{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303
[[Issue date::March 1, 2017]]
-1257 March 1, 2017 Mr. Tom Ray Site Vice President Duke Energy Corporation Oconee Nuclear Station 7800 Rochester Highway Seneca, SC 29672
-0752


Mr. Tom Ray Site Vice President Duke Energy Corporation Oconee Nuclear Station 7800 Rochester Highway Seneca, SC 29672-0752
SUBJECT: ANNUAL ASSESSMENT LETTER FOR OCONEE NUCLEAR STATION UNITS 1, 2, AND 3 - NRC INSPECTION REPORT 05000269/2016006, 05000270/2016006, AND 05000 287/2016006


SUBJECT: ANNUAL ASSESSMENT LETTER FOR OCONEE NUCLEAR STATION UNITS 1, 2, AND 3 - NRC INSPECTION REPORT 05000269/2016006, 05000270/2016006, AND 05000287/2016006
==Dear Mr. Ray:==
The NRC completed its end-of-cycle performance review of the Oconee Nuclear Station Units 1
, 2 and 3, reviewing performance indicators (PIs), inspection results, and enforcement actions from January 1, 2016 through December 31
, 2016. This letter informs you of the NRC's assessment of your facility during this period and its plans for future inspections at your facility.
 
The NRC concluded that overall performance at your facility preserved public health and safety.
 
The NRC determined that performance at Oconee Units 1, 2, and 3 during the most recent quarter was within the Licensee Response Column, the highest performance category of the NRC's Reactor Oversight Process (ROP) Action Matrix
, because all inspection findings had very low safety significance (i.e., Green), and all PIs were within the expected range (i.e., Green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility.
 
The enclosed inspection plan lists the inspections scheduled through December 31
, 2018. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last twelve months of the inspection plan are tentative and may be revised.
 
The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant.
 
This inspection plan does not inclu de security-related inspections which will be sent via separate, non-publicly available correspondence.


==Dear Mr. Ray:==
The NRC will conduct Temporary Instruction (
The NRC completed its end-of-cycle performance review of the Oconee Nuclear Station Units 1, 2 and 3, reviewing performance indicators (PIs), inspection results, and enforcement actions from January 1, 2016 through December 31, 2016. This letter informs you of the NRC's assessment of your facility during this period and its plans for future inspections at your facility. The NRC concluded that overall performance at your facility preserved public health and safety. The NRC determined that performance at Oconee Units 1, 2, and 3 during the most recent quarter was within the Licensee Response Column, the highest performance category of the NRC's Reactor Oversight Process (ROP) Action Matrix, because all inspection findings had very low safety significance (i.e., Green), and all PIs were within the expected range (i.e., Green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility. The enclosed inspection plan lists the inspections scheduled through December 31, 2018. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last twelve months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant. This inspection plan does not include security-related inspections which will be sent via separate, non-publicly available correspondence. The NRC will conduct Temporary Instruction (TI) 2515/191, "Inspection of the Implementation of Mitigation Strategies and Spent Fuel Pool Instrumentation Orders and Emergency Preparedness Communication/Staffing/Multi-Unit Dose Assessment Plans," in the future. In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
TI) 2515/191,  
"Inspection of the Implementation of Mitigation Strategies and Spent Fuel Pool Instrumentation Orders and Emergency Preparedness Communication/Staffing/Multi
-Unit Dose Assessment Plans," in the future. In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRC
's "Rules of Practice,
" a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading
-rm/adams.html (the Public Electronic Reading Room).


Please contact me at 404-997-4611 with any questions you have regarding this letter.
Please contact me at 404-997-4611 with any questions you have regarding this letter.


