ML16299A110: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BLVD. KING OF PRUSSIA, PA  19406-2713  October 25, 2016  EA-16-223   
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BLVD. KING OF PRUSSIA, PA  19406-2713  
   October 25, 2016  
   EA-16-223  
   
Mr. Anthony J. Vitale  
Mr. Anthony J. Vitale  
Site Vice President  
Site Vice President  
Entergy Nuclear Operations, Inc. Indian Point Energy Center 450 Broadway, GSB  
Entergy Nuclear Operations, Inc. Indian Point Energy Center  
450 Broadway, GSB  
P.O. Box 249  
P.O. Box 249  
Buchanan, NY  10511-0249  
Buchanan, NY  10511-0249  
  SUBJECT:  U.S. NUCLEAR REGULATORY COMMISSION ACKNOWLEDGEMENT OF DISPUTE OF NON-CITED VIOLATION 05000286/2016002-02   
 
  SUBJECT:  U.S. NUCLEAR REGULATORY COMMISSION ACKNOWLEDGEMENT OF DISPUTE OF NON-CITED VIOLATION 05000286/2016002-02  
   
Dear Mr. Vitale:  
Dear Mr. Vitale:  
   
   
I am writing to acknowledge receipt of your letter, dated September 29, 2016, written in response to the U.S. Nuclear Regulatory Commission (NRC) Integrated Inspection Report 05000247/2016002-02 and 05000286/2016002-02, issued on August 30, 2016.  
I am writing to acknowledge receipt of your letter, dated September 29, 2016, written in response to the U.S. Nuclear Regulatory Commission (NRC) Integrated Inspection Report 05000247/2016002-02 and 05000286/2016002-02, issued on August 30, 2016.  
   
   
Your letter requests withdrawal of the 10 CFR 50, Appendix B, Criterion V, "Instructions,  
Your letter requests withdrawal of the 10 CFR 50, Appendix B, Criterion V, "Instructions,  
Procedures, and Drawings," Green non-cited violation concerning the failure to follow the operability process as prescribed in Entergy procedure EN-OP-104, "Operability Determination Process."  You stated that Entergy was in full compliance with procedure EN-OP-104 when  
Procedures, and Drawings," Green non-cited violation concerning the failure to follow the operability process as prescribed in Entergy procedure EN-OP-104, "Operability Determination Process."  You stated that Entergy was in full compliance with procedure EN-OP-104 when  
evaluating the baffle former bolt condition discovered at Unit 2 as it applied to Unit 3.  The NRC will review your response and provide you a letter documenting the basis for any decision within 90 days.  
evaluating the baffle former bolt condition discovered at
  In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC's Public Document Room or from the   
Unit 2 as it applied to Unit 3.  The NRC  
A. Vitale -2-  Publicly Available Records component of the NRC's Agencywide Documents Access and Management System (ADAMS).  Your letter has also been added to ADAMS for the information of the public, and may be found under ADAMS Accession Number ML16281A486.  
will review your response and provide you a le
tter documenting the basis for any decision within  
90 days.  
 
  In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be  
available electronically for public inspection in the NRC's Public Document Room or from the   
A. Vitale -2-  
   Publicly Available Records component of the NRC's Agencywide Documents Access and Management System (ADAMS).  Your letter has also been added to ADAMS for the information of the public, and may be found under ADAMS Accession Number ML16281A486.  
 
   
   
Should you have any questions concerning this letter, please contact me at (610) 337-5262.  
Should you have any questions concerning this letter, please contact me at (610) 337-5262.  
  Sincerely,   
 
  Sincerely,  
   
   
   
         /RA/  
         /RA/  
  Daniel L. Schroeder, Chief  
  Daniel L. Schroeder, Chief  
Reactor Projects Branch 4 Division of Reactor Projects  Docket No. 50-286  
Reactor Projects Branch 4  
License No. DPR-64  cc:  Distribution via ListServ  
Division of Reactor Projects  
  Docket No. 50-286  
License No. DPR-64  
  cc:  Distribution via ListServ  
 
    
    


   ML16299A110 SUNSI Review  Non-Sensitive  Sensitive  Publicly Available Non-Publicly Available OFFICE RI/DRP RI/DRP RI/DRP  NAME NEmbert/NE GDentel/GTD DSchroeder/DLS  DATE 10/20/16 10/20/16 10/20/16
   ML16299A110
  SUNSI Review  
   Non-Sensitive  Sensitive  
  Publicly Available Non-Publicly Available OFFICE RI/DRP RI/DRP RI/DRP  NAME NEmbert/NE GDentel/GTD DSchroeder/DLS  DATE 10/20/16 10/20/16 10/20/16
}}
}}

Revision as of 02:14, 30 June 2018

U.S. Nuclear Regulatory Commission Acknowledgement of Dispute of Non-Cited Violation 05000286/2016002-02
ML16299A110
Person / Time
Site: Indian Point Entergy icon.png
Issue date: 10/25/2016
From: Schroeder D L
Reactor Projects Region 1 Branch 4
To: Vitale A J
Entergy Nuclear Operations
Schroeder D L
References
EA-16-223 IR 2016002
Download: ML16299A110 (3)


See also: IR 05000286/2016002

Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BLVD. KING OF PRUSSIA, PA 19406-2713

October 25, 2016

EA-16-223

Mr. Anthony J. Vitale

Site Vice President

Entergy Nuclear Operations, Inc. Indian Point Energy Center

450 Broadway, GSB

P.O. Box 249

Buchanan, NY 10511-0249

SUBJECT: U.S. NUCLEAR REGULATORY COMMISSION ACKNOWLEDGEMENT OF DISPUTE OF NON-CITED VIOLATION 05000286/2016002-02

Dear Mr. Vitale:

I am writing to acknowledge receipt of your letter, dated September 29, 2016, written in response to the U.S. Nuclear Regulatory Commission (NRC) Integrated Inspection Report 05000247/2016002-02 and 05000286/2016002-02, issued on August 30, 2016.

Your letter requests withdrawal of the 10 CFR 50, Appendix B, Criterion V, "Instructions,

Procedures, and Drawings," Green non-cited violation concerning the failure to follow the operability process as prescribed in Entergy procedure EN-OP-104, "Operability Determination Process." You stated that Entergy was in full compliance with procedure EN-OP-104 when

evaluating the baffle former bolt condition discovered at

Unit 2 as it applied to Unit 3. The NRC

will review your response and provide you a le

tter documenting the basis for any decision within

90 days.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be

available electronically for public inspection in the NRC's Public Document Room or from the

A. Vitale -2-

Publicly Available Records component of the NRC's Agencywide Documents Access and Management System (ADAMS). Your letter has also been added to ADAMS for the information of the public, and may be found under ADAMS Accession Number ML16281A486.

Should you have any questions concerning this letter, please contact me at (610) 337-5262.

Sincerely,

/RA/

Daniel L. Schroeder, Chief

Reactor Projects Branch 4

Division of Reactor Projects

Docket No. 50-286

License No. DPR-64

cc: Distribution via ListServ

ML16299A110

SUNSI Review

Non-Sensitive Sensitive

Publicly Available Non-Publicly Available OFFICE RI/DRP RI/DRP RI/DRP NAME NEmbert/NE GDentel/GTD DSchroeder/DLS DATE 10/20/16 10/20/16 10/20/16