{{#Wiki_filter:EOP:P-TURB. | {{#Wiki_filter:EOP: P-TURB.1 TITLE: TURBINE TRIP WITHOUT RX TRIP REQUIRED REV: 7 PAGE 1 of 12 ROCHESTER GAS AND ELECTRIC ORPORATION GINNA STAT ON CONTROLLED COPY BER TECHNICAL REVIEW PORC VIEW DATE P T SUPERINTENDENT EFF TIVE DATE CAT G RY 1.0 REVIEWED BY: 9306040i5i 930524 PDR ADQCK 05000244 P PDR L | ||
\~EOP:P-TURB.'1 TITLE: | \~EOP: P-TURB.'1 TITLE: TURBINE TRIP WITHOUT RX TRIP REQUIRED REV 7 PAGE 2 of 12 A.PURPOSE-This procedure provides the necessary instructions to control the plant following a turbine trip without a reactor trip required.B.ENTRY CONDITIONS/SYMPTOMS 1.ENTRY CONDITIONS | ||
B. | -This procedure is entered from: a.AP-CW.1, LOSS OF A CIRC WATER PUMP, or, b.AP-ELEC.l, LOSS OF 12A AND/OR 12B TRANSFORMER, or, c~AP FW 1 g PART I AL OR COMPLETE LOSS OF MA I N FEE DWATER g or, d.AP-TURB.2, AUTOMATIC TURBINE RUNBACK, or, e.AP-TURB.3, TURBINE VIBRATIONS, or, f.AP-TURB.4, LOSS OF CONDENSER VACUUM, when power is less than P-9 and the turbine trips without a Rx trip.2.SYMPTOMS-The symptoms of TURBINE TRIP WITHOUT RX TRIP REQUIRED are: a~b.c~d.e.gi Annunciator K-l, THRUST BEARING FAILURE, lit, or Annunciator K-9, TURBINE BEARING OIL LO PRESS TRIP 6 psi, lit, or Annunciator K-17, TURBINE LOW VACUUM TRIP 20" HG, lit, or Annunciator K-18, MAIN FEEDWATER PUMPS TRIPPED, lit, or Annunciator K-26, GENERATOR LOCKOUT RELAY, lit, or Annunciator K-25, TURBINE OVERSPEED ALERT 1980 RPM, lit, or Annunciator F-21, COND HI PRESS 20" HG OR LOSS OF BOTH CIRC WTR PMPS, lit, or h.Annunciator K-3, AMSAC ACTUATED, lit. | ||
- | ~l T EOP: P-TURB;1 TITLE: TURBINE TRIP WITHOUT RX TRIP REQUIRED REV 7 PAGE 3 of 12 STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED***************.**************************CAUTION IF, AT ANY TIME DURING THIS PROCEDURE, A REACTOR TRIP OR SI OCCURS, E-O, REACTOR TRIP OR SAFETY INJECTION, SHALL BE PERFORMED. | ||
~ | 1 Verify Turbine Stop Valves-CLOSED Manually trip turbine.IF turbine stop valves can NOT be closed, THEN close both MSIVs.IF reactor power greater than 8%with both MSIVs closed, THEN manually trip the reactor and go to E-O, REACTOR TRIP OR SAFETY INJECTION. | ||
EOP:P-'TURB; | EOP: P-'TURB;1 T!TLE: TURBINE TRIP WITHOUT RX TRIP REQUIRED REV: 7 PAGE 4 of 12 STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED*****************************************CAUTION PRZR PRESSURE LOW PRESSURE TRIP IS RATE SENSITIVE, THEREFORE, MONITOR PRESSURE WHEN REDUCING RCS TEMPERATURE. | ||
*****************************************NOTE:Automatic | *****************************************NOTE: Automatic rod control is desired, if available. | ||
2 Check Reactor, Power: a.NIS intermediate ranges-ABOVE THE POINT OF ADDING HEAT (APPROXIMATELY 2.5xlO 6 AMPS)a.Go to Step 3.b.Verify control rods driving in to reduce reactor power in AUTO b.Perform the following: | |||
l) | l)Ensure ROD CONTROL BANK SELECTOR switch to MANUAL 2)Insert rods as necessary to reduce reactor power.c.Borate as necessary to maintain control rods above rod insertion limits EOP: P-TURB;1 TURBINE TRIP WITHOUT RX TRIP REQUIRED REV: 7 PAGE 5 of 12 STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED 3 Monitor S/G Levels: a.Levels-GREATER THAN 30%OR INCREASING a.IF MFW regulating and bypass valves NOT controlling in AUTO, THEN place controllers in MANUAL and restore narrow range level to program.IF S/G level can NOT be restored, THEN trip the reactor and go to E-O, REACTOR TRIP OR SAFETY INJECTION. | ||
