{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE RD. | {{#Wiki_filter:UNITED STATES | ||
L. Weber -2- It is important that all of these documents are up-to-date and complete in order to minimize the number of additional documents requested during the preparation and/or the onsite portions of the inspection. Insofar as possible, this information should be provided electronically to the lead inspector. The information request has been divided into four groups: The first group lists information necessary for our initial inspection scoping activities. | NUCLEAR REGULATORY COMMISSION | ||
inspector at (630) 829-9726, or via e-mail at Andrew.Dunlop@nrc.gov. This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements were approved by the Office of Management and Budget, Control Number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget Control Number. | REGION III 2443 WARRENVILLE RD. SUIT | ||
L. Weber -3- component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). Sincerely, | E 210 LISLE, IL 60532 | ||
Christine A. Lipa, Chief Engineering Branch 2 Division of Reactor Safety Docket Nos. 50-315; 50-316 License Nos. DPR-58; DPR-74 Enclosure: Request for Information - Design Bases Inspection cc: Distribution via LISTSERV | -4352 January 22, 2016 | ||
REQUEST FOR INFORMATION - DESIGN BASES INSPECTION Enclosure Inspection Report: | Mr. Larry Weber | ||
Specifications, and Technical Specifications Bases. Specifically identify which Updated Final Safety Analysis Report sections address environmental (including seismic) qualification (EQ). 4. NRC Safety Evaluation Report(s) associated with EQ. 5. Identify the various EQ standards (including year, edition, or revision) that the station is committed to. 6. Copy of | Senior VP and Chief Nuclear Officer | ||
REQUEST FOR INFORMATION - DESIGN BASES INSPECTION 2 9. List of any installed equipment removed from the EQML and basis for removal. 10. For units that have entered the period of extended operation, if EQ files were reviewed for Aging Management effects of license renewal, identify which EQ files were modified/changed to incorporate appropriate actions for the period of extended operation. Copies of any EQ Aging Management Programs. 11. List or drawings of plant | Indiana Michigan Power Company | ||
qualified equipment (including equivalency or commercial grade dedication (CGD) programs), and material storage and shelf life controls. 13. List of CGD evaluations performed, for which the dedicated parts have been issued for installation (parts issued for the last 10 years) on EQ applications in the plant. Include CGD evaluation number, name of part, component ID number or description of the component the part was issued to repair, work order, and date issued or installed. 14. List of Condition Reports (CRs) related to the EQ Program or EQ of components for the last 5 years. 15. Current management and engineering organizational chart. II. Information Requested (for the approximate 9 - 12 selected components) to be Available by the Bagman Trip on March 29, 2016. 1. EQ Summary Report for each component/subcomponent. 2. Qualification Maintenance Requirement Sheet (QMRS) or equivalent. 3. List of CRs (corrective action documents) associated with each of the selected | Nuclear Generation Group | ||
components for the last 5 years. 4. Photos of any component in containment or high-radiation areas, if available. III. Information Requested (for the approximate 6 - 9 selected components) to be Available by April 27, 2016, (will be reviewed by the team in the Regional office | One Cook Place | ||
during the week of May 2 - 6, 2016). This information should be separated for each selected component, especially if provided electronically (e.g., folder with component name that includes EQ files, Qualification Test Reports, calculations, CRs, maintenance history, etc.). 1. EQ file, including associated Qualification Test Reports. 2. Vendor manual (electronic copy or availability of hard copy during inspection). | Bridgman, MI 49106 | ||
