ML17292A888: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:CATEGORY1REGULATOIINFORMATtON DISTRIBUTION jTEM(RODS)ACCESSION NBR:9706170043 DOC.DATS; 97/06/06NOTARIZED:
{{#Wiki_filter:CATEGORY 1 REGULATOIINFORMATtON DISTRIBUTION jTEM (RODS)ACCESSION NBR:9706170043 DOC.DATS;97/06/06 NOTARIZED:
YESDOCKETFAC'IL:50-397 WPPSSNuclearProject,Unit2,Washington PublicPowe05000397AUT~sk.NAMEAUTHORAFFILIATION BEMIS,P.R.
YES DOCKET FAC'IL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe 05000397 AUT~sk.NAME AUTHOR AFFILIATION BEMIS,P.R.
Washington PublicBowerSuppl,ySystemRECIP.NAME RECIPIENT AFFILIA'9(ON DocumentControlBranch(Document ControlDesk)
Washington Public Bower Suppl,y System RECIP.NAME RECIPIENT AFFILIA'9(ON Document Control Branch (Document Control Desk)


==SUBJECT:==
==SUBJECT:==
Withdraws requestforamendofSLMCPR.Requested changesto970520ltrincluded&TSpaqe2.0-l,modified toindicatetharSLMCPRforATRIUM-9X fidelappliesonlytoCycle13,'orwarded w/corresponding Bqsespage.DISTRIBUTION CODE'001D COPIESRECEIVED;LTR
Withdraws request for amend of SLMCPR.Requested changes to 970520 ltr included&TS paqe 2.0-l,modified to indicate thar SLMCPR for ATRIUM-9X fidel applies only to Cycle 13,'orwarded w/corresponding Bqses page.DISTRIBUTION CODE'001D COPIES RECEIVED;LTR
,ENCLSIZE'ITLE:
, ENCL SIZE'ITLE:
ORSubmittal:
OR Submittal:
GeneralDistribution NOTES:RECIPIENT IDCODE/NAME PD4-2LACOLBURNFT COPIESLTTRENCL1111RECIPIENT IDCODE/NAME PD4-2PDCOPIESLTTRENCL11INTERNAL:
General Distribution NOTES: RECIPIENT ID CODE/NAME PD4-2 LA COLBURNFT COPIES LTTR ENCL 1 1 1 1 RECIPIENT ID CODE/NAME PD4-2 PD COPIES LTTR ENCL 1 1 INTERNAL: ACRS NRR/DE/ECGB/A NRR/DRCH/HICB NRR/DSSA/SRXB OGC/HDS3 EXTERNAL: NOAC 1 1 1 1 1 1 1 1 1 0 1 1 FILE CENTER RPDE+l.bRB NRR/DSSA/SPLB NUDOCS-ABSTRACT NRC PDR'1 1 1 1 1 1 1 1 1 1 D U N NOTE TO ALL"RIDS" RECIPZENTS:
ACRSNRR/DE/ECGB/A NRR/DRCH/HICB NRR/DSSA/SRXB OGC/HDS3EXTERNAL:
PLEASE HELP US TO REDUCE WASTE.TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK{DCD)ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR 14 ENCL 13
NOAC111111111011FILECENTERRPDE+l.bRB NRR/DSSA/SPLB NUDOCS-ABSTRACT NRCPDR'1111111111DUNNOTETOALL"RIDS"RECIPZENTS:
'C t g'g WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O.Box 968~Richland,, Washington 99352-0968 June 6, 1997 G02-97-115 Docket No.50-397 U.S.Nuclear Regulatory Commission Document Control Desk Washington, D.C.20555 Gentlemen:
PLEASEHELPUSTOREDUCEWASTE.TOHAVEYOURNAMEORORGANIZATION REMOVEDFROMDISTRIBUTION LISTSORREDUCETHENUMBEROFCOPIESRECEIVEDBYYOUORYOURORGANIZATION, CONTACTTHEDOCUMENTCONTROLDESK{DCD)ONEXTENSION 415-2083TOTALNUMBEROFCOPIESREQUIRED:
LTTR14ENCL13
'Ctg'g WASHINGTON PUBLICPOWERSUPPLYSYSTEMP.O.Box968~Richland,,
Washington 99352-0968 June6,1997G02-97-115 DocketNo.50-397U.S.NuclearRegulatory Commission DocumentControlDeskWashington, D.C.20555Gentlemen:


