{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE RD. SUITE 210 LISLE, IL  60532-4352  June 10, 2015 Mr. Bryan C. Hanson Senior VP, Exelon Generation Company, LLC President and CNO, Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555 SUBJECT: LASALLE COUNTY STATION, UNITS 1 AND 2 - REQUEST FOR INFORMATION FOR AN NRC LICENSE RENEWAL INSPECTION 05000373/2015008; 05000374/2015008 Dear Mr. Hanson: On September 28, 2015, the U.S. Nuclear Regulatory Commission (NRC) will begin a License Renewal Inspection at the LaSalle County Station, Units 1 and 2.  This inspection will be performed in accordance with the NRC Inspection Procedure IP 71002. The on-site portion of the inspection will take place as follows: Week 1:  September 28 - October 2, 2015 Week 2:  October 13 - 16, 2015. Experience has shown that these inspections are extremely resource intensive, both for the NRC inspectors and the applicant staff.  In order to minimize the inspection impact on the site and to ensure a productive inspection for both parties, we would like to request the documents  
{{#Wiki_filter:UNITED STATES
needed for the inspection.  The lead inspector already has a copy of the original License Renewal Application.  In order to ensure the inspection team is adequately prepared for the inspection, please provide a copy of any amendments to the application, and any responses to Requests for Information submitted by the applicant as described in the enclosure.  This information should be made available to the lead inspector no later than September 11, 2015.  In addition, please provide or make available during the on-site weeks the additional documents described in the enclosure.  The lead inspector will coordinate with your staff to determine any additional information the team will review, or need access to, during the on-site inspection.  It is important that all documents provided are up-to-date and complete. The lead inspector for this inspection is Dr. Stuart Sheldon.  We understand that our regulatory contact for this inspection is Mr. Larry Blunk of your organization.  If there are any questions about the inspection or this request, please contact the lead inspector at (630) 829-9727, or via e-mail at Stuart.Sheldon@nrc.gov.  This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.).  Existing information collection requirements were approved by the Office of Management and Budget, Control Number 3150-0011.  The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget Control Number.   
NUCLEAR REGULATORY COMMISSION
  B. Hanson -2- In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, "Public Inspections, Exemptions, Requests for Withholding," of the NRC's "Rules of Practice," a copy of this letter, its enclosure, and your response (if any) will be available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS).  ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). Sincerely, /RA/   
REGION III 2443 WARRENVILLE RD. SUIT
  Christine A. Lipa, Chief Engineering Branch 2 Division of Reactor Safety  Docket Nos. 50-373; 50-374 License Nos. NPF-11; NPF-18 Enclosure:   Document Request for License Renewal Inspection cc w/encl:  Distribution via LISTSERV
E 210 LISLE, IL  60532
DOCUMENT REQUEST FOR LICENSE RENEWAL INSPECTION Enclosure Inspection Report: 05000373/2015008; 05000374/2015008 Onsite Dates: Week 1:  September 28 - October 2, 2015 Week 2:  October 13 - 16, 2015. Procedure: IP 71002, "License Renewal Inspection" Lead Inspector: Dr. Stuart Sheldon (630) 829-9727 Stuart.Sheldon@nrc.gov I. Information Requested Prior to the Inspection The following information is requested by September 11, 2015.  If you have any questions regarding this request, please call the lead inspector as soon as possible.  All information should be sent to Dr. Stuart Sheldon, (e-mail:  Stuart.Sheldon@nrc.gov).  Electronic media is preferred.  Where information is provided that includes tables and/or lists of data or other such information, please do not scan such tables and/or lists as images.  The preferred file format is a searchable "pdf" file or excel spreadsheet on a  
-4352  June 10, 2015
compact disk (CD).  The CD should be indexed and hyper-linked to facilitate ease of use.  Please provide three copies of each CD submitted. A. Application Information 1. Provide a copy of all amendments to your License Renewal (LR) Application. 2. Provide a copy of all responses to NRC Requests for Information  
Mr. Bryan C. Hanson
submitted as of September 4, 2015 3. Provide a listing of plant systems noting if the system has been screened in scope or out of scope for LR. 4. Provide a copy of each Aging Management Program (AMP) basis document. B. Logistics Information 1. Provide a list of contact information for individuals responsible for each AMP. 2. Organizational chart for corporate and site personnel involved in developing the LR Application and;  3. A phone list for licensee personnel.
Senior VP, Exelon Generation Company, LLC