Sincerely/RA/ Frank Ehrhardt, Chief Reactor Project Branch 1 Division of Reactor Projects Docket Nos.: 50-269, 50-270, 50-287 License Nos.: DPR-38, DPR-47, DPR-55  
Sincerely/RA/ Frank Ehrhardt
, Chief Reactor Project Branch 1 Division of Reactor Projects Docket Nos.:
50-269, 50-270, 50-287 License Nos.:
DPR-38, DPR-47, DPR-55  


===Enclosure:===
===Enclosure:===
Oconee Inspection/Activity Plan (03/01/2017 - 12/31/2018) cc Distribution via ListServ SUBJECT: ANNUAL ASSESSMENT LETTER FOR OCONEE NUCLEAR STATION UNITS 1, 2, AND 3 - NRC INSPECTION REPORT 05000269/2016006, 05000270/2016006, AND 05000287/2016006 March 1, 2017 DISTRIBUTION: M. Kowal, RII K. Sloan, RII OE Mail RIDSNRRDIRS PUBLIC RidsNrrPMOconee Resource ROP Assessment ROP Reports Institute of Nuclear Power Operations (INPO) ADAMS Accession Number: ML OFFICE RII:DRP RII:DRP NAME JWorosilo FEhrhardt DATE 2/ 16 /2017 2/17/2017 OFFICIAL AGENCY RECORD Report 22UnitNumberPlanned DatesStart EndInspection ActivityTitleNo. of Staffon SiteOconeeInspection / Activity Plan03/01/2017-12/31/2018Page 1 of 202/28/2017 06:56:45DBAI-DESIGN BASES ASSURANCE INSPECTION (TEAM)71,2,3 IPComponent Design Bases Inspection (Teams)7111121M03/06/201703/10/20171,2,3 IPComponent Design Bases Inspection (Teams)7111121M03/20/201703/24/2017OL RQ-REQUAL INSPECTION21,2,3 IPLicensed Operator Requalification Program7111111B03/20/201703/24/2017PI&R-PROBLEM IDENTIFICATION AND RESOLUTION41,2 IPProblem Identification and Resolution71152B04/03/201704/07/20171,2 IPProblem Identification and Resolution71152B04/17/201704/21/2017EP-EP PROGRAM INSPECTION31,2,3 IPAlert and Notification System Testing711140209/25/201709/29/20171,2,3 IPEmergency Preparedness Organization Staffing and Augmentation System711140309/25/201709/29/20171,2,3 IPEmergency Action Level and Emergency Plan Changes711140409/25/201709/29/20171,2,3 IPCorrection of Emergency Preparedness Weaknesses and Deficiencies711140509/25/201709/29/20171,2,3 IPPerformance Indicator Verification7115109/25/201709/29/2017RP-RP OCCUPATIONAL INSPECTION WEEK 121,2,3 IPRadiological Hazard Assessment and Exposure Controls71124.0110/30/201711/03/20171,2,3 IPOccupational ALARA Planning and Controls71124.0210/30/201711/03/20171,2,3 IPIn-Plant Airborne Radioactivity Control and Mitigation71124.0310/30/201711/03/20171,2,3 IPOccupational Dose Assessment71124.0410/30/201711/03/20171,2,3 IPRadiation Monitoring Instrumentation71124.0510/30/201711/03/20171,2,3 IPPerformance Indicator Verification7115110/30/201711/03/2017ISI-UNIT 2 IN-SERVICE INSPECTION12 IPInservice Inspection Activities - PWR7111108P11/06/201711/10/2017RP-RP OCCUPATIONAL INSPECTION WEEK 231,2,3 IPRadiological Hazard Assessment and Exposure Controls71124.0111/13/201711/17/20171,2,3 IPOccupational ALARA Planning and Controls71124.0211/13/201711/17/20171,2,3 IPIn-Plant Airborne Radioactivity Control and Mitigation71124.0311/13/201711/17/20171,2,3 IPOccupational Dose Assessment71124.0411/13/201711/17/20171,2,3 IPRadiation Monitoring Instrumentation71124.0511/13/201711/17/20171,2,3 IPPerformance Indicator Verification7115111/13/201711/17/2017SGISI-UNIT 2 SG IN-SERVICE INSPECTION12 IPInservice Inspection Activities - PWR7111108P11/13/201711/17/2017This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.
Oconee Inspection/Activity Plan (03/01/2017 - 12/31/2018) cc Distribution via ListServ SUBJECT: ANNUAL ASSESSMENT LETTER FOR OCONEE NUCLEAR STATION UNITS 1, 2, AND 3 - NRC INSPECTION REPORT 05000269/2016006, 05000270/2016006, AND 05000287/2016006 March 1, 2017 DISTRIBUTION: M. Kowal, RII K. Sloan, RII OE Mail RIDSNRRDIRS PUBLIC RidsNrrPMOconee Resource ROP Assessment ROP Reports Institute of Nuclear Power Operations (INPO)
ADAMS Accession Number: ML OFFICE RII:DRP RII:DRP NAME JWorosilo FEhrhardt DATE 2/ 16 /2017 2/17/2017 OFFICIAL AGENCY RECORD
 
