due to Rod Block Monitor is Enforcing SAT UNSAT N/A  Step 12:     
[4] PLACE CRD CONTROL SWITCH, 3
[4] PLACE CRD CONTROL SWITCH, 3
-HS-85-48, in ROD OUT NOTCH, and RELEASE.   
-HS-85-48, in ROD OUT NOTCH, and RELEASE.   
[5] OBSERVE the control rod settles into the desired position and the ROD SETTLE light extinguishes.
[5] OBSERVE the control rod settles into the desired position and the ROD SETTLE light extinguishes.
Standard:
Standard:
PLACED CRD CONTROL SWITCH, 3 48 in ROD OUT NOTCH position and RELEASED control switch to move Control Rod to Position 04 as indicated on Full Core Display
PLACED CRD CONTROL SWITCH, 3 48 in ROD OUT NOTCH position and RELEASED control switch to move Control Rod to Position 04 as indicated on Full Core Display
. Critical Step
. Critical Step
Line 4,180: Line 3,674:
C. Unit shutdown (Mode 3 or 4).
C. Unit shutdown (Mode 3 or 4).
D. Failed sensor.
D. Failed sensor.
Automatic
Automatic Action: A. Rod withdrawal block with Rx Mode Sw. in RUN.(APRM only)
 
Action: A. Rod withdrawal block with Rx Mode Sw. in RUN.(APRM only)
Operator Action: A. DETERMINE which APRM/OPRM channel is downscale/inop.
Operator Action: A. DETERMINE which APRM/OPRM channel is downscale/inop.
B. IF APRM failed downscale, THEN BYPASS channel. REFER TO 3-OI-92B.   
B. IF APRM failed downscale, THEN BYPASS channel. REFER TO 3-OI-92B.   
Line 4,189: Line 3,681:


SAT UNSAT N/A APRM DOWNSCALE/
SAT UNSAT N/A APRM DOWNSCALE/
OPRM INOP 4
OPRM INOP     4 Job Performance Measure (JPM)  13  STEP / STANDARD SAT / UNSAT Step 13(continued)
Job Performance Measure (JPM)  13  STEP / STANDARD SAT / UNSAT Step 13(continued)
Sensor/Trip Point:
Sensor/Trip Point:
Relays:3A-K1 Nuclear Instrumentation 3A-K2 Refuel Equipment in Use High Level in Scram Discharge Volume Scram Discharge Volume High Water Level Bypass Rx Mode Switch in SHUTDOWN PRNM (ANY APRM OPRM or RBM) Sensor Location:
Relays: 3A-K1 Nuclear Instrumentation 3A-K2 Refuel Equipment in Use High Level in Scram Discharge Volume Scram Discharge Volume High Water Level Bypass Rx Mode Switch in SHUTDOWN PRNM (ANY APRM OPRM or RBM) Sensor Location:
Panel 3-9-28 Elevation 593' Aux Instr Room Probable Cause:  A. One or more sensors at or above set point. B. Malfunction of sensor.
Panel 3-9-28 Elevation 593' Aux Instr Room Probable Cause:  A. One or more sensors at or above set point. B. Malfunction of sensor.
C. Control rod drop accident Automatic Action: Rod withdrawal block Operator Action:  A. DETERMINE initiating condition from corresponding rod withdrawalblock alarm(s) and REFER TO operator action for alarm(s).
C. Control rod drop accident Automatic Action: Rod withdrawal block Operator Action:  A. DETERMINE initiating condition from corresponding rod withdrawalblock alarm(s) and REFER TO operator action for alarm(s). Standard:   Reference 3
Standard:
-ARP-9-5A and identifies APRM Ch 2 is down scale and proceeds to bypass APRM Ch 2 per 3-OI-92B  CUE:Respond as stated in Alarm Response Instruction and Bypass APRM Ch 2 per 3-OI-92B. CONTROL ROD WITHDRAWAL BLOCK    7 Job Performance Measure (JPM)  14  STEP / STANDARD SAT / UNSAT Step 1 4:     
Reference 3
-ARP-9-5A and identifies APRM Ch 2 is down scale and proceeds to bypass APRM Ch 2 per 3-OI-92B  CUE:Respond as stated in Alarm Response Instruction and Bypass APRM Ch 2 per 3-OI-92B. CONTROL ROD WITHDRAWAL BLOCK    7 Job Performance Measure (JPM)  14  STEP / STANDARD SAT / UNSAT Step 14:     


6.1 Bypassing APRM/OPRM Channel
6.1 Bypassing APRM/OPRM Channel
         [1] REVIEW all precautions and limitations. REFER TO Section 3.0.
         [1] REVIEW all precautions and limitations. REFER TO Section 3.0.
Standard:
Standard:   Demonstrates reviewing precautions and limitations section 3.0.
Demonstrates reviewing precautions and limitations section 3.0.
SAT UNSAT N/A CUE: If asked per note 2 above, "Panel 9-14 Voter BLUE LIGHTS are extinguished".
SAT UNSAT N/A CUE: If asked per note 2 above, "Panel 9-14 Voter BLUE LIGHTS are extinguished".
Step 1 5:     
Step 15:     
[2] PLACE APRM BYPASS, 3
[2] PLACE APRM BYPASS, 3
-HS-92-7B/S3, to desired channel to be bypassed.
-HS-92-7B/S3, to desired channel to be bypassed.
Standard:
Standard:
PLACE APRM BYPASS, 3
PLACE APRM BYPASS, 3
-HS-92-7B/S3, to APRM CH 2 Critical Step
-HS-92-7B/S3, to APRM CH 2 Critical Step


SAT UNSAT N/A NOTES 1) Only one APRM/OPRM in each trip system can be bypassed at a time. 2) All operations are performed on Panel 3 5 unless specifically stated otherwise.
SAT UNSAT N/A NOTES 1) Only one APRM/OPRM in each trip system can be bypassed at a time. 2) All operations are performed on Panel 3 5 unless specifically stated otherwise.
Line 4,217: Line 3,704:
-14 Voters are required to be illuminated prior to testing, operating, or working on that channel.
-14 Voters are required to be illuminated prior to testing, operating, or working on that channel.
CAUTION [QA/C] SPP-10.4 requires approval of the Plant Manager or his designee prior to any planned operation with APRMs bypassed unless bypassing is specifically allowed within approved procedures. [ISE-HPS-92-RO1]
CAUTION [QA/C] SPP-10.4 requires approval of the Plant Manager or his designee prior to any planned operation with APRMs bypassed unless bypassing is specifically allowed within approved procedures. [ISE-HPS-92-RO1]
Job Performance Measure (JPM)  15  STEP / STANDARD SAT / UNSAT Step 16:    [3] CHECK BLUE BYPASSED lights illuminated on Panel 3 14 Voters. Standard:
Job Performance Measure (JPM)  15  STEP / STANDARD SAT / UNSAT Step 1 6:    [3] CHECK BLUE BYPASSED lights illuminated on Panel 3 14 Voters. Standard:
 
Simulates observing BLUE BYPASS light illuminated on Panel 3 14 for APRM CH 2
Simulates observing BLUE BYPASS light illuminated on Panel 3 14 for APRM CH 2
. SAT UNSAT N/A Cue: Blue Light is illuminated on Panel 3 14 for APRM CH 2.
. SAT UNSAT N/A Cue: Blue Light is illuminated on Panel 3 14 for APRM CH 2.
Step 17:     
Step 1 7:     
[4] VERIFY white bypass light on Panel 3 5 is illuminated.
[4] VERIFY white bypass light on Panel 3 5 is illuminated.
Standard:
Standard:
Observes WHITE BYPASS light illuminated on Panel 3 5.
Observes WHITE BYPASS light illuminated on Panel 3 5.
SAT  UNSAT  N/A Note to NRC Examiner: If needed, cue student to proceed with actions required to continue rod movements.Student may continue at step 18 or 21.
SAT  UNSAT  N/A Note to NRC Examiner: If needed, cue student to proceed with actions required to continue rod movements.Student may continue at step 18 or 21.
Line 4,233: Line 3,718:
-HS-85-46 in the OFF position to deselect the Control Rod.
-HS-85-46 in the OFF position to deselect the Control Rod.
Standard:
Standard:
CRD POWER, 3
CRD POWER, 3
-HS-85-46 in the OFF position
-HS-85-46 in the OFF position. SAT UNSAT N/A Job Performance Measure (JPM)  16  STEP / STANDARD SAT / UNSAT Step 19:    [6.2] PLACE CRD POWER, 3
. SAT UNSAT N/A Job Performance Measure (JPM)  16  STEP / STANDARD SAT / UNSAT Step 19:    [6.2] PLACE CRD POWER, 3
-HS-85-46, in the ON position.
-HS-85-46, in the ON position.
Standard:
Standard:   PLACED CRD POWER, 3-HS-85-46, in the ON position.
PLACED CRD POWER, 3-HS-85-46, in the ON position.
SAT UNSAT N/A Step 20:     
SAT UNSAT N/A Step 20:     
[6.3] IF desired, THEN CONTINUE to withdrawal Control Rods and PERFORM applicable section for Control Rod withdrawal.
[6.3] IF desired, THEN CONTINUE to withdrawal Control Rods and PERFORM applicable section for Control Rod withdrawal.
Standard:
Standard:
Continues with Control Rod Movement
Continues with Control Rod Movement


SAT UNSAT  N/A Cue:If asked, Proceed with Control Rod Movement.
SAT UNSAT  N/A Cue:If asked, Proceed with Control Rod Movement.
Step 21:    [1] SELECT the desired control rod by depressing the appropriate CRD ROD SELECT pushbutton, 3
Step 21:    [1] SELECT the desired control rod by depressing the appropriate CRD ROD SELECT pushbutton, 3
-XS-85-40. Standard:
-XS-85-40. Standard:   Selects Control Rod by depressing CRD ROD SELECT pushbutton.
Selects Control Rod by depressing CRD ROD SELECT pushbutton.
Critical Step SAT UNSAT  N/A Job Performance Measure (JPM)  17  STEP / STANDARD SAT / UNSAT Step 22:    [2] OBSERVE the following for the selected control rod:
Critical Step SAT UNSAT  N/A Job Performance Measure (JPM)  17  STEP / STANDARD SAT / UNSAT Step 22:    [2] OBSERVE the following for the selected control rod:
CRD ROD SELECT pushbutton is brightly ILLUMINATED White light on the Full Core Display ILLUMINATED Rod Out Permit light ILLUMINATED Standard:
CRD ROD SELECT pushbutton is brightly ILLUMINATED White light on the Full Core Display ILLUMINATED Rod Out Permit light ILLUMINATED Standard: VERIFIES  CRD ROD SELECT pushbutton is brightly ILLUMINATED White light on the Full Core Display ILLUMINATED Rod Out Permit light ILLUMINATED SAT UNSAT N/A  Step 23:     
VERIFIES  CRD ROD SELECT pushbutton is brightly ILLUMINATED White light on the Full Core Display ILLUMINATED Rod Out Permit light ILLUMINATED SAT UNSAT N/A  Step 23:     
[3] VERIFY Rod Worth Minimizer is operable and LATCHED into the correct ROD GROUP when the Rod Worth Minimizer is enforcing Standard: STEP is N/A due to Rod Block Monitor is Enforcing SAT  UNSAT  N/A  Step 24:    [4] PLACE CRD CONTROL SWITCH, 3
[3] VERIFY Rod Worth Minimizer is operable and LATCHED into the correct ROD GROUP when the Rod Worth Minimizer is enforcing Standard:
STEP is N/A due to Rod Block Monitor is Enforcing SAT  UNSAT  N/A  Step 24:    [4] PLACE CRD CONTROL SWITCH, 3
-HS-85-48, in ROD OUT NOTCH, and RELEASE.   
-HS-85-48, in ROD OUT NOTCH, and RELEASE.   
[5] OBSERVE the control rod settles into the desired position and the ROD SETTLE light extinguishes.
[5] OBSERVE the control rod settles into the desired position and the ROD SETTLE light extinguishes.
Standard:
Standard:
PLACED CRD CONTROL SWITCH, 3 48 in ROD OUT NOTCH position and RELEASED control switch to move Control Rod to Position 04 as indicated on Full Core Display. Critical Step
PLACED CRD CONTROL SWITCH, 3 48 in ROD OUT NOTCH position and RELEASED control switch to move Control Rod to Position 04 as indicated on Full Core Display. Critical Step


Line 4,281: Line 3,758:
2-EOI APPENDIX
2-EOI APPENDIX
-6E INJECTION SUBSYSTEM LINEUP CS SYSTEM II JPM NUMBER:
-6E INJECTION SUBSYSTEM LINEUP CS SYSTEM II JPM NUMBER:
257A U2 REVISION:
257 A U 2 REVISION: 1  TASK APPLICABILITY:
1  TASK APPLICABILITY:
SRO STA UO NAUO TASK NUMBER / TASK TITLE(S): U-000-EM-35/ Lineup Injection Subsystem
SRO STA UO NAUO TASK NUMBER / TASK TITLE(S):
U-000-EM-35/ Lineup Injection Subsystem
-Core Spray Loop I(II) in Accordance with EOI Appendix 6D(E) K/A RATINGS:
-Core Spray Loop I(II) in Accordance with EOI Appendix 6D(E) K/A RATINGS:
RO:  3.9    SRO:  3.9 K/A No. &STATEMENT:
RO:  3.9    SRO:  3.9 K/A No. &STATEMENT:
Line 4,290: Line 3,765:
Risk Significant SAFETY FUNCTION:
Risk Significant SAFETY FUNCTION:
2  EVALUATION LOCATION:
2  EVALUATION LOCATION:
In-Plant  Simulator Control Room Lab  Other - List  APPLICABLE METHOD OF TESTING:  Discussion  Simulate/Walkthrough  Perform TIME FOR COMPLETION:      NA      TIME CRITICAL (Y/N)      ALTERNATE PATH (Y/N)
In-Plant  Simulator Control R oom Lab  Other - List  APPLICABLE METHOD OF TESTING:  Discussion  Simulate/Walkthrough  Perform   TIME FOR COMPLETION:      NA      TIME CRITICAL (Y/N)      ALTERNATE PATH (Y/N)
Developed by:
Developed by:
Developer Date  (Ensure validator is briefed on exam security per NPG
Developer Date  (Ensure validator is briefed on exam security per NPG
-SPP-17.8.1)                (See JPM Validation Checklist in NPG
-SPP-17.8.1)                (See JPM Validation Checklist in NPG
-SPP-17.8.2)      Validated by:
-SPP-17.8.2)      Validated by:
Approved by:
Approved by:
Validator Date  Approved by:
Validator   Date  Approved by:
Site Training Management Date  Site Training Program Owner Date    N Y Job Performance Measure (JPM)  2  OPERATOR:
Site Training Management Date  Site Training Program Owner Date    N Y Job Performance Measure (JPM)  2  OPERATOR: ________________________________
________________________________
JPM Number:  _257A U2_  RO  SRO  DATE: _______
JPM Number:  _257A U2_  RO  SRO  DATE: _______


Line 4,326: Line 3,800:
: 3. Reset to IC-28and take out of freeze
: 3. Reset to IC-28and take out of freeze
. 4. CLOSE 2-FCV-75-51 5. OPEN 2-FCV-75-53 6. Man Scram Rx and place MS to SD. 7. Open 6 ADS Valves
. 4. CLOSE 2-FCV-75-51 5. OPEN 2-FCV-75-53 6. Man Scram Rx and place MS to SD. 7. Open 6 ADS Valves
. 8. Wait until various alarms with Supp Pool Temp High come in to save IC.      Malfunctions Description Event Severity Delay Initial set TH22 COOLANT LEAK INSIDE DRYWELL 15 75% 5 Yes CS04A CORE SPRAY LOGIC POWER FAILURE DIV I 15 N/A N/A Yes CS04B CORE SPRAY LOGIC POWER FAILURE DIV II 15 N/A N/A Yes CS02B CS INBOARD INJECTION VALVE AUTO OPENING FAILURE (FCV-75-53) 15 N/A N/A Yes RH06A RHR LOGIC POWER FAILURE DIV I 15 N/A N/A Yes RH06B RHR LOGIC POWER FAILURE DIV II 15 N/A N/A Yes RC01 RCIC TURBINE TRIP SYSTEM FAILURE 15 N/A N/A Yes HP04 HPCI STEAM SUPPLY VALVE AUTO OPENING FAILURE 15 N/A N/A Yes FW01A CONDENSATE PUMP TRIP 2A 15 N/A 10 Yes Job Performance Measure (JPM)  5  FW01B CONDENSATE PUMP TRIP 2B 15 N/A 10 Yes FW01C CONDENSATE PUMP TRIP 2C 15 N/A 10 Yes            Remotes Description Event Severity Delay Initial set                        Overrides Description Event Severity Delay Initial set Schedule File(s): JPM 257A U2 Core Spray Alt Inj.sch
. 8. Wait until various alarms with Supp Pool Temp High come in to save IC.      Malfunctions Description Event Severity Delay Initial set TH22 COOLANT LEAK INSIDE DRYWELL 1 5 75% 5 Yes CS04A CORE SPRAY LOGIC POWER FAILURE DIV I 15 N/A N/A Yes CS04B CORE SPRAY LOGIC POWER FAILURE DIV II 15 N/A N/A Yes CS02B CS INBOARD INJECTION VALVE AUTO OPENING FAILURE (FCV-75-53) 15 N/A N/A Yes RH06A RHR LOGIC POWER FAILURE DIV I 15 N/A N/A Yes RH06B RHR LOGIC POWER FAILURE DIV II 15 N/A N/A Yes RC01 RCIC TURBINE TRIP SYSTEM FAILURE 15 N/A N/A Yes HP04 HPCI STEAM SUPPLY VALVE AUTO OPENING FAILURE 15 N/A N/A Yes FW01A CONDENSATE PUMP TRIP 2A 15 N/A 10 Yes Job Performance Measure (JPM)  5  FW01B CONDENSATE PUMP TRIP 2B 15 N/A 10 Yes FW01C CONDENSATE PUMP TRIP 2C 15 N/A 10 Yes            Remotes Description Event Severity Delay Initial set                        Overrides Description Event Severity Delay Initial set Schedule File(s): JPM 257A U2 Core Spray Alt Inj.sch


Event File(s): JPM 257A U2 Core Spray Alt Inj.evt
Event File(s): JPM 257A U2 Core Spray Alt Inj.evt
Line 4,342: Line 3,816:
:  The Unit Supervisor directs you to inject water into the RPV to restore RPV water level above (-)162 inches (TAF) using Core Spray System II as directed by 2-EOI Appendix
:  The Unit Supervisor directs you to inject water into the RPV to restore RPV water level above (-)162 inches (TAF) using Core Spray System II as directed by 2-EOI Appendix
-6E, Injection Subsystems Lineup Core Spray System II.
-6E, Injection Subsystems Lineup Core Spray System II.
Job Performance Measure (JPM)  7  START TIME
Job Performance Measure (JPM)  7  START TIME:    STEP / STANDARD SAT / UNSAT Step 1:    Location: Unit 2 Control Room Attachments: 1. NPSH Monitoring
:    STEP / STANDARD SAT / UNSAT Step 1:    Location: Unit 2 Control Room Attachments: 1. NPSH Monitoring


[1] VERIFY OPEN the following valves:
[1] VERIFY OPEN the following valves:
2-FCV-75-30, CORE SPRAY PUMP 2B SUPPR POOL SUCT VLV  2-FCV-75-39, CORE SPRAY PUMP 2D SUPPR POOL SUCT VLV  Standard:
2-FCV-75-30, CORE SPRAY PUMP 2B SUPPR POOL SUCT VLV  2-FCV-75-39, CORE SPRAY PUMP 2D SUPPR POOL SUCT VLV  Standard: Verifie s 2-FCV-75-30 and 2-FCV-75-39 are open. SAT UNSAT N/A  Step 2:   
Verifies2-FCV-75-30 and 2-FCV-75-39 are open. SAT UNSAT N/A  Step 2:   
[1] (continued)VERIFY OPEN the following valves:
[1] (continued)VERIFY OPEN the following valves:
2-FCV-75-51, CORE SPRAY SYS II OUTBD INJECT VALVE.
2-FCV-75-51, CORE SPRAY SYS II OUTBD INJECT VALVE.


Standard:
Standard:
Recognizes 2-FCV-75-51 is closed and 2-FCV-75-53 is open, valve closes 2-FCV-75-53 and Opens 2-FCV-75-51. Critical Step
Recognizes 2-FCV-75-51 is closed and 2-FCV-75-53 is open, valve closes 2-FCV-75-53 and Opens 2-FCV-75-51. Critical Step


Line 4,359: Line 3,830:


Job Performance Measure (JPM)  8  STEP / STANDARD SAT / UNSAT Step 3:    [2] VERIFY CLOSED 2-FCV-75-50, CORE SPRAY SYS II TESTVALVE.
Job Performance Measure (JPM)  8  STEP / STANDARD SAT / UNSAT Step 3:    [2] VERIFY CLOSED 2-FCV-75-50, CORE SPRAY SYS II TESTVALVE.
Standard:
Standard: Verifies 2-FCV-75-50 closed SAT UNSAT N/A  Step 4:     
Verifies 2-FCV-75-50 closed SAT UNSAT N/A  Step 4:     
[3] VERIFY CS Pump 2B and/or 2D running.
[3] VERIFY CS Pump 2B and/or 2D running.
Standard:
Standard: Starts Core Pumps 2B and/or 2 D (Only starting one pump is Critical, the second pump is optional).
Starts Core Pumps 2B and/or 2D (Only starting one pump is Critical, the second pump is optional).
Critical Step
Critical Step


SAT UNSAT N/A Step 6:     
SAT UNSAT N/A Step 6:     
[4] WHEN RPV pressure is below 450 psig, THEN THROTTLE2-FCV-75-53, CORE SPRAY SYS II INBDINJECT VALVE, as necessary to control injection at or below4000 gpm per pump.
[4] WHEN RPV pressure is below 450 psig, THEN THROTTLE 2-FCV-75-53, CORE SPRAY SYS II INBDINJECT VALVE, as necessary to control injection at or below4000 gpm per pump.
Standard:
Standard: Verifies pressure < 450 psig and opens 2-FCV-75-53 and commences injection. (And verify flow <4000 gpm for 1 pump or  
Verifies pressure < 450 psig and opens 2-FCV-75-53 and commences injection. (And verify flow <4000 gpm for 1 pump or  
<8000 gpm for 2 pumps).
<8000 gpm for 2 pumps).
Critical Step SAT  UNSAT N/A Step 7:  CAUTION Continuous operation with inadequate NPSH may result in pump damage or pump inoperability.  
Critical Step SAT  UNSAT N/A Step 7:  CAUTION Continuous operation with inadequate NPSH may result in pump damage or pump inoperability.  
[5] MONITOR Core Spray Pump NPSH using Attachment 1.
[5] MONITOR Core Spray Pump NPSH using Attachment 1.
Standard:
Standard: Operator comparesCore Spray Pump flow rate with Suppression Pool temperature and Suppression Pool pressure and Determined adequate NPSH.
Operator comparesCore Spray Pump flow rate with Suppression Pool temperature and Suppression Pool pressure and Determined adequate NPSH.


SAT UNSAT N/A  Termination Criteria:  Once rector Water Level is > TAF JPM may be terminated. IF student fails to recover reactor water level above TAF (
SAT UNSAT N/A  Termination Criteria:  Once rector Water Level is > TAF JPM may be terminated. IF student fails to recover reactor water level above TAF (-162 inches), it will be considered a failure.
-162 inches), it will be considered a failure.
STOP TIME:
STOP TIME:
Job Performance Measure (JPM)  9  Provide to Applicant
Job Performance Measure (JPM)  9  Provide to Applicant
Line 4,399: Line 3,865:
3-EOI APPENDIX
3-EOI APPENDIX
-6E INJECTION SUBSYSTEM LINEUP CS SYSTEM II JPM NUMBER:
-6E INJECTION SUBSYSTEM LINEUP CS SYSTEM II JPM NUMBER:
257A U3 REVISION:
257 A U3 REVISION: 1  TASK APPLICABILITY:
1  TASK APPLICABILITY:
SRO STA UO NAUO TASK NUMBER / TASK TITLE(S): U-000-EM-35/ Lineup Injection Subsystem
SRO STA UO NAUO TASK NUMBER / TASK TITLE(S):
U-000-EM-35/ Lineup Injection Subsystem
-Core Spray Loop I(II) in Accordance with EOI Appendix 6D(E) K/A RATINGS:
-Core Spray Loop I(II) in Accordance with EOI Appendix 6D(E) K/A RATINGS:
RO:  3.9    SRO:  3.9 K/A No. &STATEMENT:
RO:  3.9    SRO:  3.9 K/A No. &STATEMENT:
Line 4,408: Line 3,872:
Risk Significant SAFETY FUNCTION:
Risk Significant SAFETY FUNCTION:
2  EVALUATION LOCATION:
2  EVALUATION LOCATION:
In-Plant  Simulator Control Room Lab  Other - List  APPLICABLE METHOD OF TESTING:  Discussion  Simulate/Walkthrough  Perform TIME FOR COMPLETION:      NA      TIME CRITICAL (Y/N)      ALTERNATE PATH (Y/N)
In-Plant  Simulator Control R oom Lab  Other - List  APPLICABLE METHOD OF TESTING:  Discussion  Simulate/Walkthrough  Perform   TIME FOR COMPLETION:      NA      TIME CRITICAL (Y/N)      ALTERNATE PATH (Y/N)
Developed by:
Developed by:
Developer Date  (Ensure validator is briefed on exam security per NPG
Developer Date  (Ensure validator is briefed on exam security per NPG
-SPP-17.8.1)                (See JPM Validation Checklist in NPG
-SPP-17.8.1)                (See JPM Validation Checklist in NPG
-SPP-17.8.2)      Validated by:
-SPP-17.8.2)      Validated by:
Approved by:
Approved by:
Validator Date  Approved by:
Validator   Date  Approved by:
Site Training Management Date  Site Training Program Owner Date    N Y Job Performance Measure (JPM)  2  OPERATOR:
Site Training Management Date  Site Training Program Owner Date    N Y Job Performance Measure (JPM)  2  OPERATOR: ________________________________
________________________________
JPM Number:  _257A U3_  RO  SRO    DATE: _______
JPM Number:  _257A U3_  RO  SRO    DATE: _______
TASK STANDARD:
TASK STANDARD:
Line 4,458: Line 3,921:
:  The Unit Supervisor directs you to inject water into the RPV to restore RPV water level above (-)162 inches (TAF) using Core Spray System II as directed by 3-EOI Appendix
:  The Unit Supervisor directs you to inject water into the RPV to restore RPV water level above (-)162 inches (TAF) using Core Spray System II as directed by 3-EOI Appendix
-6E, Injection Subsystems Lineup Core Spray System II.
-6E, Injection Subsystems Lineup Core Spray System II.
Job Performance Measure (JPM)  7  START TIME
Job Performance Measure (JPM)  7  START TIME:    STEP / STANDARD SAT / UNSAT Step 1:    Location: Unit 3 Control Room Attachments: 1. NPSH Monitoring
:    STEP / STANDARD SAT / UNSAT Step 1:    Location: Unit 3 Control Room Attachments: 1. NPSH Monitoring


[1] VERIFY OPEN the following valves:
[1] VERIFY OPEN the following valves:
3-FCV-75-30, CORE SPRAY PUMP 3B SUPPR POOL SUCT VLV  3-FCV-75-39, CORE SPRAY PUMP 3D SUPPR POOL SUCT VLV  Standard:
3-FCV-75-30, CORE SPRAY PUMP 3B SUPPR POOL SUCT VLV  3-FCV-75-39, CORE SPRAY PUMP 3D SUPPR POOL SUCT VLV  Standard: Verifie s 3-FCV-75-30 and 3-FCV-75-39 are open. SAT UNSAT N/A  Step 2:   
Verifies3-FCV-75-30 and 3-FCV-75-39 are open. SAT UNSAT N/A  Step 2:   
[1] (continued) VERIFY OPEN the following valves:
[1] (continued) VERIFY OPEN the following valves:
3-FCV-75-51, CORE SPRAY SYS II OUTBD INJECT VALVE.
3-FCV-75-51, CORE SPRAY SYS II OUTBD INJECT VALVE.


Standard:
Standard:   Recognizes 3
Recognizes 3
-FCV-75-51 is closed and 3
-FCV-75-51 is closed and 3
-FCV-75-53 is open, closes 3-FCV-75-53 and Opens 3
-FCV-75-53 is open, closes 3-FCV-75-53 and Opens 3
Line 4,476: Line 3,936:
-75, Core Spray System line up.
-75, Core Spray System line up.


Job Performance Measure (JPM)  8  STEP / STANDARD SAT / UNSAT Step 3:    [2] VERIFY CLOSED 3-FCV-75-50, CORE SPRAY SYS II TEST VALVE. Standard:
Job Performance Measure (JPM)  8  STEP / STANDARD SAT / UNSAT Step 3:    [2] VERIFY CLOSED 3-FCV-75-50, CORE SPRAY SYS II TEST VALVE. Standard: Verifies 3
Verifies 3
-FCV-75-50 closed SAT UNSAT N/A  Step 4:     
-FCV-75-50 closed SAT UNSAT N/A  Step 4:     
[3] VERIFY CS Pump 3B and/or 3D running.
[3] VERIFY CS Pump 3B and/or 3D running.
Standard:
Standard: Starts Core Pumps 3B and/or 3D (Only starting one pump is Critical, the second pump is optional).
Starts Core Pumps 3B and/or 3D (Only starting one pump is Critical, the second pump is optional).
Critical Step
Critical Step


SAT UNSAT  N/A Step 6:    [4] WHEN RPV pressure is below 450 psig, THEN THROTTLE 3-FCV-75-53, CORE SPRAY SYS II INBDINJECT VALVE, as necessary to control injection at or below4000 gpm per pump.
SAT UNSAT  N/A Step 6:    [4] WHEN RPV pressure is below 450 psig, THEN THROTTLE 3-FCV-75-53, CORE SPRAY SYS II INBDINJECT VALVE, as necessary to control injection at or below4000 gpm per pump.
Standard:
Standard: Verifies pressure < 450 psig and opens 3
Verifies pressure < 450 psig and opens 3
-FCV-75-53 and commences injection. (And verify flow <4000 gpm for 1 pump or  
-FCV-75-53 and commences injection. (And verify flow <4000 gpm for 1 pump or  
<8000 gpm for 2 pumps).
<8000 gpm for 2 pumps).
Line 4,493: Line 3,950:
SAT UNSAT N/A Step 7:  CAUTION Continuous operation with inadequate NPSH may result in pump damage or pump inoperability.  
SAT UNSAT N/A Step 7:  CAUTION Continuous operation with inadequate NPSH may result in pump damage or pump inoperability.  
[5] MONITOR Core Spray Pump NPSH using Attachment 1.
[5] MONITOR Core Spray Pump NPSH using Attachment 1.
Standard:
Standard: Operator compares Core Spray pump flow rate with Suppression Pool temperature and Suppression Pool pressure and Determined adequate NPSH.
Operator compares Core Spray pump flow rate with Suppression Pool temperature and Suppression Pool pressure and Determined adequate NPSH.


SAT UNSAT N/A  Termination Criteria:  Once rector Water Level is >
SAT UNSAT N/A  Termination Criteria:  Once rector Water Level is >
TAF JPM may be terminated. IF student fails to recover reactor water level above TAF (
TAF JPM may be terminated. IF student fails to recover reactor water level above TAF (-162 inches), it will be considered a failure.
-162 inches), it will be considered a failure.
STOP TIME:
STOP TIME:
Job Performance Measure (JPM)  9  Provide to Applicant
Job Performance Measure (JPM)  9  Provide to Applicant
Line 4,510: Line 3,965:
INITIAL CONDITIONS:  
INITIAL CONDITIONS:  


You are an Operator on Unit 3
You are an Operator on Unit 3. The Reactor is Shutdown RPV Water Level is lowering slowly.
. The Reactor is Shutdown RPV Water Level is lowering slowly.
1-EOI-1 has been entered and followed to RC
1-EOI-1 has been entered and followed to RC
-L6.   
-L6.   
Line 4,523: Line 3,977:
2-EOI Appendix
2-EOI Appendix
-11F Alternate RPV Pressure Control Systems: RFPT On Minimum Flow JPM NUMBER:
-11F Alternate RPV Pressure Control Systems: RFPT On Minimum Flow JPM NUMBER:
670A U2 REVISION:
670A U2 REVISION: 0  TASK APPLICABILITY:
0  TASK APPLICABILITY:
SRO STA UO NAUO TASK NUMBER / TASK TITLE(S):
SRO STA UO NAUO TASK NUMBER / TASK TITLE(S):
U-000-EM-58 Lineup Alternate RPV Pressure Control Systems- RFPT on Minimum Flow IAW EOI Appendix 11F K/A RATINGS:
U-000-EM-58 Lineup Alternate RPV Pressure Control Systems- RFPT on Minimum Flow IAW EOI Appendix 11F K/A RATINGS:
Line 4,531: Line 3,984:
None SAFETY FUNCTION:
None SAFETY FUNCTION:
3  EVALUATION LOCATION:
3  EVALUATION LOCATION:
In-Plant Simulator Control Room   Lab  Other - List  APPLICABLE METHOD OF TESTING:
In-Plant Simulator Control R oom   Lab  Other - List  APPLICABLE METHOD OF TESTING:
Discussion Simulate/Walkthrough Perform    TIME FOR COMPLETION:      NA      TIME CRITICAL (Y/N)      ALTERNATE PATH (Y/N)
Discussion Simulate/Walkthrough Perform    TIME FOR COMPLETION:      NA      TIME CRITICAL (Y/N)      ALTERNATE PATH (Y/N)
Developed by:
Developed by:
Developer Date  (Ensure validator is briefed on exam security per NPG
Developer Date  (Ensure validator is briefed on exam security per NPG
-SPP-17.8.1)  (See JPM Validation Checklist in NPG-SPP-17.8.2)      Validated by:
-SPP-17.8.1)  (See JPM Validation Checklist in NPG-SPP-17.8.2)      Validated by:
Approved by:
Approved by:
Validator Date  Approved by:
Validator   Date  Approved by:
Site Training Management Date  Site Training Program Owner Date    N Y Job Performance Measure (JPM)  2  OPERATOR:  ________________________________
Site Training Management Date  Site Training Program Owner Date    N Y Job Performance Measure (JPM)  2  OPERATOR:  ________________________________
JPM Number:  _670A U2_  RO  SRO  DATE: _______
JPM Number:  _670A U2_  RO  SRO  DATE: _______
Line 4,546: Line 3,999:
-11F.
-11F.
Operator Fundamental evaluated: Monitoring plant conditions and indications closely and controlling plant evolutions precisely. PRA: NA REFERENCES/PROCEDURES NEEDED:
Operator Fundamental evaluated: Monitoring plant conditions and indications closely and controlling plant evolutions precisely. PRA: NA REFERENCES/PROCEDURES NEEDED:
Procedure
Procedure:  2-EOI-APPENDIX-11F VERIFICATION TIME:  12 min    PERFORMANCE TIME:
:  2-EOI-APPENDIX-11F VERIFICATION TIME:  12 min    PERFORMANCE TIME:
COMMENTS:  
COMMENTS:  


Line 4,558: Line 4,010:
SIGNATURE: ___________________________
SIGNATURE: ___________________________
DATE: __________
DATE: __________
EXAMINER Job Performance Measure (JPM)  3  SIMULATOR SETUP IC 28 Exam IC 284        Malfunctions Description Event Severity Delay Initial set fw15a SPURIOUS RFP BEARING LOW OIL PRESSURE 15 N/A 0 N/A tc03a-j Fail Bypass Valves closed 1 0% 0 N/A ad01e 20 SRV 1-31 stuck open 20% 1 20% 0 N/A                  Remotes Description Event Severity Delay Initial set            Overrides Description Event Severity Delay Initial set        Initial Setup:
EXAMINER Job Performance Measure (JPM)  3  SIMULATOR SETUP IC 28 Exam IC 284        Malfunctions Description Event Severity Delay Initial set fw15a SPURIOUS RFP BEARING LOW OIL PRESSURE 1 5 N/A 0 N/A tc03a-j Fail Bypass Valves closed 1 0% 0 N/A ad01e 20 SRV 1-31 stuck open 20% 1 2 0% 0 N/A                  Remotes Description Event Severity Delay Initial set            Overrides Description Event Severity Delay Initial set        Initial Setup:
: 1. Reset to IC 28
: 1. Reset to IC 28
: 2. Manually Scram RX
: 2. Manually Scram RX
Line 4,587: Line 4,039:
-EOI-APPENDIX-11F and lower Reactor Pressure to low in the pressure band of 800 to 1000 psig.   
-EOI-APPENDIX-11F and lower Reactor Pressure to low in the pressure band of 800 to 1000 psig.   


Job Performance Measure (JPM)  6  START TIME STEP / STANDARD SAT / UNSAT Step 1:    [1] IF BOTH of the following exist:
Job Performance Measure (JPM)  6  START TIME STEP / STANDARD SAT / UNSAT Step 1:    [1] IF BOTH of the following exist:
Emergency RPV Depressurization is required,
Emergency RPV Depressurization is required, AND  Group 1 Isolation Signal exists, THEN  EXIT this procedure and ENTER EOI Appendix 11H.  
 
AND  Group 1 Isolation Signal exists, THEN  EXIT this procedure and ENTER EOI Appendix 11H.  


Standard:
Standard:
Verifies that a Group 1 Isolation signal Does Not exist by observing illuminated RED PCIS Group I lights and/or Verified MSIVs are open by observing illuminated RED valve position indicating lights for each valve.
Verifies that a Group 1 Isolation signal Does Not exist by observing illuminated RED PCIS Group I lights and/or Verified MSIVs are open by observing illuminated RED valve position indicating lights for each valve.


Line 4,599: Line 4,048:
[2] VERIFY MSIVs open.
[2] VERIFY MSIVs open.
Standard:
Standard:
Verifies MSIVs OPEN SAT  UNSAT  N/A Job Performance Measure (JPM)  7  STEP / STANDARD SAT / UNSAT Step 3:    [3] VERIFY Hotwell Pressure at or below  
Verifies MSIVs OPEN SAT  UNSAT  N/A Job Performance Measure (JPM)  7  STEP / STANDARD SAT / UNSAT Step 3:    [3] VERIFY Hotwell Pressure at or below  
-7 in. Hg.
-7 in. Hg. Standard:
Standard:
 
Verifies Hotwell Pressure at or below  
Verifies Hotwell Pressure at or below  
-7 in. Hg    SAT  UNSAT  N/A Step 4:     
-7 in. Hg    SAT  UNSAT  N/A Step 4:     
Line 4,610: Line 4,056:
  [4.1.1] At least one condensate pump running. [4.1.2] At least one condensate booster pump running. [4.1.3] Condensate System aligned to supply suction toRFPs.
  [4.1.1] At least one condensate pump running. [4.1.2] At least one condensate booster pump running. [4.1.3] Condensate System aligned to supply suction toRFPs.
Standard:
Standard:
Verifies one condensate pump and one condensate booster pump running, verifies condensate system aligned to supply suction to RFPs.
Verifies one condensate pump and one condensate booster pump running, verifies condensate system aligned to supply suction to RFPs.
SAT  UNSAT  N/A Step 5:     
SAT  UNSAT  N/A Step 5:     
[4.2] VERIFY Main Oil Pump running for each RFPT to bestarted.
[4.2] VERIFY Main Oil Pump running for each RFPT to bestarted.
Standard:
Standard:
Verifies main oil pump running for RFPT 2A SAT  UNSAT  N/A Step 6:     
Verifies main oil pump running for RFPT 2A SAT  UNSAT  N/A Step 6:     
[4.3] VERIFY CLOSED 2-FCV-3-19, RFP 2ADISCHARGE VALVE.
[4.3] VERIFY CLOSED 2-FCV-3-19, RFP 2ADISCHARGE VALVE.
Standard:
Standard:
VERIFY CLOSED 2-FCV-3-19, RFP 2A DISCHARGE VALVE.
VERIFY CLOSED 2-FCV-3-19, RFP 2A DISCHARGE VALVE.
Critical Step SAT  UNSAT  N/A Job Performance Measure (JPM)  8  STEP / STANDARD SAT / UNSAT Step 7:    [4.4] DEPRESS 2-HS-46-8A RFPT 2A SPEED CONT RAISE/LOWER, and VERIFY amber lightis illuminated.
Critical Step SAT  UNSAT  N/A Job Performance Measure (JPM)  8  STEP / STANDARD SAT / UNSAT Step 7:    [4.4] DEPRESS 2-HS-46-8A RFPT 2A SPEED CONT RAISE/LOWER, and VERIFY amber lightis illuminated.
Standard:
Standard:
Depresses 2
Depresses 2
-HS-46-8A  Critical Step SAT  UNSAT N/A Step 8:     
-HS-46-8A  Critical Step SAT  UNSA T N/A Step 8:     
[4.5] DEPRESS 2-HS-3-124A, RFPT 2A TRIP RESET.
[4.5] DEPRESS 2-HS-3-124A , RFPT 2A TRIP RESET.
Standard:
Standard:
Depresses 2
Depresses 2
-HS-3-124A and verifies the 2
-HS-3-124A and verifies the 2
-Z1-1-123 LP Stop Valve and 2-Z1-127 HP Stop Valve comes OPEN.
-Z1-1-123 LP Stop Valve and 2-Z1-127 HP Stop Valve comes OPEN.
Critical Step SAT  UNSAT N/A Step 9:     
Critical Step SAT  UNSA T N/A Step 9:     
[4.6] PLACE 2-HS-46-112A RFPT 2A START/LOCAL ENABLE, in START. Standard:
[4.6] PLACE 2-HS-46-112A RFPT 2A START/LOCAL ENABLE, in START. Standard:
 
Places 2-HS-46-112A in START  Critical Step SAT  UNSA T N/A Note to Examiner:
Places 2-HS-46-112A in START  Critical Step SAT  UNSAT N/A Note to Examiner:
RFPT A will Trip due to Low Bearing Oil Pressure at > 350 RPM Step 10:   
RFPT A will Trip due to Low Bearing Oil Pressure at > 350 RPM Step 10:   
[4.7] CHECK RFPT 2A speed increases to approximately 600 rpm.
[4.7] CHECK RFPT 2A speed increases to approximately 600 rpm.
Standard:
Standard:
Operator responds to RFPT A Trip and reports to US and begins to use B RFP for RPV Pressure Control per 2-EOI-APPENDIX-11F. Critical Step SAT  UNSAT  N/A CUE:  US: Proceed as directed per 2
Operator responds to RFPT A Trip and reports to US and begins to use B RFP for RPV Pressure Control per 2-EOI-APPENDIX-11F. Critical Step SAT  UNSAT  N/A CUE:  US: Proceed as directed per 2
-EOI-APPENDIX-11F. AO: Reports an oil leak of ~5 gpm on RFPT A bearings.
-EOI-APPENDIX-11F. AO: Reports an oil leak of ~5 gpm on RFPT A bearings.
 
Job Performance Measure (JPM)  9    STEP / STANDARD SAT / UNSAT Step 1 1:     
Job Performance Measure (JPM)  9    STEP / STANDARD SAT / UNSAT Step 11:     
[1] IF BOTH of the following exist:
[1] IF BOTH of the following exist:
Emergency RPV Depressurization is required, AND  Group 1 Isolation Signal exists, THEN EXIT this procedure and ENTER EOI Appendix 11H.  
Emergency RPV Depressurization is required, AND  Group 1 Isolation Signal exists, THEN EXIT this procedure and ENTER EOI Appendix 11H.  


Standard:
Standard:
Verifies that a Group 1 Isolation signal Does Not exist by observing illuminated RED PCIS Group I lights and/or Verified MSIVs are open by observing illuminated RED valve position indicating lights for each valve.
Verifies that a Group 1 Isolation signal Does Not exist by observing illuminated RED PCIS Group I lights and/or Verified MSIVs are open by observing illuminated RED valve position indicating lights for each valve.


SAT  UNSAT  N/A Step 12:     
SAT  UNSAT  N/A Step 1 2:     
[2] VERIFY MSIVs open.
[2] VERIFY MSIVs open.
Standard:
Standard:
 
Verifies MSIVs OPEN SAT  UNSAT  N/A Job Performance Measure (JPM)  10  STEP / STANDARD SAT / UNSAT Step 1 3:    [3] VERIFY Hotwell Pressure at or below  
Verifies MSIVs OPEN SAT  UNSAT  N/A Job Performance Measure (JPM)  10  STEP / STANDARD SAT / UNSAT Step 13:    [3] VERIFY Hotwell Pressure at or below  
-7 in. Hg. Standard:
-7 in. Hg.
Standard:
 
Verifies Hotwell Pressure at or below  
Verifies Hotwell Pressure at or below  
-7 in. Hg    SAT  UNSAT  N/A Step 14:     
-7 in. Hg    SAT  UNSAT  N/A Step 1 4:     
[4] PLACE RFPTs in service as follows:
[4] PLACE RFPTs in service as follows:
   [4.1] VERIFY the following:
   [4.1] VERIFY the following:
  [4.1.1] At least one condensate pump running. [4.1.2] At least one condensate booster pump running. [4.1.3] Condensate System aligned to supply suction toRFPs.
  [4.1.1] At least one condensate pump running. [4.1.2] At least one condensate booster pump running. [4.1.3] Condensate System aligned to supply suction toRFPs.
Standard:
Standard:
Verifies one condensate pump and one condensate booster pump running, verifies condensate system aligned to supply suction to RFPs.
Verifies one condensate pump and one condensate booster pump running, verifies condensate system aligned to supply suction to RFPs.
SAT  UNSAT  N/A Step 15:     
SAT  UNSAT  N/A Step 1 5:     
[4.2] VERIFY Main Oil Pump running for each RFPT to be started. Standard:
[4.2] VERIFY Main Oil Pump running for each RFPT to be started. Standard:
 
Verifies main oil pump running for RFPT 2B  SAT  UNSAT  N/A Step 1 6:     
Verifies main oil pump running for RFPT 2B  SAT  UNSAT  N/A Step 16:     
[4.3] VERIFY CLOSED 2-FCV-3-12, RFP 2B DISCHARGE VALVE.
[4.3] VERIFY CLOSED 2-FCV-3-12, RFP 2B DISCHARGE VALVE.
Standard:
Standard:
VERIFY CLOSED 2-FCV-3-12, RFP 2B DISCHARGE VALVE.
VERIFY CLOSED 2-FCV-3-12, RFP 2B DISCHARGE VALVE.
Critical Step SAT  UNSAT  N/A Job Performance Measure (JPM)  11  STEP / STANDARD SAT / UNSAT Step 17:    [4.4] DEPRESS 2-HS-46-9A, RFPT 2BSPEED CONT RAISE/LOWER, and VERIFY amber light is illuminated.
Critical Step SAT  UNSAT  N/A Job Performance Measure (JPM)  11  STEP / STANDARD SAT / UNSAT Step 1 7:    [4.4] DEPRESS 2-HS-46-9A, RFPT 2BSPEED CONT RAISE/LOWER, and VERIFY amber light is illuminated.
Standard:
Standard:
Depresses 2
Depresses 2
-HS-46-9A Critical Step SAT  UNSAT  N/A Step 18:     
-HS-46-9A Critical Step SAT  UNSAT  N/A Step 1 8:     
[4.5] DEPRESS 2-HS-3-150A, RFPT 2B TRIP RESET.
[4.5] DEPRESS 2-HS-3-150A , RFPT 2B TRIP RESET.
Standard:
Standard:
Depresses 2
Depresses 2
-HS-3-150A and verifies the 2
-HS-3-150A and verifies the 2
-ZI-1-133 LP Stop Valve and 2
-ZI-1-1 33 LP Stop Valve and 2
-FCV-135 HP Stop Valve comes OPEN.
-FCV-1 35 HP Stop Valve comes OPEN.
Critical Step SAT  UNSAT  N/A Step 19:     
Critical Step SAT  UNSAT  N/A Step 1 9:     
[4.6] PLACE 2-HS-46-138A, RFPT 2B START/LOCAL ENABLE, in START. Standard:
[4.6] PLACE 2-HS-46-138A, RFPT 2B START/LOCAL ENABLE, in START. Standard:
 
Places 2-HS-46-138A in START  Critical Step SAT  UNSAT  N/A Step 2 0:   
Places 2-HS-46-138A in START  Critical Step SAT  UNSAT  N/A Step 20:   
[4.7] CHECK RFPT 2B speed increases to approximately 600 rpm.
[4.7] CHECK RFPT 2B speed increases to approximately 600 rpm.
Standard:
Standard:
Verifies RFPT 2B speed increases to approximately 600 rpm SAT  UNSAT  N/A Job Performance Measure (JPM)  12  STEP / STANDARD SAT / UNSAT Step 21:    [4.8] VERIFY OPEN 2-FCV-3-13, RFP2B MIN FLOW VALVE.
Verifies RFPT 2B speed increases to approximately 600 rpm SAT  UNSAT  N/A Job Performance Measure (JPM)  12  STEP / STANDARD SAT / UNSAT Step 21:    [4.8] VERIFY OPEN 2-FCV-3-13, RFP2B MIN FLOW VALVE.
Standard:
Standard:
Verifies 2-FCV-3-13 OPEN  SAT  UNSAT  N/A Step 21:  CAUTION RFP discharge pressure is limited to below 1250 psig to avoid system damage.   
Verifies 2-FCV-3-13 OPEN  SAT  UNSAT  N/A Step 21:  CAUTION RFP discharge pressure is limited to below 1250 psig to avoid system damage.   
[4.9] PLACE 2-HS-46-9A, RFPT 2B SPEED CONT RAISE/LOWER in RAISE to raise RFPT speed, maintaining discharge pressure less than 1250 psig. Standard:
[4.9] PLACE 2-HS-46-9A, RFPT 2B SPEED CONT RAISE/LOWER in RAISE to raise RFPT speed, maintaining discharge pressure less than 1250 psig. Standard:
Raises RFPT speed using Manual Speed Control Handswitch, maintaining discharge pressure <1250 psig as indicated on 2-PI-3-9A RFPT 2B (Only Critical if exceeds 1250 psig, any pressure <1250 psig is acceptable).
Raises RFPT speed using Manual Speed Control Handswitch, maintaining discharge pressure <1250 psig as indicated on 2-PI-3-9A RFPT 2B (Only Critical if exceeds 1250 psig, any pressure <1250 psig is acceptable).
Critical Step SAT  UNSAT  N/A  STOP TIME  
Critical Step SAT  UNSAT  N/A  STOP TIME END OF TASK
 
END OF TASK


Job Performance Measure (JPM)  13  Provide to Applicant IN-SIMULATOR:  I will explain the initial conditions and state the task to be performed. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's Correct".  (OR "That's Incorrect", if applicable). When you have completed your assigned task, you will say, "my task is complete" and I will acknowledge that your task is complete.
Job Performance Measure (JPM)  13  Provide to Applicant IN-SIMULATOR:  I will explain the initial conditions and state the task to be performed. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's Correct".  (OR "That's Incorrect", if applicable). When you have completed your assigned task, you will say, "my task is complete" and I will acknowledge that your task is complete.
Line 4,720: Line 4,143:
3-EOI Appendix
3-EOI Appendix
-11F Alternate RPV Pressure Control Systems: RFPT On Minimum Flow JPM NUMBER:
-11F Alternate RPV Pressure Control Systems: RFPT On Minimum Flow JPM NUMBER:
JPM 670A U3 REVISION:
JPM 670A U 3 REVISION: 0  TASK APPLICABILITY:
0  TASK APPLICABILITY:
SRO      STA      UO        NAUO TASK NUMBER / TASK TITLE(S):
SRO      STA      UO        NAUO TASK NUMBER / TASK TITLE(S):
U-000-EM-58 Lineup Alternate RPV Pressure Control Systems- RFPT on Minimum Flow IAW EOI Appendix 11F K/A RATINGS:
U-000-EM-58 Lineup Alternate RPV Pressure Control Systems- RFPT on Minimum Flow IAW EOI Appendix 11F K/A RATINGS:
RO: 3.6  SRO: 3.6 K/A No. & STATEMENT:
RO: 3.6  SRO: 3.6 K/A No. & STATEMENT:
239001 Main and Reheat Steam System A1.01 Ability to predict and/or monitor changes in parameters associated with operating the MAIN AND REHEAT STEAM SYSTEM controls including: Main steam pressure RELATED PRA INFORMATION:
239001 Main and Reheat Steam System A1.01 Ability to predict and/or monitor changes in parameters associated with operating the MAIN AND REHEAT STEAM SYSTEM controls including: Main steam pressure RELATED PRA INFORMATION:
None SAFETY FUNCTION:
None SAFETY FUNCTION: 3  EVALUATION LOCATION:
3  EVALUATION LOCATION:
In-Plant  Simulator   Control R oom   Lab    Other - List  APPLICABLE METHOD OF TESTING:
In-Plant  Simulator Control Room   Lab    Other - List  APPLICABLE METHOD OF TESTING:
Discussion Simulate/Walkthrough Perform   TIME FOR COMPLETION:      NA      TIME CRITICAL (Y/N)
Discussion Simulate/Walkthrough Perform TIME FOR COMPLETION:      NA      TIME CRITICAL (Y/N)
ALTERNATE PATH (Y/N)
ALTERNATE PATH (Y/N)
Developed by:
Developed by:
Developer Date  (Ensure validator is briefed on exam security per NPG
Developer Date  (Ensure validator is briefed on exam security per NPG
-SPP-17.8.1)                (See JPM Validation Checklist in NPG
-SPP-17.8.1)                (See JPM Validation Checklist in NPG
-SPP-17.8.2)      Validated by:
-SPP-17.8.2)      Validated by:
Approved by:
Approved by:
Validator Date  Approved by:
Validator   Date  Approved by:
Site Training Management Date  Site Training Program Owner Date    N Y Job Performance Measure (JPM)  2  OPERATOR:  ________________________________
Site Training Management Date  Site Training Program Owner Date    N Y Job Performance Measure (JPM)  2  OPERATOR:  ________________________________
JPM Number:  __
JPM Number:  __
Line 4,746: Line 4,167:
Operator Fundamental evaluated: Monitoring plant conditions and indications closely and controlling plant evolutions precisely.
Operator Fundamental evaluated: Monitoring plant conditions and indications closely and controlling plant evolutions precisely.
PRA: NA REFERENCES/PROCEDURES NEEDED:
PRA: NA REFERENCES/PROCEDURES NEEDED:
Procedure
Procedure:  3-EOI-APPENDIX-11F  VERIFICATION TIME:          PERFORMANCE TIME:
:  3-EOI-APPENDIX-11F  VERIFICATION TIME:          PERFORMANCE TIME:
COMMENTS:  
COMMENTS:  


Line 4,759: Line 4,179:
DATE: __________
DATE: __________


EXAMINER Job Performance Measure (JPM)  3  SIMULATOR SETUP IC 28 Exam IC 284        Malfunctions Description Event Severity Delay Initial set fw15a SPURIOUS RFP BEARING LOW OIL PRESSURE 15 N/A 0 N/A tc03a-j  Fail Bypass Valves closed 1 0% 0 N/A ad01e  SRV 1-31 stuck open 1 26% 0 N/A                                    Remotes Description Event Severity Delay Initial set                        Overrides Description Event Severity Delay Initial set                           
EXAMINER Job Performance Measure (JPM)  3  SIMULATOR SETUP IC 28 Exam IC 284        Malfunctions Description Event Severity Delay Initial set fw15a SPURIOUS RFP BEARING LOW OIL PRESSURE 1 5 N/A 0 N/A tc03a-j  Fail Bypass Valves closed 1 0% 0 N/A ad01e  SRV 1-31 stuck open 1 26% 0 N/A                                    Remotes Description Event Severity Delay Initial set                        Overrides Description Event Severity Delay Initial set                           


Job Performance Measure (JPM)  4  Initial Setup:
Job Performance Measure (JPM)  4  Initial Setup:
Line 4,785: Line 4,205:
You are an Operator on Unit  
You are an Operator on Unit  
: 3. The Unit 3 reactor has scrammed and the turbine bypass valves are not responding for pressure control due to a loss of EHC fluid. EO I-1 has been followed to RC/P
: 3. The Unit 3 reactor has scrammed and the turbine bypass valves are not responding for pressure control due to a loss of EHC fluid. EO I-1 has been followed to RC/P
-4. Reactor water level control is in automatic on RFPT 3C.   
-4. Reactor water level control is in automatic on RFPT 3 C.   


INITIATING CUES
INITIATING CUES
Line 4,792: Line 4,212:


Job Performance Measure (JPM)  7  START TIME STEP / STANDARD SAT / UNSAT Step 1:    [1] IF BOTH of the following exist:
Job Performance Measure (JPM)  7  START TIME STEP / STANDARD SAT / UNSAT Step 1:    [1] IF BOTH of the following exist:
Emergency RPV Depressurization is required,
Emergency RPV Depressurization is required, AND  Group 1 Isolation Signal exists, THEN  EXIT this procedure and ENTER EOI Appendix 11H.  
 
AND  Group 1 Isolation Signal exists, THEN  EXIT this procedure and ENTER EOI Appendix 11H.  


Standard:
Standard:
Verifies that a Group 1 Isolation signal Does Not exist by observing illuminated RED PCIS Group I lights and/or Verified MSIVs are open by observing illuminated RED valve position indicating lights for each valve.
Verifies that a Group 1 Isolation signal Does Not exist by observing illuminated RED PCIS Group I lights and/or Verified MSIVs are open by observing illuminated RED valve position indicating lights for each valve.


Line 4,803: Line 4,220:
[2] VERIFY MSIVs open.
[2] VERIFY MSIVs open.
Standard:
Standard:
Verifies MSIVs OPEN
Verifies MSIVs OPEN


SAT  UNSAT  N/A Job Performance Measure (JPM)  8  STEP / STANDARD SAT / UNSAT Step 3:    [3] VERIFY Hotwell Pressure at or below  
SAT  UNSAT  N/A Job Performance Measure (JPM)  8  STEP / STANDARD SAT / UNSAT Step 3:    [3] VERIFY Hotwell Pressure at or below  
-7 in. Hg.
-7 in. Hg. Standard:
Standard:
 
Verifies Hotwell Pressure at or below  
Verifies Hotwell Pressure at or below  
-7 in. Hg    SAT  UNSAT  N/A Step 4:     
-7 in. Hg    SAT  UNSAT  N/A Step 4:     
Line 4,815: Line 4,229:
   [4.1] VERIFY the following:
   [4.1] VERIFY the following:
  [4.1.1] At least one condensate pump running. [4.1.2] At least one condensate booster pump running. [4.1.3] Condensate System aligned to supply suction to RFPs. Standard:
  [4.1.1] At least one condensate pump running. [4.1.2] At least one condensate booster pump running. [4.1.3] Condensate System aligned to supply suction to RFPs. Standard:
Verifies one condensate pump and one condensate booster pump running, verifies condensate system aligned to supply suction to RFPs.
Verifies one condensate pump and one condensate booster pump running, verifies condensate system aligned to supply suction to RFPs.
SAT  UNSAT  N/A Step 5:     
SAT  UNSAT  N/A Step 5:     
[4.2] VERIFY Main Oil Pump running for each RFPT to be started. Standard:
[4.2] VERIFY Main Oil Pump running for each RFPT to be started. Standard:
 
Verifies main oil pump running for RFPT 3 A SAT  UNSAT  N/A Step 6:     
Verifies main oil pump running for RFPT 3A SAT  UNSAT  N/A Step 6:     
[4.3] VERIFY CLOSED 3-FCV-3-19, RFP 3 A DISCHARGE VALVE.
[4.3] VERIFY CLOSED 3-FCV-3-19, RFP 3A DISCHARGE VALVE.
Standard:
Standard:
 
VERIFY CLOSED 3-FCV-3-19, RFP 3 A DISCHARGE VALVE.
VERIFY CLOSED 3-FCV-3-19, RFP 3A DISCHARGE VALVE.
Critical Step
Critical Step


SAT  UNSAT  N/A Job Performance Measure (JPM)  9  STEP / STANDARD SAT / UNSAT Step 7:    [4.4] DEPRESS 3-HS-46-8A, RFPT 3A SPEED CONT RAISE/LOWER, and VERIFY amber light is illuminated.
SAT  UNSAT  N/A Job Performance Measure (JPM)  9  STEP / STANDARD SAT / UNSAT Step 7:    [4.4] DEPRESS 3-HS-46-8A, RFPT 3 A SPEED CONT RAISE/LOWER, and VERIFY amber light is illuminated.
Standard:
Standard:
Depresses 3-HS-46-8A  Critical Step SAT  UNSAT  N/A Step 8:     
Depresses 3-HS-46-8A  Critical Step SAT  UNSAT  N/A Step 8:     
[4.5] DEPRESS 3-HS-3-124A, RFPT 3A TRIP RESET.
[4.5] DEPRESS 3-HS-3-124A , RFPT 3 A TRIP RESET.
Standard:
Standard:
Depresses 3
Depresses 3
-HS-3-124A and resets RFPT Trip and verifies the 3
-HS-3-124A and resets RFPT Trip and verifies the 3
Line 4,839: Line 4,248:
-ZI-127 HP Stop Valve comes OPEN.
-ZI-127 HP Stop Valve comes OPEN.
Critical Step SAT  UNSAT  N/A Step 9:     
Critical Step SAT  UNSAT  N/A Step 9:     
[4.6] PLACE 3-HS-46-112A RFPT 3A START/LOCAL ENABLE, in START. Standard:
[4.6] PLACE 3-HS-46-112A RFPT 3 A START/LOCAL ENABLE, in START. Standard:
 
Places 3-HS-46-112A in START Critical Step SAT  UNSAT  N/A Note to Examiner:
Places 3-HS-46-112A in START Critical Step SAT  UNSAT  N/A Note to Examiner:
RFPT A will Trip due to Low Bearing Oil Pressure at > 350 RPM Step 10:    [4.7] CHECK RFPT 3A speed increases to approximately 600 rpm.
RFPT A will Trip due to Low Bearing Oil Pressure at > 350 RPM Step 10:    [4.7] CHECK RFPT 3 A speed increases to approximately 600 rpm.
Standard:
Standard:
Operator responds to RFPT A Trip and reports to US and begins to use B RFP for RPV Pressure Control per 3-EOI-APPENDIX-11F. SAT  UNSAT  N/A CUE:  US: Proceed as directed per 3-EOI-APPENDIX-11F. AO: Reports an oil leak of ~5 gpm on RFPT A bearings.
Operator responds to RFPT A Trip and reports to US and begins to use B RFP for RPV Pressure Control per 3-EOI-APPENDIX-11F. SAT  UNSAT  N/A CUE:  US: Proceed as directed per 3-EOI-APPENDIX-11F. AO: Reports an oil leak of ~5 gpm on RFPT A bearings.
 
Job Performance Measure (JPM)  10 STEP / STANDARD SAT / UNSAT Step 1 1:    [1] IF BOTH of the following exist:
Job Performance Measure (JPM)  10 STEP / STANDARD SAT / UNSAT Step 11:    [1] IF BOTH of the following exist:
Emergency RPV Depressurization is required, AND  Group 1 Isolation Signal exists, THEN EXIT this procedure and ENTER EOI Appendix 11H.  
Emergency RPV Depressurization is required, AND  Group 1 Isolation Signal exists, THEN EXIT this procedure and ENTER EOI Appendix 11H.  


Standard:
Standard:
Verifies that a Group 1 Isolation signal Does Not exist by observing illuminated RED PCIS Group I lights and/or Verified MSIVs are open by observing illuminated RED valve position indicating lights for each valve.
Verifies that a Group 1 Isolation signal Does Not exist by observing illuminated RED PCIS Group I lights and/or Verified MSIVs are open by observing illuminated RED valve position indicating lights for each valve.


SAT  UNSAT  N/A Step 12:     
SAT  UNSAT  N/A Step 1 2:     
[2] VERIFY MSIVs open.
[2] VERIFY MSIVs open.
Standard:
Standard:
 
Verifies MSIVs OPEN SAT  UNSAT  N/A Job Performance Measure (JPM)  11  STEP / STANDARD SAT / UNSAT Step 1 3:    [3] VERIFY Hotwell Pressure at or below  
Verifies MSIVs OPEN SAT  UNSAT  N/A Job Performance Measure (JPM)  11  STEP / STANDARD SAT / UNSAT Step 13:    [3] VERIFY Hotwell Pressure at or below  
-7 in. Hg. Standard:
-7 in. Hg.
Standard:
 
Verifies Hotwell Pressure at or below  
Verifies Hotwell Pressure at or below  
-7 in. Hg    SAT  UNSAT  N/A Step 14:     
-7 in. Hg    SAT  UNSAT  N/A Step 1 4:     
[4] PLACE RFPTs in service as follows:
[4] PLACE RFPTs in service as follows:
   [4.1] VERIFY the following:
   [4.1] VERIFY the following:
  [4.1.1] At least one condensate pump running. [4.1.2] At least one condensate booster pump running. [4.1.3] Condensate System aligned to supply suction to RFPs. Standard:
  [4.1.1] At least one condensate pump running. [4.1.2] At least one condensate booster pump running. [4.1.3] Condensate System aligned to supply suction to RFPs. Standard:
Verifies one condensate pump and one condensate booster pump running, verifies condensate system aligned to supply suction to RFPs.
Verifies one condensate pump and one condensate booster pump running, verifies condensate system aligned to supply suction to RFPs.


SAT  UNSAT  N/A Step 15:     
SAT  UNSAT  N/A Step 1 5:     
[4.2] VERIFY Main Oil Pump running for each RFPT to be started. Standard:
[4.2] VERIFY Main Oil Pump running for each RFPT to be started. Standard:
 
Verifies main oil pump running for RFPT 3 B SAT  UNSAT  N/A Step 1 6:     
Verifies main oil pump running for RFPT 3B SAT  UNSAT  N/A Step 16:     
[4.3] VERIFY CLOSED 3-FCV-3-12, RFP 3 B DISCHARGE VALVE.
[4.3] VERIFY CLOSED 3-FCV-3-12, RFP 3B DISCHARGE VALVE.
Standard:
Standard:
 
VERIFY CLOSED 3-FCV-3-12, RFP 3 B DISCHARGE VALVE.
VERIFY CLOSED 3-FCV-3-12, RFP 3B DISCHARGE VALVE.
Critical Step
Critical Step


SAT  UNSAT  N/A Job Performance Measure (JPM)  12  STEP / STANDARD SAT / UNSAT Step 17:    [4.4] DEPRESS 3-HS-46-9A, RFPT 3B SPEED CONT RAISE/LOWER, and VERIFY amber light is illuminated.
SAT  UNSAT  N/A Job Performance Measure (JPM)  12  STEP / STANDARD SAT / UNSAT Step 1 7:    [4.4] DEPRESS 3-HS-46-9A, RFPT 3 B SPEED CONT RAISE/LOWER, and VERIFY amber light is illuminated.
Standard:
Standard:
 
Depresses 3-HS-46-9A  Critical Step SAT  UNSAT  N/A Step 1 8:     
Depresses 3-HS-46-9A  Critical Step SAT  UNSAT  N/A Step 18:     
[4.5] DEPRESS 3-HS-3-150A , RFPT 3B TRIP RESET.
[4.5] DEPRESS 3-HS-3-150A, RFPT 3B TRIP RESET.
Standard:
Standard:
Depresses 3
Depresses 3
-HS-3-150A and verifies the 3-ZI-1-133 LP Stop Valve and 3
-HS-3-150A and verifies the 3-ZI-1-133 LP Stop Valve and 3
-FCV-135 HP Stop Valve comes OPEN.
-FCV-135 HP Stop Valve comes OPEN.
Critical Step SAT  UNSAT  N/A Step 19:     
Critical Step SAT  UNSAT  N/A Step 1 9:     
[4.6] PLACE 3-HS-46-138A, RFPT 3B START/LOCAL ENABLE, in START. Standard:
[4.6] PLACE 3-HS-46-138A, RFPT 3B START/LOCAL ENABLE, in START. Standard:
 
Places 3-HS-46-138A in START  Critical Step SAT  UNSAT  N/A Step 2 0:    [4.7] CHECK RFPT 3B speed increases to approximately 600 rpm.
Places 3-HS-46-138A in START  Critical Step SAT  UNSAT  N/A Step 20:    [4.7] CHECK RFPT 3B speed increases to approximately 600 rpm.
Standard:
Standard:
Verifies RFPT 3B speed increases to approximately 600 rpm SAT  UNSAT  N/A Job Performance Measure (JPM)  13  STEP / STANDARD SAT / UNSAT Step 21:    [4.8] VERIFY OPEN 3-FCV-3-13, RFP 3B MIN FLOW VALVE.
Verifies RFPT 3B speed increases to approximately 600 rpm SAT  UNSAT  N/A Job Performance Measure (JPM)  13  STEP / STANDARD SAT / UNSAT Step 21:    [4.8] VERIFY OPEN 3-FCV-3-13, RFP 3B MIN FLOW VALVE.
Standard:
Standard:
Verifies 3-FCV-3-13 OPEN  Critical Step SAT  UNSAT  N/A Step 21:  CAUTION RFP discharge pressure is limited to below 1250 psig to avoid system damage.   
Verifies 3-FCV-3-13 OPEN  Critical Step SAT  UNSAT  N/A Step 21:  CAUTION RFP discharge pressure is limited to below 1250 psig to avoid system damage.   
[4.9] PLACE 3-HS-46-9A, RFPT 3B SPEED CONT RAISE/LOWER in RAISE to raise RFPT speed, maintaining discharge pressure less than 1250 psig. Standard:
[4.9] PLACE 3-HS-46-9A, RFPT 3 B SPEED CONT RAISE/LOWER in RAISE to raise RFPT speed, maintaining discharge pressure less than 1250 psig. Standard:
 
Raises RFPT speed using Manual Speed Control Handswitch, maintaining discharge pressure <1250 psig as indicated on 3-PI-3-9A RFPT 3B (Only Critical if exceeds 1250 psig, any pressure <1250 psig is acceptable).
Raises RFPT speed using Manual Speed Control Handswitch, maintaining discharge pressure <1250 psig as indicated on 3-PI-3-9A RFPT 3B (Only Critical if exceeds 1250 psig, any pressure <1250 psig is acceptable).
Critical Step SAT  UNSAT  N/A  STOP TIME END OF TASK
Critical Step SAT  UNSAT  N/A  STOP TIME END OF TASK
Line 4,911: Line 4,304:
You are an Operator on Unit  
You are an Operator on Unit  
: 3. The Unit 3 reactor has scrammed and the turbine bypa ss valves are not responding for pressure control due to a loss of EHC fluid. EO I-1 has been followed to RC/P
: 3. The Unit 3 reactor has scrammed and the turbine bypa ss valves are not responding for pressure control due to a loss of EHC fluid. EO I-1 has been followed to RC/P
-4. Reactor water level control is in automatic on RFPT 3C.   
-4. Reactor water level control is in automatic on RFPT 3 C.   


INITIATING CUES
INITIATING CUES
Line 4,918: Line 4,311:


Job Performance Measure (JPM)  1  SITE: BFN JPM TITLE:
Job Performance Measure (JPM)  1  SITE: BFN JPM TITLE:
N2 MAKEUP TO PRIMARY CONTAINMENT WITH 2-EOI-APPENDIX-14A JPM NUMBER:
N2 MAKEUP TO PRIMARY CONTAINMENT WITH         2-EOI-APPENDIX-14A JPM NUMBER:
669 U2 REVISION:
669 U2 REVISION: 0  TASK APPLICABILITY:
0  TASK APPLICABILITY:
SRO STA UO NAUO TASK NUMBER / TASK TITLE(S):
SRO STA UO NAUO TASK NUMBER / TASK TITLE(S):
U-000-EM-77 Lineup nitrogen Makeup to primary Containment IAW EOI
U-000-EM-77 Lineup nitrogen Makeup to primary Containment IAW EOI
Line 4,929: Line 4,321:
None SAFETY FUNCTION:
None SAFETY FUNCTION:
5  EVALUATION LOCATION:
5  EVALUATION LOCATION:
In-Plant Simulator Control Room   Lab  Other - List  APPLICABLE METHOD OF TESTING:
In-Plant Simulator Control R oom   Lab  Other - List  APPLICABLE METHOD OF TESTING:
Discussion Simulate/Walkthrough Perform    TIME FOR COMPLETION:      NA      TIME CRITICAL (Y/N)      ALTERNATE PATH (Y/N)
Discussion Simulate/Walkthrough Perform    TIME FOR COMPLETION:      NA      TIME CRITICAL (Y/N)      ALTERNATE PATH (Y/N)
Developed by:
Developed by:
Developer Date  (Ensure validator is briefed on exam security per NPG
Developer Date  (Ensure validator is briefed on exam security per NPG
-SPP-17.8.1)  (See JPM Validation Checklist in NPG-SPP-17.8.2)      Validated by:
-SPP-17.8.1)  (See JPM Validation Checklist in NPG-SPP-17.8.2)      Validated by:
Approved by:
Approved by:
Validator Date  Approved by:
Validator   Date  Approved by:
Site Training Management Date  Site Training Program Owner Date    N N Job Performance Measure (JPM)  2  OPERATOR:  ________________________________
Site Training Management Date  Site Training Program Owner Date    N N Job Performance Measure (JPM)  2  OPERATOR:  ________________________________
JPM Number:
JPM Number:
Line 4,944: Line 4,336:
Operator Fundamental evaluated: Monitoring plant conditions and indications closely and controlling plant evolutions precisely.
Operator Fundamental evaluated: Monitoring plant conditions and indications closely and controlling plant evolutions precisely.
PRA: NA REFERENCES/PROCEDURES NEEDED:
PRA: NA REFERENCES/PROCEDURES NEEDED:
Procedure
Procedure:  2-EOI-APPENDIX-14A VERIFICATION TIME: 15  min    PERFORMANCE TIME:
:  2-EOI-APPENDIX-14A VERIFICATION TIME: 15  min    PERFORMANCE TIME:
COMMENTS:  
COMMENTS:  


Line 4,965: Line 4,356:
: 6. Fire Trigger 2
: 6. Fire Trigger 2
: 7. Place H2/O2 Analyzer in service with H2/O2 ISOL BYP Keylock Switch in BYPASS per EOI APPDX 19
: 7. Place H2/O2 Analyzer in service with H2/O2 ISOL BYP Keylock Switch in BYPASS per EOI APPDX 19
: 8. Place DW Vent in Service per EOI APPX 12
: 8. Place DW Vent in Service per EOI APPX 12 9. Wait for Group 6 schedule file to time out and alrms to settle
: 9. Wait for Group 6 schedule file to time out and alrms to settle
: 10. Freeze simulator and save IC.
: 10. Freeze simulator and save IC.
Malfunctions Description Event Severity Delay Initial set  TH22 COOLANT LEAK INSIDE DRYWELL 2 100 0 Yes TH23 FUEL CLADDING DAMAGE 2 100% 0 N/A RC08 RCIC STEAM SUPPLY VALVE AUTO OPENING FAILURE 1 N/A 0 N/A HP04 HPCI STEAM SUPPLY VALVE AUTO OPENING FAILURE 1 N/A 0 N/A CS04A CORE SPRAY LOGIC POWER FAILURE DIV I 1 N/A 0 N/A CS04B CORE SPRAY LOGIC POWER FAILURE DIV II 1 N/A 0 N/A RD01A CRD PUMP TRIP 2A 1 N/A 0 N/A RD01B CRD PUMP TRIP 2B 1 N/A 0 N/A FW01A CONDENSATE PUMP TRIP 2A 1 N/A 0 N/A FW01B CONDENSATE 1 N/A 0 N/A Job Performance Measure (JPM)  4  PUMP TRIP 2B FW01C CONDENSATE PUMP TRIP 2C 1 N/A 0 N/A PC08 H2 IN DRYWELL_
Malfunctions Description Event Severity Delay Initial set  TH22 COOLANT LEAK INSIDE DRYWELL 2 100 0 Yes TH23 FUEL CLADDING DAMAGE 2 100% 0 N/A RC08 RCIC STEAM SUPPLY VALVE AUTO OPENING FAILURE 1 N/A 0 N/A HP04 HPCI STEAM SUPPLY VALVE AUTO OPENING FAILURE 1 N/A 0 N/A CS04A CORE SPRAY LOGIC POWER FAILURE DIV I 1 N/A 0 N/A CS04B CORE SPRAY LOGIC POWER FAILURE DIV II 1 N/A 0 N/A RD01A CRD PUMP TRIP 2A 1 N/A 0 N/A RD01B CRD PUMP TRIP 2B 1 N/A 0 N/A FW01A CONDENSATE PUMP TRIP 2A 1 N/A 0 N/A FW01B CONDENSATE 1 N/A 0 N/A Job Performance Measure (JPM)  4  PUMP TRIP 2B FW01C CONDENSATE PUMP TRIP 2C 1 N/A 0 N/A PC08 H2 IN DRYWELL_
Line 4,979: Line 4,369:
You are an Operator on Unit 2.
You are an Operator on Unit 2.
The Reactor is shutdown.
The Reactor is shutdown.
2-EOI-APPENDIX-12has been completed 2-EOI-APPENDIX-19 has been completed.
2-EOI-APPENDIX-12has been completed 2-EOI-APPENDIX-19 has been completed.
PCIS Group 6 has been overridden per 2
PCIS Group 6 has been overridden per 2
-EOI-APPENDIX-8E.   
-EOI-APPENDIX-8E.   
Line 4,989: Line 4,379:
.   
.   


Job Performance Measure (JPM)  7  START TIME  STEP / STANDARD SAT / UNSAT Step 1:  2. MONITOR Drywell and Suppression Chamber H 2 and O2concentrations on one or more of the following displays(2
Job Performance Measure (JPM)  7  START TIME  STEP / STANDARD SAT / UNSAT Step 1:  2. MONITOR Drywell and Suppression Chamber H 2 and O 2concentrations on one or more of the following displays(2
-EOI Appendix 19):
-EOI Appendix 19):
2-MON-76-110, H2/O2 ANALYZER (Panel 2 55)  2-XR-76-110, H2/O2 CONCENTRATION (Panel 2-9-54)  Standard:
2-MON-76-110, H2/O2 ANALYZER (Panel 2 55)  2-XR-76-110, H2/O2 CONCENTRATION (Panel 2-9-54)  Standard:
Verifies H2 and O2 concentrations  
Verifies H2 and O2 concentrations  


SAT  UNSAT  N/A Step 2:     
SAT  UNSAT  N/A Step 2:     
: 3. IF ................. Drywell/Suppression Chamber H 2 /O2 analyzer is or becomes inoperable, THEN ...........NOTIFY Chemistry Lab to sample Drywell andSuppression Chamber for H 2 and O2 using CI-644. Standard:
: 3. IF ................. Drywell/Suppression Chamber H 2 /O 2 analyzer is or becomes inoperable, THEN ...........NOTIFY Chemistry Lab to sample Drywell andSuppression Chamber for H 2 and O 2 using CI-644. Standard:
 
Verifies Drywell/Suppression Chamber H 2 /O 2 analyzers are Operable SAT  UNSAT  N/A Job Performance Measure (JPM)  8  STEP / STANDARD SAT / UNSAT Step 3:    4.WHEN ......... Drywell or Suppression Chamber H 2 or O 2 concentration is increasing,THEN ........... CONTINUE in this procedure.
Verifies Drywell/Suppression Chamber H 2 /O2 analyzers are Operable SAT  UNSAT  N/A Job Performance Measure (JPM)  8  STEP / STANDARD SAT / UNSAT Step 3:    4.WHEN ......... Drywell or Suppression Chamber H 2 or O2 concentration is increasing,THEN ........... CONTINUE in this procedure.
Standard:
Standard:
Observes a rise in Drywell H2 Concentration and continues with procedure.
Observes a rise in Drywell H2 Concentration and continues with procedure.
SAT  UNSAT  N/A Step 4:  NOTE This procedure assumes that the normal makeup is from N 2 Storage Tank B. 5. DISPATCH personnel to N2 Storage Tank B to CHECK 0-PI-76-331, N2 TANK B PRESSURE INDICATOR between 160 and 190 psig.
SAT  UNSAT  N/A Step 4:  NOTE This procedure assumes that the normal makeup is from N 2 Storage Tank B. 5. DISPATCH personnel to N 2 Storage Tank B to CHECK 0-PI-76-331, N2 TANK B PRESSURE INDICATOR between 160 and 190 psig.
Standard:
Standard: Dispatches UO to verify N 2 Storage Tank B Pressure  SAT  UNSAT  N/A  CUE: N 2 Storage Tank B Pressure is reading 180 psig Step 5:     
Dispatches UO to verify N2 Storage Tank B Pressure  SAT  UNSAT  N/A  CUE: N2 Storage Tank B Pressure is reading 180 psig Step 5:     
: 6. DETERMINE area with highest H 2 and/or O 2 concentrations and INFORM SRO. Standard:
: 6. DETERMINE area with highest H 2 and/or O2 concentrations and INFORM SRO. Standard:
 
Correctly determines highest concentration is in the drywell and informs  
Correctly determines highest concentration is in the drywell and informs  


Line 5,012: Line 4,397:


Job Performance Measure (JPM)  9  STEP / STANDARD SAT / UNSAT Step 6:    7. VERIFY PCIS RESET (Panel 2 4). Standard:
Job Performance Measure (JPM)  9  STEP / STANDARD SAT / UNSAT Step 6:    7. VERIFY PCIS RESET (Panel 2 4). Standard:
Verifies PCIS RESET on Panel 2 4  Critical Step SAT  UNSAT  N/A Step 7:     
Verifies PCIS RESET on Panel 2 4  Critical Step SAT  UNSAT  N/A Step 7:     
: 8. IF ................. It is desired to makeup N 2 to the Suppression Chamber,THEN ...........CONTINUE in this procedure at Step 10.
: 8. IF ................. It is desired to makeup N 2 to the Suppression Chamber,THEN ...........CONTINUE in this procedure at Step 10.
Standard:
Standard:
Correctly determine step is not applicable and proceeds to step 9.
Correctly determine step is not applicable and proceeds to step 9.
Critical Step SAT  UNSAT  N/A Step 8:   
Critical Step SAT  UNSAT  N/A Step 8:   
: 9. CONTROL Drywell H 2 and O2 as follows:
: 9. CONTROL Drywell H 2 and O 2 as follows:
: a. OPEN the following valves to admit N 2 to Drywell (Panel 2-9-3):  2-FCV-76-18, DRYWELL N2 MAKEUP INBDISOLATION VLV 2-FCV-76-17, PRI CTMT N2 MAKEUP OUTBDISOLATION VLV.
: a. OPEN the following valves to admit N 2 to Drywell (Panel 2-9-3):  2-FCV-76-18, DRYWELL N2 MAKEUP INBDISOLATION VLV 2-FCV-76-17, PRI CTMT N2 MAKEUP OUTBDISOLATION VLV.
Standard:
Standard: OPENS 2-FCV-76-18, DRYWELL N2 MAKEUP INBD ISOLATION VLV &
OPENS 2-FCV-76-18, DRYWELL N2 MAKEUP INBD ISOLATION VLV &
2-FCV-76-17, PRI CTMT N2 MAKEUP OUTBD ISOLATION VLV Critical Step SAT  UNSAT  N/A Step 9:     
2-FCV-76-17, PRI CTMT N2 MAKEUP OUTBD ISOLATION VLV Critical Step SAT  UNSAT  N/A Step 9:     
: b. SLOWLY ADJUST 2-PC-76-14, DW/SUPPR CHBR N2 MU PRESS CONTROL (Panel 2 3), to maintain flow > 55 and
: b. SLOWLY ADJUST 2-PC-76-14, DW/SUPPR CHBR N2 MU PRESS CONTROL (Panel 2 3), to maintain flow > 55 and
  <60 scfm on 2
  <60 scfm on 2
-XR-76-14, DW/SUPPR CHBR N2 MAKEUP FLOW/PRESS (Panel 2 3), or as directed by SRO if SAMG execution is in progress.
-XR-76-14, DW/SUPPR CHBR N2 MAKEUP FLOW/PRESS (Panel 2 3), or as directed by SRO if SAMG execution is in progress.
Standard:  Achieves a flowrate between 55
-60 scfm and monitors Drywell Hydrogen Concentration Lowering Critical Step SAT  UNSAT  N/A Job Performance Measure (JPM)  10  STEP / STANDARD SAT / UNSAT Step 10:    c. CONTINUE N 2 admission to the Drywell UNTIL Drywell H 2 andO 2 are below desired values.
Standard:
Standard:
Achieves a flowrate between 55
-60 scfm and monitors Drywell Hydrogen Concentration Lowering Critical Step SAT  UNSAT  N/A Job Performance Measure (JPM)  10  STEP / STANDARD SAT / UNSAT Step 10:    c. CONTINUEN2 admission to the Drywell UNTIL Drywell H 2 andO2 are below desired values.
Standard:
Monitors Drywell Hydrogen Concentration SAT  UNSAT  N/A  Note to Examiner:  Once satisfied with N2 Flow established between 55  
Monitors Drywell Hydrogen Concentration SAT  UNSAT  N/A  Note to Examiner:  Once satisfied with N2 Flow established between 55  
- 60 scfm with a downward trend on H2 Concentration in the Drywell. End of task.
- 60 scfm with a downward trend on H2 Concentration in the Drywell. End of task.
Pass/ Fail Criteria: Establish N2 Flow> 55 scfm and H2 Concentration on a downward trend.
Pass/ Fail Criteria: Establish N2 Flow> 55 scfm and H2 Concentration on a downward trend.
STOP TIME  
STOP TIME END OF TASK
 
END OF TASK


Job Performance Measure (JPM)  11  Provide to Applicant IN-SIMULATOR:  I will explain the initial conditions and state the task to be performed. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's Correct".  (OR "That's Incorrect", if applicable). When you have completed your assigned task, you will say, "my task is complete" and I will acknowledge that your task is complete.
Job Performance Measure (JPM)  11  Provide to Applicant IN-SIMULATOR:  I will explain the initial conditions and state the task to be performed. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's Correct".  (OR "That's Incorrect", if applicable). When you have completed your assigned task, you will say, "my task is complete" and I will acknowledge that your task is complete.
Line 5,057: Line 4,435:
Job Performance Measure (JPM)  1  SITE: BFN JPM TITLE:
Job Performance Measure (JPM)  1  SITE: BFN JPM TITLE:
N2 MAKEUP TO PRIMARY CONTAINMENT WITH 3-EOI-APPENDIX-14A JPM NUMBER:
N2 MAKEUP TO PRIMARY CONTAINMENT WITH 3-EOI-APPENDIX-14A JPM NUMBER:
670 U3 REVISION:
670 U 3 REVISION: 0  TASK APPLICABILITY:
0  TASK APPLICABILITY:
SRO STA UO NAUO TASK NUMBER / TASK TITLE(S):
SRO STA UO NAUO TASK NUMBER / TASK TITLE(S):
U-000-EM-77 Lineup nitrogen Makeup to primary Containment IAW EOI
U-000-EM-77 Lineup nitrogen Makeup to primary Containment IAW EOI
Line 5,066: Line 4,443:
None SAFETY FUNCTION:
None SAFETY FUNCTION:
5  EVALUATION LOCATION:
5  EVALUATION LOCATION:
In-Plant Simulator Control Room   Lab  Other - List  APPLICABLE METHOD OF TESTING:
In-Plant Simulator Control R oom   Lab  Other - List  APPLICABLE METHOD OF TESTING:
Discussion Simulate/Walkthrough Perform TIME FOR COMPLETION:      NA      TIME CRITICAL (Y/N)      ALTERNATE PATH (Y/N)  Developed by:
Discussion Simulate/Walkthrough Perform   TIME FOR COMPLETION:      NA      TIME CRITICAL (Y/N)      ALTERNATE PATH (Y/N)  Developed by:
Developer Date  (Ensure validator is briefed on exam security per NPG
Developer Date  (Ensure validator is briefed on exam security per NPG
-SPP-17.8.1)  (See JPM Validation Checklist in NPG
-SPP-17.8.1)  (See JPM Validation Checklist in NPG
-SPP-17.8.2)      Validated by:
-SPP-17.8.2)      Validated by:
Approved by:
Approved by:
Validator Date  Approved by:
Validator   Date  Approved by:
Site Training Management Date  Site Training Program Owner Date    N N Job Performance Measure (JPM)  2  OPERATOR:  ________________________________
Site Training Management Date  Site Training Program Owner Date    N N Job Performance Measure (JPM)  2  OPERATOR:  ________________________________
JPM Number:
JPM Number:
Line 5,082: Line 4,459:
Operator Fundamental evaluated: Monitoring plant conditions and indications closely and controlling plant evolutions precisely.
Operator Fundamental evaluated: Monitoring plant conditions and indications closely and controlling plant evolutions precisely.
PRA: NA REFERENCES/PROCEDURES NEEDED:
PRA: NA REFERENCES/PROCEDURES NEEDED:
Procedure
Procedure:  3-EOI-APPENDIX-14 A VERIFICATION TIME:    PERFORMANCE TIME:
:  3-EOI-APPENDIX-14A VERIFICATION TIME:    PERFORMANCE TIME:
COMMENTS:  
COMMENTS:  


Line 5,109: Line 4,485:
2 29 0 N/A PC09 OXYGEN IN DRYWELL_ 2 2.8 0 N/A PC10 H2 IN SUPPRESSION POOL_ 2 18 0 N/A PC11 OXYGEN IN SUPPRESSION POOL_ 2 1.5 0 N/A      Overrides Description Event Severity Delay Initial set ZLOXA554C9 DW EQUIP DRAIN SUMP LEVEL ABNORMAL 2 N/A N/A ON                    Schedule File(s):
2 29 0 N/A PC09 OXYGEN IN DRYWELL_ 2 2.8 0 N/A PC10 H2 IN SUPPRESSION POOL_ 2 18 0 N/A PC11 OXYGEN IN SUPPRESSION POOL_ 2 1.5 0 N/A      Overrides Description Event Severity Delay Initial set ZLOXA554C9 DW EQUIP DRAIN SUMP LEVEL ABNORMAL 2 N/A N/A ON                    Schedule File(s):
JPM 669 U3 N2 Makeup to Primary Containment 2
JPM 669 U3 N2 Makeup to Primary Containment 2
-EOI-APPENDIX-14A.sch Appendix\App. 8E.sch JPM 669 U3 N2 Makeup to Primary Containment 2
-EOI-APPENDIX-14A.sch   Appendix\App. 8E.sch JPM 669 U3 N2 Makeup to Primary Containment 2
-EOI-APPENDIX-14A.evt Job Performance Measure (JPM)  5  Revision Summary Rev No. Effective Date Pages Affected Description 0 05/27/15 All Initial issue
-EOI-APPENDIX-14A.evt Job Performance Measure (JPM)  5  Revision Summary Rev No. Effective Date Pages Affected Description 0 05/27/15 All Initial issue


Line 5,128: Line 4,504:
.   
.   


