ML14027A279: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 17: | Line 17: | ||
=Text= | =Text= | ||
{{#Wiki_filter: | {{#Wiki_filter:January 27, 2014 | ||
Mr. Adam C. Heflin, Senior Vice | Mr. Adam C. Heflin, Senior Vice | ||
President and Chief Nuclear Officer | President and Chief Nuclear Officer | ||
Union Electric Company P.O. Box 620 Fulton, MO 65251 | Union Electric Company P.O. Box 620 Fulton, MO 65251 | ||
SUBJECT: CALLAWAY PLANT - INFORMATION REQUEST FOR NRC TRIENNIAL BASELINE COMPONENT DESIGN BASES INSPECTION NRC INSPECTION REPORT 05000483/2014007 | |||
Dear Mr. Heflin: | Dear Mr. Heflin: | ||
On April 14, 2014, the NRC will begin a triennial baseline Component Design Bases Inspection at the Callaway Plant. A seven-person team will perform this inspection using NRC Inspection Procedure 71111.21, "Component Design Bases Inspection." | On April 14, 2014, the NRC will begin a triennial baseline Component Design Bases Inspection at the Callaway Plant. A seven-person team will perform this inspection using NRC Inspection Procedure 71111.21, "Component Design Bases Inspection." | ||
The inspection focuses on components and operator actions that have high risk and low design | The inspection focuses on components and operator actions that have high risk and low design | ||
margins. The samples reviewed during this inspection will be identified during an information gathering visit and during the subsequent in-office preparation week. In addition, a number of operating experience issues will also be selected for review. | margins. The samples reviewed during this inspection will be identified during an information gathering visit and during the subsequent in-office preparation week. In addition, a number of operating experience issues will also be selected for review. | ||
The inspection will include an information gathering site visit by the team leader and a senior | The inspection will include an information gathering site visit by the team leader and a senior | ||
reactor analyst, and 3-weeks of onsite inspection by the team. The inspection will consist of seven NRC inspectors, of which six will focus on engineering and one on operations. The current inspection schedule is as follows: | reactor analyst, and 3-weeks of onsite inspection by the team. The inspection will consist of seven NRC inspectors, of which six will focus on engineering and one on operations. The current inspection schedule is as follows: | ||
Onsite information gathering visit: Week of March 24, 2014 Onsite weeks: First On-Site Week - April 14-18, 2014 | Onsite information gathering visit: Week of March 24, 2014 Onsite weeks: First On-Site Week - April 14-18, 2014 | ||
Second On-Site Week - April 28 - May 2, 2014 Third On-Site Week - May 12-16, 2014 The purpose of the information gathering visit is to meet with members of your staff to identify | Second On-Site Week - April 28 - May 2, 2014 Third On-Site Week - May 12-16, 2014 | ||
The purpose of the information gathering visit is to meet with members of your staff to identify | |||
potential risk-significant components and operator actions. The lead inspector will also request | potential risk-significant components and operator actions. The lead inspector will also request | ||
a tour of the plant with members of your operations staff and probabilistic safety assessment staff. Additional information and documentation needed to support the inspection will be identified, including interviews with engineering managers, engineers, and probabilistic safety | a tour of the plant with members of your operations staff and probabilistic safety assessment staff. Additional information and documentation needed to support the inspection will be identified, including interviews with engineering managers, engineers, and probabilistic safety | ||
assessment staff. | assessment staff. | ||
UNITED STATESNUCLEAR REGULATORY COMMISSIONREGION IV1600 EAST LAMAR BLVDARLINGTON, TEXAS 76011-4511 | UNITED STATESNUCLEAR REGULATORY COMMISSIONREGION IV1600 EAST LAMAR BLVDARLINGTON, TEXAS 76011-4511 | ||
A. Heflin - 2 - Our experience with these inspections has shown they are extremely resource intensive, both for the NRC inspectors and the licensee staff. In order to minimize the inspection impact on the site and to ensure a productive inspection, we have enclosed a request for information needed | A. Heflin - 2 - | ||
Our experience with these inspections has shown they are extremely resource intensive, both for the NRC inspectors and the licensee staff. In order to minimize the inspection impact on the site and to ensure a productive inspection, we have enclosed a request for information needed | |||