Report 22 UnitNumberPlanned Dates Start EndInspection ActivityTitleNo. of Staff on SiteOconeeInspection / Activity Plan 03/01/2017
-12/31/2018 Page 1 of 2 02/28/2017 06:56:45DBAI-DESIGN BASES ASSURANCE INSPECTION (TEAM)
71,2,3 IPComponent Design Bases Inspection (Teams)7111121M03/06/2017 03/10/2017 1,2,3 IPComponent Design Bases Inspection (Teams)7111121M03/20/2017 03/24/2017OL RQ-REQUAL INSPECTION 21,2,3 IPLicensed Operator Requalification Program7111111B03/20/2017 03/24/2017 PI&R-PROBLEM IDENTIFICATION AND RESOLUTION 41,2 IPProblem Identification and Resolution71152B04/03/2017 04/07/2017 1,2 IPProblem Identification and Resolution71152B04/17/2017 04/21/2017 EP-EP PROGRAM INSPECTION 31,2,3 IPAlert and Notification System Testing711140209/25/2017 09/29/2017 1,2,3 IPEmergency Preparedness Organization Staffing and Augmentation System711140309/25/2017 09/29/2017 1,2,3 IPEmergency Action Level and Emergency Plan Changes711140409/25/2017 09/29/2017 1,2,3 IPCorrection of Emergency Preparedness Weaknesses and Deficiencies711140509/25/2017 09/29/2017 1,2,3 IPPerformance Indicator Verification7115109/25/2017 09/29/2017 RP-RP OCCUPATIONAL INSPECTION WEEK 1 21,2,3 IPRadiological Hazard Assessment and Exposure Controls71124.0110/30/201711/03/2017 1,2,3 IPOccupational ALARA Planning and Controls71124.0210/30/201711/03/2017 1,2,3 IPIn-Plant Airborne Radioactivity Control and Mitigation71124.0310/30/201711/03/2017 1,2,3 IPOccupational Dose Assessment71124.0410/30/201711/03/2017 1,2,3 IPRadiation Monitoring Instrumentation71124.0510/30/201711/03/2017 1,2,3 IPPerformance Indicator Verification7115110/30/201711/03/2017 ISI-UNIT 2 IN-SERVICE INSPECTION 12 IPInservice Inspection Activities - PWR7111108P11/06/201711/10/2017 RP-RP OCCUPATIONAL INSPECTION WEEK 2 31,2,3 IPRadiological Hazard Assessment and Exposure Controls71124.0111/13/201711/17/2017 1,2,3 IPOccupational ALARA Planning and Controls71124.0211/13/201711/17/2017 1,2,3 IPIn-Plant Airborne Radioactivity Control and Mitigation71124.0311/13/201711/17/2017 1,2,3 IPOccupational Dose Assessment71124.0411/13/201711/17/2017 1,2,3 IPRadiation Monitoring Instrumentation71124.0511/13/201711/17/2017 1,2,3 IPPerformance Indicator Verification7115111/13/201711/17/2017 SGISI-UNIT 2 SG IN-SERVICE INSPECTION 12 IPInservice Inspection Activities - PWR7111108P11/13/201711/17/2017 This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.