b.Levels- | b.Levels-TRENDING TO PROGRAM b.IF S/G level above program and increasing uncontrolled, THEN place controller(s) in MANUAL and decrease flow as necessary. | ||
IF flow can NOT be controlled, THEN perform the following: | |||
l) | l)Trip the reactor.2)Stop the running MFW pump.3)Close MFW pump discharge valves.4)Go to E-O, REACTOR TRIP OR SAFETY INJECTION. | ||
EOP:P.~TURB; | EOP: P.~TURB;1 TURBINE TRIP WITHOUT RX TRIP REQUIRED REV: 7 PAGE 6 of 12 STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED 4 Verify Proper Operation Of Steam Dump: a.Verify annunciator G-15, STEAM DUMP ARMED-LIT a.Place steam dump mode selector switch to MANUAL.b.Condenser steam dump operating in AUTO b.IF steam dump NOT available, THEN perform the following: | ||
1) | 1)Adjust S/G ARV setpoints to 1005 psig and verify proper operation. | ||
2) | 2)IF power is greater than 8%, THEN ensure reactor trip and go to E-O, REACTOR TRIP OR SAFETY INJECTION. | ||
c.Tavg- | c.Tavg-TRENDING TO PROGRAM c.IF Tavg can NOT be controlled, THEN manually trip the reactor and go to E-O, REACTOR TRIP OR SAFETY INJECTION. | ||
5 Check PRZR Pressure-TRENDING TO 2235 PSIG IF PRZR pressure can NOT be controlled, THEN refer to AP-PRZR.1, ABNORMAL PRESSURIZER PRESSURE. | |||
EOP:P-TURB; | EOP: P-TURB;1 TITLE: TURBINE TRIP WITHOUT RX TRIP REQUIRED REV: 7 PAGE 7 of 12 STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED 6 Check PRZR Level: a.Level-GREATER THAN 13%a.Perform the following: | ||
1) | 1)Place loop B cold leg isolation valve to REGEN Hx (AOV-427)switch to CLOSE.2)Place letdown orifice valve switches to CLOSE (AOV-200A, AOV-200B, and AOV-202).3)Verify excess letdown isolation valve (AOV-310)closed.4)Ensure PRZR heaters off.5)Control charging to restore PRZR level greater than 13%.6)WHEN PRZR level greater than 13%, THEN restore letdown.b.Level-TRENDING TO PROGRAM'b.Increase charging flow as necessary to restore PRZR level to program. | ||
3) | |||
EOP:P-TURB; | EOP: P-TURB;1 T1jLE: TURBINE TRIP WITHOUT RX TRIP REQUIRED REV 7 PAGE 8 of 12 STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED 7 Check MFW System: a.Verify MFW regulating and bypass valves-OPERATING IN AUTO b.MFW pumps-BOTH RUNNING c.Close one MFW pump discharge valve a.Place MFW regulating and bypass valve controllers in MANUAL and restore S/G level.b.Perform the following: | ||
1) | 1)Verify one MFW pump running.IF NOT, THEN verify both MDAFW pumps running.2)Go to Step 8.d.Stop selected MFW pump 8 Establish Stable Plant Conditions: | ||
a. | a.Place rod control bank selector in MANUAL b.NIS intermediate ranges-BELOW THE POINT OF ADDING HEAT (APPROXIMATELY 2.5x10 AMPS)b.Return to Step 2.c.PRZR pressure-BETWEEN 2220 PSIG AND 2260 PSIG d.PRZR level-TRENDING TO PROGRAM e.S/G levels-TRENDING TO PROGRAM f.RCS Tavg-GREATER THAN 540'F c.Control PRZR heaters and spray as necessary. | ||
