ML17335A561: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:ATTACHMENT TOC1099-11PROPOSEDT/SPAGESUNIT1Page3/49-8UNIT2Page3/49-799i0200237 99iOiiPDRADQCK050003i5PPDRg 3/4LIMITINGCONDITIONS FOROPERATION ANDSURVEILLANCE REQUIREMENTS.
{{#Wiki_filter:ATTACHMENT TO C1099-11 PROPOSED T/S PAGES UNIT 1 Page 3/4 9-8 UNIT 2 Page 3/4 9-7 99i0200237 99iOii PDR ADQCK 050003i5 P PDR g 3/4 LIMITING CONDITIONS FOR OPERATION AND SURVEILLANCE REQUIREMENTS.
3/4.9REFUELING OPERATIONS
3/4.9 REFUELING OPERATIONS
.~CRANETRAVEL-SPENTFUELSTORAGEPOOLBUILDING'IMITING CONDITION FOROPERATION 3.9.7Loadsinexcessof2,500poundsshallbeprohibited fromtraveloverfuelassemblies inthestoragepool.Loadscarriedoverthespentfuelpoolandtheheightsatwhichtheymaybecarriedoverrackscontaining fuelshallbelimitedinsuchawayastoprecludeimpactenergiesover24,240in.-lbs.,
.~CRANE TRAVEL-SPENT FUEL STORAGE POOL BUILDING'IMITING CONDITION FOR OPERATION 3.9.7 Loads in excess of 2,500 pounds shall be prohibited from travel over fuel assemblies in the storage pool.Loads carried over the spent fuel pool and the heights at which they may be carried over racks containing fuel shall be limited in such a way as to preclude impact energies over 24,240 in.-lbs., if the loads are dropped from the crane.APPLICABILITY:
iftheloadsaredroppedfromthecrane.APPLICABILITY:
With fuel assemblies in the storage pool.ACTION: With the requirements of the above specification not satisfied, place the crane load in a safe condition.
Withfuelassemblies inthestoragepool.ACTION:Withtherequirements oftheabovespecification notsatisfied, placethecraneloadinasafecondition.
The provisions of Specification 3.0.3 are not applicable.
Theprovisions ofSpecification 3.0.3arenotapplicable.
SURVEILLANCE RE UIREMENTS 4.'9.7.1 Crane interlocks which prevent crane travel with loads in excess of 2,500 pounds over fuel assemblies shall be demonstrated OPERABLE within 7 days prior to crane use and at least once per 7 days thereafter during crane operation.
SURVEILLANCE REUIREMENTS 4.'9.7.1Craneinterlocks whichpreventcranetravelwithloadsinexcessof2,500poundsoverfuelassemblies shallbedemonstrated OPERABLEwithin7dayspriortocraneuseandatleastonceper7daysthereafter duringcraneoperation.
This Surveillance Requirement is not required during the movement of steam generator sections in the auxiliary building for the Unit 1 steam generator replacement project.When crane travel interlocks are disengaged, administrative controls shall be in place to prevent loads from passing over the spent fuel pool.4.9.7.2 The potential impact energy due to dropping the crane's load shall.be determined to be S 24,240 in.-lbs.prior to moving each load over racks containing fuel.Shared system with Cook Nuclear Plant-Unit 2 COOK NUCLEAR PLANT-UNIT 1 Page 3/4 9-8 AMENDMENT 4M, 448, 486  
ThisSurveillance Requirement isnotrequiredduringthemovementofsteamgenerator sectionsintheauxiliary buildingfortheUnit1steamgenerator replacement project.Whencranetravelinterlocks aredisengaged, administrative controlsshallbeinplacetopreventloadsfrompassingoverthespentfuelpool.4.9.7.2Thepotential impactenergyduetodroppingthecrane'sloadshall.bedetermined tobeS24,240in.-lbs.priortomovingeachloadoverrackscontaining fuel.SharedsystemwithCookNuclearPlant-Unit2COOKNUCLEARPLANT-UNIT 1Page3/49-8AMENDMENT 4M,448,486  