REQUEST FOR INFORMATION - DESIGN BASES INSPECTION 3 3. Preventive maintenance template. 4. Last performed work order (WO) for each associated EQ preventive maintenance. 5. List of corrective maintenance WOs for the last 10 years. Include WO number, date performed, and brief one line description. 6. If repair work (e.g., a motor rewind) was performed under a purchase order, provide copy of the purchase order. 7. Thermal life calculation. 8. Any self-assessments of the EQ Program for the last 3 years. IV. Additional Information to be Provided on May 9, 2016, Onsite 1. During the in-office preparation activities, the team may identify additional information needed to support the inspection. The lead inspector will provide a list of the additional information needed during the week of May 2 - 6, 2016. V. Information Requested to be Provided Throughout the Inspection 1. Copies of any corrective action documents generated as a result of the team's questions or queries during this inspection. 2. Copies of the list of questions submitted by the team members and the status/resolution of the information requested (provide daily during the inspection to each team member). If you have questions regarding the information requested, please contact the lead inspector. | SUBJECT: DONALD. C. COOK NUCLEAR POWER PLANT, UNITS 1 AND | ||
L. Weber -3- component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). Sincerely, | 2 - REQUEST FOR INFORMATION FOR AN NRC PILOT DESIGN BASES INSPECTION ON THE IMPLEMENTATION OF | ||
Christine A. Lipa, Chief Engineering Branch 2 Division of Reactor Safety Docket Nos. 50-315; 50-316 License Nos. DPR-58; DPR-74 Enclosure: Request for Information - Design Bases Inspection cc: Distribution via LISTSERV DISTRIBUTION: Kimyata MorganButler RidsNrrDorlLpl3-1 Resource | THE ENVIRONMENTAL | ||
Darrell Roberts Richard Skokowski Allan Barker Carole Ariano Linda Linn | QUALIFICATION PROGRAM INSPECTION | ||
DRPIII DRSIII Jim Clay Carmen Olteanu | REPORT 05000315/2016008; 05000316/2016008 Dear Mr. Weber: On May 9, 2016, the U. S. Nuclear Regulatory Commission (NRC) will begin the pilot program portion of the | ||
triennial baseline Design Bases Inspection (DBI) | |||
at Donald C. Cook Nuclear Power Plant, Units 1 and 2 | |||
. This inspection will be performed in accordance with NRC Baseline Inspection Procedure 71111.21 | |||
N. The inspection will focus on the implementation of the Environmental Qualification | |||
(EQ) Program. The EQ components to be reviewed during this baseline inspection will be identified during the in-office preparation week that occurs prior to the first onsite inspection | |||
week. The inspection will include a bagman trip to support selection of components and one week of onsite inspection. The inspection team will consist of three NRC inspectors. The current inspection schedule is as follows: | |||
Bagman trip onsite week: | |||
March 29 | |||
- 30, 2016 Inspection onsite week: | |||
May 9 - 13, 2016 The team will be preparing for the inspection, mainly during the week of May 2 - 6, 2016, as discussed in the enclosure. | |||
Experience with previous baseline design inspections of similar depth and length has shown that this type of inspection is | |||
extremely resource intensive, both for the NRC inspectors and the licensee staff. In order to minimize the inspection impact on the site and to ensure a productive inspection for both parties, we have enclosed a request for information needed for the inspection. | |||
L. Weber -2- It is important that all of these documents are up | |||
-to-date and complete in order to minimize the number of additional documents requested during the preparation and/or the onsite portions of the inspection. Insofar as possible, this information should be provided electronically | |||
to the lead inspector. The information request has been divided into | |||
four groups: The first group lists information necessary for our initial inspection scoping activities. | |||
This information should be provided to the lead inspector no later than | |||
March 1, 2016 | |||
. By March 15, 2016, the lead inspector will communicate the initial selected set of approximately | |||
12 EQ components. | |||
The second group of documents requested is | |||
those items needed to support the bagman trip. This set of documents should be available to the lead inspector onsite on March 29, 2016 | |||
. The third group of documents requested is those items needed to support our in-office preparation activities | |||
for the selected set of 6 | |||
- 9 EQ components. This set of documents should be provided to the lead inspector | |||
at the Regional Office no later than April 27, 2016. During the in | |||
-office preparation activities, the team may identify additional information needed to support the inspection. | |||