Job Performance Measure (JPM)  7  START TIME STEP / STANDARD SAT / UNSAT Step 1:  3. MONITOR Drywell and Suppression Chamber H 2 and O2concentrations on one or more of the following displays(
Job Performance Measure (JPM)  7  START TIME STEP / STANDARD SAT / UNSAT Step 1:  3. MONITOR Drywell and Suppression Chamber H 2 and O 2concentrations on one or more of the following displays(3-EOI Appendix 19):
3-EOI Appendix 19):
3-MON-76-110, H2/O2 ANALYZER (Panel 3-9-55)  3-XR-76-110, H2/O2 CONCENTRATION (Panel 3-9-54)  Standard:
3-MON-76-110, H2/O2 ANALYZER (Panel 3-9-55)  3-XR-76-110, H2/O2 CONCENTRATION (Panel 3-9-54)  Standard:
Verifies H2 and O2 concentrations  
Verifies H2 and O2 concentrations  


SAT  UNSAT  N/A Step 2:     
SAT  UNSAT  N/A Step 2:     
: 3. IF ................. Drywell/Suppression Chamber H 2 /O2 analyzer is or becomes inoperable, THEN ...........NOTIFY Chemistry Lab to sample Drywell andSuppression Chamber for H 2 and O2 using CI-644. Standard:
: 3. IF ................. Drywell/Suppression Chamber H 2 /O 2 analyzer is or becomes inoperable, THEN ...........NOTIFY Chemistry Lab to sample Drywell andSuppression Chamber for H 2 and O 2 using CI-644. Standard:
Verifies Drywell/Suppression Chamber H 2 /O 2 analyzers are Operable 


Verifies Drywell/Suppression Chamber H 2 /O2 analyzers are Operable 
SAT UNSAT N/A Job Performance Measure (JPM)  8  STEP / STANDARD SAT / UNSAT Step 3:    4. WHEN ......... Drywell or Suppression Chamber H 2 or O 2 concentration is increasing,THEN ........... CONTINUE in this procedure.
 
SAT UNSAT N/A Job Performance Measure (JPM)  8  STEP / STANDARD SAT / UNSAT Step 3:    4. WHEN ......... Drywell or Suppression Chamber H 2 or O2 concentration is increasing,THEN ........... CONTINUE in this procedure.
Standard:
Standard:
Observes a rise in Drywell H2 Concentration and continues with procedure.
Observes a rise in Drywell H2 Concentration and continues with procedure.
SAT  UNSAT  N/A Step 4:  NOTE This procedure assumes that the normal makeup is from N 2 Storage Tank B. 5. DISPATCH personnel to N 2 Storage Tank B to CHECK 0-PI-76-331, N2 TANK B PRESSURE INDICATOR between 160 and 190 psig.
SAT  UNSAT  N/A Step 4:  NOTE This procedure assumes that the normal makeup is from N 2 Storage Tank B. 5. DISPATCH personnel to N 2 Storage Tank B to CHECK 0-PI-76-331, N2 TANK B PRESSURE INDICATOR between 160 and 190 psig.
Standard:
Standard: Dispatches UO to verify N 2 Storage Tank B Pressure  SAT  UNSAT  N/A  CUE: N 2 Storage Tank B Pressure is reading 180 psig Step 5:     
Dispatches UO to verify N2 Storage Tank B Pressure  SAT  UNSAT  N/A  CUE: N2 Storage Tank B Pressure is reading 180 psig Step 5:     
: 6. DETERMINE area with highest H 2 and/or O 2 concentrations and INFORM SRO. Standard:
: 6. DETERMINE area with highest H 2 and/or O2 concentrations and INFORM SRO. Standard:
 
Correctly determines highest concentration is in the drywell and informs  
Correctly determines highest concentration is in the drywell and informs  


Line 5,153: Line 4,523:


Job Performance Measure (JPM)  9  STEP / STANDARD SAT / UNSAT Step 6:    7. VERIFY PCIS RESET (Panel 3-9-4). Standard:
Job Performance Measure (JPM)  9  STEP / STANDARD SAT / UNSAT Step 6:    7. VERIFY PCIS RESET (Panel 3-9-4). Standard:
Verifies PCIS RESET on Panel 3-9-4  Critical Step SAT  UNSAT  N/A Step 7:     
Verifies PCIS RESET on Panel 3-9-4  Critical Step SAT  UNSAT  N/A Step 7:     
: 8. IF ................. It is desired to makeup N 2 to the Suppression Chamber,THEN ...........CONTINUE in this procedure at Step 10.
: 8. IF ................. It is desired to makeup N 2 to the Suppression Chamber,THEN ...........CONTINUE in this procedure at Step 10.
Standard:
Standard:
Correctly determine step is not applicable and proceeds to step 9.
Correctly determine step is not applicable and proceeds to step 9.
Critical Step SAT  UNSAT  N/A Step 8:   
Critical Step SAT  UNSAT  N/A Step 8:   
: 9. CONTROL Drywell H 2 and O2 as follows:
: 9. CONTROL Drywell H 2 and O 2 as follows:
: a. OPEN the following valves to admit N 2 to Drywell (Panel 3-9-3):  3-FCV-76-18, DRYWELL N2 MAKEUP INBDISOLATION VLV 3-FCV-76-17, PRI CTMT N2 MAKEUP OUTBDISOLATION VLV.
: a. OPEN the following valves to admit N 2 to Drywell (Panel 3-9-3):  3-FCV-76-18, DRYWELL N2 MAKEUP INBDISOLATION VLV 3-FCV-76-17, PRI CTMT N2 MAKEUP OUTBDISOLATION VLV.
Standard:
Standard:
OPENS 3-FCV-76-18, DRYWELL N2 MAKEUP INBD ISOLATION VLV  
OPENS 3-FCV-76-18, DRYWELL N2 MAKEUP INBD ISOLATION VLV  
&3-FCV-76-17, PRI CTMT N2 MAKEUP OUTBD ISOLATION VLV Critical Step SAT  UNSAT  N/A Step 9:     
&3-FCV-76-17, PRI CTMT N2 MAKEUP OUTBD ISOLATION VLV Critical Step SAT  UNSAT  N/A Step 9:     
: b. SLOWLY ADJUST 3-PC-76-14, DW/SUPPR CHBR N2 MUPRESS CONTROL (Panel 3-9-3), to maintain flow between 55 and60 scfm on 3-XR-76-14, DW/SUPPR CHBR N2 MAKEUPFLOW/PRESS (Panel 3-9-3), or as directed by SRO if SAMGexecution is in progress.
: b. SLOWLY ADJUST 3-PC-76-14, DW/SUPPR CHBR N2 MUPRESS CONTROL (Panel 3-9-3), to maintain flow between 55 and60 scfm on 3-XR-76-14, DW/SUPPR CHBR N2 MAKEUPFLOW/PRESS (Panel 3-9-3), or as directed by SRO if SAMGexecution is in progress.
Standard:
Standard:
Achieves a flowrate between 55
Achieves a flowrate between 55
-60 scfm and monitors Drywell Hydrogen Concentration Lowering Critical Step SAT  UNSAT  N/A Job Performance Measure (JPM)  10  STEP / STANDARD SAT / UNSAT Step 10:    c. CONTINUE N2 admission to the Drywell UNTIL Drywell H 2 and O2 are below desired values.
-60 scfm and monitors Drywell Hydrogen Concentration Lowering Critical Step SAT  UNSAT  N/A Job Performance Measure (JPM)  10  STEP / STANDARD SAT / UNSAT Step 10:    c. CONTINUE N 2 admission to the Drywell UNTIL Drywell H 2 and O 2 are below desired values.
Standard:
Standard:
Monitors Drywell Hydrogen Concentration SAT  UNSAT  N/A  Note to Examiner:  Once satisfied with N2 Flow established between 55  
Monitors Drywell Hydrogen Concentration SAT  UNSAT  N/A  Note to Examiner:  Once satisfied with N2 Flow established between 55  
- 60 scfm with a downward trend on H2 Concentration in the Drywell. End of task.
- 60 scfm with a downward trend on H2 Concentration in the Drywell. End of task.
Pass/ Fail Criteria: Establish N2 Flow > 55 scfm and H2 Concentration on a downward trend.
Pass/ Fail Criteria: Establish N2 Flow > 55 scfm and H2 Concentration on a downward trend.
STOP TIME  
STOP TIME END OF TASK
 
END OF TASK


Job Performance Measure (JPM)  11  Provide to Applicant IN-SIMULATOR:  I will explain the initial conditions and state the task to be performed. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's Correct".  (OR "That's Incorrect", if applicable). When you have completed your assigned task, you will say, "my task is complete" and I will acknowledge that your task is complete.
Job Performance Measure (JPM)  11  Provide to Applicant IN-SIMULATOR:  I will explain the initial conditions and state the task to be performed. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's Correct".  (OR "That's Incorrect", if applicable). When you have completed your assigned task, you will say, "my task is complete" and I will acknowledge that your task is complete.
Line 5,187: Line 4,550:
: 3. The Reactor is shutdown.
: 3. The Reactor is shutdown.
3-EOI-APPENDIX-12 has been completed.
3-EOI-APPENDIX-12 has been completed.
3-EOI-APPENDIX-19 has been completed.
3-EOI-APPENDIX-19 h as been completed.
PCIS Group 6 has been overridden per 3
PCIS Group 6 has been overridden per 3
-EOI-APPENDIX-8E.   
-EOI-APPENDIX-8E.   
Line 5,198: Line 4,561:
Job Performance Measure (JPM)  1  SITE: BFN JPM TITLE:
Job Performance Measure (JPM)  1  SITE: BFN JPM TITLE:
Restore Offsite Power to 4KV shutdown board at PNL 9-23 JPM NUMBER:
Restore Offsite Power to 4KV shutdown board at PNL 9-23 JPM NUMBER:
631 U2 REVISION:
631 U2 REVISION: 0  TASK APPLICABILITY:
0  TASK APPLICABILITY:
SRO            STA UO          NAUO TASK NUMBER / TASK TITLE(S):
SRO            STA UO          NAUO TASK NUMBER / TASK TITLE(S):
U-082-NO-09 / Restore Offsite Power to 4KV shutdown board at PNL 9
U-082-NO-09 / Restore Offsite Power to 4KV shutdown board at PNL 9
Line 5,207: Line 4,569:
N/A SAFETY FUNCTION:
N/A SAFETY FUNCTION:
6  EVALUATION LOCATION
6  EVALUATION LOCATION
:      In-Plant     Simulator   Control Roo m      Lab       Other - List   APPLICABLE METHOD OF TESTING:      Discussion      Simulate/Walkthrough        Perform TIME FOR COMPLETION:
:      In-Plan t     Simulato r   Control Roo m      La b       Other - Lis t   APPLICABLE METHOD OF TESTING:      Discussion      Simulate/Walkthrough        Perform TIME FOR COMPLETION:
NATIME CRITICAL (Y/N)        ALTERNATE PATH (Y/N)
NA TIME CRITICAL (Y/N)        ALTERNATE PATH (Y/N)
Developed by:
Developed by:
Developer Date  (Ensure validator is briefed on exam security per NPG
Developer Date  (Ensure validator is briefed on exam security per NPG
-SPP-17.8.1)                (See JPM Validation Checklist in NPG
-SPP-17.8.1)                (See JPM Validation Checklist in NPG
-SPP-17.8.2)      Validated by:
-SPP-17.8.2)      Validated by:
Approved by:
Approved by:
Validator Date  Approved by:
Validator   Date  Approved by:
Site Training Management Date  Site Training Program Owner Date  N N Job Performance Measure (JPM)  2  OPERATOR:  ________________________________
Site Training Management Date  Site Training Program Owner Date  N N Job Performance Measure (JPM)  2  OPERATOR:  ________________________________
JPM Number:
JPM Number:
Line 5,241: Line 4,603:


You are an Operator on Unit 2.
You are an Operator on Unit 2.
No Inclement weather currently exists in the area 8 hours ago, 4 KV Shutdown Board A was separated from Offsite Power in accordance with 0
No Inclement weather currently exists in the area 8 hour s ago, 4 KV Shutdown Board A was separated from Offsite Power in accordance with 0
-OI-82, Standby Diesel Generator System.
-OI-82, Standby Diesel Generator System.


Line 5,251: Line 4,613:
-23.   
-23.   


Job Performance Measure (JPM)  5  START TIME STEP / STANDARD SAT / UNSAT Step 1:    0-OI-82 Standby Diesel Generator System
Job Performance Measure (JPM)  5  START TIME STEP / STANDARD SAT / UNSAT Step 1:    0-OI-82 Standby Diesel Generator System


Section 8.3 Restoring Offsite Power to 4
Section 8.3 Restoring Offsite Power to 4
Line 5,259: Line 4,621:


[1]  VERIFY 4-kV Shutdown Board A is being supplied power by its respective Diesel Generator as the only source of power.
[1]  VERIFY 4-kV Shutdown Board A is being supplied power by its respective Diesel Generator as the only source of power.
Standard:
Standard:   Verifies 4
Verifies 4
-kV Shutdown Board A is being supplied by DG A
-kV Shutdown Board A is being supplied by DG A
. SAT
. SAT
__UNSAT N/A  Step 2:     
__UNSA T N/A  Step 2:     
[2]  VERIFY the associated 4kV shutdown board auto transfer lockout relay is tripped to MANUAL.
[2]  VERIFY the associated 4kV shutdown board auto transfer lockout relay is tripped to MANUAL.
Diesel Handswitch Name Handswitch No. Panel A 4KV SD BD A AUTO/LOCKOUT RESET 0-211-3EA 0-9-23-7  Standard:
Diesel Handswitch Name Handswitch No. Panel A 4KV SD BD A AUTO/LOCKOUT RESET 0-211-3EA 0-9-23-7  Standard: Verifies 4KV SD BD A AUTO/LOCKOUT RESET, HS 211-A, is tripped to manua
Verifies 4KV SD BD A AUTO/LOCKOUT RESET, HS 211-A, is tripped to manua
: l. SAT  UNSAT  N/A Job Performance Measure (JPM)  6  STEP / STANDARD SAT / UNSAT Step 3:    [3]  PLACE the synchroscope switch for the 4
: l. SAT  UNSAT  N/A Job Performance Measure (JPM)  6  STEP / STANDARD SAT / UNSAT Step 3:    [3]  PLACE the synchroscope switch for the 4
-kV shutdown board feeder breaker that is to be paralleled with the Diesel Generator in ON. Standard:
-kV shutdown board feeder breaker that is to be paralleled with the Diesel Generator in ON. Standard: Places Synchroscope switch for 4
Places Synchroscope switch for 4
-kV Shutdown Board A normal feeder breaker 1614 to ON
-kV Shutdown Board A normal feeder breaker 1614 to ON
. Critical Step
. Critical Step
Line 5,275: Line 4,634:
SAT UNSAT N/A  Step 4:     
SAT UNSAT N/A  Step 4:     
[4]  VERIFY 4-kV Shutdown Bus 1(2) voltage is between 3950 Volts and 4400 Volts and NOT undergoing abnormal voltage transients.
[4]  VERIFY 4-kV Shutdown Bus 1(2) voltage is between 3950 Volts and 4400 Volts and NOT undergoing abnormal voltage transients.
Standard:
Standard: Verifies 4
Verifies 4
-kV Shutdown Bus 1 voltage is between 3950 Volts and 4400 Volts and NOT undergoing abnormal voltage transients.  
-kV Shutdown Bus 1 voltage is between 3950 Volts and 4400 Volts and NOT undergoing abnormal voltage transients.  


Line 5,282: Line 4,640:
[5]  VERIFY associated incoming frequency is between 59 Hertz and 61 Hertz and NOT undergoing abnormal frequency transients.
[5]  VERIFY associated incoming frequency is between 59 Hertz and 61 Hertz and NOT undergoing abnormal frequency transients.
Shutdown Bd Instrument Name Instrument No.
Shutdown Bd Instrument Name Instrument No.
Panel A or B GEN SYNC FREQUENCY 0-SI-82-0AB 0-9-23-7 C or D GEN SYNC FREQUENCY 0-SI-82-0CD 0-9-23-8  Standard:
Panel A or B GEN SYNC FREQUENCY 0-SI-82-0 AB 0-9-23-7 C or D GEN SYNC FREQUENCY 0-SI-82-0 CD 0-9-23-8  Standard:   Verifies incoming frequency is between 59 Hertz and 61 Hertz and NOT undergoing abnormal frequency transients using GEN SYNC FREQUENCY,0
Verifies incoming frequency is between 59 Hertz and 61 Hertz and NOT undergoing abnormal frequency transients using GEN SYNC FREQUENCY,0
-SI-82-AB.
-SI-82-AB.
SAT UNSAT N/A Job Performance Measure (JPM)  7  STEP / STANDARD SAT / UNSAT Step 6:    CAUTION DO NOT parallel the Diesel Generators with an unstable offsite source or during inclementweather (e.g., lightning, heavy winds).
SAT UNSAT N/A Job Performance Measure (JPM)  7  STEP / STANDARD SAT / UNSAT Step 6:    CAUTION DO NOT parallel the Diesel Generators with an unstable offsite source or during inclementweather (e.g., lightning, heavy winds).
   [6]  IF 4-kV Shutdown Bus 1 (2) is experiencing abnormal voltage or frequency conditions, THEN PERFORM the following:
   [6]  IF 4-kV Shutdown Bus 1 (2) is experiencing abnormal voltage or frequency conditions, THEN PERFORM the following:
Standard:
Standard:   STEP N/A SAT UNSAT N/A Step 7:    CAUTION Only one Unit 1 and 2 Diesel Generator at a time is allowed to be operated in parallel with system.
STEP N/A SAT UNSAT N/A Step 7:    CAUTION Only one Unit 1 and 2 Diesel Generator at a time is allowed to be operated in parallel with system.


[7]  PULL and PLACE the associated Diesel Generator mode selector switch in PARALLELED WITH SYSTEM.
[7]  PULL and PLACE the associated Diesel Generator mode selector switch in PARALLELED WITH SYSTEM.
Diesel Handswitch Name Handswitch No. Panel A DG A MODE SELECT 0-HS-82-A/5A 0-9-23-7  Standard:
Diesel Handswitch Name Handswitch No. Panel A DG A MODE SELECT 0-HS-82-A/5A 0-9-23-7  Standard:   Pulls DG A MODE SELECT switch 0-HS-82-A/5A and places it in PARALLELED WITH SYSTEM
Pulls DG A MODE SELECT switch 0-HS-82-A/5A and places it in PARALLELED WITH SYSTEM
. Critical Step
. Critical Step


SAT UNSAT N/A Job Performance Measure (JPM)  8  STEP / STANDARD SAT / UNSAT Step 8:    CAUTION Failure of the PARALLELED WITH SYSTEM light to illuminate in the following step could indicate that the DG is still in SINGLE UNIT operation and result in overload when the DG output breaker is closed.   
SAT UNSAT N/A Job Performance Measure (JPM)  8  STEP / STANDARD SAT / UNSAT Step 8:    CAUTION Failure of the PARALLELED WITH SYSTEM light to illuminate in the following step could indicate that the DG is still in SINGLE UNIT operation and result in overload when the DG output breaker is closed.   
[8]  RELEASE the Diesel Generator mode selector switch and OBSERVE PARALLELED WITH SYSTEM light illuminated.
[8]  RELEASE the Diesel Generator mode selector switch and OBSERVE PARALLELED WITH SYSTEM light illuminated.
Standard:
Standard: Releases the Diesel Generator A mode selector switch, 0-HS-82-A/5A and observesPARALLELED WITH SYSTEM light is illuminated
Releases the Diesel Generator A mode selector switch, 0-HS-82-A/5A and observesPARALLELED WITH SYSTEM light is illuminated
.
.
SAT UNSAT N/A Step 9:   
SAT UNSAT N/A Step 9:   
[9]  ADJUST Diesel Generator frequency using the associated Diesel Generator governor control switch to obtain a synchroscope needle rotation of one revolution every 15 to 20 seconds in the SLOW direction.
[9]  ADJUST Diesel Generator frequency using the associated Diesel Generator governor control switch to obtain a synchroscope needle rotation of one revolution every 15 to 20 seconds in the SLOW direction.
Diesel Handswitch Name Handswitch No. Panel A DG A GOVERNOR CONTROL 0-HS-82-A/3A 0-9-23-7  Standard:
Diesel Handswitch Name Handswitch No. Panel A DG A GOVERNOR CONTROL 0-HS-82-A/3A 0-9-23-7  Standard: AdjustsDiesel Generator A frequency using Diesel Generator governor control switch, 3-HS-82-A/3A, (in lower direction) to obtain a synchroscope needle rotation of one revolution every 15 to 20 seconds in the SLOW direction.
AdjustsDiesel Generator A frequency using Diesel Generator governor control switch, 3-HS-82-A/3A, (in lower direction) to obtain a synchroscope needle rotation of one revolution every 15 to 20 seconds in the SLOW direction.
Critical Step
Critical Step


SAT UNSAT N/A Job Performance Measure (JPM)  9  STEP / STANDARD SAT / UNSAT Step 10:    [10]  USE the associated Diesel Generator voltage regulator control switch to match Diesel Generator and System voltages.
SAT UNSAT N/A Job Performance Measure (JPM)  9  STEP / STANDARD SAT / UNSAT Step 10:    [10]  USE the associated Diesel Generator voltage regulator control switch to match Diesel Generator and System voltages.
Diesel Instrument Name Inst No. Panel A DG A VOLT REGULATOR CONT 0-HS-82-A/2A 0-9-23-7 GEN SYNC REF VOLTAGE 0-EI-82-AB SYSTEM SYNC REF VOLTAGE 0-EI-211-0AB Standard:
Diesel Instrument Name Inst No. Panel A DG A VOLT REGULATOR CONT 0-HS-82-A/2A 0-9-23-7 GEN SYNC REF VOLTAGE 0-EI-82-AB SYSTEM SYNC REF VOLTAGE 0-EI-211-0 AB Standard:
 
Matches DG A voltage with system voltage using DG A VOLT REGULATOR CONT switch 0-HS-82-A/2 A.
Matches DG A voltage with system voltage using DG A VOLT REGULATOR CONT switch 0-HS-82-A/2A.
SAT UNSAT N/A Step 11:     
SAT UNSAT N/A Step 11:     
[11]  WHEN the synchroscope needle is approximately 2 minutes on the right hand side of the 12 o'clock position, THEN  CLOSE the 4-kV shutdown board feeder breaker that is to be paralleled with the Diesel Generator.
[11]  WHEN the synchroscope needle is approximately 2 minutes on the right hand side of the 12 o'clock position, THEN  CLOSE the 4-kV shutdown board feeder breaker that is to be paralleled with the Diesel Generator.
Standard:
Standard: Closesthe 4-kV shutdown board feeder breaker 1614 when the synchroscope needle is approximately 2 minutes on the right hand side of the 12 o'clock position.
Closesthe 4-kV shutdown board feeder breaker 1614 when the synchroscope needle is approximately 2 minutes on the right hand side of the 12 o'clock position.
Critical Step
Critical Step


Line 5,319: Line 4,670:
[12]  PLACE the synchroscope switch for the 4
[12]  PLACE the synchroscope switch for the 4
-kV shutdown board feeder breaker that was paralleled with the Diesel Generator in OFF. Standard:
-kV shutdown board feeder breaker that was paralleled with the Diesel Generator in OFF. Standard:
Places the synchroscope switch for BKR 1614 in OFF.
Places the synchroscope switch for BKR 1614 in OFF.
SAT  UNSAT  N/A Job Performance Measure (JPM)  10  STEP / STANDARD SAT / UNSAT Step 13:    NOTE If diesel operates greater than 4 hours at less than 50% load, the diesel should be loaded to full load for at least 30 minutes prior to engine shutdown. This will allow the engine to clean out any oil accumulations from the exhaust manifolds.
SAT  UNSAT  N/A Job Performance Measure (JPM)  10  STEP / STANDARD SAT / UNSAT Step 13:    NOTE If diesel operates greater than 4 hours at less than 50% load, the diesel should be loaded to full load for at least 30 minutes prior to engine shutdown. This will allow the engine to clean out any oil accumulations from the exhaust manifolds.
Line 5,326: Line 4,676:


toINCREASE kW and kVAR load, in increments of 100kWevery 15 minutes.
toINCREASE kW and kVAR load, in increments of 100kWevery 15 minutes.
Diesel Handswitch Name Handswitch No. Panel A DG A GOVERNOR CONTROL 0-HS-82-A/3A 0-9-23-7 DG A VOLT REGULATOR CONTROL 0-HS-82-A/2A [13.2] OBSERVE the exhaust stack smoke concentration from outside the DG room after each incremental increase.
Diesel Handswitch Name Handswitch No. Panel A DG A GOVERNOR CONTROL 0-HS-82-A/3A 0-9-23-7 DG A VOLT REGULATOR CONTROL 0-HS-82-A/2 A [13.2] OBSERVE the exhaust stack smoke concentration from outside the DG room after each incremental increase.
  [13.3] STEP N/A [13.4] WHEN smoke becomes relatively clear, CONTINUE to load DG engine to 100% if possible.
  [13.3] STEP N/A [13.4] WHEN smoke becomes relatively clear, CONTINUE to load DG engine to 100% if possible.
  [13.5] MAINTAIN 100% load for a minimum of 30 minutes.
  [13.5] MAINTAIN 100% load for a minimum of 30 minutes.
Standard:
Standard: Loads DG to 2600 kW and 185 0 kVAR by using 0-HS-82-A/3A and 0-HS-82-A/2A handswitches.
Loads DG to 2600 kW and 185 0 kVAR by using 0-HS-82-A/3A and 0-HS-82-A/2A handswitches.
Critical Step SAT UNSAT N/A CUE: After first 100 kW load adjustment state "15 minutes have elapsed and no observable black smoke from exhaust stack for time compression and continue to full load
Critical Step SAT UNSAT N/A CUE: After first 100 kW load adjustment state "15 minutes have elapsed and no observable black smoke from exhaust stack for time compression and continue to full load
."
."
Job Performance Measure (JPM)  11  STEP / STANDARD SAT / UNSAT Step 14:    NOTE Lagging VARs should be maintained when adjusting kW load (rising or lowering). This may require kW load adjustment to be stopped periodically to allow for adjusting kVAR load. Once desired kW load is achieved, Illustration 1 should be referred to for determination of kVAR loading required to obtain a power factor (pf) of 0.8 lagging. Diesel generator kVAR load should then be adjusted to obtain a 0.8 pf lagging. IF system conditions will NOT permit the kVAR loading required to obtain a 0.8 pf lagging, kVAR load should be adjusted to the maximum kVAR lagging the system will allow.
Job Performance Measure (JPM)  11  STEP / STANDARD SAT / UNSAT Step 1 4:    NOTE Lagging VARs should be maintained when adjusting kW load (rising or lowering). This may require kW load adjustment to be stopped periodically to allow for adjusting kVAR load. Once desired kW load is achieved, Illustration 1 should be referred to for determination of kVAR loading required to obtain a power factor (pf) of 0.8 lagging. Diesel generator kVAR load should then be adjusted to obtain a 0.8 pf lagging. IF system conditions will NOT permit the kVAR loading required to obtain a 0.8 pf lagging, kVAR load should be adjusted to the maximum kVAR lagging the system will allow.  
 
[14]  USE the associated Diesel Generator's governor control switch and voltage regulator control switch to obtain desired kW and kVAR load.
[14]  USE the associated Diesel Generator's governor control switch and voltage regulator control switch to obtain desired kW and kVAR load.


Standard:
Standard: Obtains desired kW and kVAR load using DG A Governor Control switch, 0-HS-82-A/3A and DG Volt Regulator Cont switch, 0
Obtains desired kW and kVAR load using DG A Governor Control switch, 0-HS-82-A/3A and DG Volt Regulator Cont switch, 0
-HS-82-A/2A. Diesel Handswitch Name Handswitch No.
-HS-82-A/2A. Diesel Handswitch Name Handswitch No.
Panel A DG A GOVERNOR CONTROL 0-HS-82-A/3A 0-9-23-7 DG A VOLT REGULATOR CONT 0-HS-82-A/2A SAT UNSAT N/A CUE: state "30 minutes have elapsed continue with procedure."
Panel A DG A GOVERNOR CONTROL 0-HS-82-A/3A 0-9-23-7 DG A VOLT REGULATOR CONT 0-HS-82-A/2A SAT UNSAT N/A CUE: state "30 minutes have elapsed continue with procedure."
Step 15:     
Step 1 5:     
[15]  MONITOR the offsite source that is paralleled with the Diesel Generator.
[15]  MONITOR the offsite source that is paralleled with the Diesel Generator.


[16]  IF abnormal voltage or frequency transients are experienced, THEN  Standard:
[16]  IF abnormal voltage or frequency transients are experienced, THEN  Standard: Step is N/A  SAT UNSAT N/A Job Performance Measure (JPM)  12  STEP / STANDARD SAT / UNSAT Step 1 6:    [17]  WHEN Parallel with System operation is no longer desired, THEN UNLOAD the Diesel Generator as follows:
Step is N/A  SAT UNSAT N/A Job Performance Measure (JPM)  12  STEP / STANDARD SAT / UNSAT Step 16:    [17]  WHEN Parallel with System operation is no longer desired, THEN UNLOAD the Diesel Generator as follows:
CAUTION When unloading the Diesel Generator, failure to slowly approach the 300 kW/250 kVARlimit may result in a reverse power trip of the Diesel Generator output breaker.  
CAUTION When unloading the Diesel Generator, failure to slowly approach the 300 kW/250 kVARlimit may result in a reverse power trip of the Diesel Generator output breaker.  
   [17.1]  USE the associated Diesel Generator's governor control switch and voltage regulator control switch to reduce generator load to approximately 300 kW and 250 kVAR:
   [17.1]  USE the associated Diesel Generator's governor control switch and voltage regulator control switch to reduce generator load to approximately 300 kW and 250 kVAR: Diesel Instrument Name Inst No. Panel  A DG A GOVERNOR CONTROL 0-HS-82-A/3 A 0-9-23-7 DG A VOLTAGE REGULATOR CONTROL 0-HS-82-A/2A DG A KILOWATTS 0-JI-82-A/A  DG A KILOVARS 0-VAR-82-A/A  Standard: Unloads the DG to approximately 300 KW and 250 kVAR
Diesel Instrument Name Inst No. Panel  A DG A GOVERNOR CONTROL 0-HS-82-A/3A 0-9-23-7 DG A VOLTAGE REGULATOR CONTROL 0-HS-82-A/2A DG A KILOWATTS 0-JI-82-A/A  DG A KILOVARS 0-VAR-82-A/A  Standard:
Unloads the DG to approximately 300 KW and 250 kVAR
. Critical Step
. Critical Step


SAT  UNSAT  N/A Step 17 [17.2]  PLACE the associated Diesel Generator breaker control switch in TRIP Diesel Handswitch Name Handswitch No.
SAT  UNSAT  N/A Step 1 7 [17.2]  PLACE the associated Diesel Generator breaker control switch in TRIP Diesel Handswitch Name Handswitch No.
Panel A DG A BKR 1818 0-HS-211-A/22A 0-9-23-7  Standard:
Panel A DG A BKR 1818 0-HS-211-A/22 A 0-9-23-7  Standard: Trips Diesel Generator breaker 1818
Trips Diesel Generator breaker 1818
. Critical Step SAT  UNSAT N/A Job Performance Measure (JPM)  13  STEP / STANDARD SAT / UNSAT Step 1 8:    [17.3]  PULL and PLACE the associated Diesel Generator mode selector switch in SINGLE UNIT.
. Critical Step SAT  UNSAT N/A Job Performance Measure (JPM)  13  STEP / STANDARD SAT / UNSAT Step 18:    [17.3]  PULL and PLACE the associated Diesel Generator mode selector switch in SINGLE UNIT.
Diesel Handswitch Name Handswitch No.
Diesel Handswitch Name Handswitch No.
Panel A DG A MODE SELECT 0-HS-211-A/5A 0-9-23-7 Standard:
Panel A DG A MODE SELECT 0-HS-211-A/5 A 0-9-23-7 Standard: Pulls and places 0
Pulls and places 0
-HS-211-A/5A to Single Unit
-HS-211-A/5A to Single Unit
. Critical Step SAT  UNSAT N/A Step 19:    [17.4]  RELEASE the Diesel Generator mode selector switch and OBSERVE the SINGLE UNIT light illuminated.
. Critical Step SAT  UNSAT N/A Step 19:    [17.4]  RELEASE the Diesel Generator mode selector switch and OBSERVE the SINGLE UNIT light illuminated.
Standard:
Standard: Verifies Single Unit light illuminated
Verifies Single Unit light illuminated
.
.
SAT  UNSAT N/A CUE:  ANOTHER OPERATOR WILL CONTINUE FROM HERE STOP TIME END OF TASK
SAT  UNSAT N/A CUE:  ANOTHER OPERATOR WILL CONTINUE FROM HERE STOP TIME END OF TASK
Line 5,369: Line 4,710:


You are an Operator on Unit 2.
You are an Operator on Unit 2.
No Inclement weather currently exists in the area 8 hours ago, 4 KV Shutdown Board A was separated from Offsite Power in accordance with 0
No Inclement weather currently exists in the area 8 hour s ago, 4 KV Shutdown Board A was separated from Offsite Power in accordance with 0
-OI-82, Standby Diesel Generator System.
-OI-82, Standby Diesel Generator System.


Line 5,382: Line 4,723:
Restore Offsite Power to 4KV shutdown board at PNL 9
Restore Offsite Power to 4KV shutdown board at PNL 9
-23      U-3 JPM NUMBER:
-23      U-3 JPM NUMBER:
631 REVISION:
631 REVISION: 0  TASK APPLICABILITY:
0  TASK APPLICABILITY:
SRO            STA UO          NAUO TASK NUMBER / TASK TITLE(S):
SRO            STA UO          NAUO TASK NUMBER / TASK TITLE(S):
U-082-NO-09 / Restore Offsite Power to 4KV shutdown board at PNL 9
U-082-NO-09 / Restore Offsite Power to 4KV shutdown board at PNL 9
Line 5,391: Line 4,731:
N/A SAFETY FUNCTION:
N/A SAFETY FUNCTION:
6  EVALUATION LOCATION
6  EVALUATION LOCATION
:      In-Plant     Simulator   Control Roo m      Lab       Other - List   APPLICABLE METHOD OF TESTING:      Discussion      Simulate/Walkthrough        Perform TIME FOR COMPLETION:
:      In-Plan t     Simulato r   Control Roo m      La b       Other - Lis t   APPLICABLE METHOD OF TESTING:      Discussion      Simulate/Walkthrough        Perform TIME FOR COMPLETION:
NA    TIME CRITICAL (Y/N)        ALTERNATE PATH (Y/N)
NA    TIME CRITICAL (Y/N)        ALTERNATE PATH (Y/N)
Developed by:
Developed by:
Developer Date  (Ensure validator is briefed on exam security per NPG
Developer Date  (Ensure validator is briefed on exam security per NPG
-SPP-17.8.1)                (See JPM Validation Checklist in NPG
-SPP-17.8.1)                (See JPM Validation Checklist in NPG
-SPP-17.8.2)      Validated by:
-SPP-17.8.2)      Validated by:
Approved by:
Approved by:
Validator Date  Approved by:
Validator   Date  Approved by:
Site Training Management Date  Site Training Program Owner Date  N N Job Performance Measure (JPM)  2  OPERATOR:  ________________________________
Site Training Management Date  Site Training Program Owner Date  N N Job Performance Measure (JPM)  2  OPERATOR:  ________________________________
JPM Number:
JPM Number:
Line 5,429: Line 4,769:


You are an Operator on Unit 3
You are an Operator on Unit 3
. No Inclement weather currently exists in the area 8 hours ago, 4 KV Shutdown Board 3EC was separated from Offsite Power in accordance with 3
. No Inclement weather currently exists in the area 8 hour s ago, 4 KV Shutdown Board 3EC was separated from Offsite Power in accordance with 3
-OI-82, Standby Diesel Generator System.
-OI-82, Standby Diesel Generator System.


Line 5,444: Line 4,784:
-kV Shutdown Board at Panel 9-23  NOTE The following list of 4
-kV Shutdown Board at Panel 9-23  NOTE The following list of 4
-kV shutdown board normal and alternate feeder breakers may be useful when performing this section:
-kV shutdown board normal and alternate feeder breakers may be useful when performing this section:
Shutdown Board 3EA 3EB 3EC 3ED Norm Feed Bkr 1334 1336 1338 1342 Alt Feed Bkr 1726 1728 1626 1628  
Shutdown Board 3E A 3E B 3E C 3E D Norm Feed Bkr 1334 1336 1338 1342 Alt Feed Bkr 1726 17 28 16 26 16 28  


[1]  VERIFY 4-kV Shutdown Board 3EC is being supplied power by its respective Diesel Generator as the only source of power.
[1]  VERIFY 4-kV Shutdown Board 3EC is being supplied power by its respective Diesel Generator as the only source of power.
Standard:
Standard:   Verifies 4
Verifies 4
-kV Shutdown Board E C is being supplied by DG C  SAT  UNSA T N/A Step 2:     
-kV Shutdown Board EC is being supplied by DG C  SAT  UNSAT N/A Step 2:     
[2]  VERIFY the associated 4kV shutdown board auto transfer lockout relay is tripped to MANUAL.
[2]  VERIFY the associated 4kV shutdown board auto transfer lockout relay is tripped to MANUAL.
Diesel Handswitch Name Handswitch No.
Diesel Handswitch Name Handswitch No.
Panel 3C 4KV SD BD 3EC AUTO/LOCKOUT RESET 3-43-211-3EC 3-9-23  Standard:
Panel 3C 4KV SD BD 3EC AUTO/LOCKOUT RESET 3-43-211-3EC 3-9-23  Standard: Verifies 4KV SD BD 3EC AUTO/LOCKOUT RESET, 3 211-3EC, is tripped to manua
Verifies 4KV SD BD 3EC AUTO/LOCKOUT RESET, 3 211-3EC, is tripped to manua
: l. SAT  UNSAT  N/A Job Performance Measure (JPM)  6  STEP / STANDARD SAT / UNSAT Step 3:    [3]  PLACE the synchroscope switch for the 4
: l. SAT  UNSAT  N/A Job Performance Measure (JPM)  6  STEP / STANDARD SAT / UNSAT Step 3:    [3]  PLACE the synchroscope switch for the 4
-kV shutdown board feeder breaker that is to be paralleled with the Diesel Generator in ON. Standard:
-kV shutdown board feeder breaker that is to be paralleled with the Diesel Generator in ON. Standard: Places Synchroscope switch for 4
Places Synchroscope switch for 4
-kV Shutdown Board EC normal feeder breaker 1338 to ON  Critical Step SAT  UNSAT  N/A Step 4:     
-kV Shutdown Board EC normal feeder breaker 1338 to ON  Critical Step SAT  UNSAT  N/A Step 4:     
[4]  CHECK the applicable 4
[4]  CHECK the applicable 4
-kV unit board (4
-kV unit board (4
-kV bus tie board) voltage is between 3950 VOLTS and 4400 VOLTS and NOT undergoing abnormal voltage transients.
-kV bus tie board) voltage is between 3950 VOLTS and 4400 VOLTS and NOT undergoing abnormal voltage transients.
Standard:
Standard: Verifies 4
Verifies 4
-kV Unit Board voltage is between 3950 Volts and 4400 Volts and NOT undergoing abnormal voltage transients.
-kV Unit Board voltage is between 3950 Volts and 4400 Volts and NOT undergoing abnormal voltage transients.
SAT  UNSAT  N/A Step 5:   
SAT  UNSAT  N/A Step 5:   
[5]  VERIFY associated incoming frequency is between 59 HERTZ and 61 HERTZ and NOT undergoing abnormal frequency transients.
[5]  VERIFY associated incoming frequency is between 59 HERTZ and 61 HERTZ and NOT undergoing abnormal frequency transients.
Shutdown Bd Instrument Name Instrument No.
Shutdown Bd Instrument Name Instrument No.
Panel 3EA or 3EB GEN SYNC FREQUENCY 3-SI-82-3AB 3-9-23 3EC or 3ED GEN SYNC FREQUENCY 3-SI-82-3CD 3-9-23  Standard:
Panel 3E A or 3E B GEN SYNC FREQUENCY 3-SI-82-3 AB 3-9-23 3EC or 3E D GEN SYNC FREQUENCY 3-SI-82-3 CD 3-9-23  Standard:   Verifies incoming frequency is between 59 Hertz and 61 Hertz and NOT undergoing abnormal frequency transients using GEN SYNC FREQUENCY, 3-SI-82-CD . SAT  UNSAT  N/A Job Performance Measure (JPM)  7  STEP / STANDARD SAT / UNSAT Step 6:    CAUTION DO NOT parallel the Diesel Generators with an unstable offsite source or during inclement weather (e.g., lightning, heavy winds).
Verifies incoming frequency is between 59 Hertz and 61 Hertz and NOT undergoing abnormal frequency transients using GEN SYNC FREQUENCY, 3-SI-82-CD . SAT  UNSAT  N/A Job Performance Measure (JPM)  7  STEP / STANDARD SAT / UNSAT Step 6:    CAUTION DO NOT parallel the Diesel Generators with an unstable offsite source or during inclement weather (e.g., lightning, heavy winds).
   [6]  IF 4-kV unit board (4
   [6]  IF 4-kV unit board (4
-kV bus tie board) is experiencing abnormal voltage or frequency conditions, THEN PERFORM the following:
-kV bus tie board) is experiencing abnormal voltage or frequency conditions, THEN PERFORM the following:
Standard:
Standard:   N/A  SAT  UNSAT  N/A Step 7:    CAUTION Only one Unit 1 and 2 Diesel Generator at a time is allowed to be operated in parallel with system.
N/A  SAT  UNSAT  N/A Step 7:    CAUTION Only one Unit 1 and 2 Diesel Generator at a time is allowed to be operated in parallel with system.


[7]  PULL and PLACE the associated Diesel Generator mode selector switch in PARALLELED WITH SYSTEM.
[7]  PULL and PLACE the associated Diesel Generator mode selector switch in PARALLELED WITH SYSTEM.
Diesel Handswitch Name Handswitch No. Panel 3C DG 3C MODE SELECT 3-HS-82-3C/5A 3-9-23  Standard:
Diesel Handswitch Name Handswitch No. Panel 3C DG 3C MODE SELECT 3-HS-82-3C/5 A 3-9-23  Standard:   Pulls DG 3C MODE SELECT switch 3-HS-82-3C/5 A and places it in PARALLELED WITH SYSTEM Critical Step SAT  UNSAT  N/A Job Performance Measure (JPM)  8  STEP / STANDARD SAT / UNSAT Step 8:    CAUTION Failure of the PARALLELED WITH SYSTEM light to illuminate in the following step could indicate that the DG is still in SINGLE UNIT operation and result in overload when the DG output breaker is closed.   
Pulls DG 3C MODE SELECT switch 3-HS-82-3C/5A and places it in PARALLELED WITH SYSTEM Critical Step SAT  UNSAT  N/A Job Performance Measure (JPM)  8  STEP / STANDARD SAT / UNSAT Step 8:    CAUTION Failure of the PARALLELED WITH SYSTEM light to illuminate in the following step could indicate that the DG is still in SINGLE UNIT operation and result in overload when the DG output breaker is closed.   
[8]  RELEASE the Diesel Generator mode selector switch and OBSERVE PARALLELED WITH SYSTEM light illuminated.
[8]  RELEASE the Diesel Generator mode selector switch and OBSERVE PARALLELED WITH SYSTEM light illuminated.
Standard:
Standard: Releases the Diesel Generator 3C mode selector switch, 3-HS-82-3C/5C and observes PARALLELED WITH SYSTEM light is illuminated
Releases the Diesel Generator 3C mode selector switch, 3-HS-82-3C/5C and observes PARALLELED WITH SYSTEM light is illuminated
. SAT  UNSAT  N/A Step 9:   
. SAT  UNSAT  N/A Step 9:   
[9]  ADJUST Diesel Generator frequency using the associated Diesel Generator governor control switch to obtain a synchroscope needle rotation of one revolution every 15 to 20 seconds in the SLOW direction.
[9]  ADJUST Diesel Generator frequency using the associated Diesel Generator governor control switch to obtain a synchroscope needle rotation of one revolution every 15 to 20 seconds in the SLOW direction.
Diesel Handswitch Name Handswitch No. Panel 3C DG 3C GOVERNOR CONTROL 3-HS-82-3C/3A 3-9-23  Standard:
Diesel Handswitch Name Handswitch No. Panel 3C DG 3C GOVERNOR CONTROL 3-HS-82-3C/3 A 3-9-23  Standard: Adjusts Diesel Generator 3C frequency using Diesel Generator governor control switch, 3-HS-82-3C/3 A (in lower direction) to obtain a synchroscope needle rotation of one revolution every 15 to 20 seconds in the SLOW direction.
Adjusts Diesel Generator 3C frequency using Diesel Generator governor control switch, 3-HS-82-3C/3A (in lower direction) to obtain a synchroscope needle rotation of one revolution every 15 to 20 seconds in the SLOW direction.
Critical Step SAT  UNSAT  N/A Job Performance Measure (JPM)  9  STEP / STANDARD SAT / UNSAT Step 10:    [10]  USE the associated Diesel Generator voltage regulator control switch to match Diesel Generator and System voltages.
Critical Step SAT  UNSAT  N/A Job Performance Measure (JPM)  9  STEP / STANDARD SAT / UNSAT Step 10:    [10]  USE the associated Diesel Generator voltage regulator control switch to match Diesel Generator and System voltages.
Diesel Instrument Name Inst No. Panel 3C DG 3C VOLT REGULATOR CONT 3-HS-82-3C/2A 3-9-23 GEN SYNC REF VOLTAGE 3-EI-82-3CD SYSTEM SYNC REF VOLTAGE 3-EI-211-3ECB/B  Standard:
Dies el Instrument Name Inst No. Panel 3C DG 3C VOLT REGULATOR CONT 3-HS-82-3C/2 A 3-9-23 GEN SYNC REF VOLTAGE 3-EI-82-3CD SYSTEM SYNC REF VOLTAGE 3-EI-211-3EC B/B  Standard:
 
Matches DG C voltage with system voltage using DG 3C VOLT REGULATOR CONT switch 3-HS-82-3C/2 A SAT  UNSAT  N/A Step 11:     
Matches DG C voltage with system voltage using DG 3C VOLT REGULATOR CONT switch 3-HS-82-3C/2A SAT  UNSAT  N/A Step 11:     
[11]  WHEN the synchroscope needle is approximately 2 minutes on the right hand side of the 12 o'clock position, THEN  CLOSE the 4-kV shutdown board feeder breaker that is to be paralleled with the Diesel Generator.
[11]  WHEN the synchroscope needle is approximately 2 minutes on the right hand side of the 12 o'clock position, THEN  CLOSE the 4-kV shutdown board feeder breaker that is to be paralleled with the Diesel Generator.
Standard:
Standard: Closes the 4-kV shutdown board normal feeder breaker 1338 when the synchroscope needle is approximately 2 minutes on the right hand side of the 12 o'clock position.
Closes the 4-kV shutdown board normal feeder breaker 1338 when the synchroscope needle is approximately 2 minutes on the right hand side of the 12 o'clock position.
Critical Step SAT  UNSAT  N/A Step 12:     
Critical Step SAT  UNSAT  N/A Step 12:     
[12]  PLACE the synchroscope switch for the 4
[12]  PLACE the synchroscope switch for the 4
-kV shutdown board feeder breaker that was paralleled with the Diesel Generator in OFF. Standard:
-kV shutdown board feeder breaker that was paralleled with the Diesel Generator in OFF. Standard:
Places the synchroscope switch for BKR 1338 in OFF SAT  UNSAT  N/A Job Performance Measure (JPM)  10  STEP / STANDARD SAT / UNSAT Step 13:    [13]  IF the normal feeder breaker is supplying the 4
Places the synchroscope switch for BKR 1338 in OFF SAT  UNSAT  N/A Job Performance Measure (JPM)  10  STEP / STANDARD SAT / UNSAT Step 13:    [13]  IF the normal feeder breaker is supplying the 4
-kV shutdown board, THEN  RESET the associated 4kV shutdown board auto transfer lockout relay. Diesel Handswitch Name Handswitch No. Panel 3C 4KV SD BD 3EC AUTO/LOCKOUT RESET 3-43-211-3EC 3-9-23 Standard:
-kV shutdown board, THEN  RESET the associated 4kV shutdown board auto transfer lockout relay. Diesel Handswitch Name Handswitch No. Panel 3C 4KV SD BD 3EC AUTO/LOCKOUT RESET 3-43-211-3EC 3-9-23 Standard: Resets 4KV SD BD 3EC Auto Transfer Lockout Relay Critical Step SAT  UNSAT  N/A Step 1 4:  NOTE If diesel operates greater than 4 hours at less than 50% load, the diesel should be loaded to full load for at least 30 minutes prior to engine shutdown. This will allow the engine to clean out any oil accumulations from the exhaust manifolds.
Resets 4KV SD BD 3EC Auto Transfer Lockout Relay Critical Step SAT  UNSAT  N/A Step 14:  NOTE If diesel operates greater than 4 hours at less than 50% load, the diesel should be loaded to full load for at least 30 minutes prior to engine shutdown. This will allow the engine to clean out any oil accumulations from the exhaust manifolds.


[14]  IF DG has been operating at a low
[14]  IF DG has been operating at a low
Line 5,505: Line 4,832:
  [14.3] STEP N/A [14.4] WHEN smoke becomes relatively clear, CONTINUE to load DG engine to 100% if possible.
  [14.3] STEP N/A [14.4] WHEN smoke becomes relatively clear, CONTINUE to load DG engine to 100% if possible.
  [14.5] MAINTAIN 100% load for a minimum of 30 minutes.
  [14.5] MAINTAIN 100% load for a minimum of 30 minutes.
Standard:
Standard: Loads DG to 2600 kW and 1850 kVAR by using 0
Loads DG to 2600 kW and 1850 kVAR by using 0
-HS-82-A/3A and 0-HS-82-A/2A handswitches.
-HS-82-A/3A and 0-HS-82-A/2A handswitches.
CUE: After first 100 kW load adjustment state "15 minutes have elapsed and no observable black smoke from exhaust stack for time compression and continue to full load.
CUE: After first 100 kW load adjustment state "15 minutes have elapsed and no observable black smoke from exhaust stack for time compression and continue to full load.
"  Step 15:    NOTE VARs lagging should be maintained when adjusting kW load (rising or lowering). This may require kW load adjustment to be stopped periodically to allow for adjusting kVAR load. Once desired kW load is achieved, Illustration 1 should be referred to for determination of kVAR loading required to obtain a power factor (pf) of 0.8 lagging. Diesel generator kVAR load should then be adjusted to obtain a 0.8 pf lagging. IF system conditions will NOT permit the kVAR loading required to obtain a 0.8 pf lagging, kVAR load should be adjusted to the maximum kVAR lagging the system will allow.
"  Step 1 5:    NOTE VARs lagging should be maintained when adjusting kW load (rising or lowering). This may require kW load adjustment to be stopped periodically to allow for adjusting kVAR load. Once desired kW load is achieved, Illustration 1 should be referred to for determination of kVAR loading required to obtain a power factor (pf) of 0.8 lagging. Diesel generator kVAR load should then be adjusted to obtain a 0.8 pf lagging. IF system conditions will NOT permit the kVAR loading required to obtain a 0.8 pf lagging, kVAR load should be adjusted to the maximum kVAR lagging the system will allow.  
 
[15]  USE the associated Diesel Generator's governor control switch and voltage regulator control switch to obtain desired kW and kVAR load.
[15]  USE the associated Diesel Generator's governor control switch and voltage regulator control switch to obtain desired kW and kVAR load.
Diesel Handswitch Name Handswitch No.
Diesel Handswitch Name Handswitch No.
Panel 3C DG 3C GOVERNOR CONTROL 3-HS-82-3C/3A 3-9-23 DG 3C VOLT REGULATOR CONT 3-HS-82-3C/2A SAT  UNSAT  N/A Job Performance Measure (JPM)  12  STEP / STANDARD SAT / UNSAT Standard:
Panel 3C DG 3C GOVERNOR CONTROL 3-HS-82-3C/3 A 3-9-23 DG 3C VOLT REGULATOR CONT 3-HS-82-3C/2 A SAT  UNSAT  N/A Job Performance Measure (JPM)  12  STEP / STANDARD SAT / UNSAT Standard: Obtains desired kW and kVAR load using DG 3C Governor Control switch, 3-HS-82-3C/3 A and DG Volt Regulator Control switch, 3
Obtains desired kW and kVAR load using DG 3C Governor Control switch, 3-HS-82-3C/3A and DG Volt Regulator Control switch, 3
-HS-82-3C/2 A CUE: state "30 minutes have elapsed continue with procedure."
-HS-82-3C/2A CUE: state "30 minutes have elapsed continue with procedure."
Step 1 6:    [16]  MONITOR the offsite source that is paralleled with the Diesel Generator.
Step 16:    [16]  MONITOR the offsite source that is paralleled with the Diesel Generator.


[17]  IF abnormal voltage or frequency transients are experienced, THEN  Standard:
[17]  IF abnormal voltage or frequency transients are experienced, THEN  Standard: Step is N/A SAT  UNSAT  N/A Step 1 7:     
Step is N/A SAT  UNSAT  N/A Step 17:     
[18]  WHEN Parallel with System operation is no longer desired, THEN UNLOAD the Diesel Generator as follows:
[18]  WHEN Parallel with System operation is no longer desired, THEN UNLOAD the Diesel Generator as follows:
CAUTION When unloading the Diesel Generator, failure to slowly approach the 300 kW/250 kVAR limit may result in a reverse power trip of the Diesel Generator output breaker.  
CAUTION When unloading the Diesel Generator, failure to slowly approach the 300 kW/250 kVAR limit may result in a reverse power trip of the Diesel Generator output breaker.  
   [18.1]  USE the associated Diesel Generator's governor control switch and voltage regulator control switch to reduce generator load to approximately 300 kW and 250 kVAR:
   [18.1]  USE the associated Diesel Generator's governor control switch and voltage regulator control switch to reduce generator load to approximately 300 kW and 250 kVAR: Diesel Instrument Name Inst No. Panel 3C DG 3C GOVERNOR CONTROL 3-HS-82-3C/3 A 3-9-23 DG 3C VOLT REGULATOR CONT 3-HS-82-3C/2 A DG 3C KILOWATTS 3-JI-82-3C/A  DG 3C KILOVARS 3-VAR-82-3C/A  Critical Step SAT  UNSAT  N/A Job Performance Measure (JPM)  13  STEP / STANDARD SAT / UNSAT  Step 17 continued
Diesel Instrument Name Inst No. Panel 3C DG 3C GOVERNOR CONTROL 3-HS-82-3C/3A 3-9-23 DG 3C VOLT REGULATOR CONT 3-HS-82-3C/2A DG 3C KILOWATTS 3-JI-82-3C/A  DG 3C KILOVARS 3-VAR-82-3C/A  Critical Step SAT  UNSAT  N/A Job Performance Measure (JPM)  13  STEP / STANDARD SAT / UNSAT  Step 17 continued
:  Standard: Unloads the DG to approximately 300 KW and 250 kVAR Step 1 8:    [18.2]  PLACE the associated Diesel Generator breaker control switch in TRIP.
:  Standard:
Unloads the DG to approximately 300 KW and 250 kVAR Step 18:    [18.2]  PLACE the associated Diesel Generator breaker control switch in TRIP.
Diesel Handswitch Name Handswitch No.
Diesel Handswitch Name Handswitch No.
Panel 3C DG 3C BKR 1832 3-HS-211-3EC/10A 3-9-23  Standard:
Panel 3C DG 3C BKR 1832 3-HS-211-3EC/10A 3-9-23  Standard: Trips breaker DG 3C BKR 1832 Critical Step SAT  UNSAT  N/A Step 1 9:    [18.3]  PULL and PLACE the associated Diesel Generator mode selector switch in SINGLE UNIT.
Trips breaker DG 3C BKR 1832 Critical Step SAT  UNSAT  N/A Step 19:    [18.3]  PULL and PLACE the associated Diesel Generator mode selector switch in SINGLE UNIT.
Diesel Handswitch Name Handswitch No.
Diesel Handswitch Name Handswitch No.
Panel 3C DG 3C MODE SELECT 3-HS-82-3C/5A 0-9-23  Standard:
Panel 3C DG 3C MODE SELECT 3-HS-82-3C/5 A 0-9-23  Standard: Pulls and places 3
Pulls and places 3
-HS-82-3C/5 A to Single Unit Critical Step SAT  UNSAT  N/A Step 20:    [18.4]  RELEASE the Diesel Generator mode selector switch and OBSERVE the SINGLE UNIT light illuminated.
-HS-82-3C/5A to Single Unit Critical Step SAT  UNSAT  N/A Step 20:    [18.4]  RELEASE the Diesel Generator mode selector switch and OBSERVE the SINGLE UNIT light illuminated.
Standard: Verifies Single Unit light illuminated SAT  UNSAT  N/A CUE:  ANOTHER OPERATOR WILL CONTINUE FROM HERE STOP TIME              END OF TASK
Standard:
Verifies Single Unit light illuminated SAT  UNSAT  N/A CUE:  ANOTHER OPERATOR WILL CONTINUE FROM HERE STOP TIME              END OF TASK


Job Performance Measure (JPM)  14  Provide to Applicant INITIAL CONDITIONS:
Job Performance Measure (JPM)  14  Provide to Applicant INITIAL CONDITIONS:


You are an Operator on Unit 3
You are an Operator on Unit 3
. No Inclement weather currently exists in the area 8 hours ago, 4 KV Shutdown Board 3EC was separated from Offsite Power in accordance with 3
. No Inclement weather currently exists in the area 8 hour s ago, 4 KV Shutdown Board 3EC was separated from Offsite Power in accordance with 3
-OI-82, Standby Diesel Generator System.
-OI-82, Standby Diesel Generator System.


Line 5,553: Line 4,871:
-Gas Post Treatment Radiation HI
-Gas Post Treatment Radiation HI
-HI-HI JPM NUMBER:
-HI-HI JPM NUMBER:
190 U2 REVISION:
190 U2 REVISION: 0  TASK APPLICABILITY:
0  TASK APPLICABILITY:
SRO STA UO NAUO TASK NUMBER / TASK TITLE(S):
SRO STA UO NAUO TASK NUMBER / TASK TITLE(S):
U-066-AB-02 -Respond to Off
U-066-AB-02 -Respond to Off
Line 5,563: Line 4,880:
N/A SAFETY FUNCTION:
N/A SAFETY FUNCTION:
9  EVALUATION LOCATION:
9  EVALUATION LOCATION:
In-Plant    Simulator Control Room Lab      Other - List  APPLICABLE METHOD OF TESTING:      Discussion        Simulate/Walkthrough        Perform TIME FOR COMPLETION: N/A        TIME CRITICAL (Y/N)      ALTERNATE PATH (Y/N)
In-Plant    Simulator   Control Room Lab      Other - List  APPLICABLE METHOD OF TESTING:      Discussion        Simulate/Walkthrough        Perform TIME FOR COMPLETION: N/A        TIME CRITICAL (Y/N)      ALTERNATE PATH (Y/N)
Developed by:
Developed by:
Developer Date  (Ensure validator is briefed on exam security per NPG
Developer Date  (Ensure validator is briefed on exam security per NPG
-SPP-17.8.1)  (See JPM Validation Checklist in NPG
-SPP-17.8.1)  (See JPM Validation Checklist in NPG
-SPP-17.8.2)      Validated by:
-SPP-17.8.2)      Validated by:
Approved by:
Approved by:
Validator Date  Approved by:
Validator   Date  Approved by:
Site Training Management Date  Site Training Program Owner Date      N Y Job Performance Measure (JPM)  2  OPERATOR:  ________________________________
Site Training Management Date  Site Training Program Owner Date      N Y Job Performance Measure (JPM)  2  OPERATOR:  ________________________________
JPM Number:
JPM Number:
Line 5,592: Line 4,909:
: 1. Reset to IC 28
: 1. Reset to IC 28
: 2. Fire Manual Trigger 2 3. Fire Manual Trigger 1
: 2. Fire Manual Trigger 2 3. Fire Manual Trigger 1
: 4. Station 2 nd operator to respond to alarms Malfunctions Description Event Severity Delay Initial set TH23 FUEL CLADDING DAMAGE 1 50 N/A YES RM14C OFFGAS RAD MONITOR FAILURERM 265A 1 1E6 CPS N/A YES RM14D OFFGAS RAD MONITOR FAILURE RM-90-266A 1 1E6 CPS N/A YES      Remotes Description Event Severity Delay Initial set OG06 Bypass FCV 28 Post Treatment Hi
: 4. Station 2 nd operator to respond to alarms Malfunctions Description Event Severity Delay Initial set TH23 FUEL CLADDING DAMAGE 1 50 N/A YES RM14C OFFGAS RAD MONITOR FAILURERM-90-265A 1 1E6 CPS N/A YES RM14D OFFGAS RAD MONITOR FAILURE RM-90-266A 1 1E6 CPS N/A YES      Remotes Description Event Severity Delay Initial set OG06 Bypass FCV 28 Post Treatment Hi
-Hi-Hi Rad Isol 2 N/A N/A BYP            Overrides Description Event Severity Delay Initial set ZAORI9014A RX BLDG AREA RAD 1 2.5 N/A YES ZAORI9017A RX BLDG AREA RAD 1 2.6 N/A YES ZAORM90265A 90-265 METER UPSCALE 1 6.0 N/A YES ZAORM90266A 90-266 METER UPSCALE 1 6.0 N/A YES ZAORR90135R1 90-135 RECORDER UPSCALE PEN 1 1 6.0 N/A YES ZAORR90135R2 90-135 RECORDER UPSCALE PEN 2 1 6.0 N/A YES ZLORM90265A_1 90-265 DRAW LITE 1 N/A N/A YES Job Performance Measure (JPM)  4  ZLORM90265A_2 90-265 DRAW LITE 1 N/A N/A YES ZLORM90265A_3 90-265 DRAW LITE 1 N/A N/A YES ZLORM90265A_4 90-265 DRAW LITE 1 N/A N/A YES ZLORM90266A_1 90-265 DRAW LITE 1 N/A N/A YES ZLORM90266A_2 90-265 DRAW LITE 1 N/A N/A YES ZLORM90266A_3 90-265 DRAW LITE 1 N/A N/A YES ZLORM90266A_4 90-265 DRAW LITE 1 N/A N/A YES XA553A5 OG PRETREAT RAD HI 1 N/A N/A YES XA553A6 STACK GAS RAD HI HI 1 N/A N/A YES XA553A7 MSL RAD HI 1 N/A N/A YES XA553A13 STACK GAS RAD HI 1 N/A N/A YES XA553A27 MSL RAD HI HI 1 N/A N/A YES XA554C26 CARBON BED VAULT RAD HI 1 N/A N/A YES XA554C27 OG ANNUAL RELEASE LIMIT EXCEEDED 1 N/A N/A YES XA554C33 OG POST TREAT RAD HI 1 N/A N/A YES XA554C34 OG POST TREAT RAD HI HI 1 N/A N/A YES XA554C35 OG POST TREAT RAD HI HIHI 1 N/A N/A YES ZDIHS6628 66-28 VALVE CLOSED 1 N/A N/A YES ZAORR90265R1 90-265 RECORDER UPSCALE PEN 1 1 6.0 N/A YES ZAORR90265R2 90-265 RECORDER UPSCALE PEN 2 1 6.0 N/A YES ZAORR90160R1 OG PRETREAT RECORDER UPSCALE 1 -2.0 N/A YES XA554B2 RWCU FILTER INLET CNDT HIGH 1 N/A N/A YES  Schedule File(s):
-Hi-Hi Rad Isol 2 N/A N/A BYP            Overrides Description Event Severity Delay Initial set ZAORI9014A RX BLDG AREA RAD 1 2.5 N/A YES ZAORI9017A RX BLDG AREA RAD 1 2.6 N/A YES ZAORM90265A 90-265 METER UPSCALE 1 6.0 N/A YES ZAORM90266A 90-266 METER UPSCALE 1 6.0 N/A YES ZAORR90135R1 90-135 RECORDER UPSCALE PEN 1 1 6.0 N/A YES ZAORR90135R2 90-135 RECORDER UPSCALE PEN 2 1 6.0 N/A YES ZLORM90265A_1 90-265 DRAW LITE 1 N/A N/A YES Job Performance Measure (JPM)  4  ZLORM90265A_2 90-265 DRAW LITE 1 N/A N/A YES ZLORM90265A_3 90-265 DRAW LITE 1 N/A N/A YES ZLORM90265A_4 90-265 DRAW LITE 1 N/A N/A YES ZLORM90266A_1 90-265 DRAW LITE 1 N/A N/A YES ZLORM90266A_2 90-265 DRAW LITE 1 N/A N/A YES ZLORM90266A_3 90-265 DRAW LITE 1 N/A N/A YES ZLORM90266A_4 90-265 DRAW LITE 1 N/A N/A YES XA553A5 OG PRETREAT RAD HI 1 N/A N/A YES XA553A6 STACK GAS RAD HI HI 1 N/A N/A YES XA553A7 MSL RAD HI 1 N/A N/A YES XA553A13 STACK GAS RAD HI 1 N/A N/A YES XA553A27 MSL RAD HI HI 1 N/A N/A YES XA554C26 CARBON BED VAULT RAD HI 1 N/A N/A YES XA554C27 OG ANNUAL RELEASE LIMIT EXCEEDED 1 N/A N/A YES XA554C33 OG POST TREAT RAD HI 1 N/A N/A YES XA554C34 OG POST TREAT RAD HI HI 1 N/A N/A YES XA554C35 OG POST TREAT RAD HI HIHI 1 N/A N/A YES ZDIHS6628 66-28 VALVE CLOSED 1 N/A N/A YES ZAORR90265R1 90-265 RECORDER UPSCALE PEN 1 1 6.0 N/A YES ZAORR90265R2 90-265 RECORDER UPSCALE PEN 2 1 6.0 N/A YES ZAORR90160R1 OG PRETREAT RECORDER UPSCALE 1 -2.0 N/A YES XA554B2 RWCU FILTER INLET CNDT HIGH 1 N/A N/A YES  Schedule File(s):
JPM 190 U2 OG Post treat Rad HI HIHI
JPM 190 U2 OG Post treat Rad HI HIHI
Line 5,598: Line 4,915:
Job Performance Measure (JPM)  5  IN-SIMULATOR:   
Job Performance Measure (JPM)  5  IN-SIMULATOR:   


I will explain the initial conditions and state the task to be performed. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's Correct".  (OR "That's Incorrect", if applicable). When you have completed your assigned task, you will say, "my task is complete" and I will acknowledge that your task is complete.
I will explain the initial conditions and state the task to be performed. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's Correct".  (OR "That's Incorrect", if applicable). When you have completed your assigned task, you will say, "my task is complete" and I will acknowledge that your task is complete.


INITIAL CONDITIONS:
INITIAL CONDITIONS:
Line 5,610: Line 4,927:
-XA-55-4C, window 35.
-XA-55-4C, window 35.


Job Performance Measure (JPM)  6  START TIME STEP / STANDARD SAT / UNSAT Performance Step 1:    When directed, identify/obtain copy of ARP 4C, window 35.
Job Performance Measure (JPM)  6  START TIME   STEP / STANDARD SAT / UNSAT Performance Step 1:    When directed, identify/obtain copy of ARP 4C, window 35.
Standard:
Standard:
Obtains copy of 2
Obtains copy of 2
-ARP-9-4C, window 35 SAT  UNSAT  N/A Examiner Note: Candidate may recognize the annunciator as an entry condition and go directly to 2
-ARP-9-4C, window 35 SAT  UNSAT  N/A Examiner Note: Candidate may recognize the annunciator as an entry condition and go directly to 2
Line 5,619: Line 4,935:
2-ARP-9-4C window 35 Operator Action:
2-ARP-9-4C window 35 Operator Action:


A. VERIFY alarm condition on the following OFFGAS POST-TREATMENT RADIATION recorder, 2-RR-90-265 on Panel 2 2. OG POST-TREATMENT CHAN A RAD MON RTMR radiationmonitor, 2
A. VERIFY alarm condition on the following OFFGAS POST-TREATMENT RADIATION recorder, 2-RR-90-265 on Panel 2 2. OG POST-TREATMENT CHAN A RAD MON RTMR radiationmonitor, 2
-RM-90-266A on Panel 2 10. OG POST-TREATMENT CHAN B RAD MON RTMR radiationmonitor, 2
-RM-90-266A on Panel 2 10. OG POST-TREATMENT CHAN B RAD MON RTMR radiationmonitor, 2
-RM-90-265A on Panel 2 10. Standard:
-RM-90-265A on Panel 2 10. Standard: Verified alarm condition on 2
Verified alarm condition on 2
-RR-90-265 and 2-RM-265/266. SAT  UNSAT  N/A Performance Step 3:        B. VERIFY OFF-GAS SYSTEM ISOLATION VALVE, 2
-RR-90-265 and 2
-RM-265/266. SAT  UNSAT  N/A Performance Step 3:        B. VERIFY OFF-GAS SYSTEM ISOLATION VALVE, 2
-FCV-66-28 has the Mechanical Restraint DISENGAGED and 2-FCV-66-28 isCLOSED.
-FCV-66-28 has the Mechanical Restraint DISENGAGED and 2-FCV-66-28 isCLOSED.
Standard:
Standard: Takes handswitch 2-FCV-66-28 to close and observes green light illuminated and red light out.
Takes handswitch 2-FCV-66-28 to close and observes green light illuminated and red light out.
Critical Step SAT  UNSAT  N/A Cue: If asked, the Offgas Isolation Valve, 2
Critical Step SAT  UNSAT  N/A Cue: If asked, the Offgas Isolation Valve, 2
-FCV-66-28 is NOT mechanically restrained.
-FCV-66-28 is NOT mechanically restrained.


Job Performance Measure (JPM)  7  STEP / STANDARD SAT / UNSAT Performance Step 4:      C. REFER to 2-AOI-66-2, Off-gas Post-treatment Radiation Hi
Job Performance Measure (JPM)  7  STEP / STANDARD SAT / UNSAT Performance Step 4:      C. REFER to 2-AOI-66-2, Off-gas Post-treatment Radiation Hi
-Hi-Hi  Standard:
-Hi-Hi  Standard:   Refers to 2-AOI-66-2, Off-gas Post-treatment Radiation Hi
Refers to 2-AOI-66-2, Off-gas Post-treatment Radiation Hi
-Hi-Hi  S AT UNSAT  N/A Performance Step 5:    2-AOI-66-2 4.0 OPERATOR ACTIONS 4.1  Immediate Actions
-Hi-Hi  SAT UNSAT  N/A Performance Step 5:    2-AOI-66-2 4.0 OPERATOR ACTIONS 4.1  Immediate Actions
   [1]  IF scram has not occurred, THEN      PERFORM the following:
   [1]  IF scram has not occurred, THEN      PERFORM the following:
     [1.1] IF core flow is above 60%, THEN    REDUCE core flow to between 50
     [1.1] IF core flow is above 60%, THEN    REDUCE core flow to between 50
-60%. Standard:
-60%. Standard:   Reduced core flow to between 50
Reduced core flow to between 50
-60% with recirc system.
-60% with recirc system.
Critical Step SAT  UNSAT  N/A Performance Step  6:    [1.2]  MANUALLY SCRAM the Reactor. (Reference 2
Critical Step SAT  UNSAT  N/A Performance Step  6:    [1.2]  MANUALLY SCRAM the Reactor. (Reference 2
-AOI-100-1). Standard:
-AOI-100-1). Standard:   Depresses both SCRAM Pushbuttons Places mode switch in shutdown Verifies All Rods in Performs a Scram Announcement o Rx Mode Switch Position: Shutdown o Rod Position: All Full In o Reactor Water Level ____ & Trend ___ o Reactor Pressure ____ & Trend ___
Depresses both SCRAM Pushbuttons Places mode switch in shutdown Verifies All Rods in Performs a Scram Announcement o Rx Mode Switch Position: Shutdown o Rod Position: All Full In o Reactor Water Level ____ & Trend ___
o Reactor Pressure ____ & Trend ___
o MSIV Position: OPEN o Rx Power: <5%
o MSIV Position: OPEN o Rx Power: <5%
Critical Step SAT  UNSAT  N/A Examiner Note
Critical Step SAT  UNSAT  N/A Examiner Note
: The scram report and referring to 2
: The scram report and referring to 2
-AOI-100-1 are not considered critical.
-AOI-100-1 are not considered critical.
Job Performance Measure (JPM)  8  STEP / STANDARD SAT / UNSAT CUE: Proceed with subsequent actions of 2
Job Performance Measure (JPM)  8  STEP / STANDARD SAT / UNSAT CUE: Proceed with subsequent actions of 2
-AOI-66-2, Off-gas Post-treatment Radiation Hi
-AOI-66-2, Off-gas Post-treatment Radiation Hi
-Hi-Hi Performance Step 7:    4.2 Subsequent Actions
-Hi-Hi Performance Step 7:    4.2 Subsequent Actions
   [1]  IF OFFGAS SYSTEM ISOLATION VALVE, 2
   [1]  IF OFFGAS SYSTEM ISOLATION VALVE, 2
-FCV-066-0028has been mechanically restrained open due to plant conditionsTHEN DISENGAGE 2-FCV-066-0028 mechanical restraint by rotating the restraining handwheel fully in the  counterclockwisedirection, locally at the Stack. (Otherwise N/A)  Standard:
-FCV-066-0028has been mechanically restrained open due to plant conditionsTHEN DISENGAGE 2-FCV-066-0028 mechanical restraint by rotating the restraining handwheel fully in the  counterclockwisedirection, locally at the Stack. (Otherwise N/A)  Standard: Verifies that 2
Verifies that 2
-FCV-066-0028 in NOT mechanically restrained.
-FCV-066-0028 in NOT mechanically restrained.
SAT  UNSAT  N/A Cue: 2-FCV-066 is NOT mechanically restrained.
SAT  UNSAT  N/A Cue: 2-FCV-066 is NOT mechanically restrained.
Performance Step 8:    [2]  VERIFY CLOSED OFFGAS SYSTEM ISOLATION VALVE, 2-FCV-66-28 on Panel 2 53 or locally.
Performance Step 8:    [2]  VERIFY CLOSED OFFGAS SYSTEM ISOLATION VALVE,   2-FCV-66-28 on Panel 2 53 or locally.
Standard:
Standard:
 
Verifies 2-FCV-66-28 is closed at panel 9
Verifies 2
-FCV-66-28 is closed at panel 9
-53 by Verifying RED light above handswitch extinguished and GREEN light above handswitch illuminated. (May have already verified valve closed from the ARP).
-53 by Verifying RED light above handswitch extinguished and GREEN light above handswitch illuminated. (May have already verified valve closed from the ARP).
Critical Step SAT  UNSAT  N/A Examiner Note: May have already verified valve closed from the ARP Performance Step 9:   
Critical Step SAT  UNSAT  N/A Examiner Note: May have already verified valve closed from the ARP Performance Step 9:   
  [3]  MONITOR area radiation levels at Panel: 2 11. Standard:
  [3]  MONITOR area radiation levels at Panel: 2 11. Standard:
Monitored radiation levels at Panel 9
Monitored radiation levels at Panel 9
-11. SAT  UNSAT  N/A Cue: Another operator will monitor and evaluate Area Radiation Levels.
-11. SAT  UNSAT  N/A Cue: Another operator will monitor and evaluate Area Radiation Levels.


Job Performance Measure (JPM)  9  STEP / STANDARD SAT / UNSAT Performance Step 10:  [4]  REFER TO EPIP-1 for emergency classification level and response.
Job Performance Measure (JPM)  9  STEP / STANDARD SAT / UNSAT Performance Step 10:  [4]  REFER TO EPIP-1 for emergency classification level and response. Standard;   Notifies SM to implement EPIP
Standard; Notifies SM to implement EPIP
-1. SAT  UNSAT  N/A Cue: The Shift Manager is implementing the EPIPs as needed.
-1. SAT  UNSAT  N/A Cue: The Shift Manager is implementing the EPIPs as needed.
Performance Step 11:
Performance Step 11:
Line 5,679: Line 4,982:
-RR-90-157, Pnl 2 2. C. OFFGAS POST-TREATMENT RADIATION 2RR
-RR-90-157, Pnl 2 2. C. OFFGAS POST-TREATMENT RADIATION 2RR
-  90-265, Pnl 2 2 D. STACK GAS RADIATION, 0
-  90-265, Pnl 2 2 D. STACK GAS RADIATION, 0
-RR-90-147, Unit 1 Panel 1-9-2. Standard;
-RR-90-147, Unit 1 Panel 1-9-2. Standard; Monitors  90
 
Monitors  90
-135, 157, and 265. Calls Unit 1 operator for a reading on 0-RR-90-147. SAT  UNSAT  N/A Cue: As Unit 1 Operator, Stack Gas Radiation, 0
-135, 157, and 265. Calls Unit 1 operator for a reading on 0-RR-90-147. SAT  UNSAT  N/A Cue: As Unit 1 Operator, Stack Gas Radiation, 0
-RR-90-147 is reading 5X10E6 cps.
-RR-90-147 is reading 5X10E6 cps.
Line 5,693: Line 4,994:
Acknowledge closing of MSIVs.
Acknowledge closing of MSIVs.
Examiner Note:
Examiner Note:
Closing 1
Closing 1-55 and 1-56 is not considered critical.
-55 and 1-56 is not considered critical.
Performance Step 13:
Performance Step 13:


NOTE Placing additional Stack Dilution Air Fans in service should keep 0
NOTE Placing additional Stack Dilution Air Fans in service should keep 0
-RM-90-147and 0-RM-90-148 on scale.
-RM-90-147and 0-RM-90-148 on scale.
   [7]  PLACE STACK DILUTION FAN SEL control switch, 2-XS-66-29, Panel 2-9-8, in OFF.
   [7]  PLACE STACK DILUTION FAN SEL control switch,   2-XS-66-29, Panel 2-9-8, in OFF.
   [8]  START standby STACK DILUTION FAN 2B(2A) using controlswitch, 2
   [8]  START standby STACK DILUTION FAN 2B(2A) using controlswitch, 2
-HS-66-31A(29A), Panel 2 8. Standard:
-HS-66-31A(29A), Panel 2 8. Standard:
Places 2-XS-66-29 in OFF and Starts standby Stack Dilution fan 2B, using 2
Places 2-XS-66-29 in OFF and Starts standby Stack Dilution fan 2B, using 2
-HS-66-31A  SAT  UNSAT  N/A Cue: That completes this task.
-HS-66-31A  SAT  UNSAT  N/A Cue: That completes this task.


STOP TIME
STOP TIME _______        END OF TASK
_______        END OF TASK


Job Performance Measure (JPM)  11  Provide to Applicant IN-SIMULATOR:
Job Performance Measure (JPM)  11  Provide to Applicant IN-SIMULATOR:
Line 5,718: Line 5,016:
INITIATING CUE:   
INITIATING CUE:   


The Unit Supervisor directs you to respond to an OFF-GAS POST TREATMENT RADIATION HI
The Unit Supervisor directs you to respond to a n OFF-GAS POST TREATMENT RADIATION HI
-HI-HI annunciator, 2
-HI-HI annunciator, 2
-XA-55-4C, window 35.
-XA-55-4C, window 35.
Line 5,726: Line 5,024:
-Gas Post Treatment Radiation HI
-Gas Post Treatment Radiation HI
-HI-HI JPM NUMBER:
-HI-HI JPM NUMBER:
190 U3 REVISION:
190 U3 REVISION: 0  TASK APPLICABILITY:
0  TASK APPLICABILITY:
SRO STA UO NAUO TASK NUMBER / TASK TITLE(S):
SRO STA UO NAUO TASK NUMBER / TASK TITLE(S):
U-066-AB-02 -Respond to Off
U-066-AB-02 -Respond to Off
Line 5,737: Line 5,034:
N/A SAFETY FUNCTION:
N/A SAFETY FUNCTION:
9  EVALUATION LOCATION:
9  EVALUATION LOCATION:
In-Plant    Simulator Control Room Lab      Other - List  APPLICABLE METHOD OF TESTING:      Discussion        Simulate/Walkthrough        Perform TIME FOR COMPLETION: N/A        TIME CRITICAL (Y/N)      ALTERNATE PATH (Y/N)
In-Plant    Simulator   Control Room Lab      Other - List  APPLICABLE METHOD OF TESTING:      Discussion        Simulate/Walkthrough        Perform TIME FOR COMPLETION: N/A        TIME CRITICAL (Y/N)      ALTERNATE PATH (Y/N)
Developed by:
Developed by:
Developer Date  (Ensure validator is briefed on exam security per NPG
Developer Date  (Ensure validator is briefed on exam security per NPG
-SPP-17.8.1)  (See JPM Validation Checklist in NPG
-SPP-17.8.1)  (See JPM Validation Checklist in NPG
-SPP-17.8.2)      Validated by:
-SPP-17.8.2)      Validated by:
Approved by:
Approved by:
Validator Date  Approved by:
Validator   Date  Approved by:
Site Training Management Date  Site Training Program Owner Date    N Y Job Performance Measure (JPM)  2  OPERATOR:  ________________________________
Site Training Management Date  Site Training Program Owner Date    N Y Job Performance Measure (JPM)  2  OPERATOR:  ________________________________
JPM Number:
JPM Number:
Line 5,763: Line 5,060:
SIGNATURE: ___________________________
SIGNATURE: ___________________________
DATE: __________
DATE: __________
EXAMINER Job Performance Measure (JPM)  3  SIMULATOR SETUP IC 28 Exam IC 288   Console Operator Instructions
EXAMINER Job Performance Measure (JPM)  3  SIMULATOR SETUP IC 28 Exam IC 28 8   Console Operator Instructions
: 1. Reset to IC 28
: 1. Reset to IC 28
: 2. Fire Manual Trigger 2 3. Fire Manual Trigger 1
: 2. Fire Manual Trigger 2 3. Fire Manual Trigger 1
Line 5,782: Line 5,079:
-HI-HI annunciator, 3-XA-55-4C, window 35.
-HI-HI annunciator, 3-XA-55-4C, window 35.