DOCUMENT REQUEST FOR LICENSE RENEWAL INSPECTION 2 II. Information Requested During the Inspection The following information is requested to be provided to the inspectors during the onsite inspection.  If the information is available in electronic form, please provide it on three sets of CDs (searchable, if possible). A. For each AMP and in-scope structure, system or component (SSC) provide: 1. LR Scoping/Boundary Drawing(s) - Hard copy E-size; 2. Program Basis Documents 3. Copies of existing procedures implementing the AMP 4. Identify the industry operating experience data bases (e.g. INPO, NRC generic communications, vendor notifications etc.) searched, and how these searches were conducted to identify aging effects managed by the AMP. B. Reference Material: 1. System P&ID drawings - E size hard copy. 2. Updated Final Safety Analysis Report - electronic copy (searchable). 3. Technical Specifications - electronic copy- searchable. C. Logistical Information 1. Copies of the list of questions/documents requested identified by the inspector, and the status/resolution of the information requested (provided daily during the TI inspection to each inspector). 2. Copies of any condition reports or tracking documents initiated during the  
President and CNO, Exelon Nuclear
inspection, and a list of these condition reports. If you have questions regarding the information requested, please contact the lead inspector.  
4300 Winfield Road
   B. Hanson -2- In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, "Public Inspections, Exemptions, Requests for Withholding," of the NRC's "Rules of Practice," a copy of this letter, its enclosure, and your response (if any) will be available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS).  ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). Sincerely, /RA/   
Warrenville, IL 60555
  Christine A. Lipa, Chief Engineering Branch 2 Division of Reactor Safety  Docket Nos. 50-373; 50-374 License Nos. NPF-11; NPF-18 Enclosure:   Document Request for License Renewal Inspection cc w/encl:  Distribution via LISTSERV DISTRIBUTION: Kimyata MorganButler RidsNrrDorlLpl3-2 Resource  RidsNrrPMLaSalle RidsNrrDirsIrib Resource Cynthia Pederson Darrell Roberts Richard Skokowski Allan Barker Carole Ariano Linda Linn DRPIII DRSIII Jim Clay Carmen Olteanu   ADAMS Accession Number ML15162A985 Publicly Available Non-Publicly Available Sensitive Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII  RIII  RIII  RIII  NAME SSheldon:cl CLipa  DATE 06/10/15 06/10/15  OFFICIAL RECORD COPY
SUBJECT: LASALLE COUNTY STATION, UNITS 1 AND 2
- REQUEST FOR INFORMATION FOR AN NRC LICENSE RENEWAL INSPECTION 05000373/20
15008; 05000374/20
15008 Dear Mr. Hanson: On September 28, 2015, the U.S. Nuclear Regulatory Commission (
NRC) will begin a License Renewal Inspection
at the LaSalle County Station, Units 1 and 2.  This inspection will be performed in accordance
with the NRC Inspection Procedure IP
71002. The on-site portion of the inspection will take place as follows:
Week 1:  September 28  
- October 2, 2015 Week 2:  October 13  
- 16, 2015. Experience has shown that these inspections are extremely resource intensive, both for the NRC inspectors and the applicant staff.  In order to minimize the inspection impact on the site and to ensure a productive inspection for both parties, we would like to request the documents  
needed for the inspection.  The lead inspector already has a copy of the original License Renewal Application
.  In order to ensure the inspection team
is adequately prepared for the inspection, please provide a copy of any amendments to the application, and any responses to Requests for Information submitted by the applicant as described in the enclosure.  This information should be made available to the lead inspector no
later than September 11, 2015.   
In addition, please provide or make available during the on
-site weeks the additional documents described in the enclosure.  
  The lead inspector will coordinate with your staff to determine any additional information the team will review, or need
access to, during the on
-site inspection.  It is important that all documents provided are up
-to-date and complete.
The lead inspector for this inspection is Dr. Stuart Sheldon.  We understand that our regulatory contact for this inspection is Mr. Larry Blunk of your organization.  If there are any questions about the inspection or this request, please contact the lead inspector at (630) 829
-9727, or via e-mail at Stuart.Sheldon@nrc.gov
.  This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.).  Existing information collection requirements were approved by the Office of Management and Budget, Control Number 3150-0011.  The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the  
requesting document displays a currently valid Office of Management and Budget Control Number.   
  B. Hanson
-2- In accordance with Title 10 of the Code of Federal Regulations
(10 CFR) 2.390, "Public Inspections, Exemptions, Requests for Withholding," of the NRC's "Rules of Practice," a copy  
of this letter, its enclosure, and your response (if any) will be available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS).  ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading
-rm/adams.html
(the Public Electronic Reading Room).
Sincerely,
  /RA/   
  Christine A. Lipa, Chief Engineering Branch 2
Division of Reactor Safety  
  Docket Nos. 50
-373; 50-374 License Nos. NPF
-11; NPF-18 Enclosure:
  Document Request for License Renewal Inspection
cc w/encl:  Distribution via LISTSERV
 