==Subject:==
==Subject:==
WNP-2OPERATING LICENSENPF-21EXIGENTREQUESTFORAMENDMENT OFSLMCPR-MODIFICATION OFREQUEST
WNP-2 OPERATING LICENSE NPF-21 EXIGENT REQUEST FOR AMENDMENT OF SLMCPR-MODIFICATION OF REQUEST


==Reference:==
==Reference:==


LetterGO2-97-102 datedMay20,1997,P.R.Bemis(SupplySystem)toNRCDocumentControlDesk,WNP-2Operating LicenseNPF-21ExigentRequestforAmendment:
Letter GO2-97-102 dated May 20, 1997, P.R.Bemis (Supply System)to NRC Document Control Desk, WNP-2 Operating License NPF-21 Exigent Request for Amendment:
MinimumCriticalPowerRatioSafetyLimitsThereferenced letterrequestsanexigentchangetotheWNP-2Technical Specifications (Section2.1.1.2)toestablish aninterimsafetylimit(SLMCPR)forSiemensPowerCorporation (SPC)ATRIUM-9X fuel.Inconjunction withtherequested change,areference describing themethodusedtoestablish theinterimsafetylimitwasproposedforinclusion intheCOLRreference list.Subsequent reviewbyNRCstaffhasdetermined thattheinclusion ofthisreference isnotnecessary forTechnical Specifications Section5.6.5.Accordingly, theSupplySystemherebywithdraws itsrequesttoinsertthenewreference inSection5.6.5.sNRCstaffreviewofthereferenced letteralsoidentified thatadditional information isnecessary toclarifytheuseofSPCSLMCPRfromCycle11insubsequent cycles.Therequested changestoAttachment iofthereferenced letterareincludedasAttachment itothisletter.Inaddition, Technical Specification page2.0-1hasbeenmodifiedtoindicatethattheSLMCPRforATRIUM-9X fuelappliesonlytoCycle13.Thisclarifies theintentoftheoriginalchangemadeinthereferenced letter.Attachment 2providestherevisedTechnical Specification page2.0-1andthecorresponding Basespage.'P70bl70043 970bObPDRADOCK05000397PPDR't60944IIIIIIIlllllllillIIIIlllillllIIl'Illllll e
Minimum Critical Power Ratio Safety Limits The referenced letter requests an exigent change to the WNP-2 Technical Specifications (Section 2.1.1.2)to establish an interim safety limit (SLMCPR)for Siemens Power Corporation (SPC)ATRIUM-9X fuel.In conjunction with the requested change, a reference describing the method used to establish the interim safety limit was proposed for inclusion in the COLR reference list.Subsequent review by NRC staff has determined that the inclusion of this reference is not necessary for Technical Specifications Section 5.6.5.Accordingly, the Supply System hereby withdraws its request to insert the new reference in Section 5.6.5.s NRC staff review of the referenced letter also identified that additional information is necessary to clarify the use of SPC SLMCPR from Cycle 11 in subsequent cycles.The requested changes to Attachment i of the referenced letter are included as Attachment i to this letter.In addition, Technical Specification page 2.0-1 has been modified to indicate that the SLMCPR for ATRIUM-9X fuel applies only to Cycle 13.This clarifies the intent of the original change made in the referenced letter.Attachment 2 provides the revised Technical Specification page 2.0-1 and the corresponding Bases page.'P70bl70043 970bOb PDR ADOCK 05000397 P PDR't60944 IIIIIIIlllllllillIIIIlllillllIIl'Illllll e