The last group includes the additional information above as well as plant specific reference | |||
material. This information should be available to the team onsite on May 9, 2016. It is also requested that corrective action documents and/or questions developed during the inspection be provided to the lead inspector as the documents are generated. | |||
The lead inspector for this inspection is Mr. Andrew Dunlop. We understand that our licensing contact for this inspection is Mr. Rick Wynegar | |||
of your organization. If there are any questions about the inspection or the material requested in the enclosure, please contact the lead | |||
inspector at (630) 829 | |||
-9726, or via e-mail at Andrew.Dunlop@nrc.gov | |||
. This letter does not contain new or amended information collection requirements subject | |||
to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection | |||
requirements were approved by the Office of Management and Budget, Control Number 3150-0011. The NRC may not conduct or sponsor, and a person is not required | |||
to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget Control Number. | |||
In accordance with Title 10 of the Code of Federal Regulations | |||
(10 CFR) 2.390, "Public Inspections, Exemptions, Requests for Withholding," of the NRC's "Rules of Practice," a copy | |||
of this letter, its enclosure, and your response (if any) will be available electronically for public | |||
inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) | |||
L. Weber -3- component of the NRC's Agencywide | |||
Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading | |||
-rm/adams.html | |||
(the Public Electronic Reading Room). | |||
Sincerely, | |||
/RA/ | |||
Christine A. Lipa, Chief Engineering Branch 2 | |||
Division of Reactor Safety | |||
Docket Nos. 50 | |||
-315; 50-316 License Nos. DPR | |||
-58; DPR-74 Enclosure: | |||
Request for Information | |||
- Design Bases Inspection | |||
cc: Distribution via LISTSERV | |||
REQUEST FOR INFORMATION | |||
- DESIGN BASES INSPECTION | |||
Enclosure | |||
Inspection Report: | |||
05000315/2016008; 05000316/2016008 Bagman Dates: March 29 - 30, 2016 Inspection Dates: | |||
May 9 - 13, 2016 Inspection Procedure: | |||
IP 71111.21 | |||
N, "Design Bases Inspection | |||
" Lead Inspector: | |||
Andrew Dunlop | |||
, Senior Reactor Engineer, DRS | |||
(630) 829 | |||
-9726 Andrew.Dunlop@nrc.gov | |||
I. Information Requested Prior to the Onsite Information Gathering/Bagman Week The following | |||
information is requested by March 1, 2016 | |||
, or sooner, to facilitate inspection preparation. If you have any questions regarding this information, please call the team leader as soon as possible. (Please provide the information electronically in "pdf" files, Excel, or other searchable formats, preferably on some portable electronic media (e.g., CD-ROM, DVD, etc.). The portable electronic media | |||
should contain descriptive names, and be indexed and hyperlinked to facilitate ease of use. Information | |||
in "lists" should contain enough information to be | |||
easily understood | |||
by someone who has knowledge | |||
of light water reactor technology). | |||
1. Risk-ranking of top | |||
250 components from your site specific probabilistic safety | |||
analysis (PSA) sorted by Fussell Vesely Importance | |||
. 2. PSA listing of top ten risk | |||
-significant | |||
systems. 3. Electronic copies of Updated Final Safety Analysis Report, Technical | |||
Specifications, and Technical Specifications Bases. Specifically identify which | |||
Updated Final Safety Analysis Report sections address environmental (including | |||
seismic) qualification | |||
(EQ). 4. NRC Safety Evaluation Report(s) associated with | |||
EQ. 5. Identify the various | |||
EQ standards (including year, edition, or revision) that the station is committed to. | |||
6. Copy of E | |||
Q Design Basis Document, if applicable. | |||
7. Copy of any licensing commitments related to | |||
EQ, if applicable | |||
. 8. Equipment | |||
Qualification | |||
Master List | |||
(EQML). Specific issues to be identified include: safety classification (safety | |||
-related or nonsafety | |||
-related), Regulatory | |||
Guide 1.97 instrumentation, EQ | |||
qualification (e.g. DOR, NUREG 588, 50.49), original or replaced after implementation of 50.49, | |||
and plant location. | |||
REQUEST FOR INFORMATION | |||
- DESIGN BASES INSPECTION | |||