Job Performance Measure (JPM)  6  START TIME STEP / STANDARD SAT / UNSAT Performance Step 1:    When directed, identify/obtain copy of ARP 4C, window 35.
Job Performance Measure (JPM)  6  START TIME   STEP / STANDARD SAT / UNSAT Performance Step 1:    When directed, identify/obtain copy of ARP 4C, window 35.
Standard:
Standard:
Obtains copy of 3-ARP-9-4C, window 35 SAT  UNSAT  N/A Examiner Note: Candidate may recognize the annunciator as an entry condition and go directly to 3-AOI-66-2. In that event, continue at Performance Step  
Obtains copy of 3-ARP-9-4C, window 35 SAT  UNSAT  N/A Examiner Note: Candidate may recognize the annunciator as an entry condition and go directly to 3-AOI-66-2. In that event, continue at Performance Step  
: 5. Performance Step 2:
: 5. Performance Step 2:
3-ARP-9-4C window 35 Operator Action:
3-ARP-9-4C window 35 Operator Action:


A. VERIFY alarm condition on the following OFFGAS POST-TREATMENT RADIATION recorder, 3-RR-90-265 on Panel 3-9-2. OG POST-TREATMENT CHAN A RAD MON RTMR radiationmonitor, 3-RM-90-266A on Panel 3-9-10. OG POST-TREATMENT CHAN B RAD MON RTMR radiationmonitor, 3-RM-90-265A on Panel 3-9-10. Standard:
A. VERIFY alarm condition on the following OFFGAS POST-TREATMENT RADIATION recorder, 3-RR-90-265 on Panel 3-9-2. OG POST-TREATMENT CHAN A RAD MON RTMR radiationmonitor, 3-RM-90-266A on Panel 3-9-10. OG POST-TREATMENT CHAN B RAD MON RTMR radiationmonitor, 3-RM-90-265A on Panel 3-9-10. Standard: Verified alarm condition on 3-RR-90-265 and 3-RM-265/266. SAT  UNSAT  N/A Performance Step 3:        B. VERIFY OFF-GAS SYSTEM ISOLATION VALVE, 3-FCV-66-28 has the Mechanical Restraint DISENGAGED and 3-FCV-66-28 isCLOSED.
Verified alarm condition on 3-RR-90-265 and 3-RM-265/266. SAT  UNSAT  N/A Performance Step 3:        B. VERIFY OFF-GAS SYSTEM ISOLATION VALVE, 3-FCV-66-28 has the Mechanical Restraint DISENGAGED and 3-FCV-66-28 isCLOSED.
Standard: Takes handswitch 3-FCV-66-28 to close and observes green light illuminated and red light out.
Standard:
Takes handswitch 3-FCV-66-28 to close and observes green light illuminated and red light out.
Critical Step SAT  UNSAT  N/A Cue: If asked, the Offgas Isolation Valve, 3-FCV-66-28 is NOT mechanically restrained.
Critical Step SAT  UNSAT  N/A Cue: If asked, the Offgas Isolation Valve, 3-FCV-66-28 is NOT mechanically restrained.


Job Performance Measure (JPM)  7  STEP / STANDARD SAT / UNSAT Performance Step 4:      C. REFER to 3-AOI-66-2, Off-gas Post-treatment Radiation Hi
Job Performance Measure (JPM)  7  STEP / STANDARD SAT / UNSAT Performance Step 4:      C. REFER to 3-AOI-66-2 , Off-gas Post-treatment Radiation Hi
-Hi-Hi  Standard:
-Hi-Hi  Standard:   Refers to 3-AOI-66-2, Off-gas Post-treatment Radiation Hi
Refers to 3-AOI-66-2, Off-gas Post-treatment Radiation Hi
-Hi-Hi SAT  UNSAT  N/A Performance Step 5:    3-AOI-66-2 4.0 OPERATOR ACTIONS 4.1  Immediate Actions
-Hi-Hi SAT  UNSAT  N/A Performance Step 5:    3-AOI-66-2 4.0 OPERATOR ACTIONS 4.1  Immediate Actions
   [1]  IF scram has not occurred, THEN      PERFORM the following:
   [1]  IF scram has not occurred, THEN      PERFORM the following:
     [1.1] IF core flow is above 60%, THEN    REDUCE core flow to between 50
     [1.1] IF core flow is above 60%, THEN    REDUCE core flow to between 50
-60%. Standard:
-60%. Standard:   Reduced core flow to between 50
Reduced core flow to between 50
-60% with recirc system.
-60% with recirc system.
Critical Step SAT  UNSAT  N/A Performance Step  6:    [1.2]  MANUALLY SCRAM the Reactor. (Reference 3
Critical Step SAT  UNSAT  N/A Performance Step  6:    [1.2]  MANUALLY SCRAM the Reactor. (Reference 3
-AOI-100-1). Standard:
-AOI-100-1). Standard:   Depresses both SCRAM Pushbuttons Places mode switch in shutdown Verifies All Rods in Performs a Scram Announcement o Rx Mode Switch Position: Shutdown o Rod Position: All Full In o Reactor Water Level ____ & Trend ___ o Reactor Pressure ____ & Trend ___
Depresses both SCRAM Pushbuttons Places mode switch in shutdown Verifies All Rods in Performs a Scram Announcement o Rx Mode Switch Position: Shutdown o Rod Position: All Full In o Reactor Water Level ____ & Trend ___
o Reactor Pressure ____ & Trend ___
o MSIV Position: OPEN o Rx Power: <5%
o MSIV Position: OPEN o Rx Power: <5%
Critical Step SAT  UNSAT  N/A Examiner Note
Critical Step SAT  UNSAT  N/A Examiner Note
: The scram report and referring to 3-AOI-100-1 are not considered critical.
: The scram report and referring to 3-AOI-100-1 are not considered critical.
Job Performance Measure (JPM)  8  STEP / STANDARD SAT / UNSAT CUE: Proceed with subsequent actions of 3
Job Performance Measure (JPM)  8  STEP / STANDARD SAT / UNSAT CUE: Proceed with subsequent actions of 3
-AOI-66-2, Off-gas Post-treatment Radiation Hi
-AOI-66-2, Off-gas Post-treatment Radiation Hi
-Hi-Hi Performance Step 7:    4.2 Subsequent Actions
-Hi-Hi Performance Step 7:    4.2 Subsequent Actions
   [1]  IF OFFGAS SYSTEM ISOLATION VALVE, 3-FCV-066-0028has been mechanically restrained open due to plant conditionsTHEN DISENGAGE 3-FCV-066-0028 mechanical restraint by rotating the restraining handwheel fully in the  counterclockwisedirection, locally at the Stack. (Otherwise N/A)  Standard:
   [1]  IF OFFGAS SYSTEM ISOLATION VALVE, 3-FCV-066-0028has been mechanically restrained open due to plant conditionsTHEN DISENGAGE 3-FCV-066-0028 mechanical restraint by rotating the restraining handwheel fully in the  counterclockwisedirection, locally at the Stack. (Otherwise N/A)  Standard: Verifies that 3-FCV-066-0028 in NOT mechanically restrained.
Verifies that 3-FCV-066-0028 in NOT mechanically restrained.
SAT  UNSAT  N/A Cue: 3-FCV-066 is NOT mechanically restrained.
SAT  UNSAT  N/A Cue: 3-FCV-066 is NOT mechanically restrained.
Performance Step 8:    [2]  VERIFY CLOSED OFFGAS SYSTEM ISOLATION VALVE, 3-FCV-66-28 on Panel 3-9-53 or locally.
Performance Step 8:    [2]  VERIFY CLOSED OFFGAS SYSTEM ISOLATION VALVE,   3-FCV-66-28 on Panel 3-9-53 or locally.
Standard:
Standard:
Verifies 3-FCV-66-28 is closed at panel 9
Verifies 3-FCV-66-28 is closed at panel 9
-53 by Verifying RED light above handswitch extinguished and GREEN light above handswitch illuminated. (May have already verified valve closed from the ARP).
-53 by Verifying RED light above handswitch extinguished and GREEN light above handswitch illuminated. (May have already verified valve closed from the ARP).
Line 5,826: Line 5,113:
  [3]  MONITOR area radiation levels at Panel:
  [3]  MONITOR area radiation levels at Panel:
3-9-11. Standard:
3-9-11. Standard:
Monitored radiation levels at Panel 9
Monitored radiation levels at Panel 9
-11. SAT  UNSAT  N/A Cue: Another operator will monitor and evaluate Area Radiation Levels.
-11. SAT  UNSAT  N/A Cue: Another operator will monitor and evaluate Area Radiation Levels.


Job Performance Measure (JPM)  9  STEP / STANDARD SAT / UNSAT Performance Step 10:  [4]  REFER TO EPIP-1 for emergency classification level and response.
Job Performance Measure (JPM)  9  STEP / STANDARD SAT / UNSAT Performance Step 10:  [4]  REFER TO EPIP-1 for emergency classification level and response. Standard;   Notifies SM to implement EPIP
Standard; Notifies SM to implement EPIP
-1. SAT  UNSAT  N/A Cue: The Shift Manager is implementing the EPIPs as needed.
-1. SAT  UNSAT  N/A Cue: The Shift Manager is implementing the EPIPs as needed.
Performance Step 11:
Performance Step 11:
   [5]  MONITOR the following parameters:
   [5]  MONITOR the following parameters:
A. MAIN STEAM LINE RADIATION, 3-RR-90-135,  Panel 3-9-2.
A. MAIN STEAM LINE RADIATION, 3-RR-90-135,  Panel 3-9-2.
B. OFFGAS PRETREATMENT RADIATION 3-RR-90-157, Pnl3-9-2. C. OFFGAS POST-TREATMENT RADIATION 3-RR-  90-265, Pnl3-9-2 D. STACK GAS RADIATION, 0
B. OFFGAS PRETREATMENT RADIATION 3-RR-90-157, Pnl 3-9-2. C. OFFGAS POST-TREATMENT RADIATION 3-RR-  90-265, Pnl 3-9-2 D. STACK GAS RADIATION, 0
-RR-90-147, Unit 1 Panel 1-9-2. Standard;
-RR-90-147, Unit 1 Panel 1-9-2. Standard; Monitors  90
 
Monitors  90
-135, 157, and 265. Calls Unit 1 operator for a reading on 0-RR-90-147. SAT  UNSAT  N/A Cue: As Unit 1 Operator, Stack Gas Radiation, 0
-135, 157, and 265. Calls Unit 1 operator for a reading on 0-RR-90-147. SAT  UNSAT  N/A Cue: As Unit 1 Operator, Stack Gas Radiation, 0
-RR-90-147 is reading 5X10E6 cps.
-RR-90-147 is reading 5X10E6 cps.
Line 5,845: Line 5,128:
Job Performance Measure (JPM)  10  STEP / STANDARD SAT / UNSAT Performance Step 12:
Job Performance Measure (JPM)  10  STEP / STANDARD SAT / UNSAT Performance Step 12:
   [6]  IF after five minutes from scram the Offgas Post Treatment activity is not less than 6 x 10 E5 cps as indicated on OFFGASRADIATION recorder 3-RR-90-265 on panel 3-9-2, THEN  CLOSE all Main Steam Isolation Valves and Main Steam LineDrain Valves, 3-FCV-1-55 and 3-FCV-1-56. Standard:  Recognizes that the Off
   [6]  IF after five minutes from scram the Offgas Post Treatment activity is not less than 6 x 10 E5 cps as indicated on OFFGASRADIATION recorder 3-RR-90-265 on panel 3-9-2, THEN  CLOSE all Main Steam Isolation Valves and Main Steam LineDrain Valves, 3-FCV-1-55 and 3-FCV-1-56. Standard:  Recognizes that the Off
-Gas Post Treatment activity is >6 X 10E 5 and closes all Main Steam Isolation Valves and Main Steam Line Drain Valves (
-Gas Post Treatment activity is >6 X 10E 5 and closes all Main Steam Isolation Valves and Main Steam Line Drain Valves (3-FCV-1-55/56)  Critical Step SAT  UNSAT  N/A Cue: The Unit has been scrammed for 5 minutes.
3-FCV-1-55/56)  Critical Step SAT  UNSAT  N/A Cue: The Unit has been scrammed for 5 minutes.
Acknowledge closing of MSIVs.
Acknowledge closing of MSIVs.
Examiner Note: Closing 1
Examiner Note: Closing 1-55 and 1-56 is not considered critical.
-55 and 1-56 is not considered critical.
Performance Step 13:
Performance Step 13:


NOTE Placing additional Stack Dilution Air Fans in service should keep 0
NOTE Placing additional Stack Dilution Air Fans in service should keep 0
-RM-90-147and 0-RM-90-148 on scale.
-RM-90-147and 0-RM-90-148 on scale.
   [7]  PLACE STACK DILUTION FAN SEL control switch, 3-XS-66-29, Panel 3-9-8, in OFF.
   [7]  PLACE STACK DILUTION FAN SEL control switch,   3-XS-66-29, Panel 3-9-8, in OFF.
   [8]  START standby STACK DILUTION FAN 3B(3A) using controlswitch, 3-HS-66-31A(29A), Panel 3-9-8. Standard:
   [8]  START standby STACK DILUTION FAN 3 B(3A) using controlswitch, 3-HS-66-31A(29A), Panel 3-9-8. Standard:
 
Places 3-XS-66-29 in OFF and Starts standby Stack Dilution fan 3B, using 3-HS-66-31A  SAT  UNSAT  N/A Cue: That completes this task.
Places 3-XS-66-29 in OFF and Starts standby Stack Dilution fan 3B, using 3-HS-66-31A  SAT  UNSAT  N/A Cue: That completes this task.


STOP TIME
STOP TIME ________
________
END OF TASK
END OF TASK


Line 5,877: Line 5,156:
Job Performance Measure (JPM)  1  SITE: BFN JPM TITLE:
Job Performance Measure (JPM)  1  SITE: BFN JPM TITLE:
AUTOMATIC START FAILURE OF A & C FIRE PUMP S JPM NUMBER:
AUTOMATIC START FAILURE OF A & C FIRE PUMP S JPM NUMBER:
673 REVISION:
673 REVISION: 0  TASK APPLICABILITY:
0  TASK APPLICABILITY:
SRO STA UO NAUO TASK NUMBER / TASK TITLE(S):
SRO STA UO NAUO TASK NUMBER / TASK TITLE(S):
U-026-NO-01/ MONITOR AUTO START OF FIRE PUMP  K/A RATINGS:
U-026-NO-01/ MONITOR AUTO START OF FIRE PUMP  K/A RATINGS:
Line 5,884: Line 5,162:
286000 Fire Protection System  A2.08; Ability to (a) predict the impacts of the following on the FIRE PROTECTION SYSTEM; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those abnormal conditions or operations: Failure to actuate when required RELATED PRA INFORMATION:
286000 Fire Protection System  A2.08; Ability to (a) predict the impacts of the following on the FIRE PROTECTION SYSTEM; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those abnormal conditions or operations: Failure to actuate when required RELATED PRA INFORMATION:
Risk Significant SAFETY FUNCTION:
Risk Significant SAFETY FUNCTION:
8  EVALUATION LOCATION:
8  EVALUATION LOCATION:
In-Plant  Simulator Control Room Lab  Other - List  APPLICABLE METHOD OF TESTING:  Discussion  Simulate/Walkthrough  Perform TIME FOR COMPLETION:      NA      TIME CRITICAL (Y/N)
In-Plant  Simulator Control R oom Lab  Other - List  APPLICABLE METHOD OF TESTING:  Discussion  Simulate/Walkthrough  Perform   TIME FOR COMPLETION:      NA      TIME CRITICAL (Y/N)
ALTERNATE PATH (Y/N)
ALTERNATE PATH (Y/N)
Developed by:      Developer Date  (Ensure validator is briefed on exam security per NPG
Developed by:      Developer Date  (Ensure validator is briefed on exam security per NPG
-SPP-17.8.1)                (See JPM Validation Checklist in NPG
-SPP-17.8.1)                (See JPM Validation Checklist in NPG
-SPP-17.8.2)      Validated by:
-SPP-17.8.2)      Validated by:
Approved by:
Approved by:
Validator Date  Approved by:
Validator   Date  Approved by:
Site Training Management Date  Site Training Program Owner Date      N Y Job Performance Measure (JPM)  2  OPERATOR:  ________________________________
Site Training Management Date  Site Training Program Owner Date      N Y Job Performance Measure (JPM)  2  OPERATOR:  ________________________________
JPM Number:  _673A___ RO  SRO  DATE: _______
JPM Number:  _673 A___ RO  SRO  DATE: _______
 
 
TASK STANDARD:
TASK STANDARD:
Perform operations necessary to manually start A, B and C Fire Pumps.
Perform operations necessary to manually start A, B and C Fire Pumps.
 
 
Operator Fundamental evaluated:  
Operator Fundamental evaluated:  
 
 
OF-1 Monitoring plant indications and conditions closely.
OF-1 Monitoring plant indications and conditions closely.
OF-5 Having a solid understanding of plant design, engineering principles, and sciences.
OF-5 Having a solid understanding of plant design, engineering principles, and sciences.
PRA: NA REFERENCES/PROCEDURES NEEDED:
PRA: NA REFERENCES/PROCEDURES NEEDED:
0-OI-26  VALIDATIONTIME:__15 min    PERFORMANCE TIME:
0-OI-26  VALIDATIONTIME:__15 min    PERFORMANCE TIME:
COMMENTS:  
COMMENTS:  
 
 
Additional comment sheets attached?  YES ___  NO ___
Additional comment sheets attached?  YES ___  NO ___
 
 
RESULTS: SATISFACTORY ____
RESULTS: SATISFACTORY ____
UNSATISFACTORY ____
UNSATISFACTORY ____
IF  UNSAT results are obtained THEN Retain entire JPM for records.(Otherwise just retain this page.
IF  UNSAT results are obtained THEN Retain entire JPM for records.(Otherwise just retain this page.
)
)
SIGNATURE: ___________________________
SIGNATURE: ___________________________
DATE: __________
DATE: __________
EXAMINER Job Performance Measure (JPM)  3  Revision Summary Rev No. Effective Date Pages Affected Description 0 04/28/15 All Initial issue
EXAMINER Job Performance Measure (JPM)  3  Revision Summary Rev No. Effective Date Pages Affected Description 0 04/28/15 All Initial issue
 
 
Job Performance Measure (JPM)  4  IN-PLANT: I will explain the initial conditions and state the task to be performed. ALL STEPS WILL BE SIMULATED. Do NOT operate any plant equipment. Touch STAAR may be carried out to the point of touching a label. If it becomes necessary to physically touch a control switch, use a non
Job Performance Measure (JPM)  4  IN-PLANT: I will explain the initial conditions and state the task to be performed. ALL STEPS WILL BE SIMULATED. Do NOT operate any plant equipment. Touch STAAR may be carried out to the point of touching a label. If it becomes necessary to physically touch a control switch, use a non-conductive pointing device. I will provide initiating cues and indicate any steps to be discussed. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's correct" (or That's incorrect", if applicable). When you have completed your assigned task, you will say, "My task is complete" and I will acknowledge that your task is complete.
-conductive pointing device. I will provide initiating cues and indicate any steps to be discussed. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's correct" (or That's incorrect", if applicable). When you have completed your assigned task, you will say, "My task is complete" and I will acknowledge that your task is complete.
 
 
INITIAL CONDITIONS:  
INITIAL CONDITIONS:  
 
 
You are an Operator on Unit 1. The Reactor Power at 70%
You are an Operator on Unit 1
A Fire Exists on B Reactor Feed Pump Lube Oil Reservoir. Fire OPS has been dispatched to the scene.
. The Reactor Power at 70%
A Fire Exists on B Reactor Feed Pump Lube Oil Reservoir
. Fire OPS has been dispatched to the scene.
Fire Pump B Tagged Out for Maintenance A and C Fire Pumps failed to Auto Start.
Fire Pump B Tagged Out for Maintenance A and C Fire Pumps failed to Auto Start.


Line 5,935: Line 5,210:
CAUTION: DO NOT OPERATE ANY PLANT EQUIPMENT!
CAUTION: DO NOT OPERATE ANY PLANT EQUIPMENT!


Job Performance Measure (JPM)  5  START TIME
Job Performance Measure (JPM)  5  START TIME:    STEP / STANDARD SAT / UNSAT Step 1:    [1] PLACE the FIRE PUMP A TRANSFER switch, 0
:    STEP / STANDARD SAT / UNSAT Step 1:    [1] PLACE the FIRE PUMP A TRANSFER switch, 0
-XS-26-1 in EMERGENCY position, at the respective switchgear.
-XS-26-1 in EMERGENCY position, at the respective switchgear.
Pump Board Compt A 4160V Shutdown Bd A 11 C 4160V Shutdown Bd C 10  Standard:
Pump Board Compt A 4160V Shutdown Bd A 11 C 4160V Shutdown Bd C 10  Standard: Simulates placing FIRE PUMP A TRANSFER switch 0
Simulates placing FIRE PUMP A TRANSFER switch 0
-XS-26-3 in EMERGENCY position at 4160 Shutdown Board A, Compartment  
-XS-26-3 in EMERGENCY position at 4160 Shutdown Board A, Compartment  


Line 5,946: Line 5,219:
SAT UNSAT N/A  CUE:  FIRE PUMP A TRANSFER switch 0
SAT UNSAT N/A  CUE:  FIRE PUMP A TRANSFER switch 0
-XS-26-1 is in the EMERGENCY position Step 2:  [2] CLOSE the breaker by placing the FIRE PUMP A CONTROL switch, 0-HS-26-1C to CLOSE.
-XS-26-1 is in the EMERGENCY position Step 2:  [2] CLOSE the breaker by placing the FIRE PUMP A CONTROL switch, 0-HS-26-1C to CLOSE.
Standard:
Standard: Simulates placing FIRE PUMP A CONTROL switch, 0
Simulates placing FIRE PUMP A CONTROL switch, 0
-HS-26-1C to CLOSE position.
-HS-26-1C to CLOSE position.
Critical Step
Critical Step
Line 5,959: Line 5,231:
[1] PLACE the FIRE PUMP C TRANSFER switch, 0
[1] PLACE the FIRE PUMP C TRANSFER switch, 0
-XS-26-3 in EMERGENCY position, at the respective switchgear.
-XS-26-3 in EMERGENCY position, at the respective switchgear.
Pump Board Compt A 4160V Shutdown Bd A 11 C 4160V Shutdown Bd C 10  Standard:
Pump Board Compt A 4160V Shutdown Bd A 11 C 4160V Shutdown Bd C 10  Standard: Simulates placing FIRE PUMP C TRANSFER switch 0
Simulates placing FIRE PUMP C TRANSFER switch 0
-XS-26-3 in EMERGENCY position at 4160 Shutdown Board C, Compartment  
-XS-26-3 in EMERGENCY position at 4160 Shutdown Board C, Compartment  


Line 5,967: Line 5,238:
SAT UNSAT N/A  CUE:  FIRE PUMP C TRANSFER switch 0
SAT UNSAT N/A  CUE:  FIRE PUMP C TRANSFER switch 0
-XS-26-3 is in the EMERGENCY position Step 5:   
-XS-26-3 is in the EMERGENCY position Step 5:   
[2] CLOSE the breaker by placing the FIRE PUMP C CONTROL switch, 0
[2] CLOSE the breaker by placing the FIRE PUMP C CONTROL switch, 0-HS-26-3C to CLOSE.
-HS-26-3C to CLOSE.
Standard: Simulates placing FIRE PUMP C CONTROL switch, 0
Standard:
Simulates placing FIRE PUMP C CONTROL switch, 0
-HS-26-3C to CLOSE position.
-HS-26-3C to CLOSE position.
Critical Step
Critical Step
Line 5,981: Line 5,250:
Standard  PLACES the NORM/EMERG Switch in NORMAL for FIRE PUMP C. SAT UNSAT N/A  CUE: FIRE PUMP C NORM/EMERG Switch is in NORMAL and this completes the JPM. Termination Criteria:  When two Fire Pumps are in service the JPM is complete.
Standard  PLACES the NORM/EMERG Switch in NORMAL for FIRE PUMP C. SAT UNSAT N/A  CUE: FIRE PUMP C NORM/EMERG Switch is in NORMAL and this completes the JPM. Termination Criteria:  When two Fire Pumps are in service the JPM is complete.
STOP TIME:
STOP TIME:
Job Performance Measure (JPM)  8  Provide to Applicant IN-PLANT: I will explain the initial conditions and state the task to be performed. ALL STEPS WILL BE SIMULATED. Do NOT operate any plant equipment. Touch STAAR may be carried out to the point of touching a label. If it becomes necessary to physically touch a control switch, use a non
Job Performance Measure (JPM)  8  Provide to Applicant IN-PLANT: I will explain the initial conditions and state the task to be performed. ALL STEPS WILL BE SIMULATED. Do NOT operate any plant equipment. Touch STAAR may be carried out to the point of touching a label. If it becomes necessary to physically touch a control switch, use a non-conductive pointing device. I will provide initiating cues and indicate any steps to be discussed. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's correct" (or That's incorrect", if applicable). When you have completed your assigned task, you will say, "My task is complete" and I will acknowledge that your task is complete.
-conductive pointing device. I will provide initiating cues and indicate any steps to be discussed. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's correct" (or That's incorrect", if applicable). When you have completed your assigned task, you will say, "My task is complete" and I will acknowledge that your task is complete.


INITIAL CONDITIONS:  
INITIAL CONDITIONS:  


You are an Operator on Unit 1
You are an Operator on Unit 1. The Reactor Power at 70%
. The Reactor Power at 70%
A Fire Exists on B Reactor Feed Pump Lube Oil Reservoir. Fire OPS has been dispatched to the scene.
A Fire Exists on B Reactor Feed Pump Lube Oil Reservoir. Fire OPS has been dispatched to the scene.
Fire Pump B Tagged Out for Maintenance A and C Fire Pumps failed to Auto Start.
Fire Pump B Tagged Out for Maintenance A and C Fire Pumps failed to Auto Start.
Line 5,999: Line 5,266:
Job Performance Measure (JPM)  1  SITE: BFN JPM TITLE:
Job Performance Measure (JPM)  1  SITE: BFN JPM TITLE:
ALIGNING EMERGENCY EECW MAKEUP TO SPENT FUEL POOL JPM NUMBER:
ALIGNING EMERGENCY EECW MAKEUP TO SPENT FUEL POOL JPM NUMBER:
674 REVISION:
674 REVISION: 0  TASK APPLICABILITY:
0  TASK APPLICABILITY:
SRO STA UO NAUO TASK NUMBER / TASK TITLE(S):
SRO STA UO NAUO TASK NUMBER / TASK TITLE(S):
U-000-EM-95/ Make-Up To SFP By EECW With Fire Hose (Internal Make
U-000-EM-95/ Make-Up To SFP By EECW With Fire Hose (Internal Make
Line 6,006: Line 5,272:
RO:  3.1    SRO:  3.3 K/A No. &STATEMENT:
RO:  3.1    SRO:  3.3 K/A No. &STATEMENT:
233000 Fuel Pool Cooling and Clean
233000 Fuel Pool Cooling and Clean
-up; A2.02; Ability to (a) predict the impacts of the following on the FUEL POOL COOLING AND CLEAN-UP ; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those abnormal conditions or operations:
-up; A2.02; Ability to (a) predict the impacts of the following on the FUEL POOL COOLING AND CL EAN-UP ; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those abnormal conditions or operations:
Low pool level RELATED PRA INFORMATION:
Low pool level RELATED PRA INFORMATION:
Risk Significant SAFETY FUNCTION:
Risk Significant SAFETY FUNCTION:
9  EVALUATION LOCATION:
9  EVALUATION LOCATION: In-Plant  Simulator Control R oom Lab  Other - List  APPLICABLE METHOD OF TESTING:  Discussion  Simulate/Walkthrough  Perform   TIME FOR COMPLETION:      NA      TIME CRITICAL (Y/N)
In-Plant  Simulator Control Room Lab  Other - List  APPLICABLE METHOD OF TESTING:  Discussion  Simulate/Walkthrough  Perform TIME FOR COMPLETION:      NA      TIME CRITICAL (Y/N)
ALTERNATE PATH (Y/N)
ALTERNATE PATH (Y/N)
Developed by:
Developed by:
Developer Date  (Ensure validator is briefed on exam security per NPG
Developer Date  (Ensure validator is briefed on exam security per NPG
-SPP-17.8.1)                (See JPM Validation Checklist in NPG
-SPP-17.8.1)                (See JPM Validation Checklist in NPG
-SPP-17.8.2)      Validated by:
-SPP-17.8.2)      Validated by:
Approved by:
Approved by:
Validator Date  Approved by: Site Training Management Date  Site Training Program Owner Date  N N Job Performance Measure (JPM)  2  OPERATOR:  ________________________________
Validator   Date  Approved by: Site Training Management Date  Site Training Program Owner Date  N N Job Performance Measure (JPM)  2  OPERATOR:  ________________________________
JPM Number:  __674__  RO  SRO  DATE: _______
JPM Number:  __674__  RO  SRO  DATE: _______


Line 6,041: Line 5,306:
EXAMINER Job Performance Measure (JPM)  3  Revision Summary Rev No. Effective Date Pages Affected Description 0 09/01/15 All Initial issue
EXAMINER Job Performance Measure (JPM)  3  Revision Summary Rev No. Effective Date Pages Affected Description 0 09/01/15 All Initial issue


Job Performance Measure (JPM)  4  IN-PLANT: I will explain the initial conditions and state the task to be performed. ALL STEPS WILL BE SIMULATED. Do NOT operate any plant equipment. Touch STAAR may be carried out to the point of touching a label. If it becomes necessary to physically touch a control switch, use a non
Job Performance Measure (JPM)  4  IN-PLANT: I will explain the initial conditions and state the task to be performed. ALL STEPS WILL BE SIMULATED. Do NOT operate any plant equipment. Touch STAAR may be carried out to the point of touching a label. If it becomes necessary to physically touch a control switch, use a non-conductive pointing device. I will provide initiating cues and indicate any steps to be discussed. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's correct" (or That's incorrect", if applicable). When you have completed your assigned task, you will say, "My task is complete" and I will acknowledge that your task is complete.
-conductive pointing device. I will provide initiating cues and indicate any steps to be discussed. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's correct" (or That's incorrect", if applicable). When you have completed your assigned task, you will say, "My task is complete" and I will acknowledge that your task is complete.


INITIAL CONDITIONS:  
INITIAL CONDITIONS:  
Line 6,051: Line 5,315:
INITIATING CUES
INITIATING CUES
:
:
The Unit Supervisor directs you to align EECW Makeup to Unit 2 Spent Fuel Pool per 2
The Unit Supervisor directs you to align EECW Makeup to Unit 2 Spent Fuel Pool per 2-AOI-78-1 Attachment 2 starting at step [3]
-AOI-78-1 Attachment 2 starting at step [3]
.   
.   


CAUTION: DO NOT OPERATE ANY PLANT EQUIPMENT!
CAUTION: DO NOT OPERATE ANY PLANT EQUIPMENT!


Job Performance Measure (JPM)  5  START TIME
Job Performance Measure (JPM)  5  START TIME:    STEP / STANDARD SAT / UNSAT Step 1:                    [3] UNLOCK and OPEN the following valves:
:    STEP / STANDARD SAT / UNSAT Step 1:                    [3] UNLOCK and OPEN the following valves:
NORTH HDR SPLY TO EMER FUEL POOL MU, 1
NORTH HDR SPLY TO EMER FUEL POOL MU, 1
-SHV-067-0792. SOUTH HDR SPLY TO EMER FUEL POOL MU, 1
-SHV-067-0792. SOUTH HDR SPLY TO EMER FUEL POOL MU, 1
-SHV-067-0793. Standard:
-SHV-067-0793. Standard: Simulates opening NORTH HDR SPLY TO EMER FUEL POOL MU, 1-SHV-067-0792 and SOUTH HDR SPLY TO EMER FUEL POOL MU, 1
Simulates opening NORTH HDR SPLY TO EMER FUEL POOL MU, 1-SHV-067-0792 and SOUTH HDR SPLY TO EMER FUEL POOL MU, 1
-SHV-067-0793 by demonstrating opening each valve cou nter-clockwise and breaking seal
-SHV-067-0793 by demonstrating opening each valve counter-clockwise and breaking seal
. Critical Step SAT  UNSAT  N/A  CUE:  NORTH HDR SPLY TO EMER FUEL POOL MU, 1
. Critical Step SAT  UNSAT  N/A  CUE:  NORTH HDR SPLY TO EMER FUEL POOL MU, 1
-SHV-067-0792 is OPEN and SOUTH HDR SPLY TO EMER FUEL POOL MU, 1
-SHV-067-0792 is OPEN and SOUTH HDR SPLY TO EMER FUEL POOL MU, 1
Line 6,076: Line 5,337:
Job Performance Measure (JPM)  6  STEP / STANDARD SAT / UNSAT Step 3:    [4] VERIFY charged hoses in stairwell are not obstructing stairway access and/or kinked.
Job Performance Measure (JPM)  6  STEP / STANDARD SAT / UNSAT Step 3:    [4] VERIFY charged hoses in stairwell are not obstructing stairway access and/or kinked.
  [4.1] ADJUST hose straps, as necessary.
  [4.1] ADJUST hose straps, as necessary.
Standard:
Standard: VERIFIES hoses in stairwell are not kinked SAT UNSAT N/A  Note to Examiner:
VERIFIES hoses in stairwell are not kinked SAT UNSAT N/A  Note to Examiner:
Hoses are already run along the stairwell. Applicant should verify hoses not kinked and connected.
Hoses are already run along the stairwell. Applicant should verify hoses not kinked and connected.
Step 4:    [5] VERIFY hose connected from NORTH HDR SPLY TO EMER FUEL POOL MU, 1
Step 4:    [5] VERIFY hose connected from NORTH HDR SPLY TO EMER FUEL POOL MU, 1
-SHV-067-0796 and route to Unit 2 Spent Fuel Pool (El 664', Refuel Floor, R6
-SHV-067-0796 and route to Unit 2 Spent Fuel Pool (El 664', Refuel Floor, R6
-U Line). Standard:
-U Line). Standard: VERIFY hose connected from NORTH HDR SPLY TO EMER FUEL POOL MU, 1
VERIFY hose connected from NORTH HDR SPLY TO EMER FUEL POOL MU, 1
-SHV-067-0796 and route to Unit 2 Spent Fuel Pool (El 664', Refuel Floor, R6
-SHV-067-0796 and route to Unit 2 Spent Fuel Pool (El 664', Refuel Floor, R6
-U Line). Critical Step SAT  UNSAT  N/A  Note to Examiner:
-U Line). Critical Step SAT  UNSAT  N/A  Note to Examiner:
Line 6,090: Line 5,349:
Step 5:    [6] VERIFY hose connected from SOUTH HDR SPLY TO EMER FUEL POOL MU, 1
Step 5:    [6] VERIFY hose connected from SOUTH HDR SPLY TO EMER FUEL POOL MU, 1
-SHV-067-0797 and route to Unit 2 Spent Fuel Pool (El 664', Refuel Floor, R6
-SHV-067-0797 and route to Unit 2 Spent Fuel Pool (El 664', Refuel Floor, R6
-U Line)  Standard:
-U Line)  Standard: VERIFY hose connected from SOUTH HDR SPLY TO EMER FUEL POOL MU, 1
VERIFY hose connected from SOUTH HDR SPLY TO EMER FUEL POOL MU, 1
-SHV-067-0797 and route to Unit 2 Spent Fuel Pool (El 664', Refuel Floor, R6
-SHV-067-0797 and route to Unit 2 Spent Fuel Pool (El 664', Refuel Floor, R6
-U Line)    Critical Step SAT  UNSAT  N/A Job Performance Measure (JPM)  7  STEP / STANDARD SAT / UNSAT Note to Examiner:
-U Line)    Critical Step SAT  UNSAT  N/A Job Performance Measure (JPM)  7  STEP / STANDARD SAT / UNSAT Note to Examiner:
Line 6,100: Line 5,358:
NORTH HDR SPLY TO EMER FUEL POOL MU, 1
NORTH HDR SPLY TO EMER FUEL POOL MU, 1
-SHV-067-0796. SOUTH HDR SPLY TO EMER FUEL POOL MU, 1
-SHV-067-0796. SOUTH HDR SPLY TO EMER FUEL POOL MU, 1
-SHV-067-0797. Standard:
-SHV-067-0797. Standard: Simulates opening NORTH HDR SPLY TO EMER FUEL POOL MU, 1-SHV-067-0796 and SOUTH HDR SPLY TO EMER FUEL POOL MU, 1
Simulates opening NORTH HDR SPLY TO EMER FUEL POOL MU, 1-SHV-067-0796 and SOUTH HDR SPLY TO EMER FUEL POOL MU, 1
-SHV-067-0797 by demonstrating opening each valve cou nter-clockwise.
-SHV-067-0797 by demonstrating opening each valve counter-clockwise.
Critical Step SAT  UNSAT  N/A  CUE:  NORTH HDR SPLY TO EMER FUEL POOL MU, 1
Critical Step SAT  UNSAT  N/A  CUE:  NORTH HDR SPLY TO EMER FUEL POOL MU, 1
-SHV-067-0796 is OPEN and SOUTH HDR SPLY TO EMER FUEL POOL MU, 1
-SHV-067-0796 is OPEN and SOUTH HDR SPLY TO EMER FUEL POOL MU, 1
-SHV-067-0797 is OPEN  Location: Refuel Floor Elevation 664 ft, R U Line.
-SHV-067-0797 is OPEN  Location: Refuel Floor Elevation 664 ft, R U Line.
Step 7:    [8] VERIFY charged hoses on the Refuel Floor are not kinked.
Step 7:    [8] VERIFY charged hoses on the Refuel Floor are not kinked.
Standard:
Standard: VERIFY charged hoses on the Refuel Floor are not kinked
VERIFY charged hoses on the Refuel Floor are not kinked


SAT UNSAT N/A  Termination Criteria:  NORTH and SOUTH Header are aligned then the JPM is complete. State another operator will perform the remaining steps. STOP TIME:
SAT UNSAT N/A  Termination Criteria:  NORTH and SOUTH Header are aligned then the JPM is complete. State another operator will perform the remaining steps. STOP TIME:
Job Performance Measure (JPM)  8  Provide to Applicant IN-PLANT: I will explain the initial conditions and state the task to be performed. ALL STEPS WILL BE SIMULATED. Do NOT operate any plant equipment. Touch STAAR may be carried out to the point of touching a label. If it becomes necessary to physically touch a control switch, use a non
Job Performance Measure (JPM)  8  Provide to Applicant IN-PLANT: I will explain the initial conditions and state the task to be performed. ALL STEPS WILL BE SIMULATED. Do NOT operate any plant equipment. Touch STAAR may be carried out to the point of touching a label. If it becomes necessary to physically touch a control switch, use a non-conductive pointing device. I will provide initiating cues and indicate any steps to be discussed. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's correct" (or That's incorrect", if applicable). When you have completed your assigned task, you will say, "My task is complete" and I will acknowledge that your task is complete.
-conductive pointing device. I will provide initiating cues and indicate any steps to be discussed. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's correct" (or That's incorrect", if applicable). When you have completed your assigned task, you will say, "My task is complete" and I will acknowledge that your task is complete.


INITIAL CONDITIONS:  
INITIAL CONDITIONS:  


You are an Operator on Unit 2
You are an Operator on Unit 2. The Reactor is in cold shutdown The Unit 2 Spent Fuel Pool water level is lowering.
. The Reactor is in cold shutdown The Unit 2 Spent Fuel Pool water level is lowering.
Fire Protection is available to assist INITIATING CUES
Fire Protection is available to assist INITIATING CUES
:
:
Line 6,126: Line 5,380:
Job Performance Measure (JPM)  1  SITE: BFN JPM TITLE:
Job Performance Measure (JPM)  1  SITE: BFN JPM TITLE:
START UP AND SYNCHRONIZE UNIT 3 PREFERRED MMG SET JPM NUMBER:
START UP AND SYNCHRONIZE UNIT 3 PREFERRED MMG SET JPM NUMBER:
307 REVISION:
307 REVISION: 6  TASK APPLICABILITY:
6  TASK APPLICABILITY:
SRO STA UO NAUO TASK NUMBER / TASK TITLE(S):
SRO STA UO NAUO TASK NUMBER / TASK TITLE(S):
S-57C-NO-04  K/A RATINGS:
S-57C-NO-04  K/A RATINGS:
Line 6,135: Line 5,388:
Risk Significant SAFETY FUNCTION:
Risk Significant SAFETY FUNCTION:
6  EVALUATION LOCATION:
6  EVALUATION LOCATION:
In-Plant  Simulator Control Room Lab  Other - List  APPLICABLE METHOD OF TESTING:  Discussion  Simulate/Walkthrough Perform TIME FOR COMPLETION:      NA      TIME CRITICAL (Y/N)
In-Plant  Simulator Control R oom Lab  Other - List  APPLICABLE METHOD OF TESTING:  Discussion  Simulate/Walkthrough Perform   TIME FOR COMPLETION:      NA      TIME CRITICAL (Y/N)
ALTERNATE PATH (Y/N)
ALTERNATE PATH (Y/N)
Developed by:
Developed by:
Developer Date  (Ensure validator is briefed on exam security per NPG
Developer Date  (Ensure validator is briefed on exam security per NPG
-SPP-17.8.1)                (See JPM Validation Checklist in NPG
-SPP-17.8.1)                (See JPM Validation Checklist in NPG
-SPP-17.8.2)      Validated by:
-SPP-17.8.2)      Validated by:
Approved by:
Approved by:
Validator Date  Approved by:
Validator   Date  Approved by:
Site Training Management Date  Site Training Program Owner Date      N N Job Performance Measure (JPM)  2  OPERATOR:  ________________________________
Site Training Management Date  Site Training Program Owner Date      N N Job Performance Measure (JPM)  2  OPERATOR:  ________________________________
JPM Number:  _307___  RO  SRO  DATE: _______
JPM Number:  _307___  RO  SRO  DATE: _______
Line 6,162: Line 5,415:
SIGNATURE: ___________________________
SIGNATURE: ___________________________
DATE: __________
DATE: __________
EXAMINER Job Performance Measure (JPM)  3  Revision Summary Rev No. Effective Date Pages Affected Description 1 10/26/94 ALL GENERAL REVISION 2 05/07/95 ALL GENERAL REVISION 3 10/15/97 ALL FORMAT, PROCEDURE REVISION, ADDED PLANT WORK EXPECTATIONS TOUCH STAAR, SAFETY, AND 3
EXAMINER Job Performance Measure (JPM)  3  Revision Summary Rev No. Effective Date Pages Affected Description 1 10/26/94 A LL GENERAL REVISION 2 05/07/95 ALL GENERAL REVISION 3 10/15/97 ALL FORMAT, PROCEDURE REVISION, ADDED PLANT WORK EXPECTATIONS TOUCH STAAR, SAFETY, AND 3
-WAY COMM.
-WAY COMM. 4 11/10/99 ALL PROCEDURE REVISION, FORMAT DOCUMENT 5 10/03/01 ALL PROCEDURE REVISION 6 04/28/15 ALL UPDATE TO NEW FORMAT
4 11/10/99 ALL PROCEDURE REVISION, FORMAT DOCUMENT 5 10/03/01 ALL PROCEDURE REVISION 6 04/28/15 ALL UPDATE TO NEW FORMAT


Job Performance Measure (JPM)  4  IN-PLANT: I will explain the initial conditions and state the task to be performed. ALL STEPS WILL BE SIMULATED. Do NOT operate any plant equipment. Touch STAAR may be carried out to the point of touching a label. If it becomes necessary to physically touch a control switch, use a non
Job Performance Measure (JPM)  4  IN-PLANT: I will explain the initial conditions and state the task to be performed. ALL STEPS WILL BE SIMULATED. Do NOT operate any plant equipment. Touch STAAR may be carried out to the point of touching a label. If it becomes necessary to physically touch a control switch, use a non-conductive pointing device. I will provide initiating cues and indicate any steps to be discussed. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's correct" (or That's incorrect", if applicable). When you have completed your assigned task, you will say, "My task is complete" and I will acknowledge that your task is complete.
-conductive pointing device. I will provide initiating cues and indicate any steps to be discussed. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's correct" (or That's incorrect", if applicable). When you have completed your assigned task, you will say, "My task is complete" and I will acknowledge that your task is complete.


INITIAL CONDITIONS:  
INITIAL CONDITIONS:  
Line 6,183: Line 5,434:
CAUTION: DO NOT OPERATE ANY PLANT EQUIPMENT!
CAUTION: DO NOT OPERATE ANY PLANT EQUIPMENT!


Job Performance Measure (JPM)  5  START TIME
Job Performance Measure (JPM)  5  START TIME:    STEP / STANDARD SAT / UNSAT Step 1:   
:    STEP / STANDARD SAT / UNSAT Step 1:   


[16] PLACE UNIT 3 MMG OPERATING MODE, 3
[16] PLACE UNIT 3 MMG OPERATING MODE, 3
-HS-252-02AB in AUTO. Standard:
-HS-252-02AB in AUTO. Standard: VERIFIED/SIMULATED PLACING the Unit 3 MMG SET OPERATING MODE 3
VERIFIED/SIMULATED PLACING the Unit 3 MMG SET OPERATING MODE 3
-HS-252-02AB in AUTO.
-HS-252-02AB in AUTO.
Critical Step
Critical Step
Line 6,198: Line 5,447:
-REMOTE CONTROL, 3
-REMOTE CONTROL, 3
-XS-252-02A in REMOTE.
-XS-252-02A in REMOTE.
Standard:
Standard: SIMULATED PLACING the Unit 3 MMG SET LOCAL
SIMULATED PLACING the Unit 3 MMG SET LOCAL
-REMOTE CONTROL 3-XS-252-02A in the REMOTE position.
-REMOTE CONTROL 3
-XS-252-02A in the REMOTE position.
Critical Step
Critical Step


Line 6,209: Line 5,456:
Step 3:   
Step 3:   
[18] PLACE UNIT 3 PFD SYSTEM GENERATOR SOURCE SYNC SWITCH SS
[18] PLACE UNIT 3 PFD SYSTEM GENERATOR SOURCE SYNC SWITCH SS
-7, 3-HS-252-03/SS-7 in ON. Standard:
-7, 3-HS-252-03/SS-7 in ON. Standard: SIMULATED PLACING UNIT 3 PFD SYSTEM GENERATOR SOURCE SYNC SWITCH, SS
SIMULATED PLACING UNIT 3 PFD SYSTEM GENERATOR SOURCE SYNC SWITCH, SS
-7, 3-HS-252-03/SS-7, in the ON position. Critical Step
-7, 3-HS-252-03/SS-7, in the ON position.
Critical Step


SAT UNSAT N/A NOTE Steps 5.5[16] through 5.5[26] are performed from Battery Board Room 2 UNIT PFD Sync. & Speed Control Panel.
SAT UNSAT N/A NOTE Steps 5.5[16] through 5.5[26] are performed from Battery Board Room 2 UNIT PFD Sync. & Speed Control Panel.


Job Performance Measure (JPM)  6  STEP / STANDARD SAT / UNSAT Cue:  The Unit 3 PFD SYSTEM GENERATOR SOURCE SYNC SS
Job Performance Measure (JPM)  6  STEP / STANDARD SAT / UNSAT Cue:  The Unit 3 PFD SYSTEM GENERATOR SOURCE SYNC SS
-7, SWITCH 3-HS-252-003/SS-7 is in the ON position.
-7, SWITCH 3-HS-252-003/SS-7 is in the ON position. Step 4:   
Step 4:   


[19] MATCH Incoming to Running AC volts using UNIT 3 MMG VOLTAGE ADJUST, 3
[19] MATCH Incoming to Running AC volts using UNIT 3 MMG VOLTAGE ADJUST, 3
-HS-252-02CD. Standard:
-HS-252-02CD. Standard: SIMULATED MANIPULATING UNIT 3 MMG VOLTAGE ADJUST, 3-HS 252-02CD until cued that incoming and running AC volts are matched. Critical Step
SIMULATED MANIPULATING UNIT 3 MMG VOLTAGE ADJUST,  
 
3-HS 252-02CD until cued that incoming and running AC volts are matched. Critical Step


SAT UNSAT N/A Cue:  INCOMING and RUNNING VOLTAGES are EQUAL at 122 Volts Step 5:   
SAT UNSAT N/A Cue:  INCOMING and RUNNING VOLTAGES are EQUAL at 122 Volts Step 5:   
[20] ADJUST MMG speed using UNIT 3 MMG FREQUENCY ADJUST, 3-HS-252-02CF to obtain a synchroscope slowly rotating in the SLOW (counter-clockwise) direction (10 to 15 second rotation) as indicated on SYNCHROSCOPE, 0
[20] ADJUST MMG speed using UNIT 3 MMG FREQUENCY ADJUST, 3-HS-252-02CF to obtain a synchroscope slowly rotating in the SLOW (counter-clockwise) direction (10 to 15 second rotation) as indicated on SYNCHROSCOPE, 0
-SCP-252-000A/B. Standard:
-SCP-252-000A/B. Standard: SIMULATED ADJUSTING UNIT 3 MMG FREQUENCY ADJUST 3-HS-252-02CF speed control switch until cued that synchroscope indicator rotating in the counterclockwise direction at 10 to 15 seconds per revolution.
SIMULATED ADJUSTING UNIT 3 MMG FREQUENCY ADJUST 3-HS-252-02CF speed control switch until cued that synchroscope indicator rotating in the counterclockwise direction at 10 to 15 seconds per revolution.
Critical Step
Critical Step


SAT UNSAT N/A  Cue: State: "The Initial Synchroscope indicator is standing still at the 5 o'clock position."  Note: If student raises frequency the state: "Synchroscope indicator is rotating in the CLOCKWISE direction at 12 seconds per revolution."
SAT UNSAT N/A  Cue: State: "T he Initial Synchroscope indicator is standing still at the 5 o'clock position."  Note: If student raises frequency the state: "Synchroscope indicator is rotating in the CLOCKWISE direction at 12 seconds per revolution."
Note: If student lowers frequency the state: "Synchroscope indicator is rotating in the COUNTERCLOCKWISE direction at 12 seconds per revolution."
Note: If student lowers frequency the state: "Synchroscope indicator is rotating in the COUNTERCLOCKWISE direction at 12 seconds per revolution."
NOTE MMG voltage and hertz are read as INCOMING.
NOTE MMG voltage and hertz are read as INCOMING.
Line 6,242: Line 5,482:
-clockwise direction, THEN PERFORM the following expeditiously:
-clockwise direction, THEN PERFORM the following expeditiously:
   [21.1] CLOSE UNIT 3 BKR 1001, using 0
   [21.1] CLOSE UNIT 3 BKR 1001, using 0
-HS-280-003/1001.  [21.2] ENSURE CLOSED UNIT 3 BKR 1001.
-HS-280-003/1001.  [21.2] ENSURE CLOSED UNIT 3 BKR 1001. Critical Step
Critical Step


SAT UNSAT N/A NOTES 1) Section 5.5[21] should be performed expeditiously (within about 15 seconds) to minimize the time AC Systems are paralleled to prevent tripping the MMG set. Voltage and amps is expected to fluctuate while the AC systems are paralleled and the MMG set will trip if the AC systems are paralleled for approximately 30 seconds.  
SAT UNSAT N/A NOTES 1) Section 5.5[21] should be performed expeditiously (within about 15 seconds) to minimize the time AC Systems are paralleled to prevent tripping the MMG set. Voltage and amps is expected to fluctuate while the AC systems are paralleled and the MMG set will trip if the AC systems are paralleled for approximately 30 seconds.  
Line 6,264: Line 5,503:
. Step 7:   
. Step 7:   
[21.3] OPEN the UNIT 3)BKR 1002, using 0
[21.3] OPEN the UNIT 3)BKR 1002, using 0
-HS-280-003/1002.
-HS-280-003/1002.


Standard:
Standard: SIMULATED UNIT 3 BKR 1002, 0-HS-282-003/1002in the OPEN position. Critical Step
SIMULATED UNIT 3 BKR 1002, 0-HS-282-003/1002in the OPEN position.
Critical Step


SAT UNSAT N/A  CUE: UNIT 3 BKR 1002, 0
SAT UNSAT N/A  C UE: UNIT 3 BKR 1002, 0
-HS-282-003/1002 IS IN THE OPEN POSITION WITH RED LIGHT ILLUMINATED.
-HS-282-003/1002 IS IN THE OPEN POSITION WITH RED LIGHT ILLUMINATED.
NOTE:  DO NOT ALLOW THE EXAMINEE TO OPERATE THE AMMETER SELECTOR SWITCH FOR THE FOLLOWING STEP.
NOTE:  DO NOT ALLOW THE EXAMINEE TO OPERATE THE AMMETER SELECTOR SWITCH FOR THE FOLLOWING STEP.
Line 6,277: Line 5,514:
-II-252-02C/1AMR L2 rise, "N" should be approximately the difference of L1& L2 (UNIT 3 MMG GENERATOR amps, 3-HS-252-02CH positions 1, 2, & 3 are respective to L1, L2 & N). SAT UNSAT N/A End of Critical Step(s)
-II-252-02C/1AMR L2 rise, "N" should be approximately the difference of L1& L2 (UNIT 3 MMG GENERATOR amps, 3-HS-252-02CH positions 1, 2, & 3 are respective to L1, L2 & N). SAT UNSAT N/A End of Critical Step(s)


Job Performance Measure (JPM)  9  STEP / STANDARD SAT / UNSAT Standard:
Job Performance Measure (JPM)  9  STEP / STANDARD SAT / UNSAT Standard: CHECKED amp indicators L1 MINUS L2 approximately equals n.
CHECKED amp indicators L1 MINUS L2 approximately equals n.
Cue: L1, L2 , N AMPS INDICATIONS HAVE RISEN and L1-L2 = N. Note: Selector Switch positions are labeled as follows: Position 1 is L1, position 2 is L2 and Position 3 is N.
Cue: L1, L2, N AMPS INDICATIONS HAVE RISEN and L1-L2 = N. Note: Selector Switch positions are labeled as follows: Position 1 is L1, position 2 is L2 and Position 3 is N.
Step 9:  [23] ENSURE OPEN UNIT 3 BKR 1003, 0
Step 9:  [23] ENSURE OPEN UNIT 3 BKR 1003, 0
-HS-280-003/1003  Standard:
-HS-280-003/1003  Standard: VERIFIED ILLUMINATED GREEN position indicating light above 0
VERIFIED ILLUMINATED GREEN position indicating light above 0
-HS-282-003/1003.
-HS-282-003/1003.
SAT UNSAT  N/A  Cue: Unit 3 Breaker 1003 0
SAT UNSAT  N/A  Cue: Unit 3 Breaker 1003 0
Line 6,288: Line 5,523:
Step 10:  [24] On Unit 2 Unit Preferred MMG Set Local Control Panel, ENSURE OPEN the following fused disconnect switches:
Step 10:  [24] On Unit 2 Unit Preferred MMG Set Local Control Panel, ENSURE OPEN the following fused disconnect switches:
BACKUP SOURCE TO BAT BD 1 BKR 1003, 1
BACKUP SOURCE TO BAT BD 1 BKR 1003, 1
-FUDS-280-001/1003 BACKUP SOURCE TO BAT BD 3 BKR 1003, 3
-FUDS-280-001/1003   BACKUP SOURCE TO BAT BD 3 BKR 1003, 3
-FUDS-280-003/1003 Standard:
-FUDS-280-003/1003 Standard: At Unit 2 Unit Preferred MMG Set Local Control Panel VERIFIED 1-FUDS-280-001/1003 AND 3
At Unit 2 Unit Preferred MMG Set Local Control Panel VERIFIED 1-FUDS-280-001/1003 AND 3
-FUDS-280-003/1003 in the OPEN POSITION. SAT UNSAT N/A Cue: 1-FUDS-280-001/1003 and 3-FUDS-280-003/1003 are in the OPEN position.
-FUDS-280-003/1003 in the OPEN POSITION.
SAT UNSAT N/A Cue: 1-FUDS-280-001/1003 and 3-FUDS-280-003/1003 are in the OPEN position.


Job Performance Measure (JPM)  10  STEP / STANDARD SAT / UNSAT Step 11:  [25] On Unit 3 Unit Preferred MMG Set Local Control Panel, ENSURE the BACKUP SOURCE TO BAT BD 2 BKR 1003, 2-FUDS-280-002/1003 fused disconnect switch is open:
Job Performance Measure (JPM)  10  STEP / STANDARD SAT / UNSAT Step 11:  [25] On Unit 3 Unit Preferred MMG Set Local Control Panel, ENSURE the BACKUP SOURCE TO BAT BD 2 BKR 1003, 2-FUDS-280-002/1003 fused disconnect switch is open:
Standard:
Standard: On Unit 3 Unit Preferred MMG Set Local Control Panel, VERIFIED 2-FUDS-280-002/1003 in the OPEN position.
On Unit 3 Unit Preferred MMG Set Local Control Panel, VERIFIED 2-FUDS-280-002/1003 in the OPEN position.
SAT UNSAT N/A Cue: 2-FUDS-280-002/1003 is in the OPEN position.
SAT UNSAT N/A Cue: 2-FUDS-280-002/1003 is in the OPEN position.
Step 12:   
Step 12:   
[26] On Battery Board 2:
[26] On Battery Board 2:


PLACE UNIT 3 PFD SYSTEM GENERATOR SOURCE SYNC SWITCH SS-7, 1-HS-252-03/SS-7 in OFF. Standard:
PLACE UNIT 3 PFD SYSTEM GENERATOR SOURCE SYNC SWITCH SS-7, 1-HS-252-03/SS-7 in OFF. Standard: SIMULATED PLACING UNIT 3 PFD SYSTEM GENERATOR SOURCE SYNC SWITCH, SS
SIMULATED PLACING UNIT 3 PFD SYSTEM GENERATOR SOURCE SYNC SWITCH, SS
-7, 1-HS-252-03/SS-7 in the OFF position. SAT UNSAT N/A Cue: UNIT 3 PFD SYSTEM GENERATOR SOURCE SYNC SWITCH, SS
-7, 1-HS-252-03/SS-7 in the OFF position.
SAT UNSAT N/A Cue: UNIT 3 PFD SYSTEM GENERATOR SOURCE SYNC SWITCH, SS
-7, 1-HS-252-03/SS-7 is in the OFF position.
-7, 1-HS-252-03/SS-7 is in the OFF position.
Step 13:   
Step 13:   
[27] On Battery Board 2:
[27] On Battery Board 2:


DEPRESS UNIT 3 MMG AC MOTOR START, 3-HS-252-02AD to return to Normal AC power from DC drive. Standard:
DEPRESS UNIT 3 MMG AC MOTOR START, 3-HS-252-02AD to return to Normal AC power from DC drive. Standard: SIMULATED DEPRESSING and RELEASING UNIT 3 MMG AC MOTOR START , 3-HS-252-02AD pushbutton.
SIMULATED DEPRESSING and RELEASING UNIT 3 MMG AC MOTOR START ,
3-HS-252-02AD pushbutton.
Critical Step
Critical Step


Line 6,317: Line 5,545:
State Another Operator will continue with procedure and this will end the task.
State Another Operator will continue with procedure and this will end the task.
STOP TIME:
STOP TIME:
Job Performance Measure (JPM)  11  Provide to Applicant IN-PLANT: I will explain the initial conditions and state the task to be performed. ALL STEPS WILL BE SIMULATED. Do NOT operate any plant equipment. Touch STAAR may be carried out to the point of touching a label. If it becomes necessary to physically touch a control switch, use a non
Job Performance Measure (JPM)  11  Provide to Applicant IN-PLANT: I will explain the initial conditions and state the task to be performed. ALL STEPS WILL BE SIMULATED. Do NOT operate any plant equipment. Touch STAAR may be carried out to the point of touching a label. If it becomes necessary to physically touch a control switch, use a non-conductive pointing device. I will provide initiating cues and indicate any steps to be discussed. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's correct" (or That's incorrect", if applicable). When you have completed your assigned task, you will say, "My task is complete" and I will acknowledge that your task is complete.
-conductive pointing device. I will provide initiating cues and indicate any steps to be discussed. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's correct" (or That's incorrect", if applicable). When you have completed your assigned task, you will say, "My task is complete" and I will acknowledge that your task is complete.


INITIAL CONDITIONS:  
INITIAL CONDITIONS:  


You are an Operator on Unit 3
You are an Operator on Unit 3. The Reactor is in cold shutdown The Unit 3 Unit Preferred Bus is being supplied from the Unit 3 Unit Preferred Transformer in accordance with Section 8.1.
. The Reactor is in cold shutdown The Unit 3 Unit Preferred Bus is being supplied from the Unit 3 Unit Preferred Transformer in accordance with Section 8.1.
Maintenance has been completed on the Unit 3 Unit Preferred MMG Set.
Maintenance has been completed on the Unit 3 Unit Preferred MMG Set.


INITIATING CUES
INITIATING CUES
:  The SM directs you to start up and synchronize the Unit 3 Unit Preferred MMG Set as directed by 0-OI-57C per section 5.5 step 5.5[16
:  The SM directs you to start up and synchronize the Unit 3 Unit Preferred MMG Set as directed by 0-O I-57C per section 5.5 step 5.5[16
]. NOTE:  PERFORMER WILL NEED GGMKA KEY.
]. NOTE:  PERFORMER WILL NEED GGMKA KEY.
CAUTION: DO NOT OPERATE ANY PLANT EQUIPMENT!
CAUTION: DO NOT OPERATE ANY PLANT EQUIPMENT!
  .}}
  .}}

Revision as of 15:51, 8 July 2018

Browns Ferry Initial Exam 2015-302 Draft Sim In-plant JPMs
ML16049A071
Person / Time
Site: Browns Ferry  Tennessee Valley Authority icon.png
Issue date: 02/18/2016
From:
Division of Reactor Safety II
To:
Tennessee Valley Authority
References
Download: ML16049A071 (226)


Text

Job Performance Measure (JPM) 1 SITE: BFN JPM TITLE:

RESPOND TO A CONTROL ROD DRIFT IN JPM NUMBER:

80 A U2 REVISION: 1 TASK APPLICABILITY:

SRO STA UO NAUO TASK NUMBER / TASK TITLE(S):

U-085-AB-05/ Respond to a Control Rod Drift In K/A RATINGS:

RO: 3.2 SRO: 3.3 K/A No. &STATEMENT:

201002 Reactor Manual Control System A2.02; Ability to (a) predict the impacts of the following on the REACTOR MANUAL CONTROL SYSTEM ; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those abnormal conditions or operations: Rod Drift Alarm RELATED PRA INFORMATION:

Risk Significant SAFETY FUNCTION:

1 EVALUATION LOCATION:

In-Plant Simulator Control R oom Lab Other - List APPLICABLE METHOD OF TESTING: Discussion Simulate/Walkthrough Perform TIME FOR COMPLETION: NA TIME CRITICAL (Y/N) ALTERNATE PATH (Y/N)

Developed by:

Developer Date (Ensure validator is briefed on exam security per NPG

-SPP-17.8.1) (See JPM Validation Checklist in NPG

-SPP-17.8.2) Validated by:

Approved by:

Validator Date Approved by:

Site Training Management Date Site Training Program Owner Date N Y Job Performance Measure (JPM) 2 OPERATOR: ________________________________

JPM Number: __

80A__ RO SRO DATE: _______

TASK STANDARD:

Perform operations necessary to respond to a Control Rod Drift In per 2

-AOI-85-5.

Operator Fundamental evaluated:

OF-1 Monitoring plant indications and conditions closely.

OF-2 Controlling plant evolutions precisely.

PRA: NA REFERENCES/PROCEDURES NEEDED:

2-AOI-85-5 , 2-AOI-100-1 VALIDATIONTIME: 18 min PERFORMANCE TIME:

COMMENTS:

Additional comment sheets attached? YES ___ NO ___

RESULTS: SATISFACTORY ____

UNSATISFACTORY ____

IF UNSAT results are obtained THEN Retain entire JPM for records.(Otherwise just retain this page.

)

SIGNATURE: ___________________________

DATE: __________

EXAMINER Job Performance Measure (JPM) 3 Revision Summary Rev No. Effective Date Pages Affected Description 0 05/27/10 All Initial issue 1 09/01/15 1 Incorrect task number; changed to U

-085-AB-05: Incorrect malfunction numbers; rd07r0231, rd07r2223 & rd07r3031; Corrected

Job Performance Measure (JPM) 4 SIMULATOR SETUP IC 28 Exam IC 280 Console Operator Instructions Reset IC 28 or Exam IC if written in above Run schedule file

NRC JPM A U2

-Control Rod Drift In Verify all triggers and overrides are correct Place the simulator in RUN to ensure stable conditions Start Rod Display on RWM Screen Provide Initial Rod Data Sheet

-PRLOG When prompted by the examiner, INSERT - Event 1 to Drift Control Rod 02

-31 into the core When prompted by the examiner, INSERT - Event 2 to Drift Control Rod Multiple Control Rods into the core Malfunctions Description Event Severity Delay Initial set rd07r0231 Drifts rod 02

-31 into core 1 NA 35 sec NA rd07r2223 Drifts rod 22

-23 into core 2 NA 10 sec NA rd07r 303 1 Drifts rod 30

-31 into core 2 NA 25 sec NA rd07r4635 Drifts rod 46

-35 into core 2 NA 20 sec NA rd07r2619 Drifts rod 26

-19 into core 2 NA 30 sec NA rd07r3027 Drifts rod 30

-27 into core 2 NA 18 sec NA rd07r5423 Drifts rod 54-23 into core 2 NA 23 sec NA rd07r2255 Drifts rod 22

-55 into core 2 NA 28 sec NA Job Performance Measure (JPM) 5 Remotes Description Event Severity Delay Initial set Overrides Description Event Severity Delay Initial set Schedule File(s): NRC JPM A U2

-Control Rod Drift In

Job Performance Measure (JPM) 6 IN-SIMULATOR: I will explain the initial conditions and state the task to be performed. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's Correct". (OR "That's Incorrect", if applicable). When you have completed your assigned task, you will say, "my task is complete" and I will acknowledge that your task is complete.

INITIAL CONDITIONS:

You are an Operator on Unit 2.

The Reactor is at 100% power INITIATING CUES

The Unit Supervisor directs you to perform Surveillance 3.1.3.3 step 7.3, Control Rod Exercise Test for Withdrawn Control Rods, for partially withdrawn control rods.

Job Performance Measure (JPM) 7 START TIME: STEP / STANDARD SAT / UNSAT Step 1: NOTE 1) Problem details of any control rod issues observed during the performance of this surveillance must be recorded on Attachment 3 for further review and possible corrective maintenance. Slow/fast rod movements or settle times should be noted in the remarks section.

2) Section 7.3 is performed for all Partially Withdrawn Control Rods and performance of steps is represented by initialing the appropriate CRD exercised on Attachment 1.

CAUTIONS 1) Any mispositioned control rod events will be dispositioned by following the direction contained within 2

-AOI-85-7. 2) If a control rod moves unexpectedly one notch beyond its intended position, notify Unit Supervisor, obtain Unit Supervisor concurrence and return the rod to its intended position.

3) At any time CTP is less than or equal to 10%, entry into LCO 3.1.6 may be required.

7.3 Exercising a Partially Withdrawn Control Rod

[1] SELECT desired control rod by DEPRESSING appropriate CRD ROD SELECT pushbutton 2

-XS-85-40.

[2] OBSERVE the following for selected control rod:

CHECK CRD ROD SELECT pushbutton is brightly ILLUMINATED.

CHECK white light on the Full Core Display is ILLUMINATED.

CHECK Rod Out Permit light is ILLUMINATED.

Standard: Selects a withdrawn control rod Critical Step

SAT UNSAT N/A Note to Examiner: May select any partially withdrawn control rod in any order

Job Performance Measure (JPM) 8 STEP / STANDARD SAT / UNSAT Step 2: [3] INSERT control rod one notch by performing the following:

[3.1] PLACE CRD CONTROL SWITCH, 2

-HS-85-48 in ROD IN andRELEASE.

[3.2] OBSERVE control rod settles into the desired position andROD SETTLE light extinguishes.

Standard: Inserts withdrawn control rod one notch Critical Step

SAT UNSAT N/A Step 3:

[4] WITHDRAW selected control rod one notch by performing the following:

[4.1] PLACE CRD CONTROL SWITCH, 2

-HS-85-48 in ROD OUT NOTCHand RELEASE.

[4.2] OBSERVE control rod settles into the desired position and ROD SETTLE light extinguishes.

Standard: Withdraws withdrawn control rod one notch Critical Step

SAT UNSAT N/A Step 4:

[5] DOCUMENT completion of control rod test as follows:

[5.1] PERFORMER INITIAL Attachment 1 (Control Rod Exercise Data Sheet) in thebox corresponding to the control rod coordinates for the control rodjust exercised to document proper movement and CRD latching.

[5.2] Concurrent Verifier (CV)

ENSURE rod inserted and returned to its original position.

INITIAL Attachment 2 (Control Rod Concurrent Verifier (CV)Check) in the box corresponding to the control rod coordinates forthe rod just exercised.

SAT UNSAT N/A Job Performance Measure (JPM) 9 STEP / STANDARD SAT / UNSAT Standard: Initials Attachment 1 for exercised control rod and continues to exercise rods.

Note to Examiner: Perform above actions for @ least two control rods

. When satisfied with the number of rod manipulations direct Simulator Booth Operator to insert trigger #1 for Control Rod 02

-31 Drift In Note to Simulator Booth Operator:

When directed by examiner insert trigger #1 for 02

-31 Control Rod Drift In.

Step 5: Performer recognizes control rod 02

-31 drift in and responds per 2-AOI-85-5.

[2] IF a Control Rod is moving from its intended position without operator actions, THEN INSERT the Control Rod to position 00 using

CONTINUOUS IN. (Otherwise N/A)

[3] IF a Control Rod Block occurs during rod insertion due to Rod Worth Minimizer, THEN BYPASS the RWM per step 4.2[1] above. (Otherwise N/A)

Standard: Responds per 2-AOI-85-5 and inserts control rod 02

-31 to full in position as indicated by position 00 indication.

Critical Step SAT UNSAT N/A CUE: When report to US, state "Respond per 2

-AOI-85-5 , Control Rod Drift In.

Step 6:

[4] NOTIFY the Reactor Engineer to Evaluate Core Thermal Limits and Preconditioning Limits for the current Control Rod pattern. Standard: Candidate notifies Reactor Engineer to Evaluate Core Thermal limits and Preconditioning Limits for the current Control Rod Pattern SAT UNSAT N/A Cue: Understand Reactor Engineering notified to evaluate Core Thermal andPreconditioning Limits

Job Performance Measure (JPM) 10 STEP / STANDARD SAT / UNSAT Step 7: [5] IF another Control Rod Drift occurs before Reactor Engineering completes the evaluation, THEN MANUALLY SCRAM Reactor and enter 2

-AOI-100-1.

[6] CHECK Thermal Limits on ICS (RUNMON).

Note to NRC Examiner:

Step [6] performed by Reactor Engineer"ing.

Standard: Reviews step and asks for guidance from US or RE SAT UNSAT N/A CUE: As Shift Manager, state "RE has evaluated Core Thermal and Preconditioning Limits and has determined that the Control Rod Exercise may continue and that any other Control Rod Drift will be considered the first.

Student will continue with Control Rod Exercise.

Step 8:

7.3 Exercising a Partially Withdrawn Control Rod

[1] SELECT desired control rod by DEPRESSING appropriate CRD ROD SELECT pushbutton 2

-XS-85-40.

[2] OBSERVE the following for selected control rod:

CHECK CRD ROD SELECT pushbutton is brightly ILLUMINATED.

CHECK white light on the Full Core Display is ILLUMINATED.

CHECK Rod Out Permit light is ILLUMINATED.

Standard: Selects a withdrawn control rod Critical Step SAT UNSAT N/A Job Performance Measure (JPM) 11 STEP / STANDARD SAT / UNSAT Step 9: [3] INSERT control rod one notch by performing the following:

[3.1] PLACE CRD CONTROL SWITCH, 2

-HS-85-48 in ROD IN andRELEASE.

[3.2] OBSERVE control rod settles into the desired position andROD SETTLE light extinguishes.

Standard: Inserts withdrawn control rod one notch Critical Step

SAT UNSAT N/A Step 10:

[4] WITHDRAW selected control rod one notch by performing the following:

[4.1] PLACE CRD CONTROL SWITCH, 2

-HS-85-48 in ROD OUT NOTCHand RELEASE.

[4.2] OBSERVE control rod settles into the desired position and ROD SETTLE light extinguishes.

Standard: Withdraws withdrawn control rod one notch Critical Step

SAT UNSAT N/A Note to Examiner: When satisfied with the number of rod manipulations direct Simulator Booth Operator to insert trigger #2 for Multiple Control Rods Drifting In Step 11: Multiple Control Rods Drifting In Standard:

Recognizes Multiple Control Rods Drift into the Core and Manually Scrams the Reactor per 2-AOI-85-5. Depresses both SCRAM Pushbuttons Places mode switch in shutdown Verifies All Rods in

Critical Step

SAT UNSAT N/A

Job Performance Measure (JPM) 12 STEP / STANDARD SAT / UNSAT Step 11 continued

Performs a Scram Announcement o Rx Mode Switch Position: Shutdown o Rod Position: All Full In o Reactor Water Level ____ & Trend ___

o Reactor Pressure ____ & Trend ___

o MSIV Position: OPEN o Rx Power: <5

% Critical Step

SAT UNSAT N/A Termination Criteria: REPEAT BACK SCRAM REPORT THEN STATE, "THIS COMPLETES THE JPM. THAT WILL BE ALL FOR NOW, ANOTHER OPERATOR WILL CONTINUE IN 2-AOI-100-1." STOP TIME:

Job Performance Measure (JPM) 13 Provide to Applicant

      • IN-SIMULATOR: I will explain the initial conditions and state the task to be performed. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's Correct". (OR "That's Incorrect", if applicable). When you have completed your assigned task, you will say, "my task is complete" and I will acknowledge that your task is complete.

INITIAL CONDITIONS:

You are an Operator on Unit 2.

The Reactor is at 100% power

.

INITIATING CUES

The Unit Supervisor directs you to perform Surveillance 3.1.3.3 step 7.3, Control Rod Exercise Test for Withdrawn Control Rods, for partially withdrawn control rods.

Job Performance Measure (JPM) 1 SITE: BFN JPM TITLE:

RESPOND TO A CONTROL ROD DRIFT IN JPM NUMBER:

80 A U 3 REVISION: 1 TASK APPLICABILITY:

SRO STA UO NAUO TASK NUMBER / TASK TITLE(S):

U-085-AB-05/ Respond to a Control Rod Drift In K/A RATINGS:

RO: 3.2 SRO: 3.3 K/A No. &STATEMENT:

201002 Reactor Manual Control System A2.02; Ability to (a) predict the impacts of the following on the REACTOR MANUAL CONTROL SYSTEM ; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those abnormal conditions or operations: Rod Drift Alarm RELATED PRA INFORMATION:

Risk Significant SAFETY FUNCTION:

1 EVALUATION LOCATION:

In-Plant Simulator Control R oom Lab Other - List APPLICABLE METHOD OF TESTING: Discussion Simulate/Walkthrough Perform TIME FOR COMPLETION: NA TIME CRITICAL (Y/N) ALTERNATE PATH (Y/N)

Developed by:

Developer Date (Ensure validator is briefed on exam security per NPG

-SPP-17.8.1) (See JPM Validation Checklist in NPG

-SPP-17.8.2) Validated by:

Approved by:

Validator Date Approved by:

Site Training Management Date Site Training Program Owner Date N Y Job Performance Measure (JPM) 2 OPERATOR: ________________________________

JPM Number: _80A U3_ RO SRO DATE: _______

TASK STANDARD:

Perform operations necessary to respond to a Control Rod Drift In per 3-AOI-85-5.

Operator Fundamental evaluated:

OF-1 Monitoring plant indications and conditions closely.

OF-2 Controlling plant evolutions precisely.

PRA: NA REFERENCES/PROCEDURES NEEDED:

3-AOI-85-5 , 3-AOI-100-1 VALIDATIONTIME: PERFORMANCE TIME:

COMMENTS:

Additional comment sheets attached? YES ___ NO ___

RESULTS: SATISFACTORY ____

UNSATISFACTORY ____

IF UNSAT results are obtained THEN Retain entire JPM for records.(Otherwise just retain this page.

)

SIGNATURE:

___________________________

DATE: __________

EXAMINER Job Performance Measure (JPM) 3 Revision Summary Rev No. Effective Date Pages Affected Description 0 05/27/10 All Initial issue 1 05/11/15 1 Incorrect task number; changed to U

-085-AB-05: Incorrect malfunction numbers; rd07r0231, rd07r2223 & rd07r3031; Corrected

Job Performance Measure (JPM) 4 SIMULATOR SETUP IC 28 Exam IC 280 Console Operator Instructions Reset IC 28 or Exam IC if written in above Run schedule file: NRC JPM A U3

-Control Rod Drift In Verify all triggers and overrides are correct Place the simulator in RUN to ensure stable conditions Start Rod Display on RWM Screen Provide Initial Rod Data Sheet

-PRLOG When prompted by the examiner, INSERT - Event 1 to Drift Control Rod 02

-31 into the core When prompted by the examiner, INSERT - Event 2 to Drift Control Rod Multiple Control Rods into the core Malfunctions Description Event Severity Delay Initial set rd07r0231 Drifts rod 02

-31 into core 1 NA 35 sec NA rd07r2223 Drifts rod 22

-23 into core 2 NA 10 sec NA rd07r 303 1 Drifts rod 30

-31 into core 2 NA 25 sec NA rd07r4635 Drifts rod 46

-35 into core 2 NA 20 sec NA rd07r2619 Drifts rod 26

-19 into core 2 NA 30 sec NA rd07r3027 Drifts rod 30

-27 into core 2 NA 18 sec NA rd07r5423 Drifts rod 54

-23 into core 2 NA 23 sec NA rd07r2255 Drifts rod 22

-55 into core 2 NA 28 sec NA Job Performance Measure (JPM) 5 Remotes Description Event Severity Delay Initial set Overrides Description Event Severity Delay Initial set Schedule File(s): NRC JPM A U3

-Control Rod Drift In

Job Performance Measure (JPM) 6 IN-SIMULATOR: I will explain the initial conditions and state the task to be performed. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's Correct". (OR "That's Incorrect", if applicable). When you have completed your assigned task, you will say, "my task is complete" and I will acknowledge that your task is complete.

INITIAL CONDITIONS:

You are an Operator on Unit

3. The Reactor is at 100% power INITIATING CUES
The Unit Supervisor directs you to perform Surveillance 3.1.3.3 step 7.3, Control Rod Exercise Test for Withdrawn Control Rods, for partially withdrawn control rods.

Job Performance Measure (JPM) 7 START TIME: STEP / STANDARD SAT / UNSAT Step 1: NOTE 1) Problem details of any control rod issues observed during the performance of this surveillance must be recorded on Attachment 3 for further review and possible corrective maintenance. Slow/fast rod movements or settle times should be noted in the remarks section.

2) Section 7.3 is performed for all Partially Withdrawn Control Rods and performance of steps is represented by initialing the appropriate CRD exercised on Attachment 1.

CAUTIONS 3) Any mispositioned control rod events will be dispositioned by following the direction contained within 3-AOI-85-7.

4) If a control rod moves unexpectedly one notch beyond its intended position, notify Unit Supervisor, obtain Unit Supervisor concurrence and return the rod to its intended position.
5) At any time CTP is less than or equal to 10%, entry into LCO 3.1.6 may be required.

7.3 Exercising a Partially Withdrawn Control Rod

[1] SELECT desired control rod by DEPRESSING appropriate CRD ROD SELECT pushbutton 3-XS-85-40.

[2] OBSERVE the following for selected control rod:

CHECK CRD ROD SELECT pushbutton is brightly ILLUMINATED.

CHECK white light on the Full Core Display is ILLUMINATED.

CHECK Rod Out Permit light is ILLUMINATED.

Standard: Selects a withdrawn control rod Critical Step

SAT UNSAT N/A Note to Examiner: May select any partially withdrawn control rod in any order

Job Performance Measure (JPM) 8 STEP / STANDARD SAT / UNSAT Step 2: [3] INSERT control rod one notch by performing the following:

[3.1] PLACE CRD CONTROL SWITCH, 3-HS-85-48 in ROD IN andRELEASE. [3.2] OBSERVE control rod settles into the desired position andROD SETTLE light extinguishes.

Standard: Inserts withdrawn control rod one notch Critical Step

SAT UNSAT N/A Step 3:

[4] WITHDRAW selected control rod one notch by performing the following:

[4.1] PLACE CRD CONTROL SWITCH, 3-HS-85-48 in ROD OUT NOTCHand RELEASE.

[4.2] OBSERVE control rod settles into the desired position and ROD SETTLE light extinguishes.

Standard: Withdraws withdrawn control rod one notch Critical Step

SAT UNSAT N/A Step 4:

[5] DOCUMENT completion of control rod test as follows:

[5.1] PERFORMER INITIAL Attachment 1 (Control Rod Exercise Data Sheet) in thebox corresponding to the control rod coordinates for the control rodjust exercised to document proper movement and CRD latching.

[5.2] Concurrent Verifier (CV)

ENSURE rod inserted and returned to its original position.

INITIAL Attachment 2 (Control Rod Concurrent Verifier (CV)Check) in the box corresponding to the control rod coordinates forthe rod just exercised.

SAT UNSAT N/A Job Performance Measure (JPM) 9 STEP / STANDARD SAT / UNSAT Standard: Initials Attachment 1 for exercised control rod and continues to exercise rods.

Note to Examiner: Perform above actions for @ least two control rods

. When satisfied with the number of rod manipulations direct Simulator Booth Operator to insert trigger #1 for Control Rod 02

-31 Drift In Note to Simulator Booth Operator:

When directed by examiner insert trigger #1 for 02

-31 Control Rod Drift In.

Step 5: Performer recognizes control rod 02

-31 drift in and responds per 3-AOI-85-5.

[2] IF a Control Rod is moving from its intended position without operator actions, THEN INSERT the Control Rod to position 00 using

CONTINUOUS IN. (Otherwise N/A)

[3] IF a Control Rod Block occurs during rod insertion due to Rod Worth Minimizer, THEN BYPASS the RWM per step 4.2[1] above. (Otherwise N/A)

Standard: Responds per 3-AOI-85-5 and inserts control rod 02

-31 to full in position as indicated by position 00 indication. Critical Step

SAT UNSAT N/A CUE: When report to US, state "Respond per 3-AOI-85-5, Control Rod Drift In.

Step 6:

[4] NOTIFY the Reactor Engineer to Evaluate Core Thermal Limits and Preconditioning Limits for the current Control Rod pattern. Standard: Candidate notifies Reactor Engineer to Evaluate Core Thermal limits and Preconditioning Limits for the current Control Rod Pattern SAT UNSAT N/A Cue: Understand Reactor Engineering notified to evaluate Core Thermal andPreconditioning Limits

Job Performance Measure (JPM) 10 STEP / STANDARD SAT / UNSAT Step 7: [5] IF another Control Rod Drift occurs before Reactor Engineering completes the evaluation, THEN MANUALLY SCRAM Reactor and enter 2

-AOI-100-1.

[6] CHECK Thermal Limits on ICS (RUNMON).

Note to NRC Examiner:

Step [6] performed by Reactor Engineer"ing.

Standard: Reviews step and asks for guidance from US or RE SAT UNSAT N/A CUE: As Shift Manager, state "RE has evaluated Core Thermal and Preconditioning Limits and has determined that the Control Rod Exercise may continue and that any other Control Rod Drift will be considered the first.

Student will continue with Control Rod Exercise.

Step 8:

7.3 Exercising a Partially Withdrawn Control Rod

[1] SELECT desired control rod by DEPRESSING appropriate CRD ROD SELECT pushbutton 2

-XS-85-40.

[2] OBSERVE the following for selected control rod:

CHECK CRD ROD SELECT pushbutton is brightly ILLUMINATED.

CHECK white light on the Full Core Display is ILLUMINATED.

CHECK Rod Out Permit light is ILLUMINATED. Standard: Selects a withdrawn control rod Critical Step SAT UNSAT N/A Job Performance Measure (JPM) 11 STEP / STANDARD SAT / UNSAT Step 9: [3] INSERT control rod one notch by performing the following:

[3.1] PLACE CRD CONTROL SWITCH, 2

-HS-85-48 in ROD IN andRELEASE.

[3.2] OBSERVE control rod settles into the desired position andROD SETTLE light extinguishes.

Standard: Inserts withdrawn control rod one notch Critical Step

SAT UNSAT N/A Step 10:

[4] WITHDRAW selected control rod one notch by performing the following:

[4.1] PLACE CRD CONTROL SWITCH, 2

-HS-85-48 in ROD OUT NOTCHand RELEASE.

[4.2] OBSERVE control rod settles into the desired position and ROD SETTLE light extinguishes.

Standard: Withdraws withdrawn control rod one notch Critical Step

SAT UNSAT N/A Note to Examiner: When satisfied with the number of rod manipulations direct Simulator BoothOperator to insert trigger #2 for Multiple Control Rods Drifting In Step 11: Multiple Control Rods Drifting In Standard:

Recognizes Multiple Control Rods Drift into the Core and Manually Scrams the Reactor per 3

-AOI-85-5. Depresses both SCRAM Pushbuttons Places mode switch in shutdown Verifies All Rods in Critical Step

SAT UNSAT N/A

Job Performance Measure (JPM) 12 STEP / STANDARD SAT / UNSAT Step 11 continued

Performs a Scram Announcement o Rx Mode Switch Position: Shutdown o Rod Position: All Full In o Reactor Water Level ____ & Trend ___

o Reactor Pressure ____ & Trend ___

o MSIV Position: OPEN o Rx Power: <5%

Critical Step

SAT UNSAT N/A Termination Criteria: repeat back scram report then state, "this completes the JPM". That will be all for now, another operator will continue in 2-AOI-100-1 STOP TIME:

Job Performance Measure (JPM) 13 Provide to Applicant

      • IN-SIMULATOR: I will explain the initial conditions and state the task to be performed. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's Correct". (OR "That's Incorrect", if applicable). When you have completed your assigned task, you will say, "my task is complete" and I will acknowledge that your task is complete.

INITIAL CONDITIONS:

You are an Operator on Unit

3. The Reactor is at 100% power

INITIATING CUES

The Unit Supervisor directs you to perform Surveillance 3.1.3.3 step 7.3, Control Rod Exercise Test for Withdrawn Control Rods, for partially withdrawn control rods.