d. | d.Control charging as necessary. | ||
e. | e.Control S/G feed flow as necessary. | ||
f. | f.Control dumping steam as necessary. | ||
IF cooldown continues, THEN close both MSIVs. | |||
A~~ | A~~ | ||
EOP:P-WRB: | EOP: P-WRB:1 T1TLE: TURBINE TRIP WITHOUT RX TRIP REQUIRED REV 7 PAGE 9 of 12 STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED****************************************CAUTION IF ANY S/G LEVEL ABOVE PROGRAM, THEN AFW FLOW MAY BE THROTTLED IMMEDIATELY TO PREVENT S/G ISOLATION. | ||
NOTE: | NOTE: Maintain Reactor power less than 2%.This is within the capacity of MDAFW pumps.4 9 Check S/G Feed Flow Status: a.Manually start both MDAFW pumps b.Verify AFW flow-ESTABLISHED c.Verify MFW flow control valves CLOSED~MFW regulating valves~MFW bypass valves d.Close MFW pump discharge valves~MOV-3977, A MFW pump~MOV~976, B MFW pump e.Stop any running MFW pump and place in PULL STOP f.Check S/G level-TRENDING TO 39%b.Perform the following: | ||
1)Establish | 1)Establish MFW flow using MFW regulating valve bypass valves.IF MFW NOT available, THEN manually start TDAFW pump and establish flow as necessary. | ||
2) | 2)Go to Step 10.c.Place A and B MFW regulating and bypass valve controllers in manual at 0%demand.f.Adjust MDAFW pump flow as necessary to restore S/G level. | ||
EOP:P~TURB." | EOP: P~TURB." 1 TITLE: TURBINE TRIP WITHOUT RX TRIP REQUIRED REV: 7 PAGE 10 of 12 STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED*****************************************CAUTION WHEN FEEDING BOTH S/G(S)USING ONE MDAFW PUMP, THEN THE SUM OF THE FLOWS TO BOTH S/G(S)MUST BE LESS THAN 230 GPM.10 Establish Normal AFW Pump Shutdown Alignment: | ||
a. | a.Place AFW bypass switches to DEF b.Verify the following: | ||
o Both S/G levels-STABLE OR INCREASING b.Continue with Step ll.WHEN conditions met, THEN do Steps 10c through f.o Total AFW flow-LESS THAN 200 GPM c.Close MDAFW pump discharge valves~MOV-4007~MOV-4008 d.Stop all but one MDAFW pump e.Open AFW discharge crossover valves~MOV-4000A~MOV-4000B f.Open AFW bypass valves as necessary to control S/G levels~AOV-4480~AOV-4481 EOP: TITLE: TURBINE TRIP WITHOUT RX TRIP REQUIRED REV: 7 PAGE 11 of 12 STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED 11 Establish Normal Shutdown Alignment: | |||
~MOV-4000B f. | a.Check condenser-AVAILABLE a.Dispatch AO to perform Attachment SD-2.b.Perform the following as necessary: | ||
a. | o Open generator disconnects | ||
-AVAILABLE a. | ~1G13A71~9X13A73 o Place voltage regulator to OFF o Open turbine drain valves o Rotate reheater steam supply controller cern to close valves o Place reheater dump valve switches to HAND o Stop all but one condensate pump c.Verify Bus llA and Bus llB energized-BOTH BUSSES GREATER THAN 4 KV c.IF either bus NOT energized, THEN refer to 0-6.9.2, ESTABLISHING AND/OR TRANSFERRING OFFSITE POWER TO BUS 12A/BUS 12B.d.Dispatch AO to perform Attachment SD-1 | ||
~1G13A71~ | |||
- | |||
(' | (' | ||
EOP: | EOP: II PERTURB;1 TURBINE TRIP WITHOUT RX TRIP REQUIRED REV 7 PAGE 12 of 12 STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED NOTE: Refer to 0-9.3, NRC IMMEDIATE NOTIFICATION, for reporting requirements. | ||