2 9. List of any installed | |||
equipment removed from the EQML and basis for removal. 10. For units that have entered the period of extended operation, if | |||
EQ files were reviewed for Aging Management effects of license renewal, identify which EQ files were modified/changed to incorporate appropriate actions for the period of extended operation. | |||
Copies of any EQ Aging Management Programs. | |||
11. List or drawings of plant area | |||
s that are subjected to EQ, identifying design (limiting) temperature, both normal and accident, high-energy line break, radiation levels, etc. that the associated equipme | |||
nt will have to be qualified | |||
to meet EQ. If unit has obtained a power uprate (greater than 5 percent) provide same information pre | |||
-update (earliest available | |||
if multiple uprates). | |||
12. Site (and corporate if applicable) procedures associated with the 10 CFR 50. | |||
49 EQ Program | |||
for electrical components. Include procedures for procurement of qualified equipment, maintenance of qualified equipment, modification to | |||
qualified equipment (including equivalency or commercial grade dedication (CGD) programs), and material storage and shelf life controls | |||
. 13. List of CGD evaluations performed, for which the dedicated parts have been issued for installation (parts issued for the last | |||
10 years) on EQ applications | |||
in the plant. Include CGD evaluation number, name of part, component ID number or description of the component the part was issued to repair, work order, and date issued or installed. | |||
14. List of Condition | |||
Reports (CRs) related to the EQ Program or EQ of components for the last | |||
5 years. 15. Current management and engineering organizational chart | |||
. II. Information Requested (for the approximate 9 - 12 selected components) to be | |||
Available by | |||
the Bagman Trip | |||
on March 29, 2016 | |||
. 1. EQ Summary Report | |||
for each component/subcomponent | |||
. 2. Qualification Maintenance Requirement Sheet (QMRS) or equivalent | |||
. 3. List of CRs (corrective action documents) associated with each of the selected | |||
components for the last | |||
5 years. 4. Photos of any component in containment or high | |||
-radiation areas, if available. | |||
III. Information Requested (for the approximate 6 - 9 selected components) to be Available by April 27, 2016, (will be reviewed by the team in the Regional office | |||
during the week of May 2 - 6, 2016). This information | |||
should be separated for each selected component, especially if provided electronically (e.g., folder with component name that includes EQ files, Qualification Test Reports | |||
, calculations, | |||
CRs, maintenance history, etc | |||
.). 1. EQ file, including | |||
associated Qualification Test Reports | |||
. 2. Vendor manual (electronic copy or availability of hard copy during inspection | |||
). | |||
REQUEST FOR INFORMATION | |||
- DESIGN BASES INSPECTION | |||
3 3. Preventive maintenance template | |||
. 4. Last performed work order (WO) for each associated EQ preventive maintenance | |||
. 5. List of corrective maintenance WOs for the last | |||
10 years. Include WO | |||
number, date performed, and brief one line description. 6. If repair work (e.g., a motor rewind) was performed under a purchase order, provide copy of the purchase order. | |||
7. Thermal life calculation | |||
. 8. Any self-assessments of the EQ Program for the last | |||
3 years. IV. Additional Information to be | |||
Provided on May 9, 2016, Onsite 1. During the in | |||
-office preparation activities, the team may identify additional information needed to support the inspection. The lead inspector will provide a list of the additional information needed during the week of May 2 - 6, 2016. V. Information Requested to be Provided Throughout the Inspection | |||
1. Copies of any corrective action documents generated as a result of the team's questions or queries during this inspection | |||
. 2. Copies of the list of questions submitted by the team members and the status/resolution of the information requested (provide daily during the inspection | |||
to each team member) | |||
. If you have questions regarding the information requested, please contact the lead inspector. | |||
L. Weber -3- component of the NRC's Agencywide | |||
Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading | |||
-rm/adams.html | |||