DOCUMENT REQUEST FOR LICENSE RENEWAL INSPECTION
Enclosure
  Inspection Report
: 05000373/20
15008; 05000374/20
15008 Onsite Dates:
Week 1:  September 28  
- October 2, 2015
Week 2:  October 13  
- 16, 2015. Procedure:
IP 71002, "License Renewal Inspection"
Lead Inspector
: Dr. Stuart Sheldon
(630) 829
-9727 Stuart.Sheldon@nrc.gov
I. Information Requested Prior to the Inspection
The following information is requested b
y September  
11, 2015.  If you have any questions regarding this request, please call the lead inspector as soon as possible.  All information should be sent to Dr. Stuart Sheldon, (
e-mail:  Stuart.Sheldon@nrc.gov
).  Electronic media is preferred.  Where information is provided that includes tables and/or lists of data or other such information, please do not scan such tables and/or lists as images.  The preferred file format is a searchable "pdf" file or excel spreadsheet on a  
compact disk
(CD).  The CD should be indexed and hyper
-linked to facilitate ease of use.  Please provide three copies of each CD submitted.
A. Application Information
1. Provide a copy of all amendments to your License Renewal (LR)  
Application.
2. Provide a copy of all responses to NRC Requests for Information  
submitted as of September 4, 2015 3. Provide a listing of plant systems noting if the system has been screened in scope or out of scope
for LR. 4. Provide a copy of each Aging Management Program (AMP)
basis document. B. Logistics Information
1. Provide a list of contact information for individuals responsible for each AMP. 2. Organizational chart for corporate and site personnel involved in developing the
LR Application and;  
  3. A phone list for licensee personnel.
 