12 Notify Higher Supervision 13 Establish Desired Plant Conditions: | |||
a. | a.Reactor shutdown-DESIRED a.IF turbine is to be restored to service, THEN maintain reactor critical and refer to 0-1.2, PLANT FROM HOT SHUTDOWN TO STEADY LOAD.b.Refer to 0-2.1, NORMAL SHUTDOWN TO HOT SHUTDOWN-END-0~J 0 EOP: TURBINE TRIP WITHOUT RX TRIP REQUIRED REV: 7 PAGE 1 of 1 AP-TURB.1 APPENDIX LIST TITLE PAGES 1)2)ATTACHMENT SD-1 ATTACHMENT SD-2}} |
Revision as of 14:08, 7 July 2018
ML17263A304 | |
Person / Time | |
---|---|
Site: | Ginna |
Issue date: | 05/07/1993 |
From: | MARLOW T A ROCHESTER GAS & ELECTRIC CORP. |
To: | |
Shared Package | |
ML17263A305 | List: |
References | |
AP-TURB.1, NUDOCS 9306040151 | |
Download: ML17263A304 (19) | |
Text
EOP: P-TURB.1 TITLE: TURBINE TRIP WITHOUT RX TRIP REQUIRED REV: 7 PAGE 1 of 12 ROCHESTER GAS AND ELECTRIC ORPORATION GINNA STAT ON CONTROLLED COPY BER TECHNICAL REVIEW PORC VIEW DATE P T SUPERINTENDENT EFF TIVE DATE CAT G RY 1.0 REVIEWED BY: 9306040i5i 930524 PDR ADQCK 05000244 P PDR L
\~EOP: P-TURB.'1 TITLE: TURBINE TRIP WITHOUT RX TRIP REQUIRED REV 7 PAGE 2 of 12 A.PURPOSE-This procedure provides the necessary instructions to control the plant following a turbine trip without a reactor trip required.B.ENTRY CONDITIONS/SYMPTOMS 1.ENTRY CONDITIONS
-This procedure is entered from: a.AP-CW.1, LOSS OF A CIRC WATER PUMP, or, b.AP-ELEC.l, LOSS OF 12A AND/OR 12B TRANSFORMER, or, c~AP FW 1 g PART I AL OR COMPLETE LOSS OF MA I N FEE DWATER g or, d.AP-TURB.2, AUTOMATIC TURBINE RUNBACK, or, e.AP-TURB.3, TURBINE VIBRATIONS, or, f.AP-TURB.4, LOSS OF CONDENSER VACUUM, when power is less than P-9 and the turbine trips without a Rx trip.2.SYMPTOMS-The symptoms of TURBINE TRIP WITHOUT RX TRIP REQUIRED are: a~b.c~d.e.gi Annunciator K-l, THRUST BEARING FAILURE, lit, or Annunciator K-9, TURBINE BEARING OIL LO PRESS TRIP 6 psi, lit, or Annunciator K-17, TURBINE LOW VACUUM TRIP 20" HG, lit, or Annunciator K-18, MAIN FEEDWATER PUMPS TRIPPED, lit, or Annunciator K-26, GENERATOR LOCKOUT RELAY, lit, or Annunciator K-25, TURBINE OVERSPEED ALERT 1980 RPM, lit, or Annunciator F-21, COND HI PRESS 20" HG OR LOSS OF BOTH CIRC WTR PMPS, lit, or h.Annunciator K-3, AMSAC ACTUATED, lit.
~l T EOP: P-TURB;1 TITLE: TURBINE TRIP WITHOUT RX TRIP REQUIRED REV 7 PAGE 3 of 12 STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED***************.**************************CAUTION IF, AT ANY TIME DURING THIS PROCEDURE, A REACTOR TRIP OR SI OCCURS, E-O, REACTOR TRIP OR SAFETY INJECTION, SHALL BE PERFORMED.
1 Verify Turbine Stop Valves-CLOSED Manually trip turbine.IF turbine stop valves can NOT be closed, THEN close both MSIVs.IF reactor power greater than 8%with both MSIVs closed, THEN manually trip the reactor and go to E-O, REACTOR TRIP OR SAFETY INJECTION.
EOP: P-'TURB;1 T!TLE: TURBINE TRIP WITHOUT RX TRIP REQUIRED REV: 7 PAGE 4 of 12 STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED*****************************************CAUTION PRZR PRESSURE LOW PRESSURE TRIP IS RATE SENSITIVE, THEREFORE, MONITOR PRESSURE WHEN REDUCING RCS TEMPERATURE.
- NOTE: Automatic rod control is desired, if available.