(the Public Electronic Reading Room). | |||
Sincerely, | |||
/RA/ | |||
Christine A. Lipa, Chief Engineering Branch 2 | |||
Division of Reactor Safety | |||
Docket Nos. 50 | |||
-315; 50-316 License Nos. DPR | |||
-58; DPR-74 Enclosure: | |||
Request for Information | |||
- Design Bases Inspection | |||
cc: Distribution via LISTSERV | |||
DISTRIBUTION | |||
: Kimyata MorganButler | |||
RidsNrrDorlLpl3 | |||
-1 Resource | |||
RidsNrrPMDCCook Resource | |||
RidsNrrDirsIrib Resource | |||
Cynthia Pederson | |||
Darrell Roberts | |||
Richard Skokowski | |||
Allan Barker | |||
Carole Ariano | |||
Linda Linn | |||
DRPIII DRSIII Jim Clay Carmen Olteanu | |||
ADAMS Accession Number ML16025A055 | |||
Publicly Available | |||
Non-Publicly Available | |||
Sensitive | |||
Non-Sensitive | |||
To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy | |||
OFFICE RIII RIII NAME CLipa for ADunlop:cl CLipa DATE 01/22/16 01/22/16 OFFICIAL RECORD COPY | |||
}} | }} |
Revision as of 13:41, 30 June 2018
ML16025A055 | |
Person / Time | |
---|---|
Site: | Cook |
Issue date: | 01/22/2016 |
From: | Lipa C A NRC/RGN-III/DRS/EB2 |
To: | Weber L Indiana Michigan Power Co |
References | |
IR 2016008 | |
Download: ML16025A055 (7) | |
See also: IR 05000315/2016008
Text
UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION III 2443 WARRENVILLE RD. SUIT
E 210 LISLE, IL 60532
-4352 January 22, 2016
Mr. Larry Weber
Senior VP and Chief Nuclear Officer
Indiana Michigan Power Company
Nuclear Generation Group
One Cook Place
Bridgman, MI 49106
SUBJECT: DONALD. C. COOK NUCLEAR POWER PLANT, UNITS 1 AND
2 - REQUEST FOR INFORMATION FOR AN NRC PILOT DESIGN BASES INSPECTION ON THE IMPLEMENTATION OF
THE ENVIRONMENTAL
QUALIFICATION PROGRAM INSPECTION
REPORT 05000315/2016008; 05000316/2016008 Dear Mr. Weber: On May 9, 2016, the U. S. Nuclear Regulatory Commission (NRC) will begin the pilot program portion of the
triennial baseline Design Bases Inspection (DBI)
at Donald C. Cook Nuclear Power Plant, Units 1 and 2
. This inspection will be performed in accordance with NRC Baseline Inspection Procedure 71111.21
N. The inspection will focus on the implementation of the Environmental Qualification
(EQ) Program. The EQ components to be reviewed during this baseline inspection will be identified during the in-office preparation week that occurs prior to the first onsite inspection
week. The inspection will include a bagman trip to support selection of components and one week of onsite inspection. The inspection team will consist of three NRC inspectors. The current inspection schedule is as follows:
Bagman trip onsite week:
March 29
- 30, 2016 Inspection onsite week:
May 9 - 13, 2016 The team will be preparing for the inspection, mainly during the week of May 2 - 6, 2016, as discussed in the enclosure.
Experience with previous baseline design inspections of similar depth and length has shown that this type of inspection is
extremely resource intensive, both for the NRC inspectors and the licensee staff. In order to minimize the inspection impact on the site and to ensure a productive inspection for both parties, we have enclosed a request for information needed for the inspection.
L. Weber -2- It is important that all of these documents are up
-to-date and complete in order to minimize the number of additional documents requested during the preparation and/or the onsite portions of the inspection. Insofar as possible, this information should be provided electronically
to the lead inspector. The information request has been divided into
four groups: The first group lists information necessary for our initial inspection scoping activities.
This information should be provided to the lead inspector no later than
March 1, 2016
. By March 15, 2016, the lead inspector will communicate the initial selected set of approximately
12 EQ components.
The second group of documents requested is
those items needed to support the bagman trip. This set of documents should be available to the lead inspector onsite on March 29, 2016
. The third group of documents requested is those items needed to support our in-office preparation activities
for the selected set of 6
- 9 EQ components. This set of documents should be provided to the lead inspector
at the Regional Office no later than April 27, 2016. During the in
-office preparation activities, the team may identify additional information needed to support the inspection.