DOCUMENT REQUEST FOR LICENSE RENEWAL INSPECTION
2 II. Information Requested During the Inspection
The following information is requested to be provided to the inspectors during the onsite inspection.  If the information is available in electronic form, please provide it on three sets of CDs (searchable, if possible).
A. For each AMP and in-scope structure, system or component (SSC) provide:
1. LR Scoping/Boundary Drawing(s)  
- Hard copy E
-size; 2. Program Basis Documents
3. Copies of existing procedures implementing the AMP
4. Identify the industry operating experience data bases (e.g. INPO, NRC  
generic communications, vendor notifications etc.) searched
, and how these searches were conducted to identify aging effects managed by the AMP. B. Reference Material:
1. System P&ID drawings  
- E size hard copy
. 2. Updated Final Safety Analysis Report - electronic copy  
(searchable
). 3. Technical Specifications  
- electronic copy
- searchable
. C. Logistical Information
1. Copies of the list of questions/documents requested identified by the inspector
, and the status/resolution of the information requested (provide
d daily during the TI
inspection to each inspector).
2. Copies of any condition reports or tracking documents initiated during the  
inspection
, and a list of these condition reports
. If you have questions regarding the information requested, please contact the
lead inspector.
 
   B. Hanson
-2- In accordance with Title 10 of the Code of Federal Regulations
(10 CFR) 2.390, "Public Inspections, Exemptions, Requests for Withholding," of the NRC's "Rules of Practice," a copy  
of this letter, its enclosure, and your response (if any) will be available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide
Documents Access and Management System (ADAMS).  ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading
-rm/adams.html
(the Public Electronic Reading Room).
Sincerely,
  /RA/   
  Christine A. Lipa, Chief Engineering Branch 2
Division of Reactor Safety  
  Docket Nos. 50
-373; 50-374 License Nos. NPF
-11; NPF-18 Enclosure:
  Document Request for License Renewal Inspection
cc w/encl:  Distribution via LISTSERV
DISTRIBUTION
: Kimyata MorganButler
RidsNrrDorlLpl3
-2 Resource
  RidsNrrPMLaSalle
  RidsNrrDirsIrib Resource Cynthia Pederson
Darrell Roberts
Richard Skokowski
Allan Barker
Carole Ariano
Linda Linn
DRPIII DRSIII Jim Clay Carmen Olteanu
  ADAMS Accession Number ML15162A985
  Publicly Available
  Non-Publicly Available
  Sensitive
  Non-Sensitive
To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy
OFFICE RIII  RIII  RIII  RIII  NAME SSheldon:cl
CLipa  DATE 06/10/15 06/10/15  OFFICIAL RECORD COPY
}}
}}

Revision as of 00:04, 1 July 2018

Ltr. 06/10/15 LaSalle County Station, Units 1 and 2 - Request for Information for an NRC License Renewal Inspection 05000373/2015008; 05000374/2015008 (Sns)
ML15162A985
Person / Time
Site: LaSalle  Constellation icon.png
Issue date: 06/10/2015
From: Lipa C A
NRC/RGN-III/DRS/EB2
To: Bryan Hanson
Exelon Generation Co, Exelon Nuclear
References
IR 2015008
Download: ML15162A985 (5)


See also: IR 05000373/2015008

Text

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION III 2443 WARRENVILLE RD. SUIT

E 210 LISLE, IL 60532

-4352 June 10, 2015

Mr. Bryan C. Hanson

Senior VP, Exelon Generation Company, LLC

President and CNO, Exelon Nuclear

4300 Winfield Road

Warrenville, IL 60555

SUBJECT: LASALLE COUNTY STATION, UNITS 1 AND 2

- REQUEST FOR INFORMATION FOR AN NRC LICENSE RENEWAL INSPECTION 05000373/20

15008; 05000374/20

15008 Dear Mr. Hanson: On September 28, 2015, the U.S. Nuclear Regulatory Commission (

NRC) will begin a License Renewal Inspection

at the LaSalle County Station, Units 1 and 2. This inspection will be performed in accordance

with the NRC Inspection Procedure IP

71002. The on-site portion of the inspection will take place as follows:

Week 1: September 28

- October 2, 2015 Week 2: October 13

- 16, 2015. Experience has shown that these inspections are extremely resource intensive, both for the NRC inspectors and the applicant staff. In order to minimize the inspection impact on the site and to ensure a productive inspection for both parties, we would like to request the documents

needed for the inspection. The lead inspector already has a copy of the original License Renewal Application

. In order to ensure the inspection team

is adequately prepared for the inspection, please provide a copy of any amendments to the application, and any responses to Requests for Information submitted by the applicant as described in the enclosure. This information should be made available to the lead inspector no

later than September 11, 2015.

In addition, please provide or make available during the on

-site weeks the additional documents described in the enclosure.

The lead inspector will coordinate with your staff to determine any additional information the team will review, or need

access to, during the on

-site inspection. It is important that all documents provided are up

-to-date and complete.

The lead inspector for this inspection is Dr. Stuart Sheldon. We understand that our regulatory contact for this inspection is Mr. Larry Blunk of your organization. If there are any questions about the inspection or this request, please contact the lead inspector at (630) 829

-9727, or via e-mail at Stuart.Sheldon@nrc.gov

. This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements were approved by the Office of Management and Budget, Control Number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the

requesting document displays a currently valid Office of Management and Budget Control Number.

B. Hanson

-2- In accordance with Title 10 of the Code of Federal Regulations

(10 CFR) 2.390, "Public Inspections, Exemptions, Requests for Withholding," of the NRC's "Rules of Practice," a copy

of this letter, its enclosure, and your response (if any) will be available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading

-rm/adams.html

(the Public Electronic Reading Room).