Report 22UnitNumberPlanned DatesStart EndInspection ActivityTitleNo. of Staffon SiteOconeeInspection / Activity Plan03/01/2017-12/31/2018Page 2 of 202/28/2017 06:56:45ISI-UNIT 3 IN-SERVICE INSPECTION1 3 IPInservice Inspection Activities - PWR7111108P04/30/201805/04/2018RP-RAD HAZARDS AND TRANSPORTATION21,2,3 IPRadiological Hazard Assessment and Exposure Controls71124.0104/30/201805/04/20181,2,3 IPRadioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation71124.0804/30/201805/04/2018OL EXAM-INITIAL LICENSE EXAM PREP61 OCONEE / JUNE 2018 INITIAL EXAM AT POWER FACILITIESV2351205/07/201805/11/2018SGISI-UNIT 3 SG IN-SERVICE INSPECTION1 3 IPInservice Inspection Activities - PWR7111108P05/07/201805/11/2018OL EXAM-INITIAL LICENSE EXAM41 OCONEE / JUNE 2018 INITIAL EXAM AT POWER FACILITIESV2351206/04/201806/15/2018HS-TRIENNIAL HEAT SINK PERFORMANCE11,2,3 IPHeat Sink Performance7111107T06/18/201806/22/2018RP-RP PUBLIC INSPECTION21,2,3 IPRadioactive Gaseous and Liquid Effluent Treatment71124.0606/18/201806/22/20181,2,3 IPRadiological Environmental Monitoring Program71124.0706/18/201806/22/20181,2,3 IPOccupational Exposure Control Effectiveness71151-OR0106/18/201806/22/20181,2,3 IPRETS/ODCM Radiological Effluent Occurrences71151-PR0106/18/201806/22/2018EP-EP EXERCISE91,2,3 IPExercise Evaluation711140108/13/201808/17/20181,2,3 IPEmergency Action Level and Emergency Plan Changes711140408/13/201808/17/20181,2,3 IPDrill/Exercise Performance71151-EP0108/13/201808/17/20181,2,3 IPERO Readiness71151-EP0208/13/201808/17/20181,2,3 IPAlert & Notification System Reliability71151-EP0308/13/201808/17/20181,2,3 IPAlert & Notification System Reliability71151-EP0308/13/201808/17/2018EQI-DESIGN BASES ASSURANCE INSPECTION (PROGR31,2,3 IPComponent Design Bases Inspection (Programs)7111121N08/27/201808/31/20181,2,3 IPComponent Design Bases Inspection (Programs)7111121N09/17/201809/21/2018 3 IPComponent Design Bases Inspection (Programs)7111121N10/01/201810/05/2018ISI-UNIT 1 IN-SERVICE INSPECTION11 IPInservice Inspection Activities - PWR7111108P11/05/201811/09/2018SGISI-UNIT 1 SG IN-SERVICE INSPECTION11 IPInservice Inspection Activities - PWR7111108P11/12/201811/16/2018This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.
Report 22 UnitNumberPlanned Dates Start EndInspection ActivityTitleNo. of Staff on SiteOconeeInspection / Activity Plan 03/01/2017
-12/31/2018 Page 2 of 2 02/28/2017 06:56:45 ISI-UNIT 3 IN-SERVICE INSPECTION 1 3 IPInservice Inspection Activities - PWR7111108P04/30/2018 05/04/2018 RP-RAD HAZARDS AND TRANSPORTATION 21,2,3 IPRadiological Hazard Assessment and Exposure Controls71124.0104/30/2018 05/04/2018 1,2,3 IPRadioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation71124.0804/30/2018 05/04/2018OL EXAM-INITIAL LICENSE EXAM PREP 61 OCONEE / JUNE 2018 INITIAL EXAM AT POWER FACILITIES V2351205/07/201805/11/2018 SGISI-UNIT 3 SG IN-SERVICE INSPECTION 1 3 IPInservice Inspection Activities - PWR7111108P05/07/201805/11/2018OL EXAM-INITIAL LICENSE EXAM 41 OCONEE / JUNE 2018 INITIAL EXAM AT POWER FACILITIES V2351206/04/2018 06/15/2018 HS-TRIENNIAL HEAT SINK PERFORMANCE 11,2,3 IPHeat Sink Performance7111107T06/18/2018 06/22/2018 RP-RP PUBLIC INSPECTION 21,2,3 IPRadioactive Gaseous and Liquid Effluent Treatment71124.0606/18/2018 06/22/2018 1,2,3 IPRadiological Environmental Monitoring Program71124.0706/18/2018 06/22/2018 1,2,3 IPOccupational Exposure Control Effectiveness71151-OR01 06/18/2018 06/22/2018 1,2,3 IPRETS/ODCM Radiological Effluent Occurrences71151-PR01 06/18/2018 06/22/2018 EP-EP EXERCISE 91,2,3 IPExercise Evaluation711140108/13/2018 08/17/2018 1,2,3 IPEmergency Action Level and Emergency Plan Changes711140408/13/2018 08/17/2018 1,2,3 IPDrill/Exercise Performance71151-EP01 08/13/2018 08/17/2018 1,2,3 IPERO Readiness71151-EP02 08/13/2018 08/17/2018 1,2,3 IPAlert & Notification System Reliability71151-EP03 08/13/2018 08/17/2018 1,2,3 IPAlert & Notification System Reliability71151-EP03 08/13/2018 08/17/2018 EQI-DESIGN BASES ASSURANCE INSPECTION (PROGR 31,2,3 IPComponent Design Bases Inspection (Programs)7111121N08/27/2018 08/31/2018 1,2,3 IPComponent Design Bases Inspection (Programs)7111121N09/17/2018 09/21/2018 3 IPComponent Design Bases Inspection (Programs)7111121N10/01/2018 10/05/2018 ISI-UNIT 1 IN-SERVICE INSPECTION 11 IPInservice Inspection Activities - PWR7111108P11/05/201811/09/2018 SGISI-UNIT 1 SG IN-SERVICE INSPECTION 11 IPInservice Inspection Activities - PWR7111108P11/12/201811/16/2018 This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.
}}
}}