The last group includes the additional information above as well as plant specific reference
material. This information should be available to the team onsite on May 9, 2016. It is also requested that corrective action documents and/or questions developed during the inspection be provided to the lead inspector as the documents are generated.
The lead inspector for this inspection is Mr. Andrew Dunlop. We understand that our licensing contact for this inspection is Mr. Rick Wynegar
of your organization. If there are any questions about the inspection or the material requested in the enclosure, please contact the lead
inspector at (630) 829
-9726, or via e-mail at Andrew.Dunlop@nrc.gov
. This letter does not contain new or amended information collection requirements subject
to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection
requirements were approved by the Office of Management and Budget, Control Number 3150-0011. The NRC may not conduct or sponsor, and a person is not required
to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget Control Number.
In accordance with Title 10 of the Code of Federal Regulations
(10 CFR) 2.390, "Public Inspections, Exemptions, Requests for Withholding," of the NRC's "Rules of Practice," a copy
of this letter, its enclosure, and your response (if any) will be available electronically for public
inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS)
L. Weber -3- component of the NRC's Agencywide
Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading
-rm/adams.html
(the Public Electronic Reading Room).
Sincerely,
/RA/
Christine A. Lipa, Chief Engineering Branch 2
Division of Reactor Safety
Docket Nos. 50
-315; 50-316 License Nos. DPR
-58; DPR-74 Enclosure:
Request for Information
- Design Bases Inspection
cc: Distribution via LISTSERV
REQUEST FOR INFORMATION
- DESIGN BASES INSPECTION
Enclosure
Inspection Report: 05000315/2016008; 05000316/2016008 Bagman Dates: March 29 - 30, 2016 Inspection Dates:
May 9 - 13, 2016 Inspection Procedure:
N, "Design Bases Inspection
" Lead Inspector:
Andrew Dunlop
, Senior Reactor Engineer, DRS
(630) 829
-9726 Andrew.Dunlop@nrc.gov
I. Information Requested Prior to the Onsite Information Gathering/Bagman Week The following
information is requested by March 1, 2016
, or sooner, to facilitate inspection preparation. If you have any questions regarding this information, please call the team leader as soon as possible. (Please provide the information electronically in "pdf" files, Excel, or other searchable formats, preferably on some portable electronic media (e.g., CD-ROM, DVD, etc.). The portable electronic media
should contain descriptive names, and be indexed and hyperlinked to facilitate ease of use. Information
in "lists" should contain enough information to be
easily understood
by someone who has knowledge
of light water reactor technology).
1. Risk-ranking of top
250 components from your site specific probabilistic safety
analysis (PSA) sorted by Fussell Vesely Importance
. 2. PSA listing of top ten risk
-significant
systems. 3. Electronic copies of Updated Final Safety Analysis Report, Technical
Specifications, and Technical Specifications Bases. Specifically identify which
Updated Final Safety Analysis Report sections address environmental (including
seismic) qualification
(EQ). 4. NRC Safety Evaluation Report(s) associated with
EQ. 5. Identify the various
EQ standards (including year, edition, or revision) that the station is committed to.
6. Copy of E
Q Design Basis Document, if applicable.
7. Copy of any licensing commitments related to
EQ, if applicable
. 8. Equipment
Qualification
Master List
(EQML). Specific issues to be identified include: safety classification (safety
-related or nonsafety
-related), Regulatory
Guide 1.97 instrumentation, EQ
qualification (e.g. DOR, NUREG 588, 50.49), original or replaced after implementation of 50.49,
and plant location.
REQUEST FOR INFORMATION
- DESIGN BASES INSPECTION
2 9. List of any installed
equipment removed from the EQML and basis for removal. 10. For units that have entered the period of extended operation, if
EQ files were reviewed for Aging Management effects of license renewal, identify which EQ files were modified/changed to incorporate appropriate actions for the period of extended operation.