Job Performance Measure (JPM) 1 SITE: BFN JPM TITLE:

EHC Auto Cooldown JPM NUMBER:

276 U2 REVISION: 1 TASK APPLICABILITY:

SRO STA UO NAUO TASK NUMBER / TASK TITLE(S):

U-000-NO-32 Perform Reactor Cooldown U-000-NO-34 Perform a Reactor Cooldown from Hot Standby Conditions K/A RATINGS:

RO: 3.9 SRO: 3.9 K/A No. &STATEMENT:

239001Main and Reheat Steam System: A4.09 Ability to manually operate and/or monitor in the control room: Reactor pressure RELATED PRA INFORMATION:

Risk Significant SAFETY FUNCTION:

4 EVALUATION LOCATION:

In-Plant Simulator Control R oom Lab Other - List APPLICABLE METHOD OF TESTING: Discussion Simulate/Walkthrough Perform TIME FOR COMPLETION: NA TIME CRITICAL (Y/N) ALTERNATE PATH (Y/N)

Developed by:

Developer Date (Ensure validator is briefed on exam security per NPG

-SPP-17.8.1) (See JPM Validation Checklist in NPG

-SPP-17.8.2) Validated by:

Approved by:

Validator Date Approved by:

Site Training Management Date Site Training Program Owner Date N N Job Performance Measure (JPM) 2 OPERATOR: ________________________________

JPM Number: _276 U2 RO SRO DATE: _______

TASK STANDARD:

Perform operations necessary to initiate an Auto Cooldown with Turbine Bypass Valves.

Operator Fundamental evaluated:

OF-1 Monitoring plant indications and conditions closely.

OF-2 Controlling plant evolutions precisely.

OF-5 Having a solid understanding of plant design, engineering principles, and sciences.

PRA: NA REFERENCES/PROCEDURES NEEDED:

2-OI-47 VALIDATIONTIME: 4 min PERFORMANCE TIME:

COMMENTS:

Additional comment sheets attached? YES ___ NO ___

RESULTS: SATISFACTORY ____

UNSATISFACTORY ____

IF UNSAT results are obtained THEN Retain entire JPM for records.(Otherwise just retain this page.

)

SIGNATURE: ___________________________

DATE: __________

EXAMINER Job Performance Measure (JPM) 3 Revision Summary Rev No. Effective Date Pages Affected Description 0 06/1 9/12 All Initial issue 1 07/22/15 All General revision & re

-format Job Performance Measure (JPM) 4 SIMULATOR SETUP IC 40 Exam IC 281 Console Operator Instructions Reset IC 40 or Exam IC if written in above Ensure RFP is in Manual on PDS controller with plant parameters stable. Malfunctions Description Event Severity Delay Initial set Remotes Description Event Severity Delay Initial set Overrides Description Event Severity Delay Initial set Schedule File(s): None

Job Performance Measure (JPM) 5 IN-SIMULATOR: I will explain the initial conditions and state the task to be performed. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's Correct". (OR "That's Incorrect", if applicable). When you have completed your assigned task, you will say, "my task is complete" and I will acknowledge that your task is complete.

INITIAL CONDITIONS:

You are an Operator on Unit 2.

The Plant has been shutdown in preparation for a refueling outage. The Main Turbine is tripped. Reactor Water Level is stable and under control. Reactor Pressure is stable and being controlled by bypass valves.

INITIATING CUES

The Unit Supervisor directs you to commence an Auto Cooldown to 20 psig in accordance with 2-OI-47, Turbine

-Generator System, Section 8.1.2, starting at step [6].

Job Performance Measure (JPM) 6 START TIME: STEP / STANDARD SAT / UNSAT Step 1: [6] VERIFY EHC is in Pressure Control using 2-HS-47-204. Standard:

Observes light on for EHC Pressure Control on 2

-HS-47-204. SAT UNSAT N/A Step 2:

[7] On the EHC Work Station on Panel 9

-7: [7.1] SELECT Main Menu from the toolbar at bottom of the screen. [7.2] SELECT Log In on Display Screen and ENTER "OPS" for name and "OPS" for Password.

[7.3] SELECT Auto Cooldown from list of function on the screen. Standard: Candidate logs into EHC workstation and selects Auto Cooldown from the list of functions on the screen. Critical Step SAT UNSAT N/A Step 3:

[8] On the Auto Cooldown Display Screen

CHECK the following are displayed.

Turbine Tripped or All Valves Closed

- indicates Reset.

Rx Press Ctrl

- indicates Reset.

Standard: Candidate checks the Turbine Tripped or All Valves Closed

-indicates Reset.

Candidate checks Rx Press Ctrl

- indicates Reset.

SAT UNSAT N/A Job Performance Measure (JPM) 7 STEP / STANDARD SAT / UNSAT Step 4: [9] On the Auto Cooldown Screen SET the desired Final Pressure for cooldown as follows:

[9.1] SELECT the block above the "FINAL PRESSURE TARGET". [9.2] ENTER the desired pressure using the Display Screen or Key Board.

[9.3] WHEN desired Pressure is entered SELECT "OK" Standard: Candidate sets the desired final target pressure of 20psig (given in initial conditions).

Critical Step SAT UNSAT N/A Step 5: [10] WHEN Cooldown is ready to commence, THEN

[10.1] VERIFY Reactor Pressure is stable and being controlled by EHC Pressure Control with at least one Bypass Valve opened. (Adjust setpoint as necessary)

[10.2] DEPRESS the "START" button on the Auto Cooldown Display Screen.

[11] WHEN Caution "Are You Sure You Want to Initiate Auto Cooldown?" appears SELECT "Yes" Screen Button to start the cooldown.

Standard: Candidate depresses START and acknowledges "YES' to commence auto cooldown.

Critical Step SAT UNSAT N/A Job Performance Measure (JPM) 8 STEP / STANDARD SAT / UNSAT Step 6: [12] CHECK the following:

EHC PRESSURE SETPOINT, 2

-PI-47-162, is lowering.

EHC AUTO COOLDOWN displays "IN PROGRESS" Standard: Candidate monitors EHC pressure and the auto cooldown is "IN PROGRESS".

SAT UNSAT N/A Cue: The Unit Supervisor directs you to adjust the Final Pressure Target to 100 psig. Step 7:

[13] IF it is desired to change the Final Pressure Target, THEN On the Auto Cooldown Screen.

[13.1] SELECT the block above the "FINAL PRESSURE TARGET" [13.2] ENTER the desired pressure using the Display Screen or Key Board.

[13.3] WHEN desired Pressure is entered SELECT "OK" Standard: Candidate adjusts "FINAL PRESSURE TARGET" to 100 psig and recommences the auto cooldown.

Critical Step SAT UNSAT N/A Evaluator Cue: Another operator will continue to monitor the cooldown. This completes your task.

STOP TIME:

Job Performance Measure (JPM) 9 Provide to Applicant

      • IN-SIMULATOR: I will explain the initial conditions and state the task to be performed. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's Correct". (OR "That's Incorrect", if applicable). When you have completed your assigned task, you will say, "my task is complete" and I will acknowledge that your task is complete.

INITIAL CONDITIONS:

You are an Operator on Unit 2.

The Plant has been shutdown in preparation for a refueling outage. The Main Turbine is tripped. Reactor Water Level is stable and under control. Reactor Pressure is stable and being controlled by bypass valves.

INITIATING CUES

The Unit Supervisor directs you to commence an Auto Cooldown to 20 psig in accordance with

2-OI-47, Turbine

-Generator System, Section 8.1.2, starting at step [6].

Job Performance Measure (JPM) 1 SITE: BFN JPM TITLE:

EHC Auto Cooldown JPM NUMBER:

276 U 3 REVISION: 1 TASK APPLICABILITY:

SRO STA UO NAUO TASK NUMBER / TASK TITLE(S):

U-000-NO-32 Perform Reactor Cooldown U-000-NO-34 Perform a Reactor Cooldown from Hot Standby Conditions K/A RATINGS:

RO: 3.9 SRO: 3.9 K/A No. &STATEMENT:

239001Main and Reheat Steam System: A4.09 Ability to manually operate and/or monitor in the control room: Reactor pressure RELATED PRA INFORMATION:

Risk Significant SAFETY FUNCTION:

4 EVALUATION LOCATION:

In-Plant Simulator Control R oom Lab Other - List APPLICABLE METHOD OF TESTING: Discussion Simulate/Walkthrough Perform TIME FOR COMPLETION: NA TIME CRITICAL (Y/N) ALTERNATE PATH (Y/N)

Developed by:

Developer Date (Ensure validator is briefed on exam security per NPG

-SPP-17.8.1) (See JPM Validation Checklist in NPG

-SPP-17.8.2) Validated by:

Approved by:

Validator Date Approved by:

Site Training Management Date Site Training Program Owner Date N N Job Performance Measure (JPM) 2 OPERATOR: ________________________________

JPM Number: _276 U3_ RO SRO DATE: _______

TASK STANDARD:

Perform operations necessary to initiate an Auto Cooldown with Turbine Bypass Valves.

Operator Fundamental evaluated:

OF-1 Monitoring plant indications and conditions closely.

OF-2 Controlling plant evolutions precisely.

OF-5 Having a solid understanding of plant design, engineering principles, and sciences.

PRA: NA REFERENCES/PROCEDURES NEEDED:

3-OI-47 VALIDATIONTIME: PERFORMANCE TIME:

COMMENTS:

Additional comment sheets attached? YES ___ NO ___

RESULTS: SATISFACTORY ____

UNSATISFACTORY ____

IF UNSAT results are obtained THEN Retain entire JPM for records.(Otherwise just retain this page.

)

SIGNATURE: ___________________________

DATE: __________

EXAMINER Job Performance Measure (JPM) 3 Revision Summary Rev No. Effective Date Pages Affected Description 0 06/1 9/12 All Initial issue 1 07/22/15 All General revision & re

-format Job Performance Measure (JPM) 4 SIMULATOR SETUP IC 40 Exam IC 281 Console Operator Instructions Reset IC 40 or Exam IC if written in above Ensure RFP is in Manual on PDS controller with plant parameters stable. Malfunctions Description Event Severity Delay Initial set Remotes Description Event Severity Delay Initial set Overrides Description Event Severity Delay Initial set Schedule File(s): None

Job Performance Measure (JPM) 5 IN-SIMULATOR: I will explain the initial conditions and state the task to be performed. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's Correct". (OR "That's Incorrect", if applicable). When you have completed your assigned task, you will say, "my task is complete" and I will acknowledge that your task is complete.

INITIAL CONDITIONS:

You are an Operator on Unit 3. The Plant has been shutdown in preparation for a refueling outage. The Main Turbine is tripped. Reactor Water Level is stable and under control. Reactor Pressure is stable and being controlled by bypass valves.

INITIATING CUES

The Unit Supervisor directs you to commence an Auto Cooldown to 20 psig in accordance with 3-OI-47, Turbine

-Generator System, Section 8.1.2, starting at step [6].

Job Performance Measure (JPM) 6 START TIME: STEP / STANDARD SAT / UNSAT Step 1: [6] VERIFY EHC is in Pressure Control using 3

-HS-47-204. Standard:

Observes light on for EHC Pressure Control on 3

-HS-47-204. SAT UNSAT N/A Step 2:

[7] On the EHC Work Station on Panel 9

-7: [7.1] SELECT Main Menu from the toolbar at bottom of the screen. [7.2] SELECT Log In on Display Screen and ENTER "OPS" for name and "OPS" for Password.

[7.3] SELECT Auto Cooldown from list of function on the screen. Standard: Candidate logs into EHC workstation and selects Auto Cooldown from the list of functions on the screen.

Critical Step SAT UNSAT N/A Step 3:

[8] On the Auto Cooldown Display Screen

CHECK the following are displayed.

Turbine Tripped or All Valves Closed

- indicates Reset.

Rx Press Ctrl

- indicates Reset.

Standard: Candidate checks the Turbine Tripped or All Valves Closed

-indicates Reset.

Candidate checks Rx Press Ctrl

- indicates Reset.

SAT UNSAT N/A Job Performance Measure (JPM) 7 Step 4: [9] On the Auto Cooldown Screen SET the desired Final Pressure for cooldown as follows:

[9.1] SELECT the block above the "FINAL PRESSURE TARGET". [9.2] ENTER the desired pressure using the Display Screen or Key Board.

[9.3] WHEN desired Pressure is entered SELECT "OK" Standard: Candidate sets the desired final target pressure of 20psig (given in initial conditions).

Critical Step SAT UNSAT N/A Step 5: [10] WHEN Cooldown is ready to commence, THEN

[10.1] VERIFY Reactor Pressure is stable and being controlled by EHC Pressure Control with at least one Bypass Valve opened. (Adjust setpoint as necessary)

[10.2] DEPRESS the "START" button on the Auto Cooldown Display Screen.

[11] WHEN Caution "Are You Sure You Want to Initiate Auto Cooldown?" appears SELECT "Yes" Screen Button to start the cooldown.

Standard: Candidate depresses START and acknowledges "YES' to commence auto cooldown.

Critical Step SAT UNSAT N/A Job Performance Measure (JPM) 8 Step 6: [12] CHECK the following:

EHC PRESSURE SETPOINT, 3

-PI-47-162, is lowering.

EHC AUTO COOLDOWN displays "IN PROGRESS" Standard: Candidate monitors EHC pressure and the auto cooldown is "IN PROGRESS".

SAT UNSAT N/A Cue: The Unit Supervisor directs you to adjust the Final Pressure Target to 100 psig. Step 7:

[13] IF it is desired to change the Final Pressure Target, THEN On the Auto Cooldown Screen.

[13.1] SELECT the block above the "FINAL PRESSURE TARGET" [13.2] ENTER the desired pressure using the Display Screen or Key Board.

[13.3] WHEN desired Pressure is entered SELECT "OK" Standard: Candidate adjusts "FINAL PRESSURE TARGET" to 100 psig and recommences the auto cooldown.

Critical Step SAT UNSAT N/A Evaluator Cue: Another operator will continue to monitor the cooldown. This completes your task.

STOP TIME:

Job Performance Measure (JPM) 9 Provide to Applicant

      • IN-SIMULATOR: I will explain the initial conditions and state the task to be performed. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's Correct". (OR "That's Incorrect", if applicable). When you have completed your assigned task, you will say, "my task is complete" and I will acknowledge that your task is complete.

INITIAL CONDITIONS:

You are an Operator on Unit 3. The Plant has been shutdown in preparation for a refueling outage. The Main Turbine is tripped. Reactor Water Level is stable and under control. Reactor Pressure is stable and being controlled by bypass valves.

INITIATING CUES

The Unit Supervisor directs you to commence an Auto Cooldown to 20 psig in accordance with 3-OI-47, Turbine

-Generator System, Section 8.1.2, starting at step [6].

Job Performance Measure (JPM) 1 SITE: BFN JPM TITLE:

LOSS OF REFERENCE APRM TO ROD BLOCK MONITOR JPM NUMBER:

672A U2 REVISION: 0 TASK APPLICABILITY:

SRO STA UO NAUO TASK NUMBER / TASK TITLE(S):

U-085-AL-03 RESPOND TO CONTROL ROD WITHDRAWL BLOCK K/A RATINGS:

RO: 3.1 SRO: 3.3 K/A No. &STATEMENT:

215002 Rod Block Monitor System A2.03; Ability to (a) predict the impacts of the following on the ROD BLOCK MONITOR SYSTEM ; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those abnormal conditions or operations: Loss of associated reference APRM channel: BWR

-3,4,5 RELATED PRA INFORMATION:

Risk Significant SAFETY FUNCTION:

7 EVALUATION LOCATION: In-Plant Simulator Control R oom Lab Other - List APPLICABLE METHOD OF TESTING: Discussion Simulate/Walkthrough Perform TIME FOR COMPLETION: NA TIME CRITICAL (Y/N)

ALTERNATE PATH (Y/N)

Developed by:

Developer Date (Ensure validator is briefed on exam security per NPG

-SPP-17.8.1) (See JPM Validation Checklist in NPG

-SPP-17.8.2) Validated by:

Approved by:

Validator Date Approved by:

Site Training Management Date Site Training Program Owner Date N Y Job Performance Measure (JPM) 2 OPERATOR: ________________________________

JPM Number: _672A U2_ RO SRO DATE: _______

TASK STANDARD:

Perform operations necessary to bypass an APRM Channel and clear a Control Rod Block from Rod Block Monitoring System.

Operator Fundamental evaluated:

OF-1 Monitoring plant indications and conditions closely.

OF-2 Controlling plant evolutions precisely.

OF-5 Having a solid understanding of plant design, engineering principles, and sciences.

PRA: NA REFERENCES/PROCEDURES NEEDED:

2-OI-85, 2-OI-92B, 2-ARP-9-5A, 2-SR-3.1.3.5(A)

VALIDATIONTIME: 16 min PERFORMANCE TIME:

COMMENTS:

Additional comment sheets attached? YES ___ NO ___

RESULTS: SATISFACTORY ____

UNSATISFACTORY ____

IF UNSAT results are obtained THEN Retain entire JPM for records.(Otherwise just retain this page.

)

SIGNATURE: ___________________________

DATE: __________

EXAMINER Job Performance Measure (JPM) 3 Revision Summary Rev No. Effective Date Pages Affected Description 0 09/01/15 All Initial issue

Job Performance Measure (JPM) 4 SIMULATOR SETUP IC 39 Exam IC 282 Console Operator Instructions Reset to IC-39 to ~ 3 0% Reactor Power Open Schedule File: NRC JPM C U2

-RBM APRM Fail Downscale.sch Open Event File: NRC JPM C U2

-RBM APRM Fail Downscale.evt Malfunctions Description Event Severity Delay Initial set NM07L3233C LPRM AMPLIFIER FAILURE 32 C 15 0 N/A N/A NM07L4025B LPRM AMPLIFIER FAILURE 40 B 15 0 N/A N/A NM07L4033D LPRM AMPLIFIER FAILURE 40 D 15 0 N/A N/A NM07L0817B LPRM AMPLIFIER FAILURE 08 B 15 0 N/A N/A NM07L4017B LPRM AMPLIFIER FAILURE 40 B 15 0 N/A N/A NM07L4041D LPRM AMPLIFIER FAILURE 40 D 15 0 N/A N/A NM07L4049B LPRM AMPLIFIER FAILURE 40 B 15 0 N/A N/A NM07L4057B LPRM AMPLIFIER FAILURE 40 B 15 0 N/A N/A NM07L4817C LPRM AMPLIFIER FAILURE 48 C 15 0 N/A N/A NM07L4825C LPRM AMPLIFIER FAILURE 48 C 15 0 N/A N/A NM07L4833A LPRM AMPLIFIER FAILURE 48 A 15 0 N/A N/A NM07L4841A LPRM AMPLIFIER FAILURE 48 A 15 0 N/A N/A NM07L4849C LPRM AMPLIFIER FAILURE 48 C 15 0 N/A N/A NM07L0825B LPRM AMPLIFIER FAILURE 08 B 15 0 N/A N/A Job Performance Measure (JPM) 5 NM07L0833D LPRM AMPLIFIER FAILURE 08 D 15 0 N/A N/A NM07L0841D LPRM AMPLIFIER FAILURE 08 D 15 0 N/A N/A NM07L0849B LPRM AMPLIFIER FAILURE 08 B 15 0 N/A N/A NM07L2409B LPRM AMPLIFIER FAILURE 24 B 15 0 N/A N/A NM07L2417D LPRM AMPLIFIER FAILURE 24 D 15 0 N/A N/A NM07L2425D LPRM AMPLIFIER FAILURE 24 D 15 0 N/A N/A NM07L2433B LPRM AMPLIFIER FAILURE 24 B 15 0 N/A N/A NM07L2449D LPRM AMPLIFIER FAILURE 24 D 15 0 N/A N/A NM07L2457D LPRM AMPLIFIER FAILURE 24 D 15 0 N/A N/A NM07L1617C LPRM AMPLIFIER FAILURE 16 C 15 0 N/A N/A NM07L1625C LPRM AMPLIFIER FAILURE 16 C 15 0 N/A N/A NM07L1633A LPRM AMPLIFIER FAILURE 16 A 15 0 N/A N/A NM07L1641A LPRM AMPLIFIER FAILURE 16 A 15 0 N/A N/A NM07L1649C LPRM AMPLIFIER FAILURE 16 C 15 0 N/A N/A NM07L1657C LPRM AMPLIFIER FAILURE 16 C 15 0 N/A N/A NM07L1609A LPRM AMPLIFIER FAILURE 16 A 15 0 N/A N/A NM07L3209C LPRM AMPLIFIER FAILURE 32 C 15 0 N/A N/A NM07L3217A LPRM AMPLIFIER FAILURE 32 A 15 0 N/A N/A NM07L3225A LPRM AMPLIFIER FAILURE 32 A 15 0 N/A N/A NM07L3249A LPRM AMPLIFIER FAILURE 32 A 15 0 N/A N/A NM07L3257A LPRM AMPLIFIER FAILURE 32 A 15 0 N/A N/A NM07L4009D LPRM AMPLIFIER FAILURE 40 D 15 0 N/A N/A NM07L4809A LPRM AMPLIFIER 15 0 N/A N/A Job Performance Measure (JPM) 6 FAILURE 48 A NM07L5617D LPRM AMPLIFIER FAILURE 56 D 15 0 N/A N/A NM07L5633B LPRM AMPLIFIER FAILURE 56 B 15 0 N/A N/A NM07L5641B LPRM AMPLIFIER FAILURE 56 B 15 0 N/A N/A NM07L3241C LPRM AMPLIFIER FAILURE 32 C 15 0 N/A N/A Remotes Description Event Severity Delay Initial set Overrides Description Event Severity Delay Initial set ZLO4631LGREENT(1)

Control Rod 46-31 GREEN INDICATION 15 0 N/A N/A Schedule File(s):

Event File: NRC JPM C U2

-RBM APRM Fail Downscale.evt; <TRIGGER id="15" description="APRM Ch 2 Fail Downscale">ZLO4631LGREENT(1) == 0</TRIGGER>

Schedule File: NRC JPM C U2

-RBM APRM Fail Downscale.sch Job Performance Measure (JPM) 7 IN-SIMULATOR: I will explain the initial conditions and state the task to be performed. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's Correct". (OR "That's Incorrect", if applicable). When you have completed your assigned task, you will say, "my task is complete" and I will acknowledge that your task is complete.

INITIAL CONDITIONS:

You are an Operator on Unit

2. The Reactor is at 30% power Startup Sequence Control Rod Movement Data Sheet 2

-SR-3.1.3.5(A) completed through group 57.

No Control Rods are Fast Notching INITIATING CUES

The US has directed you to raise Reactor Power to 40% per 2

-SR-3.1.3.5(A) in preparation for placing Feedwater Heaters and Moisture Separator Drain System in service. Start on Group 58; Control Rod 14

-31.

Job Performance Measure (JPM) 8 START TIME: STEP / STANDARD SAT / UNSAT Step 1: [1] SELECT the desired control rod by depressing the appropriate CRD ROD SELECT pushbutton, 2-XS-85-40. Standard: Selects Control Rod by depressing CRD ROD SELECT pushbutton.

Critical Step

SAT UNSAT N/A Step 2:

[2] IF selected control rod has been identified as a "fast notching" control rod by engineering, THEN THROTTLE OPEN 2

-PCV-085-0023 CRD, CRD DRIVE WATER PRESS CONTROL VLV, to as low as 180 psid using 2

-HS-85-23A. (Otherwise N/A)

Standard:

Determines that step in N/A SAT UNSAT N/A Step 3:

[3] OBSERVE the following for the selected control rod:

CRD ROD SELECT pushbutton is brightly ILLUMINATED White light on the Full Core Display ILLUMINATED Rod Out Permit light ILLUMINATED Standard: VERIFIES CRD ROD SELECT pushbutton is brightly ILLUMINATED White light on the Full Core Display ILLUMINATED Rod Out Permit light ILLUMINATED SAT UNSAT N/A Job Performance Measure (JPM) 9 STEP / STANDARD SAT / UNSAT Step 4: [4] VERIFY Rod Worth Minimizer is operable and LATCHED into the correct ROD GROUP when the Rod Worth Minimizer is enforcing Standard: STEP is N/A due to Rod Block Monitor is Enforcing SAT UNSAT N/A Step 5: [5] PLACE CRD CONTROL SWITCH, 2-HS-85-48, in ROD OUT NOTCH, and RELEASE.

[6] OBSERVE the control rod settles into the desired position and the ROD SETTLE light extinguishes.

Standard:

PLACED CRD CONTROL SWITCH, 2-85-48 in ROD OUT NOTCH position and RELEASED control switch to move Control Rod to Position 04 as indicated on Full Core Display. Critical Step

SAT UNSAT N/A Note to Examiner: Step is repeated to get Control Rod to Position 04 Step 6:

[1] SELECT the desired control rod by depressing the appropriate CRD ROD SELECT pushbutton, 2-XS-85-40. Standard: Selects Control Rod by depressing CRD ROD SELECT pushbutton.

Critical Step

SAT UNSAT N/A Job Performance Measure (JPM) 10 STEP / STANDARD SAT / UNSAT Step 7: [2] IF selected control rod has been identified as a "fast notching" control rod by engineering, THEN THROTTLE OPEN 2

-PCV-085-0023 CRD, CRD DRIVE WATER PRESS CONTROL VLV, to as low as 180 psid using 2

-HS-85-23A. (Otherwise N/A)

Standard:

Determines that step in N/A SAT UNSAT N/A Step 8:

[3] OBSERVE the following for the selected control rod:

CRD ROD SELECT pushbutton is brightly ILLUMINATED White light on the Full Core Display ILLUMINATED Rod Out Permit light ILLUMINATED Standard: VERIFIES CRD ROD SELECT pushbutton is brightly ILLUMINATED White light on the Full Core Display ILLUMINATED Rod Out Permit light ILLUMINATED SAT UNSAT N/A Step 9:

[4] VERIFY Rod Worth Minimizer is operable and LATCHED into the correct ROD GROUP when the Rod Worth Minimizer is enforcing Standard: STEP is N/A due to Rod Block Monitor is Enforcing SAT UNSAT N/A Job Performance Measure (JPM) 11 STEP / STANDARD SAT / UNSAT Step 10: [5] PLACE CRD CONTROL SWITCH, 2-HS-85-48, in ROD OUT NOTCH, and RELEASE.

[6] OBSERVE the control rod settles into the desired position and the ROD SETTLE light extinguishes.

Standard:

PLACED CRD CONTROL SWITCH, 2-85-48 in ROD OUT NOTCH position and RELEASED control switch to move Control Rod to Position 04 as indicated on Full Core Display

. Critical Step

SAT UNSAT N/A Note to Examiner: Step is repeated to get Control Rod to Position 04 Step 11:

[1] SELECT the desired control rod by depressing the appropriate CRD ROD SELECT pushbutton, 2-XS-85-40. Standard: Selects Control Rod by depressing CRD ROD SELECT pushbutton.

Critical Step

SAT UNSAT N/A Step 1 2:

[2] IF selected control rod has been identified as a "fast notching" control rod by engineering, THEN THROTTLE OPEN 2

-PCV-085-0023 CRD, CRD DRIVE WATER PRESS CONTROL VLV, to as low as 180 psid using 2

-HS-85-23A. (Otherwise N/A)

Standard:

Determines that step in N/A SAT UNSAT N/A Job Performance Measure (JPM) 12 STEP / STANDARD SAT / UNSAT Step 1 3: [3] OBSERVE the following for the selected control rod:

CRD ROD SELECT pushbutton is brightly ILLUMINATED White light on the Full Core Display ILLUMINATED Rod Out Permit light ILLUMINATED Standard: VERIFIES CRD ROD SELECT pushbutton is brightly ILLUMINATED White light on the Full Core Display ILLUMINATED Rod Out Permit light ILLUMINATED SAT UNSAT N/A Step 1 4:

[4] VERIFY Rod Worth Minimizer is operable and LATCHED into the correct ROD GROUP when the Rod Worth Minimizer is enforcing Standard: STEP is N/A due to Rod Block Monitor is Enforcing SAT UNSAT N/A Step 1 5:

[5] PLACE CRD CONTROL SWITCH, 2-HS-85-48, in ROD OUT NOTCH, and RELEASE.

[6] OBSERVE the control rod settles into the desired position and the ROD SETTLE light extinguishes.

Standard:

PLACED CRD CONTROL SWITCH, 2-85-48 in ROD OUT NOTCH position and RELEASED control switch to move Control Rod to Position 04 as indicated on Full Core Display. Critical Step

SAT UNSAT N/A Note to Examiner: Step is repeated to get Control Rod to Position 04

Job Performance Measure (JPM) 13 STEP / STANDARD SAT / UNSAT Note to Examiner:

This begins the Alternate Path section of JPM Simulator Booth Operator: Insert Event Trigger #1 to fail APRM 2 Downscale.

Step 1 6: Sensor/Trip Point:

APRM Downscale: <=5% OPRM Inop: Less than 23 operable cells

Sensor Location:

Control Room Panel 2-9-14. Probable Cause: A. Unbypassed APRM channel at or below sensor set point.

B. SI or SR in progress.

C. Unit shutdown (Mode 3 or 4).

D. Failed sensor.

Automatic Action: A. Rod withdrawal block with Rx Mode Sw. in RUN.(APRM only)

Operator Action: A. DETERMINE which APRM/OPRM channel is downscale/inop.

B. IF APRM failed downscale, THEN BYPASS channel. REFER TO 2-OI-92B.

Critical Step

SAT UNSAT N/A APRM DOWNSCALE/

OPRM INOP 4 Job Performance Measure (JPM) 14 STEP / STANDARD SAT / UNSAT Step 1 6(continued)

Sensor/Trip Point:

Relays:

3 A-K1 Nuclear Instrumentation 3 A-K2 Refuel Equipment in Use High Level in Scram Discharge Volume Scram Discharge Volume High Water Level Bypass Rx Mode Switch in SHUTDOWN PRNM (ANY APRM OPRM or RBM) Sensor Location:

Panel 2-9-28 Elevation 593' Aux Instr Room Probable Cause: A. One or more sensors at or above set point.

B. Malfunction of sensor.

C. Control rod drop accident Automatic Action: Rod withdrawal block Operator Action: A. DETERMINE initiating condition from corresponding rod withdrawal block alarm(s) and REFER TO operator action for alarm(s). Standard: Reference 2-ARP-9-5A and identifies APRM Ch 2 is down scale and proceeds to bypass APRM Ch 2 per 2-OI-92B CUE: Respond as stated in Alarm Response Instruction and Bypass APRM Ch 2 per 3-OI-92B. CONTROL ROD WITHDRAWAL BLOCK 7 Job Performance Measure (JPM) 15 STEP / STANDARD SAT / UNSAT Step 1 7:

6.1 Bypassing APRM/OPRM Channel

[1] REVIEW all precautions and limitations. REFER TO Section 3.0.

Standard: Demonstrates reviewing precautions and limitations section 3.0.

SAT UNSAT N/A Step 1 8:

[2] PLACE APRM BYPASS, 2-HS-92-7B/S3, to desired channel to be bypassed.

Standard: PLACE APRM BYPASS, 2-HS-92-7B/S3, to APRM CH 2 Critical Step

SAT UNSAT N/A NOTES 1) Only one APRM/OPRM in each trip system can be bypassed at a time. 2) All operations are performed on Panel 2 5 unless specifically stated otherwise.

3) In order to prevent inadvertent rod withdrawal block or Reactor scram while operating APRM BYPASS selector switch, Verify that the BLUE BYPASSED lights on Panel 9

-14 Voters are extinguished prior to selecting any other channel to be bypassed. After bypassing a channel, the applicable BLUE BYPASSED status lights on Panel 9

-14 Voters are required to be illuminated prior to testing, operating, or working on that channel.

CAUTION [QA/C] SPP-10.4 requires approval of the Plant Manager or his designee prior to any planned operation with APRMs bypassed unless bypassing is specifically allowed within approved procedures. [ISE-HPS-92-RO1]

Job Performance Measure (JPM) 16 STEP / STANDARD SAT / UNSAT Step 1 9: [3] CHECK BLUE BYPASSED lights illuminated on Panel 2-9-14 Voters. Standard:

Observes BLUE BYPASS light illuminated on Panel 2-9-14 for APRM CH 2. SAT UNSAT N/A Step 20:

[4] VERIFY white bypass light on Panel 2-9-5 is illuminated.

Standard: Observes WHITE BYPASS light illuminated on Panel 2-9-5. SAT UNSAT N/A Note to Examiner: If needed, cue student to proceed with actions required to continue rod movements.

Student may continue at step 21 or 24.

Step 2 1:

6.6.2 Actions Required During and Following Control Rod Withdrawal (continued)

[6] IF Control Rod movement was stopped to keep from exceeding a RBM setpoint or was caused by a RBM Rod Block, THEN PERFORM the following at the Unit Supervisor's discretion to "REINITIALIZE" the RBM:

[6.1] PLACE CRD POWER, 2-HS-85-46 in the OFF position to deselect the Control Rod.

Standard: CRD POWER, 2-HS-85-46 in the OFF position. SAT UNSAT N/A Job Performance Measure (JPM) 17 STEP / STANDARD SAT / UNSAT Step 22: [6.2] PLACE CRD POWER, 2-HS-85-46, in the ON position.

Standard: PLACED CRD POWER, 2-HS-85-46, in the ON position.

SAT UNSAT N/A Step 2 3:

[6.3] IF desired, THEN CONTINUE to withdrawal Control Rods and PERFORM applicable section for Control Rod withdrawal.

Standard: Continues with Control Rod Movement

SAT UNSAT N/A CUE: Proceed with Control Rod Movement.

Step 2 4: [1] SELECT the desired control rod by depressing the appropriate CRD ROD SELECT pushbutton, 2-XS-85-40. Standard: Selects Control Rod by depressing CRD ROD SELECT pushbutton.

Critical Step SAT UNSAT N/A Job Performance Measure (JPM) 18 STEP / STANDARD SAT / UNSAT Step 2 5: [2] IF selected control rod has been identified as a "fast notching" control rod by engineering, THEN THROTTLE OPEN 2

-PCV-085-0023 CRD, CRD DRIVE WATER PRESS CONTROL VLV, to as low as 180 psid using 2

-HS-85-23A. (Otherwise N/A)

Standard:

Determines that step in N/A SAT UNSAT N/A Step 2 6:

[3] OBSERVE the following for the selected control rod:

CRD ROD SELECT pushbutton is brightly ILLUMINATED White light on the Full Core Display ILLUMINATED Rod Out Permit light ILLUMINATED Standard: VERIFIES CRD ROD SELECT pushbutton is brightly ILLUMINATED White light on the Full Core Display ILLUMINATED Rod Out Permit light ILLUMINATED SAT UNSAT N/A Step 2 7:

[4] VERIFY Rod Worth Minimizer is operable and LATCHED into the correct ROD GROUP when the Rod Worth Minimizer is enforcing Standard: STEP is N/A due to Rod Block Monitor is Enforcing SAT UNSAT N/A Job Performance Measure (JPM) 19 STEP / STANDARD SAT / UNSAT Step 2 8: [5] PLACE CRD CONTROL SWITCH, 2-HS-85-48, in ROD OUT NOTCH, and RELEASE.

[6] OBSERVE the control rod settles into the desired position and the ROD SETTLE light extinguishes.

Standard:

PLACED CRD CONTROL SWITCH, 2-85-48 in ROD OUT NOTCH position and RELEASED control switch to move Control Rod to Position 04 as indicated on Full Core Display

. Critical Step

SAT UNSAT N/A Note to Examiner: Step is repeated to get Control Rod to Position 04 Termination Criteria: When Control Rod is at position 04, s tate "End of Task"

STOP TIME:

Job Performance Measure (JPM) 20 Provide to Applicant

      • IN-SIMULATOR: I will explain the initial conditions and state the task to be performed. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's Correct". (OR "That's Incorrect", if applicable). When you have completed your assigned task, you will say, "my task is complete" and I will acknowledge that your task is complete.

INITIAL CONDITIONS:

You are an Operator on Unit

2. The Reactor is at 30% power Startup Sequence Control Rod Movement Data Sheet 2

-SR-3.1.3.5(A) completed through group 57.

INITIATING CUES

The US has directed you to raise Reactor Power to 40% per 2-SR-3.1.3.5(A) in preparation for placing Feedwater Heaters and Moisture Separator Drain System in service. Start on Group 58; Control Rod 14

-31.

Job Performance Measure (JPM) 1 SITE: BFN JPM TITLE:

LOSS OF REFERENCE APRM TO ROD BLOCK MONITOR JPM NUMBER:

672A U3 REVISION: 0 TASK APPLICABILITY:

SRO STA UO NAUO TASK NUMBER / TASK TITLE(S):

U-085-AL-03 RESPOND TO CONTROL ROD WITHDRAWL BLOCK K/A RATINGS:

RO: 3.1 SRO: 3.3 K/A No. &STATEMENT:

215002 Rod Block Monitor System A2.03; Ability to (a) predict the impacts of the following on the ROD BLOCK MONITOR SYSTEM ; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those abnormal conditions or operations: Loss of associated reference APRM channel: BWR

-3,4,5 RELATED PRA INFORMATION:

Risk Significant SAFETY FUNCTION:

7 EVALUATION LOCATION: In-Plant Simulator Control R oom Lab Other - List APPLICABLE METHOD OF TESTING: Discussion Simulate/Walkthrough Perform TIME FOR COMPLETION: NA TIME CRITICAL (Y/N) ALTERNATE PATH (Y/N)

Developed by:

Developer Date (Ensure validator is briefed on exam security per NPG

-SPP-17.8.1) (See JPM Validation Checklist in NPG

-SPP-17.8.2) Validated by:

Approved by:

Validator Date Approved by:

Site Training Management Date Site Training Program Owner Date N Y Job Performance Measure (JPM) 2 OPERATOR: ________________________________

JPM Number: _672A U3_ RO SRO DATE: _______

TASK STANDARD:

Perform operations necessary to bypass an APRM Channel and clear a Control Rod Block from Rod Block Monitoring System.

Operator Fundamental evaluated:

OF-1 Monitoring plant indications and conditions closely.

OF-2 Controlling plant evolutions precisely.

OF-5 Having a solid understanding of plant design, engineering principles, and sciences.

PRA: NA REFERENCES/PROCEDURES NEEDED:

3-OI-85, 3-OI-92B, 3-ARP-9-5A, 3-SR-3.1.3.5(A)

VALIDATIONTIME: PERFORMANCE TIME:

COMMENTS:

Additional comment sheets attached? YES ___ NO ___

RESULTS: SATISFACTORY ____

UNSATISFACTORY ____

IF UNSAT results are obtained THEN Retain entire JPM for records.(Otherwise just retain this page.

)

SIGNATURE: ___________________________

DATE: __________

EXAMINER Job Performance Measure (JPM) 3 Revision Summary Rev No. Effective Date Pages Affected Description 0 04/30/15 All Initial issue

Job Performance Measure (JPM) 4 SIMULATOR SETUP IC 39 Exam IC 282 Console Operator Instructions Reset IC-39to ~ 3 0% Reactor Power Open Schedule File: NRC JPM C U3

-RBM APRM Fail Downscale.sch Open Event File: NRC JPM C U3

-RBM APRM Fail Downscale.evt Malfunctions Description Event Severity Delay Initial set NM07L3233C LPRM AMPLIFIER FAILURE 32 C 15 0 N/A N/A NM07L4025B LPRM AMPLIFIER FAILURE 40 B 15 0 N/A N/A NM07L4033D LPRM AMPLIFIER FAILURE 40 D 15 0 N/A N/A NM07L0817B LPRM AMPLIFIER FAILURE 08 B 15 0 N/A N/A NM07L4017B LPRM AMPLIFIER FAILURE 40 B 15 0 N/A N/A NM07L4041D LPRM AMPLIFIER FAILURE 40 D 15 0 N/A N/A NM07L4049B LPRM AMPLIFIER FAILURE 40 B 15 0 N/A N/A NM07L4057B LPRM AMPLIFIER FAILURE 40 B 15 0 N/A N/A NM07L4817C LPRM AMPLIFIER FAILURE 48 C 15 0 N/A N/A NM07L4825C LPRM AMPLIFIER FAILURE 48 C 15 0 N/A N/A NM07L4833A LPRM AMPLIFIER FAILURE 48 A 15 0 N/A N/A NM07L4841A LPRM AMPLIFIER FAILURE 48 A 15 0 N/A N/A NM07L4849C LPRM AMPLIFIER FAILURE 48 C 15 0 N/A N/A NM07L0825B LPRM AMPLIFIER FAILURE 08 B 15 0 N/A N/A Job Performance Measure (JPM) 5 NM07L0833D LPRM AMPLIFIER FAILURE 08 D 15 0 N/A N/A NM07L0841D LPRM AMPLIFIER FAILURE 08 D 15 0 N/A N/A NM07L0849B LPRM AMPLIFIER FAILURE 08 B 15 0 N/A N/A NM07L2409B LPRM AMPLIFIER FAILURE 24 B 15 0 N/A N/A NM07L2417D LPRM AMPLIFIER FAILURE 24 D 15 0 N/A N/A NM07L2425D LPRM AMPLIFIER FAILURE 24 D 15 0 N/A N/A NM07L2433B LPRM AMPLIFIER FAILURE 24 B 15 0 N/A N/A NM07L2449D LPRM AMPLIFIER FAILURE 24 D 15 0 N/A N/A NM07L2457D LPRM AMPLIFIER FAILURE 24 D 15 0 N/A N/A NM07L1617C LPRM AMPLIFIER FAILURE 16 C 15 0 N/A N/A NM07L1625C LPRM AMPLIFIER FAILURE 16 C 15 0 N/A N/A NM07L1633A LPRM AMPLIFIER FAILURE 16 A 15 0 N/A N/A NM07L1641A LPRM AMPLIFIER FAILURE 16 A 15 0 N/A N/A NM07L1649C LPRM AMPLIFIER FAILURE 16 C 15 0 N/A N/A NM07L1657C LPRM AMPLIFIER FAILURE 16 C 15 0 N/A N/A NM07L1609A LPRM AMPLIFIER FAILURE 16 A 15 0 N/A N/A NM07L3209C LPRM AMPLIFIER FAILURE 32 C 15 0 N/A N/A NM07L3217A LPRM AMPLIFIER FAILURE 32 A 15 0 N/A N/A NM07L3225A LPRM AMPLIFIER FAILURE 32 A 15 0 N/A N/A NM07L3249A LPRM AMPLIFIER FAILURE 32 A 15 0 N/A N/A NM07L3257A LPRM AMPLIFIER FAILURE 32 A 15 0 N/A N/A NM07L4009D LPRM AMPLIFIER FAILURE 40 D 15 0 N/A N/A NM07L4809A LPRM AMPLIFIER 15 0 N/A N/A Job Performance Measure (JPM) 6 FAILURE 48 A NM07L5617D LPRM AMPLIFIER FAILURE 56 D 15 0 N/A N/A NM07L5633B LPRM AMPLIFIER FAILURE 56 B 15 0 N/A N/A NM07L5641B LPRM AMPLIFIER FAILURE 56 B 15 0 N/A N/A NM07L3241C LPRM AMPLIFIER FAILURE 32 C 15 0 N/A N/A Remotes Description Event Severity Delay Initial set Overrides Description Event Severity Delay Initial set ZLO4631LGREENT(1)

Control Rod 46

-31 GREEN INDICATION 15 0 N/A N/A Schedule File(s):

Event File: NRC JPM C U3

-RBM APRM Fail Downscale.evt; <TRIGGER id="15" description="APRM Ch 2 Fail Downscale">ZLO4631LGREENT(1) == 0</TRIGGER>

Schedule File: NRC JPM C U3

-RBM APRM Fail Downscale.sch Job Performance Measure (JPM) 7 IN-SIMULATOR: I will explain the initial conditions and state the task to be performed. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's Correct".

(OR "That's Incorrect", if applicable). When you have completed your assigned task, you will say, "my task is complete" and I will acknowledge that your task is complete.

INITIAL CONDITIONS:

You are an Operator on Unit

3. The Reactor is at 30% power Startup Sequence Control Rod Movement Data Sheet 3

-SR-3.1.3.5(A) completed through group 58.

INITIATING CUES

The US has directed you to raise Reactor Power to 40% per 3

-SR-3.1.3.5(A) in preparation for placing Feedwater Heaters and Moisture Separator Drain System in service. Start on Group 59; Control Rod 22

-39.

Job Performance Measure (JPM) 8 START TIME: STEP / STANDARD SAT / UNSAT Step 1: [1] SELECT the desired control rod by depressing the appropriate CRD ROD SELECT pushbutton, 3

-XS-85-40. Standard: Selects Control Rod by depressing CRD ROD SELECT pushbutton.

Critical Step

SAT UNSAT N/A Step 2:

[2] OBSERVE the following for the selected control rod:

CRD ROD SELECT pushbutton is brightly ILLUMINATED White light on the Full Core Display ILLUMINATED Rod Out Permit light ILLUMINATED Standard: VERIFIES CRD ROD SELECT pushbutton is brightly ILLUMINATED White light on the Full Core Display ILLUMINATED Rod Out Permit light ILLUMINATED SAT UNSAT N/A Step 3:

[3] VERIFY Rod Worth Minimizer is operable and LATCHED into the correct ROD GROUP when the Rod Worth Minimizer is enforcing Standard: STEP is N/A due to Rod Block Monitor is Enforcing SAT UNSAT N/A Job Performance Measure (JPM) 9 STEP / STANDARD SAT / UNSAT Step 4: [4] PLACE CRD CONTROL SWITCH, 3

-HS-85-48, in ROD OUT NOTCH, and RELEASE.

[5] OBSERVE the control rod settles into the desired position and the ROD SETTLE light extinguishes.

Standard:

PLACED CRD CONTROL SWITCH, 3 48 in ROD OUT NOTCH position and RELEASED control switch to move Control Rod to Position 04 as indicated on Full Core Display

. Critical Step

SAT UNSAT N/A Note to Examiner: Step is repeated to get Control Rod to Position 04 Step 5:

[1] SELECT the desired control rod by depressing the appropriate CRD ROD SELECT pushbutton, 3

-XS-85-40. Standard: Selects Control Rod by depressing CRD ROD SELECT pushbutton.

Critical Step

SAT UNSAT N/A Step 6:

[2] OBSERVE the following for the selected control rod:

CRD ROD SELECT pushbutton is brightly ILLUMINATED White light on the Full Core Display ILLUMINATED Rod Out Permit light ILLUMINATED Standard: VERIFIES CRD ROD SELECT pushbutton is brightly ILLUMINATED White light on the Full Core Display ILLUMINATED Rod Out Permit light ILLUMINATED SAT UNSAT N/A Job Performance Measure (JPM) 10 STEP / STANDARD SAT / UNSAT Step 7: [3] VERIFY Rod Worth Minimizer is operable and LATCHED into the correct ROD GROUP when the Rod Worth Minimizer is enforcing Standard: STEP is N/A due to Rod Block Monitor is Enforcing SAT UNSAT N/A Step 8: [4] PLACE CRD CONTROL SWITCH, 3

-HS-85-48, in ROD OUT NOTCH, and RELEASE.

[5] OBSERVE the control rod settles into the desired position and the ROD SETTLE light extinguishes.

Standard:

PLACED CRD CONTROL SWITCH, 3 48 in ROD OUT NOTCH position and RELEASED control switch to move Control Rod to Position 04 as indicated on Full Core Display

. Critical Step

SAT UNSAT N/A Note to Examiner: Step is repeated to get Control Rod to Position 04 Step 9:

[1] SELECT the desired control rod by depressing the appropriate CRD ROD SELECT pushbutton, 3

-XS-85-40. Standard: Selects Control Rod by depressing CRD ROD SELECT pushbutton.

Critical Step

SAT UNSAT N/A Job Performance Measure (JPM) 11 STEP / STANDARD SAT / UNSAT Step 10: [2] OBSERVE the following for the selected control rod:

CRD ROD SELECT pushbutton is brightly ILLUMINATED White light on the Full Core Display ILLUMINATED Rod Out Permit light ILLUMINATED Standard: VERIFIES CRD ROD SELECT pushbutton is brightly ILLUMINATED White light on the Full Core Display ILLUMINATED Rod Out Permit light ILLUMINATED SAT UNSAT N/A Step 11:

[3] VERIFY Rod Worth Minimizer is operable and LATCHED into the correct ROD GROUP when the Rod Worth Minimizer is enforcing Standard: STEP is N/A due to Rod Block Monitor is Enforcing SAT UNSAT N/A Step 12:

[4] PLACE CRD CONTROL SWITCH, 3

-HS-85-48, in ROD OUT NOTCH, and RELEASE.

[5] OBSERVE the control rod settles into the desired position and the ROD SETTLE light extinguishes.

Standard:

PLACED CRD CONTROL SWITCH, 3 48 in ROD OUT NOTCH position and RELEASED control switch to move Control Rod to Position 04 as indicated on Full Core Display

. Critical Step

SAT UNSAT N/A Note to Examiner: Step is repeated to get Control Rod to Position 04

Job Performance Measure (JPM) 12 STEP / STANDARD SAT / UNSAT Note to Examiner:

This begins the Alternate Path section of JPM Simulator Booth Operator: Insert Event Trigger #1 to fail APRM 2 Downscale.

Step 13: Sensor/Trip Point:

APRM Downscale: <=5% OPRM Inop: Less than 23 operable cells

Sensor Location:

Control Room Panel 3 14. Probable Cause: A. Unbypassed APRM channel at or below sensor set point.

B. SI or SR in progress.

C. Unit shutdown (Mode 3 or 4).

D. Failed sensor.

Automatic Action: A. Rod withdrawal block with Rx Mode Sw. in RUN.(APRM only)

Operator Action: A. DETERMINE which APRM/OPRM channel is downscale/inop.

B. IF APRM failed downscale, THEN BYPASS channel. REFER TO 3-OI-92B.

Critical Step

SAT UNSAT N/A APRM DOWNSCALE/

OPRM INOP 4 Job Performance Measure (JPM) 13 STEP / STANDARD SAT / UNSAT Step 13(continued)

Sensor/Trip Point:

Relays: 3A-K1 Nuclear Instrumentation 3A-K2 Refuel Equipment in Use High Level in Scram Discharge Volume Scram Discharge Volume High Water Level Bypass Rx Mode Switch in SHUTDOWN PRNM (ANY APRM OPRM or RBM) Sensor Location:

Panel 3-9-28 Elevation 593' Aux Instr Room Probable Cause: A. One or more sensors at or above set point. B. Malfunction of sensor.

C. Control rod drop accident Automatic Action: Rod withdrawal block Operator Action: A. DETERMINE initiating condition from corresponding rod withdrawalblock alarm(s) and REFER TO operator action for alarm(s). Standard: Reference 3

-ARP-9-5A and identifies APRM Ch 2 is down scale and proceeds to bypass APRM Ch 2 per 3-OI-92B CUE:Respond as stated in Alarm Response Instruction and Bypass APRM Ch 2 per 3-OI-92B. CONTROL ROD WITHDRAWAL BLOCK 7 Job Performance Measure (JPM) 14 STEP / STANDARD SAT / UNSAT Step 1 4:

6.1 Bypassing APRM/OPRM Channel

[1] REVIEW all precautions and limitations. REFER TO Section 3.0.

Standard: Demonstrates reviewing precautions and limitations section 3.0.

SAT UNSAT N/A CUE: If asked per note 2 above, "Panel 9-14 Voter BLUE LIGHTS are extinguished".

Step 1 5:

[2] PLACE APRM BYPASS, 3

-HS-92-7B/S3, to desired channel to be bypassed.

Standard:

PLACE APRM BYPASS, 3

-HS-92-7B/S3, to APRM CH 2 Critical Step

SAT UNSAT N/A NOTES 1) Only one APRM/OPRM in each trip system can be bypassed at a time. 2) All operations are performed on Panel 3 5 unless specifically stated otherwise.

3) In order to prevent inadvertent rod withdrawal block or Reactor scram while operating APRM BYPASS selector switch, Verify that the BLUE BYPASSED lights on Panel 9

-14 Voters are extinguished prior to selecting any other channel to be bypassed. After bypassing a channel, the applicable BLUE BYPASSED status lights on Panel 9

-14 Voters are required to be illuminated prior to testing, operating, or working on that channel.

CAUTION [QA/C] SPP-10.4 requires approval of the Plant Manager or his designee prior to any planned operation with APRMs bypassed unless bypassing is specifically allowed within approved procedures. [ISE-HPS-92-RO1]

Job Performance Measure (JPM) 15 STEP / STANDARD SAT / UNSAT Step 1 6: [3] CHECK BLUE BYPASSED lights illuminated on Panel 3 14 Voters. Standard:

Simulates observing BLUE BYPASS light illuminated on Panel 3 14 for APRM CH 2

. SAT UNSAT N/A Cue: Blue Light is illuminated on Panel 3 14 for APRM CH 2.

Step 1 7:

[4] VERIFY white bypass light on Panel 3 5 is illuminated.

Standard:

Observes WHITE BYPASS light illuminated on Panel 3 5.

SAT UNSAT N/A Note to NRC Examiner: If needed, cue student to proceed with actions required to continue rod movements.Student may continue at step 18 or 21.

Step 18:

6.6.2 Actions Required During and Following Control Rod Withdrawal (continued)

[6] IF Control Rod movement was stopped to keep from exceeding a RBM setpoint or was caused by a RBM Rod Block, THEN PERFORM the following at the Unit Supervisor's discretion to "REINITIALIZE" the RBM:

[6.1] PLACE CRD POWER, 3

-HS-85-46 in the OFF position to deselect the Control Rod.

Standard:

CRD POWER, 3

-HS-85-46 in the OFF position. SAT UNSAT N/A Job Performance Measure (JPM) 16 STEP / STANDARD SAT / UNSAT Step 19: [6.2] PLACE CRD POWER, 3

-HS-85-46, in the ON position.

Standard: PLACED CRD POWER, 3-HS-85-46, in the ON position.

SAT UNSAT N/A Step 20:

[6.3] IF desired, THEN CONTINUE to withdrawal Control Rods and PERFORM applicable section for Control Rod withdrawal.

Standard:

Continues with Control Rod Movement

SAT UNSAT N/A Cue:If asked, Proceed with Control Rod Movement.

Step 21: [1] SELECT the desired control rod by depressing the appropriate CRD ROD SELECT pushbutton, 3

-XS-85-40. Standard: Selects Control Rod by depressing CRD ROD SELECT pushbutton.

Critical Step SAT UNSAT N/A Job Performance Measure (JPM) 17 STEP / STANDARD SAT / UNSAT Step 22: [2] OBSERVE the following for the selected control rod:

CRD ROD SELECT pushbutton is brightly ILLUMINATED White light on the Full Core Display ILLUMINATED Rod Out Permit light ILLUMINATED Standard: VERIFIES CRD ROD SELECT pushbutton is brightly ILLUMINATED White light on the Full Core Display ILLUMINATED Rod Out Permit light ILLUMINATED SAT UNSAT N/A Step 23:

[3] VERIFY Rod Worth Minimizer is operable and LATCHED into the correct ROD GROUP when the Rod Worth Minimizer is enforcing Standard: STEP is N/A due to Rod Block Monitor is Enforcing SAT UNSAT N/A Step 24: [4] PLACE CRD CONTROL SWITCH, 3

-HS-85-48, in ROD OUT NOTCH, and RELEASE.

[5] OBSERVE the control rod settles into the desired position and the ROD SETTLE light extinguishes.

Standard:

PLACED CRD CONTROL SWITCH, 3 48 in ROD OUT NOTCH position and RELEASED control switch to move Control Rod to Position 04 as indicated on Full Core Display. Critical Step

SAT UNSAT N/A Note to Examiner: Step is repeated to get Control Rod to Position 04 Termination Criteria: When Control Rod is at position 04, s tate "End of Task" STOP TIME:

Job Performance Measure (JPM) 18 Provide to Applicant

      • IN-SIMULATOR: I will explain the initial conditions and state the task to be performed. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's Correct". (OR "That's Incorrect", if applicable). When you have completed your assigned task, you will say, "my task is complete" and I will acknowledge that your task is complete.

INITIAL CONDITIONS:

You are an Operator on Unit

3. The Reactor is at 30% power Startup Sequence Control Rod Movement Data Sheet 3

-SR-3.1.3.5(A) completed through group 58.

INITIATING CUES

The US has directed you to raise Reactor Power to 40% per 3-SR-3.1.3.5(A) in preparation for placing Feedwater Heaters and Moisture Separator Drain System in service. Start on Group 59; Control Rod 22

-39.

Job Performance Measure (JPM) 1 SITE: BFN JPM TITLE:

2-EOI APPENDIX

-6E INJECTION SUBSYSTEM LINEUP CS SYSTEM II JPM NUMBER:

257 A U 2 REVISION: 1 TASK APPLICABILITY:

SRO STA UO NAUO TASK NUMBER / TASK TITLE(S): U-000-EM-35/ Lineup Injection Subsystem

-Core Spray Loop I(II) in Accordance with EOI Appendix 6D(E) K/A RATINGS:

RO: 3.9 SRO: 3.9 K/A No. &STATEMENT:

209001 Low Pressure Core Spray SystemA4.08 Ability to manually operate and/or monitor in thecontrol room: Reactor water level RELATED PRA INFORMATION:

Risk Significant SAFETY FUNCTION:

2 EVALUATION LOCATION:

In-Plant Simulator Control R oom Lab Other - List APPLICABLE METHOD OF TESTING: Discussion Simulate/Walkthrough Perform TIME FOR COMPLETION: NA TIME CRITICAL (Y/N) ALTERNATE PATH (Y/N)

Developed by:

Developer Date (Ensure validator is briefed on exam security per NPG

-SPP-17.8.1) (See JPM Validation Checklist in NPG

-SPP-17.8.2) Validated by:

Approved by:

Validator Date Approved by:

Site Training Management Date Site Training Program Owner Date N Y Job Performance Measure (JPM) 2 OPERATOR: ________________________________

JPM Number: _257A U2_ RO SRO DATE: _______

TASK STANDARD:

Perform operations necessary to identify and corrects Inboard and Outboard Injection Valve lineup in order to inject water into the RPV with Core Spray System II to recover level

Operator Fundamental evaluated:

OF-1 Monitoring plant indications and conditions closely.

OF-5 Having a solid understanding of plant design, engineering principles, and sciences.

PRA: NA REFERENCES/PROCEDURES NEEDED:

2-EOI APPENDIX-6E VALIDATIONTIME: 8 min PERFORMANCE TIME:

COMMENTS:

Additional comment sheets attached? YES ___ NO ___

RESULTS: SATISFACTORY ____

UNSATISFACTORY ____

IF UNSAT results are obtained THEN Retain entire JPM for records.(Otherwise just retain this page.

)

SIGNATURE: ___________________________

DATE: __________

EXAMINER Job Performance Measure (JPM) 3 Revision Summary Rev No. Effective Date Pages Affected Description 0 12/06/10 All Initial issue 1 04/27/15 All General revision & re

-format Job Performance Measure (JPM) 4 SIMULATOR SETUP IC 28 Exam IC 283 Console Operator Instructions

1. Open Schedule File
2. Open Event File
3. Reset to IC-28and take out of freeze

. 4. CLOSE 2-FCV-75-51 5. OPEN 2-FCV-75-53 6. Man Scram Rx and place MS to SD. 7. Open 6 ADS Valves

. 8. Wait until various alarms with Supp Pool Temp High come in to save IC. Malfunctions Description Event Severity Delay Initial set TH22 COOLANT LEAK INSIDE DRYWELL 1 5 75% 5 Yes CS04A CORE SPRAY LOGIC POWER FAILURE DIV I 15 N/A N/A Yes CS04B CORE SPRAY LOGIC POWER FAILURE DIV II 15 N/A N/A Yes CS02B CS INBOARD INJECTION VALVE AUTO OPENING FAILURE (FCV-75-53) 15 N/A N/A Yes RH06A RHR LOGIC POWER FAILURE DIV I 15 N/A N/A Yes RH06B RHR LOGIC POWER FAILURE DIV II 15 N/A N/A Yes RC01 RCIC TURBINE TRIP SYSTEM FAILURE 15 N/A N/A Yes HP04 HPCI STEAM SUPPLY VALVE AUTO OPENING FAILURE 15 N/A N/A Yes FW01A CONDENSATE PUMP TRIP 2A 15 N/A 10 Yes Job Performance Measure (JPM) 5 FW01B CONDENSATE PUMP TRIP 2B 15 N/A 10 Yes FW01C CONDENSATE PUMP TRIP 2C 15 N/A 10 Yes Remotes Description Event Severity Delay Initial set Overrides Description Event Severity Delay Initial set Schedule File(s): JPM 257A U2 Core Spray Alt Inj.sch

Event File(s): JPM 257A U2 Core Spray Alt Inj.evt

Job Performance Measure (JPM) 6 IN-SIMULATOR: I will explain the initial conditions and state the task to be performed. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's Correct". (OR "That's Incorrect", if applicable). When you have completed your assigned task, you will say, "my task

is complete" and I will acknowledge that your task is complete.

INITIAL CONDITIONS:

You are an Operator on Unit

2. The Reactor is Shutdown RPV Water Level is lowering slowly.

1-EOI-1 has been entered and followed to RC

-L6. INITIATING CUES

The Unit Supervisor directs you to inject water into the RPV to restore RPV water level above (-)162 inches (TAF) using Core Spray System II as directed by 2-EOI Appendix

-6E, Injection Subsystems Lineup Core Spray System II.

Job Performance Measure (JPM) 7 START TIME: STEP / STANDARD SAT / UNSAT Step 1: Location: Unit 2 Control Room Attachments: 1. NPSH Monitoring

[1] VERIFY OPEN the following valves:

2-FCV-75-30, CORE SPRAY PUMP 2B SUPPR POOL SUCT VLV 2-FCV-75-39, CORE SPRAY PUMP 2D SUPPR POOL SUCT VLV Standard: Verifie s 2-FCV-75-30 and 2-FCV-75-39 are open. SAT UNSAT N/A Step 2:

[1] (continued)VERIFY OPEN the following valves:

2-FCV-75-51, CORE SPRAY SYS II OUTBD INJECT VALVE.

Standard:

Recognizes 2-FCV-75-51 is closed and 2-FCV-75-53 is open, valve closes 2-FCV-75-53 and Opens 2-FCV-75-51. Critical Step

SAT UNSAT N/A Note to Examiner: Student will realignper OPDP-8 Conduct of Ops or OI

-75, Core Spray System line up.

Job Performance Measure (JPM) 8 STEP / STANDARD SAT / UNSAT Step 3: [2] VERIFY CLOSED 2-FCV-75-50, CORE SPRAY SYS II TESTVALVE.

Standard: Verifies 2-FCV-75-50 closed SAT UNSAT N/A Step 4:

[3] VERIFY CS Pump 2B and/or 2D running.

Standard: Starts Core Pumps 2B and/or 2 D (Only starting one pump is Critical, the second pump is optional).

Critical Step

SAT UNSAT N/A Step 6:

[4] WHEN RPV pressure is below 450 psig, THEN THROTTLE 2-FCV-75-53, CORE SPRAY SYS II INBDINJECT VALVE, as necessary to control injection at or below4000 gpm per pump.

Standard: Verifies pressure < 450 psig and opens 2-FCV-75-53 and commences injection. (And verify flow <4000 gpm for 1 pump or

<8000 gpm for 2 pumps).

Critical Step SAT UNSAT N/A Step 7: CAUTION Continuous operation with inadequate NPSH may result in pump damage or pump inoperability.

[5] MONITOR Core Spray Pump NPSH using Attachment 1.

Standard: Operator comparesCore Spray Pump flow rate with Suppression Pool temperature and Suppression Pool pressure and Determined adequate NPSH.

SAT UNSAT N/A Termination Criteria: Once rector Water Level is > TAF JPM may be terminated. IF student fails to recover reactor water level above TAF (-162 inches), it will be considered a failure.

STOP TIME:

Job Performance Measure (JPM) 9 Provide to Applicant

      • IN-SIMULATOR: I will explain the initial conditions and state the task to be performed. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's Correct". (OR "That's Incorrect", if applicable). When you have completed your assigned task, you will say, "my task is complete" and I will acknowledge that your task is complete.

INITIAL CONDITIONS:

You are an Operator on Unit

2. The Reactor is Shutdown RPV Water Level is lowering slowly.

1-EOI-1 has been entered and followed to RC

-L6.

INITIATING CUES

The Unit Supervisor directs you to inject water into the RPV to restore RPV water level above 162 inches (TAF) using Core Spray System II as directed by 2-EOI Appendix

-6E, Injection Subsystems Lineup Core Spray System II.

Job Performance Measure (JPM) 1 SITE: BFN JPM TITLE:

3-EOI APPENDIX

-6E INJECTION SUBSYSTEM LINEUP CS SYSTEM II JPM NUMBER:

257 A U3 REVISION: 1 TASK APPLICABILITY:

SRO STA UO NAUO TASK NUMBER / TASK TITLE(S): U-000-EM-35/ Lineup Injection Subsystem

-Core Spray Loop I(II) in Accordance with EOI Appendix 6D(E) K/A RATINGS:

RO: 3.9 SRO: 3.9 K/A No. &STATEMENT:

209001 Low Pressure Core Spray System A4.08 Ability to manually operate and/or monitor in the control room: Reactor water level RELATED PRA INFORMATION:

Risk Significant SAFETY FUNCTION:

2 EVALUATION LOCATION:

In-Plant Simulator Control R oom Lab Other - List APPLICABLE METHOD OF TESTING: Discussion Simulate/Walkthrough Perform TIME FOR COMPLETION: NA TIME CRITICAL (Y/N) ALTERNATE PATH (Y/N)

Developed by:

Developer Date (Ensure validator is briefed on exam security per NPG

-SPP-17.8.1) (See JPM Validation Checklist in NPG

-SPP-17.8.2) Validated by:

Approved by:

Validator Date Approved by:

Site Training Management Date Site Training Program Owner Date N Y Job Performance Measure (JPM) 2 OPERATOR: ________________________________

JPM Number: _257A U3_ RO SRO DATE: _______

TASK STANDARD:

Perform operations necessary to identify and corrects Inboard and Outboard Injection Valve lineup in order to inject water into the RPV with Core Spray System II to recover level

Operator Fundamental evaluated:

OF-1 Monitoring plant indications and conditions closely.

OF-5 Having a solid understanding of plant design, engineering principles, and sciences.

PRA: NA REFERENCES/PROCEDURES NEEDED:

3-EOI APPENDIX-6E VALIDATIONTIME: 5 min PERFORMANCE TIME:

COMMENTS:

Additional comment sheets attached? YES ___ NO ___

RESULTS: SATISFACTORY ____

UNSATISFACTORY ____

IF UNSAT results are obtained THEN Retain entire JPM for records.(Otherwise just retain this page.

)

SIGNATURE: ___________________________

DATE: __________

EXAMINER Job Performance Measure (JPM) 3 Revision Summary Rev No. Effective Date Pages Affected Description 0 12/06/10 All Initial issue 1 04/27/15 All General revision & re

-format Job Performance Measure (JPM) 4 SIMULATOR SETUP IC 28 Exam IC 283 Console Operator Instructions

1. Open Schedule File
2. Open Event File
3. Reset to IC

-28 and take out of freeze.

4. CLOSE 2-FCV-75-51 5. OPEN 2-FCV-75-53 6. Man Scram Rx and place MS to SD. 7. Open 6 ADS Valves.
8. Wait until various alarms with Supp Pool Temp High come in to save IC. Malfunctions Description Event Severity Delay Initial set TH22 COOLANT LEAK INSIDE DRYWELL 15 75% 5 Yes CS04A CORE SPRAY LOGIC POWER FAILURE DIV I 15 N/A N/A Yes CS04B CORE SPRAY LOGIC POWER FAILURE DIV II 15 N/A N/A Yes CS02B CS INBOARD INJECTION VALVE AUTO OPENING FAILURE (FCV-75-53) 15 N/A N/A Yes RH06A RHR LOGIC POWER FAILURE DIV I 15 N/A N/A Yes RH06B RHR LOGIC POWER FAILURE DIV II 15 N/A N/A Yes RC01 RCIC TURBINE TRIP SYSTEM FAILURE 15 N/A N/A Yes HP04 HPCI STEAM SUPPLY VALVE AUTO OPENING FAILURE 15 N/A N/A Yes FW01A CONDENSATE PUMP TRIP 3A 15 N/A 10 Yes Job Performance Measure (JPM) 5 FW01B CONDENSATE PUMP TRIP 3B 15 N/A 10 Yes FW01C CONDENSATE PUMP TRIP 3C 15 N/A 10 Yes Remotes Description Event Severity Delay Initial set Overrides Description Event Severity Delay Initial set Schedule File(s): JPM 257A U3 Core Spray Alt Inj.sch

Event File(s): JPM 257A U3 Core Spray Alt Inj.evt

Job Performance Measure (JPM) 6 IN-SIMULATOR: I will explain the initial conditions and state the task to be performed. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's Correct". (OR "That's Incorrect", if applicable). When you have completed your assigned task, you will say, "my task is complete" and I will acknowledge that your task is complete.

INITIAL CONDITIONS:

You are an Operator on Unit

3. The Reactor is Shutdown RPV Water Level is lowering slowly.

1-EOI-1 has been entered and followed to RC

-L6. INITIATING CUES

The Unit Supervisor directs you to inject water into the RPV to restore RPV water level above (-)162 inches (TAF) using Core Spray System II as directed by 3-EOI Appendix

-6E, Injection Subsystems Lineup Core Spray System II.

Job Performance Measure (JPM) 7 START TIME: STEP / STANDARD SAT / UNSAT Step 1: Location: Unit 3 Control Room Attachments: 1. NPSH Monitoring

[1] VERIFY OPEN the following valves:

3-FCV-75-30, CORE SPRAY PUMP 3B SUPPR POOL SUCT VLV 3-FCV-75-39, CORE SPRAY PUMP 3D SUPPR POOL SUCT VLV Standard: Verifie s 3-FCV-75-30 and 3-FCV-75-39 are open. SAT UNSAT N/A Step 2:

[1] (continued) VERIFY OPEN the following valves:

3-FCV-75-51, CORE SPRAY SYS II OUTBD INJECT VALVE.

Standard: Recognizes 3

-FCV-75-51 is closed and 3

-FCV-75-53 is open, closes 3-FCV-75-53 and Opens 3

-FCV-75-51. Critical Step

SAT UNSAT N/A Note to Examiner: Student will realignper OPDP-8 Conduct of Ops or OI

-75, Core Spray System line up.

Job Performance Measure (JPM) 8 STEP / STANDARD SAT / UNSAT Step 3: [2] VERIFY CLOSED 3-FCV-75-50, CORE SPRAY SYS II TEST VALVE. Standard: Verifies 3

-FCV-75-50 closed SAT UNSAT N/A Step 4:

[3] VERIFY CS Pump 3B and/or 3D running.

Standard: Starts Core Pumps 3B and/or 3D (Only starting one pump is Critical, the second pump is optional).

Critical Step

SAT UNSAT N/A Step 6: [4] WHEN RPV pressure is below 450 psig, THEN THROTTLE 3-FCV-75-53, CORE SPRAY SYS II INBDINJECT VALVE, as necessary to control injection at or below4000 gpm per pump.

Standard: Verifies pressure < 450 psig and opens 3

-FCV-75-53 and commences injection. (And verify flow <4000 gpm for 1 pump or

<8000 gpm for 2 pumps).

Critical Step

SAT UNSAT N/A Step 7: CAUTION Continuous operation with inadequate NPSH may result in pump damage or pump inoperability.

[5] MONITOR Core Spray Pump NPSH using Attachment 1.

Standard: Operator compares Core Spray pump flow rate with Suppression Pool temperature and Suppression Pool pressure and Determined adequate NPSH.

SAT UNSAT N/A Termination Criteria: Once rector Water Level is >

TAF JPM may be terminated. IF student fails to recover reactor water level above TAF (-162 inches), it will be considered a failure.

STOP TIME:

Job Performance Measure (JPM) 9 Provide to Applicant

      • IN-SIMULATOR: I will explain the initial conditions and state the task to be performed. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's Correct". (OR "That's Incorrect", if applicable). When you have completed your assigned task, you will say, "my task

is complete" and I will acknowledge that your task is complete.

INITIAL CONDITIONS:

You are an Operator on Unit 3. The Reactor is Shutdown RPV Water Level is lowering slowly.

1-EOI-1 has been entered and followed to RC

-L6.

INITIATING CUES

The Unit Supervisor directs you to inject water into the RPV to restore RPV water level using Core Spray System II as directed by 3-EOI Appendix

-6E, Injection Subsystems Lineup Core Spray System II. Directed level band is +2 to +51 inches.

Job Performance Measure (JPM) 1 SITE: BFN JPM TITLE:

2-EOI Appendix

-11F Alternate RPV Pressure Control Systems: RFPT On Minimum Flow JPM NUMBER:

670A U2 REVISION: 0 TASK APPLICABILITY:

SRO STA UO NAUO TASK NUMBER / TASK TITLE(S):

U-000-EM-58 Lineup Alternate RPV Pressure Control Systems- RFPT on Minimum Flow IAW EOI Appendix 11F K/A RATINGS:

RO: 3.6SRO: 3.6 K/A No. &STATEMENT:

239001 Main and Reheat Steam System A1.01 Ability to predict and/or monitor changes in parameters associated with operating the MAIN ANDREHEAT STEAM SYSTEM controls including: Main steam pressure RELATED PRA INFORMATION:

None SAFETY FUNCTION:

3 EVALUATION LOCATION:

In-Plant Simulator Control R oom Lab Other - List APPLICABLE METHOD OF TESTING:

Discussion Simulate/Walkthrough Perform TIME FOR COMPLETION: NA TIME CRITICAL (Y/N) ALTERNATE PATH (Y/N)

Developed by:

Developer Date (Ensure validator is briefed on exam security per NPG

-SPP-17.8.1) (See JPM Validation Checklist in NPG-SPP-17.8.2) Validated by:

Approved by:

Validator Date Approved by:

Site Training Management Date Site Training Program Owner Date N Y Job Performance Measure (JPM) 2 OPERATOR: ________________________________

JPM Number: _670A U2_ RO SRO DATE: _______

TASK STANDARD:

Perform operations necessary to necessary to place one RFPT in pressure control as directed by 2

-EOI Appendix

-11F.

Operator Fundamental evaluated: Monitoring plant conditions and indications closely and controlling plant evolutions precisely. PRA: NA REFERENCES/PROCEDURES NEEDED:

Procedure: 2-EOI-APPENDIX-11F VERIFICATION TIME: 12 min PERFORMANCE TIME:

COMMENTS:

Additional comment sheets attached? YES ___ NO ___

RESULTS: SATISFACTORY ____

UNSATISFACTORY ____

(Retain entire JPM for records)

SIGNATURE: ___________________________

DATE: __________

EXAMINER Job Performance Measure (JPM) 3 SIMULATOR SETUP IC 28 Exam IC 284 Malfunctions Description Event Severity Delay Initial set fw15a SPURIOUS RFP BEARING LOW OIL PRESSURE 1 5 N/A 0 N/A tc03a-j Fail Bypass Valves closed 1 0% 0 N/A ad01e 20 SRV 1-31 stuck open 20% 1 2 0% 0 N/A Remotes Description Event Severity Delay Initial set Overrides Description Event Severity Delay Initial set Initial Setup:

1. Reset to IC 28
2. Manually Scram RX
3. Trip 2A and 2B RFPT
4. Run Schedule File: NRC JPM E U2

-Alt RPV Press Control RFP Min Flow

5. Insert Manual Trigger #1
6. After 2A RFPT Speed is <350 RPM Open Event File: NRC JPM E U2-Alt RPV Press Control RFP Min Flow
7. Verify Auto Trigger #15 is ACTIVE
8. Freeze simulator and save IC.

Schedule Files:

1. NRC JPM E U2

-Alt RPV Press Control RFP Min Flow.sch 2. NRC JPM E U2

-Alt RPV Press Control RFP Min Flow RFPT Trip.evt

Job Performance Measure (JPM) 4 Revision Summary Rev No. Effective Date Pages Affected Description 0 09/01/15 All Initial issue

Job Performance Measure (JPM) 5 IN-SIMULATOR: I will explain the initial conditions and state the task to be performed. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's Correct". (OR "That's Incorrect", if applicable). When you have completed your assigned task, you will say, "my task is complete" and I will acknowledge that your task is complete.

INITIAL CONDITIONS:

You are an Operator on Unit 2. The Unit 2 reactor has scrammed and the turbine bypass valves are not responding for pressure control due to a loss of EHC fluid. EO I-1 has been followed to RC/P

-4. Reactor water level control is in automatic on RFPT 2C.

INITIATING CUES

The Unit Supervisor directs you to place 2A RFPT in alternate pressure control, as directed by 2

-EOI-APPENDIX-11F and lower Reactor Pressure to low in the pressure band of 800 to 1000 psig.

Job Performance Measure (JPM) 6 START TIME STEP / STANDARD SAT / UNSAT Step 1: [1] IF BOTH of the following exist:

Emergency RPV Depressurization is required, AND Group 1 Isolation Signal exists, THEN EXIT this procedure and ENTER EOI Appendix 11H.

Standard:

Verifies that a Group 1 Isolation signal Does Not exist by observing illuminated RED PCIS Group I lights and/or Verified MSIVs are open by observing illuminated RED valve position indicating lights for each valve.

SAT UNSAT N/A Step 2:

[2] VERIFY MSIVs open.

Standard:

Verifies MSIVs OPEN SAT UNSAT N/A Job Performance Measure (JPM) 7 STEP / STANDARD SAT / UNSAT Step 3: [3] VERIFY Hotwell Pressure at or below

-7 in. Hg. Standard:

Verifies Hotwell Pressure at or below

-7 in. Hg SAT UNSAT N/A Step 4:

[4] PLACE RFPTs in service as follows:

[4.1] VERIFY the following:

[4.1.1] At least one condensate pump running. [4.1.2] At least one condensate booster pump running. [4.1.3] Condensate System aligned to supply suction toRFPs.

Standard:

Verifies one condensate pump and one condensate booster pump running, verifies condensate system aligned to supply suction to RFPs.

SAT UNSAT N/A Step 5:

[4.2] VERIFY Main Oil Pump running for each RFPT to bestarted.

Standard:

Verifies main oil pump running for RFPT 2A SAT UNSAT N/A Step 6:

[4.3] VERIFY CLOSED 2-FCV-3-19, RFP 2ADISCHARGE VALVE.

Standard:

VERIFY CLOSED 2-FCV-3-19, RFP 2A DISCHARGE VALVE.

Critical Step SAT UNSAT N/A Job Performance Measure (JPM) 8 STEP / STANDARD SAT / UNSAT Step 7: [4.4] DEPRESS 2-HS-46-8A RFPT 2A SPEED CONT RAISE/LOWER, and VERIFY amber lightis illuminated.

Standard:

Depresses 2

-HS-46-8A Critical Step SAT UNSA T N/A Step 8:

[4.5] DEPRESS 2-HS-3-124A , RFPT 2A TRIP RESET.

Standard:

Depresses 2

-HS-3-124A and verifies the 2

-Z1-1-123 LP Stop Valve and 2-Z1-127 HP Stop Valve comes OPEN.

Critical Step SAT UNSA T N/A Step 9:

[4.6] PLACE 2-HS-46-112A RFPT 2A START/LOCAL ENABLE, in START. Standard:

Places 2-HS-46-112A in START Critical Step SAT UNSA T N/A Note to Examiner:

RFPT A will Trip due to Low Bearing Oil Pressure at > 350 RPM Step 10:

[4.7] CHECK RFPT 2A speed increases to approximately 600 rpm.

Standard:

Operator responds to RFPT A Trip and reports to US and begins to use B RFP for RPV Pressure Control per 2-EOI-APPENDIX-11F. Critical Step SAT UNSAT N/A CUE: US: Proceed as directed per 2

-EOI-APPENDIX-11F. AO: Reports an oil leak of ~5 gpm on RFPT A bearings.

Job Performance Measure (JPM) 9 STEP / STANDARD SAT / UNSAT Step 1 1:

[1] IF BOTH of the following exist:

Emergency RPV Depressurization is required, AND Group 1 Isolation Signal exists, THEN EXIT this procedure and ENTER EOI Appendix 11H.

Standard:

Verifies that a Group 1 Isolation signal Does Not exist by observing illuminated RED PCIS Group I lights and/or Verified MSIVs are open by observing illuminated RED valve position indicating lights for each valve.

SAT UNSAT N/A Step 1 2:

[2] VERIFY MSIVs open.

Standard:

Verifies MSIVs OPEN SAT UNSAT N/A Job Performance Measure (JPM) 10 STEP / STANDARD SAT / UNSAT Step 1 3: [3] VERIFY Hotwell Pressure at or below

-7 in. Hg. Standard:

Verifies Hotwell Pressure at or below

-7 in. Hg SAT UNSAT N/A Step 1 4:

[4] PLACE RFPTs in service as follows:

[4.1] VERIFY the following:

[4.1.1] At least one condensate pump running. [4.1.2] At least one condensate booster pump running. [4.1.3] Condensate System aligned to supply suction toRFPs.

Standard:

Verifies one condensate pump and one condensate booster pump running, verifies condensate system aligned to supply suction to RFPs.

SAT UNSAT N/A Step 1 5:

[4.2] VERIFY Main Oil Pump running for each RFPT to be started. Standard:

Verifies main oil pump running for RFPT 2B SAT UNSAT N/A Step 1 6:

[4.3] VERIFY CLOSED 2-FCV-3-12, RFP 2B DISCHARGE VALVE.

Standard:

VERIFY CLOSED 2-FCV-3-12, RFP 2B DISCHARGE VALVE.

Critical Step SAT UNSAT N/A Job Performance Measure (JPM) 11 STEP / STANDARD SAT / UNSAT Step 1 7: [4.4] DEPRESS 2-HS-46-9A, RFPT 2BSPEED CONT RAISE/LOWER, and VERIFY amber light is illuminated.

Standard:

Depresses 2

-HS-46-9A Critical Step SAT UNSAT N/A Step 1 8:

[4.5] DEPRESS 2-HS-3-150A , RFPT 2B TRIP RESET.

Standard:

Depresses 2

-HS-3-150A and verifies the 2

-ZI-1-1 33 LP Stop Valve and 2

-FCV-1 35 HP Stop Valve comes OPEN.

Critical Step SAT UNSAT N/A Step 1 9:

[4.6] PLACE 2-HS-46-138A, RFPT 2B START/LOCAL ENABLE, in START. Standard:

Places 2-HS-46-138A in START Critical Step SAT UNSAT N/A Step 2 0:

[4.7] CHECK RFPT 2B speed increases to approximately 600 rpm.

Standard:

Verifies RFPT 2B speed increases to approximately 600 rpm SAT UNSAT N/A Job Performance Measure (JPM) 12 STEP / STANDARD SAT / UNSAT Step 21: [4.8] VERIFY OPEN 2-FCV-3-13, RFP2B MIN FLOW VALVE.

Standard:

Verifies 2-FCV-3-13 OPEN SAT UNSAT N/A Step 21: CAUTION RFP discharge pressure is limited to below 1250 psig to avoid system damage.

[4.9] PLACE 2-HS-46-9A, RFPT 2B SPEED CONT RAISE/LOWER in RAISE to raise RFPT speed, maintaining discharge pressure less than 1250 psig. Standard:

Raises RFPT speed using Manual Speed Control Handswitch, maintaining discharge pressure <1250 psig as indicated on 2-PI-3-9A RFPT 2B (Only Critical if exceeds 1250 psig, any pressure <1250 psig is acceptable).

Critical Step SAT UNSAT N/A STOP TIME END OF TASK

Job Performance Measure (JPM) 13 Provide to Applicant IN-SIMULATOR: I will explain the initial conditions and state the task to be performed. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's Correct". (OR "That's Incorrect", if applicable). When you have completed your assigned task, you will say, "my task is complete" and I will acknowledge that your task is complete.

INITIAL CONDITIONS:

You are an Operator on Unit 2. The Unit 2 reactor has scrammed and the turbine bypass valves are not responding for pressure control due to a loss of EHC fluid. EO I-1 has been followed to RC/P

-4. Reactor water level control is in automatic on RFPT 2C.

INITIATING CUES

The Unit Supervisor directs you to place 2A RFPT in alternate pressure control, as directed by 2

-EOI-APPENDIX-11F and lower Reactor Pressure to low in the pressure band of 800 to 1000 psig.

Job Performance Measure (JPM) 1 SITE: BFN JPM TITLE:

3-EOI Appendix

-11F Alternate RPV Pressure Control Systems: RFPT On Minimum Flow JPM NUMBER:

JPM 670A U 3 REVISION: 0 TASK APPLICABILITY:

SRO STA UO NAUO TASK NUMBER / TASK TITLE(S):

U-000-EM-58 Lineup Alternate RPV Pressure Control Systems- RFPT on Minimum Flow IAW EOI Appendix 11F K/A RATINGS:

RO: 3.6 SRO: 3.6 K/A No. & STATEMENT:

239001 Main and Reheat Steam System A1.01 Ability to predict and/or monitor changes in parameters associated with operating the MAIN AND REHEAT STEAM SYSTEM controls including: Main steam pressure RELATED PRA INFORMATION:

None SAFETY FUNCTION: 3 EVALUATION LOCATION:

In-Plant Simulator Control R oom Lab Other - List APPLICABLE METHOD OF TESTING:

Discussion Simulate/Walkthrough Perform TIME FOR COMPLETION: NA TIME CRITICAL (Y/N)

ALTERNATE PATH (Y/N)

Developed by:

Developer Date (Ensure validator is briefed on exam security per NPG

-SPP-17.8.1) (See JPM Validation Checklist in NPG

-SPP-17.8.2) Validated by:

Approved by:

Validator Date Approved by:

Site Training Management Date Site Training Program Owner Date N Y Job Performance Measure (JPM) 2 OPERATOR: ________________________________

JPM Number: __

_____ RO SRO DATE: _______

TASK STANDARD:

Perform operations necessary to necessary to place one RFPT in pressure control as directed by 3

-EOI Appendix

-11F.

Operator Fundamental evaluated: Monitoring plant conditions and indications closely and controlling plant evolutions precisely.