for the inspection. The request has been divided into three groups. The first group lists | for the inspection. The request has been divided into three groups. The first group lists | ||
information necessary for the information gathering visit and for general preparation. This | information necessary for the information gathering visit and for general preparation. This | ||
information should be available to the regional office no later than March 17, 2014. Insofar as | information should be available to the regional office no later than March 17, 2014. Insofar as | ||
possible, this information should be provided electronically to the lead inspector. Since the inspection will be concentrated on high risk/low margin components, calculations associated with your list of high risk components should be available to review during the information | possible, this information should be provided electronically to the lead inspector. Since the inspection will be concentrated on high risk/low margin components, calculations associated with your list of high risk components should be available to review during the information | ||
gathering visit to assist in our selection of components based on available design margin. | gathering visit to assist in our selection of components based on available design margin. | ||
The second group of documents requested are those items that the team will need access to when onsite and after the inspection samples are selected. The third group lists information necessary to aid the inspection team in tracking issues identified as a result of the inspection. It | The second group of documents requested are those items that the team will need access to when onsite and after the inspection samples are selected. The third group lists information necessary to aid the inspection team in tracking issues identified as a result of the inspection. It | ||
is requested that this information be provided to the lead inspector as the information is | is requested that this information be provided to the lead inspector as the information is | ||
Line 50: | Line 62: | ||
completed in order to minimize the number of additional documents requested during the preparation and/or the onsite portions of the inspection. In order to facilitate the inspection, we request that a contact individual be assigned to each inspector to ensure information requests, | completed in order to minimize the number of additional documents requested during the preparation and/or the onsite portions of the inspection. In order to facilitate the inspection, we request that a contact individual be assigned to each inspector to ensure information requests, | ||
questions, and concerns are addressed in a timely manner. | questions, and concerns are addressed in a timely manner. | ||
The lead inspector for this inspection is Mr. Ronald Kopriva. We understand that our licensing engineer contact for this inspection is Mr. Steve Petzel. If there are any questions about the inspection or the requested materials, please contact the lead inspector at (817) 200-1104 or via e-mail at Ron.Kopriva@nrc.gov. | The lead inspector for this inspection is Mr. Ronald Kopriva. We understand that our licensing engineer contact for this inspection is Mr. Steve Petzel. If there are any questions about the inspection or the requested materials, please contact the lead inspector at (817) 200-1104 or via | ||
e-mail at Ron.Kopriva@nrc.gov | |||
. | |||
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be | In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be | ||
made available electronically for public inspection in the NRC | made available electronically for | ||
public inspection in the NRC Pub | |||
lic Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html | |||
(the Public Electronic Reading Room). | |||
Sincerely, | Sincerely, | ||
/RA/ Thomas R. Farnholtz, Chief Engineering Branch 1 Division of Reactor Safety Docket: 50-483 | /RA/ | ||
Thomas R. Farnholtz, Chief Engineering Branch 1 | |||
Division of Reactor Safety | |||
Docket: 50-483 | |||
License: NPF-30 | License: NPF-30 | ||
Enclosure: | Enclosure: | ||
Component Design Basis Inspection | Component Design Basis Inspection | ||
Document Request | |||
cc w/ enclosure: Electronic Distribution for Callaway Plant | cc w/ enclosure: Electronic Distribution for Callaway Plant | ||
- 1 - Enclosure INFORMATION REQUEST FOR CALLAWAY PLANT COMPONENT DESIGN BASES (CDBI) INSPECTION | ML14027A279 | ||