EXIGENTREQUESTFRAMENDMENT OFSLMCPRMODIFICATION OFREQUESTPageosThechangesproposedbythisletterdonotalterthepreviousconclusion ofnosignificant hazardsthatwereevaluated inaccordance with10CFR50.92(c) anddocumented inthereferenced letter.Therevisedamendment requesthasalsobeenevaluated againstthecriteriaforidentification oflicensing andregulatory actionsrequiring environmental assessment inaccordance with10CFR51.21.
EXIGENT REQUEST F R AMENDMENT OF SLMCPR MODIFICATION OF REQUEST Pageos The changes proposed by this letter do not alter the previous conclusion of no significant hazards that were evaluated in accordance with 10CFR50.92(c) and documented in the referenced letter.The revised amendment request has also been evaluated against the criteria for identification of licensing and regulatory actions requiring environmental assessment in accordance with 10CFR51.21.
Themodifiedrequestcontinues tomeettheeligibility criteriaforacategorical exclusion assetforthin10CFR51.22(c)(9).
The modified request continues to meet the eligibility criteria for a categorical exclusion as set forth in 10CFR51.22(c)(9).
Therefore, inaccordance with10CFR51.22(b),
Therefore, in accordance with 10CFR51.22(b), an environmental assessment of the change is not required.This request for modification of the pending exigent Technical Specifications amendment request has been reviewed and approved by the WNP-2 Plant Operations Committee and the Supply System Corporate Nuclear Safety Review Board.In accordance with 10CFR50.91, the State of Washington has been provided a copy of this letter.Should you have any questions or desire additional information regarding the matter, please contact Mr.P.J.Inserra at (509)377-4147.Respectfully, P.R.Bemis Vice President Nuclear Operations Mail Drop PE23 Attachments CC: EW Merschoff-NRC RIV KE Perkins, Jr.-NRC RIV, Walnut Creek Field Office TG Colburn-NRR NRC Sr.Resident Inspector-927N DL Williams-BPA/399 CR Wallis-EFSEC PD Robinson-Winston&Strawn  
anenvironmental assessment ofthechangeisnotrequired.
, STATE OF WASHINGTON)
Thisrequestformodification ofthependingexigentTechnical Specifications amendment requesthasbeenreviewedandapprovedbytheWNP-2PlantOperations Committee andtheSupplySystemCorporate NuclearSafetyReviewBoard.Inaccordance with10CFR50.91, theStateofWashington hasbeenprovidedacopyofthisletter.Shouldyouhaveanyquestions ordesireadditional information regarding thematter,pleasecontactMr.P.J.Inserraat(509)377-4147.
)COUNTY OF BENTON)
Respectfully, P.R.BemisVicePresident NuclearOperations MailDropPE23Attachments CC:EWMerschoff
-NRCRIVKEPerkins,Jr.-NRCRIV,WalnutCreekFieldOfficeTGColburn-NRRNRCSr.ResidentInspector
-927NDLWilliams-BPA/399CRWallis-EFSECPDRobinson-Winston&Strawn  
,STATEOFWASHINGTON)
)COUNTYOFBENTON)