PRA: NA REFERENCES/PROCEDURES NEEDED:

Procedure: 3-EOI-APPENDIX-11F VERIFICATION TIME: PERFORMANCE TIME:

COMMENTS:

Additional comment sheets attached? YES ___ NO ___

RESULTS: SATISFACTORY ____

UNSATISFACTORY ____

(Retain entire JPM for records)

SIGNATURE: ___________________________

DATE: __________

EXAMINER Job Performance Measure (JPM) 3 SIMULATOR SETUP IC 28 Exam IC 284 Malfunctions Description Event Severity Delay Initial set fw15a SPURIOUS RFP BEARING LOW OIL PRESSURE 1 5 N/A 0 N/A tc03a-j Fail Bypass Valves closed 1 0% 0 N/A ad01e SRV 1-31 stuck open 1 26% 0 N/A Remotes Description Event Severity Delay Initial set Overrides Description Event Severity Delay Initial set

Job Performance Measure (JPM) 4 Initial Setup:

1. Reset to IC 28
2. Manually Scram RX
3. Trip 2A and 2B RFPT
4. Run Schedule File: NRC JPM E U2

-Alt RPV Press Control RFP Min Flow

5. Insert Manual Trigger #1
6. After 2A RFPT Speed is <350 RPM Open Event File: NRC JPM E U2

-Alt RPV Press Control RFP Min Flow

7. Verify Auto Trigger #15 is ACTIVE
8. Freeze simulator and save IC.

Schedule Files:

1. NRC JPM E U3

-Alt RPV Press Control RFP Min Flow.sch 2. NRC JPM E U 3-Alt RPV Press Control RFP Min Flow RFPT Trip.evt

Job Performance Measure (JPM) 5 Revision Summary Rev No. Effective Date Pages Affected Description 0 05/11/15 All Initial issue

Job Performance Measure (JPM) 6 IN-SIMULATOR: I will explain the initial conditions and state the task to be performed. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's Correct".

(OR "That's Incorrect", if applicable). When you have completed your assigned task, you will say, "my task is complete" and I will acknowledge that your task is complete.

INITIAL CONDITIONS:

You are an Operator on Unit

3. The Unit 3 reactor has scrammed and the turbine bypass valves are not responding for pressure control due to a loss of EHC fluid. EO I-1 has been followed to RC/P

-4. Reactor water level control is in automatic on RFPT 3 C.

INITIATING CUES

The Unit Supervisor directs you to place 3A RFPT in alternate pressure control, as directed by 3-EOI-APPENDIX-11F and lower Reactor Pressure to low in the pressure band of 800 to 1000 psig.

Job Performance Measure (JPM) 7 START TIME STEP / STANDARD SAT / UNSAT Step 1: [1] IF BOTH of the following exist:

Emergency RPV Depressurization is required, AND Group 1 Isolation Signal exists, THEN EXIT this procedure and ENTER EOI Appendix 11H.

Standard:

Verifies that a Group 1 Isolation signal Does Not exist by observing illuminated RED PCIS Group I lights and/or Verified MSIVs are open by observing illuminated RED valve position indicating lights for each valve.

SAT UNSAT N/A Step 2:

[2] VERIFY MSIVs open.

Standard:

Verifies MSIVs OPEN

SAT UNSAT N/A Job Performance Measure (JPM) 8 STEP / STANDARD SAT / UNSAT Step 3: [3] VERIFY Hotwell Pressure at or below

-7 in. Hg. Standard:

Verifies Hotwell Pressure at or below

-7 in. Hg SAT UNSAT N/A Step 4:

[4] PLACE RFPTs in service as follows:

[4.1] VERIFY the following:

[4.1.1] At least one condensate pump running. [4.1.2] At least one condensate booster pump running. [4.1.3] Condensate System aligned to supply suction to RFPs. Standard:

Verifies one condensate pump and one condensate booster pump running, verifies condensate system aligned to supply suction to RFPs.

SAT UNSAT N/A Step 5:

[4.2] VERIFY Main Oil Pump running for each RFPT to be started. Standard:

Verifies main oil pump running for RFPT 3 A SAT UNSAT N/A Step 6:

[4.3] VERIFY CLOSED 3-FCV-3-19, RFP 3 A DISCHARGE VALVE.

Standard:

VERIFY CLOSED 3-FCV-3-19, RFP 3 A DISCHARGE VALVE.

Critical Step

SAT UNSAT N/A Job Performance Measure (JPM) 9 STEP / STANDARD SAT / UNSAT Step 7: [4.4] DEPRESS 3-HS-46-8A, RFPT 3 A SPEED CONT RAISE/LOWER, and VERIFY amber light is illuminated.

Standard:

Depresses 3-HS-46-8A Critical Step SAT UNSAT N/A Step 8:

[4.5] DEPRESS 3-HS-3-124A , RFPT 3 A TRIP RESET.

Standard:

Depresses 3

-HS-3-124A and resets RFPT Trip and verifies the 3

-ZI-1-123 LP Stop Valve and 3

-ZI-127 HP Stop Valve comes OPEN.

Critical Step SAT UNSAT N/A Step 9:

[4.6] PLACE 3-HS-46-112A RFPT 3 A START/LOCAL ENABLE, in START. Standard:

Places 3-HS-46-112A in START Critical Step SAT UNSAT N/A Note to Examiner:

RFPT A will Trip due to Low Bearing Oil Pressure at > 350 RPM Step 10: [4.7] CHECK RFPT 3 A speed increases to approximately 600 rpm.

Standard:

Operator responds to RFPT A Trip and reports to US and begins to use B RFP for RPV Pressure Control per 3-EOI-APPENDIX-11F. SAT UNSAT N/A CUE: US: Proceed as directed per 3-EOI-APPENDIX-11F. AO: Reports an oil leak of ~5 gpm on RFPT A bearings.

Job Performance Measure (JPM) 10 STEP / STANDARD SAT / UNSAT Step 1 1: [1] IF BOTH of the following exist:

Emergency RPV Depressurization is required, AND Group 1 Isolation Signal exists, THEN EXIT this procedure and ENTER EOI Appendix 11H.

Standard:

Verifies that a Group 1 Isolation signal Does Not exist by observing illuminated RED PCIS Group I lights and/or Verified MSIVs are open by observing illuminated RED valve position indicating lights for each valve.

SAT UNSAT N/A Step 1 2:

[2] VERIFY MSIVs open.

Standard:

Verifies MSIVs OPEN SAT UNSAT N/A Job Performance Measure (JPM) 11 STEP / STANDARD SAT / UNSAT Step 1 3: [3] VERIFY Hotwell Pressure at or below

-7 in. Hg. Standard:

Verifies Hotwell Pressure at or below

-7 in. Hg SAT UNSAT N/A Step 1 4:

[4] PLACE RFPTs in service as follows:

[4.1] VERIFY the following:

[4.1.1] At least one condensate pump running. [4.1.2] At least one condensate booster pump running. [4.1.3] Condensate System aligned to supply suction to RFPs. Standard:

Verifies one condensate pump and one condensate booster pump running, verifies condensate system aligned to supply suction to RFPs.

SAT UNSAT N/A Step 1 5:

[4.2] VERIFY Main Oil Pump running for each RFPT to be started. Standard:

Verifies main oil pump running for RFPT 3 B SAT UNSAT N/A Step 1 6:

[4.3] VERIFY CLOSED 3-FCV-3-12, RFP 3 B DISCHARGE VALVE.

Standard:

VERIFY CLOSED 3-FCV-3-12, RFP 3 B DISCHARGE VALVE.

Critical Step

SAT UNSAT N/A Job Performance Measure (JPM) 12 STEP / STANDARD SAT / UNSAT Step 1 7: [4.4] DEPRESS 3-HS-46-9A, RFPT 3 B SPEED CONT RAISE/LOWER, and VERIFY amber light is illuminated.

Standard:

Depresses 3-HS-46-9A Critical Step SAT UNSAT N/A Step 1 8:

[4.5] DEPRESS 3-HS-3-150A , RFPT 3B TRIP RESET.

Standard:

Depresses 3

-HS-3-150A and verifies the 3-ZI-1-133 LP Stop Valve and 3

-FCV-135 HP Stop Valve comes OPEN.

Critical Step SAT UNSAT N/A Step 1 9:

[4.6] PLACE 3-HS-46-138A, RFPT 3B START/LOCAL ENABLE, in START. Standard:

Places 3-HS-46-138A in START Critical Step SAT UNSAT N/A Step 2 0: [4.7] CHECK RFPT 3B speed increases to approximately 600 rpm.

Standard:

Verifies RFPT 3B speed increases to approximately 600 rpm SAT UNSAT N/A Job Performance Measure (JPM) 13 STEP / STANDARD SAT / UNSAT Step 21: [4.8] VERIFY OPEN 3-FCV-3-13, RFP 3B MIN FLOW VALVE.

Standard:

Verifies 3-FCV-3-13 OPEN Critical Step SAT UNSAT N/A Step 21: CAUTION RFP discharge pressure is limited to below 1250 psig to avoid system damage.

[4.9] PLACE 3-HS-46-9A, RFPT 3 B SPEED CONT RAISE/LOWER in RAISE to raise RFPT speed, maintaining discharge pressure less than 1250 psig. Standard:

Raises RFPT speed using Manual Speed Control Handswitch, maintaining discharge pressure <1250 psig as indicated on 3-PI-3-9A RFPT 3B (Only Critical if exceeds 1250 psig, any pressure <1250 psig is acceptable).

Critical Step SAT UNSAT N/A STOP TIME END OF TASK

Job Performance Measure (JPM) 14 Provide to Applicant IN-SIMULATOR: I will explain the initial conditions and state the task to be performed. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's Correct". (OR "That's Incorrect", if applicable). When you have completed your assigned task, you will say, "my task is complete" and I will acknowledge that your task is complete.

INITIAL CONDITIONS:

You are an Operator on Unit

3. The Unit 3 reactor has scrammed and the turbine bypa ss valves are not responding for pressure control due to a loss of EHC fluid. EO I-1 has been followed to RC/P

-4. Reactor water level control is in automatic on RFPT 3 C.

INITIATING CUES

The Unit Supervisor directs you to place 3A RFPT in alternate pressure control, as directed by 3-EOI-APPENDIX-11F and lower Reactor Pressure to low in the pressure band of 800 to 1000 psig.

Job Performance Measure (JPM) 1 SITE: BFN JPM TITLE:

N2 MAKEUP TO PRIMARY CONTAINMENT WITH 2-EOI-APPENDIX-14A JPM NUMBER:

669 U2 REVISION: 0 TASK APPLICABILITY:

SRO STA UO NAUO TASK NUMBER / TASK TITLE(S):

U-000-EM-77 Lineup nitrogen Makeup to primary Containment IAW EOI

-APPENDIX-14A K/A RATINGS:

RO: 3.7SRO: 3.8 K/A No. &STATEMENT:

223001 Primary Containment System and Auxiliaries A2.04

Ability to (a) predict the impacts of the following on the PRIMARY CONTAINMENT SYSTEM AND AUXILIARIES ; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences ofthose abnormal conditions or operations
High containment/drywell hydrogen concentration RELATED PRA INFORMATION:

None SAFETY FUNCTION:

5 EVALUATION LOCATION:

In-Plant Simulator Control R oom Lab Other - List APPLICABLE METHOD OF TESTING:

Discussion Simulate/Walkthrough Perform TIME FOR COMPLETION: NA TIME CRITICAL (Y/N) ALTERNATE PATH (Y/N)

Developed by:

Developer Date (Ensure validator is briefed on exam security per NPG

-SPP-17.8.1) (See JPM Validation Checklist in NPG-SPP-17.8.2) Validated by:

Approved by:

Validator Date Approved by:

Site Training Management Date Site Training Program Owner Date N N Job Performance Measure (JPM) 2 OPERATOR: ________________________________

JPM Number:

_669 U2__ RO SRO DATE: _______

TASK STANDARD:

Perform operations necessary to establish Nitrogen Makeup to Primary Containment and lower Primary Containment Hydrogen Concentration.

Operator Fundamental evaluated: Monitoring plant conditions and indications closely and controlling plant evolutions precisely.

PRA: NA REFERENCES/PROCEDURES NEEDED:

Procedure: 2-EOI-APPENDIX-14A VERIFICATION TIME: 15 min PERFORMANCE TIME:

COMMENTS:

Additional comment sheets attached? YES ___ NO ___

RESULTS: SATISFACTORY ____

UNSATISFACTORY ____

(Retain entire JPM for records)

SIGNATURE: ___________________________

DATE: __________

EXAMINER Job Performance Measure (JPM) 3 SIMULATOR SETUP IC 28 Exam IC 285 Console Operator Instructions

1. Open Schedule File
2. Open Event File
3. Reset to IC

-28 and take out of freeze.

4. Man Scram Rx and place MS to SD.
5. Inhibit ADS & Open 6 ADS Valves.
6. Fire Trigger 2
7. Place H2/O2 Analyzer in service with H2/O2 ISOL BYP Keylock Switch in BYPASS per EOI APPDX 19
8. Place DW Vent in Service per EOI APPX 12 9. Wait for Group 6 schedule file to time out and alrms to settle
10. Freeze simulator and save IC.

Malfunctions Description Event Severity Delay Initial set TH22 COOLANT LEAK INSIDE DRYWELL 2 100 0 Yes TH23 FUEL CLADDING DAMAGE 2 100% 0 N/A RC08 RCIC STEAM SUPPLY VALVE AUTO OPENING FAILURE 1 N/A 0 N/A HP04 HPCI STEAM SUPPLY VALVE AUTO OPENING FAILURE 1 N/A 0 N/A CS04A CORE SPRAY LOGIC POWER FAILURE DIV I 1 N/A 0 N/A CS04B CORE SPRAY LOGIC POWER FAILURE DIV II 1 N/A 0 N/A RD01A CRD PUMP TRIP 2A 1 N/A 0 N/A RD01B CRD PUMP TRIP 2B 1 N/A 0 N/A FW01A CONDENSATE PUMP TRIP 2A 1 N/A 0 N/A FW01B CONDENSATE 1 N/A 0 N/A Job Performance Measure (JPM) 4 PUMP TRIP 2B FW01C CONDENSATE PUMP TRIP 2C 1 N/A 0 N/A PC08 H2 IN DRYWELL_

2 29 0 N/A PC09 OXYGEN IN DRYWELL_ 2 2.8 0 N/A PC10 H2 IN SUPPRESSION POOL_ 2 18 0 N/A PC11 OXYGEN IN SUPPRESSION POOL_ 2 1.5 0 N/A Remotes Description Event Severity Delay Initial set Overrides Description Event Severity Delay Initial set ZLOXA554C9 DW EQUIP DRAIN SUMP LEVEL ABNORMAL 2 N/A N/A ON Schedule File(s):

JPM 669 U2 N2 Makeup to Primary Containment 2-EOI-APPENDIX-14A.sch Appendix\App. 8E.sch JPM 669 U2 N2 Makeup to Primary Containment 2

-EOI-APPENDIX-14A.evt Job Performance Measure (JPM) 5 Revision Summary Rev No. Effective Date Pages Affected Description 0 05/27/15 All Initial issue

Job Performance Measure (JPM) 6 IN-SIMULATOR: I will explain the initial conditions and state the task to be performed. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's Correct". (OR "That's Incorrect", if applicable). When you have completed your assigned task, you will say, "my task is complete" and I will acknowledge that your task is complete.

INITIAL CONDITIONS:

You are an Operator on Unit 2.

The Reactor is shutdown.

2-EOI-APPENDIX-12has been completed 2-EOI-APPENDIX-19 has been completed.

PCIS Group 6 has been overridden per 2

-EOI-APPENDIX-8E.

INITIATING CUES

The Unit Supervisor directs you to lower Hydrogen Concentration by performing 2

-EOI-APPENDIX-14A beginning on step 2

.

Job Performance Measure (JPM) 7 START TIME STEP / STANDARD SAT / UNSAT Step 1: 2. MONITOR Drywell and Suppression Chamber H 2 and O 2concentrations on one or more of the following displays(2

-EOI Appendix 19):

2-MON-76-110, H2/O2 ANALYZER (Panel 2 55) 2-XR-76-110, H2/O2 CONCENTRATION (Panel 2-9-54) Standard:

Verifies H2 and O2 concentrations

SAT UNSAT N/A Step 2:

3. IF ................. Drywell/Suppression Chamber H 2 /O 2 analyzer is or becomes inoperable, THEN ...........NOTIFY Chemistry Lab to sample Drywell andSuppression Chamber for H 2 and O 2 using CI-644. Standard:

Verifies Drywell/Suppression Chamber H 2 /O 2 analyzers are Operable SAT UNSAT N/A Job Performance Measure (JPM) 8 STEP / STANDARD SAT / UNSAT Step 3: 4.WHEN ......... Drywell or Suppression Chamber H 2 or O 2 concentration is increasing,THEN ........... CONTINUE in this procedure.

Standard:

Observes a rise in Drywell H2 Concentration and continues with procedure.

SAT UNSAT N/A Step 4: NOTE This procedure assumes that the normal makeup is from N 2 Storage Tank B. 5. DISPATCH personnel to N 2 Storage Tank B to CHECK 0-PI-76-331, N2 TANK B PRESSURE INDICATOR between 160 and 190 psig.

Standard: Dispatches UO to verify N 2 Storage Tank B Pressure SAT UNSAT N/A CUE: N 2 Storage Tank B Pressure is reading 180 psig Step 5:

6. DETERMINE area with highest H 2 and/or O 2 concentrations and INFORM SRO. Standard:

Correctly determines highest concentration is in the drywell and informs

US Critical Step SAT UNSAT N/A CUE: If asked about 15 minute sample time, state "15 minutes have elapsed"

Job Performance Measure (JPM) 9 STEP / STANDARD SAT / UNSAT Step 6: 7. VERIFY PCIS RESET (Panel 2 4). Standard:

Verifies PCIS RESET on Panel 2 4 Critical Step SAT UNSAT N/A Step 7:

8. IF ................. It is desired to makeup N 2 to the Suppression Chamber,THEN ...........CONTINUE in this procedure at Step 10.

Standard:

Correctly determine step is not applicable and proceeds to step 9.

Critical Step SAT UNSAT N/A Step 8:

9. CONTROL Drywell H 2 and O 2 as follows:
a. OPEN the following valves to admit N 2 to Drywell (Panel 2-9-3): 2-FCV-76-18, DRYWELL N2 MAKEUP INBDISOLATION VLV 2-FCV-76-17, PRI CTMT N2 MAKEUP OUTBDISOLATION VLV.

Standard: OPENS 2-FCV-76-18, DRYWELL N2 MAKEUP INBD ISOLATION VLV &

2-FCV-76-17, PRI CTMT N2 MAKEUP OUTBD ISOLATION VLV Critical Step SAT UNSAT N/A Step 9:

b. SLOWLY ADJUST 2-PC-76-14, DW/SUPPR CHBR N2 MU PRESS CONTROL (Panel 2 3), to maintain flow > 55 and

<60 scfm on 2

-XR-76-14, DW/SUPPR CHBR N2 MAKEUP FLOW/PRESS (Panel 2 3), or as directed by SRO if SAMG execution is in progress.

Standard: Achieves a flowrate between 55

-60 scfm and monitors Drywell Hydrogen Concentration Lowering Critical Step SAT UNSAT N/A Job Performance Measure (JPM) 10 STEP / STANDARD SAT / UNSAT Step 10: c. CONTINUE N 2 admission to the Drywell UNTIL Drywell H 2 andO 2 are below desired values.

Standard:

Monitors Drywell Hydrogen Concentration SAT UNSAT N/A Note to Examiner: Once satisfied with N2 Flow established between 55

- 60 scfm with a downward trend on H2 Concentration in the Drywell. End of task.

Pass/ Fail Criteria: Establish N2 Flow> 55 scfm and H2 Concentration on a downward trend.

STOP TIME END OF TASK

Job Performance Measure (JPM) 11 Provide to Applicant IN-SIMULATOR: I will explain the initial conditions and state the task to be performed. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's Correct". (OR "That's Incorrect", if applicable). When you have completed your assigned task, you will say, "my task is complete" and I will acknowledge that your task is complete.

INITIAL CONDITIONS:

You are an Operator on Unit 2.

The Reactor is shutdown.

2-EOI-APPENDIX-12 has been completed 2-EOI-APPENDIX-19 has been completed.

PCIS Group 6 has been overridden per 2

-EOI-APPENDIX-8E.

INITIATING CUES

The Unit Supervisor directs you to lower Hydrogen Concentration by performing 2

-EOI-APPENDIX-14A beginning on step 2

.

Job Performance Measure (JPM) 1 SITE: BFN JPM TITLE:

N2 MAKEUP TO PRIMARY CONTAINMENT WITH 3-EOI-APPENDIX-14A JPM NUMBER:

670 U 3 REVISION: 0 TASK APPLICABILITY:

SRO STA UO NAUO TASK NUMBER / TASK TITLE(S):

U-000-EM-77 Lineup nitrogen Makeup to primary Containment IAW EOI

-APPENDIX-14A K/A RATINGS:

RO: 3.7SRO: 3.8 K/A No. &STATEMENT:

223001 Primary Containment System and Auxiliaries A2.04; Ability to (a) predict the impacts of the following on the PRIMARY CONTAINMENT SYSTEM AND AUXILIARIES ; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences ofthose abnormal conditions or operations: High containment/drywell hydrogen concentration RELATED PRA INFORMATION:

None SAFETY FUNCTION:

5 EVALUATION LOCATION:

In-Plant Simulator Control R oom Lab Other - List APPLICABLE METHOD OF TESTING:

Discussion Simulate/Walkthrough Perform TIME FOR COMPLETION: NA TIME CRITICAL (Y/N) ALTERNATE PATH (Y/N) Developed by:

Developer Date (Ensure validator is briefed on exam security per NPG

-SPP-17.8.1) (See JPM Validation Checklist in NPG

-SPP-17.8.2) Validated by:

Approved by:

Validator Date Approved by:

Site Training Management Date Site Training Program Owner Date N N Job Performance Measure (JPM) 2 OPERATOR: ________________________________

JPM Number:

_670 U3_ RO SRO DATE: _______

TASK STANDARD:

Perform operations necessary to establish Nitrogen Makeup to Primary Containment and lower Primary Containment Hydrogen Concentration.

Operator Fundamental evaluated: Monitoring plant conditions and indications closely and controlling plant evolutions precisely.

PRA: NA REFERENCES/PROCEDURES NEEDED:

Procedure: 3-EOI-APPENDIX-14 A VERIFICATION TIME: PERFORMANCE TIME:

COMMENTS:

Additional comment sheets attached? YES ___ NO ___

RESULTS: SATISFACTORY ____

UNSATISFACTORY ____

(Retain entire JPM for records)

SIGNATURE: ___________________________

DATE: __________

EXAMINER Job Performance Measure (JPM) 3 SIMULATOR SETUP IC 28 Exam IC 285 Console Operator Instructions

1. Open Schedule File
2. Open Event File
3. Reset to IC

-28 and take out of freeze.

4. Man Scram Rx and place MS to SD.
5. Inhibit ADS & Open 6 ADS Valves.
6. Fire Trigger 2
7. Place H2/O2 Analyzer in service with H2/O2 ISOL BYP Keylock Switch in BYPASS per EOI APPDX 19
8. Place DW Vent in Service per EOI APPX 12
9. Wait for Group 6 schedule file to time out and alrms to settle
10. Freeze simulator and save IC.

Malfunctions Description Event Severity Delay Initial set TH22 COOLANT LEAK INSIDE DRYWELL 2 100 0 Yes TH23 FUEL CLADDING DAMAGE 2 100% 0 N/A RC08 RCIC STEAM SUPPLY VALVE AUTO OPENING FAILURE 1 N/A 0 N/A HP04 HPCI STEAM SUPPLY VALVE AUTO OPENING FAILURE 1 N/A 0 N/A CS04A CORE SPRAY LOGIC POWER FAILURE DIV I 1 N/A 0 N/A CS04B CORE SPRAY LOGIC POWER FAILURE DIV II 1 N/A 0 N/A RD01A CRD PUMP TRIP 2A 1 N/A 0 N/A RD01B CRD PUMP TRIP 2B 1 N/A 0 N/A Job Performance Measure (JPM) 4 FW01C CONDENSATE PUMP TRIP 2C 1 N/A 0 N/A PC08 H2 IN DRYWELL_

2 29 0 N/A PC09 OXYGEN IN DRYWELL_ 2 2.8 0 N/A PC10 H2 IN SUPPRESSION POOL_ 2 18 0 N/A PC11 OXYGEN IN SUPPRESSION POOL_ 2 1.5 0 N/A Overrides Description Event Severity Delay Initial set ZLOXA554C9 DW EQUIP DRAIN SUMP LEVEL ABNORMAL 2 N/A N/A ON Schedule File(s):

JPM 669 U3 N2 Makeup to Primary Containment 2

-EOI-APPENDIX-14A.sch Appendix\App. 8E.sch JPM 669 U3 N2 Makeup to Primary Containment 2

-EOI-APPENDIX-14A.evt Job Performance Measure (JPM) 5 Revision Summary Rev No. Effective Date Pages Affected Description 0 05/27/15 All Initial issue

Job Performance Measure (JPM) 6 IN-SIMULATOR: I will explain the initial conditions and state the task to be performed. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's Correct". (OR "That's Incorrect", if applicable). When you have completed your assigned task, you will say, "my task is complete" and I will acknowledge that your task is complete.

INITIAL CONDITIONS:

You are an Operator on Unit

3. The Reactor is shutdown.

3-EOI-APPENDIX-12 has been completed.

3-EOI-APPENDIX-19 has been completed.

PCIS Group 6 has been overridden per 3

-EOI-APPENDIX-8E.

INITIATING CUES

The Unit Supervisor directs you to lower Hydrogen Concentration by performing 3-EOI-APPENDIX-14A beginning on step 2

.

Job Performance Measure (JPM) 7 START TIME STEP / STANDARD SAT / UNSAT Step 1: 3. MONITOR Drywell and Suppression Chamber H 2 and O 2concentrations on one or more of the following displays(3-EOI Appendix 19):

3-MON-76-110, H2/O2 ANALYZER (Panel 3-9-55) 3-XR-76-110, H2/O2 CONCENTRATION (Panel 3-9-54) Standard:

Verifies H2 and O2 concentrations

SAT UNSAT N/A Step 2:

3. IF ................. Drywell/Suppression Chamber H 2 /O 2 analyzer is or becomes inoperable, THEN ...........NOTIFY Chemistry Lab to sample Drywell andSuppression Chamber for H 2 and O 2 using CI-644. Standard:

Verifies Drywell/Suppression Chamber H 2 /O 2 analyzers are Operable

SAT UNSAT N/A Job Performance Measure (JPM) 8 STEP / STANDARD SAT / UNSAT Step 3: 4. WHEN ......... Drywell or Suppression Chamber H 2 or O 2 concentration is increasing,THEN ........... CONTINUE in this procedure.

Standard:

Observes a rise in Drywell H2 Concentration and continues with procedure.

SAT UNSAT N/A Step 4: NOTE This procedure assumes that the normal makeup is from N 2 Storage Tank B. 5. DISPATCH personnel to N 2 Storage Tank B to CHECK 0-PI-76-331, N2 TANK B PRESSURE INDICATOR between 160 and 190 psig.

Standard: Dispatches UO to verify N 2 Storage Tank B Pressure SAT UNSAT N/A CUE: N 2 Storage Tank B Pressure is reading 180 psig Step 5:

6. DETERMINE area with highest H 2 and/or O 2 concentrations and INFORM SRO. Standard:

Correctly determines highest concentration is in the drywell and informs

US Critical Step SAT UNSAT N/A CUE: If asked about 15 minute sample time, state "15 minutes have elapsed"

Job Performance Measure (JPM) 9 STEP / STANDARD SAT / UNSAT Step 6: 7. VERIFY PCIS RESET (Panel 3-9-4). Standard:

Verifies PCIS RESET on Panel 3-9-4 Critical Step SAT UNSAT N/A Step 7:

8. IF ................. It is desired to makeup N 2 to the Suppression Chamber,THEN ...........CONTINUE in this procedure at Step 10.

Standard:

Correctly determine step is not applicable and proceeds to step 9.

Critical Step SAT UNSAT N/A Step 8:

9. CONTROL Drywell H 2 and O 2 as follows:
a. OPEN the following valves to admit N 2 to Drywell (Panel 3-9-3): 3-FCV-76-18, DRYWELL N2 MAKEUP INBDISOLATION VLV 3-FCV-76-17, PRI CTMT N2 MAKEUP OUTBDISOLATION VLV.

Standard:

OPENS 3-FCV-76-18, DRYWELL N2 MAKEUP INBD ISOLATION VLV

&3-FCV-76-17, PRI CTMT N2 MAKEUP OUTBD ISOLATION VLV Critical Step SAT UNSAT N/A Step 9:

b. SLOWLY ADJUST 3-PC-76-14, DW/SUPPR CHBR N2 MUPRESS CONTROL (Panel 3-9-3), to maintain flow between 55 and60 scfm on 3-XR-76-14, DW/SUPPR CHBR N2 MAKEUPFLOW/PRESS (Panel 3-9-3), or as directed by SRO if SAMGexecution is in progress.

Standard:

Achieves a flowrate between 55

-60 scfm and monitors Drywell Hydrogen Concentration Lowering Critical Step SAT UNSAT N/A Job Performance Measure (JPM) 10 STEP / STANDARD SAT / UNSAT Step 10: c. CONTINUE N 2 admission to the Drywell UNTIL Drywell H 2 and O 2 are below desired values.

Standard:

Monitors Drywell Hydrogen Concentration SAT UNSAT N/A Note to Examiner: Once satisfied with N2 Flow established between 55

- 60 scfm with a downward trend on H2 Concentration in the Drywell. End of task.

Pass/ Fail Criteria: Establish N2 Flow > 55 scfm and H2 Concentration on a downward trend.

STOP TIME END OF TASK

Job Performance Measure (JPM) 11 Provide to Applicant IN-SIMULATOR: I will explain the initial conditions and state the task to be performed. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's Correct". (OR "That's Incorrect", if applicable). When you have completed your assigned task, you will say, "my task is complete" and I will acknowledge that your task is complete.

INITIAL CONDITIONS:

You are an Operator on Unit

3. The Reactor is shutdown.

3-EOI-APPENDIX-12 has been completed.

3-EOI-APPENDIX-19 h as been completed.

PCIS Group 6 has been overridden per 3

-EOI-APPENDIX-8E.

INITIATING CUES

The Unit Supervisor directs you to lower Hydrogen Concentration by performing 3-EOI-APPENDIX-14A beginning on step 2

.

Job Performance Measure (JPM) 1 SITE: BFN JPM TITLE:

Restore Offsite Power to 4KV shutdown board at PNL 9-23 JPM NUMBER:

631 U2 REVISION: 0 TASK APPLICABILITY:

SRO STA UO NAUO TASK NUMBER / TASK TITLE(S):

U-082-NO-09 / Restore Offsite Power to 4KV shutdown board at PNL 9

-23 K/A RATINGS:

RO 3.4 SRO 3.4 K/A STATEMENT:

262001 A.C. Electrical Distribution A4.02 Ability to manually operate and/or monitor in the control room: Synchroscope, including understanding of running andincoming voltages RELATED PRA INFORMATION:

N/A SAFETY FUNCTION:

6 EVALUATION LOCATION

In-Plan t Simulato r Control Roo m La b Other - Lis t APPLICABLE METHOD OF TESTING: Discussion Simulate/Walkthrough Perform TIME FOR COMPLETION:

NA TIME CRITICAL (Y/N) ALTERNATE PATH (Y/N)

Developed by:

Developer Date (Ensure validator is briefed on exam security per NPG

-SPP-17.8.1) (See JPM Validation Checklist in NPG

-SPP-17.8.2) Validated by:

Approved by:

Validator Date Approved by:

Site Training Management Date Site Training Program Owner Date N N Job Performance Measure (JPM) 2 OPERATOR: ________________________________

JPM Number:

631 U2 RO SRO DATE: _______

TASK STANDARD:

Perform operations necessary to restore offsite power to 4KV SD BD A from 4KV SD BUS 1

. PRA: NA REFERENCES/PROCEDURES NEEDED:

Procedure 0-OI-82 VERIFICATION TIME:

15 Min PERFORMANCE TIME:

COMMENTS:

Additional comment sheets attached? YES ___ NO ___

RESULTS: SATISFACTORY ____

UNSATISFACTORY ____ (Retain entire JPM for records)

SIGNATURE: ___________________________

DATE: __________

EXAMINER Job Performance Measure (JPM) 3 SIMULATOR SETUP IC 28 Exam IC 286 Console Operator Instructions

1. Reset to IC 28 and take out of freeze
2. Start A EDG and parallel with offsite
3. Open 4-kV Shutdown Board A Breaker 1614 Malfunctions Description Event Severity Delay Initial set Remotes Description Event Severity Delay Initial set Overrides Description Event Severity Delay Initial set Job Performance Measure (JPM) 4 **************************************************************************************************** IN-SIMULATOR: I will explain the initial conditions and state the task to be performed. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's Correct". (OR "That's Incorrect", if applicable). When you have completed your assigned task, you will say, "my task is complete" and I will acknowledge that your task is complete.
  • INITIAL CONDITIONS:

You are an Operator on Unit 2.

No Inclement weather currently exists in the area 8 hour9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> s ago, 4 KV Shutdown Board A was separated from Offsite Power in accordance with 0

-OI-82, Standby Diesel Generator System.

INITIATING CUE:

The Unit Supervisor has directed you to restore offsite power to 4KV Shutdown Board A using the normal feeder breaker and remove DG A from parallel operation in accordance with 0

-OI-82, Section 8.3, Restoring Offsite Power to 4

-kV Shutdown Board at Panel 9

-23.

Job Performance Measure (JPM) 5 START TIME STEP / STANDARD SAT / UNSAT Step 1: 0-OI-82 Standby Diesel Generator System

Section 8.3 Restoring Offsite Power to 4

-kV Shutdown Board at Panel 9-23 NOTE The following list of 4

-kV shutdown board normal and alternate feeder breakers may be useful when performing this section:

Shutdown Board A B C D Norm Feed Bkr 1614 1616 1718 1724 Alt Feed Bkr 1716 1714 1624 1618

[1] VERIFY 4-kV Shutdown Board A is being supplied power by its respective Diesel Generator as the only source of power.

Standard: Verifies 4

-kV Shutdown Board A is being supplied by DG A

. SAT

__UNSA T N/A Step 2:

[2] VERIFY the associated 4kV shutdown board auto transfer lockout relay is tripped to MANUAL.

Diesel Handswitch Name Handswitch No. Panel A 4KV SD BD A AUTO/LOCKOUT RESET 0-211-3EA 0-9-23-7 Standard: Verifies 4KV SD BD A AUTO/LOCKOUT RESET, HS 211-A, is tripped to manua

l. SAT UNSAT N/A Job Performance Measure (JPM) 6 STEP / STANDARD SAT / UNSAT Step 3: [3] PLACE the synchroscope switch for the 4

-kV shutdown board feeder breaker that is to be paralleled with the Diesel Generator in ON. Standard: Places Synchroscope switch for 4

-kV Shutdown Board A normal feeder breaker 1614 to ON

. Critical Step

SAT UNSAT N/A Step 4:

[4] VERIFY 4-kV Shutdown Bus 1(2) voltage is between 3950 Volts and 4400 Volts and NOT undergoing abnormal voltage transients.

Standard: Verifies 4

-kV Shutdown Bus 1 voltage is between 3950 Volts and 4400 Volts and NOT undergoing abnormal voltage transients.

SAT UNSAT N/A Step 5:

[5] VERIFY associated incoming frequency is between 59 Hertz and 61 Hertz and NOT undergoing abnormal frequency transients.

Shutdown Bd Instrument Name Instrument No.

Panel A or B GEN SYNC FREQUENCY 0-SI-82-0 AB 0-9-23-7 C or D GEN SYNC FREQUENCY 0-SI-82-0 CD 0-9-23-8 Standard: Verifies incoming frequency is between 59 Hertz and 61 Hertz and NOT undergoing abnormal frequency transients using GEN SYNC FREQUENCY,0

-SI-82-AB.

SAT UNSAT N/A Job Performance Measure (JPM) 7 STEP / STANDARD SAT / UNSAT Step 6: CAUTION DO NOT parallel the Diesel Generators with an unstable offsite source or during inclementweather (e.g., lightning, heavy winds).

[6] IF 4-kV Shutdown Bus 1 (2) is experiencing abnormal voltage or frequency conditions, THEN PERFORM the following:

Standard: STEP N/A SAT UNSAT N/A Step 7: CAUTION Only one Unit 1 and 2 Diesel Generator at a time is allowed to be operated in parallel with system.

[7] PULL and PLACE the associated Diesel Generator mode selector switch in PARALLELED WITH SYSTEM.

Diesel Handswitch Name Handswitch No. Panel A DG A MODE SELECT 0-HS-82-A/5A 0-9-23-7 Standard: Pulls DG A MODE SELECT switch 0-HS-82-A/5A and places it in PARALLELED WITH SYSTEM

. Critical Step

SAT UNSAT N/A Job Performance Measure (JPM) 8 STEP / STANDARD SAT / UNSAT Step 8: CAUTION Failure of the PARALLELED WITH SYSTEM light to illuminate in the following step could indicate that the DG is still in SINGLE UNIT operation and result in overload when the DG output breaker is closed.

[8] RELEASE the Diesel Generator mode selector switch and OBSERVE PARALLELED WITH SYSTEM light illuminated.

Standard: Releases the Diesel Generator A mode selector switch, 0-HS-82-A/5A and observesPARALLELED WITH SYSTEM light is illuminated

.

SAT UNSAT N/A Step 9:

[9] ADJUST Diesel Generator frequency using the associated Diesel Generator governor control switch to obtain a synchroscope needle rotation of one revolution every 15 to 20 seconds in the SLOW direction.

Diesel Handswitch Name Handswitch No. Panel A DG A GOVERNOR CONTROL 0-HS-82-A/3A 0-9-23-7 Standard: AdjustsDiesel Generator A frequency using Diesel Generator governor control switch, 3-HS-82-A/3A, (in lower direction) to obtain a synchroscope needle rotation of one revolution every 15 to 20 seconds in the SLOW direction.

Critical Step

SAT UNSAT N/A Job Performance Measure (JPM) 9 STEP / STANDARD SAT / UNSAT Step 10: [10] USE the associated Diesel Generator voltage regulator control switch to match Diesel Generator and System voltages.

Diesel Instrument Name Inst No. Panel A DG A VOLT REGULATOR CONT 0-HS-82-A/2A 0-9-23-7 GEN SYNC REF VOLTAGE 0-EI-82-AB SYSTEM SYNC REF VOLTAGE 0-EI-211-0 AB Standard:

Matches DG A voltage with system voltage using DG A VOLT REGULATOR CONT switch 0-HS-82-A/2 A.

SAT UNSAT N/A Step 11:

[11] WHEN the synchroscope needle is approximately 2 minutes on the right hand side of the 12 o'clock position, THEN CLOSE the 4-kV shutdown board feeder breaker that is to be paralleled with the Diesel Generator.

Standard: Closesthe 4-kV shutdown board feeder breaker 1614 when the synchroscope needle is approximately 2 minutes on the right hand side of the 12 o'clock position.

Critical Step

SAT UNSAT N/A Step 12:

[12] PLACE the synchroscope switch for the 4

-kV shutdown board feeder breaker that was paralleled with the Diesel Generator in OFF. Standard:

Places the synchroscope switch for BKR 1614 in OFF.

SAT UNSAT N/A Job Performance Measure (JPM) 10 STEP / STANDARD SAT / UNSAT Step 13: NOTE If diesel operates greater than 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> at less than 50% load, the diesel should be loaded to full load for at least 30 minutes prior to engine shutdown. This will allow the engine to clean out any oil accumulations from the exhaust manifolds.

[13] IF DG has been operating at a low-THEN PERFORM the following (Otherwise N/A):

[13.1] USE the associated Diesel Generator's governor controlswitch and voltage regulator control switch

toINCREASE kW and kVAR load, in increments of 100kWevery 15 minutes.

Diesel Handswitch Name Handswitch No. Panel A DG A GOVERNOR CONTROL 0-HS-82-A/3A 0-9-23-7 DG A VOLT REGULATOR CONTROL 0-HS-82-A/2 A [13.2] OBSERVE the exhaust stack smoke concentration from outside the DG room after each incremental increase.

[13.3] STEP N/A [13.4] WHEN smoke becomes relatively clear, CONTINUE to load DG engine to 100% if possible.

[13.5] MAINTAIN 100% load for a minimum of 30 minutes.

Standard: Loads DG to 2600 kW and 185 0 kVAR by using 0-HS-82-A/3A and 0-HS-82-A/2A handswitches.

Critical Step SAT UNSAT N/A CUE: After first 100 kW load adjustment state "15 minutes have elapsed and no observable black smoke from exhaust stack for time compression and continue to full load

."

Job Performance Measure (JPM) 11 STEP / STANDARD SAT / UNSAT Step 1 4: NOTE Lagging VARs should be maintained when adjusting kW load (rising or lowering). This may require kW load adjustment to be stopped periodically to allow for adjusting kVAR load. Once desired kW load is achieved, Illustration 1 should be referred to for determination of kVAR loading required to obtain a power factor (pf) of 0.8 lagging. Diesel generator kVAR load should then be adjusted to obtain a 0.8 pf lagging. IF system conditions will NOT permit the kVAR loading required to obtain a 0.8 pf lagging, kVAR load should be adjusted to the maximum kVAR lagging the system will allow.

[14] USE the associated Diesel Generator's governor control switch and voltage regulator control switch to obtain desired kW and kVAR load.

Standard: Obtains desired kW and kVAR load using DG A Governor Control switch, 0-HS-82-A/3A and DG Volt Regulator Cont switch, 0

-HS-82-A/2A. Diesel Handswitch Name Handswitch No.

Panel A DG A GOVERNOR CONTROL 0-HS-82-A/3A 0-9-23-7 DG A VOLT REGULATOR CONT 0-HS-82-A/2A SAT UNSAT N/A CUE: state "30 minutes have elapsed continue with procedure."

Step 1 5:

[15] MONITOR the offsite source that is paralleled with the Diesel Generator.

[16] IF abnormal voltage or frequency transients are experienced, THEN Standard: Step is N/A SAT UNSAT N/A Job Performance Measure (JPM) 12 STEP / STANDARD SAT / UNSAT Step 1 6: [17] WHEN Parallel with System operation is no longer desired, THEN UNLOAD the Diesel Generator as follows:

CAUTION When unloading the Diesel Generator, failure to slowly approach the 300 kW/250 kVARlimit may result in a reverse power trip of the Diesel Generator output breaker.

[17.1] USE the associated Diesel Generator's governor control switch and voltage regulator control switch to reduce generator load to approximately 300 kW and 250 kVAR: Diesel Instrument Name Inst No. Panel A DG A GOVERNOR CONTROL 0-HS-82-A/3 A 0-9-23-7 DG A VOLTAGE REGULATOR CONTROL 0-HS-82-A/2A DG A KILOWATTS 0-JI-82-A/A DG A KILOVARS 0-VAR-82-A/A Standard: Unloads the DG to approximately 300 KW and 250 kVAR

. Critical Step

SAT UNSAT N/A Step 1 7 [17.2] PLACE the associated Diesel Generator breaker control switch in TRIP Diesel Handswitch Name Handswitch No.

Panel A DG A BKR 1818 0-HS-211-A/22 A 0-9-23-7 Standard: Trips Diesel Generator breaker 1818

. Critical Step SAT UNSAT N/A Job Performance Measure (JPM) 13 STEP / STANDARD SAT / UNSAT Step 1 8: [17.3] PULL and PLACE the associated Diesel Generator mode selector switch in SINGLE UNIT.

Diesel Handswitch Name Handswitch No.

Panel A DG A MODE SELECT 0-HS-211-A/5 A 0-9-23-7 Standard: Pulls and places 0

-HS-211-A/5A to Single Unit

. Critical Step SAT UNSAT N/A Step 19: [17.4] RELEASE the Diesel Generator mode selector switch and OBSERVE the SINGLE UNIT light illuminated.

Standard: Verifies Single Unit light illuminated

.

SAT UNSAT N/A CUE: ANOTHER OPERATOR WILL CONTINUE FROM HERE STOP TIME END OF TASK

Job Performance Measure (JPM) 14 Provide to Applicant INITIAL CONDITIONS:

You are an Operator on Unit 2.

No Inclement weather currently exists in the area 8 hour9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> s ago, 4 KV Shutdown Board A was separated from Offsite Power in accordance with 0

-OI-82, Standby Diesel Generator System.

INITIATING CUE:

The Unit Supervisor has directed you to restore offsite power to 4KV Shutdown Board A using the normal feeder breaker and remove DG A from parallel operation in accordance with 0

-OI-82, Section 8.3, Restoring Offsite Power to 4

-kV Shutdown Board at Panel 9

-23.

Job Performance Measure (JPM) 1 SITE: BFN JPM TITLE:

Restore Offsite Power to 4KV shutdown board at PNL 9

-23 U-3 JPM NUMBER:

631 REVISION: 0 TASK APPLICABILITY:

SRO STA UO NAUO TASK NUMBER / TASK TITLE(S):

U-082-NO-09 / Restore Offsite Power to 4KV shutdown board at PNL 9

-23 K/A RATINGS:

RO 3.4 SRO 3.4 K/A STATEMENT:

262001 A.C. Electrical Distribution A4.02 Ability to manually operate and/or monitor in the control room: Synchroscope, including understanding of running and incoming voltages RELATED PRA INFORMATION:

N/A SAFETY FUNCTION:

6 EVALUATION LOCATION

In-Plan t Simulato r Control Roo m La b Other - Lis t APPLICABLE METHOD OF TESTING: Discussion Simulate/Walkthrough Perform TIME FOR COMPLETION:

NA TIME CRITICAL (Y/N) ALTERNATE PATH (Y/N)

Developed by:

Developer Date (Ensure validator is briefed on exam security per NPG

-SPP-17.8.1) (See JPM Validation Checklist in NPG

-SPP-17.8.2) Validated by:

Approved by:

Validator Date Approved by:

Site Training Management Date Site Training Program Owner Date N N Job Performance Measure (JPM) 2 OPERATOR: ________________________________

JPM Number:

631 RO SRO DATE: _______

TASK STANDARD:

Perform operations necessary to restore offsite power to 4KV SD BD

EC.

PRA: NA REFERENCES/PROCEDURES NEEDED:

Procedure 3-OI-82 VERIFICATION TIME:

15 Min PERFORMANCE TIME:

COMMENTS:

Additional comment sheets attached? YES ___ NO ___

RESULTS: SATISFACTORY ____

UNSATISFACTORY ____ (Retain entire JPM for records)

SIGNATURE: ___________________________

DATE: __________

EXAMINER Job Performance Measure (JPM) 3 SIMULATOR SETUP IC 28 Exam IC 286 Console Operator Instructions

1. Reset to IC 28 and take out of freeze
2. Start C EDG and parallel with offsite
3. Open 4-kV Shutdown Board 3EC Breaker 1338 Malfunctions Description Event Severity Delay Initial set Remotes Description Event Severity Delay Initial set Overrides Description Event Severity Delay Initial set Batch / Pref File(s):

Job Performance Measure (JPM) 4 **************************************************************************************************** IN-SIMULATOR: I will explain the initial conditions and state the task to be performed. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's Correct". (OR "That's Incorrect", if applicable). When you have completed your assigned task, you will say, "my task is complete" and I will acknowledge that your task is complete.

  • INITIAL CONDITIONS:

You are an Operator on Unit 3

. No Inclement weather currently exists in the area 8 hour9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> s ago, 4 KV Shutdown Board 3EC was separated from Offsite Power in accordance with 3

-OI-82, Standby Diesel Generator System.

INITIATING CUE:

The Unit Supervisor has directed you to restore offsite power to 4KV Shutdown Board 3EC using the normal feeder breaker and remove DG 3C from parallel operation in accordance with 3

-OI-82, Section 8.3, Restoring Offsite Power to 4

-kV Shutdown Board at Panel 9

-23.

Job Performance Measure (JPM) 5 START TIME STEP / STANDARD SAT / UNSAT Step 1: 3-OI-82 Standby Diesel Generator System

Section 8.3 Restoring Offsite Power to 4

-kV Shutdown Board at Panel 9-23 NOTE The following list of 4

-kV shutdown board normal and alternate feeder breakers may be useful when performing this section:

Shutdown Board 3E A 3E B 3E C 3E D Norm Feed Bkr 1334 1336 1338 1342 Alt Feed Bkr 1726 17 28 16 26 16 28

[1] VERIFY 4-kV Shutdown Board 3EC is being supplied power by its respective Diesel Generator as the only source of power.

Standard: Verifies 4

-kV Shutdown Board E C is being supplied by DG C SAT UNSA T N/A Step 2:

[2] VERIFY the associated 4kV shutdown board auto transfer lockout relay is tripped to MANUAL.

Diesel Handswitch Name Handswitch No.

Panel 3C 4KV SD BD 3EC AUTO/LOCKOUT RESET 3-43-211-3EC 3-9-23 Standard: Verifies 4KV SD BD 3EC AUTO/LOCKOUT RESET, 3 211-3EC, is tripped to manua

l. SAT UNSAT N/A Job Performance Measure (JPM) 6 STEP / STANDARD SAT / UNSAT Step 3: [3] PLACE the synchroscope switch for the 4

-kV shutdown board feeder breaker that is to be paralleled with the Diesel Generator in ON. Standard: Places Synchroscope switch for 4

-kV Shutdown Board EC normal feeder breaker 1338 to ON Critical Step SAT UNSAT N/A Step 4:

[4] CHECK the applicable 4

-kV unit board (4

-kV bus tie board) voltage is between 3950 VOLTS and 4400 VOLTS and NOT undergoing abnormal voltage transients.

Standard: Verifies 4

-kV Unit Board voltage is between 3950 Volts and 4400 Volts and NOT undergoing abnormal voltage transients.

SAT UNSAT N/A Step 5:

[5] VERIFY associated incoming frequency is between 59 HERTZ and 61 HERTZ and NOT undergoing abnormal frequency transients.

Shutdown Bd Instrument Name Instrument No.

Panel 3E A or 3E B GEN SYNC FREQUENCY 3-SI-82-3 AB 3-9-23 3EC or 3E D GEN SYNC FREQUENCY 3-SI-82-3 CD 3-9-23 Standard: Verifies incoming frequency is between 59 Hertz and 61 Hertz and NOT undergoing abnormal frequency transients using GEN SYNC FREQUENCY, 3-SI-82-CD . SAT UNSAT N/A Job Performance Measure (JPM) 7 STEP / STANDARD SAT / UNSAT Step 6: CAUTION DO NOT parallel the Diesel Generators with an unstable offsite source or during inclement weather (e.g., lightning, heavy winds).

[6] IF 4-kV unit board (4

-kV bus tie board) is experiencing abnormal voltage or frequency conditions, THEN PERFORM the following:

Standard: N/A SAT UNSAT N/A Step 7: CAUTION Only one Unit 1 and 2 Diesel Generator at a time is allowed to be operated in parallel with system.

[7] PULL and PLACE the associated Diesel Generator mode selector switch in PARALLELED WITH SYSTEM.

Diesel Handswitch Name Handswitch No. Panel 3C DG 3C MODE SELECT 3-HS-82-3C/5 A 3-9-23 Standard: Pulls DG 3C MODE SELECT switch 3-HS-82-3C/5 A and places it in PARALLELED WITH SYSTEM Critical Step SAT UNSAT N/A Job Performance Measure (JPM) 8 STEP / STANDARD SAT / UNSAT Step 8: CAUTION Failure of the PARALLELED WITH SYSTEM light to illuminate in the following step could indicate that the DG is still in SINGLE UNIT operation and result in overload when the DG output breaker is closed.

[8] RELEASE the Diesel Generator mode selector switch and OBSERVE PARALLELED WITH SYSTEM light illuminated.

Standard: Releases the Diesel Generator 3C mode selector switch, 3-HS-82-3C/5C and observes PARALLELED WITH SYSTEM light is illuminated

. SAT UNSAT N/A Step 9:

[9] ADJUST Diesel Generator frequency using the associated Diesel Generator governor control switch to obtain a synchroscope needle rotation of one revolution every 15 to 20 seconds in the SLOW direction.

Diesel Handswitch Name Handswitch No. Panel 3C DG 3C GOVERNOR CONTROL 3-HS-82-3C/3 A 3-9-23 Standard: Adjusts Diesel Generator 3C frequency using Diesel Generator governor control switch, 3-HS-82-3C/3 A (in lower direction) to obtain a synchroscope needle rotation of one revolution every 15 to 20 seconds in the SLOW direction.

Critical Step SAT UNSAT N/A Job Performance Measure (JPM) 9 STEP / STANDARD SAT / UNSAT Step 10: [10] USE the associated Diesel Generator voltage regulator control switch to match Diesel Generator and System voltages.

Dies el Instrument Name Inst No. Panel 3C DG 3C VOLT REGULATOR CONT 3-HS-82-3C/2 A 3-9-23 GEN SYNC REF VOLTAGE 3-EI-82-3CD SYSTEM SYNC REF VOLTAGE 3-EI-211-3EC B/B Standard:

Matches DG C voltage with system voltage using DG 3C VOLT REGULATOR CONT switch 3-HS-82-3C/2 A SAT UNSAT N/A Step 11:

[11] WHEN the synchroscope needle is approximately 2 minutes on the right hand side of the 12 o'clock position, THEN CLOSE the 4-kV shutdown board feeder breaker that is to be paralleled with the Diesel Generator.

Standard: Closes the 4-kV shutdown board normal feeder breaker 1338 when the synchroscope needle is approximately 2 minutes on the right hand side of the 12 o'clock position.

Critical Step SAT UNSAT N/A Step 12:

[12] PLACE the synchroscope switch for the 4

-kV shutdown board feeder breaker that was paralleled with the Diesel Generator in OFF. Standard:

Places the synchroscope switch for BKR 1338 in OFF SAT UNSAT N/A Job Performance Measure (JPM) 10 STEP / STANDARD SAT / UNSAT Step 13: [13] IF the normal feeder breaker is supplying the 4

-kV shutdown board, THEN RESET the associated 4kV shutdown board auto transfer lockout relay. Diesel Handswitch Name Handswitch No. Panel 3C 4KV SD BD 3EC AUTO/LOCKOUT RESET 3-43-211-3EC 3-9-23 Standard: Resets 4KV SD BD 3EC Auto Transfer Lockout Relay Critical Step SAT UNSAT N/A Step 1 4: NOTE If diesel operates greater than 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> at less than 50% load, the diesel should be loaded to full load for at least 30 minutes prior to engine shutdown. This will allow the engine to clean out any oil accumulations from the exhaust manifolds.

[14] IF DG has been operating at a low

-THEN PERFORM the following (Otherwise N/A):

[14.1] USE the associated Diesel Generator's governor control switch and voltage regulator control switch to INCREASE kW and kVAR load, in increments of 100kW every 15 minutes. Diesel Handswitch Name Handswitch No. Panel 3C DG 3C GOVERNOR CONTROL 3-HS-82-3C/3A 3-9-23 DG 3C VOLT REGULATOR CONTROL 3-HS-82-3C/2A Critical Step SAT UNSAT N/A Job Performance Measure (JPM) 11 STEP / STANDARD SAT / UNSAT Step 14 continued

[14.2] OBSERVE the exhaust stack smoke concentration from outside the DG room after each incremental increase.

[14.3] STEP N/A [14.4] WHEN smoke becomes relatively clear, CONTINUE to load DG engine to 100% if possible.

[14.5] MAINTAIN 100% load for a minimum of 30 minutes.

Standard: Loads DG to 2600 kW and 1850 kVAR by using 0

-HS-82-A/3A and 0-HS-82-A/2A handswitches.

CUE: After first 100 kW load adjustment state "15 minutes have elapsed and no observable black smoke from exhaust stack for time compression and continue to full load.

" Step 1 5: NOTE VARs lagging should be maintained when adjusting kW load (rising or lowering). This may require kW load adjustment to be stopped periodically to allow for adjusting kVAR load. Once desired kW load is achieved, Illustration 1 should be referred to for determination of kVAR loading required to obtain a power factor (pf) of 0.8 lagging. Diesel generator kVAR load should then be adjusted to obtain a 0.8 pf lagging. IF system conditions will NOT permit the kVAR loading required to obtain a 0.8 pf lagging, kVAR load should be adjusted to the maximum kVAR lagging the system will allow.

[15] USE the associated Diesel Generator's governor control switch and voltage regulator control switch to obtain desired kW and kVAR load.

Diesel Handswitch Name Handswitch No.

Panel 3C DG 3C GOVERNOR CONTROL 3-HS-82-3C/3 A 3-9-23 DG 3C VOLT REGULATOR CONT 3-HS-82-3C/2 A SAT UNSAT N/A Job Performance Measure (JPM) 12 STEP / STANDARD SAT / UNSAT Standard: Obtains desired kW and kVAR load using DG 3C Governor Control switch, 3-HS-82-3C/3 A and DG Volt Regulator Control switch, 3

-HS-82-3C/2 A CUE: state "30 minutes have elapsed continue with procedure."

Step 1 6: [16] MONITOR the offsite source that is paralleled with the Diesel Generator.

[17] IF abnormal voltage or frequency transients are experienced, THEN Standard: Step is N/A SAT UNSAT N/A Step 1 7:

[18] WHEN Parallel with System operation is no longer desired, THEN UNLOAD the Diesel Generator as follows:

CAUTION When unloading the Diesel Generator, failure to slowly approach the 300 kW/250 kVAR limit may result in a reverse power trip of the Diesel Generator output breaker.

[18.1] USE the associated Diesel Generator's governor control switch and voltage regulator control switch to reduce generator load to approximately 300 kW and 250 kVAR: Diesel Instrument Name Inst No. Panel 3C DG 3C GOVERNOR CONTROL 3-HS-82-3C/3 A 3-9-23 DG 3C VOLT REGULATOR CONT 3-HS-82-3C/2 A DG 3C KILOWATTS 3-JI-82-3C/A DG 3C KILOVARS 3-VAR-82-3C/A Critical Step SAT UNSAT N/A Job Performance Measure (JPM) 13 STEP / STANDARD SAT / UNSAT Step 17 continued

Standard: Unloads the DG to approximately 300 KW and 250 kVAR Step 1 8: [18.2] PLACE the associated Diesel Generator breaker control switch in TRIP.

Diesel Handswitch Name Handswitch No.

Panel 3C DG 3C BKR 1832 3-HS-211-3EC/10A 3-9-23 Standard: Trips breaker DG 3C BKR 1832 Critical Step SAT UNSAT N/A Step 1 9: [18.3] PULL and PLACE the associated Diesel Generator mode selector switch in SINGLE UNIT.

Diesel Handswitch Name Handswitch No.

Panel 3C DG 3C MODE SELECT 3-HS-82-3C/5 A 0-9-23 Standard: Pulls and places 3

-HS-82-3C/5 A to Single Unit Critical Step SAT UNSAT N/A Step 20: [18.4] RELEASE the Diesel Generator mode selector switch and OBSERVE the SINGLE UNIT light illuminated.

Standard: Verifies Single Unit light illuminated SAT UNSAT N/A CUE: ANOTHER OPERATOR WILL CONTINUE FROM HERE STOP TIME END OF TASK

Job Performance Measure (JPM) 14 Provide to Applicant INITIAL CONDITIONS:

You are an Operator on Unit 3

. No Inclement weather currently exists in the area 8 hour9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> s ago, 4 KV Shutdown Board 3EC was separated from Offsite Power in accordance with 3

-OI-82, Standby Diesel Generator System.

INITIATING CUE:

The Unit Supervisor has directed you to restore offsite power to 4KV Shutdown Board 3EC using the normal feeder breaker and remove DG 3C from parallel operation in accordance with 3

-OI-82, Section 8.3, Restoring Offsite Power to 4

-kV Shutdown Board at Panel 9

-23.

Job Performance Measure (JPM) 1 SITE: BFN JPM TITLE:

Respond to Off

-Gas Post Treatment Radiation HI

-HI-HI JPM NUMBER:

190 U2 REVISION: 0 TASK APPLICABILITY:

SRO STA UO NAUO TASK NUMBER / TASK TITLE(S):

U-066-AB-02 -Respond to Off

-Gas Post Treatment Radiation Hi

-Hi-Hi K/A RATINGS:

RO 2.9 SRO 3.2 K/A STATEMENT:

271000 Offgas System: A2.16; Ability to (a) predict the impacts of the following on the OFFGAS SYSTEM ; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those abnormal conditions or operations: Loss of offgas system loop seals (2.9/3.2) RELATED PRA INFORMATION:

N/A SAFETY FUNCTION:

9 EVALUATION LOCATION:

In-Plant Simulator Control Room Lab Other - List APPLICABLE METHOD OF TESTING: Discussion Simulate/Walkthrough Perform TIME FOR COMPLETION: N/A TIME CRITICAL (Y/N) ALTERNATE PATH (Y/N)

Developed by:

Developer Date (Ensure validator is briefed on exam security per NPG

-SPP-17.8.1) (See JPM Validation Checklist in NPG

-SPP-17.8.2) Validated by:

Approved by:

Validator Date Approved by:

Site Training Management Date Site Training Program Owner Date N Y Job Performance Measure (JPM) 2 OPERATOR: ________________________________

JPM Number:

190 U2 RO SRO DATE: _______

TASK STANDARD:

Respond to Off-Gas Post Treatment Radiation HI

-HI-HI per 2-AOI-66-2 and/or 2

-ARP-9-4C/35 PRA: NA REFERENCES/PROCEDURES NEEDED:

2-AOI-66-2, 2-ARP-9-4C/35 VALIDATION TIME: 15 Minutes PERFORMANCE TIME:

COMMENTS:

Additional comment sheets attached? YES ___ NO ___

RESULTS: SATISFACTORY ____

UNSATISFACTORY ____

(Retain entire JPM for records)

SIGNATURE: ___________________________

DATE: __________

EXAMINER Job Performance Measure (JPM) 3 SIMULATOR SETUP IC 28 Exam IC 287 Console Operator Instructions

1. Reset to IC 28
2. Fire Manual Trigger 2 3. Fire Manual Trigger 1
4. Station 2 nd operator to respond to alarms Malfunctions Description Event Severity Delay Initial set TH23 FUEL CLADDING DAMAGE 1 50 N/A YES RM14C OFFGAS RAD MONITOR FAILURERM-90-265A 1 1E6 CPS N/A YES RM14D OFFGAS RAD MONITOR FAILURE RM-90-266A 1 1E6 CPS N/A YES Remotes Description Event Severity Delay Initial set OG06 Bypass FCV 28 Post Treatment Hi

-Hi-Hi Rad Isol 2 N/A N/A BYP Overrides Description Event Severity Delay Initial set ZAORI9014A RX BLDG AREA RAD 1 2.5 N/A YES ZAORI9017A RX BLDG AREA RAD 1 2.6 N/A YES ZAORM90265A 90-265 METER UPSCALE 1 6.0 N/A YES ZAORM90266A 90-266 METER UPSCALE 1 6.0 N/A YES ZAORR90135R1 90-135 RECORDER UPSCALE PEN 1 1 6.0 N/A YES ZAORR90135R2 90-135 RECORDER UPSCALE PEN 2 1 6.0 N/A YES ZLORM90265A_1 90-265 DRAW LITE 1 N/A N/A YES Job Performance Measure (JPM) 4 ZLORM90265A_2 90-265 DRAW LITE 1 N/A N/A YES ZLORM90265A_3 90-265 DRAW LITE 1 N/A N/A YES ZLORM90265A_4 90-265 DRAW LITE 1 N/A N/A YES ZLORM90266A_1 90-265 DRAW LITE 1 N/A N/A YES ZLORM90266A_2 90-265 DRAW LITE 1 N/A N/A YES ZLORM90266A_3 90-265 DRAW LITE 1 N/A N/A YES ZLORM90266A_4 90-265 DRAW LITE 1 N/A N/A YES XA553A5 OG PRETREAT RAD HI 1 N/A N/A YES XA553A6 STACK GAS RAD HI HI 1 N/A N/A YES XA553A7 MSL RAD HI 1 N/A N/A YES XA553A13 STACK GAS RAD HI 1 N/A N/A YES XA553A27 MSL RAD HI HI 1 N/A N/A YES XA554C26 CARBON BED VAULT RAD HI 1 N/A N/A YES XA554C27 OG ANNUAL RELEASE LIMIT EXCEEDED 1 N/A N/A YES XA554C33 OG POST TREAT RAD HI 1 N/A N/A YES XA554C34 OG POST TREAT RAD HI HI 1 N/A N/A YES XA554C35 OG POST TREAT RAD HI HIHI 1 N/A N/A YES ZDIHS6628 66-28 VALVE CLOSED 1 N/A N/A YES ZAORR90265R1 90-265 RECORDER UPSCALE PEN 1 1 6.0 N/A YES ZAORR90265R2 90-265 RECORDER UPSCALE PEN 2 1 6.0 N/A YES ZAORR90160R1 OG PRETREAT RECORDER UPSCALE 1 -2.0 N/A YES XA554B2 RWCU FILTER INLET CNDT HIGH 1 N/A N/A YES Schedule File(s):

JPM 190 U2 OG Post treat Rad HI HIHI

Job Performance Measure (JPM) 5 IN-SIMULATOR:

I will explain the initial conditions and state the task to be performed. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's Correct". (OR "That's Incorrect", if applicable). When you have completed your assigned task, you will say, "my task is complete" and I will acknowledge that your task is complete.

INITIAL CONDITIONS:

You are the Unit 2 Operator. Unit 2 is at 100% power.

INITIATING CUE:

The Unit Supervisor directs you to respond to a n OFF-GAS POST TREATMENT RADIATION HI

-HI-HI annunciator, 2

-XA-55-4C, window 35.

Job Performance Measure (JPM) 6 START TIME STEP / STANDARD SAT / UNSAT Performance Step 1: When directed, identify/obtain copy of ARP 4C, window 35.

Standard:

Obtains copy of 2

-ARP-9-4C, window 35 SAT UNSAT N/A Examiner Note: Candidate may recognize the annunciator as an entry condition and go directly to 2

-AOI-66-2. In that event, continue at Performance Step

5. Performance Step 2:

2-ARP-9-4C window 35 Operator Action:

A. VERIFY alarm condition on the following OFFGAS POST-TREATMENT RADIATION recorder, 2-RR-90-265 on Panel 2 2. OG POST-TREATMENT CHAN A RAD MON RTMR radiationmonitor, 2

-RM-90-266A on Panel 2 10. OG POST-TREATMENT CHAN B RAD MON RTMR radiationmonitor, 2

-RM-90-265A on Panel 2 10. Standard: Verified alarm condition on 2

-RR-90-265 and 2-RM-265/266. SAT UNSAT N/A Performance Step 3: B. VERIFY OFF-GAS SYSTEM ISOLATION VALVE, 2

-FCV-66-28 has the Mechanical Restraint DISENGAGED and 2-FCV-66-28 isCLOSED.

Standard: Takes handswitch 2-FCV-66-28 to close and observes green light illuminated and red light out.

Critical Step SAT UNSAT N/A Cue: If asked, the Offgas Isolation Valve, 2

-FCV-66-28 is NOT mechanically restrained.

Job Performance Measure (JPM) 7 STEP / STANDARD SAT / UNSAT Performance Step 4: C. REFER to 2-AOI-66-2, Off-gas Post-treatment Radiation Hi

-Hi-Hi Standard: Refers to 2-AOI-66-2, Off-gas Post-treatment Radiation Hi

-Hi-Hi S AT UNSAT N/A Performance Step 5: 2-AOI-66-2 4.0 OPERATOR ACTIONS 4.1 Immediate Actions

[1] IF scram has not occurred, THEN PERFORM the following:

[1.1] IF core flow is above 60%, THEN REDUCE core flow to between 50

-60%. Standard: Reduced core flow to between 50

-60% with recirc system.

Critical Step SAT UNSAT N/A Performance Step 6: [1.2] MANUALLY SCRAM the Reactor. (Reference 2

-AOI-100-1). Standard: Depresses both SCRAM Pushbuttons Places mode switch in shutdown Verifies All Rods in Performs a Scram Announcement o Rx Mode Switch Position: Shutdown o Rod Position: All Full In o Reactor Water Level ____ & Trend ___ o Reactor Pressure ____ & Trend ___

o MSIV Position: OPEN o Rx Power: <5%

Critical Step SAT UNSAT N/A Examiner Note

The scram report and referring to 2

-AOI-100-1 are not considered critical.

Job Performance Measure (JPM) 8 STEP / STANDARD SAT / UNSAT CUE: Proceed with subsequent actions of 2

-AOI-66-2, Off-gas Post-treatment Radiation Hi

-Hi-Hi Performance Step 7: 4.2 Subsequent Actions

[1] IF OFFGAS SYSTEM ISOLATION VALVE, 2

-FCV-066-0028has been mechanically restrained open due to plant conditionsTHEN DISENGAGE 2-FCV-066-0028 mechanical restraint by rotating the restraining handwheel fully in the counterclockwisedirection, locally at the Stack. (Otherwise N/A) Standard: Verifies that 2

-FCV-066-0028 in NOT mechanically restrained.

SAT UNSAT N/A Cue: 2-FCV-066 is NOT mechanically restrained.

Performance Step 8: [2] VERIFY CLOSED OFFGAS SYSTEM ISOLATION VALVE, 2-FCV-66-28 on Panel 2 53 or locally.

Standard:

Verifies 2-FCV-66-28 is closed at panel 9

-53 by Verifying RED light above handswitch extinguished and GREEN light above handswitch illuminated. (May have already verified valve closed from the ARP).

Critical Step SAT UNSAT N/A Examiner Note: May have already verified valve closed from the ARP Performance Step 9:

[3] MONITOR area radiation levels at Panel: 2 11. Standard:

Monitored radiation levels at Panel 9

-11. SAT UNSAT N/A Cue: Another operator will monitor and evaluate Area Radiation Levels.

Job Performance Measure (JPM) 9 STEP / STANDARD SAT / UNSAT Performance Step 10: [4] REFER TO EPIP-1 for emergency classification level and response. Standard; Notifies SM to implement EPIP

-1. SAT UNSAT N/A Cue: The Shift Manager is implementing the EPIPs as needed.

Performance Step 11:

[5] MONITOR the following parameters:

A. MAIN STEAM LINE RADIATION, 2

-RR-90-135, Panel 2-9-2.

B. OFFGAS PRETREATMENT RADIATION 2

-RR-90-157, Pnl 2 2. C. OFFGAS POST-TREATMENT RADIATION 2RR

- 90-265, Pnl 2 2 D. STACK GAS RADIATION, 0

-RR-90-147, Unit 1 Panel 1-9-2. Standard; Monitors 90

-135, 157, and 265. Calls Unit 1 operator for a reading on 0-RR-90-147. SAT UNSAT N/A Cue: As Unit 1 Operator, Stack Gas Radiation, 0

-RR-90-147 is reading 5X10E6 cps.

Job Performance Measure (JPM) 10 STEP / STANDARD SAT / UNSAT Performance Step 12:

[6] IF after five minutes from scram the Offgas Post Treatment activity is not less than 6 x 10 E5 cps as indicated on OFFGASRADIATION recorder 2

-RR-90-266 on panel 2 2, THEN CLOSE all Main Steam Isolation Valves and Main Steam LineDrain Valves, 2

-FCV-1-55 and 2-FCV-1-56. Standard: Recognizes that the Off

-Gas Post Treatment activity is >6 X 10E 5 and closes all Main Steam Isolation Valves and Main Steam Line Drain Valves (2

-FCV-1-55/56) Critical Step SAT UNSAT N/A Cue: The Unit has been scrammed for 5 minutes.

Acknowledge closing of MSIVs.

Examiner Note:

Closing 1-55 and 1-56 is not considered critical.

Performance Step 13:

NOTE Placing additional Stack Dilution Air Fans in service should keep 0

-RM-90-147and 0-RM-90-148 on scale.

[7] PLACE STACK DILUTION FAN SEL control switch, 2-XS-66-29, Panel 2-9-8, in OFF.

[8] START standby STACK DILUTION FAN 2B(2A) using controlswitch, 2

-HS-66-31A(29A), Panel 2 8. Standard:

Places 2-XS-66-29 in OFF and Starts standby Stack Dilution fan 2B, using 2

-HS-66-31A SAT UNSAT N/A Cue: That completes this task.

STOP TIME _______ END OF TASK

Job Performance Measure (JPM) 11 Provide to Applicant IN-SIMULATOR:

I will explain the initial conditions and state the task to be performed. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's Correct". (OR "That's Incorrect", if applicable). When you have completed your assigned task, you will say, "my task is complete" and I will acknowledge that your task is complete.

INITIAL CONDITIONS:

You are the Unit 2 Operator. Unit 2 is at 100% power.

INITIATING CUE:

The Unit Supervisor directs you to respond to a n OFF-GAS POST TREATMENT RADIATION HI

-HI-HI annunciator, 2

-XA-55-4C, window 35.

Job Performance Measure (JPM) 1 SITE: BFN JPM TITLE:

Respond to Off

-Gas Post Treatment Radiation HI

-HI-HI JPM NUMBER:

190 U3 REVISION: 0 TASK APPLICABILITY:

SRO STA UO NAUO TASK NUMBER / TASK TITLE(S):

U-066-AB-02 -Respond to Off

-Gas Post Treatment Radiation Hi

-Hi-Hi K/A RATINGS:

RO 2.9 SRO 3.2 K/A STATEMENT:

271000 Offgas System

A2.16;Ability to (a) predict the impacts of the following on the OFFGAS SYSTEM ; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those abnormal conditions or operations: Loss of offgas system loop seals (2.9/3.2) RELATED PRA INFORMATION:

N/A SAFETY FUNCTION:

9 EVALUATION LOCATION:

In-Plant Simulator Control Room Lab Other - List APPLICABLE METHOD OF TESTING: Discussion Simulate/Walkthrough Perform TIME FOR COMPLETION: N/A TIME CRITICAL (Y/N) ALTERNATE PATH (Y/N)

Developed by:

Developer Date (Ensure validator is briefed on exam security per NPG

-SPP-17.8.1) (See JPM Validation Checklist in NPG

-SPP-17.8.2) Validated by:

Approved by:

Validator Date Approved by:

Site Training Management Date Site Training Program Owner Date N Y Job Performance Measure (JPM) 2 OPERATOR: ________________________________

JPM Number:

190 RO SRO DATE: _______

TASK STANDARD:

Respond to Off

-Gas Post Treatment Radiation HI

-HI-HI per 3-AOI-66-2 and/or 3-ARP-9-4C/35 PRA: NA REFERENCES/PROCEDURES NEEDED:

3-AOI-66-2, 3-ARP-9-4C/35 VALIDATION TIME: 15 Minutes PERFORMANCE TIME:

COMMENTS:

Additional comment sheets attached? YES ___ NO ___

RESULTS: SATISFACTORY ____

UNSATISFACTORY ____

(Retain entire JPM for records)

SIGNATURE: ___________________________

DATE: __________

EXAMINER Job Performance Measure (JPM) 3 SIMULATOR SETUP IC 28 Exam IC 28 8 Console Operator Instructions

1. Reset to IC 28
2. Fire Manual Trigger 2 3. Fire Manual Trigger 1
4. Station 2 nd operator to respond to alarms Malfunctions Description Event Severity Delay Initial set TH23 FUEL CLADDING DAMAGE 1 50 N/A YES RM14C OFFGAS RAD MONITOR FAILURE RM-90-265A 1 1E6 CPS N/A YES RM14D OFFGAS RAD MONITOR FAILURE RM-90-266A 1 1E6 CPS N/A YES Remotes Description Event Severity Delay Initial set OG06 Bypass FCV 28 Post Treatment Hi

-Hi-Hi Rad Isol 2 N/A N/A BYP Overrides Description Event Severity Delay Initial set ZAORI9014A RX BLDG AREA RAD 1 2.5 N/A YES ZAORI9017A RX BLDG AREA RAD 1 2.6 N/A YES ZAORM90265A 90-265 METER UPSCALE 1 6.0 N/A YES ZAORM90266A 90-266 METER UPSCALE 1 6.0 N/A YES ZAORR90135R1 90-135 RECORDER UPSCALE PEN 1 1 6.0 N/A YES ZAORR90135R2 90-135 RECORDER UPSCALE PEN 2 1 6.0 N/A YES ZLORM90265A_1 90-265 DRAW LITE 1 N/A N/A YES ZLORM90265A_2 90-265 DRAW LITE 1 N/A N/A YES Job Performance Measure (JPM) 4 ZLORM90265A_3 90-265 DRAW LITE 1 N/A N/A YES ZLORM90265A_4 90-265 DRAW LITE 1 N/A N/A YES ZLORM90266A_1 90-265 DRAW LITE 1 N/A N/A YES ZLORM90266A_2 90-265 DRAW LITE 1 N/A N/A YES ZLORM90266A_3 90-265 DRAW LITE 1 N/A N/A YES ZLORM90266A_4 90-265 DRAW LITE 1 N/A N/A YES XA553A5 OG PRETREAT RAD HI 1 N/A N/A YES XA553A6 STACK GAS RAD HI HI 1 N/A N/A YES XA553A7 MSL RAD HI 1 N/A N/A YES XA553A13 STACK GAS RAD HI 1 N/A N/A YES XA553A27 MSL RAD HI HI 1 N/A N/A YES XA554C26 CARBON BED VAULT RAD HI 1 N/A N/A YES XA554C27 OG ANNUAL RELEASE LIMIT EXCEEDED 1 N/A N/A YES XA554C33 OG POST TREAT RAD HI 1 N/A N/A YES XA554C34 OG POST TREAT RAD HI HI 1 N/A N/A YES XA554C35 OG POST TREAT RAD HI HIHI 1 N/A N/A YES ZDIHS6628 66-28 VALVE CLOSED 1 N/A N/A YES ZAORR90265R1 90-265 RECORDER UPSCALE PEN 1 1 6.0 N/A YES ZAORR90265R2 90-265 RECORDER UPSCALE PEN 2 1 6.0 N/A YES ZAORR90160R1 OG PRETREAT RECORDER UPSCALE 1 -2.0 N/A YES XA554B2 RWCU FILTER INLET CNDT HIGH 1 N/A N/A YES Schedule File(s): JPM 190 U3 OG Post treat Rad HI HIHI

Job Performance Measure (JPM) 5 IN-SIMULATOR:

I will explain the initial conditions and state the task to be performed. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's Correct". (OR "That's Incorrect", if applicable). When you have completed your assigned task, you will say, "my task is complete" and I will acknowledge that your task is complete.

INITIAL CONDITIONS:

You are the Unit 3 Operator. Unit 3 is at 100% power.

INITIATING CUE:

The Unit Supervisor directs you to respond to a n OFF-GAS POST TREATMENT RADIATION HI

-HI-HI annunciator, 3-XA-55-4C, window 35.

Job Performance Measure (JPM) 6 START TIME STEP / STANDARD SAT / UNSAT Performance Step 1: When directed, identify/obtain copy of ARP 4C, window 35.

Standard:

Obtains copy of 3-ARP-9-4C, window 35 SAT UNSAT N/A Examiner Note: Candidate may recognize the annunciator as an entry condition and go directly to 3-AOI-66-2. In that event, continue at Performance Step

5. Performance Step 2:

3-ARP-9-4C window 35 Operator Action:

A. VERIFY alarm condition on the following OFFGAS POST-TREATMENT RADIATION recorder, 3-RR-90-265 on Panel 3-9-2. OG POST-TREATMENT CHAN A RAD MON RTMR radiationmonitor, 3-RM-90-266A on Panel 3-9-10. OG POST-TREATMENT CHAN B RAD MON RTMR radiationmonitor, 3-RM-90-265A on Panel 3-9-10. Standard: Verified alarm condition on 3-RR-90-265 and 3-RM-265/266. SAT UNSAT N/A Performance Step 3: B. VERIFY OFF-GAS SYSTEM ISOLATION VALVE, 3-FCV-66-28 has the Mechanical Restraint DISENGAGED and 3-FCV-66-28 isCLOSED.

Standard: Takes handswitch 3-FCV-66-28 to close and observes green light illuminated and red light out.

Critical Step SAT UNSAT N/A Cue: If asked, the Offgas Isolation Valve, 3-FCV-66-28 is NOT mechanically restrained.

Job Performance Measure (JPM) 7 STEP / STANDARD SAT / UNSAT Performance Step 4: C. REFER to 3-AOI-66-2 , Off-gas Post-treatment Radiation Hi

-Hi-Hi Standard: Refers to 3-AOI-66-2, Off-gas Post-treatment Radiation Hi

-Hi-Hi SAT UNSAT N/A Performance Step 5: 3-AOI-66-2 4.0 OPERATOR ACTIONS 4.1 Immediate Actions

[1] IF scram has not occurred, THEN PERFORM the following:

[1.1] IF core flow is above 60%, THEN REDUCE core flow to between 50

-60%. Standard: Reduced core flow to between 50

-60% with recirc system.

Critical Step SAT UNSAT N/A Performance Step 6: [1.2] MANUALLY SCRAM the Reactor. (Reference 3

-AOI-100-1). Standard: Depresses both SCRAM Pushbuttons Places mode switch in shutdown Verifies All Rods in Performs a Scram Announcement o Rx Mode Switch Position: Shutdown o Rod Position: All Full In o Reactor Water Level ____ & Trend ___ o Reactor Pressure ____ & Trend ___

o MSIV Position: OPEN o Rx Power: <5%

Critical Step SAT UNSAT N/A Examiner Note

The scram report and referring to 3-AOI-100-1 are not considered critical.

Job Performance Measure (JPM) 8 STEP / STANDARD SAT / UNSAT CUE: Proceed with subsequent actions of 3

-AOI-66-2, Off-gas Post-treatment Radiation Hi

-Hi-Hi Performance Step 7: 4.2 Subsequent Actions

[1] IF OFFGAS SYSTEM ISOLATION VALVE, 3-FCV-066-0028has been mechanically restrained open due to plant conditionsTHEN DISENGAGE 3-FCV-066-0028 mechanical restraint by rotating the restraining handwheel fully in the counterclockwisedirection, locally at the Stack. (Otherwise N/A) Standard: Verifies that 3-FCV-066-0028 in NOT mechanically restrained.

SAT UNSAT N/A Cue: 3-FCV-066 is NOT mechanically restrained.

Performance Step 8: [2] VERIFY CLOSED OFFGAS SYSTEM ISOLATION VALVE, 3-FCV-66-28 on Panel 3-9-53 or locally.

Standard:

Verifies 3-FCV-66-28 is closed at panel 9

-53 by Verifying RED light above handswitch extinguished and GREEN light above handswitch illuminated. (May have already verified valve closed from the ARP).

Critical Step SAT UNSAT N/A Examiner Note: May have already verified valve closed from the ARP Performance Step 9:

[3] MONITOR area radiation levels at Panel:

3-9-11. Standard:

Monitored radiation levels at Panel 9

-11. SAT UNSAT N/A Cue: Another operator will monitor and evaluate Area Radiation Levels.

Job Performance Measure (JPM) 9 STEP / STANDARD SAT / UNSAT Performance Step 10: [4] REFER TO EPIP-1 for emergency classification level and response. Standard; Notifies SM to implement EPIP

-1. SAT UNSAT N/A Cue: The Shift Manager is implementing the EPIPs as needed.

Performance Step 11:

[5] MONITOR the following parameters:

A. MAIN STEAM LINE RADIATION, 3-RR-90-135, Panel 3-9-2.

B. OFFGAS PRETREATMENT RADIATION 3-RR-90-157, Pnl 3-9-2. C. OFFGAS POST-TREATMENT RADIATION 3-RR- 90-265, Pnl 3-9-2 D. STACK GAS RADIATION, 0

-RR-90-147, Unit 1 Panel 1-9-2. Standard; Monitors 90

-135, 157, and 265. Calls Unit 1 operator for a reading on 0-RR-90-147. SAT UNSAT N/A Cue: As Unit 1 Operator, Stack Gas Radiation, 0

-RR-90-147 is reading 5X10E6 cps.

Job Performance Measure (JPM) 10 STEP / STANDARD SAT / UNSAT Performance Step 12:

[6] IF after five minutes from scram the Offgas Post Treatment activity is not less than 6 x 10 E5 cps as indicated on OFFGASRADIATION recorder 3-RR-90-265 on panel 3-9-2, THEN CLOSE all Main Steam Isolation Valves and Main Steam LineDrain Valves, 3-FCV-1-55 and 3-FCV-1-56. Standard: Recognizes that the Off

-Gas Post Treatment activity is >6 X 10E 5 and closes all Main Steam Isolation Valves and Main Steam Line Drain Valves (3-FCV-1-55/56) Critical Step SAT UNSAT N/A Cue: The Unit has been scrammed for 5 minutes.

Acknowledge closing of MSIVs.

Examiner Note: Closing 1-55 and 1-56 is not considered critical.

Performance Step 13:

NOTE Placing additional Stack Dilution Air Fans in service should keep 0

-RM-90-147and 0-RM-90-148 on scale.

[7] PLACE STACK DILUTION FAN SEL control switch, 3-XS-66-29, Panel 3-9-8, in OFF.

[8] START standby STACK DILUTION FAN 3 B(3A) using controlswitch, 3-HS-66-31A(29A), Panel 3-9-8. Standard:

Places 3-XS-66-29 in OFF and Starts standby Stack Dilution fan 3B, using 3-HS-66-31A SAT UNSAT N/A Cue: That completes this task.

STOP TIME ________

END OF TASK

Job Performance Measure (JPM) 11 Provide to Applicant IN-SIMULATOR:

I will explain the initial conditions and state the task to be performed. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's Correct". (OR "That's Incorrect", if applicable). When you have completed your assigned task, you will say, "my task is complete" and I will acknowledge that your task is complete.

INITIAL CONDITIONS:

You are the Unit 3 Operator. Unit 3 is at 100% power.

INITIATING CUE:

The Unit Supervisor directs you to respond to a n OFF-GAS POST TREATMENT RADIATION HI

-HI-HI annunciator, 3-XA-55-4C, window 35.