2 Check Reactor, Power: a.NIS intermediate ranges-ABOVE THE POINT OF ADDING HEAT (APPROXIMATELY 2.5xlO 6 AMPS)a.Go to Step 3.b.Verify control rods driving in to reduce reactor power in AUTO b.Perform the following:
l)Ensure ROD CONTROL BANK SELECTOR switch to MANUAL 2)Insert rods as necessary to reduce reactor power.c.Borate as necessary to maintain control rods above rod insertion limits EOP: P-TURB;1 TURBINE TRIP WITHOUT RX TRIP REQUIRED REV: 7 PAGE 5 of 12 STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED 3 Monitor S/G Levels: a.Levels-GREATER THAN 30%OR INCREASING a.IF MFW regulating and bypass valves NOT controlling in AUTO, THEN place controllers in MANUAL and restore narrow range level to program.IF S/G level can NOT be restored, THEN trip the reactor and go to E-O, REACTOR TRIP OR SAFETY INJECTION.
b.Levels-TRENDING TO PROGRAM b.IF S/G level above program and increasing uncontrolled, THEN place controller(s) in MANUAL and decrease flow as necessary.
IF flow can NOT be controlled, THEN perform the following:
l)Trip the reactor.2)Stop the running MFW pump.3)Close MFW pump discharge valves.4)Go to E-O, REACTOR TRIP OR SAFETY INJECTION.
EOP: P.~TURB;1 TURBINE TRIP WITHOUT RX TRIP REQUIRED REV: 7 PAGE 6 of 12 STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED 4 Verify Proper Operation Of Steam Dump: a.Verify annunciator G-15, STEAM DUMP ARMED-LIT a.Place steam dump mode selector switch to MANUAL.b.Condenser steam dump operating in AUTO b.IF steam dump NOT available, THEN perform the following:
1)Adjust S/G ARV setpoints to 1005 psig and verify proper operation.
2)IF power is greater than 8%, THEN ensure reactor trip and go to E-O, REACTOR TRIP OR SAFETY INJECTION.
c.Tavg-TRENDING TO PROGRAM c.IF Tavg can NOT be controlled, THEN manually trip the reactor and go to E-O, REACTOR TRIP OR SAFETY INJECTION.
5 Check PRZR Pressure-TRENDING TO 2235 PSIG IF PRZR pressure can NOT be controlled, THEN refer to AP-PRZR.1, ABNORMAL PRESSURIZER PRESSURE.
EOP: P-TURB;1 TITLE: TURBINE TRIP WITHOUT RX TRIP REQUIRED REV: 7 PAGE 7 of 12 STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED 6 Check PRZR Level: a.Level-GREATER THAN 13%a.Perform the following:
1)Place loop B cold leg isolation valve to REGEN Hx (AOV-427)switch to CLOSE.2)Place letdown orifice valve switches to CLOSE (AOV-200A, AOV-200B, and AOV-202).3)Verify excess letdown isolation valve (AOV-310)closed.4)Ensure PRZR heaters off.5)Control charging to restore PRZR level greater than 13%.6)WHEN PRZR level greater than 13%, THEN restore letdown.b.Level-TRENDING TO PROGRAM'b.Increase charging flow as necessary to restore PRZR level to program.
EOP: P-TURB;1 T1jLE: TURBINE TRIP WITHOUT RX TRIP REQUIRED REV 7 PAGE 8 of 12 STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED 7 Check MFW System: a.Verify MFW regulating and bypass valves-OPERATING IN AUTO b.MFW pumps-BOTH RUNNING c.Close one MFW pump discharge valve a.Place MFW regulating and bypass valve controllers in MANUAL and restore S/G level.b.Perform the following:
1)Verify one MFW pump running.IF NOT, THEN verify both MDAFW pumps running.2)Go to Step 8.d.Stop selected MFW pump 8 Establish Stable Plant Conditions:
a.Place rod control bank selector in MANUAL b.NIS intermediate ranges-BELOW THE POINT OF ADDING HEAT (APPROXIMATELY 2.5x10 AMPS)b.Return to Step 2.c.PRZR pressure-BETWEEN 2220 PSIG AND 2260 PSIG d.PRZR level-TRENDING TO PROGRAM e.S/G levels-TRENDING TO PROGRAM f.RCS Tavg-GREATER THAN 540'F c.Control PRZR heaters and spray as necessary.
d.Control charging as necessary.
e.Control S/G feed flow as necessary.
f.Control dumping steam as necessary.