Inspection Report: 05000483/2014007 | SUNSI Rev Compl. Yes No ADAMS Yes No Reviewer Initials TRFPublicly Avail Yes No Sensitive Yes No Sens. Type Initials TRFRIV:SRI:DRS/EB1 BC/EB1 RKopriva TFarnholtz /RA/ TRF for | ||
Information Gathering Dates: March 24-28, 2014 | /RA/ 01/23/2014 01/23/2014 | ||
On-site Inspection Dates: First Week - April 14-18, 2014 | - 1 - Enclosure INFORMATION REQUEST FOR CALLAWAY PLANT COMPONENT DESIGN BASES (CDBI) INSPECTION | ||
Inspection Report: 05000483/2014007 | |||
Information Gathering Dates: March 24-28, 2014 | |||
On-site Inspection Dates: First Week - April 14-18, 2014 | |||
Second Week - April 28 - May 2, 2014 Third Week - May 12-16, 2014 | |||
Inspection Procedure: IP 71111.21, "Component Design Bases Inspection" Lead Inspector/Team Leader: Ronald Kopriva 817-200-1104 | Inspection Procedure: IP 71111.21, "Component Design Bases Inspection" | ||
Lead Inspector/Team Leader: Ronald Kopriva 817-200-1104 | |||
Ron.Kopriva@nrc.gov | Ron.Kopriva@nrc.gov | ||
I. Information Requested Prior to the information Gathering Visit | |||
I. Information Requested Prior to the information Gathering Visit | |||
The following information is requested by March 17, 2014, or sooner, to facilitate | |||
inspection preparation. If you have any questions regarding this information, | inspection preparation. If you have any questions regarding this information, | ||
pleased call the lead inspector as soon as possible. (Please provide the information electronically in "pdf" files, Excel, or other searchable formats. The information should contain descriptive names, and be indexed and hyperlinked to facilitate ease of use. Information in "lists" should contain enough information to | pleased call the lead inspector as soon as possible. (Please provide the information electronically in "pdf" files, Excel, or other searchable formats. The information should contain descriptive names, and be indexed and hyperlinked to facilitate ease of use. Information in "lists" should contain enough information to | ||
be easily understood by someone who has knowledge of boiling water reactor | be easily understood by someone who has knowledge of boiling water reactor | ||
technology.) 1. An excel spreadsheet of equipment basic events (with definitions) including importance measures sorted by risk achievement worth (RAW) and Fussell-Vesely (FV) from your internal events probabilistic risk | |||
technology.) | |||
1. An excel spreadsheet of equipment basic events (with definitions) including importance measures sorted by risk achievement worth (RAW) and Fussell-Vesely (FV) from your internal events probabilistic risk | |||
assessment (PRA). Include basic events with RAW value of 1.3 or | assessment (PRA). Include basic events with RAW value of 1.3 or | ||
greater. | |||
3. Copies of PRA "system notebooks," and the latest PRA summary document. 4. An excel spreadsheet of PRA human action basic events or risk ranking of operator actions from your site specific PSA sorted by RAW and FV. | greater. | ||
Provide copies of your human reliability worksheets for these items. | 2. Provide a list of the top 500 cut-sets from your PRA. | ||
5. If you have an external events or fire PSA model, provide the information requested in items 1-4 for external events and fire. | |||
3. Copies of PRA "system notebooks," and the latest PRA summary | |||
document. | |||
4. An excel spreadsheet of PRA human action basic events or risk ranking of operator actions from your site specific PSA sorted by RAW and FV. | |||
Provide copies of your human reliability worksheets for these items. | |||
5. If you have an external events or fire PSA model, provide the information requested in items 1-4 for external events and fire. | |||
- 2 - 6. Any pre-existing evaluation or list of components and associated calculations with low design margins, (i.e., pumps closest to the design | - 2 - 6. Any pre-existing evaluation or list of components and associated calculations with low design margins, (i.e., pumps closest to the design | ||
limit for flow or pressure, diesel generator close to design required output, heat exchangers close to rated design heat removal, etc.). | limit for flow or pressure, diesel generator close to design required output, heat exchangers close to rated design heat removal, etc.). | ||
7. List of high risk maintenance rule systems/components and functions; based on engineering or expert panel judgment. | |||
8. A list of operating experience evaluations for the last 2 years. | 7. List of high risk maintenance rule systems/components and functions; based on engineering or expert panel judgment. | ||