Job Performance Measure (JPM) 1 SITE: BFN JPM TITLE:

AUTOMATIC START FAILURE OF A & C FIRE PUMP S JPM NUMBER:

673 REVISION: 0 TASK APPLICABILITY:

SRO STA UO NAUO TASK NUMBER / TASK TITLE(S):

U-026-NO-01/ MONITOR AUTO START OF FIRE PUMP K/A RATINGS:

RO: 3.4 SRO: 3.4 K/A No. &STATEMENT:

286000 Fire Protection System A2.08; Ability to (a) predict the impacts of the following on the FIRE PROTECTION SYSTEM; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those abnormal conditions or operations: Failure to actuate when required RELATED PRA INFORMATION:

Risk Significant SAFETY FUNCTION:

8 EVALUATION LOCATION:

In-Plant Simulator Control R oom Lab Other - List APPLICABLE METHOD OF TESTING: Discussion Simulate/Walkthrough Perform TIME FOR COMPLETION: NA TIME CRITICAL (Y/N)

ALTERNATE PATH (Y/N)

Developed by: Developer Date (Ensure validator is briefed on exam security per NPG

-SPP-17.8.1) (See JPM Validation Checklist in NPG

-SPP-17.8.2) Validated by:

Approved by:

Validator Date Approved by:

Site Training Management Date Site Training Program Owner Date N Y Job Performance Measure (JPM) 2 OPERATOR: ________________________________

JPM Number: _673 A___ RO SRO DATE: _______

TASK STANDARD:

Perform operations necessary to manually start A, B and C Fire Pumps.

Operator Fundamental evaluated:

OF-1 Monitoring plant indications and conditions closely.

OF-5 Having a solid understanding of plant design, engineering principles, and sciences.

PRA: NA REFERENCES/PROCEDURES NEEDED:

0-OI-26 VALIDATIONTIME:__15 min PERFORMANCE TIME:

COMMENTS:

Additional comment sheets attached? YES ___ NO ___

RESULTS: SATISFACTORY ____

UNSATISFACTORY ____

IF UNSAT results are obtained THEN Retain entire JPM for records.(Otherwise just retain this page.

)

SIGNATURE: ___________________________

DATE: __________

EXAMINER Job Performance Measure (JPM) 3 Revision Summary Rev No. Effective Date Pages Affected Description 0 04/28/15 All Initial issue

Job Performance Measure (JPM) 4 IN-PLANT: I will explain the initial conditions and state the task to be performed. ALL STEPS WILL BE SIMULATED. Do NOT operate any plant equipment. Touch STAAR may be carried out to the point of touching a label. If it becomes necessary to physically touch a control switch, use a non-conductive pointing device. I will provide initiating cues and indicate any steps to be discussed. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's correct" (or That's incorrect", if applicable). When you have completed your assigned task, you will say, "My task is complete" and I will acknowledge that your task is complete.

INITIAL CONDITIONS:

You are an Operator on Unit 1. The Reactor Power at 70%

A Fire Exists on B Reactor Feed Pump Lube Oil Reservoir. Fire OPS has been dispatched to the scene.

Fire Pump B Tagged Out for Maintenance A and C Fire Pumps failed to Auto Start.

INITIATING CUES

The US directs you to start A and C Electric Fire Pumps per 0

-OI-26 section 5.

4.

CAUTION: DO NOT OPERATE ANY PLANT EQUIPMENT!

Job Performance Measure (JPM) 5 START TIME: STEP / STANDARD SAT / UNSAT Step 1: [1] PLACE the FIRE PUMP A TRANSFER switch, 0

-XS-26-1 in EMERGENCY position, at the respective switchgear.

Pump Board Compt A 4160V Shutdown Bd A 11 C 4160V Shutdown Bd C 10 Standard: Simulates placing FIRE PUMP A TRANSFER switch 0

-XS-26-3 in EMERGENCY position at 4160 Shutdown Board A, Compartment

11 Critical Step

SAT UNSAT N/A CUE: FIRE PUMP A TRANSFER switch 0

-XS-26-1 is in the EMERGENCY position Step 2: [2] CLOSE the breaker by placing the FIRE PUMP A CONTROL switch, 0-HS-26-1C to CLOSE.

Standard: Simulates placing FIRE PUMP A CONTROL switch, 0

-HS-26-1C to CLOSE position.

Critical Step

SAT UNSAT N/A CUE: Breaker Red indicating light is ON with Green and Amber lights are OFF. Breaker Flag indicates CLOSED with Charging Spring indicating CHARGED.

Step 3:

[3] CHECK pump ammeter at breaker indicates between 25 and 40 amps. Standard VERIFIES pump ammeter at breaker indicates between 25 and 40 amps. SAT UNSAT N/A CUE: FIRE PUMP A ammeter at breaker indicates 30 amps.

Job Performance Measure (JPM) 6 Step 4: [4] PLACE the NORM/EMERG Switch in NORMAL.

Standard PLACES the NORM/EMERG Switch in NORMAL for FIRE PUMP A. SAT UNSAT N/A CUE: FIRE PUMP A NORM/EMERG Switch is in NORMAL Step 5:

[1] PLACE the FIRE PUMP C TRANSFER switch, 0

-XS-26-3 in EMERGENCY position, at the respective switchgear.

Pump Board Compt A 4160V Shutdown Bd A 11 C 4160V Shutdown Bd C 10 Standard: Simulates placing FIRE PUMP C TRANSFER switch 0

-XS-26-3 in EMERGENCY position at 4160 Shutdown Board C, Compartment

10 Critical Step

SAT UNSAT N/A CUE: FIRE PUMP C TRANSFER switch 0

-XS-26-3 is in the EMERGENCY position Step 5:

[2] CLOSE the breaker by placing the FIRE PUMP C CONTROL switch, 0-HS-26-3C to CLOSE.

Standard: Simulates placing FIRE PUMP C CONTROL switch, 0

-HS-26-3C to CLOSE position.

Critical Step

SAT UNSAT N/A CUE: Breaker Red indicating light is ON with Green and Amber lights are OFF. Breaker Flag indicates CLOSED with Charging Spring indicating CHARGED.

Job Performance Measure (JPM) 7 Step 6: [3] CHECK pump ammeter at breaker indicates between 25 and 40 amps. Standard VERIFIES pump ammeter at breaker indicates between 25 and 40 amps. SAT UNSAT N/A CUE: FIRE PUMP C ammeter at breaker indicates 30 amps.

Step 7:

[4] PLACE the NORM/EMERG Switch in NORMAL.

Standard PLACES the NORM/EMERG Switch in NORMAL for FIRE PUMP C. SAT UNSAT N/A CUE: FIRE PUMP C NORM/EMERG Switch is in NORMAL and this completes the JPM. Termination Criteria: When two Fire Pumps are in service the JPM is complete.

STOP TIME:

Job Performance Measure (JPM) 8 Provide to Applicant IN-PLANT: I will explain the initial conditions and state the task to be performed. ALL STEPS WILL BE SIMULATED. Do NOT operate any plant equipment. Touch STAAR may be carried out to the point of touching a label. If it becomes necessary to physically touch a control switch, use a non-conductive pointing device. I will provide initiating cues and indicate any steps to be discussed. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's correct" (or That's incorrect", if applicable). When you have completed your assigned task, you will say, "My task is complete" and I will acknowledge that your task is complete.

INITIAL CONDITIONS:

You are an Operator on Unit 1. The Reactor Power at 70%

A Fire Exists on B Reactor Feed Pump Lube Oil Reservoir. Fire OPS has been dispatched to the scene.

Fire Pump B Tagged Out for Maintenance A and C Fire Pumps failed to Auto Start.

INITIATING CUES

The US directs you to start A and C Electric Fire Pumps per 0

-OI-26 section 5.2.

CAUTION: DO NOT OPERATE ANY PLANT EQUIPMENT!

Job Performance Measure (JPM) 1 SITE: BFN JPM TITLE:

ALIGNING EMERGENCY EECW MAKEUP TO SPENT FUEL POOL JPM NUMBER:

674 REVISION: 0 TASK APPLICABILITY:

SRO STA UO NAUO TASK NUMBER / TASK TITLE(S):

U-000-EM-95/ Make-Up To SFP By EECW With Fire Hose (Internal Make

-Up) K/A RATINGS:

RO: 3.1 SRO: 3.3 K/A No. &STATEMENT:

233000 Fuel Pool Cooling and Clean

-up; A2.02; Ability to (a) predict the impacts of the following on the FUEL POOL COOLING AND CL EAN-UP ; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those abnormal conditions or operations:

Low pool level RELATED PRA INFORMATION:

Risk Significant SAFETY FUNCTION:

9 EVALUATION LOCATION: In-Plant Simulator Control R oom Lab Other - List APPLICABLE METHOD OF TESTING: Discussion Simulate/Walkthrough Perform TIME FOR COMPLETION: NA TIME CRITICAL (Y/N)

ALTERNATE PATH (Y/N)

Developed by:

Developer Date (Ensure validator is briefed on exam security per NPG

-SPP-17.8.1) (See JPM Validation Checklist in NPG

-SPP-17.8.2) Validated by:

Approved by:

Validator Date Approved by: Site Training Management Date Site Training Program Owner Date N N Job Performance Measure (JPM) 2 OPERATOR: ________________________________

JPM Number: __674__ RO SRO DATE: _______

TASK STANDARD:

Perform operations necessary to align either North or South Headers of EECW to Unit 2 Spent Fuel Pool.

Operator Fundamental evaluated:

OF-2 Controlling plant evolutions and indications closely.

OF-5 Having a solid understanding of plant design, engineering principles, and sciences.

PRA: NA REFERENCES/PROCEDURES NEEDED:

2-AOI-78-1 VALIDATION TIME: 25 min PERFORMANCE TIME:

COMMENTS:

Additional comment sheets attached? YES ___ NO ___

RESULTS: SATISFACTORY ____

UNSATISFACTORY ____

IF UNSAT results are obtained THEN Retain entire JPM for records.(Otherwise just retain this page.

)

SIGNATURE: ___________________________

DATE: __________

EXAMINER Job Performance Measure (JPM) 3 Revision Summary Rev No. Effective Date Pages Affected Description 0 09/01/15 All Initial issue

Job Performance Measure (JPM) 4 IN-PLANT: I will explain the initial conditions and state the task to be performed. ALL STEPS WILL BE SIMULATED. Do NOT operate any plant equipment. Touch STAAR may be carried out to the point of touching a label. If it becomes necessary to physically touch a control switch, use a non-conductive pointing device. I will provide initiating cues and indicate any steps to be discussed. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's correct" (or That's incorrect", if applicable). When you have completed your assigned task, you will say, "My task is complete" and I will acknowledge that your task is complete.

INITIAL CONDITIONS:

You are an Operator on Unit

2. The Reactor is in cold shutdown The Unit 2 Spent Fuel Pool water level is lowering. Fire Protection is available to assist

INITIATING CUES

The Unit Supervisor directs you to align EECW Makeup to Unit 2 Spent Fuel Pool per 2-AOI-78-1 Attachment 2 starting at step [3]

.

CAUTION: DO NOT OPERATE ANY PLANT EQUIPMENT!

Job Performance Measure (JPM) 5 START TIME: STEP / STANDARD SAT / UNSAT Step 1: [3] UNLOCK and OPEN the following valves:

NORTH HDR SPLY TO EMER FUEL POOL MU, 1

-SHV-067-0792. SOUTH HDR SPLY TO EMER FUEL POOL MU, 1

-SHV-067-0793. Standard: Simulates opening NORTH HDR SPLY TO EMER FUEL POOL MU, 1-SHV-067-0792 and SOUTH HDR SPLY TO EMER FUEL POOL MU, 1

-SHV-067-0793 by demonstrating opening each valve cou nter-clockwise and breaking seal

. Critical Step SAT UNSAT N/A CUE: NORTH HDR SPLY TO EMER FUEL POOL MU, 1

-SHV-067-0792 is OPEN and SOUTH HDR SPLY TO EMER FUEL POOL MU, 1

-SHV-067-0793 is OPEN Located in stairwell between elevation 565 ft and 593 ft.

Hoses are already connected, no tools required.

NOTES 1) Hose straps are staged at the hoses at the following locations:

Unit 1/Unit 2 Reactor Bldg Stairwell, El. 621', R6 U Line (placed on hose to carry weight of charged hose lines).

Hose reel on the Refuel Floor, El. 664', R6 U Line (for use in securing hose ends as needed).

2) Additional hose is stored in a cabinet located in Unit 1/Unit 2 Elevator Room, Reactor Bldg, El 595'.

CAUTION Performance of this attachment will degrade water chemistry in the Spent Fuel Pool.

Job Performance Measure (JPM) 6 STEP / STANDARD SAT / UNSAT Step 3: [4] VERIFY charged hoses in stairwell are not obstructing stairway access and/or kinked.

[4.1] ADJUST hose straps, as necessary.

Standard: VERIFIES hoses in stairwell are not kinked SAT UNSAT N/A Note to Examiner:

Hoses are already run along the stairwell. Applicant should verify hoses not kinked and connected.

Step 4: [5] VERIFY hose connected from NORTH HDR SPLY TO EMER FUEL POOL MU, 1

-SHV-067-0796 and route to Unit 2 Spent Fuel Pool (El 664', Refuel Floor, R6

-U Line). Standard: VERIFY hose connected from NORTH HDR SPLY TO EMER FUEL POOL MU, 1

-SHV-067-0796 and route to Unit 2 Spent Fuel Pool (El 664', Refuel Floor, R6

-U Line). Critical Step SAT UNSAT N/A Note to Examiner:

Hoses will be simulated routed to Unit 2 Spent Fuel Pool. Any route to the Unit 2 Spent Fuel Pool is acceptable.

Hoses are already connected, no tools required.

Location: Refuel Floor Elevation 664 ft, R U Line.

Step 5: [6] VERIFY hose connected from SOUTH HDR SPLY TO EMER FUEL POOL MU, 1

-SHV-067-0797 and route to Unit 2 Spent Fuel Pool (El 664', Refuel Floor, R6

-U Line) Standard: VERIFY hose connected from SOUTH HDR SPLY TO EMER FUEL POOL MU, 1

-SHV-067-0797 and route to Unit 2 Spent Fuel Pool (El 664', Refuel Floor, R6

-U Line) Critical Step SAT UNSAT N/A Job Performance Measure (JPM) 7 STEP / STANDARD SAT / UNSAT Note to Examiner:

Hoses will be simulated routed to Unit 2 Spent Fuel Pool. Any route to the Unit 2 Spent Fuel Pool is acceptable.

Hoses are already connected, no tools required.

Location: Refuel Floor Elevation 664 ft, R U Line.

Step 6: [7] VERIFY OPEN the following valves (El 664', Refuel Floor, R6 U Line):

NORTH HDR SPLY TO EMER FUEL POOL MU, 1

-SHV-067-0796. SOUTH HDR SPLY TO EMER FUEL POOL MU, 1

-SHV-067-0797. Standard: Simulates opening NORTH HDR SPLY TO EMER FUEL POOL MU, 1-SHV-067-0796 and SOUTH HDR SPLY TO EMER FUEL POOL MU, 1

-SHV-067-0797 by demonstrating opening each valve cou nter-clockwise.

Critical Step SAT UNSAT N/A CUE: NORTH HDR SPLY TO EMER FUEL POOL MU, 1

-SHV-067-0796 is OPEN and SOUTH HDR SPLY TO EMER FUEL POOL MU, 1

-SHV-067-0797 is OPEN Location: Refuel Floor Elevation 664 ft, R U Line.

Step 7: [8] VERIFY charged hoses on the Refuel Floor are not kinked.

Standard: VERIFY charged hoses on the Refuel Floor are not kinked

SAT UNSAT N/A Termination Criteria: NORTH and SOUTH Header are aligned then the JPM is complete. State another operator will perform the remaining steps. STOP TIME:

Job Performance Measure (JPM) 8 Provide to Applicant IN-PLANT: I will explain the initial conditions and state the task to be performed. ALL STEPS WILL BE SIMULATED. Do NOT operate any plant equipment. Touch STAAR may be carried out to the point of touching a label. If it becomes necessary to physically touch a control switch, use a non-conductive pointing device. I will provide initiating cues and indicate any steps to be discussed. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's correct" (or That's incorrect", if applicable). When you have completed your assigned task, you will say, "My task is complete" and I will acknowledge that your task is complete.

INITIAL CONDITIONS:

You are an Operator on Unit 2. The Reactor is in cold shutdown The Unit 2 Spent Fuel Pool water level is lowering.

Fire Protection is available to assist INITIATING CUES

The Unit Supervisor directs you to align EECW Makeup to Unit 2 Spent Fuel Pool per 2-AOI-78-1 Attachment 2 starting at step [3].

CAUTION: DO NOT OPERATE ANY PLANT EQUIPMENT!

Job Performance Measure (JPM) 1 SITE: BFN JPM TITLE:

START UP AND SYNCHRONIZE UNIT 3 PREFERRED MMG SET JPM NUMBER:

307 REVISION: 6 TASK APPLICABILITY:

SRO STA UO NAUO TASK NUMBER / TASK TITLE(S):

S-57C-NO-04 K/A RATINGS:

RO: 2.5 SRO: 2.9 K/A No. &STATEMENT:

262002 Uninterruptable Power Supply (A.C./D.C.) A1.02; Ability to predict and/or monitor changes in parameters associated with operating the UNINTERRUPTABLE POWER SUPPLY (A.C./D.C.) controls including:

Motor generator outputs RELATED PRA INFORMATION:

Risk Significant SAFETY FUNCTION:

6 EVALUATION LOCATION:

In-Plant Simulator Control R oom Lab Other - List APPLICABLE METHOD OF TESTING: Discussion Simulate/Walkthrough Perform TIME FOR COMPLETION: NA TIME CRITICAL (Y/N)

ALTERNATE PATH (Y/N)

Developed by:

Developer Date (Ensure validator is briefed on exam security per NPG

-SPP-17.8.1) (See JPM Validation Checklist in NPG

-SPP-17.8.2) Validated by:

Approved by:

Validator Date Approved by:

Site Training Management Date Site Training Program Owner Date N N Job Performance Measure (JPM) 2 OPERATOR: ________________________________

JPM Number: _307___ RO SRO DATE: _______

TASK STANDARD:

Perform operations necessary to Start-up and synchronize Unit Preferred MMG Set Operator Fundamental evaluated:

OF-1 Monitoring plant indications and conditions closely.

OF-2 Controlling plant Evolutions Precisely PRA: NA REFERENCES/PROCEDURES NEEDED:

0-OI-57C VALIDATIONTIME: 25 min PERFORMANCE TIME:

COMMENTS:

Additional comment sheets attached? YES ___ NO ___

RESULTS: SATISFACTORY ____

UNSATISFACTORY ____

IF UNSAT results are obtained THEN Retain entire JPM for records.(Otherwise just retain this page.

)

SIGNATURE: ___________________________

DATE: __________

EXAMINER Job Performance Measure (JPM) 3 Revision Summary Rev No. Effective Date Pages Affected Description 1 10/26/94 A LL GENERAL REVISION 2 05/07/95 ALL GENERAL REVISION 3 10/15/97 ALL FORMAT, PROCEDURE REVISION, ADDED PLANT WORK EXPECTATIONS TOUCH STAAR, SAFETY, AND 3

-WAY COMM. 4 11/10/99 ALL PROCEDURE REVISION, FORMAT DOCUMENT 5 10/03/01 ALL PROCEDURE REVISION 6 04/28/15 ALL UPDATE TO NEW FORMAT

Job Performance Measure (JPM) 4 IN-PLANT: I will explain the initial conditions and state the task to be performed. ALL STEPS WILL BE SIMULATED. Do NOT operate any plant equipment. Touch STAAR may be carried out to the point of touching a label. If it becomes necessary to physically touch a control switch, use a non-conductive pointing device. I will provide initiating cues and indicate any steps to be discussed. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's correct" (or That's incorrect", if applicable). When you have completed your assigned task, you will say, "My task is complete" and I will acknowledge that your task is complete.

INITIAL CONDITIONS:

You are an Operator on Unit

3. The Reactor is in cold shutdown The Unit 3 Unit Preferred Bus is being supplied from the Unit 3 Unit Preferred Transformer in accordance with Section 8.1.

Maintenance has been completed on the Unit 3 Unit Preferred MMG Set.

INITIATING CUES

The SM directs you to start up and synchronize the Unit 3 Unit Preferred MMG Set as directed by 0-OI-57C per section 5.5 step 5.5[16

].

NOTE: PERFORMER WILL NEED GGMKA KEY.

CAUTION: DO NOT OPERATE ANY PLANT EQUIPMENT!

Job Performance Measure (JPM) 5 START TIME: STEP / STANDARD SAT / UNSAT Step 1:

[16] PLACE UNIT 3 MMG OPERATING MODE, 3

-HS-252-02AB in AUTO. Standard: VERIFIED/SIMULATED PLACING the Unit 3 MMG SET OPERATING MODE 3

-HS-252-02AB in AUTO.

Critical Step

SAT UNSAT N/A Cue: The Unit 3 MMG SET OPERATING MODE 3

-HS-252-02AB is in AUTO position.

Step 2:

[17] PLACE UNIT 3 MMG LOCAL

-REMOTE CONTROL, 3

-XS-252-02A in REMOTE.

Standard: SIMULATED PLACING the Unit 3 MMG SET LOCAL

-REMOTE CONTROL 3-XS-252-02A in the REMOTE position.

Critical Step

SAT UNSAT N/A Cue: The Unit 3 MMG SET LOCAL

-REMOTE CONTROL 3

-HS-252-02A is in the REMOTE position.

Step 3:

[18] PLACE UNIT 3 PFD SYSTEM GENERATOR SOURCE SYNC SWITCH SS

-7, 3-HS-252-03/SS-7 in ON. Standard: SIMULATED PLACING UNIT 3 PFD SYSTEM GENERATOR SOURCE SYNC SWITCH, SS

-7, 3-HS-252-03/SS-7, in the ON position. Critical Step

SAT UNSAT N/A NOTE Steps 5.5[16] through 5.5[26] are performed from Battery Board Room 2 UNIT PFD Sync. & Speed Control Panel.

Job Performance Measure (JPM) 6 STEP / STANDARD SAT / UNSAT Cue: The Unit 3 PFD SYSTEM GENERATOR SOURCE SYNC SS

-7, SWITCH 3-HS-252-003/SS-7 is in the ON position. Step 4:

[19] MATCH Incoming to Running AC volts using UNIT 3 MMG VOLTAGE ADJUST, 3

-HS-252-02CD. Standard: SIMULATED MANIPULATING UNIT 3 MMG VOLTAGE ADJUST, 3-HS 252-02CD until cued that incoming and running AC volts are matched. Critical Step

SAT UNSAT N/A Cue: INCOMING and RUNNING VOLTAGES are EQUAL at 122 Volts Step 5:

[20] ADJUST MMG speed using UNIT 3 MMG FREQUENCY ADJUST, 3-HS-252-02CF to obtain a synchroscope slowly rotating in the SLOW (counter-clockwise) direction (10 to 15 second rotation) as indicated on SYNCHROSCOPE, 0

-SCP-252-000A/B. Standard: SIMULATED ADJUSTING UNIT 3 MMG FREQUENCY ADJUST 3-HS-252-02CF speed control switch until cued that synchroscope indicator rotating in the counterclockwise direction at 10 to 15 seconds per revolution.

Critical Step

SAT UNSAT N/A Cue: State: "T he Initial Synchroscope indicator is standing still at the 5 o'clock position." Note: If student raises frequency the state: "Synchroscope indicator is rotating in the CLOCKWISE direction at 12 seconds per revolution."

Note: If student lowers frequency the state: "Synchroscope indicator is rotating in the COUNTERCLOCKWISE direction at 12 seconds per revolution."

NOTE MMG voltage and hertz are read as INCOMING.

Job Performance Measure (JPM) 7 STEP / STANDARD SAT / UNSAT Step 6:

[21] WHEN SYNCHROSCOPE, 0

-SCP-252-000A/B is 5 minutes prior to 12 o'clock, in the SLOW counter

-clockwise direction, THEN PERFORM the following expeditiously:

[21.1] CLOSE UNIT 3 BKR 1001, using 0

-HS-280-003/1001. [21.2] ENSURE CLOSED UNIT 3 BKR 1001. Critical Step

SAT UNSAT N/A NOTES 1) Section 5.5[21] should be performed expeditiously (within about 15 seconds) to minimize the time AC Systems are paralleled to prevent tripping the MMG set. Voltage and amps is expected to fluctuate while the AC systems are paralleled and the MMG set will trip if the AC systems are paralleled for approximately 30 seconds.

2) If breaker 1001 trips, it must be reset with reset push button on the respective Unit Battery Board, Panel 10.

CAUTIONS 1) Voltage Oscillations may occur during Bus Power Transfers.

These oscillations are caused when two Power Supplies having separate Voltage Regulators try to maintain voltage control.

Therefore, the time the Power Supplies are paralleled should be minimized as follows:[PER 64835]

When transferring Bus power supplies from one MMG to another MMG.

When transferring Bus power supplies from one MMG with the unit preferred transformer. (Unit 2 has a Voltage Regulator Transformer which makes voltage oscillations more susceptible.)

2) Minimize the number of Bus power supply transfers and only transfer Bus power supplies when absolutely necessary.
3) During the transfer of Bus power supplies the affiliated RPS circuit protectors 1(2)C1 and/or 1(2)C2 may trip.

Start of Critical Step(s)

Job Performance Measure (JPM) 8 STEP / STANDARD SAT / UNSAT Standard( step 6 continued)

When cued synchroscope indicator at 5 minutes prior to 12 o'clock, SIMULATED PLACING 3-BKR 1001, 0

-HS-252-003/1001 in the CLOSE position.

NOTE: IT WOULD ASSIST THE EXAMINEE IF THE EVALUATOR WOULD USE HIS FINGER TO DEMONSTRATE INDICATOR POSITION ON THE SYNCHROSCOPE AS THE READINGS ARE ENUNCIATED.

CUE: THE SYNCHROSCOPE INDICATOR IS AT 30 MINUTES BEFORE THE 12 O'CLOCK POSITION. THE SYNCHROSCOPE INDICATOR IS AT 15 MINUTES BEFORE THE 12 O'CLOCK POSITION. THE SYNCHROSCOPE INDICATOR IS AT 5 MINUTES BEFORE THE 12 O'CLOCK POSITION

. CUE: [WHEN CLOSED] UNIT 3 BREAKER 1001 BREAKER POSITION INDICATING LAMP CHANGED FROM ILLUMINATED GREEN TO ILLUMINATED RED

. Step 7:

[21.3] OPEN the UNIT 3)BKR 1002, using 0

-HS-280-003/1002.

Standard: SIMULATED UNIT 3 BKR 1002, 0-HS-282-003/1002in the OPEN position. Critical Step

SAT UNSAT N/A C UE: UNIT 3 BKR 1002, 0

-HS-282-003/1002 IS IN THE OPEN POSITION WITH RED LIGHT ILLUMINATED.

NOTE: DO NOT ALLOW THE EXAMINEE TO OPERATE THE AMMETER SELECTOR SWITCH FOR THE FOLLOWING STEP.

Step 8:

[22] CHECK generator is loaded by observing UNI T 3 MMG GENERATOR amps, 3

-II-252-02C/1AMR L2 rise, "N" should be approximately the difference of L1& L2 (UNIT 3 MMG GENERATOR amps, 3-HS-252-02CH positions 1, 2, & 3 are respective to L1, L2 & N). SAT UNSAT N/A End of Critical Step(s)

Job Performance Measure (JPM) 9 STEP / STANDARD SAT / UNSAT Standard: CHECKED amp indicators L1 MINUS L2 approximately equals n.

Cue: L1, L2 , N AMPS INDICATIONS HAVE RISEN and L1-L2 = N. Note: Selector Switch positions are labeled as follows: Position 1 is L1, position 2 is L2 and Position 3 is N.

Step 9: [23] ENSURE OPEN UNIT 3 BKR 1003, 0

-HS-280-003/1003 Standard: VERIFIED ILLUMINATED GREEN position indicating light above 0

-HS-282-003/1003.

SAT UNSAT N/A Cue: Unit 3 Breaker 1003 0

-HS-280-003/1003 Position Indicating Lamp changed from illuminated RED to illuminated GREEN.

Step 10: [24] On Unit 2 Unit Preferred MMG Set Local Control Panel, ENSURE OPEN the following fused disconnect switches:

BACKUP SOURCE TO BAT BD 1 BKR 1003, 1

-FUDS-280-001/1003 BACKUP SOURCE TO BAT BD 3 BKR 1003, 3

-FUDS-280-003/1003 Standard: At Unit 2 Unit Preferred MMG Set Local Control Panel VERIFIED 1-FUDS-280-001/1003 AND 3

-FUDS-280-003/1003 in the OPEN POSITION. SAT UNSAT N/A Cue: 1-FUDS-280-001/1003 and 3-FUDS-280-003/1003 are in the OPEN position.

Job Performance Measure (JPM) 10 STEP / STANDARD SAT / UNSAT Step 11: [25] On Unit 3 Unit Preferred MMG Set Local Control Panel, ENSURE the BACKUP SOURCE TO BAT BD 2 BKR 1003, 2-FUDS-280-002/1003 fused disconnect switch is open:

Standard: On Unit 3 Unit Preferred MMG Set Local Control Panel, VERIFIED 2-FUDS-280-002/1003 in the OPEN position.

SAT UNSAT N/A Cue: 2-FUDS-280-002/1003 is in the OPEN position.

Step 12:

[26] On Battery Board 2:

PLACE UNIT 3 PFD SYSTEM GENERATOR SOURCE SYNC SWITCH SS-7, 1-HS-252-03/SS-7 in OFF. Standard: SIMULATED PLACING UNIT 3 PFD SYSTEM GENERATOR SOURCE SYNC SWITCH, SS

-7, 1-HS-252-03/SS-7 in the OFF position. SAT UNSAT N/A Cue: UNIT 3 PFD SYSTEM GENERATOR SOURCE SYNC SWITCH, SS

-7, 1-HS-252-03/SS-7 is in the OFF position.

Step 13:

[27] On Battery Board 2:

DEPRESS UNIT 3 MMG AC MOTOR START, 3-HS-252-02AD to return to Normal AC power from DC drive. Standard: SIMULATED DEPRESSING and RELEASING UNIT 3 MMG AC MOTOR START , 3-HS-252-02AD pushbutton.

Critical Step

SAT UNSAT N/A Cue: [The AC motor Breaker Position Indicating Lamp changed from illuminated GREEN to illuminated RED.

State Another Operator will continue with procedure and this will end the task.

STOP TIME:

Job Performance Measure (JPM) 11 Provide to Applicant IN-PLANT: I will explain the initial conditions and state the task to be performed. ALL STEPS WILL BE SIMULATED. Do NOT operate any plant equipment. Touch STAAR may be carried out to the point of touching a label. If it becomes necessary to physically touch a control switch, use a non-conductive pointing device. I will provide initiating cues and indicate any steps to be discussed. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's correct" (or That's incorrect", if applicable). When you have completed your assigned task, you will say, "My task is complete" and I will acknowledge that your task is complete.

INITIAL CONDITIONS:

You are an Operator on Unit 3. The Reactor is in cold shutdown The Unit 3 Unit Preferred Bus is being supplied from the Unit 3 Unit Preferred Transformer in accordance with Section 8.1.

Maintenance has been completed on the Unit 3 Unit Preferred MMG Set.

INITIATING CUES

The SM directs you to start up and synchronize the Unit 3 Unit Preferred MMG Set as directed by 0-O I-57C per section 5.5 step 5.5[16

]. NOTE: PERFORMER WILL NEED GGMKA KEY.

CAUTION: DO NOT OPERATE ANY PLANT EQUIPMENT!

.

Job Performance Measure (JPM) 1 SITE: BFN JPM TITLE:

RESPOND TO A CONTROL ROD DRIFT IN JPM NUMBER:

80 A U2 REVISION: 1 TASK APPLICABILITY:

SRO STA UO NAUO TASK NUMBER / TASK TITLE(S):

U-085-AB-05/ Respond to a Control Rod Drift In K/A RATINGS:

RO: 3.2 SRO: 3.3 K/A No. &STATEMENT:

201002 Reactor Manual Control System A2.02; Ability to (a) predict the impacts of the following on the REACTOR MANUAL CONTROL SYSTEM ; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those abnormal conditions or operations: Rod Drift Alarm RELATED PRA INFORMATION:

Risk Significant SAFETY FUNCTION:

1 EVALUATION LOCATION:

In-Plant Simulator Control R oom Lab Other - List APPLICABLE METHOD OF TESTING: Discussion Simulate/Walkthrough Perform TIME FOR COMPLETION: NA TIME CRITICAL (Y/N) ALTERNATE PATH (Y/N)

Developed by:

Developer Date (Ensure validator is briefed on exam security per NPG

-SPP-17.8.1) (See JPM Validation Checklist in NPG

-SPP-17.8.2) Validated by:

Approved by:

Validator Date Approved by:

Site Training Management Date Site Training Program Owner Date N Y Job Performance Measure (JPM) 2 OPERATOR: ________________________________

JPM Number: __

80A__ RO SRO DATE: _______

TASK STANDARD:

Perform operations necessary to respond to a Control Rod Drift In per 2

-AOI-85-5.

Operator Fundamental evaluated:

OF-1 Monitoring plant indications and conditions closely.

OF-2 Controlling plant evolutions precisely.

PRA: NA REFERENCES/PROCEDURES NEEDED:

2-AOI-85-5 , 2-AOI-100-1 VALIDATIONTIME: 18 min PERFORMANCE TIME:

COMMENTS:

Additional comment sheets attached? YES ___ NO ___

RESULTS: SATISFACTORY ____

UNSATISFACTORY ____

IF UNSAT results are obtained THEN Retain entire JPM for records.(Otherwise just retain this page.

)

SIGNATURE: ___________________________

DATE: __________

EXAMINER Job Performance Measure (JPM) 3 Revision Summary Rev No. Effective Date Pages Affected Description 0 05/27/10 All Initial issue 1 09/01/15 1 Incorrect task number; changed to U

-085-AB-05: Incorrect malfunction numbers; rd07r0231, rd07r2223 & rd07r3031; Corrected

Job Performance Measure (JPM) 4 SIMULATOR SETUP IC 28 Exam IC 280 Console Operator Instructions Reset IC 28 or Exam IC if written in above Run schedule file

NRC JPM A U2

-Control Rod Drift In Verify all triggers and overrides are correct Place the simulator in RUN to ensure stable conditions Start Rod Display on RWM Screen Provide Initial Rod Data Sheet

-PRLOG When prompted by the examiner, INSERT - Event 1 to Drift Control Rod 02

-31 into the core When prompted by the examiner, INSERT - Event 2 to Drift Control Rod Multiple Control Rods into the core Malfunctions Description Event Severity Delay Initial set rd07r0231 Drifts rod 02

-31 into core 1 NA 35 sec NA rd07r2223 Drifts rod 22

-23 into core 2 NA 10 sec NA rd07r 303 1 Drifts rod 30

-31 into core 2 NA 25 sec NA rd07r4635 Drifts rod 46

-35 into core 2 NA 20 sec NA rd07r2619 Drifts rod 26

-19 into core 2 NA 30 sec NA rd07r3027 Drifts rod 30

-27 into core 2 NA 18 sec NA rd07r5423 Drifts rod 54-23 into core 2 NA 23 sec NA rd07r2255 Drifts rod 22

-55 into core 2 NA 28 sec NA Job Performance Measure (JPM) 5 Remotes Description Event Severity Delay Initial set Overrides Description Event Severity Delay Initial set Schedule File(s): NRC JPM A U2

-Control Rod Drift In

Job Performance Measure (JPM) 6 IN-SIMULATOR: I will explain the initial conditions and state the task to be performed. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's Correct". (OR "That's Incorrect", if applicable). When you have completed your assigned task, you will say, "my task is complete" and I will acknowledge that your task is complete.

INITIAL CONDITIONS:

You are an Operator on Unit 2.

The Reactor is at 100% power INITIATING CUES

The Unit Supervisor directs you to perform Surveillance 3.1.3.3 step 7.3, Control Rod Exercise Test for Withdrawn Control Rods, for partially withdrawn control rods.

Job Performance Measure (JPM) 7 START TIME: STEP / STANDARD SAT / UNSAT Step 1: NOTE 1) Problem details of any control rod issues observed during the performance of this surveillance must be recorded on Attachment 3 for further review and possible corrective maintenance. Slow/fast rod movements or settle times should be noted in the remarks section.

2) Section 7.3 is performed for all Partially Withdrawn Control Rods and performance of steps is represented by initialing the appropriate CRD exercised on Attachment 1.

CAUTIONS 1) Any mispositioned control rod events will be dispositioned by following the direction contained within 2

-AOI-85-7. 2) If a control rod moves unexpectedly one notch beyond its intended position, notify Unit Supervisor, obtain Unit Supervisor concurrence and return the rod to its intended position.

3) At any time CTP is less than or equal to 10%, entry into LCO 3.1.6 may be required.

7.3 Exercising a Partially Withdrawn Control Rod

[1] SELECT desired control rod by DEPRESSING appropriate CRD ROD SELECT pushbutton 2

-XS-85-40.

[2] OBSERVE the following for selected control rod:

CHECK CRD ROD SELECT pushbutton is brightly ILLUMINATED.

CHECK white light on the Full Core Display is ILLUMINATED.

CHECK Rod Out Permit light is ILLUMINATED.

Standard: Selects a withdrawn control rod Critical Step

SAT UNSAT N/A Note to Examiner: May select any partially withdrawn control rod in any order

Job Performance Measure (JPM) 8 STEP / STANDARD SAT / UNSAT Step 2: [3] INSERT control rod one notch by performing the following:

[3.1] PLACE CRD CONTROL SWITCH, 2

-HS-85-48 in ROD IN andRELEASE.

[3.2] OBSERVE control rod settles into the desired position andROD SETTLE light extinguishes.

Standard: Inserts withdrawn control rod one notch Critical Step

SAT UNSAT N/A Step 3:

[4] WITHDRAW selected control rod one notch by performing the following:

[4.1] PLACE CRD CONTROL SWITCH, 2

-HS-85-48 in ROD OUT NOTCHand RELEASE.

[4.2] OBSERVE control rod settles into the desired position and ROD SETTLE light extinguishes.

Standard: Withdraws withdrawn control rod one notch Critical Step

SAT UNSAT N/A Step 4:

[5] DOCUMENT completion of control rod test as follows:

[5.1] PERFORMER INITIAL Attachment 1 (Control Rod Exercise Data Sheet) in thebox corresponding to the control rod coordinates for the control rodjust exercised to document proper movement and CRD latching.

[5.2] Concurrent Verifier (CV)

ENSURE rod inserted and returned to its original position.

INITIAL Attachment 2 (Control Rod Concurrent Verifier (CV)Check) in the box corresponding to the control rod coordinates forthe rod just exercised.

SAT UNSAT N/A Job Performance Measure (JPM) 9 STEP / STANDARD SAT / UNSAT Standard: Initials Attachment 1 for exercised control rod and continues to exercise rods.

Note to Examiner: Perform above actions for @ least two control rods

. When satisfied with the number of rod manipulations direct Simulator Booth Operator to insert trigger #1 for Control Rod 02

-31 Drift In Note to Simulator Booth Operator:

When directed by examiner insert trigger #1 for 02

-31 Control Rod Drift In.

Step 5: Performer recognizes control rod 02

-31 drift in and responds per 2-AOI-85-5.

[2] IF a Control Rod is moving from its intended position without operator actions, THEN INSERT the Control Rod to position 00 using

CONTINUOUS IN. (Otherwise N/A)

[3] IF a Control Rod Block occurs during rod insertion due to Rod Worth Minimizer, THEN BYPASS the RWM per step 4.2[1] above. (Otherwise N/A)

Standard: Responds per 2-AOI-85-5 and inserts control rod 02

-31 to full in position as indicated by position 00 indication.

Critical Step SAT UNSAT N/A CUE: When report to US, state "Respond per 2

-AOI-85-5 , Control Rod Drift In.

Step 6:

[4] NOTIFY the Reactor Engineer to Evaluate Core Thermal Limits and Preconditioning Limits for the current Control Rod pattern. Standard: Candidate notifies Reactor Engineer to Evaluate Core Thermal limits and Preconditioning Limits for the current Control Rod Pattern SAT UNSAT N/A Cue: Understand Reactor Engineering notified to evaluate Core Thermal andPreconditioning Limits

Job Performance Measure (JPM) 10 STEP / STANDARD SAT / UNSAT Step 7: [5] IF another Control Rod Drift occurs before Reactor Engineering completes the evaluation, THEN MANUALLY SCRAM Reactor and enter 2

-AOI-100-1.

[6] CHECK Thermal Limits on ICS (RUNMON).

Note to NRC Examiner:

Step [6] performed by Reactor Engineer"ing.

Standard: Reviews step and asks for guidance from US or RE SAT UNSAT N/A CUE: As Shift Manager, state "RE has evaluated Core Thermal and Preconditioning Limits and has determined that the Control Rod Exercise may continue and that any other Control Rod Drift will be considered the first.

Student will continue with Control Rod Exercise.

Step 8:

7.3 Exercising a Partially Withdrawn Control Rod

[1] SELECT desired control rod by DEPRESSING appropriate CRD ROD SELECT pushbutton 2

-XS-85-40.

[2] OBSERVE the following for selected control rod:

CHECK CRD ROD SELECT pushbutton is brightly ILLUMINATED.

CHECK white light on the Full Core Display is ILLUMINATED.

CHECK Rod Out Permit light is ILLUMINATED.

Standard: Selects a withdrawn control rod Critical Step SAT UNSAT N/A Job Performance Measure (JPM) 11 STEP / STANDARD SAT / UNSAT Step 9: [3] INSERT control rod one notch by performing the following:

[3.1] PLACE CRD CONTROL SWITCH, 2

-HS-85-48 in ROD IN andRELEASE.

[3.2] OBSERVE control rod settles into the desired position andROD SETTLE light extinguishes.

Standard: Inserts withdrawn control rod one notch Critical Step

SAT UNSAT N/A Step 10:

[4] WITHDRAW selected control rod one notch by performing the following:

[4.1] PLACE CRD CONTROL SWITCH, 2

-HS-85-48 in ROD OUT NOTCHand RELEASE.

[4.2] OBSERVE control rod settles into the desired position and ROD SETTLE light extinguishes.

Standard: Withdraws withdrawn control rod one notch Critical Step

SAT UNSAT N/A Note to Examiner: When satisfied with the number of rod manipulations direct Simulator Booth Operator to insert trigger #2 for Multiple Control Rods Drifting In Step 11: Multiple Control Rods Drifting In Standard:

Recognizes Multiple Control Rods Drift into the Core and Manually Scrams the Reactor per 2-AOI-85-5. Depresses both SCRAM Pushbuttons Places mode switch in shutdown Verifies All Rods in

Critical Step

SAT UNSAT N/A

Job Performance Measure (JPM) 12 STEP / STANDARD SAT / UNSAT Step 11 continued

Performs a Scram Announcement o Rx Mode Switch Position: Shutdown o Rod Position: All Full In o Reactor Water Level ____ & Trend ___

o Reactor Pressure ____ & Trend ___

o MSIV Position: OPEN o Rx Power: <5

% Critical Step

SAT UNSAT N/A Termination Criteria: REPEAT BACK SCRAM REPORT THEN STATE, "THIS COMPLETES THE JPM. THAT WILL BE ALL FOR NOW, ANOTHER OPERATOR WILL CONTINUE IN 2-AOI-100-1." STOP TIME:

Job Performance Measure (JPM) 13 Provide to Applicant

      • IN-SIMULATOR: I will explain the initial conditions and state the task to be performed. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's Correct". (OR "That's Incorrect", if applicable). When you have completed your assigned task, you will say, "my task is complete" and I will acknowledge that your task is complete.

INITIAL CONDITIONS:

You are an Operator on Unit 2.

The Reactor is at 100% power

.

INITIATING CUES

The Unit Supervisor directs you to perform Surveillance 3.1.3.3 step 7.3, Control Rod Exercise Test for Withdrawn Control Rods, for partially withdrawn control rods.

Job Performance Measure (JPM) 1 SITE: BFN JPM TITLE:

RESPOND TO A CONTROL ROD DRIFT IN JPM NUMBER:

80 A U 3 REVISION: 1 TASK APPLICABILITY:

SRO STA UO NAUO TASK NUMBER / TASK TITLE(S):

U-085-AB-05/ Respond to a Control Rod Drift In K/A RATINGS:

RO: 3.2 SRO: 3.3 K/A No. &STATEMENT:

201002 Reactor Manual Control System A2.02; Ability to (a) predict the impacts of the following on the REACTOR MANUAL CONTROL SYSTEM ; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those abnormal conditions or operations: Rod Drift Alarm RELATED PRA INFORMATION:

Risk Significant SAFETY FUNCTION:

1 EVALUATION LOCATION:

In-Plant Simulator Control R oom Lab Other - List APPLICABLE METHOD OF TESTING: Discussion Simulate/Walkthrough Perform TIME FOR COMPLETION: NA TIME CRITICAL (Y/N) ALTERNATE PATH (Y/N)

Developed by:

Developer Date (Ensure validator is briefed on exam security per NPG

-SPP-17.8.1) (See JPM Validation Checklist in NPG

-SPP-17.8.2) Validated by:

Approved by:

Validator Date Approved by:

Site Training Management Date Site Training Program Owner Date N Y Job Performance Measure (JPM) 2 OPERATOR: ________________________________

JPM Number: _80A U3_ RO SRO DATE: _______

TASK STANDARD:

Perform operations necessary to respond to a Control Rod Drift In per 3-AOI-85-5.

Operator Fundamental evaluated:

OF-1 Monitoring plant indications and conditions closely.

OF-2 Controlling plant evolutions precisely.

PRA: NA REFERENCES/PROCEDURES NEEDED:

3-AOI-85-5 , 3-AOI-100-1 VALIDATIONTIME: PERFORMANCE TIME:

COMMENTS:

Additional comment sheets attached? YES ___ NO ___

RESULTS: SATISFACTORY ____

UNSATISFACTORY ____

IF UNSAT results are obtained THEN Retain entire JPM for records.(Otherwise just retain this page.

)

SIGNATURE:

___________________________

DATE: __________

EXAMINER Job Performance Measure (JPM) 3 Revision Summary Rev No. Effective Date Pages Affected Description 0 05/27/10 All Initial issue 1 05/11/15 1 Incorrect task number; changed to U

-085-AB-05: Incorrect malfunction numbers; rd07r0231, rd07r2223 & rd07r3031; Corrected

Job Performance Measure (JPM) 4 SIMULATOR SETUP IC 28 Exam IC 280 Console Operator Instructions Reset IC 28 or Exam IC if written in above Run schedule file: NRC JPM A U3

-Control Rod Drift In Verify all triggers and overrides are correct Place the simulator in RUN to ensure stable conditions Start Rod Display on RWM Screen Provide Initial Rod Data Sheet

-PRLOG When prompted by the examiner, INSERT - Event 1 to Drift Control Rod 02

-31 into the core When prompted by the examiner, INSERT - Event 2 to Drift Control Rod Multiple Control Rods into the core Malfunctions Description Event Severity Delay Initial set rd07r0231 Drifts rod 02

-31 into core 1 NA 35 sec NA rd07r2223 Drifts rod 22

-23 into core 2 NA 10 sec NA rd07r 303 1 Drifts rod 30

-31 into core 2 NA 25 sec NA rd07r4635 Drifts rod 46

-35 into core 2 NA 20 sec NA rd07r2619 Drifts rod 26

-19 into core 2 NA 30 sec NA rd07r3027 Drifts rod 30

-27 into core 2 NA 18 sec NA rd07r5423 Drifts rod 54

-23 into core 2 NA 23 sec NA rd07r2255 Drifts rod 22

-55 into core 2 NA 28 sec NA Job Performance Measure (JPM) 5 Remotes Description Event Severity Delay Initial set Overrides Description Event Severity Delay Initial set Schedule File(s): NRC JPM A U3

-Control Rod Drift In

Job Performance Measure (JPM) 6 IN-SIMULATOR: I will explain the initial conditions and state the task to be performed. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's Correct". (OR "That's Incorrect", if applicable). When you have completed your assigned task, you will say, "my task is complete" and I will acknowledge that your task is complete.

INITIAL CONDITIONS:

You are an Operator on Unit

3. The Reactor is at 100% power INITIATING CUES
The Unit Supervisor directs you to perform Surveillance 3.1.3.3 step 7.3, Control Rod Exercise Test for Withdrawn Control Rods, for partially withdrawn control rods.

Job Performance Measure (JPM) 7 START TIME: STEP / STANDARD SAT / UNSAT Step 1: NOTE 1) Problem details of any control rod issues observed during the performance of this surveillance must be recorded on Attachment 3 for further review and possible corrective maintenance. Slow/fast rod movements or settle times should be noted in the remarks section.

2) Section 7.3 is performed for all Partially Withdrawn Control Rods and performance of steps is represented by initialing the appropriate CRD exercised on Attachment 1.

CAUTIONS 3) Any mispositioned control rod events will be dispositioned by following the direction contained within 3-AOI-85-7.

4) If a control rod moves unexpectedly one notch beyond its intended position, notify Unit Supervisor, obtain Unit Supervisor concurrence and return the rod to its intended position.
5) At any time CTP is less than or equal to 10%, entry into LCO 3.1.6 may be required.

7.3 Exercising a Partially Withdrawn Control Rod

[1] SELECT desired control rod by DEPRESSING appropriate CRD ROD SELECT pushbutton 3-XS-85-40.

[2] OBSERVE the following for selected control rod:

CHECK CRD ROD SELECT pushbutton is brightly ILLUMINATED.

CHECK white light on the Full Core Display is ILLUMINATED.

CHECK Rod Out Permit light is ILLUMINATED.

Standard: Selects a withdrawn control rod Critical Step

SAT UNSAT N/A Note to Examiner: May select any partially withdrawn control rod in any order

Job Performance Measure (JPM) 8 STEP / STANDARD SAT / UNSAT Step 2: [3] INSERT control rod one notch by performing the following:

[3.1] PLACE CRD CONTROL SWITCH, 3-HS-85-48 in ROD IN andRELEASE. [3.2] OBSERVE control rod settles into the desired position andROD SETTLE light extinguishes.

Standard: Inserts withdrawn control rod one notch Critical Step

SAT UNSAT N/A Step 3:

[4] WITHDRAW selected control rod one notch by performing the following:

[4.1] PLACE CRD CONTROL SWITCH, 3-HS-85-48 in ROD OUT NOTCHand RELEASE.

[4.2] OBSERVE control rod settles into the desired position and ROD SETTLE light extinguishes.

Standard: Withdraws withdrawn control rod one notch Critical Step

SAT UNSAT N/A Step 4:

[5] DOCUMENT completion of control rod test as follows:

[5.1] PERFORMER INITIAL Attachment 1 (Control Rod Exercise Data Sheet) in thebox corresponding to the control rod coordinates for the control rodjust exercised to document proper movement and CRD latching.

[5.2] Concurrent Verifier (CV)

ENSURE rod inserted and returned to its original position.

INITIAL Attachment 2 (Control Rod Concurrent Verifier (CV)Check) in the box corresponding to the control rod coordinates forthe rod just exercised.

SAT UNSAT N/A Job Performance Measure (JPM) 9 STEP / STANDARD SAT / UNSAT Standard: Initials Attachment 1 for exercised control rod and continues to exercise rods.

Note to Examiner: Perform above actions for @ least two control rods

. When satisfied with the number of rod manipulations direct Simulator Booth Operator to insert trigger #1 for Control Rod 02

-31 Drift In Note to Simulator Booth Operator:

When directed by examiner insert trigger #1 for 02

-31 Control Rod Drift In.

Step 5: Performer recognizes control rod 02

-31 drift in and responds per 3-AOI-85-5.

[2] IF a Control Rod is moving from its intended position without operator actions, THEN INSERT the Control Rod to position 00 using

CONTINUOUS IN. (Otherwise N/A)

[3] IF a Control Rod Block occurs during rod insertion due to Rod Worth Minimizer, THEN BYPASS the RWM per step 4.2[1] above. (Otherwise N/A)

Standard: Responds per 3-AOI-85-5 and inserts control rod 02

-31 to full in position as indicated by position 00 indication. Critical Step

SAT UNSAT N/A CUE: When report to US, state "Respond per 3-AOI-85-5, Control Rod Drift In.

Step 6:

[4] NOTIFY the Reactor Engineer to Evaluate Core Thermal Limits and Preconditioning Limits for the current Control Rod pattern. Standard: Candidate notifies Reactor Engineer to Evaluate Core Thermal limits and Preconditioning Limits for the current Control Rod Pattern SAT UNSAT N/A Cue: Understand Reactor Engineering notified to evaluate Core Thermal andPreconditioning Limits

Job Performance Measure (JPM) 10 STEP / STANDARD SAT / UNSAT Step 7: [5] IF another Control Rod Drift occurs before Reactor Engineering completes the evaluation, THEN MANUALLY SCRAM Reactor and enter 2

-AOI-100-1.

[6] CHECK Thermal Limits on ICS (RUNMON).

Note to NRC Examiner:

Step [6] performed by Reactor Engineer"ing.

Standard: Reviews step and asks for guidance from US or RE SAT UNSAT N/A CUE: As Shift Manager, state "RE has evaluated Core Thermal and Preconditioning Limits and has determined that the Control Rod Exercise may continue and that any other Control Rod Drift will be considered the first.

Student will continue with Control Rod Exercise.

Step 8:

7.3 Exercising a Partially Withdrawn Control Rod

[1] SELECT desired control rod by DEPRESSING appropriate CRD ROD SELECT pushbutton 2

-XS-85-40.

[2] OBSERVE the following for selected control rod:

CHECK CRD ROD SELECT pushbutton is brightly ILLUMINATED.

CHECK white light on the Full Core Display is ILLUMINATED.

CHECK Rod Out Permit light is ILLUMINATED. Standard: Selects a withdrawn control rod Critical Step SAT UNSAT N/A Job Performance Measure (JPM) 11 STEP / STANDARD SAT / UNSAT Step 9: [3] INSERT control rod one notch by performing the following:

[3.1] PLACE CRD CONTROL SWITCH, 2

-HS-85-48 in ROD IN andRELEASE.

[3.2] OBSERVE control rod settles into the desired position andROD SETTLE light extinguishes.

Standard: Inserts withdrawn control rod one notch Critical Step

SAT UNSAT N/A Step 10:

[4] WITHDRAW selected control rod one notch by performing the following:

[4.1] PLACE CRD CONTROL SWITCH, 2

-HS-85-48 in ROD OUT NOTCHand RELEASE.

[4.2] OBSERVE control rod settles into the desired position and ROD SETTLE light extinguishes.

Standard: Withdraws withdrawn control rod one notch Critical Step

SAT UNSAT N/A Note to Examiner: When satisfied with the number of rod manipulations direct Simulator BoothOperator to insert trigger #2 for Multiple Control Rods Drifting In Step 11: Multiple Control Rods Drifting In Standard:

Recognizes Multiple Control Rods Drift into the Core and Manually Scrams the Reactor per 3

-AOI-85-5. Depresses both SCRAM Pushbuttons Places mode switch in shutdown Verifies All Rods in Critical Step

SAT UNSAT N/A

Job Performance Measure (JPM) 12 STEP / STANDARD SAT / UNSAT Step 11 continued

Performs a Scram Announcement o Rx Mode Switch Position: Shutdown o Rod Position: All Full In o Reactor Water Level ____ & Trend ___

o Reactor Pressure ____ & Trend ___

o MSIV Position: OPEN o Rx Power: <5%

Critical Step

SAT UNSAT N/A Termination Criteria: repeat back scram report then state, "this completes the JPM". That will be all for now, another operator will continue in 2-AOI-100-1 STOP TIME:

Job Performance Measure (JPM) 13 Provide to Applicant

      • IN-SIMULATOR: I will explain the initial conditions and state the task to be performed. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's Correct". (OR "That's Incorrect", if applicable). When you have completed your assigned task, you will say, "my task is complete" and I will acknowledge that your task is complete.

INITIAL CONDITIONS:

You are an Operator on Unit

3. The Reactor is at 100% power

INITIATING CUES

The Unit Supervisor directs you to perform Surveillance 3.1.3.3 step 7.3, Control Rod Exercise Test for Withdrawn Control Rods, for partially withdrawn control rods.

Job Performance Measure (JPM) 1 SITE: BFN JPM TITLE:

EHC Auto Cooldown JPM NUMBER:

276 U2 REVISION: 1 TASK APPLICABILITY:

SRO STA UO NAUO TASK NUMBER / TASK TITLE(S):

U-000-NO-32 Perform Reactor Cooldown U-000-NO-34 Perform a Reactor Cooldown from Hot Standby Conditions K/A RATINGS:

RO: 3.9 SRO: 3.9 K/A No. &STATEMENT:

239001Main and Reheat Steam System: A4.09 Ability to manually operate and/or monitor in the control room: Reactor pressure RELATED PRA INFORMATION:

Risk Significant SAFETY FUNCTION:

4 EVALUATION LOCATION:

In-Plant Simulator Control R oom Lab Other - List APPLICABLE METHOD OF TESTING: Discussion Simulate/Walkthrough Perform TIME FOR COMPLETION: NA TIME CRITICAL (Y/N) ALTERNATE PATH (Y/N)

Developed by:

Developer Date (Ensure validator is briefed on exam security per NPG

-SPP-17.8.1) (See JPM Validation Checklist in NPG

-SPP-17.8.2) Validated by:

Approved by:

Validator Date Approved by:

Site Training Management Date Site Training Program Owner Date N N Job Performance Measure (JPM) 2 OPERATOR: ________________________________

JPM Number: _276 U2 RO SRO DATE: _______

TASK STANDARD:

Perform operations necessary to initiate an Auto Cooldown with Turbine Bypass Valves.

Operator Fundamental evaluated:

OF-1 Monitoring plant indications and conditions closely.

OF-2 Controlling plant evolutions precisely.

OF-5 Having a solid understanding of plant design, engineering principles, and sciences.

PRA: NA REFERENCES/PROCEDURES NEEDED:

2-OI-47 VALIDATIONTIME: 4 min PERFORMANCE TIME:

COMMENTS:

Additional comment sheets attached? YES ___ NO ___

RESULTS: SATISFACTORY ____

UNSATISFACTORY ____

IF UNSAT results are obtained THEN Retain entire JPM for records.(Otherwise just retain this page.

)

SIGNATURE: ___________________________

DATE: __________

EXAMINER Job Performance Measure (JPM) 3 Revision Summary Rev No. Effective Date Pages Affected Description 0 06/1 9/12 All Initial issue 1 07/22/15 All General revision & re

-format Job Performance Measure (JPM) 4 SIMULATOR SETUP IC 40 Exam IC 281 Console Operator Instructions Reset IC 40 or Exam IC if written in above Ensure RFP is in Manual on PDS controller with plant parameters stable. Malfunctions Description Event Severity Delay Initial set Remotes Description Event Severity Delay Initial set Overrides Description Event Severity Delay Initial set Schedule File(s): None

Job Performance Measure (JPM) 5 IN-SIMULATOR: I will explain the initial conditions and state the task to be performed. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's Correct". (OR "That's Incorrect", if applicable). When you have completed your assigned task, you will say, "my task is complete" and I will acknowledge that your task is complete.

INITIAL CONDITIONS:

You are an Operator on Unit 2.

The Plant has been shutdown in preparation for a refueling outage. The Main Turbine is tripped. Reactor Water Level is stable and under control. Reactor Pressure is stable and being controlled by bypass valves.

INITIATING CUES

The Unit Supervisor directs you to commence an Auto Cooldown to 20 psig in accordance with 2-OI-47, Turbine

-Generator System, Section 8.1.2, starting at step [6].

Job Performance Measure (JPM) 6 START TIME: STEP / STANDARD SAT / UNSAT Step 1: [6] VERIFY EHC is in Pressure Control using 2-HS-47-204. Standard:

Observes light on for EHC Pressure Control on 2

-HS-47-204. SAT UNSAT N/A Step 2:

[7] On the EHC Work Station on Panel 9

-7: [7.1] SELECT Main Menu from the toolbar at bottom of the screen. [7.2] SELECT Log In on Display Screen and ENTER "OPS" for name and "OPS" for Password.

[7.3] SELECT Auto Cooldown from list of function on the screen. Standard: Candidate logs into EHC workstation and selects Auto Cooldown from the list of functions on the screen. Critical Step SAT UNSAT N/A Step 3:

[8] On the Auto Cooldown Display Screen

CHECK the following are displayed.

Turbine Tripped or All Valves Closed

- indicates Reset.

Rx Press Ctrl

- indicates Reset.

Standard: Candidate checks the Turbine Tripped or All Valves Closed

-indicates Reset.

Candidate checks Rx Press Ctrl

- indicates Reset.

SAT UNSAT N/A Job Performance Measure (JPM) 7 STEP / STANDARD SAT / UNSAT Step 4: [9] On the Auto Cooldown Screen SET the desired Final Pressure for cooldown as follows:

[9.1] SELECT the block above the "FINAL PRESSURE TARGET". [9.2] ENTER the desired pressure using the Display Screen or Key Board.

[9.3] WHEN desired Pressure is entered SELECT "OK" Standard: Candidate sets the desired final target pressure of 20psig (given in initial conditions).

Critical Step SAT UNSAT N/A Step 5: [10] WHEN Cooldown is ready to commence, THEN

[10.1] VERIFY Reactor Pressure is stable and being controlled by EHC Pressure Control with at least one Bypass Valve opened. (Adjust setpoint as necessary)

[10.2] DEPRESS the "START" button on the Auto Cooldown Display Screen.

[11] WHEN Caution "Are You Sure You Want to Initiate Auto Cooldown?" appears SELECT "Yes" Screen Button to start the cooldown.

Standard: Candidate depresses START and acknowledges "YES' to commence auto cooldown.

Critical Step SAT UNSAT N/A Job Performance Measure (JPM) 8 STEP / STANDARD SAT / UNSAT Step 6: [12] CHECK the following:

EHC PRESSURE SETPOINT, 2

-PI-47-162, is lowering.

EHC AUTO COOLDOWN displays "IN PROGRESS" Standard: Candidate monitors EHC pressure and the auto cooldown is "IN PROGRESS".

SAT UNSAT N/A Cue: The Unit Supervisor directs you to adjust the Final Pressure Target to 100 psig. Step 7:

[13] IF it is desired to change the Final Pressure Target, THEN On the Auto Cooldown Screen.

[13.1] SELECT the block above the "FINAL PRESSURE TARGET" [13.2] ENTER the desired pressure using the Display Screen or Key Board.

[13.3] WHEN desired Pressure is entered SELECT "OK" Standard: Candidate adjusts "FINAL PRESSURE TARGET" to 100 psig and recommences the auto cooldown.

Critical Step SAT UNSAT N/A Evaluator Cue: Another operator will continue to monitor the cooldown. This completes your task.

STOP TIME:

Job Performance Measure (JPM) 9 Provide to Applicant

      • IN-SIMULATOR: I will explain the initial conditions and state the task to be performed. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's Correct". (OR "That's Incorrect", if applicable). When you have completed your assigned task, you will say, "my task is complete" and I will acknowledge that your task is complete.

INITIAL CONDITIONS:

You are an Operator on Unit 2.

The Plant has been shutdown in preparation for a refueling outage. The Main Turbine is tripped. Reactor Water Level is stable and under control. Reactor Pressure is stable and being controlled by bypass valves.

INITIATING CUES

The Unit Supervisor directs you to commence an Auto Cooldown to 20 psig in accordance with

2-OI-47, Turbine

-Generator System, Section 8.1.2, starting at step [6].

Job Performance Measure (JPM) 1 SITE: BFN JPM TITLE:

EHC Auto Cooldown JPM NUMBER:

276 U 3 REVISION: 1 TASK APPLICABILITY:

SRO STA UO NAUO TASK NUMBER / TASK TITLE(S):

U-000-NO-32 Perform Reactor Cooldown U-000-NO-34 Perform a Reactor Cooldown from Hot Standby Conditions K/A RATINGS:

RO: 3.9 SRO: 3.9 K/A No. &STATEMENT:

239001Main and Reheat Steam System: A4.09 Ability to manually operate and/or monitor in the control room: Reactor pressure RELATED PRA INFORMATION:

Risk Significant SAFETY FUNCTION:

4 EVALUATION LOCATION:

In-Plant Simulator Control R oom Lab Other - List APPLICABLE METHOD OF TESTING: Discussion Simulate/Walkthrough Perform TIME FOR COMPLETION: NA TIME CRITICAL (Y/N) ALTERNATE PATH (Y/N)

Developed by:

Developer Date (Ensure validator is briefed on exam security per NPG

-SPP-17.8.1) (See JPM Validation Checklist in NPG

-SPP-17.8.2) Validated by:

Approved by:

Validator Date Approved by:

Site Training Management Date Site Training Program Owner Date N N Job Performance Measure (JPM) 2 OPERATOR: ________________________________

JPM Number: _276 U3_ RO SRO DATE: _______

TASK STANDARD:

Perform operations necessary to initiate an Auto Cooldown with Turbine Bypass Valves.

Operator Fundamental evaluated:

OF-1 Monitoring plant indications and conditions closely.

OF-2 Controlling plant evolutions precisely.

OF-5 Having a solid understanding of plant design, engineering principles, and sciences.

PRA: NA REFERENCES/PROCEDURES NEEDED:

3-OI-47 VALIDATIONTIME: PERFORMANCE TIME:

COMMENTS:

Additional comment sheets attached? YES ___ NO ___

RESULTS: SATISFACTORY ____

UNSATISFACTORY ____

IF UNSAT results are obtained THEN Retain entire JPM for records.(Otherwise just retain this page.

)

SIGNATURE: ___________________________

DATE: __________

EXAMINER Job Performance Measure (JPM) 3 Revision Summary Rev No. Effective Date Pages Affected Description 0 06/1 9/12 All Initial issue 1 07/22/15 All General revision & re

-format Job Performance Measure (JPM) 4 SIMULATOR SETUP IC 40 Exam IC 281 Console Operator Instructions Reset IC 40 or Exam IC if written in above Ensure RFP is in Manual on PDS controller with plant parameters stable. Malfunctions Description Event Severity Delay Initial set Remotes Description Event Severity Delay Initial set Overrides Description Event Severity Delay Initial set Schedule File(s): None

Job Performance Measure (JPM) 5 IN-SIMULATOR: I will explain the initial conditions and state the task to be performed. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's Correct". (OR "That's Incorrect", if applicable). When you have completed your assigned task, you will say, "my task is complete" and I will acknowledge that your task is complete.

INITIAL CONDITIONS:

You are an Operator on Unit 3. The Plant has been shutdown in preparation for a refueling outage. The Main Turbine is tripped. Reactor Water Level is stable and under control. Reactor Pressure is stable and being controlled by bypass valves.

INITIATING CUES

The Unit Supervisor directs you to commence an Auto Cooldown to 20 psig in accordance with 3-OI-47, Turbine

-Generator System, Section 8.1.2, starting at step [6].

Job Performance Measure (JPM) 6 START TIME: STEP / STANDARD SAT / UNSAT Step 1: [6] VERIFY EHC is in Pressure Control using 3

-HS-47-204. Standard:

Observes light on for EHC Pressure Control on 3

-HS-47-204. SAT UNSAT N/A Step 2:

[7] On the EHC Work Station on Panel 9

-7: [7.1] SELECT Main Menu from the toolbar at bottom of the screen. [7.2] SELECT Log In on Display Screen and ENTER "OPS" for name and "OPS" for Password.

[7.3] SELECT Auto Cooldown from list of function on the screen. Standard: Candidate logs into EHC workstation and selects Auto Cooldown from the list of functions on the screen.

Critical Step SAT UNSAT N/A Step 3:

[8] On the Auto Cooldown Display Screen

CHECK the following are displayed.

Turbine Tripped or All Valves Closed

- indicates Reset.

Rx Press Ctrl

- indicates Reset.

Standard: Candidate checks the Turbine Tripped or All Valves Closed

-indicates Reset.

Candidate checks Rx Press Ctrl

- indicates Reset.

SAT UNSAT N/A Job Performance Measure (JPM) 7 Step 4: [9] On the Auto Cooldown Screen SET the desired Final Pressure for cooldown as follows:

[9.1] SELECT the block above the "FINAL PRESSURE TARGET". [9.2] ENTER the desired pressure using the Display Screen or Key Board.

[9.3] WHEN desired Pressure is entered SELECT "OK" Standard: Candidate sets the desired final target pressure of 20psig (given in initial conditions).

Critical Step SAT UNSAT N/A Step 5: [10] WHEN Cooldown is ready to commence, THEN

[10.1] VERIFY Reactor Pressure is stable and being controlled by EHC Pressure Control with at least one Bypass Valve opened. (Adjust setpoint as necessary)

[10.2] DEPRESS the "START" button on the Auto Cooldown Display Screen.

[11] WHEN Caution "Are You Sure You Want to Initiate Auto Cooldown?" appears SELECT "Yes" Screen Button to start the cooldown.

Standard: Candidate depresses START and acknowledges "YES' to commence auto cooldown.

Critical Step SAT UNSAT N/A Job Performance Measure (JPM) 8 Step 6: [12] CHECK the following:

EHC PRESSURE SETPOINT, 3

-PI-47-162, is lowering.

EHC AUTO COOLDOWN displays "IN PROGRESS" Standard: Candidate monitors EHC pressure and the auto cooldown is "IN PROGRESS".

SAT UNSAT N/A Cue: The Unit Supervisor directs you to adjust the Final Pressure Target to 100 psig. Step 7:

[13] IF it is desired to change the Final Pressure Target, THEN On the Auto Cooldown Screen.

[13.1] SELECT the block above the "FINAL PRESSURE TARGET" [13.2] ENTER the desired pressure using the Display Screen or Key Board.

[13.3] WHEN desired Pressure is entered SELECT "OK" Standard: Candidate adjusts "FINAL PRESSURE TARGET" to 100 psig and recommences the auto cooldown.

Critical Step SAT UNSAT N/A Evaluator Cue: Another operator will continue to monitor the cooldown. This completes your task.

STOP TIME:

Job Performance Measure (JPM) 9 Provide to Applicant

      • IN-SIMULATOR: I will explain the initial conditions and state the task to be performed. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's Correct". (OR "That's Incorrect", if applicable). When you have completed your assigned task, you will say, "my task is complete" and I will acknowledge that your task is complete.

INITIAL CONDITIONS:

You are an Operator on Unit 3. The Plant has been shutdown in preparation for a refueling outage. The Main Turbine is tripped. Reactor Water Level is stable and under control. Reactor Pressure is stable and being controlled by bypass valves.

INITIATING CUES

The Unit Supervisor directs you to commence an Auto Cooldown to 20 psig in accordance with 3-OI-47, Turbine

-Generator System, Section 8.1.2, starting at step [6].

Job Performance Measure (JPM) 1 SITE: BFN JPM TITLE:

LOSS OF REFERENCE APRM TO ROD BLOCK MONITOR JPM NUMBER:

672A U2 REVISION: 0 TASK APPLICABILITY:

SRO STA UO NAUO TASK NUMBER / TASK TITLE(S):

U-085-AL-03 RESPOND TO CONTROL ROD WITHDRAWL BLOCK K/A RATINGS:

RO: 3.1 SRO: 3.3 K/A No. &STATEMENT:

215002 Rod Block Monitor System A2.03; Ability to (a) predict the impacts of the following on the ROD BLOCK MONITOR SYSTEM ; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those abnormal conditions or operations: Loss of associated reference APRM channel: BWR

-3,4,5 RELATED PRA INFORMATION:

Risk Significant SAFETY FUNCTION:

7 EVALUATION LOCATION: In-Plant Simulator Control R oom Lab Other - List APPLICABLE METHOD OF TESTING: Discussion Simulate/Walkthrough Perform TIME FOR COMPLETION: NA TIME CRITICAL (Y/N)

ALTERNATE PATH (Y/N)

Developed by:

Developer Date (Ensure validator is briefed on exam security per NPG

-SPP-17.8.1) (See JPM Validation Checklist in NPG

-SPP-17.8.2) Validated by:

Approved by:

Validator Date Approved by:

Site Training Management Date Site Training Program Owner Date N Y Job Performance Measure (JPM) 2 OPERATOR: ________________________________

JPM Number: _672A U2_ RO SRO DATE: _______

TASK STANDARD:

Perform operations necessary to bypass an APRM Channel and clear a Control Rod Block from Rod Block Monitoring System.

Operator Fundamental evaluated:

OF-1 Monitoring plant indications and conditions closely.

OF-2 Controlling plant evolutions precisely.

OF-5 Having a solid understanding of plant design, engineering principles, and sciences.

PRA: NA REFERENCES/PROCEDURES NEEDED:

2-OI-85, 2-OI-92B, 2-ARP-9-5A, 2-SR-3.1.3.5(A)

VALIDATIONTIME: 16 min PERFORMANCE TIME:

COMMENTS:

Additional comment sheets attached? YES ___ NO ___

RESULTS: SATISFACTORY ____

UNSATISFACTORY ____

IF UNSAT results are obtained THEN Retain entire JPM for records.(Otherwise just retain this page.

)

SIGNATURE: ___________________________

DATE: __________

EXAMINER Job Performance Measure (JPM) 3 Revision Summary Rev No. Effective Date Pages Affected Description 0 09/01/15 All Initial issue

Job Performance Measure (JPM) 4 SIMULATOR SETUP IC 39 Exam IC 282 Console Operator Instructions Reset to IC-39 to ~ 3 0% Reactor Power Open Schedule File: NRC JPM C U2

-RBM APRM Fail Downscale.sch Open Event File: NRC JPM C U2

-RBM APRM Fail Downscale.evt Malfunctions Description Event Severity Delay Initial set NM07L3233C LPRM AMPLIFIER FAILURE 32 C 15 0 N/A N/A NM07L4025B LPRM AMPLIFIER FAILURE 40 B 15 0 N/A N/A NM07L4033D LPRM AMPLIFIER FAILURE 40 D 15 0 N/A N/A NM07L0817B LPRM AMPLIFIER FAILURE 08 B 15 0 N/A N/A NM07L4017B LPRM AMPLIFIER FAILURE 40 B 15 0 N/A N/A NM07L4041D LPRM AMPLIFIER FAILURE 40 D 15 0 N/A N/A NM07L4049B LPRM AMPLIFIER FAILURE 40 B 15 0 N/A N/A NM07L4057B LPRM AMPLIFIER FAILURE 40 B 15 0 N/A N/A NM07L4817C LPRM AMPLIFIER FAILURE 48 C 15 0 N/A N/A NM07L4825C LPRM AMPLIFIER FAILURE 48 C 15 0 N/A N/A NM07L4833A LPRM AMPLIFIER FAILURE 48 A 15 0 N/A N/A NM07L4841A LPRM AMPLIFIER FAILURE 48 A 15 0 N/A N/A NM07L4849C LPRM AMPLIFIER FAILURE 48 C 15 0 N/A N/A NM07L0825B LPRM AMPLIFIER FAILURE 08 B 15 0 N/A N/A Job Performance Measure (JPM) 5 NM07L0833D LPRM AMPLIFIER FAILURE 08 D 15 0 N/A N/A NM07L0841D LPRM AMPLIFIER FAILURE 08 D 15 0 N/A N/A NM07L0849B LPRM AMPLIFIER FAILURE 08 B 15 0 N/A N/A NM07L2409B LPRM AMPLIFIER FAILURE 24 B 15 0 N/A N/A NM07L2417D LPRM AMPLIFIER FAILURE 24 D 15 0 N/A N/A NM07L2425D LPRM AMPLIFIER FAILURE 24 D 15 0 N/A N/A NM07L2433B LPRM AMPLIFIER FAILURE 24 B 15 0 N/A N/A NM07L2449D LPRM AMPLIFIER FAILURE 24 D 15 0 N/A N/A NM07L2457D LPRM AMPLIFIER FAILURE 24 D 15 0 N/A N/A NM07L1617C LPRM AMPLIFIER FAILURE 16 C 15 0 N/A N/A NM07L1625C LPRM AMPLIFIER FAILURE 16 C 15 0 N/A N/A NM07L1633A LPRM AMPLIFIER FAILURE 16 A 15 0 N/A N/A NM07L1641A LPRM AMPLIFIER FAILURE 16 A 15 0 N/A N/A NM07L1649C LPRM AMPLIFIER FAILURE 16 C 15 0 N/A N/A NM07L1657C LPRM AMPLIFIER FAILURE 16 C 15 0 N/A N/A NM07L1609A LPRM AMPLIFIER FAILURE 16 A 15 0 N/A N/A NM07L3209C LPRM AMPLIFIER FAILURE 32 C 15 0 N/A N/A NM07L3217A LPRM AMPLIFIER FAILURE 32 A 15 0 N/A N/A NM07L3225A LPRM AMPLIFIER FAILURE 32 A 15 0 N/A N/A NM07L3249A LPRM AMPLIFIER FAILURE 32 A 15 0 N/A N/A NM07L3257A LPRM AMPLIFIER FAILURE 32 A 15 0 N/A N/A NM07L4009D LPRM AMPLIFIER FAILURE 40 D 15 0 N/A N/A NM07L4809A LPRM AMPLIFIER 15 0 N/A N/A Job Performance Measure (JPM) 6 FAILURE 48 A NM07L5617D LPRM AMPLIFIER FAILURE 56 D 15 0 N/A N/A NM07L5633B LPRM AMPLIFIER FAILURE 56 B 15 0 N/A N/A NM07L5641B LPRM AMPLIFIER FAILURE 56 B 15 0 N/A N/A NM07L3241C LPRM AMPLIFIER FAILURE 32 C 15 0 N/A N/A Remotes Description Event Severity Delay Initial set Overrides Description Event Severity Delay Initial set ZLO4631LGREENT(1)

Control Rod 46-31 GREEN INDICATION 15 0 N/A N/A Schedule File(s):

Event File: NRC JPM C U2

-RBM APRM Fail Downscale.evt; <TRIGGER id="15" description="APRM Ch 2 Fail Downscale">ZLO4631LGREENT(1) == 0</TRIGGER>

Schedule File: NRC JPM C U2

-RBM APRM Fail Downscale.sch Job Performance Measure (JPM) 7 IN-SIMULATOR: I will explain the initial conditions and state the task to be performed. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's Correct". (OR "That's Incorrect", if applicable). When you have completed your assigned task, you will say, "my task is complete" and I will acknowledge that your task is complete.

INITIAL CONDITIONS:

You are an Operator on Unit

2. The Reactor is at 30% power Startup Sequence Control Rod Movement Data Sheet 2

-SR-3.1.3.5(A) completed through group 57.

No Control Rods are Fast Notching INITIATING CUES

The US has directed you to raise Reactor Power to 40% per 2

-SR-3.1.3.5(A) in preparation for placing Feedwater Heaters and Moisture Separator Drain System in service. Start on Group 58; Control Rod 14

-31.

Job Performance Measure (JPM) 8 START TIME: STEP / STANDARD SAT / UNSAT Step 1: [1] SELECT the desired control rod by depressing the appropriate CRD ROD SELECT pushbutton, 2-XS-85-40. Standard: Selects Control Rod by depressing CRD ROD SELECT pushbutton.

Critical Step

SAT UNSAT N/A Step 2:

[2] IF selected control rod has been identified as a "fast notching" control rod by engineering, THEN THROTTLE OPEN 2

-PCV-085-0023 CRD, CRD DRIVE WATER PRESS CONTROL VLV, to as low as 180 psid using 2

-HS-85-23A. (Otherwise N/A)

Standard:

Determines that step in N/A SAT UNSAT N/A Step 3:

[3] OBSERVE the following for the selected control rod:

CRD ROD SELECT pushbutton is brightly ILLUMINATED White light on the Full Core Display ILLUMINATED Rod Out Permit light ILLUMINATED Standard: VERIFIES CRD ROD SELECT pushbutton is brightly ILLUMINATED White light on the Full Core Display ILLUMINATED Rod Out Permit light ILLUMINATED SAT UNSAT N/A Job Performance Measure (JPM) 9 STEP / STANDARD SAT / UNSAT Step 4: [4] VERIFY Rod Worth Minimizer is operable and LATCHED into the correct ROD GROUP when the Rod Worth Minimizer is enforcing Standard: STEP is N/A due to Rod Block Monitor is Enforcing SAT UNSAT N/A Step 5: [5] PLACE CRD CONTROL SWITCH, 2-HS-85-48, in ROD OUT NOTCH, and RELEASE.

[6] OBSERVE the control rod settles into the desired position and the ROD SETTLE light extinguishes.

Standard:

PLACED CRD CONTROL SWITCH, 2-85-48 in ROD OUT NOTCH position and RELEASED control switch to move Control Rod to Position 04 as indicated on Full Core Display. Critical Step

SAT UNSAT N/A Note to Examiner: Step is repeated to get Control Rod to Position 04 Step 6:

[1] SELECT the desired control rod by depressing the appropriate CRD ROD SELECT pushbutton, 2-XS-85-40. Standard: Selects Control Rod by depressing CRD ROD SELECT pushbutton.

Critical Step

SAT UNSAT N/A Job Performance Measure (JPM) 10 STEP / STANDARD SAT / UNSAT Step 7: [2] IF selected control rod has been identified as a "fast notching" control rod by engineering, THEN THROTTLE OPEN 2

-PCV-085-0023 CRD, CRD DRIVE WATER PRESS CONTROL VLV, to as low as 180 psid using 2

-HS-85-23A. (Otherwise N/A)

Standard:

Determines that step in N/A SAT UNSAT N/A Step 8:

[3] OBSERVE the following for the selected control rod:

CRD ROD SELECT pushbutton is brightly ILLUMINATED White light on the Full Core Display ILLUMINATED Rod Out Permit light ILLUMINATED Standard: VERIFIES CRD ROD SELECT pushbutton is brightly ILLUMINATED White light on the Full Core Display ILLUMINATED Rod Out Permit light ILLUMINATED SAT UNSAT N/A Step 9:

[4] VERIFY Rod Worth Minimizer is operable and LATCHED into the correct ROD GROUP when the Rod Worth Minimizer is enforcing Standard: STEP is N/A due to Rod Block Monitor is Enforcing SAT UNSAT N/A Job Performance Measure (JPM) 11 STEP / STANDARD SAT / UNSAT Step 10: [5] PLACE CRD CONTROL SWITCH, 2-HS-85-48, in ROD OUT NOTCH, and RELEASE.

[6] OBSERVE the control rod settles into the desired position and the ROD SETTLE light extinguishes.

Standard:

PLACED CRD CONTROL SWITCH, 2-85-48 in ROD OUT NOTCH position and RELEASED control switch to move Control Rod to Position 04 as indicated on Full Core Display

. Critical Step

SAT UNSAT N/A Note to Examiner: Step is repeated to get Control Rod to Position 04 Step 11:

[1] SELECT the desired control rod by depressing the appropriate CRD ROD SELECT pushbutton, 2-XS-85-40. Standard: Selects Control Rod by depressing CRD ROD SELECT pushbutton.

Critical Step

SAT UNSAT N/A Step 1 2:

[2] IF selected control rod has been identified as a "fast notching" control rod by engineering, THEN THROTTLE OPEN 2

-PCV-085-0023 CRD, CRD DRIVE WATER PRESS CONTROL VLV, to as low as 180 psid using 2

-HS-85-23A. (Otherwise N/A)

Standard:

Determines that step in N/A SAT UNSAT N/A Job Performance Measure (JPM) 12 STEP / STANDARD SAT / UNSAT Step 1 3: [3] OBSERVE the following for the selected control rod:

CRD ROD SELECT pushbutton is brightly ILLUMINATED White light on the Full Core Display ILLUMINATED Rod Out Permit light ILLUMINATED Standard: VERIFIES CRD ROD SELECT pushbutton is brightly ILLUMINATED White light on the Full Core Display ILLUMINATED Rod Out Permit light ILLUMINATED SAT UNSAT N/A Step 1 4:

[4] VERIFY Rod Worth Minimizer is operable and LATCHED into the correct ROD GROUP when the Rod Worth Minimizer is enforcing Standard: STEP is N/A due to Rod Block Monitor is Enforcing SAT UNSAT N/A Step 1 5:

[5] PLACE CRD CONTROL SWITCH, 2-HS-85-48, in ROD OUT NOTCH, and RELEASE.

[6] OBSERVE the control rod settles into the desired position and the ROD SETTLE light extinguishes.

Standard:

PLACED CRD CONTROL SWITCH, 2-85-48 in ROD OUT NOTCH position and RELEASED control switch to move Control Rod to Position 04 as indicated on Full Core Display. Critical Step

SAT UNSAT N/A Note to Examiner: Step is repeated to get Control Rod to Position 04

Job Performance Measure (JPM) 13 STEP / STANDARD SAT / UNSAT Note to Examiner:

This begins the Alternate Path section of JPM Simulator Booth Operator: Insert Event Trigger #1 to fail APRM 2 Downscale.

Step 1 6: Sensor/Trip Point:

APRM Downscale: <=5% OPRM Inop: Less than 23 operable cells

Sensor Location:

Control Room Panel 2-9-14. Probable Cause: A. Unbypassed APRM channel at or below sensor set point.

B. SI or SR in progress.

C. Unit shutdown (Mode 3 or 4).

D. Failed sensor.

Automatic Action: A. Rod withdrawal block with Rx Mode Sw. in RUN.(APRM only)

Operator Action: A. DETERMINE which APRM/OPRM channel is downscale/inop.

B. IF APRM failed downscale, THEN BYPASS channel. REFER TO 2-OI-92B.

Critical Step

SAT UNSAT N/A APRM DOWNSCALE/

OPRM INOP 4 Job Performance Measure (JPM) 14 STEP / STANDARD SAT / UNSAT Step 1 6(continued)

Sensor/Trip Point:

Relays:

3 A-K1 Nuclear Instrumentation 3 A-K2 Refuel Equipment in Use High Level in Scram Discharge Volume Scram Discharge Volume High Water Level Bypass Rx Mode Switch in SHUTDOWN PRNM (ANY APRM OPRM or RBM) Sensor Location:

Panel 2-9-28 Elevation 593' Aux Instr Room Probable Cause: A. One or more sensors at or above set point.

B. Malfunction of sensor.

C. Control rod drop accident Automatic Action: Rod withdrawal block Operator Action: A. DETERMINE initiating condition from corresponding rod withdrawal block alarm(s) and REFER TO operator action for alarm(s). Standard: Reference 2-ARP-9-5A and identifies APRM Ch 2 is down scale and proceeds to bypass APRM Ch 2 per 2-OI-92B CUE: Respond as stated in Alarm Response Instruction and Bypass APRM Ch 2 per 3-OI-92B. CONTROL ROD WITHDRAWAL BLOCK 7 Job Performance Measure (JPM) 15 STEP / STANDARD SAT / UNSAT Step 1 7:

6.1 Bypassing APRM/OPRM Channel

[1] REVIEW all precautions and limitations. REFER TO Section 3.0.

Standard: Demonstrates reviewing precautions and limitations section 3.0.

SAT UNSAT N/A Step 1 8:

[2] PLACE APRM BYPASS, 2-HS-92-7B/S3, to desired channel to be bypassed.