Sincerely,

/RA/

Christine A. Lipa, Chief Engineering Branch 2

Division of Reactor Safety

Docket Nos. 50

-373; 50-374 License Nos. NPF

-11; NPF-18 Enclosure:

Document Request for License Renewal Inspection

cc w/encl: Distribution via LISTSERV

DOCUMENT REQUEST FOR LICENSE RENEWAL INSPECTION

Enclosure

Inspection Report

05000373/20

15008; 05000374/20

15008 Onsite Dates:

Week 1: September 28

- October 2, 2015

Week 2: October 13

- 16, 2015. Procedure:

IP 71002, "License Renewal Inspection"

Lead Inspector

Dr. Stuart Sheldon

(630) 829

-9727 Stuart.Sheldon@nrc.gov

I. Information Requested Prior to the Inspection

The following information is requested b

y September

11, 2015. If you have any questions regarding this request, please call the lead inspector as soon as possible. All information should be sent to Dr. Stuart Sheldon, (

e-mail: Stuart.Sheldon@nrc.gov

). Electronic media is preferred. Where information is provided that includes tables and/or lists of data or other such information, please do not scan such tables and/or lists as images. The preferred file format is a searchable "pdf" file or excel spreadsheet on a

compact disk

(CD). The CD should be indexed and hyper

-linked to facilitate ease of use. Please provide three copies of each CD submitted.

A. Application Information

1. Provide a copy of all amendments to your License Renewal (LR)

Application.

2. Provide a copy of all responses to NRC Requests for Information

submitted as of September 4, 2015 3. Provide a listing of plant systems noting if the system has been screened in scope or out of scope

for LR. 4. Provide a copy of each Aging Management Program (AMP)

basis document. B. Logistics Information

1. Provide a list of contact information for individuals responsible for each AMP. 2. Organizational chart for corporate and site personnel involved in developing the

LR Application and;

3. A phone list for licensee personnel.

DOCUMENT REQUEST FOR LICENSE RENEWAL INSPECTION

2 II. Information Requested During the Inspection

The following information is requested to be provided to the inspectors during the onsite inspection. If the information is available in electronic form, please provide it on three sets of CDs (searchable, if possible).

A. For each AMP and in-scope structure, system or component (SSC) provide:

1. LR Scoping/Boundary Drawing(s)

- Hard copy E

-size; 2. Program Basis Documents

3. Copies of existing procedures implementing the AMP

4. Identify the industry operating experience data bases (e.g. INPO, NRC

generic communications, vendor notifications etc.) searched

, and how these searches were conducted to identify aging effects managed by the AMP. B. Reference Material:

1. System P&ID drawings

- E size hard copy

. 2. Updated Final Safety Analysis Report - electronic copy

(searchable

). 3. Technical Specifications

- electronic copy

- searchable

. C. Logistical Information

1. Copies of the list of questions/documents requested identified by the inspector

, and the status/resolution of the information requested (provide

d daily during the TI

inspection to each inspector).

2. Copies of any condition reports or tracking documents initiated during the

inspection

, and a list of these condition reports

. If you have questions regarding the information requested, please contact the

lead inspector.

B. Hanson

-2- In accordance with Title 10 of the Code of Federal Regulations

(10 CFR) 2.390, "Public Inspections, Exemptions, Requests for Withholding," of the NRC's "Rules of Practice," a copy

of this letter, its enclosure, and your response (if any) will be available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide

Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading

-rm/adams.html

(the Public Electronic Reading Room).

Sincerely,

/RA/

Christine A. Lipa, Chief Engineering Branch 2

Division of Reactor Safety

Docket Nos. 50

-373; 50-374 License Nos. NPF

-11; NPF-18 Enclosure:

Document Request for License Renewal Inspection

cc w/encl: Distribution via LISTSERV

DISTRIBUTION

Kimyata MorganButler

RidsNrrDorlLpl3

-2 Resource

RidsNrrPMLaSalle

RidsNrrDirsIrib Resource Cynthia Pederson

Darrell Roberts

Richard Skokowski

Allan Barker

Carole Ariano

Linda Linn

DRPIII DRSIII Jim Clay Carmen Olteanu

ADAMS Accession Number ML15162A985

Publicly Available

Non-Publicly Available

Sensitive

Non-Sensitive

To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy

OFFICE RIII RIII RIII RIII NAME SSheldon:cl

CLipa DATE 06/10/15 06/10/15 OFFICIAL RECORD COPY