8. A list of operating experience evaluations for the last 2 years. | |||
9. A list of all time-critical operator actions in procedures. | |||
10. A list of permanent and temporary modifications sorted by component identified in Item 1. | |||
11. List of current "operator work arounds/burdens." | |||
12. A list of the design calculations, which provide the design margin information for components included in Item 1. (Calculations should be available during the information gathering visit.) | |||
13. List of root cause evaluations associated with component failures or design issues initiated/completed in the last 5 years. | |||
13. List of root cause evaluations associated with component failures or design issues initiated/completed in the last 5 years. | |||
14. Current management and engineering organizational charts. | 14. Current management and engineering organizational charts. | ||
15. Callaway Plant IPEEE, if available electronically. | |||
16. Mechanical piping drawings for: | 16. Mechanical piping drawings for: | ||
Engineered safety features Emergency core cooling Systems | Engineered safety features Emergency core cooling Systems | ||
Emergency diesel generators | Emergency diesel generators | ||
17 Electrical one-line drawings for: | 17 Electrical one-line drawings for: | ||
Offsite power/switchyard supplies Normal ac power systems | Offsite power/switchyard supplies Normal ac power systems | ||
Emergency ac/dc power systems including 120Vac power, and 125Vdc/24Vdc safety class systems | Emergency ac/dc power systems including 120Vac power, and 125Vdc/24Vdc safety class systems | ||
18. List of any common-cause failures of components in the last 3 years. | 18. List of any common-cause failures of components in the last 3 years. | ||
19. An electronic copy of the Design Bases Documents. | |||
20. An electronic copy of the System Health notebooks. | |||
- 3 - II. Information Requested to be Available on First Day of Inspection | |||
(April 14, 2014) | |||
1. List of condition reports (corrective action documents) associated with each of the selected components for the last 5 years. | |||
2. The corrective maintenance history associated with each of the selected components for the last 2 years. | |||
3. Copies of calculations associated with each of the selected components (if not previously provided), excluding data files. Please review the | |||
2. The corrective maintenance history associated with each of the selected components for the last 2 years. | |||
calculations and also provide copies of reference material (such as | calculations and also provide copies of reference material (such as | ||
drawings, engineering requests, and vendor letters). 4. Copies of operability evaluations associated with each of the selected components and plans for restoring operability, if applicable. | drawings, engineering requests, and vendor letters). | ||
5. Copies of selected operator work-around evaluations associated with each of the selected components and plans for resolution, if applicable. 6. Copies of any open temporary modifications associated with each of the selected components, if applicable. | 4. Copies of operability evaluations associated with each of the selected components and plans for restoring operability, if applicable. | ||
7. Trend data on the selected electrical/mechanical components' performance for last 3 years (for example, pumps' performance including in-service testing, other vibration monitoring, oil sample results, etc., as applicable). | |||
8. A copy of any internal/external self-assessments and associated corrective action documents generated in preparation for the inspection. | 5. Copies of selected operator work-around evaluations associated with each of the selected components and plans for resolution, if applicable. | ||
10. List of motor operated valves (MOVs) in the program, design margin and risk ranking. 11. List of air operated valves (AOVs) in the valve program, design and risk ranking. | 6. Copies of any open temporary modifications associated with each of the selected components, if applicable. | ||
12. Structure, system and components in the Maintenance Rule (a)(1) category. | |||
7. Trend data on the selected electrical/mechanical components' | |||
performance for last 3 years (for example, pumps' performance including in-service testing, other vibration monitoring, oil sample results, etc., as applicable). | |||
8. A copy of any internal/external self-assessments and associated corrective action documents generated in preparation for the inspection. | |||