Standard: PLACE APRM BYPASS, 2-HS-92-7B/S3, to APRM CH 2 Critical Step

SAT UNSAT N/A NOTES 1) Only one APRM/OPRM in each trip system can be bypassed at a time. 2) All operations are performed on Panel 2 5 unless specifically stated otherwise.

3) In order to prevent inadvertent rod withdrawal block or Reactor scram while operating APRM BYPASS selector switch, Verify that the BLUE BYPASSED lights on Panel 9

-14 Voters are extinguished prior to selecting any other channel to be bypassed. After bypassing a channel, the applicable BLUE BYPASSED status lights on Panel 9

-14 Voters are required to be illuminated prior to testing, operating, or working on that channel.

CAUTION [QA/C] SPP-10.4 requires approval of the Plant Manager or his designee prior to any planned operation with APRMs bypassed unless bypassing is specifically allowed within approved procedures. [ISE-HPS-92-RO1]

Job Performance Measure (JPM) 16 STEP / STANDARD SAT / UNSAT Step 1 9: [3] CHECK BLUE BYPASSED lights illuminated on Panel 2-9-14 Voters. Standard:

Observes BLUE BYPASS light illuminated on Panel 2-9-14 for APRM CH 2. SAT UNSAT N/A Step 20:

[4] VERIFY white bypass light on Panel 2-9-5 is illuminated.

Standard: Observes WHITE BYPASS light illuminated on Panel 2-9-5. SAT UNSAT N/A Note to Examiner: If needed, cue student to proceed with actions required to continue rod movements.

Student may continue at step 21 or 24.

Step 2 1:

6.6.2 Actions Required During and Following Control Rod Withdrawal (continued)

[6] IF Control Rod movement was stopped to keep from exceeding a RBM setpoint or was caused by a RBM Rod Block, THEN PERFORM the following at the Unit Supervisor's discretion to "REINITIALIZE" the RBM:

[6.1] PLACE CRD POWER, 2-HS-85-46 in the OFF position to deselect the Control Rod.

Standard: CRD POWER, 2-HS-85-46 in the OFF position. SAT UNSAT N/A Job Performance Measure (JPM) 17 STEP / STANDARD SAT / UNSAT Step 22: [6.2] PLACE CRD POWER, 2-HS-85-46, in the ON position.

Standard: PLACED CRD POWER, 2-HS-85-46, in the ON position.

SAT UNSAT N/A Step 2 3:

[6.3] IF desired, THEN CONTINUE to withdrawal Control Rods and PERFORM applicable section for Control Rod withdrawal.

Standard: Continues with Control Rod Movement

SAT UNSAT N/A CUE: Proceed with Control Rod Movement.

Step 2 4: [1] SELECT the desired control rod by depressing the appropriate CRD ROD SELECT pushbutton, 2-XS-85-40. Standard: Selects Control Rod by depressing CRD ROD SELECT pushbutton.

Critical Step SAT UNSAT N/A Job Performance Measure (JPM) 18 STEP / STANDARD SAT / UNSAT Step 2 5: [2] IF selected control rod has been identified as a "fast notching" control rod by engineering, THEN THROTTLE OPEN 2

-PCV-085-0023 CRD, CRD DRIVE WATER PRESS CONTROL VLV, to as low as 180 psid using 2

-HS-85-23A. (Otherwise N/A)

Standard:

Determines that step in N/A SAT UNSAT N/A Step 2 6:

[3] OBSERVE the following for the selected control rod:

CRD ROD SELECT pushbutton is brightly ILLUMINATED White light on the Full Core Display ILLUMINATED Rod Out Permit light ILLUMINATED Standard: VERIFIES CRD ROD SELECT pushbutton is brightly ILLUMINATED White light on the Full Core Display ILLUMINATED Rod Out Permit light ILLUMINATED SAT UNSAT N/A Step 2 7:

[4] VERIFY Rod Worth Minimizer is operable and LATCHED into the correct ROD GROUP when the Rod Worth Minimizer is enforcing Standard: STEP is N/A due to Rod Block Monitor is Enforcing SAT UNSAT N/A Job Performance Measure (JPM) 19 STEP / STANDARD SAT / UNSAT Step 2 8: [5] PLACE CRD CONTROL SWITCH, 2-HS-85-48, in ROD OUT NOTCH, and RELEASE.

[6] OBSERVE the control rod settles into the desired position and the ROD SETTLE light extinguishes.

Standard:

PLACED CRD CONTROL SWITCH, 2-85-48 in ROD OUT NOTCH position and RELEASED control switch to move Control Rod to Position 04 as indicated on Full Core Display

. Critical Step

SAT UNSAT N/A Note to Examiner: Step is repeated to get Control Rod to Position 04 Termination Criteria: When Control Rod is at position 04, s tate "End of Task"

STOP TIME:

Job Performance Measure (JPM) 20 Provide to Applicant

      • IN-SIMULATOR: I will explain the initial conditions and state the task to be performed. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's Correct". (OR "That's Incorrect", if applicable). When you have completed your assigned task, you will say, "my task is complete" and I will acknowledge that your task is complete.

INITIAL CONDITIONS:

You are an Operator on Unit

2. The Reactor is at 30% power Startup Sequence Control Rod Movement Data Sheet 2

-SR-3.1.3.5(A) completed through group 57.

INITIATING CUES

The US has directed you to raise Reactor Power to 40% per 2-SR-3.1.3.5(A) in preparation for placing Feedwater Heaters and Moisture Separator Drain System in service. Start on Group 58; Control Rod 14

-31.

Job Performance Measure (JPM) 1 SITE: BFN JPM TITLE:

LOSS OF REFERENCE APRM TO ROD BLOCK MONITOR JPM NUMBER:

672A U3 REVISION: 0 TASK APPLICABILITY:

SRO STA UO NAUO TASK NUMBER / TASK TITLE(S):

U-085-AL-03 RESPOND TO CONTROL ROD WITHDRAWL BLOCK K/A RATINGS:

RO: 3.1 SRO: 3.3 K/A No. &STATEMENT:

215002 Rod Block Monitor System A2.03; Ability to (a) predict the impacts of the following on the ROD BLOCK MONITOR SYSTEM ; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those abnormal conditions or operations: Loss of associated reference APRM channel: BWR

-3,4,5 RELATED PRA INFORMATION:

Risk Significant SAFETY FUNCTION:

7 EVALUATION LOCATION: In-Plant Simulator Control R oom Lab Other - List APPLICABLE METHOD OF TESTING: Discussion Simulate/Walkthrough Perform TIME FOR COMPLETION: NA TIME CRITICAL (Y/N) ALTERNATE PATH (Y/N)

Developed by:

Developer Date (Ensure validator is briefed on exam security per NPG

-SPP-17.8.1) (See JPM Validation Checklist in NPG

-SPP-17.8.2) Validated by:

Approved by:

Validator Date Approved by:

Site Training Management Date Site Training Program Owner Date N Y Job Performance Measure (JPM) 2 OPERATOR: ________________________________

JPM Number: _672A U3_ RO SRO DATE: _______

TASK STANDARD:

Perform operations necessary to bypass an APRM Channel and clear a Control Rod Block from Rod Block Monitoring System.

Operator Fundamental evaluated:

OF-1 Monitoring plant indications and conditions closely.

OF-2 Controlling plant evolutions precisely.

OF-5 Having a solid understanding of plant design, engineering principles, and sciences.

PRA: NA REFERENCES/PROCEDURES NEEDED:

3-OI-85, 3-OI-92B, 3-ARP-9-5A, 3-SR-3.1.3.5(A)

VALIDATIONTIME: PERFORMANCE TIME:

COMMENTS:

Additional comment sheets attached? YES ___ NO ___

RESULTS: SATISFACTORY ____

UNSATISFACTORY ____

IF UNSAT results are obtained THEN Retain entire JPM for records.(Otherwise just retain this page.

)

SIGNATURE: ___________________________

DATE: __________

EXAMINER Job Performance Measure (JPM) 3 Revision Summary Rev No. Effective Date Pages Affected Description 0 04/30/15 All Initial issue

Job Performance Measure (JPM) 4 SIMULATOR SETUP IC 39 Exam IC 282 Console Operator Instructions Reset IC-39to ~ 3 0% Reactor Power Open Schedule File: NRC JPM C U3

-RBM APRM Fail Downscale.sch Open Event File: NRC JPM C U3

-RBM APRM Fail Downscale.evt Malfunctions Description Event Severity Delay Initial set NM07L3233C LPRM AMPLIFIER FAILURE 32 C 15 0 N/A N/A NM07L4025B LPRM AMPLIFIER FAILURE 40 B 15 0 N/A N/A NM07L4033D LPRM AMPLIFIER FAILURE 40 D 15 0 N/A N/A NM07L0817B LPRM AMPLIFIER FAILURE 08 B 15 0 N/A N/A NM07L4017B LPRM AMPLIFIER FAILURE 40 B 15 0 N/A N/A NM07L4041D LPRM AMPLIFIER FAILURE 40 D 15 0 N/A N/A NM07L4049B LPRM AMPLIFIER FAILURE 40 B 15 0 N/A N/A NM07L4057B LPRM AMPLIFIER FAILURE 40 B 15 0 N/A N/A NM07L4817C LPRM AMPLIFIER FAILURE 48 C 15 0 N/A N/A NM07L4825C LPRM AMPLIFIER FAILURE 48 C 15 0 N/A N/A NM07L4833A LPRM AMPLIFIER FAILURE 48 A 15 0 N/A N/A NM07L4841A LPRM AMPLIFIER FAILURE 48 A 15 0 N/A N/A NM07L4849C LPRM AMPLIFIER FAILURE 48 C 15 0 N/A N/A NM07L0825B LPRM AMPLIFIER FAILURE 08 B 15 0 N/A N/A Job Performance Measure (JPM) 5 NM07L0833D LPRM AMPLIFIER FAILURE 08 D 15 0 N/A N/A NM07L0841D LPRM AMPLIFIER FAILURE 08 D 15 0 N/A N/A NM07L0849B LPRM AMPLIFIER FAILURE 08 B 15 0 N/A N/A NM07L2409B LPRM AMPLIFIER FAILURE 24 B 15 0 N/A N/A NM07L2417D LPRM AMPLIFIER FAILURE 24 D 15 0 N/A N/A NM07L2425D LPRM AMPLIFIER FAILURE 24 D 15 0 N/A N/A NM07L2433B LPRM AMPLIFIER FAILURE 24 B 15 0 N/A N/A NM07L2449D LPRM AMPLIFIER FAILURE 24 D 15 0 N/A N/A NM07L2457D LPRM AMPLIFIER FAILURE 24 D 15 0 N/A N/A NM07L1617C LPRM AMPLIFIER FAILURE 16 C 15 0 N/A N/A NM07L1625C LPRM AMPLIFIER FAILURE 16 C 15 0 N/A N/A NM07L1633A LPRM AMPLIFIER FAILURE 16 A 15 0 N/A N/A NM07L1641A LPRM AMPLIFIER FAILURE 16 A 15 0 N/A N/A NM07L1649C LPRM AMPLIFIER FAILURE 16 C 15 0 N/A N/A NM07L1657C LPRM AMPLIFIER FAILURE 16 C 15 0 N/A N/A NM07L1609A LPRM AMPLIFIER FAILURE 16 A 15 0 N/A N/A NM07L3209C LPRM AMPLIFIER FAILURE 32 C 15 0 N/A N/A NM07L3217A LPRM AMPLIFIER FAILURE 32 A 15 0 N/A N/A NM07L3225A LPRM AMPLIFIER FAILURE 32 A 15 0 N/A N/A NM07L3249A LPRM AMPLIFIER FAILURE 32 A 15 0 N/A N/A NM07L3257A LPRM AMPLIFIER FAILURE 32 A 15 0 N/A N/A NM07L4009D LPRM AMPLIFIER FAILURE 40 D 15 0 N/A N/A NM07L4809A LPRM AMPLIFIER 15 0 N/A N/A Job Performance Measure (JPM) 6 FAILURE 48 A NM07L5617D LPRM AMPLIFIER FAILURE 56 D 15 0 N/A N/A NM07L5633B LPRM AMPLIFIER FAILURE 56 B 15 0 N/A N/A NM07L5641B LPRM AMPLIFIER FAILURE 56 B 15 0 N/A N/A NM07L3241C LPRM AMPLIFIER FAILURE 32 C 15 0 N/A N/A Remotes Description Event Severity Delay Initial set Overrides Description Event Severity Delay Initial set ZLO4631LGREENT(1)

Control Rod 46

-31 GREEN INDICATION 15 0 N/A N/A Schedule File(s):

Event File: NRC JPM C U3

-RBM APRM Fail Downscale.evt; <TRIGGER id="15" description="APRM Ch 2 Fail Downscale">ZLO4631LGREENT(1) == 0</TRIGGER>

Schedule File: NRC JPM C U3

-RBM APRM Fail Downscale.sch Job Performance Measure (JPM) 7 IN-SIMULATOR: I will explain the initial conditions and state the task to be performed. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's Correct".

(OR "That's Incorrect", if applicable). When you have completed your assigned task, you will say, "my task is complete" and I will acknowledge that your task is complete.

INITIAL CONDITIONS:

You are an Operator on Unit

3. The Reactor is at 30% power Startup Sequence Control Rod Movement Data Sheet 3

-SR-3.1.3.5(A) completed through group 58.

INITIATING CUES

The US has directed you to raise Reactor Power to 40% per 3

-SR-3.1.3.5(A) in preparation for placing Feedwater Heaters and Moisture Separator Drain System in service. Start on Group 59; Control Rod 22

-39.

Job Performance Measure (JPM) 8 START TIME: STEP / STANDARD SAT / UNSAT Step 1: [1] SELECT the desired control rod by depressing the appropriate CRD ROD SELECT pushbutton, 3

-XS-85-40. Standard: Selects Control Rod by depressing CRD ROD SELECT pushbutton.

Critical Step

SAT UNSAT N/A Step 2:

[2] OBSERVE the following for the selected control rod:

CRD ROD SELECT pushbutton is brightly ILLUMINATED White light on the Full Core Display ILLUMINATED Rod Out Permit light ILLUMINATED Standard: VERIFIES CRD ROD SELECT pushbutton is brightly ILLUMINATED White light on the Full Core Display ILLUMINATED Rod Out Permit light ILLUMINATED SAT UNSAT N/A Step 3:

[3] VERIFY Rod Worth Minimizer is operable and LATCHED into the correct ROD GROUP when the Rod Worth Minimizer is enforcing Standard: STEP is N/A due to Rod Block Monitor is Enforcing SAT UNSAT N/A Job Performance Measure (JPM) 9 STEP / STANDARD SAT / UNSAT Step 4: [4] PLACE CRD CONTROL SWITCH, 3

-HS-85-48, in ROD OUT NOTCH, and RELEASE.

[5] OBSERVE the control rod settles into the desired position and the ROD SETTLE light extinguishes.

Standard:

PLACED CRD CONTROL SWITCH, 3 48 in ROD OUT NOTCH position and RELEASED control switch to move Control Rod to Position 04 as indicated on Full Core Display

. Critical Step

SAT UNSAT N/A Note to Examiner: Step is repeated to get Control Rod to Position 04 Step 5:

[1] SELECT the desired control rod by depressing the appropriate CRD ROD SELECT pushbutton, 3

-XS-85-40. Standard: Selects Control Rod by depressing CRD ROD SELECT pushbutton.

Critical Step

SAT UNSAT N/A Step 6:

[2] OBSERVE the following for the selected control rod:

CRD ROD SELECT pushbutton is brightly ILLUMINATED White light on the Full Core Display ILLUMINATED Rod Out Permit light ILLUMINATED Standard: VERIFIES CRD ROD SELECT pushbutton is brightly ILLUMINATED White light on the Full Core Display ILLUMINATED Rod Out Permit light ILLUMINATED SAT UNSAT N/A Job Performance Measure (JPM) 10 STEP / STANDARD SAT / UNSAT Step 7: [3] VERIFY Rod Worth Minimizer is operable and LATCHED into the correct ROD GROUP when the Rod Worth Minimizer is enforcing Standard: STEP is N/A due to Rod Block Monitor is Enforcing SAT UNSAT N/A Step 8: [4] PLACE CRD CONTROL SWITCH, 3

-HS-85-48, in ROD OUT NOTCH, and RELEASE.

[5] OBSERVE the control rod settles into the desired position and the ROD SETTLE light extinguishes.

Standard:

PLACED CRD CONTROL SWITCH, 3 48 in ROD OUT NOTCH position and RELEASED control switch to move Control Rod to Position 04 as indicated on Full Core Display

. Critical Step

SAT UNSAT N/A Note to Examiner: Step is repeated to get Control Rod to Position 04 Step 9:

[1] SELECT the desired control rod by depressing the appropriate CRD ROD SELECT pushbutton, 3

-XS-85-40. Standard: Selects Control Rod by depressing CRD ROD SELECT pushbutton.

Critical Step

SAT UNSAT N/A Job Performance Measure (JPM) 11 STEP / STANDARD SAT / UNSAT Step 10: [2] OBSERVE the following for the selected control rod:

CRD ROD SELECT pushbutton is brightly ILLUMINATED White light on the Full Core Display ILLUMINATED Rod Out Permit light ILLUMINATED Standard: VERIFIES CRD ROD SELECT pushbutton is brightly ILLUMINATED White light on the Full Core Display ILLUMINATED Rod Out Permit light ILLUMINATED SAT UNSAT N/A Step 11:

[3] VERIFY Rod Worth Minimizer is operable and LATCHED into the correct ROD GROUP when the Rod Worth Minimizer is enforcing Standard: STEP is N/A due to Rod Block Monitor is Enforcing SAT UNSAT N/A Step 12:

[4] PLACE CRD CONTROL SWITCH, 3

-HS-85-48, in ROD OUT NOTCH, and RELEASE.

[5] OBSERVE the control rod settles into the desired position and the ROD SETTLE light extinguishes.

Standard:

PLACED CRD CONTROL SWITCH, 3 48 in ROD OUT NOTCH position and RELEASED control switch to move Control Rod to Position 04 as indicated on Full Core Display

. Critical Step

SAT UNSAT N/A Note to Examiner: Step is repeated to get Control Rod to Position 04

Job Performance Measure (JPM) 12 STEP / STANDARD SAT / UNSAT Note to Examiner:

This begins the Alternate Path section of JPM Simulator Booth Operator: Insert Event Trigger #1 to fail APRM 2 Downscale.

Step 13: Sensor/Trip Point:

APRM Downscale: <=5% OPRM Inop: Less than 23 operable cells

Sensor Location:

Control Room Panel 3 14. Probable Cause: A. Unbypassed APRM channel at or below sensor set point.

B. SI or SR in progress.

C. Unit shutdown (Mode 3 or 4).

D. Failed sensor.

Automatic Action: A. Rod withdrawal block with Rx Mode Sw. in RUN.(APRM only)

Operator Action: A. DETERMINE which APRM/OPRM channel is downscale/inop.

B. IF APRM failed downscale, THEN BYPASS channel. REFER TO 3-OI-92B.

Critical Step

SAT UNSAT N/A APRM DOWNSCALE/

OPRM INOP 4 Job Performance Measure (JPM) 13 STEP / STANDARD SAT / UNSAT Step 13(continued)

Sensor/Trip Point:

Relays: 3A-K1 Nuclear Instrumentation 3A-K2 Refuel Equipment in Use High Level in Scram Discharge Volume Scram Discharge Volume High Water Level Bypass Rx Mode Switch in SHUTDOWN PRNM (ANY APRM OPRM or RBM) Sensor Location:

Panel 3-9-28 Elevation 593' Aux Instr Room Probable Cause: A. One or more sensors at or above set point. B. Malfunction of sensor.

C. Control rod drop accident Automatic Action: Rod withdrawal block Operator Action: A. DETERMINE initiating condition from corresponding rod withdrawalblock alarm(s) and REFER TO operator action for alarm(s). Standard: Reference 3

-ARP-9-5A and identifies APRM Ch 2 is down scale and proceeds to bypass APRM Ch 2 per 3-OI-92B CUE:Respond as stated in Alarm Response Instruction and Bypass APRM Ch 2 per 3-OI-92B. CONTROL ROD WITHDRAWAL BLOCK 7 Job Performance Measure (JPM) 14 STEP / STANDARD SAT / UNSAT Step 1 4:

6.1 Bypassing APRM/OPRM Channel

[1] REVIEW all precautions and limitations. REFER TO Section 3.0.

Standard: Demonstrates reviewing precautions and limitations section 3.0.

SAT UNSAT N/A CUE: If asked per note 2 above, "Panel 9-14 Voter BLUE LIGHTS are extinguished".

Step 1 5:

[2] PLACE APRM BYPASS, 3

-HS-92-7B/S3, to desired channel to be bypassed.

Standard:

PLACE APRM BYPASS, 3

-HS-92-7B/S3, to APRM CH 2 Critical Step

SAT UNSAT N/A NOTES 1) Only one APRM/OPRM in each trip system can be bypassed at a time. 2) All operations are performed on Panel 3 5 unless specifically stated otherwise.

3) In order to prevent inadvertent rod withdrawal block or Reactor scram while operating APRM BYPASS selector switch, Verify that the BLUE BYPASSED lights on Panel 9

-14 Voters are extinguished prior to selecting any other channel to be bypassed. After bypassing a channel, the applicable BLUE BYPASSED status lights on Panel 9

-14 Voters are required to be illuminated prior to testing, operating, or working on that channel.

CAUTION [QA/C] SPP-10.4 requires approval of the Plant Manager or his designee prior to any planned operation with APRMs bypassed unless bypassing is specifically allowed within approved procedures. [ISE-HPS-92-RO1]

Job Performance Measure (JPM) 15 STEP / STANDARD SAT / UNSAT Step 1 6: [3] CHECK BLUE BYPASSED lights illuminated on Panel 3 14 Voters. Standard:

Simulates observing BLUE BYPASS light illuminated on Panel 3 14 for APRM CH 2

. SAT UNSAT N/A Cue: Blue Light is illuminated on Panel 3 14 for APRM CH 2.

Step 1 7:

[4] VERIFY white bypass light on Panel 3 5 is illuminated.

Standard:

Observes WHITE BYPASS light illuminated on Panel 3 5.

SAT UNSAT N/A Note to NRC Examiner: If needed, cue student to proceed with actions required to continue rod movements.Student may continue at step 18 or 21.

Step 18:

6.6.2 Actions Required During and Following Control Rod Withdrawal (continued)

[6] IF Control Rod movement was stopped to keep from exceeding a RBM setpoint or was caused by a RBM Rod Block, THEN PERFORM the following at the Unit Supervisor's discretion to "REINITIALIZE" the RBM:

[6.1] PLACE CRD POWER, 3

-HS-85-46 in the OFF position to deselect the Control Rod.

Standard:

CRD POWER, 3

-HS-85-46 in the OFF position. SAT UNSAT N/A Job Performance Measure (JPM) 16 STEP / STANDARD SAT / UNSAT Step 19: [6.2] PLACE CRD POWER, 3

-HS-85-46, in the ON position.

Standard: PLACED CRD POWER, 3-HS-85-46, in the ON position.

SAT UNSAT N/A Step 20:

[6.3] IF desired, THEN CONTINUE to withdrawal Control Rods and PERFORM applicable section for Control Rod withdrawal.

Standard:

Continues with Control Rod Movement

SAT UNSAT N/A Cue:If asked, Proceed with Control Rod Movement.

Step 21: [1] SELECT the desired control rod by depressing the appropriate CRD ROD SELECT pushbutton, 3

-XS-85-40. Standard: Selects Control Rod by depressing CRD ROD SELECT pushbutton.

Critical Step SAT UNSAT N/A Job Performance Measure (JPM) 17 STEP / STANDARD SAT / UNSAT Step 22: [2] OBSERVE the following for the selected control rod:

CRD ROD SELECT pushbutton is brightly ILLUMINATED White light on the Full Core Display ILLUMINATED Rod Out Permit light ILLUMINATED Standard: VERIFIES CRD ROD SELECT pushbutton is brightly ILLUMINATED White light on the Full Core Display ILLUMINATED Rod Out Permit light ILLUMINATED SAT UNSAT N/A Step 23:

[3] VERIFY Rod Worth Minimizer is operable and LATCHED into the correct ROD GROUP when the Rod Worth Minimizer is enforcing Standard: STEP is N/A due to Rod Block Monitor is Enforcing SAT UNSAT N/A Step 24: [4] PLACE CRD CONTROL SWITCH, 3

-HS-85-48, in ROD OUT NOTCH, and RELEASE.

[5] OBSERVE the control rod settles into the desired position and the ROD SETTLE light extinguishes.

Standard:

PLACED CRD CONTROL SWITCH, 3 48 in ROD OUT NOTCH position and RELEASED control switch to move Control Rod to Position 04 as indicated on Full Core Display. Critical Step

SAT UNSAT N/A Note to Examiner: Step is repeated to get Control Rod to Position 04 Termination Criteria: When Control Rod is at position 04, s tate "End of Task" STOP TIME:

Job Performance Measure (JPM) 18 Provide to Applicant

      • IN-SIMULATOR: I will explain the initial conditions and state the task to be performed. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's Correct". (OR "That's Incorrect", if applicable). When you have completed your assigned task, you will say, "my task is complete" and I will acknowledge that your task is complete.

INITIAL CONDITIONS:

You are an Operator on Unit

3. The Reactor is at 30% power Startup Sequence Control Rod Movement Data Sheet 3

-SR-3.1.3.5(A) completed through group 58.

INITIATING CUES

The US has directed you to raise Reactor Power to 40% per 3-SR-3.1.3.5(A) in preparation for placing Feedwater Heaters and Moisture Separator Drain System in service. Start on Group 59; Control Rod 22

-39.

Job Performance Measure (JPM) 1 SITE: BFN JPM TITLE:

2-EOI APPENDIX

-6E INJECTION SUBSYSTEM LINEUP CS SYSTEM II JPM NUMBER:

257 A U 2 REVISION: 1 TASK APPLICABILITY:

SRO STA UO NAUO TASK NUMBER / TASK TITLE(S): U-000-EM-35/ Lineup Injection Subsystem

-Core Spray Loop I(II) in Accordance with EOI Appendix 6D(E) K/A RATINGS:

RO: 3.9 SRO: 3.9 K/A No. &STATEMENT:

209001 Low Pressure Core Spray SystemA4.08 Ability to manually operate and/or monitor in thecontrol room: Reactor water level RELATED PRA INFORMATION:

Risk Significant SAFETY FUNCTION:

2 EVALUATION LOCATION:

In-Plant Simulator Control R oom Lab Other - List APPLICABLE METHOD OF TESTING: Discussion Simulate/Walkthrough Perform TIME FOR COMPLETION: NA TIME CRITICAL (Y/N) ALTERNATE PATH (Y/N)

Developed by:

Developer Date (Ensure validator is briefed on exam security per NPG

-SPP-17.8.1) (See JPM Validation Checklist in NPG

-SPP-17.8.2) Validated by:

Approved by:

Validator Date Approved by:

Site Training Management Date Site Training Program Owner Date N Y Job Performance Measure (JPM) 2 OPERATOR: ________________________________

JPM Number: _257A U2_ RO SRO DATE: _______

TASK STANDARD:

Perform operations necessary to identify and corrects Inboard and Outboard Injection Valve lineup in order to inject water into the RPV with Core Spray System II to recover level

Operator Fundamental evaluated:

OF-1 Monitoring plant indications and conditions closely.

OF-5 Having a solid understanding of plant design, engineering principles, and sciences.

PRA: NA REFERENCES/PROCEDURES NEEDED:

2-EOI APPENDIX-6E VALIDATIONTIME: 8 min PERFORMANCE TIME:

COMMENTS:

Additional comment sheets attached? YES ___ NO ___

RESULTS: SATISFACTORY ____

UNSATISFACTORY ____

IF UNSAT results are obtained THEN Retain entire JPM for records.(Otherwise just retain this page.

)

SIGNATURE: ___________________________

DATE: __________

EXAMINER Job Performance Measure (JPM) 3 Revision Summary Rev No. Effective Date Pages Affected Description 0 12/06/10 All Initial issue 1 04/27/15 All General revision & re

-format Job Performance Measure (JPM) 4 SIMULATOR SETUP IC 28 Exam IC 283 Console Operator Instructions

1. Open Schedule File
2. Open Event File
3. Reset to IC-28and take out of freeze

. 4. CLOSE 2-FCV-75-51 5. OPEN 2-FCV-75-53 6. Man Scram Rx and place MS to SD. 7. Open 6 ADS Valves

. 8. Wait until various alarms with Supp Pool Temp High come in to save IC. Malfunctions Description Event Severity Delay Initial set TH22 COOLANT LEAK INSIDE DRYWELL 1 5 75% 5 Yes CS04A CORE SPRAY LOGIC POWER FAILURE DIV I 15 N/A N/A Yes CS04B CORE SPRAY LOGIC POWER FAILURE DIV II 15 N/A N/A Yes CS02B CS INBOARD INJECTION VALVE AUTO OPENING FAILURE (FCV-75-53) 15 N/A N/A Yes RH06A RHR LOGIC POWER FAILURE DIV I 15 N/A N/A Yes RH06B RHR LOGIC POWER FAILURE DIV II 15 N/A N/A Yes RC01 RCIC TURBINE TRIP SYSTEM FAILURE 15 N/A N/A Yes HP04 HPCI STEAM SUPPLY VALVE AUTO OPENING FAILURE 15 N/A N/A Yes FW01A CONDENSATE PUMP TRIP 2A 15 N/A 10 Yes Job Performance Measure (JPM) 5 FW01B CONDENSATE PUMP TRIP 2B 15 N/A 10 Yes FW01C CONDENSATE PUMP TRIP 2C 15 N/A 10 Yes Remotes Description Event Severity Delay Initial set Overrides Description Event Severity Delay Initial set Schedule File(s): JPM 257A U2 Core Spray Alt Inj.sch

Event File(s): JPM 257A U2 Core Spray Alt Inj.evt

Job Performance Measure (JPM) 6 IN-SIMULATOR: I will explain the initial conditions and state the task to be performed. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's Correct". (OR "That's Incorrect", if applicable). When you have completed your assigned task, you will say, "my task

is complete" and I will acknowledge that your task is complete.

INITIAL CONDITIONS:

You are an Operator on Unit

2. The Reactor is Shutdown RPV Water Level is lowering slowly.

1-EOI-1 has been entered and followed to RC

-L6. INITIATING CUES

The Unit Supervisor directs you to inject water into the RPV to restore RPV water level above (-)162 inches (TAF) using Core Spray System II as directed by 2-EOI Appendix

-6E, Injection Subsystems Lineup Core Spray System II.

Job Performance Measure (JPM) 7 START TIME: STEP / STANDARD SAT / UNSAT Step 1: Location: Unit 2 Control Room Attachments: 1. NPSH Monitoring

[1] VERIFY OPEN the following valves:

2-FCV-75-30, CORE SPRAY PUMP 2B SUPPR POOL SUCT VLV 2-FCV-75-39, CORE SPRAY PUMP 2D SUPPR POOL SUCT VLV Standard: Verifie s 2-FCV-75-30 and 2-FCV-75-39 are open. SAT UNSAT N/A Step 2:

[1] (continued)VERIFY OPEN the following valves:

2-FCV-75-51, CORE SPRAY SYS II OUTBD INJECT VALVE.

Standard:

Recognizes 2-FCV-75-51 is closed and 2-FCV-75-53 is open, valve closes 2-FCV-75-53 and Opens 2-FCV-75-51. Critical Step

SAT UNSAT N/A Note to Examiner: Student will realignper OPDP-8 Conduct of Ops or OI

-75, Core Spray System line up.

Job Performance Measure (JPM) 8 STEP / STANDARD SAT / UNSAT Step 3: [2] VERIFY CLOSED 2-FCV-75-50, CORE SPRAY SYS II TESTVALVE.

Standard: Verifies 2-FCV-75-50 closed SAT UNSAT N/A Step 4:

[3] VERIFY CS Pump 2B and/or 2D running.

Standard: Starts Core Pumps 2B and/or 2 D (Only starting one pump is Critical, the second pump is optional).

Critical Step

SAT UNSAT N/A Step 6:

[4] WHEN RPV pressure is below 450 psig, THEN THROTTLE 2-FCV-75-53, CORE SPRAY SYS II INBDINJECT VALVE, as necessary to control injection at or below4000 gpm per pump.

Standard: Verifies pressure < 450 psig and opens 2-FCV-75-53 and commences injection. (And verify flow <4000 gpm for 1 pump or

<8000 gpm for 2 pumps).

Critical Step SAT UNSAT N/A Step 7: CAUTION Continuous operation with inadequate NPSH may result in pump damage or pump inoperability.

[5] MONITOR Core Spray Pump NPSH using Attachment 1.

Standard: Operator comparesCore Spray Pump flow rate with Suppression Pool temperature and Suppression Pool pressure and Determined adequate NPSH.

SAT UNSAT N/A Termination Criteria: Once rector Water Level is > TAF JPM may be terminated. IF student fails to recover reactor water level above TAF (-162 inches), it will be considered a failure.

STOP TIME:

Job Performance Measure (JPM) 9 Provide to Applicant

      • IN-SIMULATOR: I will explain the initial conditions and state the task to be performed. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's Correct". (OR "That's Incorrect", if applicable). When you have completed your assigned task, you will say, "my task is complete" and I will acknowledge that your task is complete.

INITIAL CONDITIONS:

You are an Operator on Unit

2. The Reactor is Shutdown RPV Water Level is lowering slowly.

1-EOI-1 has been entered and followed to RC

-L6.

INITIATING CUES

The Unit Supervisor directs you to inject water into the RPV to restore RPV water level above 162 inches (TAF) using Core Spray System II as directed by 2-EOI Appendix

-6E, Injection Subsystems Lineup Core Spray System II.

Job Performance Measure (JPM) 1 SITE: BFN JPM TITLE:

3-EOI APPENDIX

-6E INJECTION SUBSYSTEM LINEUP CS SYSTEM II JPM NUMBER:

257 A U3 REVISION: 1 TASK APPLICABILITY:

SRO STA UO NAUO TASK NUMBER / TASK TITLE(S): U-000-EM-35/ Lineup Injection Subsystem

-Core Spray Loop I(II) in Accordance with EOI Appendix 6D(E) K/A RATINGS:

RO: 3.9 SRO: 3.9 K/A No. &STATEMENT:

209001 Low Pressure Core Spray System A4.08 Ability to manually operate and/or monitor in the control room: Reactor water level RELATED PRA INFORMATION:

Risk Significant SAFETY FUNCTION:

2 EVALUATION LOCATION:

In-Plant Simulator Control R oom Lab Other - List APPLICABLE METHOD OF TESTING: Discussion Simulate/Walkthrough Perform TIME FOR COMPLETION: NA TIME CRITICAL (Y/N) ALTERNATE PATH (Y/N)

Developed by:

Developer Date (Ensure validator is briefed on exam security per NPG

-SPP-17.8.1) (See JPM Validation Checklist in NPG

-SPP-17.8.2) Validated by:

Approved by:

Validator Date Approved by:

Site Training Management Date Site Training Program Owner Date N Y Job Performance Measure (JPM) 2 OPERATOR: ________________________________

JPM Number: _257A U3_ RO SRO DATE: _______

TASK STANDARD:

Perform operations necessary to identify and corrects Inboard and Outboard Injection Valve lineup in order to inject water into the RPV with Core Spray System II to recover level

Operator Fundamental evaluated:

OF-1 Monitoring plant indications and conditions closely.

OF-5 Having a solid understanding of plant design, engineering principles, and sciences.

PRA: NA REFERENCES/PROCEDURES NEEDED:

3-EOI APPENDIX-6E VALIDATIONTIME: 5 min PERFORMANCE TIME:

COMMENTS:

Additional comment sheets attached? YES ___ NO ___

RESULTS: SATISFACTORY ____

UNSATISFACTORY ____

IF UNSAT results are obtained THEN Retain entire JPM for records.(Otherwise just retain this page.

)

SIGNATURE: ___________________________

DATE: __________

EXAMINER Job Performance Measure (JPM) 3 Revision Summary Rev No. Effective Date Pages Affected Description 0 12/06/10 All Initial issue 1 04/27/15 All General revision & re

-format Job Performance Measure (JPM) 4 SIMULATOR SETUP IC 28 Exam IC 283 Console Operator Instructions

1. Open Schedule File
2. Open Event File
3. Reset to IC

-28 and take out of freeze.

4. CLOSE 2-FCV-75-51 5. OPEN 2-FCV-75-53 6. Man Scram Rx and place MS to SD. 7. Open 6 ADS Valves.
8. Wait until various alarms with Supp Pool Temp High come in to save IC. Malfunctions Description Event Severity Delay Initial set TH22 COOLANT LEAK INSIDE DRYWELL 15 75% 5 Yes CS04A CORE SPRAY LOGIC POWER FAILURE DIV I 15 N/A N/A Yes CS04B CORE SPRAY LOGIC POWER FAILURE DIV II 15 N/A N/A Yes CS02B CS INBOARD INJECTION VALVE AUTO OPENING FAILURE (FCV-75-53) 15 N/A N/A Yes RH06A RHR LOGIC POWER FAILURE DIV I 15 N/A N/A Yes RH06B RHR LOGIC POWER FAILURE DIV II 15 N/A N/A Yes RC01 RCIC TURBINE TRIP SYSTEM FAILURE 15 N/A N/A Yes HP04 HPCI STEAM SUPPLY VALVE AUTO OPENING FAILURE 15 N/A N/A Yes FW01A CONDENSATE PUMP TRIP 3A 15 N/A 10 Yes Job Performance Measure (JPM) 5 FW01B CONDENSATE PUMP TRIP 3B 15 N/A 10 Yes FW01C CONDENSATE PUMP TRIP 3C 15 N/A 10 Yes Remotes Description Event Severity Delay Initial set Overrides Description Event Severity Delay Initial set Schedule File(s): JPM 257A U3 Core Spray Alt Inj.sch

Event File(s): JPM 257A U3 Core Spray Alt Inj.evt

Job Performance Measure (JPM) 6 IN-SIMULATOR: I will explain the initial conditions and state the task to be performed. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's Correct". (OR "That's Incorrect", if applicable). When you have completed your assigned task, you will say, "my task is complete" and I will acknowledge that your task is complete.

INITIAL CONDITIONS:

You are an Operator on Unit

3. The Reactor is Shutdown RPV Water Level is lowering slowly.

1-EOI-1 has been entered and followed to RC

-L6. INITIATING CUES

The Unit Supervisor directs you to inject water into the RPV to restore RPV water level above (-)162 inches (TAF) using Core Spray System II as directed by 3-EOI Appendix

-6E, Injection Subsystems Lineup Core Spray System II.

Job Performance Measure (JPM) 7 START TIME: STEP / STANDARD SAT / UNSAT Step 1: Location: Unit 3 Control Room Attachments: 1. NPSH Monitoring

[1] VERIFY OPEN the following valves:

3-FCV-75-30, CORE SPRAY PUMP 3B SUPPR POOL SUCT VLV 3-FCV-75-39, CORE SPRAY PUMP 3D SUPPR POOL SUCT VLV Standard: Verifie s 3-FCV-75-30 and 3-FCV-75-39 are open. SAT UNSAT N/A Step 2:

[1] (continued) VERIFY OPEN the following valves:

3-FCV-75-51, CORE SPRAY SYS II OUTBD INJECT VALVE.

Standard: Recognizes 3

-FCV-75-51 is closed and 3

-FCV-75-53 is open, closes 3-FCV-75-53 and Opens 3

-FCV-75-51. Critical Step

SAT UNSAT N/A Note to Examiner: Student will realignper OPDP-8 Conduct of Ops or OI

-75, Core Spray System line up.

Job Performance Measure (JPM) 8 STEP / STANDARD SAT / UNSAT Step 3: [2] VERIFY CLOSED 3-FCV-75-50, CORE SPRAY SYS II TEST VALVE. Standard: Verifies 3

-FCV-75-50 closed SAT UNSAT N/A Step 4:

[3] VERIFY CS Pump 3B and/or 3D running.

Standard: Starts Core Pumps 3B and/or 3D (Only starting one pump is Critical, the second pump is optional).

Critical Step

SAT UNSAT N/A Step 6: [4] WHEN RPV pressure is below 450 psig, THEN THROTTLE 3-FCV-75-53, CORE SPRAY SYS II INBDINJECT VALVE, as necessary to control injection at or below4000 gpm per pump.

Standard: Verifies pressure < 450 psig and opens 3

-FCV-75-53 and commences injection. (And verify flow <4000 gpm for 1 pump or

<8000 gpm for 2 pumps).

Critical Step

SAT UNSAT N/A Step 7: CAUTION Continuous operation with inadequate NPSH may result in pump damage or pump inoperability.

[5] MONITOR Core Spray Pump NPSH using Attachment 1.

Standard: Operator compares Core Spray pump flow rate with Suppression Pool temperature and Suppression Pool pressure and Determined adequate NPSH.

SAT UNSAT N/A Termination Criteria: Once rector Water Level is >

TAF JPM may be terminated. IF student fails to recover reactor water level above TAF (-162 inches), it will be considered a failure.

STOP TIME:

Job Performance Measure (JPM) 9 Provide to Applicant

      • IN-SIMULATOR: I will explain the initial conditions and state the task to be performed. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's Correct". (OR "That's Incorrect", if applicable). When you have completed your assigned task, you will say, "my task

is complete" and I will acknowledge that your task is complete.

INITIAL CONDITIONS:

You are an Operator on Unit 3. The Reactor is Shutdown RPV Water Level is lowering slowly.

1-EOI-1 has been entered and followed to RC

-L6.

INITIATING CUES

The Unit Supervisor directs you to inject water into the RPV to restore RPV water level using Core Spray System II as directed by 3-EOI Appendix

-6E, Injection Subsystems Lineup Core Spray System II. Directed level band is +2 to +51 inches.

Job Performance Measure (JPM) 1 SITE: BFN JPM TITLE:

2-EOI Appendix

-11F Alternate RPV Pressure Control Systems: RFPT On Minimum Flow JPM NUMBER:

670A U2 REVISION: 0 TASK APPLICABILITY:

SRO STA UO NAUO TASK NUMBER / TASK TITLE(S):

U-000-EM-58 Lineup Alternate RPV Pressure Control Systems- RFPT on Minimum Flow IAW EOI Appendix 11F K/A RATINGS:

RO: 3.6SRO: 3.6 K/A No. &STATEMENT:

239001 Main and Reheat Steam System A1.01 Ability to predict and/or monitor changes in parameters associated with operating the MAIN ANDREHEAT STEAM SYSTEM controls including: Main steam pressure RELATED PRA INFORMATION:

None SAFETY FUNCTION:

3 EVALUATION LOCATION:

In-Plant Simulator Control R oom Lab Other - List APPLICABLE METHOD OF TESTING:

Discussion Simulate/Walkthrough Perform TIME FOR COMPLETION: NA TIME CRITICAL (Y/N) ALTERNATE PATH (Y/N)

Developed by:

Developer Date (Ensure validator is briefed on exam security per NPG

-SPP-17.8.1) (See JPM Validation Checklist in NPG-SPP-17.8.2) Validated by:

Approved by:

Validator Date Approved by:

Site Training Management Date Site Training Program Owner Date N Y Job Performance Measure (JPM) 2 OPERATOR: ________________________________

JPM Number: _670A U2_ RO SRO DATE: _______

TASK STANDARD:

Perform operations necessary to necessary to place one RFPT in pressure control as directed by 2

-EOI Appendix

-11F.

Operator Fundamental evaluated: Monitoring plant conditions and indications closely and controlling plant evolutions precisely. PRA: NA REFERENCES/PROCEDURES NEEDED:

Procedure: 2-EOI-APPENDIX-11F VERIFICATION TIME: 12 min PERFORMANCE TIME:

COMMENTS:

Additional comment sheets attached? YES ___ NO ___

RESULTS: SATISFACTORY ____

UNSATISFACTORY ____

(Retain entire JPM for records)

SIGNATURE: ___________________________

DATE: __________

EXAMINER Job Performance Measure (JPM) 3 SIMULATOR SETUP IC 28 Exam IC 284 Malfunctions Description Event Severity Delay Initial set fw15a SPURIOUS RFP BEARING LOW OIL PRESSURE 1 5 N/A 0 N/A tc03a-j Fail Bypass Valves closed 1 0% 0 N/A ad01e 20 SRV 1-31 stuck open 20% 1 2 0% 0 N/A Remotes Description Event Severity Delay Initial set Overrides Description Event Severity Delay Initial set Initial Setup:

1. Reset to IC 28
2. Manually Scram RX
3. Trip 2A and 2B RFPT
4. Run Schedule File: NRC JPM E U2

-Alt RPV Press Control RFP Min Flow

5. Insert Manual Trigger #1
6. After 2A RFPT Speed is <350 RPM Open Event File: NRC JPM E U2-Alt RPV Press Control RFP Min Flow
7. Verify Auto Trigger #15 is ACTIVE
8. Freeze simulator and save IC.

Schedule Files:

1. NRC JPM E U2

-Alt RPV Press Control RFP Min Flow.sch 2. NRC JPM E U2

-Alt RPV Press Control RFP Min Flow RFPT Trip.evt

Job Performance Measure (JPM) 4 Revision Summary Rev No. Effective Date Pages Affected Description 0 09/01/15 All Initial issue

Job Performance Measure (JPM) 5 IN-SIMULATOR: I will explain the initial conditions and state the task to be performed. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's Correct". (OR "That's Incorrect", if applicable). When you have completed your assigned task, you will say, "my task is complete" and I will acknowledge that your task is complete.

INITIAL CONDITIONS:

You are an Operator on Unit 2. The Unit 2 reactor has scrammed and the turbine bypass valves are not responding for pressure control due to a loss of EHC fluid. EO I-1 has been followed to RC/P

-4. Reactor water level control is in automatic on RFPT 2C.

INITIATING CUES

The Unit Supervisor directs you to place 2A RFPT in alternate pressure control, as directed by 2

-EOI-APPENDIX-11F and lower Reactor Pressure to low in the pressure band of 800 to 1000 psig.

Job Performance Measure (JPM) 6 START TIME STEP / STANDARD SAT / UNSAT Step 1: [1] IF BOTH of the following exist:

Emergency RPV Depressurization is required, AND Group 1 Isolation Signal exists, THEN EXIT this procedure and ENTER EOI Appendix 11H.

Standard:

Verifies that a Group 1 Isolation signal Does Not exist by observing illuminated RED PCIS Group I lights and/or Verified MSIVs are open by observing illuminated RED valve position indicating lights for each valve.

SAT UNSAT N/A Step 2:

[2] VERIFY MSIVs open.

Standard:

Verifies MSIVs OPEN SAT UNSAT N/A Job Performance Measure (JPM) 7 STEP / STANDARD SAT / UNSAT Step 3: [3] VERIFY Hotwell Pressure at or below

-7 in. Hg. Standard:

Verifies Hotwell Pressure at or below

-7 in. Hg SAT UNSAT N/A Step 4:

[4] PLACE RFPTs in service as follows:

[4.1] VERIFY the following:

[4.1.1] At least one condensate pump running. [4.1.2] At least one condensate booster pump running. [4.1.3] Condensate System aligned to supply suction toRFPs.

Standard:

Verifies one condensate pump and one condensate booster pump running, verifies condensate system aligned to supply suction to RFPs.

SAT UNSAT N/A Step 5:

[4.2] VERIFY Main Oil Pump running for each RFPT to bestarted.

Standard:

Verifies main oil pump running for RFPT 2A SAT UNSAT N/A Step 6:

[4.3] VERIFY CLOSED 2-FCV-3-19, RFP 2ADISCHARGE VALVE.

Standard:

VERIFY CLOSED 2-FCV-3-19, RFP 2A DISCHARGE VALVE.

Critical Step SAT UNSAT N/A Job Performance Measure (JPM) 8 STEP / STANDARD SAT / UNSAT Step 7: [4.4] DEPRESS 2-HS-46-8A RFPT 2A SPEED CONT RAISE/LOWER, and VERIFY amber lightis illuminated.

Standard:

Depresses 2

-HS-46-8A Critical Step SAT UNSA T N/A Step 8:

[4.5] DEPRESS 2-HS-3-124A , RFPT 2A TRIP RESET.

Standard:

Depresses 2

-HS-3-124A and verifies the 2

-Z1-1-123 LP Stop Valve and 2-Z1-127 HP Stop Valve comes OPEN.

Critical Step SAT UNSA T N/A Step 9:

[4.6] PLACE 2-HS-46-112A RFPT 2A START/LOCAL ENABLE, in START. Standard:

Places 2-HS-46-112A in START Critical Step SAT UNSA T N/A Note to Examiner:

RFPT A will Trip due to Low Bearing Oil Pressure at > 350 RPM Step 10:

[4.7] CHECK RFPT 2A speed increases to approximately 600 rpm.

Standard:

Operator responds to RFPT A Trip and reports to US and begins to use B RFP for RPV Pressure Control per 2-EOI-APPENDIX-11F. Critical Step SAT UNSAT N/A CUE: US: Proceed as directed per 2

-EOI-APPENDIX-11F. AO: Reports an oil leak of ~5 gpm on RFPT A bearings.

Job Performance Measure (JPM) 9 STEP / STANDARD SAT / UNSAT Step 1 1:

[1] IF BOTH of the following exist:

Emergency RPV Depressurization is required, AND Group 1 Isolation Signal exists, THEN EXIT this procedure and ENTER EOI Appendix 11H.

Standard:

Verifies that a Group 1 Isolation signal Does Not exist by observing illuminated RED PCIS Group I lights and/or Verified MSIVs are open by observing illuminated RED valve position indicating lights for each valve.

SAT UNSAT N/A Step 1 2:

[2] VERIFY MSIVs open.

Standard:

Verifies MSIVs OPEN SAT UNSAT N/A Job Performance Measure (JPM) 10 STEP / STANDARD SAT / UNSAT Step 1 3: [3] VERIFY Hotwell Pressure at or below

-7 in. Hg. Standard:

Verifies Hotwell Pressure at or below

-7 in. Hg SAT UNSAT N/A Step 1 4:

[4] PLACE RFPTs in service as follows:

[4.1] VERIFY the following:

[4.1.1] At least one condensate pump running. [4.1.2] At least one condensate booster pump running. [4.1.3] Condensate System aligned to supply suction toRFPs.

Standard:

Verifies one condensate pump and one condensate booster pump running, verifies condensate system aligned to supply suction to RFPs.

SAT UNSAT N/A Step 1 5:

[4.2] VERIFY Main Oil Pump running for each RFPT to be started. Standard:

Verifies main oil pump running for RFPT 2B SAT UNSAT N/A Step 1 6:

[4.3] VERIFY CLOSED 2-FCV-3-12, RFP 2B DISCHARGE VALVE.

Standard:

VERIFY CLOSED 2-FCV-3-12, RFP 2B DISCHARGE VALVE.

Critical Step SAT UNSAT N/A Job Performance Measure (JPM) 11 STEP / STANDARD SAT / UNSAT Step 1 7: [4.4] DEPRESS 2-HS-46-9A, RFPT 2BSPEED CONT RAISE/LOWER, and VERIFY amber light is illuminated.

Standard:

Depresses 2

-HS-46-9A Critical Step SAT UNSAT N/A Step 1 8:

[4.5] DEPRESS 2-HS-3-150A , RFPT 2B TRIP RESET.

Standard:

Depresses 2

-HS-3-150A and verifies the 2

-ZI-1-1 33 LP Stop Valve and 2

-FCV-1 35 HP Stop Valve comes OPEN.

Critical Step SAT UNSAT N/A Step 1 9:

[4.6] PLACE 2-HS-46-138A, RFPT 2B START/LOCAL ENABLE, in START. Standard:

Places 2-HS-46-138A in START Critical Step SAT UNSAT N/A Step 2 0:

[4.7] CHECK RFPT 2B speed increases to approximately 600 rpm.

Standard:

Verifies RFPT 2B speed increases to approximately 600 rpm SAT UNSAT N/A Job Performance Measure (JPM) 12 STEP / STANDARD SAT / UNSAT Step 21: [4.8] VERIFY OPEN 2-FCV-3-13, RFP2B MIN FLOW VALVE.

Standard:

Verifies 2-FCV-3-13 OPEN SAT UNSAT N/A Step 21: CAUTION RFP discharge pressure is limited to below 1250 psig to avoid system damage.

[4.9] PLACE 2-HS-46-9A, RFPT 2B SPEED CONT RAISE/LOWER in RAISE to raise RFPT speed, maintaining discharge pressure less than 1250 psig. Standard:

Raises RFPT speed using Manual Speed Control Handswitch, maintaining discharge pressure <1250 psig as indicated on 2-PI-3-9A RFPT 2B (Only Critical if exceeds 1250 psig, any pressure <1250 psig is acceptable).

Critical Step SAT UNSAT N/A STOP TIME END OF TASK

Job Performance Measure (JPM) 13 Provide to Applicant IN-SIMULATOR: I will explain the initial conditions and state the task to be performed. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's Correct". (OR "That's Incorrect", if applicable). When you have completed your assigned task, you will say, "my task is complete" and I will acknowledge that your task is complete.

INITIAL CONDITIONS:

You are an Operator on Unit 2. The Unit 2 reactor has scrammed and the turbine bypass valves are not responding for pressure control due to a loss of EHC fluid. EO I-1 has been followed to RC/P

-4. Reactor water level control is in automatic on RFPT 2C.

INITIATING CUES

The Unit Supervisor directs you to place 2A RFPT in alternate pressure control, as directed by 2

-EOI-APPENDIX-11F and lower Reactor Pressure to low in the pressure band of 800 to 1000 psig.

Job Performance Measure (JPM) 1 SITE: BFN JPM TITLE:

3-EOI Appendix

-11F Alternate RPV Pressure Control Systems: RFPT On Minimum Flow JPM NUMBER:

JPM 670A U 3 REVISION: 0 TASK APPLICABILITY:

SRO STA UO NAUO TASK NUMBER / TASK TITLE(S):

U-000-EM-58 Lineup Alternate RPV Pressure Control Systems- RFPT on Minimum Flow IAW EOI Appendix 11F K/A RATINGS:

RO: 3.6 SRO: 3.6 K/A No. & STATEMENT:

239001 Main and Reheat Steam System A1.01 Ability to predict and/or monitor changes in parameters associated with operating the MAIN AND REHEAT STEAM SYSTEM controls including: Main steam pressure RELATED PRA INFORMATION:

None SAFETY FUNCTION: 3 EVALUATION LOCATION:

In-Plant Simulator Control R oom Lab Other - List APPLICABLE METHOD OF TESTING:

Discussion Simulate/Walkthrough Perform TIME FOR COMPLETION: NA TIME CRITICAL (Y/N)

ALTERNATE PATH (Y/N)

Developed by:

Developer Date (Ensure validator is briefed on exam security per NPG

-SPP-17.8.1) (See JPM Validation Checklist in NPG

-SPP-17.8.2) Validated by:

Approved by:

Validator Date Approved by:

Site Training Management Date Site Training Program Owner Date N Y Job Performance Measure (JPM) 2 OPERATOR: ________________________________

JPM Number: __

_____ RO SRO DATE: _______

TASK STANDARD:

Perform operations necessary to necessary to place one RFPT in pressure control as directed by 3

-EOI Appendix

-11F.

Operator Fundamental evaluated: Monitoring plant conditions and indications closely and controlling plant evolutions precisely.

PRA: NA REFERENCES/PROCEDURES NEEDED:

Procedure: 3-EOI-APPENDIX-11F VERIFICATION TIME: PERFORMANCE TIME:

COMMENTS:

Additional comment sheets attached? YES ___ NO ___

RESULTS: SATISFACTORY ____

UNSATISFACTORY ____

(Retain entire JPM for records)

SIGNATURE: ___________________________

DATE: __________

EXAMINER Job Performance Measure (JPM) 3 SIMULATOR SETUP IC 28 Exam IC 284 Malfunctions Description Event Severity Delay Initial set fw15a SPURIOUS RFP BEARING LOW OIL PRESSURE 1 5 N/A 0 N/A tc03a-j Fail Bypass Valves closed 1 0% 0 N/A ad01e SRV 1-31 stuck open 1 26% 0 N/A Remotes Description Event Severity Delay Initial set Overrides Description Event Severity Delay Initial set

Job Performance Measure (JPM) 4 Initial Setup:

1. Reset to IC 28
2. Manually Scram RX
3. Trip 2A and 2B RFPT
4. Run Schedule File: NRC JPM E U2

-Alt RPV Press Control RFP Min Flow

5. Insert Manual Trigger #1
6. After 2A RFPT Speed is <350 RPM Open Event File: NRC JPM E U2

-Alt RPV Press Control RFP Min Flow

7. Verify Auto Trigger #15 is ACTIVE
8. Freeze simulator and save IC.

Schedule Files:

1. NRC JPM E U3

-Alt RPV Press Control RFP Min Flow.sch 2. NRC JPM E U 3-Alt RPV Press Control RFP Min Flow RFPT Trip.evt

Job Performance Measure (JPM) 5 Revision Summary Rev No. Effective Date Pages Affected Description 0 05/11/15 All Initial issue

Job Performance Measure (JPM) 6 IN-SIMULATOR: I will explain the initial conditions and state the task to be performed. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's Correct".

(OR "That's Incorrect", if applicable). When you have completed your assigned task, you will say, "my task is complete" and I will acknowledge that your task is complete.

INITIAL CONDITIONS:

You are an Operator on Unit

3. The Unit 3 reactor has scrammed and the turbine bypass valves are not responding for pressure control due to a loss of EHC fluid. EO I-1 has been followed to RC/P

-4. Reactor water level control is in automatic on RFPT 3 C.

INITIATING CUES

The Unit Supervisor directs you to place 3A RFPT in alternate pressure control, as directed by 3-EOI-APPENDIX-11F and lower Reactor Pressure to low in the pressure band of 800 to 1000 psig.

Job Performance Measure (JPM) 7 START TIME STEP / STANDARD SAT / UNSAT Step 1: [1] IF BOTH of the following exist:

Emergency RPV Depressurization is required, AND Group 1 Isolation Signal exists, THEN EXIT this procedure and ENTER EOI Appendix 11H.

Standard:

Verifies that a Group 1 Isolation signal Does Not exist by observing illuminated RED PCIS Group I lights and/or Verified MSIVs are open by observing illuminated RED valve position indicating lights for each valve.

SAT UNSAT N/A Step 2:

[2] VERIFY MSIVs open.

Standard:

Verifies MSIVs OPEN

SAT UNSAT N/A Job Performance Measure (JPM) 8 STEP / STANDARD SAT / UNSAT Step 3: [3] VERIFY Hotwell Pressure at or below

-7 in. Hg. Standard:

Verifies Hotwell Pressure at or below

-7 in. Hg SAT UNSAT N/A Step 4:

[4] PLACE RFPTs in service as follows:

[4.1] VERIFY the following:

[4.1.1] At least one condensate pump running. [4.1.2] At least one condensate booster pump running. [4.1.3] Condensate System aligned to supply suction to RFPs. Standard:

Verifies one condensate pump and one condensate booster pump running, verifies condensate system aligned to supply suction to RFPs.

SAT UNSAT N/A Step 5:

[4.2] VERIFY Main Oil Pump running for each RFPT to be started. Standard:

Verifies main oil pump running for RFPT 3 A SAT UNSAT N/A Step 6:

[4.3] VERIFY CLOSED 3-FCV-3-19, RFP 3 A DISCHARGE VALVE.

Standard:

VERIFY CLOSED 3-FCV-3-19, RFP 3 A DISCHARGE VALVE.

Critical Step

SAT UNSAT N/A Job Performance Measure (JPM) 9 STEP / STANDARD SAT / UNSAT Step 7: [4.4] DEPRESS 3-HS-46-8A, RFPT 3 A SPEED CONT RAISE/LOWER, and VERIFY amber light is illuminated.

Standard:

Depresses 3-HS-46-8A Critical Step SAT UNSAT N/A Step 8:

[4.5] DEPRESS 3-HS-3-124A , RFPT 3 A TRIP RESET.

Standard:

Depresses 3

-HS-3-124A and resets RFPT Trip and verifies the 3

-ZI-1-123 LP Stop Valve and 3

-ZI-127 HP Stop Valve comes OPEN.

Critical Step SAT UNSAT N/A Step 9:

[4.6] PLACE 3-HS-46-112A RFPT 3 A START/LOCAL ENABLE, in START. Standard:

Places 3-HS-46-112A in START Critical Step SAT UNSAT N/A Note to Examiner:

RFPT A will Trip due to Low Bearing Oil Pressure at > 350 RPM Step 10: [4.7] CHECK RFPT 3 A speed increases to approximately 600 rpm.

Standard:

Operator responds to RFPT A Trip and reports to US and begins to use B RFP for RPV Pressure Control per 3-EOI-APPENDIX-11F. SAT UNSAT N/A CUE: US: Proceed as directed per 3-EOI-APPENDIX-11F. AO: Reports an oil leak of ~5 gpm on RFPT A bearings.

Job Performance Measure (JPM) 10 STEP / STANDARD SAT / UNSAT Step 1 1: [1] IF BOTH of the following exist:

Emergency RPV Depressurization is required, AND Group 1 Isolation Signal exists, THEN EXIT this procedure and ENTER EOI Appendix 11H.

Standard:

Verifies that a Group 1 Isolation signal Does Not exist by observing illuminated RED PCIS Group I lights and/or Verified MSIVs are open by observing illuminated RED valve position indicating lights for each valve.

SAT UNSAT N/A Step 1 2:

[2] VERIFY MSIVs open.

Standard:

Verifies MSIVs OPEN SAT UNSAT N/A Job Performance Measure (JPM) 11 STEP / STANDARD SAT / UNSAT Step 1 3: [3] VERIFY Hotwell Pressure at or below

-7 in. Hg. Standard:

Verifies Hotwell Pressure at or below

-7 in. Hg SAT UNSAT N/A Step 1 4:

[4] PLACE RFPTs in service as follows:

[4.1] VERIFY the following:

[4.1.1] At least one condensate pump running. [4.1.2] At least one condensate booster pump running. [4.1.3] Condensate System aligned to supply suction to RFPs. Standard:

Verifies one condensate pump and one condensate booster pump running, verifies condensate system aligned to supply suction to RFPs.

SAT UNSAT N/A Step 1 5:

[4.2] VERIFY Main Oil Pump running for each RFPT to be started. Standard:

Verifies main oil pump running for RFPT 3 B SAT UNSAT N/A Step 1 6:

[4.3] VERIFY CLOSED 3-FCV-3-12, RFP 3 B DISCHARGE VALVE.

Standard:

VERIFY CLOSED 3-FCV-3-12, RFP 3 B DISCHARGE VALVE.

Critical Step

SAT UNSAT N/A Job Performance Measure (JPM) 12 STEP / STANDARD SAT / UNSAT Step 1 7: [4.4] DEPRESS 3-HS-46-9A, RFPT 3 B SPEED CONT RAISE/LOWER, and VERIFY amber light is illuminated.

Standard:

Depresses 3-HS-46-9A Critical Step SAT UNSAT N/A Step 1 8:

[4.5] DEPRESS 3-HS-3-150A , RFPT 3B TRIP RESET.

Standard:

Depresses 3

-HS-3-150A and verifies the 3-ZI-1-133 LP Stop Valve and 3

-FCV-135 HP Stop Valve comes OPEN.

Critical Step SAT UNSAT N/A Step 1 9:

[4.6] PLACE 3-HS-46-138A, RFPT 3B START/LOCAL ENABLE, in START. Standard:

Places 3-HS-46-138A in START Critical Step SAT UNSAT N/A Step 2 0: [4.7] CHECK RFPT 3B speed increases to approximately 600 rpm.

Standard:

Verifies RFPT 3B speed increases to approximately 600 rpm SAT UNSAT N/A Job Performance Measure (JPM) 13 STEP / STANDARD SAT / UNSAT Step 21: [4.8] VERIFY OPEN 3-FCV-3-13, RFP 3B MIN FLOW VALVE.

Standard:

Verifies 3-FCV-3-13 OPEN Critical Step SAT UNSAT N/A Step 21: CAUTION RFP discharge pressure is limited to below 1250 psig to avoid system damage.

[4.9] PLACE 3-HS-46-9A, RFPT 3 B SPEED CONT RAISE/LOWER in RAISE to raise RFPT speed, maintaining discharge pressure less than 1250 psig. Standard:

Raises RFPT speed using Manual Speed Control Handswitch, maintaining discharge pressure <1250 psig as indicated on 3-PI-3-9A RFPT 3B (Only Critical if exceeds 1250 psig, any pressure <1250 psig is acceptable).

Critical Step SAT UNSAT N/A STOP TIME END OF TASK

Job Performance Measure (JPM) 14 Provide to Applicant IN-SIMULATOR: I will explain the initial conditions and state the task to be performed. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's Correct". (OR "That's Incorrect", if applicable). When you have completed your assigned task, you will say, "my task is complete" and I will acknowledge that your task is complete.

INITIAL CONDITIONS:

You are an Operator on Unit

3. The Unit 3 reactor has scrammed and the turbine bypa ss valves are not responding for pressure control due to a loss of EHC fluid. EO I-1 has been followed to RC/P

-4. Reactor water level control is in automatic on RFPT 3 C.

INITIATING CUES

The Unit Supervisor directs you to place 3A RFPT in alternate pressure control, as directed by 3-EOI-APPENDIX-11F and lower Reactor Pressure to low in the pressure band of 800 to 1000 psig.

Job Performance Measure (JPM) 1 SITE: BFN JPM TITLE:

N2 MAKEUP TO PRIMARY CONTAINMENT WITH 2-EOI-APPENDIX-14A JPM NUMBER:

669 U2 REVISION: 0 TASK APPLICABILITY:

SRO STA UO NAUO TASK NUMBER / TASK TITLE(S):

U-000-EM-77 Lineup nitrogen Makeup to primary Containment IAW EOI

-APPENDIX-14A K/A RATINGS:

RO: 3.7SRO: 3.8 K/A No. &STATEMENT:

223001 Primary Containment System and Auxiliaries A2.04

Ability to (a) predict the impacts of the following on the PRIMARY CONTAINMENT SYSTEM AND AUXILIARIES ; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences ofthose abnormal conditions or operations
High containment/drywell hydrogen concentration RELATED PRA INFORMATION:

None SAFETY FUNCTION:

5 EVALUATION LOCATION:

In-Plant Simulator Control R oom Lab Other - List APPLICABLE METHOD OF TESTING:

Discussion Simulate/Walkthrough Perform TIME FOR COMPLETION: NA TIME CRITICAL (Y/N) ALTERNATE PATH (Y/N)

Developed by:

Developer Date (Ensure validator is briefed on exam security per NPG

-SPP-17.8.1) (See JPM Validation Checklist in NPG-SPP-17.8.2) Validated by:

Approved by:

Validator Date Approved by:

Site Training Management Date Site Training Program Owner Date N N Job Performance Measure (JPM) 2 OPERATOR: ________________________________

JPM Number:

_669 U2__ RO SRO DATE: _______

TASK STANDARD:

Perform operations necessary to establish Nitrogen Makeup to Primary Containment and lower Primary Containment Hydrogen Concentration.

Operator Fundamental evaluated: Monitoring plant conditions and indications closely and controlling plant evolutions precisely.

PRA: NA REFERENCES/PROCEDURES NEEDED:

Procedure: 2-EOI-APPENDIX-14A VERIFICATION TIME: 15 min PERFORMANCE TIME:

COMMENTS:

Additional comment sheets attached? YES ___ NO ___

RESULTS: SATISFACTORY ____

UNSATISFACTORY ____

(Retain entire JPM for records)

SIGNATURE: ___________________________

DATE: __________

EXAMINER Job Performance Measure (JPM) 3 SIMULATOR SETUP IC 28 Exam IC 285 Console Operator Instructions

1. Open Schedule File
2. Open Event File
3. Reset to IC

-28 and take out of freeze.

4. Man Scram Rx and place MS to SD.
5. Inhibit ADS & Open 6 ADS Valves.
6. Fire Trigger 2
7. Place H2/O2 Analyzer in service with H2/O2 ISOL BYP Keylock Switch in BYPASS per EOI APPDX 19
8. Place DW Vent in Service per EOI APPX 12 9. Wait for Group 6 schedule file to time out and alrms to settle
10. Freeze simulator and save IC.

Malfunctions Description Event Severity Delay Initial set TH22 COOLANT LEAK INSIDE DRYWELL 2 100 0 Yes TH23 FUEL CLADDING DAMAGE 2 100% 0 N/A RC08 RCIC STEAM SUPPLY VALVE AUTO OPENING FAILURE 1 N/A 0 N/A HP04 HPCI STEAM SUPPLY VALVE AUTO OPENING FAILURE 1 N/A 0 N/A CS04A CORE SPRAY LOGIC POWER FAILURE DIV I 1 N/A 0 N/A CS04B CORE SPRAY LOGIC POWER FAILURE DIV II 1 N/A 0 N/A RD01A CRD PUMP TRIP 2A 1 N/A 0 N/A RD01B CRD PUMP TRIP 2B 1 N/A 0 N/A FW01A CONDENSATE PUMP TRIP 2A 1 N/A 0 N/A FW01B CONDENSATE 1 N/A 0 N/A Job Performance Measure (JPM) 4 PUMP TRIP 2B FW01C CONDENSATE PUMP TRIP 2C 1 N/A 0 N/A PC08 H2 IN DRYWELL_

2 29 0 N/A PC09 OXYGEN IN DRYWELL_ 2 2.8 0 N/A PC10 H2 IN SUPPRESSION POOL_ 2 18 0 N/A PC11 OXYGEN IN SUPPRESSION POOL_ 2 1.5 0 N/A Remotes Description Event Severity Delay Initial set Overrides Description Event Severity Delay Initial set ZLOXA554C9 DW EQUIP DRAIN SUMP LEVEL ABNORMAL 2 N/A N/A ON Schedule File(s):

JPM 669 U2 N2 Makeup to Primary Containment 2-EOI-APPENDIX-14A.sch Appendix\App. 8E.sch JPM 669 U2 N2 Makeup to Primary Containment 2

-EOI-APPENDIX-14A.evt Job Performance Measure (JPM) 5 Revision Summary Rev No. Effective Date Pages Affected Description 0 05/27/15 All Initial issue

Job Performance Measure (JPM) 6 IN-SIMULATOR: I will explain the initial conditions and state the task to be performed. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's Correct". (OR "That's Incorrect", if applicable). When you have completed your assigned task, you will say, "my task is complete" and I will acknowledge that your task is complete.

INITIAL CONDITIONS:

You are an Operator on Unit 2.

The Reactor is shutdown.

2-EOI-APPENDIX-12has been completed 2-EOI-APPENDIX-19 has been completed.

PCIS Group 6 has been overridden per 2

-EOI-APPENDIX-8E.

INITIATING CUES

The Unit Supervisor directs you to lower Hydrogen Concentration by performing 2

-EOI-APPENDIX-14A beginning on step 2

.

Job Performance Measure (JPM) 7 START TIME STEP / STANDARD SAT / UNSAT Step 1: 2. MONITOR Drywell and Suppression Chamber H 2 and O 2concentrations on one or more of the following displays(2

-EOI Appendix 19):

2-MON-76-110, H2/O2 ANALYZER (Panel 2 55) 2-XR-76-110, H2/O2 CONCENTRATION (Panel 2-9-54) Standard:

Verifies H2 and O2 concentrations

SAT UNSAT N/A Step 2:

3. IF ................. Drywell/Suppression Chamber H 2 /O 2 analyzer is or becomes inoperable, THEN ...........NOTIFY Chemistry Lab to sample Drywell andSuppression Chamber for H 2 and O 2 using CI-644. Standard:

Verifies Drywell/Suppression Chamber H 2 /O 2 analyzers are Operable SAT UNSAT N/A Job Performance Measure (JPM) 8 STEP / STANDARD SAT / UNSAT Step 3: 4.WHEN ......... Drywell or Suppression Chamber H 2 or O 2 concentration is increasing,THEN ........... CONTINUE in this procedure.

Standard:

Observes a rise in Drywell H2 Concentration and continues with procedure.

SAT UNSAT N/A Step 4: NOTE This procedure assumes that the normal makeup is from N 2 Storage Tank B. 5. DISPATCH personnel to N 2 Storage Tank B to CHECK 0-PI-76-331, N2 TANK B PRESSURE INDICATOR between 160 and 190 psig.

Standard: Dispatches UO to verify N 2 Storage Tank B Pressure SAT UNSAT N/A CUE: N 2 Storage Tank B Pressure is reading 180 psig Step 5:

6. DETERMINE area with highest H 2 and/or O 2 concentrations and INFORM SRO. Standard:

Correctly determines highest concentration is in the drywell and informs

US Critical Step SAT UNSAT N/A CUE: If asked about 15 minute sample time, state "15 minutes have elapsed"

Job Performance Measure (JPM) 9 STEP / STANDARD SAT / UNSAT Step 6: 7. VERIFY PCIS RESET (Panel 2 4). Standard:

Verifies PCIS RESET on Panel 2 4 Critical Step SAT UNSAT N/A Step 7:

8. IF ................. It is desired to makeup N 2 to the Suppression Chamber,THEN ...........CONTINUE in this procedure at Step 10.

Standard:

Correctly determine step is not applicable and proceeds to step 9.

Critical Step SAT UNSAT N/A Step 8:

9. CONTROL Drywell H 2 and O 2 as follows:
a. OPEN the following valves to admit N 2 to Drywell (Panel 2-9-3): 2-FCV-76-18, DRYWELL N2 MAKEUP INBDISOLATION VLV 2-FCV-76-17, PRI CTMT N2 MAKEUP OUTBDISOLATION VLV.

Standard: OPENS 2-FCV-76-18, DRYWELL N2 MAKEUP INBD ISOLATION VLV &

2-FCV-76-17, PRI CTMT N2 MAKEUP OUTBD ISOLATION VLV Critical Step SAT UNSAT N/A Step 9:

b. SLOWLY ADJUST 2-PC-76-14, DW/SUPPR CHBR N2 MU PRESS CONTROL (Panel 2 3), to maintain flow > 55 and

<60 scfm on 2

-XR-76-14, DW/SUPPR CHBR N2 MAKEUP FLOW/PRESS (Panel 2 3), or as directed by SRO if SAMG execution is in progress.

Standard: Achieves a flowrate between 55

-60 scfm and monitors Drywell Hydrogen Concentration Lowering Critical Step SAT UNSAT N/A Job Performance Measure (JPM) 10 STEP / STANDARD SAT / UNSAT Step 10: c. CONTINUE N 2 admission to the Drywell UNTIL Drywell H 2 andO 2 are below desired values.

Standard:

Monitors Drywell Hydrogen Concentration SAT UNSAT N/A Note to Examiner: Once satisfied with N2 Flow established between 55

- 60 scfm with a downward trend on H2 Concentration in the Drywell. End of task.

Pass/ Fail Criteria: Establish N2 Flow> 55 scfm and H2 Concentration on a downward trend.

STOP TIME END OF TASK

Job Performance Measure (JPM) 11 Provide to Applicant IN-SIMULATOR: I will explain the initial conditions and state the task to be performed. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's Correct". (OR "That's Incorrect", if applicable). When you have completed your assigned task, you will say, "my task is complete" and I will acknowledge that your task is complete.

INITIAL CONDITIONS:

You are an Operator on Unit 2.

The Reactor is shutdown.

2-EOI-APPENDIX-12 has been completed 2-EOI-APPENDIX-19 has been completed.

PCIS Group 6 has been overridden per 2

-EOI-APPENDIX-8E.

INITIATING CUES

The Unit Supervisor directs you to lower Hydrogen Concentration by performing 2

-EOI-APPENDIX-14A beginning on step 2

.

Job Performance Measure (JPM) 1 SITE: BFN JPM TITLE:

N2 MAKEUP TO PRIMARY CONTAINMENT WITH 3-EOI-APPENDIX-14A JPM NUMBER:

670 U 3 REVISION: 0 TASK APPLICABILITY:

SRO STA UO NAUO TASK NUMBER / TASK TITLE(S):

U-000-EM-77 Lineup nitrogen Makeup to primary Containment IAW EOI

-APPENDIX-14A K/A RATINGS:

RO: 3.7SRO: 3.8 K/A No. &STATEMENT:

223001 Primary Containment System and Auxiliaries A2.04; Ability to (a) predict the impacts of the following on the PRIMARY CONTAINMENT SYSTEM AND AUXILIARIES ; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences ofthose abnormal conditions or operations: High containment/drywell hydrogen concentration RELATED PRA INFORMATION:

None SAFETY FUNCTION:

5 EVALUATION LOCATION:

In-Plant Simulator Control R oom Lab Other - List APPLICABLE METHOD OF TESTING:

Discussion Simulate/Walkthrough Perform TIME FOR COMPLETION: NA TIME CRITICAL (Y/N) ALTERNATE PATH (Y/N) Developed by:

Developer Date (Ensure validator is briefed on exam security per NPG

-SPP-17.8.1) (See JPM Validation Checklist in NPG

-SPP-17.8.2) Validated by:

Approved by:

Validator Date Approved by:

Site Training Management Date Site Training Program Owner Date N N Job Performance Measure (JPM) 2 OPERATOR: ________________________________

JPM Number:

_670 U3_ RO SRO DATE: _______

TASK STANDARD:

Perform operations necessary to establish Nitrogen Makeup to Primary Containment and lower Primary Containment Hydrogen Concentration.

Operator Fundamental evaluated: Monitoring plant conditions and indications closely and controlling plant evolutions precisely.

PRA: NA REFERENCES/PROCEDURES NEEDED:

Procedure: 3-EOI-APPENDIX-14 A VERIFICATION TIME: PERFORMANCE TIME:

COMMENTS:

Additional comment sheets attached? YES ___ NO ___

RESULTS: SATISFACTORY ____

UNSATISFACTORY ____

(Retain entire JPM for records)

SIGNATURE: ___________________________

DATE: __________

EXAMINER Job Performance Measure (JPM) 3 SIMULATOR SETUP IC 28 Exam IC 285 Console Operator Instructions

1. Open Schedule File
2. Open Event File
3. Reset to IC

-28 and take out of freeze.

4. Man Scram Rx and place MS to SD.
5. Inhibit ADS & Open 6 ADS Valves.
6. Fire Trigger 2
7. Place H2/O2 Analyzer in service with H2/O2 ISOL BYP Keylock Switch in BYPASS per EOI APPDX 19
8. Place DW Vent in Service per EOI APPX 12
9. Wait for Group 6 schedule file to time out and alrms to settle
10. Freeze simulator and save IC.

Malfunctions Description Event Severity Delay Initial set TH22 COOLANT LEAK INSIDE DRYWELL 2 100 0 Yes TH23 FUEL CLADDING DAMAGE 2 100% 0 N/A RC08 RCIC STEAM SUPPLY VALVE AUTO OPENING FAILURE 1 N/A 0 N/A HP04 HPCI STEAM SUPPLY VALVE AUTO OPENING FAILURE 1 N/A 0 N/A CS04A CORE SPRAY LOGIC POWER FAILURE DIV I 1 N/A 0 N/A CS04B CORE SPRAY LOGIC POWER FAILURE DIV II 1 N/A 0 N/A RD01A CRD PUMP TRIP 2A 1 N/A 0 N/A RD01B CRD PUMP TRIP 2B 1 N/A 0 N/A Job Performance Measure (JPM) 4 FW01C CONDENSATE PUMP TRIP 2C 1 N/A 0 N/A PC08 H2 IN DRYWELL_

2 29 0 N/A PC09 OXYGEN IN DRYWELL_ 2 2.8 0 N/A PC10 H2 IN SUPPRESSION POOL_ 2 18 0 N/A PC11 OXYGEN IN SUPPRESSION POOL_ 2 1.5 0 N/A Overrides Description Event Severity Delay Initial set ZLOXA554C9 DW EQUIP DRAIN SUMP LEVEL ABNORMAL 2 N/A N/A ON Schedule File(s):

JPM 669 U3 N2 Makeup to Primary Containment 2

-EOI-APPENDIX-14A.sch Appendix\App. 8E.sch JPM 669 U3 N2 Makeup to Primary Containment 2

-EOI-APPENDIX-14A.evt Job Performance Measure (JPM) 5 Revision Summary Rev No. Effective Date Pages Affected Description 0 05/27/15 All Initial issue

Job Performance Measure (JPM) 6 IN-SIMULATOR: I will explain the initial conditions and state the task to be performed. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's Correct". (OR "That's Incorrect", if applicable). When you have completed your assigned task, you will say, "my task is complete" and I will acknowledge that your task is complete.

INITIAL CONDITIONS:

You are an Operator on Unit

3. The Reactor is shutdown.

3-EOI-APPENDIX-12 has been completed.

3-EOI-APPENDIX-19 has been completed.

PCIS Group 6 has been overridden per 3

-EOI-APPENDIX-8E.

INITIATING CUES

The Unit Supervisor directs you to lower Hydrogen Concentration by performing 3-EOI-APPENDIX-14A beginning on step 2

.

Job Performance Measure (JPM) 7 START TIME STEP / STANDARD SAT / UNSAT Step 1: 3. MONITOR Drywell and Suppression Chamber H 2 and O 2concentrations on one or more of the following displays(3-EOI Appendix 19):

3-MON-76-110, H2/O2 ANALYZER (Panel 3-9-55) 3-XR-76-110, H2/O2 CONCENTRATION (Panel 3-9-54) Standard:

Verifies H2 and O2 concentrations

SAT UNSAT N/A Step 2:

3. IF ................. Drywell/Suppression Chamber H 2 /O 2 analyzer is or becomes inoperable, THEN ...........NOTIFY Chemistry Lab to sample Drywell andSuppression Chamber for H 2 and O 2 using CI-644. Standard:

Verifies Drywell/Suppression Chamber H 2 /O 2 analyzers are Operable

SAT UNSAT N/A Job Performance Measure (JPM) 8 STEP / STANDARD SAT / UNSAT Step 3: 4. WHEN ......... Drywell or Suppression Chamber H 2 or O 2 concentration is increasing,THEN ........... CONTINUE in this procedure.

Standard:

Observes a rise in Drywell H2 Concentration and continues with procedure.

SAT UNSAT N/A Step 4: NOTE This procedure assumes that the normal makeup is from N 2 Storage Tank B. 5. DISPATCH personnel to N 2 Storage Tank B to CHECK 0-PI-76-331, N2 TANK B PRESSURE INDICATOR between 160 and 190 psig.

Standard: Dispatches UO to verify N 2 Storage Tank B Pressure SAT UNSAT N/A CUE: N 2 Storage Tank B Pressure is reading 180 psig Step 5:

6. DETERMINE area with highest H 2 and/or O 2 concentrations and INFORM SRO. Standard:

Correctly determines highest concentration is in the drywell and informs

US Critical Step SAT UNSAT N/A CUE: If asked about 15 minute sample time, state "15 minutes have elapsed"

Job Performance Measure (JPM) 9 STEP / STANDARD SAT / UNSAT Step 6: 7. VERIFY PCIS RESET (Panel 3-9-4). Standard:

Verifies PCIS RESET on Panel 3-9-4 Critical Step SAT UNSAT N/A Step 7:

8. IF ................. It is desired to makeup N 2 to the Suppression Chamber,THEN ...........CONTINUE in this procedure at Step 10.

Standard:

Correctly determine step is not applicable and proceeds to step 9.

Critical Step SAT UNSAT N/A Step 8:

9. CONTROL Drywell H 2 and O 2 as follows:
a. OPEN the following valves to admit N 2 to Drywell (Panel 3-9-3): 3-FCV-76-18, DRYWELL N2 MAKEUP INBDISOLATION VLV 3-FCV-76-17, PRI CTMT N2 MAKEUP OUTBDISOLATION VLV.

Standard:

OPENS 3-FCV-76-18, DRYWELL N2 MAKEUP INBD ISOLATION VLV

&3-FCV-76-17, PRI CTMT N2 MAKEUP OUTBD ISOLATION VLV Critical Step SAT UNSAT N/A Step 9:

b. SLOWLY ADJUST 3-PC-76-14, DW/SUPPR CHBR N2 MUPRESS CONTROL (Panel 3-9-3), to maintain flow between 55 and60 scfm on 3-XR-76-14, DW/SUPPR CHBR N2 MAKEUPFLOW/PRESS (Panel 3-9-3), or as directed by SRO if SAMGexecution is in progress.

Standard:

Achieves a flowrate between 55

-60 scfm and monitors Drywell Hydrogen Concentration Lowering Critical Step SAT UNSAT N/A Job Performance Measure (JPM) 10 STEP / STANDARD SAT / UNSAT Step 10: c. CONTINUE N 2 admission to the Drywell UNTIL Drywell H 2 and O 2 are below desired values.

Standard:

Monitors Drywell Hydrogen Concentration SAT UNSAT N/A Note to Examiner: Once satisfied with N2 Flow established between 55

- 60 scfm with a downward trend on H2 Concentration in the Drywell. End of task.

Pass/ Fail Criteria: Establish N2 Flow > 55 scfm and H2 Concentration on a downward trend.

STOP TIME END OF TASK

Job Performance Measure (JPM) 11 Provide to Applicant IN-SIMULATOR: I will explain the initial conditions and state the task to be performed. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's Correct". (OR "That's Incorrect", if applicable). When you have completed your assigned task, you will say, "my task is complete" and I will acknowledge that your task is complete.

INITIAL CONDITIONS:

You are an Operator on Unit

3. The Reactor is shutdown.

3-EOI-APPENDIX-12 has been completed.

3-EOI-APPENDIX-19 h as been completed.

PCIS Group 6 has been overridden per 3

-EOI-APPENDIX-8E.

INITIATING CUES

The Unit Supervisor directs you to lower Hydrogen Concentration by performing 3-EOI-APPENDIX-14A beginning on step 2

.