Revision as of 22:40, 29 June 2018

Annual Assessment Letter for Oconee Nuclear Station, Units 1, 2, and 3 - NRC Inspection Report 05000269/2016006, 05000270/2016006 and 05000287/2016006
ML17060A211
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 03/01/2017
From: Ehrhardt F J
NRC/RGN-II/DRP/RPB1
To: Teresa Ray
Duke Energy Corp
References
IR 2016006
Download: ML17060A211 (5)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303

-1257 March 1, 2017 Mr. Tom Ray Site Vice President Duke Energy Corporation Oconee Nuclear Station 7800 Rochester Highway Seneca, SC 29672

-0752

SUBJECT: ANNUAL ASSESSMENT LETTER FOR OCONEE NUCLEAR STATION UNITS 1, 2, AND 3 - NRC INSPECTION REPORT 05000269/2016006, 05000270/2016006, AND 05000 287/2016006

Dear Mr. Ray:

The NRC completed its end-of-cycle performance review of the Oconee Nuclear Station Units 1

, 2 and 3, reviewing performance indicators (PIs), inspection results, and enforcement actions from January 1, 2016 through December 31

, 2016. This letter informs you of the NRC's assessment of your facility during this period and its plans for future inspections at your facility.

The NRC concluded that overall performance at your facility preserved public health and safety.

The NRC determined that performance at Oconee Units 1, 2, and 3 during the most recent quarter was within the Licensee Response Column, the highest performance category of the NRC's Reactor Oversight Process (ROP) Action Matrix

, because all inspection findings had very low safety significance (i.e., Green), and all PIs were within the expected range (i.e., Green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility.

The enclosed inspection plan lists the inspections scheduled through December 31

, 2018. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last twelve months of the inspection plan are tentative and may be revised.

The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant.