==Subject:==
==Subject:==
RequestforMcxBfication ofAmendment toTSMCPRafeLimiI,G.O.SMITH,beingdulysworn,subscribe toandsaythatIamtheActingVicePresident, NuclearOperations fortheWASHINGTON PUBLICPOWERSUPPLYSYSTEM,theapplicant herein;thatIhavethefullauthority toexecutethisoath;thatIhavereviewedtheforegoing; andthattothebestofmyknowledge, information, andbeliefthestatements madeinitaretrue.DATE,1997G.O.SnuthActingVicePresident, NuclearOperations Onthisdatepersonally appearedbeforemeG.O.Smith,tomeknowntobetheindividual whoexecutedtheforegoing instrument, andacknowledged thathesignedthesameashisfreeactanddeedfortheusesandpurposeshereinmentioned.
Request for McxBfication of Amendment to TS MCPR afe Limi I, G.O.SMITH, being duly sworn, subscribe to and say that I am the Acting Vice President, Nuclear Operations for the WASHINGTON PUBLIC POWER SUPPLY SYSTEM, the applicant herein;that I have the full authority to execute this oath;that I have reviewed the foregoing; and that to the best of my knowledge, information, and belief the statements made in it are true.DATE , 1997 G.O.Snuth Acting Vice President, Nuclear Operations On this date personally appeared before me G.O.Smith, to me known to be the individual who executed the foregoing instrument, and acknowledged that he signed the same as his free act and deed for the uses and purposes herein mentioned.
GIVENundermyhandandsealthis~dayof1997NotaryPublicmandfortheSTATEOFWASHINGTON byrResidingatMyCommission Expires EXIGENTREQUESTFORAMENDMENT OFSLMCPRMODIFICATION OFREQUESTAttachment 1'agelof1ATTACHMi22IT 1Submittal ofAdditional Information Page1ofAttachment 1ofthedocumentreferenced belowisrevisedbyinserting thefollowing textasnewparagraph 2:Cycle13willbecomprised of112freshABBassemblies, 104once-burned ABBassemblies, and548oftheatleasttwiceburnedATRIUM-9X assemblies.
GIVEN under my hand and seal this~day of 1997 Notary Public m and for the STATE OF WASHINGTON by r Residing at My Commission Expires EXIGENT REQUEST FOR AMENDMENT OF SLMCPR MODIFICATION OF REQUEST Attachment 1'agelof 1 ATTACHMi22IT 1 Submittal of Additional Information Page 1 of Attachment 1 of the document referenced below is revised by inserting the following text as new paragraph 2: Cycle 13 will be comprised of 112 fresh ABB assemblies, 104 once-burned ABB assemblies, and 548 of the at least twice burned ATRIUM-9X assemblies.
TheNRCapprovedABBmethodology (i.e.,COLRReference 11:CENPD-300-P-A) assumesthatthesafetylimitMCPR(SLMCPR)forthenon-ABBresidentfuelisunchanged fromthelastcycleforwhichitwasevaluated byitssupplier.
The NRC approved ABB methodology (i.e., COLR Reference 11: CENPD-300-P-A) assumes that the safety limit MCPR (SLMCPR)for the non-ABB resident fuel is unchanged from the last cycle for which it was evaluated by its supplier.The A'INDIUM-9X fuel was last evaluated by SPC in Cycle ll.Accordingly, a new ATRIUM-9X SLMCPR for Cycle 11 has been determined by SPC (Reference 3)using the changes to the additive constant uncertainty discussed below.The SPC determined SLMCPR will be applied by ABB to Cycle 13 and future cycles that use the ATRIUM-9X fuel.
TheA'INDIUM-9X fuelwaslastevaluated bySPCinCyclell.Accordingly, anewATRIUM-9X SLMCPRforCycle11hasbeendetermined bySPC(Reference 3)usingthechangestotheadditiveconstantuncertainty discussed below.TheSPCdetermined SLMCPRwillbeappliedbyABBtoCycle13andfuturecyclesthatusetheATRIUM-9X fuel.