~iS (V 3/4 LIMITING CONDITIONS FOR OPERATION AND SURVEILLANCE REQUIREMENTS 3/4.9 REFUELING OPERATIONS CRANE TRAVEL-SPENT FUEL STORAGE POOL BUILDING*LIMITING CONDITION FOR OPERATION 3.9.7 Loads in excess of 2,500 pounds shall be prohibited from travel over fuel assemblies in the storage pool.Loads carried over the spent fuel pool and the heights at which they may be carried over racks containing fuel shall be limited in such a way as to preclude impact energies over 24,240 in.-lbs., if the loads are dropped from the crane.APPLICABILITY:
~iS(V 3/4LIMITINGCONDITIONS FOROPERATION ANDSURVEILLANCE REQUIREMENTS 3/4.9REFUELING OPERATIONS CRANETRAVEL-SPENTFUELSTORAGEPOOLBUILDING*
With fuel assemblies in the storage pool.ACTION: With the requirements of the above specification not satisfied, place the crane load in a safe condition.
LIMITINGCONDITION FOROPERATION 3.9.7Loadsinexcessof2,500poundsshallbeprohibited fromtraveloverfuelassemblies inthestoragepool.Loadscarriedoverthespentfuelpoolandtheheightsatwhichtheymaybecarriedoverrackscontaining fuelshallbelimitedinsuchawayastoprecludeimpactenergiesover24,240in.-lbs.,
The'rovisions of Specification 3.0.3 are not applicable.
iftheloadsaredroppedfromthecrane.APPLICABILITY:
SURVEILLANCE RE UIREMENTS 4.9.7.1 Crane interlocks which prevent crane travel with loads in excess of 2,500 pounds over fuel assemblics shall.be demonstrated OPERABLE within 7 days prior to crane use and at least once per 7 days thereafter during crane operation.
Withfuelassemblies inthestoragepool.ACTION:Withtherequirements oftheabovespecification notsatisfied, placethecraneloadinasafecondition.
This Surveillance Requirement is not required during the movement of steam generator sections in the auxiliary building for the Unit 1 steam generator replacement project.When crane travel interlocks are disengaged, administrative controls shall be in place to prevent loads from passing over the spent fuel pool.4.9.7.2 The potential impact energy due to dropping the crane's load shall be determined to be 5 24,240 in.-lbs.prior to moving each load over racks containing fuel.Shared system with Cook Nuclear Plant-Unit 1.COOK NUCLEAR PLANT-UNIT 2 Page 3/4 9-7 AMENDMENT 8V, 96,+VS o M~~~.~'}}
The'rovisions ofSpecification 3.0.3arenotapplicable.
SURVEILLANCE REUIREMENTS 4.9.7.1Craneinterlocks whichpreventcranetravelwithloadsinexcessof2,500poundsoverfuelassemblics shall.bedemonstrated OPERABLEwithin7dayspriortocraneuseandatleastonceper7daysthereafter duringcraneoperation.
ThisSurveillance Requirement isnotrequiredduringthemovementofsteamgenerator sectionsintheauxiliary buildingfortheUnit1steamgenerator replacement project.Whencranetravelinterlocks aredisengaged, administrative controlsshallbeinplacetopreventloadsfrompassingoverthespentfuelpool.4.9.7.2Thepotential impactenergyduetodroppingthecrane'sloadshallbedetermined tobe524,240in.-lbs.priortomovingeachloadoverrackscontaining fuel.SharedsystemwithCookNuclearPlant-Unit1.COOKNUCLEARPLANT-UNIT 2Page3/49-7AMENDMENT 8V,96,+VS oM~~~.~'}}