This inspection plan does not inclu de security-related inspections which will be sent via separate, non-publicly available correspondence.

The NRC will conduct Temporary Instruction (

TI) 2515/191,

"Inspection of the Implementation of Mitigation Strategies and Spent Fuel Pool Instrumentation Orders and Emergency Preparedness Communication/Staffing/Multi

-Unit Dose Assessment Plans," in the future. In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRC

's "Rules of Practice,

" a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading

-rm/adams.html (the Public Electronic Reading Room).

Please contact me at 404-997-4611 with any questions you have regarding this letter.

Sincerely/RA/ Frank Ehrhardt

, Chief Reactor Project Branch 1 Division of Reactor Projects Docket Nos.:

50-269, 50-270, 50-287 License Nos.:

DPR-38, DPR-47, DPR-55

Enclosure:

Oconee Inspection/Activity Plan (03/01/2017 - 12/31/2018) cc Distribution via ListServ SUBJECT: ANNUAL ASSESSMENT LETTER FOR OCONEE NUCLEAR STATION UNITS 1, 2, AND 3 - NRC INSPECTION REPORT 05000269/2016006, 05000270/2016006, AND 05000287/2016006 March 1, 2017 DISTRIBUTION: M. Kowal, RII K. Sloan, RII OE Mail RIDSNRRDIRS PUBLIC RidsNrrPMOconee Resource ROP Assessment ROP Reports Institute of Nuclear Power Operations (INPO)

ADAMS Accession Number: ML OFFICE RII:DRP RII:DRP NAME JWorosilo FEhrhardt DATE 2/ 16 /2017 2/17/2017 OFFICIAL AGENCY RECORD

Report 22 UnitNumberPlanned Dates Start EndInspection ActivityTitleNo. of Staff on SiteOconeeInspection / Activity Plan 03/01/2017

-12/31/2018 Page 1 of 2 02/28/2017 06:56:45DBAI-DESIGN BASES ASSURANCE INSPECTION (TEAM)

71,2,3 IPComponent Design Bases Inspection (Teams)7111121M03/06/2017 03/10/2017 1,2,3 IPComponent Design Bases Inspection (Teams)7111121M03/20/2017 03/24/2017OL RQ-REQUAL INSPECTION 21,2,3 IPLicensed Operator Requalification Program7111111B03/20/2017 03/24/2017 PI&R-PROBLEM IDENTIFICATION AND RESOLUTION 41,2 IPProblem Identification and Resolution71152B04/03/2017 04/07/2017 1,2 IPProblem Identification and Resolution71152B04/17/2017 04/21/2017 EP-EP PROGRAM INSPECTION 31,2,3 IPAlert and Notification System Testing711140209/25/2017 09/29/2017 1,2,3 IPEmergency Preparedness Organization Staffing and Augmentation System711140309/25/2017 09/29/2017 1,2,3 IPEmergency Action Level and Emergency Plan Changes711140409/25/2017 09/29/2017 1,2,3 IPCorrection of Emergency Preparedness Weaknesses and Deficiencies711140509/25/2017 09/29/2017 1,2,3 IPPerformance Indicator Verification7115109/25/2017 09/29/2017 RP-RP OCCUPATIONAL INSPECTION WEEK 1 21,2,3 IPRadiological Hazard Assessment and Exposure Controls71124.0110/30/201711/03/2017 1,2,3 IPOccupational ALARA Planning and Controls71124.0210/30/201711/03/2017 1,2,3 IPIn-Plant Airborne Radioactivity Control and Mitigation71124.0310/30/201711/03/2017 1,2,3 IPOccupational Dose Assessment71124.0410/30/201711/03/2017 1,2,3 IPRadiation Monitoring Instrumentation71124.0510/30/201711/03/2017 1,2,3 IPPerformance Indicator Verification7115110/30/201711/03/2017 ISI-UNIT 2 IN-SERVICE INSPECTION 12 IPInservice Inspection Activities - PWR7111108P11/06/201711/10/2017 RP-RP OCCUPATIONAL INSPECTION WEEK 2 31,2,3 IPRadiological Hazard Assessment and Exposure Controls71124.0111/13/201711/17/2017 1,2,3 IPOccupational ALARA Planning and Controls71124.0211/13/201711/17/2017 1,2,3 IPIn-Plant Airborne Radioactivity Control and Mitigation71124.0311/13/201711/17/2017 1,2,3 IPOccupational Dose Assessment71124.0411/13/201711/17/2017 1,2,3 IPRadiation Monitoring Instrumentation71124.0511/13/201711/17/2017 1,2,3 IPPerformance Indicator Verification7115111/13/201711/17/2017 SGISI-UNIT 2 SG IN-SERVICE INSPECTION 12 IPInservice Inspection Activities - PWR7111108P11/13/201711/17/2017 This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.