==Reference:==
==Reference:==


LetterGO2-97-102 datedMay20,1997,P.R.Bemis(SupplySystem)toNRCDocumentControlDesk,WNP-2Operating LicenseNPF-21ExigentRequestforAmendment:
Letter GO2-97-102 dated May 20, 1997, P.R.Bemis (Supply System)to NRC Document Control Desk, WNP-2 Operating License NPF-21 Exigent Request for Amendment:
MinimumCriticalPowerRatioSafetyLimits.}}
Minimum Critical Power Ratio Safety Limits.}}

Revision as of 12:05, 6 July 2018

Withdraws Request for Amend of Slmcpr.Requested Changes to 970520 Ltr Included & TS Page 2.0-1,modified to Indicate That SLMCPR for ATRIUM-9X Fuel Applies Only to Cycle 13, Forwarded W/Corresponding Bases Page
ML17292A888
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 06/06/1997
From: BEMIS P R
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML17292A889 List:
References
GO2-97-115, NUDOCS 9706170043
Download: ML17292A888 (6)


Text

CATEGORY 1 REGULATOIINFORMATtON DISTRIBUTION jTEM (RODS)ACCESSION NBR:9706170043 DOC.DATS;97/06/06 NOTARIZED:

YES DOCKET FAC'IL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe 05000397 AUT~sk.NAME AUTHOR AFFILIATION BEMIS,P.R.

Washington Public Bower Suppl,y System RECIP.NAME RECIPIENT AFFILIA'9(ON Document Control Branch (Document Control Desk)

SUBJECT:

Withdraws request for amend of SLMCPR.Requested changes to 970520 ltr included&TS paqe 2.0-l,modified to indicate thar SLMCPR for ATRIUM-9X fidel applies only to Cycle 13,'orwarded w/corresponding Bqses page.DISTRIBUTION CODE'001D COPIES RECEIVED;LTR

, ENCL SIZE'ITLE:

OR Submittal:

General Distribution NOTES: RECIPIENT ID CODE/NAME PD4-2 LA COLBURNFT COPIES LTTR ENCL 1 1 1 1 RECIPIENT ID CODE/NAME PD4-2 PD COPIES LTTR ENCL 1 1 INTERNAL: ACRS NRR/DE/ECGB/A NRR/DRCH/HICB NRR/DSSA/SRXB OGC/HDS3 EXTERNAL: NOAC 1 1 1 1 1 1 1 1 1 0 1 1 FILE CENTER RPDE+l.bRB NRR/DSSA/SPLB NUDOCS-ABSTRACT NRC PDR'1 1 1 1 1 1 1 1 1 1 D U N NOTE TO ALL"RIDS" RECIPZENTS:

PLEASE HELP US TO REDUCE WASTE.TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK{DCD)ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR 14 ENCL 13

'C t g'g WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O.Box 968~Richland,, Washington 99352-0968 June 6, 1997 G02-97-115 Docket No.50-397 U.S.Nuclear Regulatory Commission Document Control Desk Washington, D.C.20555 Gentlemen:

Subject:

WNP-2 OPERATING LICENSE NPF-21 EXIGENT REQUEST FOR AMENDMENT OF SLMCPR-MODIFICATION OF REQUEST

Reference:

Letter GO2-97-102 dated May 20, 1997, P.R.Bemis (Supply System)to NRC Document Control Desk, WNP-2 Operating License NPF-21 Exigent Request for Amendment:

Minimum Critical Power Ratio Safety Limits The referenced letter requests an exigent change to the WNP-2 Technical Specifications (Section 2.1.1.2)to establish an interim safety limit (SLMCPR)for Siemens Power Corporation (SPC)ATRIUM-9X fuel.In conjunction with the requested change, a reference describing the method used to establish the interim safety limit was proposed for inclusion in the COLR reference list.Subsequent review by NRC staff has determined that the inclusion of this reference is not necessary for Technical Specifications Section 5.6.5.Accordingly, the Supply System hereby withdraws its request to insert the new reference in Section 5.6.5.s NRC staff review of the referenced letter also identified that additional information is necessary to clarify the use of SPC SLMCPR from Cycle 11 in subsequent cycles.The requested changes to Attachment i of the referenced letter are included as Attachment i to this letter.In addition, Technical Specification page 2.0-1 has been modified to indicate that the SLMCPR for ATRIUM-9X fuel applies only to Cycle 13.This clarifies the intent of the original change made in the referenced letter.Attachment 2 provides the revised Technical Specification page 2.0-1 and the corresponding Bases page.'P70bl70043 970bOb PDR ADOCK 05000397 P PDR't60944 IIIIIIIlllllllillIIIIlllillllIIl'Illllll e