Revision as of 06:02, 6 July 2018

Proposed Tech Specs Pages,Correcting TS Pages Inadvertently Submitted in 990923 Submittal
ML17335A561
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 10/11/1999
From:
INDIANA MICHIGAN POWER CO.
To:
Shared Package
ML17335A560 List:
References
NUDOCS 9910200237
Download: ML17335A561 (5)


Text

ATTACHMENT TO C1099-11 PROPOSED T/S PAGES UNIT 1 Page 3/4 9-8 UNIT 2 Page 3/4 9-7 99i0200237 99iOii PDR ADQCK 050003i5 P PDR g 3/4 LIMITING CONDITIONS FOR OPERATION AND SURVEILLANCE REQUIREMENTS.

3/4.9 REFUELING OPERATIONS

.~CRANE TRAVEL-SPENT FUEL STORAGE POOL BUILDING'IMITING CONDITION FOR OPERATION 3.9.7 Loads in excess of 2,500 pounds shall be prohibited from travel over fuel assemblies in the storage pool.Loads carried over the spent fuel pool and the heights at which they may be carried over racks containing fuel shall be limited in such a way as to preclude impact energies over 24,240 in.-lbs., if the loads are dropped from the crane.APPLICABILITY:

With fuel assemblies in the storage pool.ACTION: With the requirements of the above specification not satisfied, place the crane load in a safe condition.

The provisions of Specification 3.0.3 are not applicable.

SURVEILLANCE RE UIREMENTS 4.'9.7.1 Crane interlocks which prevent crane travel with loads in excess of 2,500 pounds over fuel assemblies shall be demonstrated OPERABLE within 7 days prior to crane use and at least once per 7 days thereafter during crane operation.

This Surveillance Requirement is not required during the movement of steam generator sections in the auxiliary building for the Unit 1 steam generator replacement project.When crane travel interlocks are disengaged, administrative controls shall be in place to prevent loads from passing over the spent fuel pool.4.9.7.2 The potential impact energy due to dropping the crane's load shall.be determined to be S 24,240 in.-lbs.prior to moving each load over racks containing fuel.Shared system with Cook Nuclear Plant-Unit 2 COOK NUCLEAR PLANT-UNIT 1 Page 3/4 9-8 AMENDMENT 4M, 448, 486

~iS (V 3/4 LIMITING CONDITIONS FOR OPERATION AND SURVEILLANCE REQUIREMENTS 3/4.9 REFUELING OPERATIONS CRANE TRAVEL-SPENT FUEL STORAGE POOL BUILDING*LIMITING CONDITION FOR OPERATION 3.9.7 Loads in excess of 2,500 pounds shall be prohibited from travel over fuel assemblies in the storage pool.Loads carried over the spent fuel pool and the heights at which they may be carried over racks containing fuel shall be limited in such a way as to preclude impact energies over 24,240 in.-lbs., if the loads are dropped from the crane.APPLICABILITY:

With fuel assemblies in the storage pool.ACTION: With the requirements of the above specification not satisfied, place the crane load in a safe condition.

The'rovisions of Specification 3.0.3 are not applicable.

SURVEILLANCE RE UIREMENTS 4.9.7.1 Crane interlocks which prevent crane travel with loads in excess of 2,500 pounds over fuel assemblics shall.be demonstrated OPERABLE within 7 days prior to crane use and at least once per 7 days thereafter during crane operation.

This Surveillance Requirement is not required during the movement of steam generator sections in the auxiliary building for the Unit 1 steam generator replacement project.When crane travel interlocks are disengaged, administrative controls shall be in place to prevent loads from passing over the spent fuel pool.4.9.7.2 The potential impact energy due to dropping the crane's load shall be determined to be 5 24,240 in.-lbs.prior to moving each load over racks containing fuel.Shared system with Cook Nuclear Plant-Unit 1.COOK NUCLEAR PLANT-UNIT 2 Page 3/4 9-7 AMENDMENT 8V, 96,+VS o M~~~.~'