Report 22 UnitNumberPlanned Dates Start EndInspection ActivityTitleNo. of Staff on SiteOconeeInspection / Activity Plan 03/01/2017

-12/31/2018 Page 2 of 2 02/28/2017 06:56:45 ISI-UNIT 3 IN-SERVICE INSPECTION 1 3 IPInservice Inspection Activities - PWR7111108P04/30/2018 05/04/2018 RP-RAD HAZARDS AND TRANSPORTATION 21,2,3 IPRadiological Hazard Assessment and Exposure Controls71124.0104/30/2018 05/04/2018 1,2,3 IPRadioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation71124.0804/30/2018 05/04/2018OL EXAM-INITIAL LICENSE EXAM PREP 61 OCONEE / JUNE 2018 INITIAL EXAM AT POWER FACILITIES V2351205/07/201805/11/2018 SGISI-UNIT 3 SG IN-SERVICE INSPECTION 1 3 IPInservice Inspection Activities - PWR7111108P05/07/201805/11/2018OL EXAM-INITIAL LICENSE EXAM 41 OCONEE / JUNE 2018 INITIAL EXAM AT POWER FACILITIES V2351206/04/2018 06/15/2018 HS-TRIENNIAL HEAT SINK PERFORMANCE 11,2,3 IPHeat Sink Performance7111107T06/18/2018 06/22/2018 RP-RP PUBLIC INSPECTION 21,2,3 IPRadioactive Gaseous and Liquid Effluent Treatment71124.0606/18/2018 06/22/2018 1,2,3 IPRadiological Environmental Monitoring Program71124.0706/18/2018 06/22/2018 1,2,3 IPOccupational Exposure Control Effectiveness71151-OR01 06/18/2018 06/22/2018 1,2,3 IPRETS/ODCM Radiological Effluent Occurrences71151-PR01 06/18/2018 06/22/2018 EP-EP EXERCISE 91,2,3 IPExercise Evaluation711140108/13/2018 08/17/2018 1,2,3 IPEmergency Action Level and Emergency Plan Changes711140408/13/2018 08/17/2018 1,2,3 IPDrill/Exercise Performance71151-EP01 08/13/2018 08/17/2018 1,2,3 IPERO Readiness71151-EP02 08/13/2018 08/17/2018 1,2,3 IPAlert & Notification System Reliability71151-EP03 08/13/2018 08/17/2018 1,2,3 IPAlert & Notification System Reliability71151-EP03 08/13/2018 08/17/2018 EQI-DESIGN BASES ASSURANCE INSPECTION (PROGR 31,2,3 IPComponent Design Bases Inspection (Programs)7111121N08/27/2018 08/31/2018 1,2,3 IPComponent Design Bases Inspection (Programs)7111121N09/17/2018 09/21/2018 3 IPComponent Design Bases Inspection (Programs)7111121N10/01/2018 10/05/2018 ISI-UNIT 1 IN-SERVICE INSPECTION 11 IPInservice Inspection Activities - PWR7111108P11/05/201811/09/2018 SGISI-UNIT 1 SG IN-SERVICE INSPECTION 11 IPInservice Inspection Activities - PWR7111108P11/12/201811/16/2018 This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.