EXIGENT REQUEST F R AMENDMENT OF SLMCPR MODIFICATION OF REQUEST Pageos The changes proposed by this letter do not alter the previous conclusion of no significant hazards that were evaluated in accordance with 10CFR50.92(c) and documented in the referenced letter.The revised amendment request has also been evaluated against the criteria for identification of licensing and regulatory actions requiring environmental assessment in accordance with 10CFR51.21.

The modified request continues to meet the eligibility criteria for a categorical exclusion as set forth in 10CFR51.22(c)(9).

Therefore, in accordance with 10CFR51.22(b), an environmental assessment of the change is not required.This request for modification of the pending exigent Technical Specifications amendment request has been reviewed and approved by the WNP-2 Plant Operations Committee and the Supply System Corporate Nuclear Safety Review Board.In accordance with 10CFR50.91, the State of Washington has been provided a copy of this letter.Should you have any questions or desire additional information regarding the matter, please contact Mr.P.J.Inserra at (509)377-4147.Respectfully, P.R.Bemis Vice President Nuclear Operations Mail Drop PE23 Attachments CC: EW Merschoff-NRC RIV KE Perkins, Jr.-NRC RIV, Walnut Creek Field Office TG Colburn-NRR NRC Sr.Resident Inspector-927N DL Williams-BPA/399 CR Wallis-EFSEC PD Robinson-Winston&Strawn

, STATE OF WASHINGTON)

)COUNTY OF BENTON)

Subject:

Request for McxBfication of Amendment to TS MCPR afe Limi I, G.O.SMITH, being duly sworn, subscribe to and say that I am the Acting Vice President, Nuclear Operations for the WASHINGTON PUBLIC POWER SUPPLY SYSTEM, the applicant herein;that I have the full authority to execute this oath;that I have reviewed the foregoing; and that to the best of my knowledge, information, and belief the statements made in it are true.DATE , 1997 G.O.Snuth Acting Vice President, Nuclear Operations On this date personally appeared before me G.O.Smith, to me known to be the individual who executed the foregoing instrument, and acknowledged that he signed the same as his free act and deed for the uses and purposes herein mentioned.

GIVEN under my hand and seal this~day of 1997 Notary Public m and for the STATE OF WASHINGTON by r Residing at My Commission Expires EXIGENT REQUEST FOR AMENDMENT OF SLMCPR MODIFICATION OF REQUEST Attachment 1'agelof 1 ATTACHMi22IT 1 Submittal of Additional Information Page 1 of Attachment 1 of the document referenced below is revised by inserting the following text as new paragraph 2: Cycle 13 will be comprised of 112 fresh ABB assemblies, 104 once-burned ABB assemblies, and 548 of the at least twice burned ATRIUM-9X assemblies.

The NRC approved ABB methodology (i.e., COLR Reference 11: CENPD-300-P-A) assumes that the safety limit MCPR (SLMCPR)for the non-ABB resident fuel is unchanged from the last cycle for which it was evaluated by its supplier.The A'INDIUM-9X fuel was last evaluated by SPC in Cycle ll.Accordingly, a new ATRIUM-9X SLMCPR for Cycle 11 has been determined by SPC (Reference 3)using the changes to the additive constant uncertainty discussed below.The SPC determined SLMCPR will be applied by ABB to Cycle 13 and future cycles that use the ATRIUM-9X fuel.

Reference:

Letter GO2-97-102 dated May 20, 1997, P.R.Bemis (Supply System)to NRC Document Control Desk, WNP-2 Operating License NPF-21 Exigent Request for Amendment:

Minimum Critical Power Ratio Safety Limits.