Copies of any EQ Aging Management Programs.
11. List or drawings of plant area
s that are subjected to EQ, identifying design (limiting) temperature, both normal and accident, high-energy line break, radiation levels, etc. that the associated equipme
nt will have to be qualified
to meet EQ. If unit has obtained a power uprate (greater than 5 percent) provide same information pre
-update (earliest available
if multiple uprates).
12. Site (and corporate if applicable) procedures associated with the 10 CFR 50.
49 EQ Program
for electrical components. Include procedures for procurement of qualified equipment, maintenance of qualified equipment, modification to
qualified equipment (including equivalency or commercial grade dedication (CGD) programs), and material storage and shelf life controls
. 13. List of CGD evaluations performed, for which the dedicated parts have been issued for installation (parts issued for the last
10 years) on EQ applications
in the plant. Include CGD evaluation number, name of part, component ID number or description of the component the part was issued to repair, work order, and date issued or installed.
14. List of Condition
Reports (CRs) related to the EQ Program or EQ of components for the last
5 years. 15. Current management and engineering organizational chart
. II. Information Requested (for the approximate 9 - 12 selected components) to be
Available by
the Bagman Trip
on March 29, 2016
. 1. EQ Summary Report
for each component/subcomponent
. 2. Qualification Maintenance Requirement Sheet (QMRS) or equivalent
. 3. List of CRs (corrective action documents) associated with each of the selected
components for the last
5 years. 4. Photos of any component in containment or high
-radiation areas, if available.
III. Information Requested (for the approximate 6 - 9 selected components) to be Available by April 27, 2016, (will be reviewed by the team in the Regional office
during the week of May 2 - 6, 2016). This information
should be separated for each selected component, especially if provided electronically (e.g., folder with component name that includes EQ files, Qualification Test Reports
, calculations,
CRs, maintenance history, etc
.). 1. EQ file, including
associated Qualification Test Reports
. 2. Vendor manual (electronic copy or availability of hard copy during inspection
).
REQUEST FOR INFORMATION
- DESIGN BASES INSPECTION
3 3. Preventive maintenance template
. 4. Last performed work order (WO) for each associated EQ preventive maintenance
. 5. List of corrective maintenance WOs for the last
10 years. Include WO
number, date performed, and brief one line description. 6. If repair work (e.g., a motor rewind) was performed under a purchase order, provide copy of the purchase order.
7. Thermal life calculation
. 8. Any self-assessments of the EQ Program for the last
3 years. IV. Additional Information to be
Provided on May 9, 2016, Onsite 1. During the in
-office preparation activities, the team may identify additional information needed to support the inspection. The lead inspector will provide a list of the additional information needed during the week of May 2 - 6, 2016. V. Information Requested to be Provided Throughout the Inspection
1. Copies of any corrective action documents generated as a result of the team's questions or queries during this inspection
. 2. Copies of the list of questions submitted by the team members and the status/resolution of the information requested (provide daily during the inspection
to each team member)
. If you have questions regarding the information requested, please contact the lead inspector.
L. Weber -3- component of the NRC's Agencywide
Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading
-rm/adams.html
(the Public Electronic Reading Room).
Sincerely,
/RA/
Christine A. Lipa, Chief Engineering Branch 2
Division of Reactor Safety
Docket Nos. 50
-315; 50-316 License Nos. DPR
-58; DPR-74 Enclosure:
Request for Information
- Design Bases Inspection
cc: Distribution via LISTSERV
DISTRIBUTION
- Kimyata MorganButler
RidsNrrDorlLpl3
-1 Resource
RidsNrrPMDCCook Resource
RidsNrrDirsIrib Resource
Cynthia Pederson
DRPIII DRSIII Jim Clay Carmen Olteanu
ADAMS Accession Number ML16025A055
Publicly Available
Non-Publicly Available
Sensitive
Non-Sensitive
To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy
OFFICE RIII RIII NAME CLipa for ADunlop:cl CLipa DATE 01/22/16 01/22/16 OFFICIAL RECORD COPY