IF cooldown continues, THEN close both MSIVs.
A~~
EOP: P-WRB:1 T1TLE: TURBINE TRIP WITHOUT RX TRIP REQUIRED REV 7 PAGE 9 of 12 STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED****************************************CAUTION IF ANY S/G LEVEL ABOVE PROGRAM, THEN AFW FLOW MAY BE THROTTLED IMMEDIATELY TO PREVENT S/G ISOLATION.
NOTE: Maintain Reactor power less than 2%.This is within the capacity of MDAFW pumps.4 9 Check S/G Feed Flow Status: a.Manually start both MDAFW pumps b.Verify AFW flow-ESTABLISHED c.Verify MFW flow control valves CLOSED~MFW regulating valves~MFW bypass valves d.Close MFW pump discharge valves~MOV-3977, A MFW pump~MOV~976, B MFW pump e.Stop any running MFW pump and place in PULL STOP f.Check S/G level-TRENDING TO 39%b.Perform the following:
1)Establish MFW flow using MFW regulating valve bypass valves.IF MFW NOT available, THEN manually start TDAFW pump and establish flow as necessary.
2)Go to Step 10.c.Place A and B MFW regulating and bypass valve controllers in manual at 0%demand.f.Adjust MDAFW pump flow as necessary to restore S/G level.
EOP: P~TURB." 1 TITLE: TURBINE TRIP WITHOUT RX TRIP REQUIRED REV: 7 PAGE 10 of 12 STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED*****************************************CAUTION WHEN FEEDING BOTH S/G(S)USING ONE MDAFW PUMP, THEN THE SUM OF THE FLOWS TO BOTH S/G(S)MUST BE LESS THAN 230 GPM.10 Establish Normal AFW Pump Shutdown Alignment:
a.Place AFW bypass switches to DEF b.Verify the following:
o Both S/G levels-STABLE OR INCREASING b.Continue with Step ll.WHEN conditions met, THEN do Steps 10c through f.o Total AFW flow-LESS THAN 200 GPM c.Close MDAFW pump discharge valves~MOV-4007~MOV-4008 d.Stop all but one MDAFW pump e.Open AFW discharge crossover valves~MOV-4000A~MOV-4000B f.Open AFW bypass valves as necessary to control S/G levels~AOV-4480~AOV-4481 EOP: TITLE: TURBINE TRIP WITHOUT RX TRIP REQUIRED REV: 7 PAGE 11 of 12 STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED 11 Establish Normal Shutdown Alignment:
a.Check condenser-AVAILABLE a.Dispatch AO to perform Attachment SD-2.b.Perform the following as necessary:
o Open generator disconnects
~1G13A71~9X13A73 o Place voltage regulator to OFF o Open turbine drain valves o Rotate reheater steam supply controller cern to close valves o Place reheater dump valve switches to HAND o Stop all but one condensate pump c.Verify Bus llA and Bus llB energized-BOTH BUSSES GREATER THAN 4 KV c.IF either bus NOT energized, THEN refer to 0-6.9.2, ESTABLISHING AND/OR TRANSFERRING OFFSITE POWER TO BUS 12A/BUS 12B.d.Dispatch AO to perform Attachment SD-1
('
EOP: II PERTURB;1 TURBINE TRIP WITHOUT RX TRIP REQUIRED REV 7 PAGE 12 of 12 STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED NOTE: Refer to 0-9.3, NRC IMMEDIATE NOTIFICATION, for reporting requirements.
12 Notify Higher Supervision 13 Establish Desired Plant Conditions:
a.Reactor shutdown-DESIRED a.IF turbine is to be restored to service, THEN maintain reactor critical and refer to 0-1.2, PLANT FROM HOT SHUTDOWN TO STEADY LOAD.b.Refer to 0-2.1, NORMAL SHUTDOWN TO HOT SHUTDOWN-END-0~J 0 EOP: TURBINE TRIP WITHOUT RX TRIP REQUIRED REV: 7 PAGE 1 of 1 AP-TURB.1 APPENDIX LIST TITLE PAGES 1)2)ATTACHMENT SD-1 ATTACHMENT SD-2