9. A copy of engineering/operations related audits completed in the last | |||
2 years. | |||
10. List of motor operated valves (MOVs) in the program, design margin and risk ranking. | |||
11. List of air operated valves (AOVs) in the valve program, design and risk ranking. | |||
12. Structure, system and components in the Maintenance Rule (a)(1) | |||
category. | |||
13. Site top 10 issues list. | 13. Site top 10 issues list. | ||
14. Procedures used to accomplish operator actions associated with the | |||
basic events in your PRA. | |||
15. List of licensee contacts for the inspection team with pager or phone | |||
numbers. | |||
- 4 - III. Information Requested to be provided throughout the inspection. | |||
1. Copies of any corrective action documents generated as a result of the team's questions or queries during this inspection. | |||
2. Copies of the list of questions submitted by the team members and the status/resolution of the information requested (provide daily during the | 2. Copies of the list of questions submitted by the team members and the status/resolution of the information requested (provide daily during the | ||
inspection to each team member). 3. Reference materials (available electronically and as needed during all onsite weeks): | inspection to each team member). | ||
3. Reference materials (available electronically and as needed during all | |||
onsite weeks): | |||
General set of plant drawings IPE/PRA report Procurement documents for components selected Plant procedures (normal, abnormal, emergency, surveillance, etc.) | General set of plant drawings IPE/PRA report Procurement documents for components selected Plant procedures (normal, abnormal, emergency, surveillance, etc.) | ||
Technical Specifications | Technical Specifications | ||
Updated Final Safety Analysis Report | Updated Final Safety Analysis Report | ||
Vendor manuals | Vendor manuals | ||
Inspector Contact Information: | |||
Inspector Contact Information | |||
: | |||
Ronald Kopriva | Ronald Kopriva | ||
Senior Reactor Inspector (817) 200-1104 Ron.Kopriva@nrc.gov | Senior Reactor Inspector | ||
(817) 200-1104 Ron.Kopriva@nrc.gov | |||
Mailing Address: RONALD KOPRIVA US NRC, REGION IV | Mailing Address | ||
: RONALD KOPRIVA US NRC, REGION IV | |||
1600 E LAMAR BLVD | 1600 E LAMAR BLVD | ||
ARLINGTON TX 76011 | ARLINGTON TX 76011 | ||
}} | }} |
Revision as of 01:10, 3 July 2018
ML14027A279 | |
Person / Time | |
---|---|
Site: | Callaway |
Issue date: | 01/27/2014 |
From: | Thomas Farnholtz Region 4 Engineering Branch 1 |
To: | Heflin A C Union Electric Co |
References | |
IR-14-007 | |
Download: ML14027A279 (7) | |
See also: IR 05000483/2014007
Text
January 27, 2014
Mr. Adam C. Heflin, Senior Vice
President and Chief Nuclear Officer
Union Electric Company P.O. Box 620 Fulton, MO 65251
SUBJECT: CALLAWAY PLANT - INFORMATION REQUEST FOR NRC TRIENNIAL BASELINE COMPONENT DESIGN BASES INSPECTION NRC INSPECTION REPORT 05000483/2014007
Dear Mr. Heflin:
On April 14, 2014, the NRC will begin a triennial baseline Component Design Bases Inspection at the Callaway Plant. A seven-person team will perform this inspection using NRC Inspection Procedure 71111.21, "Component Design Bases Inspection."
The inspection focuses on components and operator actions that have high risk and low design
margins. The samples reviewed during this inspection will be identified during an information gathering visit and during the subsequent in-office preparation week. In addition, a number of operating experience issues will also be selected for review.
The inspection will include an information gathering site visit by the team leader and a senior
reactor analyst, and 3-weeks of onsite inspection by the team. The inspection will consist of seven NRC inspectors, of which six will focus on engineering and one on operations. The current inspection schedule is as follows:
Onsite information gathering visit: Week of March 24, 2014 Onsite weeks: First On-Site Week - April 14-18, 2014
Second On-Site Week - April 28 - May 2, 2014 Third On-Site Week - May 12-16, 2014
The purpose of the information gathering visit is to meet with members of your staff to identify
potential risk-significant components and operator actions. The lead inspector will also request
a tour of the plant with members of your operations staff and probabilistic safety assessment staff. Additional information and documentation needed to support the inspection will be identified, including interviews with engineering managers, engineers, and probabilistic safety
assessment staff.