Job Performance Measure (JPM) 1 SITE: BFN JPM TITLE:

Restore Offsite Power to 4KV shutdown board at PNL 9-23 JPM NUMBER:

631 U2 REVISION: 0 TASK APPLICABILITY:

SRO STA UO NAUO TASK NUMBER / TASK TITLE(S):

U-082-NO-09 / Restore Offsite Power to 4KV shutdown board at PNL 9

-23 K/A RATINGS:

RO 3.4 SRO 3.4 K/A STATEMENT:

262001 A.C. Electrical Distribution A4.02 Ability to manually operate and/or monitor in the control room: Synchroscope, including understanding of running andincoming voltages RELATED PRA INFORMATION:

N/A SAFETY FUNCTION:

6 EVALUATION LOCATION

In-Plan t Simulato r Control Roo m La b Other - Lis t APPLICABLE METHOD OF TESTING: Discussion Simulate/Walkthrough Perform TIME FOR COMPLETION:

NA TIME CRITICAL (Y/N) ALTERNATE PATH (Y/N)

Developed by:

Developer Date (Ensure validator is briefed on exam security per NPG

-SPP-17.8.1) (See JPM Validation Checklist in NPG

-SPP-17.8.2) Validated by:

Approved by:

Validator Date Approved by:

Site Training Management Date Site Training Program Owner Date N N Job Performance Measure (JPM) 2 OPERATOR: ________________________________

JPM Number:

631 U2 RO SRO DATE: _______

TASK STANDARD:

Perform operations necessary to restore offsite power to 4KV SD BD A from 4KV SD BUS 1

. PRA: NA REFERENCES/PROCEDURES NEEDED:

Procedure 0-OI-82 VERIFICATION TIME:

15 Min PERFORMANCE TIME:

COMMENTS:

Additional comment sheets attached? YES ___ NO ___

RESULTS: SATISFACTORY ____

UNSATISFACTORY ____ (Retain entire JPM for records)

SIGNATURE: ___________________________

DATE: __________

EXAMINER Job Performance Measure (JPM) 3 SIMULATOR SETUP IC 28 Exam IC 286 Console Operator Instructions

1. Reset to IC 28 and take out of freeze
2. Start A EDG and parallel with offsite
3. Open 4-kV Shutdown Board A Breaker 1614 Malfunctions Description Event Severity Delay Initial set Remotes Description Event Severity Delay Initial set Overrides Description Event Severity Delay Initial set Job Performance Measure (JPM) 4 **************************************************************************************************** IN-SIMULATOR: I will explain the initial conditions and state the task to be performed. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's Correct". (OR "That's Incorrect", if applicable). When you have completed your assigned task, you will say, "my task is complete" and I will acknowledge that your task is complete.
  • INITIAL CONDITIONS:

You are an Operator on Unit 2.

No Inclement weather currently exists in the area 8 hour9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> s ago, 4 KV Shutdown Board A was separated from Offsite Power in accordance with 0

-OI-82, Standby Diesel Generator System.

INITIATING CUE:

The Unit Supervisor has directed you to restore offsite power to 4KV Shutdown Board A using the normal feeder breaker and remove DG A from parallel operation in accordance with 0

-OI-82, Section 8.3, Restoring Offsite Power to 4

-kV Shutdown Board at Panel 9

-23.

Job Performance Measure (JPM) 5 START TIME STEP / STANDARD SAT / UNSAT Step 1: 0-OI-82 Standby Diesel Generator System

Section 8.3 Restoring Offsite Power to 4

-kV Shutdown Board at Panel 9-23 NOTE The following list of 4

-kV shutdown board normal and alternate feeder breakers may be useful when performing this section:

Shutdown Board A B C D Norm Feed Bkr 1614 1616 1718 1724 Alt Feed Bkr 1716 1714 1624 1618

[1] VERIFY 4-kV Shutdown Board A is being supplied power by its respective Diesel Generator as the only source of power.

Standard: Verifies 4

-kV Shutdown Board A is being supplied by DG A

. SAT

__UNSA T N/A Step 2:

[2] VERIFY the associated 4kV shutdown board auto transfer lockout relay is tripped to MANUAL.

Diesel Handswitch Name Handswitch No. Panel A 4KV SD BD A AUTO/LOCKOUT RESET 0-211-3EA 0-9-23-7 Standard: Verifies 4KV SD BD A AUTO/LOCKOUT RESET, HS 211-A, is tripped to manua

l. SAT UNSAT N/A Job Performance Measure (JPM) 6 STEP / STANDARD SAT / UNSAT Step 3: [3] PLACE the synchroscope switch for the 4

-kV shutdown board feeder breaker that is to be paralleled with the Diesel Generator in ON. Standard: Places Synchroscope switch for 4

-kV Shutdown Board A normal feeder breaker 1614 to ON

. Critical Step

SAT UNSAT N/A Step 4:

[4] VERIFY 4-kV Shutdown Bus 1(2) voltage is between 3950 Volts and 4400 Volts and NOT undergoing abnormal voltage transients.

Standard: Verifies 4

-kV Shutdown Bus 1 voltage is between 3950 Volts and 4400 Volts and NOT undergoing abnormal voltage transients.

SAT UNSAT N/A Step 5:

[5] VERIFY associated incoming frequency is between 59 Hertz and 61 Hertz and NOT undergoing abnormal frequency transients.

Shutdown Bd Instrument Name Instrument No.

Panel A or B GEN SYNC FREQUENCY 0-SI-82-0 AB 0-9-23-7 C or D GEN SYNC FREQUENCY 0-SI-82-0 CD 0-9-23-8 Standard: Verifies incoming frequency is between 59 Hertz and 61 Hertz and NOT undergoing abnormal frequency transients using GEN SYNC FREQUENCY,0

-SI-82-AB.

SAT UNSAT N/A Job Performance Measure (JPM) 7 STEP / STANDARD SAT / UNSAT Step 6: CAUTION DO NOT parallel the Diesel Generators with an unstable offsite source or during inclementweather (e.g., lightning, heavy winds).

[6] IF 4-kV Shutdown Bus 1 (2) is experiencing abnormal voltage or frequency conditions, THEN PERFORM the following:

Standard: STEP N/A SAT UNSAT N/A Step 7: CAUTION Only one Unit 1 and 2 Diesel Generator at a time is allowed to be operated in parallel with system.

[7] PULL and PLACE the associated Diesel Generator mode selector switch in PARALLELED WITH SYSTEM.

Diesel Handswitch Name Handswitch No. Panel A DG A MODE SELECT 0-HS-82-A/5A 0-9-23-7 Standard: Pulls DG A MODE SELECT switch 0-HS-82-A/5A and places it in PARALLELED WITH SYSTEM

. Critical Step

SAT UNSAT N/A Job Performance Measure (JPM) 8 STEP / STANDARD SAT / UNSAT Step 8: CAUTION Failure of the PARALLELED WITH SYSTEM light to illuminate in the following step could indicate that the DG is still in SINGLE UNIT operation and result in overload when the DG output breaker is closed.

[8] RELEASE the Diesel Generator mode selector switch and OBSERVE PARALLELED WITH SYSTEM light illuminated.

Standard: Releases the Diesel Generator A mode selector switch, 0-HS-82-A/5A and observesPARALLELED WITH SYSTEM light is illuminated

.

SAT UNSAT N/A Step 9:

[9] ADJUST Diesel Generator frequency using the associated Diesel Generator governor control switch to obtain a synchroscope needle rotation of one revolution every 15 to 20 seconds in the SLOW direction.

Diesel Handswitch Name Handswitch No. Panel A DG A GOVERNOR CONTROL 0-HS-82-A/3A 0-9-23-7 Standard: AdjustsDiesel Generator A frequency using Diesel Generator governor control switch, 3-HS-82-A/3A, (in lower direction) to obtain a synchroscope needle rotation of one revolution every 15 to 20 seconds in the SLOW direction.

Critical Step

SAT UNSAT N/A Job Performance Measure (JPM) 9 STEP / STANDARD SAT / UNSAT Step 10: [10] USE the associated Diesel Generator voltage regulator control switch to match Diesel Generator and System voltages.

Diesel Instrument Name Inst No. Panel A DG A VOLT REGULATOR CONT 0-HS-82-A/2A 0-9-23-7 GEN SYNC REF VOLTAGE 0-EI-82-AB SYSTEM SYNC REF VOLTAGE 0-EI-211-0 AB Standard:

Matches DG A voltage with system voltage using DG A VOLT REGULATOR CONT switch 0-HS-82-A/2 A.

SAT UNSAT N/A Step 11:

[11] WHEN the synchroscope needle is approximately 2 minutes on the right hand side of the 12 o'clock position, THEN CLOSE the 4-kV shutdown board feeder breaker that is to be paralleled with the Diesel Generator.

Standard: Closesthe 4-kV shutdown board feeder breaker 1614 when the synchroscope needle is approximately 2 minutes on the right hand side of the 12 o'clock position.

Critical Step

SAT UNSAT N/A Step 12:

[12] PLACE the synchroscope switch for the 4

-kV shutdown board feeder breaker that was paralleled with the Diesel Generator in OFF. Standard:

Places the synchroscope switch for BKR 1614 in OFF.

SAT UNSAT N/A Job Performance Measure (JPM) 10 STEP / STANDARD SAT / UNSAT Step 13: NOTE If diesel operates greater than 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> at less than 50% load, the diesel should be loaded to full load for at least 30 minutes prior to engine shutdown. This will allow the engine to clean out any oil accumulations from the exhaust manifolds.

[13] IF DG has been operating at a low-THEN PERFORM the following (Otherwise N/A):

[13.1] USE the associated Diesel Generator's governor controlswitch and voltage regulator control switch

toINCREASE kW and kVAR load, in increments of 100kWevery 15 minutes.

Diesel Handswitch Name Handswitch No. Panel A DG A GOVERNOR CONTROL 0-HS-82-A/3A 0-9-23-7 DG A VOLT REGULATOR CONTROL 0-HS-82-A/2 A [13.2] OBSERVE the exhaust stack smoke concentration from outside the DG room after each incremental increase.

[13.3] STEP N/A [13.4] WHEN smoke becomes relatively clear, CONTINUE to load DG engine to 100% if possible.

[13.5] MAINTAIN 100% load for a minimum of 30 minutes.

Standard: Loads DG to 2600 kW and 185 0 kVAR by using 0-HS-82-A/3A and 0-HS-82-A/2A handswitches.

Critical Step SAT UNSAT N/A CUE: After first 100 kW load adjustment state "15 minutes have elapsed and no observable black smoke from exhaust stack for time compression and continue to full load

."

Job Performance Measure (JPM) 11 STEP / STANDARD SAT / UNSAT Step 1 4: NOTE Lagging VARs should be maintained when adjusting kW load (rising or lowering). This may require kW load adjustment to be stopped periodically to allow for adjusting kVAR load. Once desired kW load is achieved, Illustration 1 should be referred to for determination of kVAR loading required to obtain a power factor (pf) of 0.8 lagging. Diesel generator kVAR load should then be adjusted to obtain a 0.8 pf lagging. IF system conditions will NOT permit the kVAR loading required to obtain a 0.8 pf lagging, kVAR load should be adjusted to the maximum kVAR lagging the system will allow.

[14] USE the associated Diesel Generator's governor control switch and voltage regulator control switch to obtain desired kW and kVAR load.

Standard: Obtains desired kW and kVAR load using DG A Governor Control switch, 0-HS-82-A/3A and DG Volt Regulator Cont switch, 0

-HS-82-A/2A. Diesel Handswitch Name Handswitch No.

Panel A DG A GOVERNOR CONTROL 0-HS-82-A/3A 0-9-23-7 DG A VOLT REGULATOR CONT 0-HS-82-A/2A SAT UNSAT N/A CUE: state "30 minutes have elapsed continue with procedure."

Step 1 5:

[15] MONITOR the offsite source that is paralleled with the Diesel Generator.

[16] IF abnormal voltage or frequency transients are experienced, THEN Standard: Step is N/A SAT UNSAT N/A Job Performance Measure (JPM) 12 STEP / STANDARD SAT / UNSAT Step 1 6: [17] WHEN Parallel with System operation is no longer desired, THEN UNLOAD the Diesel Generator as follows:

CAUTION When unloading the Diesel Generator, failure to slowly approach the 300 kW/250 kVARlimit may result in a reverse power trip of the Diesel Generator output breaker.

[17.1] USE the associated Diesel Generator's governor control switch and voltage regulator control switch to reduce generator load to approximately 300 kW and 250 kVAR: Diesel Instrument Name Inst No. Panel A DG A GOVERNOR CONTROL 0-HS-82-A/3 A 0-9-23-7 DG A VOLTAGE REGULATOR CONTROL 0-HS-82-A/2A DG A KILOWATTS 0-JI-82-A/A DG A KILOVARS 0-VAR-82-A/A Standard: Unloads the DG to approximately 300 KW and 250 kVAR

. Critical Step

SAT UNSAT N/A Step 1 7 [17.2] PLACE the associated Diesel Generator breaker control switch in TRIP Diesel Handswitch Name Handswitch No.

Panel A DG A BKR 1818 0-HS-211-A/22 A 0-9-23-7 Standard: Trips Diesel Generator breaker 1818

. Critical Step SAT UNSAT N/A Job Performance Measure (JPM) 13 STEP / STANDARD SAT / UNSAT Step 1 8: [17.3] PULL and PLACE the associated Diesel Generator mode selector switch in SINGLE UNIT.

Diesel Handswitch Name Handswitch No.

Panel A DG A MODE SELECT 0-HS-211-A/5 A 0-9-23-7 Standard: Pulls and places 0

-HS-211-A/5A to Single Unit

. Critical Step SAT UNSAT N/A Step 19: [17.4] RELEASE the Diesel Generator mode selector switch and OBSERVE the SINGLE UNIT light illuminated.

Standard: Verifies Single Unit light illuminated

.

SAT UNSAT N/A CUE: ANOTHER OPERATOR WILL CONTINUE FROM HERE STOP TIME END OF TASK

Job Performance Measure (JPM) 14 Provide to Applicant INITIAL CONDITIONS:

You are an Operator on Unit 2.

No Inclement weather currently exists in the area 8 hour9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> s ago, 4 KV Shutdown Board A was separated from Offsite Power in accordance with 0

-OI-82, Standby Diesel Generator System.

INITIATING CUE:

The Unit Supervisor has directed you to restore offsite power to 4KV Shutdown Board A using the normal feeder breaker and remove DG A from parallel operation in accordance with 0

-OI-82, Section 8.3, Restoring Offsite Power to 4

-kV Shutdown Board at Panel 9

-23.

Job Performance Measure (JPM) 1 SITE: BFN JPM TITLE:

Restore Offsite Power to 4KV shutdown board at PNL 9

-23 U-3 JPM NUMBER:

631 REVISION: 0 TASK APPLICABILITY:

SRO STA UO NAUO TASK NUMBER / TASK TITLE(S):

U-082-NO-09 / Restore Offsite Power to 4KV shutdown board at PNL 9

-23 K/A RATINGS:

RO 3.4 SRO 3.4 K/A STATEMENT:

262001 A.C. Electrical Distribution A4.02 Ability to manually operate and/or monitor in the control room: Synchroscope, including understanding of running and incoming voltages RELATED PRA INFORMATION:

N/A SAFETY FUNCTION:

6 EVALUATION LOCATION

In-Plan t Simulato r Control Roo m La b Other - Lis t APPLICABLE METHOD OF TESTING: Discussion Simulate/Walkthrough Perform TIME FOR COMPLETION:

NA TIME CRITICAL (Y/N) ALTERNATE PATH (Y/N)

Developed by:

Developer Date (Ensure validator is briefed on exam security per NPG

-SPP-17.8.1) (See JPM Validation Checklist in NPG

-SPP-17.8.2) Validated by:

Approved by:

Validator Date Approved by:

Site Training Management Date Site Training Program Owner Date N N Job Performance Measure (JPM) 2 OPERATOR: ________________________________

JPM Number:

631 RO SRO DATE: _______

TASK STANDARD:

Perform operations necessary to restore offsite power to 4KV SD BD

EC.

PRA: NA REFERENCES/PROCEDURES NEEDED:

Procedure 3-OI-82 VERIFICATION TIME:

15 Min PERFORMANCE TIME:

COMMENTS:

Additional comment sheets attached? YES ___ NO ___

RESULTS: SATISFACTORY ____

UNSATISFACTORY ____ (Retain entire JPM for records)

SIGNATURE: ___________________________

DATE: __________

EXAMINER Job Performance Measure (JPM) 3 SIMULATOR SETUP IC 28 Exam IC 286 Console Operator Instructions

1. Reset to IC 28 and take out of freeze
2. Start C EDG and parallel with offsite
3. Open 4-kV Shutdown Board 3EC Breaker 1338 Malfunctions Description Event Severity Delay Initial set Remotes Description Event Severity Delay Initial set Overrides Description Event Severity Delay Initial set Batch / Pref File(s):

Job Performance Measure (JPM) 4 **************************************************************************************************** IN-SIMULATOR: I will explain the initial conditions and state the task to be performed. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's Correct". (OR "That's Incorrect", if applicable). When you have completed your assigned task, you will say, "my task is complete" and I will acknowledge that your task is complete.

  • INITIAL CONDITIONS:

You are an Operator on Unit 3

. No Inclement weather currently exists in the area 8 hour9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> s ago, 4 KV Shutdown Board 3EC was separated from Offsite Power in accordance with 3

-OI-82, Standby Diesel Generator System.

INITIATING CUE:

The Unit Supervisor has directed you to restore offsite power to 4KV Shutdown Board 3EC using the normal feeder breaker and remove DG 3C from parallel operation in accordance with 3

-OI-82, Section 8.3, Restoring Offsite Power to 4

-kV Shutdown Board at Panel 9

-23.

Job Performance Measure (JPM) 5 START TIME STEP / STANDARD SAT / UNSAT Step 1: 3-OI-82 Standby Diesel Generator System

Section 8.3 Restoring Offsite Power to 4

-kV Shutdown Board at Panel 9-23 NOTE The following list of 4

-kV shutdown board normal and alternate feeder breakers may be useful when performing this section:

Shutdown Board 3E A 3E B 3E C 3E D Norm Feed Bkr 1334 1336 1338 1342 Alt Feed Bkr 1726 17 28 16 26 16 28

[1] VERIFY 4-kV Shutdown Board 3EC is being supplied power by its respective Diesel Generator as the only source of power.

Standard: Verifies 4

-kV Shutdown Board E C is being supplied by DG C SAT UNSA T N/A Step 2:

[2] VERIFY the associated 4kV shutdown board auto transfer lockout relay is tripped to MANUAL.

Diesel Handswitch Name Handswitch No.

Panel 3C 4KV SD BD 3EC AUTO/LOCKOUT RESET 3-43-211-3EC 3-9-23 Standard: Verifies 4KV SD BD 3EC AUTO/LOCKOUT RESET, 3 211-3EC, is tripped to manua

l. SAT UNSAT N/A Job Performance Measure (JPM) 6 STEP / STANDARD SAT / UNSAT Step 3: [3] PLACE the synchroscope switch for the 4

-kV shutdown board feeder breaker that is to be paralleled with the Diesel Generator in ON. Standard: Places Synchroscope switch for 4

-kV Shutdown Board EC normal feeder breaker 1338 to ON Critical Step SAT UNSAT N/A Step 4:

[4] CHECK the applicable 4

-kV unit board (4

-kV bus tie board) voltage is between 3950 VOLTS and 4400 VOLTS and NOT undergoing abnormal voltage transients.

Standard: Verifies 4

-kV Unit Board voltage is between 3950 Volts and 4400 Volts and NOT undergoing abnormal voltage transients.

SAT UNSAT N/A Step 5:

[5] VERIFY associated incoming frequency is between 59 HERTZ and 61 HERTZ and NOT undergoing abnormal frequency transients.

Shutdown Bd Instrument Name Instrument No.

Panel 3E A or 3E B GEN SYNC FREQUENCY 3-SI-82-3 AB 3-9-23 3EC or 3E D GEN SYNC FREQUENCY 3-SI-82-3 CD 3-9-23 Standard: Verifies incoming frequency is between 59 Hertz and 61 Hertz and NOT undergoing abnormal frequency transients using GEN SYNC FREQUENCY, 3-SI-82-CD . SAT UNSAT N/A Job Performance Measure (JPM) 7 STEP / STANDARD SAT / UNSAT Step 6: CAUTION DO NOT parallel the Diesel Generators with an unstable offsite source or during inclement weather (e.g., lightning, heavy winds).

[6] IF 4-kV unit board (4

-kV bus tie board) is experiencing abnormal voltage or frequency conditions, THEN PERFORM the following:

Standard: N/A SAT UNSAT N/A Step 7: CAUTION Only one Unit 1 and 2 Diesel Generator at a time is allowed to be operated in parallel with system.

[7] PULL and PLACE the associated Diesel Generator mode selector switch in PARALLELED WITH SYSTEM.

Diesel Handswitch Name Handswitch No. Panel 3C DG 3C MODE SELECT 3-HS-82-3C/5 A 3-9-23 Standard: Pulls DG 3C MODE SELECT switch 3-HS-82-3C/5 A and places it in PARALLELED WITH SYSTEM Critical Step SAT UNSAT N/A Job Performance Measure (JPM) 8 STEP / STANDARD SAT / UNSAT Step 8: CAUTION Failure of the PARALLELED WITH SYSTEM light to illuminate in the following step could indicate that the DG is still in SINGLE UNIT operation and result in overload when the DG output breaker is closed.

[8] RELEASE the Diesel Generator mode selector switch and OBSERVE PARALLELED WITH SYSTEM light illuminated.

Standard: Releases the Diesel Generator 3C mode selector switch, 3-HS-82-3C/5C and observes PARALLELED WITH SYSTEM light is illuminated

. SAT UNSAT N/A Step 9:

[9] ADJUST Diesel Generator frequency using the associated Diesel Generator governor control switch to obtain a synchroscope needle rotation of one revolution every 15 to 20 seconds in the SLOW direction.

Diesel Handswitch Name Handswitch No. Panel 3C DG 3C GOVERNOR CONTROL 3-HS-82-3C/3 A 3-9-23 Standard: Adjusts Diesel Generator 3C frequency using Diesel Generator governor control switch, 3-HS-82-3C/3 A (in lower direction) to obtain a synchroscope needle rotation of one revolution every 15 to 20 seconds in the SLOW direction.

Critical Step SAT UNSAT N/A Job Performance Measure (JPM) 9 STEP / STANDARD SAT / UNSAT Step 10: [10] USE the associated Diesel Generator voltage regulator control switch to match Diesel Generator and System voltages.

Dies el Instrument Name Inst No. Panel 3C DG 3C VOLT REGULATOR CONT 3-HS-82-3C/2 A 3-9-23 GEN SYNC REF VOLTAGE 3-EI-82-3CD SYSTEM SYNC REF VOLTAGE 3-EI-211-3EC B/B Standard:

Matches DG C voltage with system voltage using DG 3C VOLT REGULATOR CONT switch 3-HS-82-3C/2 A SAT UNSAT N/A Step 11:

[11] WHEN the synchroscope needle is approximately 2 minutes on the right hand side of the 12 o'clock position, THEN CLOSE the 4-kV shutdown board feeder breaker that is to be paralleled with the Diesel Generator.

Standard: Closes the 4-kV shutdown board normal feeder breaker 1338 when the synchroscope needle is approximately 2 minutes on the right hand side of the 12 o'clock position.

Critical Step SAT UNSAT N/A Step 12:

[12] PLACE the synchroscope switch for the 4

-kV shutdown board feeder breaker that was paralleled with the Diesel Generator in OFF. Standard:

Places the synchroscope switch for BKR 1338 in OFF SAT UNSAT N/A Job Performance Measure (JPM) 10 STEP / STANDARD SAT / UNSAT Step 13: [13] IF the normal feeder breaker is supplying the 4

-kV shutdown board, THEN RESET the associated 4kV shutdown board auto transfer lockout relay. Diesel Handswitch Name Handswitch No. Panel 3C 4KV SD BD 3EC AUTO/LOCKOUT RESET 3-43-211-3EC 3-9-23 Standard: Resets 4KV SD BD 3EC Auto Transfer Lockout Relay Critical Step SAT UNSAT N/A Step 1 4: NOTE If diesel operates greater than 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> at less than 50% load, the diesel should be loaded to full load for at least 30 minutes prior to engine shutdown. This will allow the engine to clean out any oil accumulations from the exhaust manifolds.

[14] IF DG has been operating at a low

-THEN PERFORM the following (Otherwise N/A):

[14.1] USE the associated Diesel Generator's governor control switch and voltage regulator control switch to INCREASE kW and kVAR load, in increments of 100kW every 15 minutes. Diesel Handswitch Name Handswitch No. Panel 3C DG 3C GOVERNOR CONTROL 3-HS-82-3C/3A 3-9-23 DG 3C VOLT REGULATOR CONTROL 3-HS-82-3C/2A Critical Step SAT UNSAT N/A Job Performance Measure (JPM) 11 STEP / STANDARD SAT / UNSAT Step 14 continued

[14.2] OBSERVE the exhaust stack smoke concentration from outside the DG room after each incremental increase.

[14.3] STEP N/A [14.4] WHEN smoke becomes relatively clear, CONTINUE to load DG engine to 100% if possible.

[14.5] MAINTAIN 100% load for a minimum of 30 minutes.

Standard: Loads DG to 2600 kW and 1850 kVAR by using 0

-HS-82-A/3A and 0-HS-82-A/2A handswitches.

CUE: After first 100 kW load adjustment state "15 minutes have elapsed and no observable black smoke from exhaust stack for time compression and continue to full load.

" Step 1 5: NOTE VARs lagging should be maintained when adjusting kW load (rising or lowering). This may require kW load adjustment to be stopped periodically to allow for adjusting kVAR load. Once desired kW load is achieved, Illustration 1 should be referred to for determination of kVAR loading required to obtain a power factor (pf) of 0.8 lagging. Diesel generator kVAR load should then be adjusted to obtain a 0.8 pf lagging. IF system conditions will NOT permit the kVAR loading required to obtain a 0.8 pf lagging, kVAR load should be adjusted to the maximum kVAR lagging the system will allow.

[15] USE the associated Diesel Generator's governor control switch and voltage regulator control switch to obtain desired kW and kVAR load.

Diesel Handswitch Name Handswitch No.

Panel 3C DG 3C GOVERNOR CONTROL 3-HS-82-3C/3 A 3-9-23 DG 3C VOLT REGULATOR CONT 3-HS-82-3C/2 A SAT UNSAT N/A Job Performance Measure (JPM) 12 STEP / STANDARD SAT / UNSAT Standard: Obtains desired kW and kVAR load using DG 3C Governor Control switch, 3-HS-82-3C/3 A and DG Volt Regulator Control switch, 3

-HS-82-3C/2 A CUE: state "30 minutes have elapsed continue with procedure."

Step 1 6: [16] MONITOR the offsite source that is paralleled with the Diesel Generator.

[17] IF abnormal voltage or frequency transients are experienced, THEN Standard: Step is N/A SAT UNSAT N/A Step 1 7:

[18] WHEN Parallel with System operation is no longer desired, THEN UNLOAD the Diesel Generator as follows:

CAUTION When unloading the Diesel Generator, failure to slowly approach the 300 kW/250 kVAR limit may result in a reverse power trip of the Diesel Generator output breaker.

[18.1] USE the associated Diesel Generator's governor control switch and voltage regulator control switch to reduce generator load to approximately 300 kW and 250 kVAR: Diesel Instrument Name Inst No. Panel 3C DG 3C GOVERNOR CONTROL 3-HS-82-3C/3 A 3-9-23 DG 3C VOLT REGULATOR CONT 3-HS-82-3C/2 A DG 3C KILOWATTS 3-JI-82-3C/A DG 3C KILOVARS 3-VAR-82-3C/A Critical Step SAT UNSAT N/A Job Performance Measure (JPM) 13 STEP / STANDARD SAT / UNSAT Step 17 continued

Standard: Unloads the DG to approximately 300 KW and 250 kVAR Step 1 8: [18.2] PLACE the associated Diesel Generator breaker control switch in TRIP.

Diesel Handswitch Name Handswitch No.

Panel 3C DG 3C BKR 1832 3-HS-211-3EC/10A 3-9-23 Standard: Trips breaker DG 3C BKR 1832 Critical Step SAT UNSAT N/A Step 1 9: [18.3] PULL and PLACE the associated Diesel Generator mode selector switch in SINGLE UNIT.

Diesel Handswitch Name Handswitch No.

Panel 3C DG 3C MODE SELECT 3-HS-82-3C/5 A 0-9-23 Standard: Pulls and places 3

-HS-82-3C/5 A to Single Unit Critical Step SAT UNSAT N/A Step 20: [18.4] RELEASE the Diesel Generator mode selector switch and OBSERVE the SINGLE UNIT light illuminated.

Standard: Verifies Single Unit light illuminated SAT UNSAT N/A CUE: ANOTHER OPERATOR WILL CONTINUE FROM HERE STOP TIME END OF TASK

Job Performance Measure (JPM) 14 Provide to Applicant INITIAL CONDITIONS:

You are an Operator on Unit 3

. No Inclement weather currently exists in the area 8 hour9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> s ago, 4 KV Shutdown Board 3EC was separated from Offsite Power in accordance with 3

-OI-82, Standby Diesel Generator System.

INITIATING CUE:

The Unit Supervisor has directed you to restore offsite power to 4KV Shutdown Board 3EC using the normal feeder breaker and remove DG 3C from parallel operation in accordance with 3

-OI-82, Section 8.3, Restoring Offsite Power to 4

-kV Shutdown Board at Panel 9

-23.

Job Performance Measure (JPM) 1 SITE: BFN JPM TITLE:

Respond to Off

-Gas Post Treatment Radiation HI

-HI-HI JPM NUMBER:

190 U2 REVISION: 0 TASK APPLICABILITY:

SRO STA UO NAUO TASK NUMBER / TASK TITLE(S):

U-066-AB-02 -Respond to Off

-Gas Post Treatment Radiation Hi

-Hi-Hi K/A RATINGS:

RO 2.9 SRO 3.2 K/A STATEMENT:

271000 Offgas System: A2.16; Ability to (a) predict the impacts of the following on the OFFGAS SYSTEM ; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those abnormal conditions or operations: Loss of offgas system loop seals (2.9/3.2) RELATED PRA INFORMATION:

N/A SAFETY FUNCTION:

9 EVALUATION LOCATION:

In-Plant Simulator Control Room Lab Other - List APPLICABLE METHOD OF TESTING: Discussion Simulate/Walkthrough Perform TIME FOR COMPLETION: N/A TIME CRITICAL (Y/N) ALTERNATE PATH (Y/N)

Developed by:

Developer Date (Ensure validator is briefed on exam security per NPG

-SPP-17.8.1) (See JPM Validation Checklist in NPG

-SPP-17.8.2) Validated by:

Approved by:

Validator Date Approved by:

Site Training Management Date Site Training Program Owner Date N Y Job Performance Measure (JPM) 2 OPERATOR: ________________________________

JPM Number:

190 U2 RO SRO DATE: _______

TASK STANDARD:

Respond to Off-Gas Post Treatment Radiation HI

-HI-HI per 2-AOI-66-2 and/or 2

-ARP-9-4C/35 PRA: NA REFERENCES/PROCEDURES NEEDED:

2-AOI-66-2, 2-ARP-9-4C/35 VALIDATION TIME: 15 Minutes PERFORMANCE TIME:

COMMENTS:

Additional comment sheets attached? YES ___ NO ___

RESULTS: SATISFACTORY ____

UNSATISFACTORY ____

(Retain entire JPM for records)

SIGNATURE: ___________________________

DATE: __________

EXAMINER Job Performance Measure (JPM) 3 SIMULATOR SETUP IC 28 Exam IC 287 Console Operator Instructions

1. Reset to IC 28
2. Fire Manual Trigger 2 3. Fire Manual Trigger 1
4. Station 2 nd operator to respond to alarms Malfunctions Description Event Severity Delay Initial set TH23 FUEL CLADDING DAMAGE 1 50 N/A YES RM14C OFFGAS RAD MONITOR FAILURERM-90-265A 1 1E6 CPS N/A YES RM14D OFFGAS RAD MONITOR FAILURE RM-90-266A 1 1E6 CPS N/A YES Remotes Description Event Severity Delay Initial set OG06 Bypass FCV 28 Post Treatment Hi

-Hi-Hi Rad Isol 2 N/A N/A BYP Overrides Description Event Severity Delay Initial set ZAORI9014A RX BLDG AREA RAD 1 2.5 N/A YES ZAORI9017A RX BLDG AREA RAD 1 2.6 N/A YES ZAORM90265A 90-265 METER UPSCALE 1 6.0 N/A YES ZAORM90266A 90-266 METER UPSCALE 1 6.0 N/A YES ZAORR90135R1 90-135 RECORDER UPSCALE PEN 1 1 6.0 N/A YES ZAORR90135R2 90-135 RECORDER UPSCALE PEN 2 1 6.0 N/A YES ZLORM90265A_1 90-265 DRAW LITE 1 N/A N/A YES Job Performance Measure (JPM) 4 ZLORM90265A_2 90-265 DRAW LITE 1 N/A N/A YES ZLORM90265A_3 90-265 DRAW LITE 1 N/A N/A YES ZLORM90265A_4 90-265 DRAW LITE 1 N/A N/A YES ZLORM90266A_1 90-265 DRAW LITE 1 N/A N/A YES ZLORM90266A_2 90-265 DRAW LITE 1 N/A N/A YES ZLORM90266A_3 90-265 DRAW LITE 1 N/A N/A YES ZLORM90266A_4 90-265 DRAW LITE 1 N/A N/A YES XA553A5 OG PRETREAT RAD HI 1 N/A N/A YES XA553A6 STACK GAS RAD HI HI 1 N/A N/A YES XA553A7 MSL RAD HI 1 N/A N/A YES XA553A13 STACK GAS RAD HI 1 N/A N/A YES XA553A27 MSL RAD HI HI 1 N/A N/A YES XA554C26 CARBON BED VAULT RAD HI 1 N/A N/A YES XA554C27 OG ANNUAL RELEASE LIMIT EXCEEDED 1 N/A N/A YES XA554C33 OG POST TREAT RAD HI 1 N/A N/A YES XA554C34 OG POST TREAT RAD HI HI 1 N/A N/A YES XA554C35 OG POST TREAT RAD HI HIHI 1 N/A N/A YES ZDIHS6628 66-28 VALVE CLOSED 1 N/A N/A YES ZAORR90265R1 90-265 RECORDER UPSCALE PEN 1 1 6.0 N/A YES ZAORR90265R2 90-265 RECORDER UPSCALE PEN 2 1 6.0 N/A YES ZAORR90160R1 OG PRETREAT RECORDER UPSCALE 1 -2.0 N/A YES XA554B2 RWCU FILTER INLET CNDT HIGH 1 N/A N/A YES Schedule File(s):

JPM 190 U2 OG Post treat Rad HI HIHI

Job Performance Measure (JPM) 5 IN-SIMULATOR:

I will explain the initial conditions and state the task to be performed. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's Correct". (OR "That's Incorrect", if applicable). When you have completed your assigned task, you will say, "my task is complete" and I will acknowledge that your task is complete.

INITIAL CONDITIONS:

You are the Unit 2 Operator. Unit 2 is at 100% power.

INITIATING CUE:

The Unit Supervisor directs you to respond to a n OFF-GAS POST TREATMENT RADIATION HI

-HI-HI annunciator, 2

-XA-55-4C, window 35.

Job Performance Measure (JPM) 6 START TIME STEP / STANDARD SAT / UNSAT Performance Step 1: When directed, identify/obtain copy of ARP 4C, window 35.

Standard:

Obtains copy of 2

-ARP-9-4C, window 35 SAT UNSAT N/A Examiner Note: Candidate may recognize the annunciator as an entry condition and go directly to 2

-AOI-66-2. In that event, continue at Performance Step

5. Performance Step 2:

2-ARP-9-4C window 35 Operator Action:

A. VERIFY alarm condition on the following OFFGAS POST-TREATMENT RADIATION recorder, 2-RR-90-265 on Panel 2 2. OG POST-TREATMENT CHAN A RAD MON RTMR radiationmonitor, 2

-RM-90-266A on Panel 2 10. OG POST-TREATMENT CHAN B RAD MON RTMR radiationmonitor, 2

-RM-90-265A on Panel 2 10. Standard: Verified alarm condition on 2

-RR-90-265 and 2-RM-265/266. SAT UNSAT N/A Performance Step 3: B. VERIFY OFF-GAS SYSTEM ISOLATION VALVE, 2

-FCV-66-28 has the Mechanical Restraint DISENGAGED and 2-FCV-66-28 isCLOSED.

Standard: Takes handswitch 2-FCV-66-28 to close and observes green light illuminated and red light out.

Critical Step SAT UNSAT N/A Cue: If asked, the Offgas Isolation Valve, 2

-FCV-66-28 is NOT mechanically restrained.

Job Performance Measure (JPM) 7 STEP / STANDARD SAT / UNSAT Performance Step 4: C. REFER to 2-AOI-66-2, Off-gas Post-treatment Radiation Hi

-Hi-Hi Standard: Refers to 2-AOI-66-2, Off-gas Post-treatment Radiation Hi

-Hi-Hi S AT UNSAT N/A Performance Step 5: 2-AOI-66-2 4.0 OPERATOR ACTIONS 4.1 Immediate Actions

[1] IF scram has not occurred, THEN PERFORM the following:

[1.1] IF core flow is above 60%, THEN REDUCE core flow to between 50

-60%. Standard: Reduced core flow to between 50

-60% with recirc system.

Critical Step SAT UNSAT N/A Performance Step 6: [1.2] MANUALLY SCRAM the Reactor. (Reference 2

-AOI-100-1). Standard: Depresses both SCRAM Pushbuttons Places mode switch in shutdown Verifies All Rods in Performs a Scram Announcement o Rx Mode Switch Position: Shutdown o Rod Position: All Full In o Reactor Water Level ____ & Trend ___ o Reactor Pressure ____ & Trend ___

o MSIV Position: OPEN o Rx Power: <5%

Critical Step SAT UNSAT N/A Examiner Note

The scram report and referring to 2

-AOI-100-1 are not considered critical.

Job Performance Measure (JPM) 8 STEP / STANDARD SAT / UNSAT CUE: Proceed with subsequent actions of 2

-AOI-66-2, Off-gas Post-treatment Radiation Hi

-Hi-Hi Performance Step 7: 4.2 Subsequent Actions

[1] IF OFFGAS SYSTEM ISOLATION VALVE, 2

-FCV-066-0028has been mechanically restrained open due to plant conditionsTHEN DISENGAGE 2-FCV-066-0028 mechanical restraint by rotating the restraining handwheel fully in the counterclockwisedirection, locally at the Stack. (Otherwise N/A) Standard: Verifies that 2

-FCV-066-0028 in NOT mechanically restrained.

SAT UNSAT N/A Cue: 2-FCV-066 is NOT mechanically restrained.

Performance Step 8: [2] VERIFY CLOSED OFFGAS SYSTEM ISOLATION VALVE, 2-FCV-66-28 on Panel 2 53 or locally.

Standard:

Verifies 2-FCV-66-28 is closed at panel 9

-53 by Verifying RED light above handswitch extinguished and GREEN light above handswitch illuminated. (May have already verified valve closed from the ARP).

Critical Step SAT UNSAT N/A Examiner Note: May have already verified valve closed from the ARP Performance Step 9:

[3] MONITOR area radiation levels at Panel: 2 11. Standard:

Monitored radiation levels at Panel 9

-11. SAT UNSAT N/A Cue: Another operator will monitor and evaluate Area Radiation Levels.

Job Performance Measure (JPM) 9 STEP / STANDARD SAT / UNSAT Performance Step 10: [4] REFER TO EPIP-1 for emergency classification level and response. Standard; Notifies SM to implement EPIP

-1. SAT UNSAT N/A Cue: The Shift Manager is implementing the EPIPs as needed.

Performance Step 11:

[5] MONITOR the following parameters:

A. MAIN STEAM LINE RADIATION, 2

-RR-90-135, Panel 2-9-2.

B. OFFGAS PRETREATMENT RADIATION 2

-RR-90-157, Pnl 2 2. C. OFFGAS POST-TREATMENT RADIATION 2RR

- 90-265, Pnl 2 2 D. STACK GAS RADIATION, 0

-RR-90-147, Unit 1 Panel 1-9-2. Standard; Monitors 90

-135, 157, and 265. Calls Unit 1 operator for a reading on 0-RR-90-147. SAT UNSAT N/A Cue: As Unit 1 Operator, Stack Gas Radiation, 0

-RR-90-147 is reading 5X10E6 cps.

Job Performance Measure (JPM) 10 STEP / STANDARD SAT / UNSAT Performance Step 12:

[6] IF after five minutes from scram the Offgas Post Treatment activity is not less than 6 x 10 E5 cps as indicated on OFFGASRADIATION recorder 2

-RR-90-266 on panel 2 2, THEN CLOSE all Main Steam Isolation Valves and Main Steam LineDrain Valves, 2

-FCV-1-55 and 2-FCV-1-56. Standard: Recognizes that the Off

-Gas Post Treatment activity is >6 X 10E 5 and closes all Main Steam Isolation Valves and Main Steam Line Drain Valves (2

-FCV-1-55/56) Critical Step SAT UNSAT N/A Cue: The Unit has been scrammed for 5 minutes.

Acknowledge closing of MSIVs.

Examiner Note:

Closing 1-55 and 1-56 is not considered critical.

Performance Step 13:

NOTE Placing additional Stack Dilution Air Fans in service should keep 0

-RM-90-147and 0-RM-90-148 on scale.

[7] PLACE STACK DILUTION FAN SEL control switch, 2-XS-66-29, Panel 2-9-8, in OFF.

[8] START standby STACK DILUTION FAN 2B(2A) using controlswitch, 2

-HS-66-31A(29A), Panel 2 8. Standard:

Places 2-XS-66-29 in OFF and Starts standby Stack Dilution fan 2B, using 2

-HS-66-31A SAT UNSAT N/A Cue: That completes this task.

STOP TIME _______ END OF TASK

Job Performance Measure (JPM) 11 Provide to Applicant IN-SIMULATOR:

I will explain the initial conditions and state the task to be performed. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's Correct". (OR "That's Incorrect", if applicable). When you have completed your assigned task, you will say, "my task is complete" and I will acknowledge that your task is complete.

INITIAL CONDITIONS:

You are the Unit 2 Operator. Unit 2 is at 100% power.

INITIATING CUE:

The Unit Supervisor directs you to respond to a n OFF-GAS POST TREATMENT RADIATION HI

-HI-HI annunciator, 2

-XA-55-4C, window 35.

Job Performance Measure (JPM) 1 SITE: BFN JPM TITLE:

Respond to Off

-Gas Post Treatment Radiation HI

-HI-HI JPM NUMBER:

190 U3 REVISION: 0 TASK APPLICABILITY:

SRO STA UO NAUO TASK NUMBER / TASK TITLE(S):

U-066-AB-02 -Respond to Off

-Gas Post Treatment Radiation Hi

-Hi-Hi K/A RATINGS:

RO 2.9 SRO 3.2 K/A STATEMENT:

271000 Offgas System

A2.16;Ability to (a) predict the impacts of the following on the OFFGAS SYSTEM ; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those abnormal conditions or operations: Loss of offgas system loop seals (2.9/3.2) RELATED PRA INFORMATION:

N/A SAFETY FUNCTION:

9 EVALUATION LOCATION:

In-Plant Simulator Control Room Lab Other - List APPLICABLE METHOD OF TESTING: Discussion Simulate/Walkthrough Perform TIME FOR COMPLETION: N/A TIME CRITICAL (Y/N) ALTERNATE PATH (Y/N)

Developed by:

Developer Date (Ensure validator is briefed on exam security per NPG

-SPP-17.8.1) (See JPM Validation Checklist in NPG

-SPP-17.8.2) Validated by:

Approved by:

Validator Date Approved by:

Site Training Management Date Site Training Program Owner Date N Y Job Performance Measure (JPM) 2 OPERATOR: ________________________________

JPM Number:

190 RO SRO DATE: _______

TASK STANDARD:

Respond to Off

-Gas Post Treatment Radiation HI

-HI-HI per 3-AOI-66-2 and/or 3-ARP-9-4C/35 PRA: NA REFERENCES/PROCEDURES NEEDED:

3-AOI-66-2, 3-ARP-9-4C/35 VALIDATION TIME: 15 Minutes PERFORMANCE TIME:

COMMENTS:

Additional comment sheets attached? YES ___ NO ___

RESULTS: SATISFACTORY ____

UNSATISFACTORY ____

(Retain entire JPM for records)

SIGNATURE: ___________________________

DATE: __________

EXAMINER Job Performance Measure (JPM) 3 SIMULATOR SETUP IC 28 Exam IC 28 8 Console Operator Instructions

1. Reset to IC 28
2. Fire Manual Trigger 2 3. Fire Manual Trigger 1
4. Station 2 nd operator to respond to alarms Malfunctions Description Event Severity Delay Initial set TH23 FUEL CLADDING DAMAGE 1 50 N/A YES RM14C OFFGAS RAD MONITOR FAILURE RM-90-265A 1 1E6 CPS N/A YES RM14D OFFGAS RAD MONITOR FAILURE RM-90-266A 1 1E6 CPS N/A YES Remotes Description Event Severity Delay Initial set OG06 Bypass FCV 28 Post Treatment Hi

-Hi-Hi Rad Isol 2 N/A N/A BYP Overrides Description Event Severity Delay Initial set ZAORI9014A RX BLDG AREA RAD 1 2.5 N/A YES ZAORI9017A RX BLDG AREA RAD 1 2.6 N/A YES ZAORM90265A 90-265 METER UPSCALE 1 6.0 N/A YES ZAORM90266A 90-266 METER UPSCALE 1 6.0 N/A YES ZAORR90135R1 90-135 RECORDER UPSCALE PEN 1 1 6.0 N/A YES ZAORR90135R2 90-135 RECORDER UPSCALE PEN 2 1 6.0 N/A YES ZLORM90265A_1 90-265 DRAW LITE 1 N/A N/A YES ZLORM90265A_2 90-265 DRAW LITE 1 N/A N/A YES Job Performance Measure (JPM) 4 ZLORM90265A_3 90-265 DRAW LITE 1 N/A N/A YES ZLORM90265A_4 90-265 DRAW LITE 1 N/A N/A YES ZLORM90266A_1 90-265 DRAW LITE 1 N/A N/A YES ZLORM90266A_2 90-265 DRAW LITE 1 N/A N/A YES ZLORM90266A_3 90-265 DRAW LITE 1 N/A N/A YES ZLORM90266A_4 90-265 DRAW LITE 1 N/A N/A YES XA553A5 OG PRETREAT RAD HI 1 N/A N/A YES XA553A6 STACK GAS RAD HI HI 1 N/A N/A YES XA553A7 MSL RAD HI 1 N/A N/A YES XA553A13 STACK GAS RAD HI 1 N/A N/A YES XA553A27 MSL RAD HI HI 1 N/A N/A YES XA554C26 CARBON BED VAULT RAD HI 1 N/A N/A YES XA554C27 OG ANNUAL RELEASE LIMIT EXCEEDED 1 N/A N/A YES XA554C33 OG POST TREAT RAD HI 1 N/A N/A YES XA554C34 OG POST TREAT RAD HI HI 1 N/A N/A YES XA554C35 OG POST TREAT RAD HI HIHI 1 N/A N/A YES ZDIHS6628 66-28 VALVE CLOSED 1 N/A N/A YES ZAORR90265R1 90-265 RECORDER UPSCALE PEN 1 1 6.0 N/A YES ZAORR90265R2 90-265 RECORDER UPSCALE PEN 2 1 6.0 N/A YES ZAORR90160R1 OG PRETREAT RECORDER UPSCALE 1 -2.0 N/A YES XA554B2 RWCU FILTER INLET CNDT HIGH 1 N/A N/A YES Schedule File(s): JPM 190 U3 OG Post treat Rad HI HIHI

Job Performance Measure (JPM) 5 IN-SIMULATOR:

I will explain the initial conditions and state the task to be performed. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's Correct". (OR "That's Incorrect", if applicable). When you have completed your assigned task, you will say, "my task is complete" and I will acknowledge that your task is complete.

INITIAL CONDITIONS:

You are the Unit 3 Operator. Unit 3 is at 100% power.

INITIATING CUE:

The Unit Supervisor directs you to respond to a n OFF-GAS POST TREATMENT RADIATION HI

-HI-HI annunciator, 3-XA-55-4C, window 35.

Job Performance Measure (JPM) 6 START TIME STEP / STANDARD SAT / UNSAT Performance Step 1: When directed, identify/obtain copy of ARP 4C, window 35.

Standard:

Obtains copy of 3-ARP-9-4C, window 35 SAT UNSAT N/A Examiner Note: Candidate may recognize the annunciator as an entry condition and go directly to 3-AOI-66-2. In that event, continue at Performance Step

5. Performance Step 2:

3-ARP-9-4C window 35 Operator Action:

A. VERIFY alarm condition on the following OFFGAS POST-TREATMENT RADIATION recorder, 3-RR-90-265 on Panel 3-9-2. OG POST-TREATMENT CHAN A RAD MON RTMR radiationmonitor, 3-RM-90-266A on Panel 3-9-10. OG POST-TREATMENT CHAN B RAD MON RTMR radiationmonitor, 3-RM-90-265A on Panel 3-9-10. Standard: Verified alarm condition on 3-RR-90-265 and 3-RM-265/266. SAT UNSAT N/A Performance Step 3: B. VERIFY OFF-GAS SYSTEM ISOLATION VALVE, 3-FCV-66-28 has the Mechanical Restraint DISENGAGED and 3-FCV-66-28 isCLOSED.

Standard: Takes handswitch 3-FCV-66-28 to close and observes green light illuminated and red light out.

Critical Step SAT UNSAT N/A Cue: If asked, the Offgas Isolation Valve, 3-FCV-66-28 is NOT mechanically restrained.

Job Performance Measure (JPM) 7 STEP / STANDARD SAT / UNSAT Performance Step 4: C. REFER to 3-AOI-66-2 , Off-gas Post-treatment Radiation Hi

-Hi-Hi Standard: Refers to 3-AOI-66-2, Off-gas Post-treatment Radiation Hi

-Hi-Hi SAT UNSAT N/A Performance Step 5: 3-AOI-66-2 4.0 OPERATOR ACTIONS 4.1 Immediate Actions

[1] IF scram has not occurred, THEN PERFORM the following:

[1.1] IF core flow is above 60%, THEN REDUCE core flow to between 50

-60%. Standard: Reduced core flow to between 50

-60% with recirc system.

Critical Step SAT UNSAT N/A Performance Step 6: [1.2] MANUALLY SCRAM the Reactor. (Reference 3

-AOI-100-1). Standard: Depresses both SCRAM Pushbuttons Places mode switch in shutdown Verifies All Rods in Performs a Scram Announcement o Rx Mode Switch Position: Shutdown o Rod Position: All Full In o Reactor Water Level ____ & Trend ___ o Reactor Pressure ____ & Trend ___

o MSIV Position: OPEN o Rx Power: <5%

Critical Step SAT UNSAT N/A Examiner Note

The scram report and referring to 3-AOI-100-1 are not considered critical.

Job Performance Measure (JPM) 8 STEP / STANDARD SAT / UNSAT CUE: Proceed with subsequent actions of 3

-AOI-66-2, Off-gas Post-treatment Radiation Hi

-Hi-Hi Performance Step 7: 4.2 Subsequent Actions

[1] IF OFFGAS SYSTEM ISOLATION VALVE, 3-FCV-066-0028has been mechanically restrained open due to plant conditionsTHEN DISENGAGE 3-FCV-066-0028 mechanical restraint by rotating the restraining handwheel fully in the counterclockwisedirection, locally at the Stack. (Otherwise N/A) Standard: Verifies that 3-FCV-066-0028 in NOT mechanically restrained.

SAT UNSAT N/A Cue: 3-FCV-066 is NOT mechanically restrained.

Performance Step 8: [2] VERIFY CLOSED OFFGAS SYSTEM ISOLATION VALVE, 3-FCV-66-28 on Panel 3-9-53 or locally.

Standard:

Verifies 3-FCV-66-28 is closed at panel 9

-53 by Verifying RED light above handswitch extinguished and GREEN light above handswitch illuminated. (May have already verified valve closed from the ARP).

Critical Step SAT UNSAT N/A Examiner Note: May have already verified valve closed from the ARP Performance Step 9:

[3] MONITOR area radiation levels at Panel:

3-9-11. Standard:

Monitored radiation levels at Panel 9

-11. SAT UNSAT N/A Cue: Another operator will monitor and evaluate Area Radiation Levels.

Job Performance Measure (JPM) 9 STEP / STANDARD SAT / UNSAT Performance Step 10: [4] REFER TO EPIP-1 for emergency classification level and response. Standard; Notifies SM to implement EPIP

-1. SAT UNSAT N/A Cue: The Shift Manager is implementing the EPIPs as needed.

Performance Step 11:

[5] MONITOR the following parameters:

A. MAIN STEAM LINE RADIATION, 3-RR-90-135, Panel 3-9-2.

B. OFFGAS PRETREATMENT RADIATION 3-RR-90-157, Pnl 3-9-2. C. OFFGAS POST-TREATMENT RADIATION 3-RR- 90-265, Pnl 3-9-2 D. STACK GAS RADIATION, 0

-RR-90-147, Unit 1 Panel 1-9-2. Standard; Monitors 90

-135, 157, and 265. Calls Unit 1 operator for a reading on 0-RR-90-147. SAT UNSAT N/A Cue: As Unit 1 Operator, Stack Gas Radiation, 0

-RR-90-147 is reading 5X10E6 cps.

Job Performance Measure (JPM) 10 STEP / STANDARD SAT / UNSAT Performance Step 12:

[6] IF after five minutes from scram the Offgas Post Treatment activity is not less than 6 x 10 E5 cps as indicated on OFFGASRADIATION recorder 3-RR-90-265 on panel 3-9-2, THEN CLOSE all Main Steam Isolation Valves and Main Steam LineDrain Valves, 3-FCV-1-55 and 3-FCV-1-56. Standard: Recognizes that the Off

-Gas Post Treatment activity is >6 X 10E 5 and closes all Main Steam Isolation Valves and Main Steam Line Drain Valves (3-FCV-1-55/56) Critical Step SAT UNSAT N/A Cue: The Unit has been scrammed for 5 minutes.

Acknowledge closing of MSIVs.

Examiner Note: Closing 1-55 and 1-56 is not considered critical.

Performance Step 13:

NOTE Placing additional Stack Dilution Air Fans in service should keep 0

-RM-90-147and 0-RM-90-148 on scale.

[7] PLACE STACK DILUTION FAN SEL control switch, 3-XS-66-29, Panel 3-9-8, in OFF.

[8] START standby STACK DILUTION FAN 3 B(3A) using controlswitch, 3-HS-66-31A(29A), Panel 3-9-8. Standard:

Places 3-XS-66-29 in OFF and Starts standby Stack Dilution fan 3B, using 3-HS-66-31A SAT UNSAT N/A Cue: That completes this task.

STOP TIME ________

END OF TASK

Job Performance Measure (JPM) 11 Provide to Applicant IN-SIMULATOR:

I will explain the initial conditions and state the task to be performed. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's Correct". (OR "That's Incorrect", if applicable). When you have completed your assigned task, you will say, "my task is complete" and I will acknowledge that your task is complete.

INITIAL CONDITIONS:

You are the Unit 3 Operator. Unit 3 is at 100% power.

INITIATING CUE:

The Unit Supervisor directs you to respond to a n OFF-GAS POST TREATMENT RADIATION HI

-HI-HI annunciator, 3-XA-55-4C, window 35.

Job Performance Measure (JPM) 1 SITE: BFN JPM TITLE:

AUTOMATIC START FAILURE OF A & C FIRE PUMP S JPM NUMBER:

673 REVISION: 0 TASK APPLICABILITY:

SRO STA UO NAUO TASK NUMBER / TASK TITLE(S):

U-026-NO-01/ MONITOR AUTO START OF FIRE PUMP K/A RATINGS:

RO: 3.4 SRO: 3.4 K/A No. &STATEMENT:

286000 Fire Protection System A2.08; Ability to (a) predict the impacts of the following on the FIRE PROTECTION SYSTEM; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those abnormal conditions or operations: Failure to actuate when required RELATED PRA INFORMATION:

Risk Significant SAFETY FUNCTION:

8 EVALUATION LOCATION:

In-Plant Simulator Control R oom Lab Other - List APPLICABLE METHOD OF TESTING: Discussion Simulate/Walkthrough Perform TIME FOR COMPLETION: NA TIME CRITICAL (Y/N)

ALTERNATE PATH (Y/N)

Developed by: Developer Date (Ensure validator is briefed on exam security per NPG

-SPP-17.8.1) (See JPM Validation Checklist in NPG

-SPP-17.8.2) Validated by:

Approved by:

Validator Date Approved by:

Site Training Management Date Site Training Program Owner Date N Y Job Performance Measure (JPM) 2 OPERATOR: ________________________________

JPM Number: _673 A___ RO SRO DATE: _______

TASK STANDARD:

Perform operations necessary to manually start A, B and C Fire Pumps.

Operator Fundamental evaluated:

OF-1 Monitoring plant indications and conditions closely.

OF-5 Having a solid understanding of plant design, engineering principles, and sciences.

PRA: NA REFERENCES/PROCEDURES NEEDED:

0-OI-26 VALIDATIONTIME:__15 min PERFORMANCE TIME:

COMMENTS:

Additional comment sheets attached? YES ___ NO ___

RESULTS: SATISFACTORY ____

UNSATISFACTORY ____

IF UNSAT results are obtained THEN Retain entire JPM for records.(Otherwise just retain this page.

)

SIGNATURE: ___________________________

DATE: __________

EXAMINER Job Performance Measure (JPM) 3 Revision Summary Rev No. Effective Date Pages Affected Description 0 04/28/15 All Initial issue

Job Performance Measure (JPM) 4 IN-PLANT: I will explain the initial conditions and state the task to be performed. ALL STEPS WILL BE SIMULATED. Do NOT operate any plant equipment. Touch STAAR may be carried out to the point of touching a label. If it becomes necessary to physically touch a control switch, use a non-conductive pointing device. I will provide initiating cues and indicate any steps to be discussed. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's correct" (or That's incorrect", if applicable). When you have completed your assigned task, you will say, "My task is complete" and I will acknowledge that your task is complete.

INITIAL CONDITIONS:

You are an Operator on Unit 1. The Reactor Power at 70%

A Fire Exists on B Reactor Feed Pump Lube Oil Reservoir. Fire OPS has been dispatched to the scene.

Fire Pump B Tagged Out for Maintenance A and C Fire Pumps failed to Auto Start.

INITIATING CUES

The US directs you to start A and C Electric Fire Pumps per 0

-OI-26 section 5.

4.

CAUTION: DO NOT OPERATE ANY PLANT EQUIPMENT!

Job Performance Measure (JPM) 5 START TIME: STEP / STANDARD SAT / UNSAT Step 1: [1] PLACE the FIRE PUMP A TRANSFER switch, 0

-XS-26-1 in EMERGENCY position, at the respective switchgear.

Pump Board Compt A 4160V Shutdown Bd A 11 C 4160V Shutdown Bd C 10 Standard: Simulates placing FIRE PUMP A TRANSFER switch 0

-XS-26-3 in EMERGENCY position at 4160 Shutdown Board A, Compartment

11 Critical Step

SAT UNSAT N/A CUE: FIRE PUMP A TRANSFER switch 0

-XS-26-1 is in the EMERGENCY position Step 2: [2] CLOSE the breaker by placing the FIRE PUMP A CONTROL switch, 0-HS-26-1C to CLOSE.

Standard: Simulates placing FIRE PUMP A CONTROL switch, 0

-HS-26-1C to CLOSE position.

Critical Step

SAT UNSAT N/A CUE: Breaker Red indicating light is ON with Green and Amber lights are OFF. Breaker Flag indicates CLOSED with Charging Spring indicating CHARGED.

Step 3:

[3] CHECK pump ammeter at breaker indicates between 25 and 40 amps. Standard VERIFIES pump ammeter at breaker indicates between 25 and 40 amps. SAT UNSAT N/A CUE: FIRE PUMP A ammeter at breaker indicates 30 amps.

Job Performance Measure (JPM) 6 Step 4: [4] PLACE the NORM/EMERG Switch in NORMAL.

Standard PLACES the NORM/EMERG Switch in NORMAL for FIRE PUMP A. SAT UNSAT N/A CUE: FIRE PUMP A NORM/EMERG Switch is in NORMAL Step 5:

[1] PLACE the FIRE PUMP C TRANSFER switch, 0

-XS-26-3 in EMERGENCY position, at the respective switchgear.

Pump Board Compt A 4160V Shutdown Bd A 11 C 4160V Shutdown Bd C 10 Standard: Simulates placing FIRE PUMP C TRANSFER switch 0

-XS-26-3 in EMERGENCY position at 4160 Shutdown Board C, Compartment

10 Critical Step

SAT UNSAT N/A CUE: FIRE PUMP C TRANSFER switch 0

-XS-26-3 is in the EMERGENCY position Step 5:

[2] CLOSE the breaker by placing the FIRE PUMP C CONTROL switch, 0-HS-26-3C to CLOSE.

Standard: Simulates placing FIRE PUMP C CONTROL switch, 0

-HS-26-3C to CLOSE position.

Critical Step

SAT UNSAT N/A CUE: Breaker Red indicating light is ON with Green and Amber lights are OFF. Breaker Flag indicates CLOSED with Charging Spring indicating CHARGED.

Job Performance Measure (JPM) 7 Step 6: [3] CHECK pump ammeter at breaker indicates between 25 and 40 amps. Standard VERIFIES pump ammeter at breaker indicates between 25 and 40 amps. SAT UNSAT N/A CUE: FIRE PUMP C ammeter at breaker indicates 30 amps.

Step 7:

[4] PLACE the NORM/EMERG Switch in NORMAL.

Standard PLACES the NORM/EMERG Switch in NORMAL for FIRE PUMP C. SAT UNSAT N/A CUE: FIRE PUMP C NORM/EMERG Switch is in NORMAL and this completes the JPM. Termination Criteria: When two Fire Pumps are in service the JPM is complete.

STOP TIME:

Job Performance Measure (JPM) 8 Provide to Applicant IN-PLANT: I will explain the initial conditions and state the task to be performed. ALL STEPS WILL BE SIMULATED. Do NOT operate any plant equipment. Touch STAAR may be carried out to the point of touching a label. If it becomes necessary to physically touch a control switch, use a non-conductive pointing device. I will provide initiating cues and indicate any steps to be discussed. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's correct" (or That's incorrect", if applicable). When you have completed your assigned task, you will say, "My task is complete" and I will acknowledge that your task is complete.

INITIAL CONDITIONS:

You are an Operator on Unit 1. The Reactor Power at 70%

A Fire Exists on B Reactor Feed Pump Lube Oil Reservoir. Fire OPS has been dispatched to the scene.

Fire Pump B Tagged Out for Maintenance A and C Fire Pumps failed to Auto Start.

INITIATING CUES

The US directs you to start A and C Electric Fire Pumps per 0

-OI-26 section 5.2.

CAUTION: DO NOT OPERATE ANY PLANT EQUIPMENT!

Job Performance Measure (JPM) 1 SITE: BFN JPM TITLE:

ALIGNING EMERGENCY EECW MAKEUP TO SPENT FUEL POOL JPM NUMBER:

674 REVISION: 0 TASK APPLICABILITY:

SRO STA UO NAUO TASK NUMBER / TASK TITLE(S):

U-000-EM-95/ Make-Up To SFP By EECW With Fire Hose (Internal Make

-Up) K/A RATINGS:

RO: 3.1 SRO: 3.3 K/A No. &STATEMENT:

233000 Fuel Pool Cooling and Clean

-up; A2.02; Ability to (a) predict the impacts of the following on the FUEL POOL COOLING AND CL EAN-UP ; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those abnormal conditions or operations:

Low pool level RELATED PRA INFORMATION:

Risk Significant SAFETY FUNCTION:

9 EVALUATION LOCATION: In-Plant Simulator Control R oom Lab Other - List APPLICABLE METHOD OF TESTING: Discussion Simulate/Walkthrough Perform TIME FOR COMPLETION: NA TIME CRITICAL (Y/N)

ALTERNATE PATH (Y/N)

Developed by:

Developer Date (Ensure validator is briefed on exam security per NPG

-SPP-17.8.1) (See JPM Validation Checklist in NPG

-SPP-17.8.2) Validated by:

Approved by:

Validator Date Approved by: Site Training Management Date Site Training Program Owner Date N N Job Performance Measure (JPM) 2 OPERATOR: ________________________________

JPM Number: __674__ RO SRO DATE: _______

TASK STANDARD:

Perform operations necessary to align either North or South Headers of EECW to Unit 2 Spent Fuel Pool.

Operator Fundamental evaluated:

OF-2 Controlling plant evolutions and indications closely.

OF-5 Having a solid understanding of plant design, engineering principles, and sciences.

PRA: NA REFERENCES/PROCEDURES NEEDED:

2-AOI-78-1 VALIDATION TIME: 25 min PERFORMANCE TIME:

COMMENTS:

Additional comment sheets attached? YES ___ NO ___

RESULTS: SATISFACTORY ____

UNSATISFACTORY ____

IF UNSAT results are obtained THEN Retain entire JPM for records.(Otherwise just retain this page.

)

SIGNATURE: ___________________________

DATE: __________

EXAMINER Job Performance Measure (JPM) 3 Revision Summary Rev No. Effective Date Pages Affected Description 0 09/01/15 All Initial issue

Job Performance Measure (JPM) 4 IN-PLANT: I will explain the initial conditions and state the task to be performed. ALL STEPS WILL BE SIMULATED. Do NOT operate any plant equipment. Touch STAAR may be carried out to the point of touching a label. If it becomes necessary to physically touch a control switch, use a non-conductive pointing device. I will provide initiating cues and indicate any steps to be discussed. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's correct" (or That's incorrect", if applicable). When you have completed your assigned task, you will say, "My task is complete" and I will acknowledge that your task is complete.

INITIAL CONDITIONS:

You are an Operator on Unit

2. The Reactor is in cold shutdown The Unit 2 Spent Fuel Pool water level is lowering. Fire Protection is available to assist

INITIATING CUES

The Unit Supervisor directs you to align EECW Makeup to Unit 2 Spent Fuel Pool per 2-AOI-78-1 Attachment 2 starting at step [3]

.

CAUTION: DO NOT OPERATE ANY PLANT EQUIPMENT!

Job Performance Measure (JPM) 5 START TIME: STEP / STANDARD SAT / UNSAT Step 1: [3] UNLOCK and OPEN the following valves:

NORTH HDR SPLY TO EMER FUEL POOL MU, 1

-SHV-067-0792. SOUTH HDR SPLY TO EMER FUEL POOL MU, 1

-SHV-067-0793. Standard: Simulates opening NORTH HDR SPLY TO EMER FUEL POOL MU, 1-SHV-067-0792 and SOUTH HDR SPLY TO EMER FUEL POOL MU, 1

-SHV-067-0793 by demonstrating opening each valve cou nter-clockwise and breaking seal

. Critical Step SAT UNSAT N/A CUE: NORTH HDR SPLY TO EMER FUEL POOL MU, 1

-SHV-067-0792 is OPEN and SOUTH HDR SPLY TO EMER FUEL POOL MU, 1

-SHV-067-0793 is OPEN Located in stairwell between elevation 565 ft and 593 ft.

Hoses are already connected, no tools required.

NOTES 1) Hose straps are staged at the hoses at the following locations:

Unit 1/Unit 2 Reactor Bldg Stairwell, El. 621', R6 U Line (placed on hose to carry weight of charged hose lines).

Hose reel on the Refuel Floor, El. 664', R6 U Line (for use in securing hose ends as needed).

2) Additional hose is stored in a cabinet located in Unit 1/Unit 2 Elevator Room, Reactor Bldg, El 595'.

CAUTION Performance of this attachment will degrade water chemistry in the Spent Fuel Pool.

Job Performance Measure (JPM) 6 STEP / STANDARD SAT / UNSAT Step 3: [4] VERIFY charged hoses in stairwell are not obstructing stairway access and/or kinked.

[4.1] ADJUST hose straps, as necessary.

Standard: VERIFIES hoses in stairwell are not kinked SAT UNSAT N/A Note to Examiner:

Hoses are already run along the stairwell. Applicant should verify hoses not kinked and connected.

Step 4: [5] VERIFY hose connected from NORTH HDR SPLY TO EMER FUEL POOL MU, 1

-SHV-067-0796 and route to Unit 2 Spent Fuel Pool (El 664', Refuel Floor, R6

-U Line). Standard: VERIFY hose connected from NORTH HDR SPLY TO EMER FUEL POOL MU, 1

-SHV-067-0796 and route to Unit 2 Spent Fuel Pool (El 664', Refuel Floor, R6

-U Line). Critical Step SAT UNSAT N/A Note to Examiner:

Hoses will be simulated routed to Unit 2 Spent Fuel Pool. Any route to the Unit 2 Spent Fuel Pool is acceptable.

Hoses are already connected, no tools required.

Location: Refuel Floor Elevation 664 ft, R U Line.

Step 5: [6] VERIFY hose connected from SOUTH HDR SPLY TO EMER FUEL POOL MU, 1

-SHV-067-0797 and route to Unit 2 Spent Fuel Pool (El 664', Refuel Floor, R6

-U Line) Standard: VERIFY hose connected from SOUTH HDR SPLY TO EMER FUEL POOL MU, 1

-SHV-067-0797 and route to Unit 2 Spent Fuel Pool (El 664', Refuel Floor, R6

-U Line) Critical Step SAT UNSAT N/A Job Performance Measure (JPM) 7 STEP / STANDARD SAT / UNSAT Note to Examiner:

Hoses will be simulated routed to Unit 2 Spent Fuel Pool. Any route to the Unit 2 Spent Fuel Pool is acceptable.

Hoses are already connected, no tools required.

Location: Refuel Floor Elevation 664 ft, R U Line.

Step 6: [7] VERIFY OPEN the following valves (El 664', Refuel Floor, R6 U Line):

NORTH HDR SPLY TO EMER FUEL POOL MU, 1

-SHV-067-0796. SOUTH HDR SPLY TO EMER FUEL POOL MU, 1

-SHV-067-0797. Standard: Simulates opening NORTH HDR SPLY TO EMER FUEL POOL MU, 1-SHV-067-0796 and SOUTH HDR SPLY TO EMER FUEL POOL MU, 1

-SHV-067-0797 by demonstrating opening each valve cou nter-clockwise.

Critical Step SAT UNSAT N/A CUE: NORTH HDR SPLY TO EMER FUEL POOL MU, 1

-SHV-067-0796 is OPEN and SOUTH HDR SPLY TO EMER FUEL POOL MU, 1

-SHV-067-0797 is OPEN Location: Refuel Floor Elevation 664 ft, R U Line.

Step 7: [8] VERIFY charged hoses on the Refuel Floor are not kinked.

Standard: VERIFY charged hoses on the Refuel Floor are not kinked

SAT UNSAT N/A Termination Criteria: NORTH and SOUTH Header are aligned then the JPM is complete. State another operator will perform the remaining steps. STOP TIME:

Job Performance Measure (JPM) 8 Provide to Applicant IN-PLANT: I will explain the initial conditions and state the task to be performed. ALL STEPS WILL BE SIMULATED. Do NOT operate any plant equipment. Touch STAAR may be carried out to the point of touching a label. If it becomes necessary to physically touch a control switch, use a non-conductive pointing device. I will provide initiating cues and indicate any steps to be discussed. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's correct" (or That's incorrect", if applicable). When you have completed your assigned task, you will say, "My task is complete" and I will acknowledge that your task is complete.

INITIAL CONDITIONS:

You are an Operator on Unit 2. The Reactor is in cold shutdown The Unit 2 Spent Fuel Pool water level is lowering.

Fire Protection is available to assist INITIATING CUES

The Unit Supervisor directs you to align EECW Makeup to Unit 2 Spent Fuel Pool per 2-AOI-78-1 Attachment 2 starting at step [3].

CAUTION: DO NOT OPERATE ANY PLANT EQUIPMENT!

Job Performance Measure (JPM) 1 SITE: BFN JPM TITLE:

START UP AND SYNCHRONIZE UNIT 3 PREFERRED MMG SET JPM NUMBER:

307 REVISION: 6 TASK APPLICABILITY:

SRO STA UO NAUO TASK NUMBER / TASK TITLE(S):

S-57C-NO-04 K/A RATINGS:

RO: 2.5 SRO: 2.9 K/A No. &STATEMENT:

262002 Uninterruptable Power Supply (A.C./D.C.) A1.02; Ability to predict and/or monitor changes in parameters associated with operating the UNINTERRUPTABLE POWER SUPPLY (A.C./D.C.) controls including:

Motor generator outputs RELATED PRA INFORMATION:

Risk Significant SAFETY FUNCTION:

6 EVALUATION LOCATION:

In-Plant Simulator Control R oom Lab Other - List APPLICABLE METHOD OF TESTING: Discussion Simulate/Walkthrough Perform TIME FOR COMPLETION: NA TIME CRITICAL (Y/N)

ALTERNATE PATH (Y/N)

Developed by:

Developer Date (Ensure validator is briefed on exam security per NPG

-SPP-17.8.1) (See JPM Validation Checklist in NPG

-SPP-17.8.2) Validated by:

Approved by:

Validator Date Approved by:

Site Training Management Date Site Training Program Owner Date N N Job Performance Measure (JPM) 2 OPERATOR: ________________________________

JPM Number: _307___ RO SRO DATE: _______

TASK STANDARD:

Perform operations necessary to Start-up and synchronize Unit Preferred MMG Set Operator Fundamental evaluated:

OF-1 Monitoring plant indications and conditions closely.

OF-2 Controlling plant Evolutions Precisely PRA: NA REFERENCES/PROCEDURES NEEDED:

0-OI-57C VALIDATIONTIME: 25 min PERFORMANCE TIME:

COMMENTS:

Additional comment sheets attached? YES ___ NO ___

RESULTS: SATISFACTORY ____

UNSATISFACTORY ____

IF UNSAT results are obtained THEN Retain entire JPM for records.(Otherwise just retain this page.

)

SIGNATURE: ___________________________

DATE: __________

EXAMINER Job Performance Measure (JPM) 3 Revision Summary Rev No. Effective Date Pages Affected Description 1 10/26/94 A LL GENERAL REVISION 2 05/07/95 ALL GENERAL REVISION 3 10/15/97 ALL FORMAT, PROCEDURE REVISION, ADDED PLANT WORK EXPECTATIONS TOUCH STAAR, SAFETY, AND 3

-WAY COMM. 4 11/10/99 ALL PROCEDURE REVISION, FORMAT DOCUMENT 5 10/03/01 ALL PROCEDURE REVISION 6 04/28/15 ALL UPDATE TO NEW FORMAT

Job Performance Measure (JPM) 4 IN-PLANT: I will explain the initial conditions and state the task to be performed. ALL STEPS WILL BE SIMULATED. Do NOT operate any plant equipment. Touch STAAR may be carried out to the point of touching a label. If it becomes necessary to physically touch a control switch, use a non-conductive pointing device. I will provide initiating cues and indicate any steps to be discussed. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's correct" (or That's incorrect", if applicable). When you have completed your assigned task, you will say, "My task is complete" and I will acknowledge that your task is complete.

INITIAL CONDITIONS:

You are an Operator on Unit

3. The Reactor is in cold shutdown The Unit 3 Unit Preferred Bus is being supplied from the Unit 3 Unit Preferred Transformer in accordance with Section 8.1.

Maintenance has been completed on the Unit 3 Unit Preferred MMG Set.

INITIATING CUES

The SM directs you to start up and synchronize the Unit 3 Unit Preferred MMG Set as directed by 0-OI-57C per section 5.5 step 5.5[16

].

NOTE: PERFORMER WILL NEED GGMKA KEY.

CAUTION: DO NOT OPERATE ANY PLANT EQUIPMENT!

Job Performance Measure (JPM) 5 START TIME: STEP / STANDARD SAT / UNSAT Step 1:

[16] PLACE UNIT 3 MMG OPERATING MODE, 3

-HS-252-02AB in AUTO. Standard: VERIFIED/SIMULATED PLACING the Unit 3 MMG SET OPERATING MODE 3

-HS-252-02AB in AUTO.

Critical Step

SAT UNSAT N/A Cue: The Unit 3 MMG SET OPERATING MODE 3

-HS-252-02AB is in AUTO position.

Step 2:

[17] PLACE UNIT 3 MMG LOCAL

-REMOTE CONTROL, 3

-XS-252-02A in REMOTE.

Standard: SIMULATED PLACING the Unit 3 MMG SET LOCAL

-REMOTE CONTROL 3-XS-252-02A in the REMOTE position.

Critical Step

SAT UNSAT N/A Cue: The Unit 3 MMG SET LOCAL

-REMOTE CONTROL 3

-HS-252-02A is in the REMOTE position.

Step 3:

[18] PLACE UNIT 3 PFD SYSTEM GENERATOR SOURCE SYNC SWITCH SS

-7, 3-HS-252-03/SS-7 in ON. Standard: SIMULATED PLACING UNIT 3 PFD SYSTEM GENERATOR SOURCE SYNC SWITCH, SS

-7, 3-HS-252-03/SS-7, in the ON position. Critical Step

SAT UNSAT N/A NOTE Steps 5.5[16] through 5.5[26] are performed from Battery Board Room 2 UNIT PFD Sync. & Speed Control Panel.

Job Performance Measure (JPM) 6 STEP / STANDARD SAT / UNSAT Cue: The Unit 3 PFD SYSTEM GENERATOR SOURCE SYNC SS

-7, SWITCH 3-HS-252-003/SS-7 is in the ON position. Step 4:

[19] MATCH Incoming to Running AC volts using UNIT 3 MMG VOLTAGE ADJUST, 3

-HS-252-02CD. Standard: SIMULATED MANIPULATING UNIT 3 MMG VOLTAGE ADJUST, 3-HS 252-02CD until cued that incoming and running AC volts are matched. Critical Step

SAT UNSAT N/A Cue: INCOMING and RUNNING VOLTAGES are EQUAL at 122 Volts Step 5:

[20] ADJUST MMG speed using UNIT 3 MMG FREQUENCY ADJUST, 3-HS-252-02CF to obtain a synchroscope slowly rotating in the SLOW (counter-clockwise) direction (10 to 15 second rotation) as indicated on SYNCHROSCOPE, 0

-SCP-252-000A/B. Standard: SIMULATED ADJUSTING UNIT 3 MMG FREQUENCY ADJUST 3-HS-252-02CF speed control switch until cued that synchroscope indicator rotating in the counterclockwise direction at 10 to 15 seconds per revolution.

Critical Step

SAT UNSAT N/A Cue: State: "T he Initial Synchroscope indicator is standing still at the 5 o'clock position." Note: If student raises frequency the state: "Synchroscope indicator is rotating in the CLOCKWISE direction at 12 seconds per revolution."

Note: If student lowers frequency the state: "Synchroscope indicator is rotating in the COUNTERCLOCKWISE direction at 12 seconds per revolution."

NOTE MMG voltage and hertz are read as INCOMING.

Job Performance Measure (JPM) 7 STEP / STANDARD SAT / UNSAT Step 6:

[21] WHEN SYNCHROSCOPE, 0

-SCP-252-000A/B is 5 minutes prior to 12 o'clock, in the SLOW counter

-clockwise direction, THEN PERFORM the following expeditiously:

[21.1] CLOSE UNIT 3 BKR 1001, using 0

-HS-280-003/1001. [21.2] ENSURE CLOSED UNIT 3 BKR 1001. Critical Step

SAT UNSAT N/A NOTES 1) Section 5.5[21] should be performed expeditiously (within about 15 seconds) to minimize the time AC Systems are paralleled to prevent tripping the MMG set. Voltage and amps is expected to fluctuate while the AC systems are paralleled and the MMG set will trip if the AC systems are paralleled for approximately 30 seconds.

2) If breaker 1001 trips, it must be reset with reset push button on the respective Unit Battery Board, Panel 10.

CAUTIONS 1) Voltage Oscillations may occur during Bus Power Transfers.

These oscillations are caused when two Power Supplies having separate Voltage Regulators try to maintain voltage control.

Therefore, the time the Power Supplies are paralleled should be minimized as follows:[PER 64835]

When transferring Bus power supplies from one MMG to another MMG.

When transferring Bus power supplies from one MMG with the unit preferred transformer. (Unit 2 has a Voltage Regulator Transformer which makes voltage oscillations more susceptible.)

2) Minimize the number of Bus power supply transfers and only transfer Bus power supplies when absolutely necessary.
3) During the transfer of Bus power supplies the affiliated RPS circuit protectors 1(2)C1 and/or 1(2)C2 may trip.

Start of Critical Step(s)

Job Performance Measure (JPM) 8 STEP / STANDARD SAT / UNSAT Standard( step 6 continued)

When cued synchroscope indicator at 5 minutes prior to 12 o'clock, SIMULATED PLACING 3-BKR 1001, 0

-HS-252-003/1001 in the CLOSE position.

NOTE: IT WOULD ASSIST THE EXAMINEE IF THE EVALUATOR WOULD USE HIS FINGER TO DEMONSTRATE INDICATOR POSITION ON THE SYNCHROSCOPE AS THE READINGS ARE ENUNCIATED.

CUE: THE SYNCHROSCOPE INDICATOR IS AT 30 MINUTES BEFORE THE 12 O'CLOCK POSITION. THE SYNCHROSCOPE INDICATOR IS AT 15 MINUTES BEFORE THE 12 O'CLOCK POSITION. THE SYNCHROSCOPE INDICATOR IS AT 5 MINUTES BEFORE THE 12 O'CLOCK POSITION

. CUE: [WHEN CLOSED] UNIT 3 BREAKER 1001 BREAKER POSITION INDICATING LAMP CHANGED FROM ILLUMINATED GREEN TO ILLUMINATED RED

. Step 7:

[21.3] OPEN the UNIT 3)BKR 1002, using 0

-HS-280-003/1002.

Standard: SIMULATED UNIT 3 BKR 1002, 0-HS-282-003/1002in the OPEN position. Critical Step

SAT UNSAT N/A C UE: UNIT 3 BKR 1002, 0

-HS-282-003/1002 IS IN THE OPEN POSITION WITH RED LIGHT ILLUMINATED.

NOTE: DO NOT ALLOW THE EXAMINEE TO OPERATE THE AMMETER SELECTOR SWITCH FOR THE FOLLOWING STEP.

Step 8:

[22] CHECK generator is loaded by observing UNI T 3 MMG GENERATOR amps, 3

-II-252-02C/1AMR L2 rise, "N" should be approximately the difference of L1& L2 (UNIT 3 MMG GENERATOR amps, 3-HS-252-02CH positions 1, 2, & 3 are respective to L1, L2 & N). SAT UNSAT N/A End of Critical Step(s)

Job Performance Measure (JPM) 9 STEP / STANDARD SAT / UNSAT Standard: CHECKED amp indicators L1 MINUS L2 approximately equals n.

Cue: L1, L2 , N AMPS INDICATIONS HAVE RISEN and L1-L2 = N. Note: Selector Switch positions are labeled as follows: Position 1 is L1, position 2 is L2 and Position 3 is N.

Step 9: [23] ENSURE OPEN UNIT 3 BKR 1003, 0

-HS-280-003/1003 Standard: VERIFIED ILLUMINATED GREEN position indicating light above 0

-HS-282-003/1003.

SAT UNSAT N/A Cue: Unit 3 Breaker 1003 0

-HS-280-003/1003 Position Indicating Lamp changed from illuminated RED to illuminated GREEN.

Step 10: [24] On Unit 2 Unit Preferred MMG Set Local Control Panel, ENSURE OPEN the following fused disconnect switches:

BACKUP SOURCE TO BAT BD 1 BKR 1003, 1

-FUDS-280-001/1003 BACKUP SOURCE TO BAT BD 3 BKR 1003, 3

-FUDS-280-003/1003 Standard: At Unit 2 Unit Preferred MMG Set Local Control Panel VERIFIED 1-FUDS-280-001/1003 AND 3

-FUDS-280-003/1003 in the OPEN POSITION. SAT UNSAT N/A Cue: 1-FUDS-280-001/1003 and 3-FUDS-280-003/1003 are in the OPEN position.

Job Performance Measure (JPM) 10 STEP / STANDARD SAT / UNSAT Step 11: [25] On Unit 3 Unit Preferred MMG Set Local Control Panel, ENSURE the BACKUP SOURCE TO BAT BD 2 BKR 1003, 2-FUDS-280-002/1003 fused disconnect switch is open:

Standard: On Unit 3 Unit Preferred MMG Set Local Control Panel, VERIFIED 2-FUDS-280-002/1003 in the OPEN position.

SAT UNSAT N/A Cue: 2-FUDS-280-002/1003 is in the OPEN position.

Step 12:

[26] On Battery Board 2:

PLACE UNIT 3 PFD SYSTEM GENERATOR SOURCE SYNC SWITCH SS-7, 1-HS-252-03/SS-7 in OFF. Standard: SIMULATED PLACING UNIT 3 PFD SYSTEM GENERATOR SOURCE SYNC SWITCH, SS

-7, 1-HS-252-03/SS-7 in the OFF position. SAT UNSAT N/A Cue: UNIT 3 PFD SYSTEM GENERATOR SOURCE SYNC SWITCH, SS

-7, 1-HS-252-03/SS-7 is in the OFF position.

Step 13:

[27] On Battery Board 2:

DEPRESS UNIT 3 MMG AC MOTOR START, 3-HS-252-02AD to return to Normal AC power from DC drive. Standard: SIMULATED DEPRESSING and RELEASING UNIT 3 MMG AC MOTOR START , 3-HS-252-02AD pushbutton.

Critical Step

SAT UNSAT N/A Cue: [The AC motor Breaker Position Indicating Lamp changed from illuminated GREEN to illuminated RED.

State Another Operator will continue with procedure and this will end the task.

STOP TIME:

Job Performance Measure (JPM) 11 Provide to Applicant IN-PLANT: I will explain the initial conditions and state the task to be performed. ALL STEPS WILL BE SIMULATED. Do NOT operate any plant equipment. Touch STAAR may be carried out to the point of touching a label. If it becomes necessary to physically touch a control switch, use a non-conductive pointing device. I will provide initiating cues and indicate any steps to be discussed. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's correct" (or That's incorrect", if applicable). When you have completed your assigned task, you will say, "My task is complete" and I will acknowledge that your task is complete.

INITIAL CONDITIONS:

You are an Operator on Unit 3. The Reactor is in cold shutdown The Unit 3 Unit Preferred Bus is being supplied from the Unit 3 Unit Preferred Transformer in accordance with Section 8.1.

Maintenance has been completed on the Unit 3 Unit Preferred MMG Set.

INITIATING CUES

The SM directs you to start up and synchronize the Unit 3 Unit Preferred MMG Set as directed by 0-O I-57C per section 5.5 step 5.5[16

]. NOTE: PERFORMER WILL NEED GGMKA KEY.

CAUTION: DO NOT OPERATE ANY PLANT EQUIPMENT!

.