UNITED STATESNUCLEAR REGULATORY COMMISSIONREGION IV1600 EAST LAMAR BLVDARLINGTON, TEXAS 76011-4511
A. Heflin - 2 -
Our experience with these inspections has shown they are extremely resource intensive, both for the NRC inspectors and the licensee staff. In order to minimize the inspection impact on the site and to ensure a productive inspection, we have enclosed a request for information needed
for the inspection. The request has been divided into three groups. The first group lists
information necessary for the information gathering visit and for general preparation. This
information should be available to the regional office no later than March 17, 2014. Insofar as
possible, this information should be provided electronically to the lead inspector. Since the inspection will be concentrated on high risk/low margin components, calculations associated with your list of high risk components should be available to review during the information
gathering visit to assist in our selection of components based on available design margin.
The second group of documents requested are those items that the team will need access to when onsite and after the inspection samples are selected. The third group lists information necessary to aid the inspection team in tracking issues identified as a result of the inspection. It
is requested that this information be provided to the lead inspector as the information is
generated during the inspection. It is important that all of these documents are up to date and
completed in order to minimize the number of additional documents requested during the preparation and/or the onsite portions of the inspection. In order to facilitate the inspection, we request that a contact individual be assigned to each inspector to ensure information requests,
questions, and concerns are addressed in a timely manner.
The lead inspector for this inspection is Mr. Ronald Kopriva. We understand that our licensing engineer contact for this inspection is Mr. Steve Petzel. If there are any questions about the inspection or the requested materials, please contact the lead inspector at (817) 200-1104 or via
e-mail at Ron.Kopriva@nrc.gov
.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be
made available electronically for
public inspection in the NRC Pub
lic Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html
(the Public Electronic Reading Room).
Sincerely,
/RA/
Thomas R. Farnholtz, Chief Engineering Branch 1
Division of Reactor Safety
Docket: 50-483
License: NPF-30
Enclosure:
Component Design Basis Inspection
Document Request
cc w/ enclosure: Electronic Distribution for Callaway Plant
SUNSI Rev Compl. Yes No ADAMS Yes No Reviewer Initials TRFPublicly Avail Yes No Sensitive Yes No Sens. Type Initials TRFRIV:SRI:DRS/EB1 BC/EB1 RKopriva TFarnholtz /RA/ TRF for
/RA/ 01/23/2014 01/23/2014
- 1 - Enclosure INFORMATION REQUEST FOR CALLAWAY PLANT COMPONENT DESIGN BASES (CDBI) INSPECTION
Inspection Report: 05000483/2014007
Information Gathering Dates: March 24-28, 2014
On-site Inspection Dates: First Week - April 14-18, 2014
Second Week - April 28 - May 2, 2014 Third Week - May 12-16, 2014
Inspection Procedure: IP 71111.21, "Component Design Bases Inspection"
Lead Inspector/Team Leader: Ronald Kopriva 817-200-1104
Ron.Kopriva@nrc.gov
I. Information Requested Prior to the information Gathering Visit
The following information is requested by March 17, 2014, or sooner, to facilitate
inspection preparation. If you have any questions regarding this information,
pleased call the lead inspector as soon as possible. (Please provide the information electronically in "pdf" files, Excel, or other searchable formats. The information should contain descriptive names, and be indexed and hyperlinked to facilitate ease of use. Information in "lists" should contain enough information to
be easily understood by someone who has knowledge of boiling water reactor
technology.)
1. An excel spreadsheet of equipment basic events (with definitions) including importance measures sorted by risk achievement worth (RAW) and Fussell-Vesely (FV) from your internal events probabilistic risk
assessment (PRA). Include basic events with RAW value of 1.3 or
greater.
2. Provide a list of the top 500 cut-sets from your PRA.
3. Copies of PRA "system notebooks," and the latest PRA summary
document.
4. An excel spreadsheet of PRA human action basic events or risk ranking of operator actions from your site specific PSA sorted by RAW and FV.
Provide copies of your human reliability worksheets for these items.
5. If you have an external events or fire PSA model, provide the information requested in items 1-4 for external events and fire.
- 2 - 6. Any pre-existing evaluation or list of components and associated calculations with low design margins, (i.e., pumps closest to the design
limit for flow or pressure, diesel generator close to design required output, heat exchangers close to rated design heat removal, etc.).
7. List of high risk maintenance rule systems/components and functions; based on engineering or expert panel judgment.
8. A list of operating experience evaluations for the last 2 years.
9. A list of all time-critical operator actions in procedures.
10. A list of permanent and temporary modifications sorted by component identified in Item 1.
11. List of current "operator work arounds/burdens."
12. A list of the design calculations, which provide the design margin information for components included in Item 1. (Calculations should be available during the information gathering visit.)
13. List of root cause evaluations associated with component failures or design issues initiated/completed in the last 5 years.
14. Current management and engineering organizational charts.
15. Callaway Plant IPEEE, if available electronically.
16. Mechanical piping drawings for:
Engineered safety features Emergency core cooling Systems
17 Electrical one-line drawings for:
Offsite power/switchyard supplies Normal ac power systems
Emergency ac/dc power systems including 120Vac power, and 125Vdc/24Vdc safety class systems
18. List of any common-cause failures of components in the last 3 years.
19. An electronic copy of the Design Bases Documents.
20. An electronic copy of the System Health notebooks.
- 3 - II. Information Requested to be Available on First Day of Inspection
(April 14, 2014)
1. List of condition reports (corrective action documents) associated with each of the selected components for the last 5 years.
2. The corrective maintenance history associated with each of the selected components for the last 2 years.
3. Copies of calculations associated with each of the selected components (if not previously provided), excluding data files. Please review the
calculations and also provide copies of reference material (such as
drawings, engineering requests, and vendor letters).
4. Copies of operability evaluations associated with each of the selected components and plans for restoring operability, if applicable.
5. Copies of selected operator work-around evaluations associated with each of the selected components and plans for resolution, if applicable.
6. Copies of any open temporary modifications associated with each of the selected components, if applicable.
7. Trend data on the selected electrical/mechanical components'
performance for last 3 years (for example, pumps' performance including in-service testing, other vibration monitoring, oil sample results, etc., as applicable).
8. A copy of any internal/external self-assessments and associated corrective action documents generated in preparation for the inspection.
9. A copy of engineering/operations related audits completed in the last
2 years.
10. List of motor operated valves (MOVs) in the program, design margin and risk ranking.
11. List of air operated valves (AOVs) in the valve program, design and risk ranking.
12. Structure, system and components in the Maintenance Rule (a)(1)
category.
13. Site top 10 issues list.
14. Procedures used to accomplish operator actions associated with the
basic events in your PRA.
15. List of licensee contacts for the inspection team with pager or phone
numbers.
- 4 - III. Information Requested to be provided throughout the inspection.
1. Copies of any corrective action documents generated as a result of the team's questions or queries during this inspection.
2. Copies of the list of questions submitted by the team members and the status/resolution of the information requested (provide daily during the
inspection to each team member).
3. Reference materials (available electronically and as needed during all
onsite weeks):
General set of plant drawings IPE/PRA report Procurement documents for components selected Plant procedures (normal, abnormal, emergency, surveillance, etc.)
Technical Specifications
Updated Final Safety Analysis Report
Vendor manuals
Inspector Contact Information
Ronald Kopriva
Senior Reactor Inspector
(817) 200-1104 Ron.Kopriva@nrc.gov
Mailing Address
- RONALD KOPRIVA US NRC, REGION IV
1600 E LAMAR BLVD
ARLINGTON TX 76011