{{#Wiki_filter:Mr. Thomas J. Palmisano UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 June 22, 2015 Vice President and Chief Nuclear Officer Southern California Edison Company San Onofre Nuclear Generating Station P.O. Box 128 San Clemente, CA 92674-0128 | |||
==SUBJECT:== | |||
SAN ONOFRE NUCLEAR GENERATING STATION UNITS 2 AND 3-TERMINATION OF EMERGENCY RESPONSE DATA SYSTEM FEED TO THE U.S. NUCLEAR REGULATORY COMMISSION | |||
==Dear Mr. Palmisano:== | |||
This letter serves to acknowledge that the Emergency Response Data System (EROS), including the Southern California Edison Company (SCE) EROS data link from the San Onofre Nuclear Generating Station (SONGS), Units 2 and 3, to the U.S. Nuclear Regulatory Commission (NRC) Operations Center, is no longer required based on the permanently shutdown and defueled condition of your facility. Section VI of Appendix E to Part 50 of Title 10 of the Code of Federal Regulations (10 CFR) establishes the requirement for a nuclear power reactor licensee to have a real-time electronic data link from the licensee's onsite computer system to the NRC Operations Center that provides for the automated transmission of a limited data set of selected parameters. However, Section Vl.2 of Appendix E to 10 CFR Part 50 specifically exempts from the requirement to maintain the EROS data link with the NRC those nuclear power facilities that have permanently or indefinitely shut down. By letter dated June 12, 2013 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML 131640201), SCE submitted to the NRC a certification, under 10 CFR 50.82(a)(1 )(i), indicating that it had permanently ceased power operations at SONGS Units 2 and 3, effective June 7, 2013. On June 28, 2013, SCE submitted a certification of permanent removal of fuel from the SONGS Unit 3 reactor vessel under 1 O CFR 50.82(a)(1 )(ii) (ADAMS Accession No. ML 13183A391). On July 22, 2013, SCE submitted a certification of permanent removal of fuel from the SONGS Unit 2 reactor vessel under 1 O CFR 50.82(a)(1 )(ii) (ADAMS Accession No. ML 13204A304). Upon docketing of these certifications, the 10 CFR Part 50 licenses for SONGS Units 2 and 3 no longer authorize operation of the reactors or emplacement or retention of fuel into the reactor vessels, as specified in 1 O CFR 50.82(a)(2). As such, SCE is in the process of terminating the EROS data transmission link to the NRC for SONGS Units 2 and 3. Based on the certification of the permanently shutdown and defueled condition of the SONGS Units 2 and 3 reactors, the NRC acknowledges that SCE is no longer required to maintain the SONGS Units 2 and 3 EROS in accordance with Section Vl.3 of Appendix E to 10 CFR Part 50. The NRG requests that SCE return any NRG-provided hardware or software in support of the EROS link within 90 days of the date of this letter, or as soon as reasonably practical. | |||
T. Palmisano If you have any questions regarding the termination of the EROS data link from SONGS Units 2 and 3 to the NRC Operations Center, or the return of NRC-provided hardware/software, please contact Bezakulu Alemu at (301) 287-3731 or e-mail at Bezakulu.Alemu@nrc.gov. Docket Nos. 50-361 and 50-362 cc: Distribution via Listserv Sincerely, Meena K. Khanna, Chief Plant Licensing IV-2 and Decommissioning Transition Branch Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation | |||
ML 15040A428 OFFICE NSIR/DPR NSIR/DPR NAME BAie mu BStapleton DATE 02/11/15 02/13/15 Sincerely, IRAS. Koenick/ Meena K. Khanna, Chief Plant Licensing IV-2 and Decommissioning Transition Branch Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation BAlemu, NSIR BStapleton, NSIR JDAnderson, NSIR RidsNsirDpr Resource RidsRgn4MailCenter Resource RidsNsirDprOrlob Resource VDricks, RIV MConley, OPA NSIR/DPR/ORLOB/BC NSIR/DPR:D JDAnderson RLewis (JAndersen for) 02/13/15 03/02/15 OFFICE NRR/DORL/LPL4-2/LA NRR/DORL/LPL4-2/PM OGC NLO N RR/DORL/LPL4-2/BC NAME PBlechman TWengert BMizuno MKhanna (SKoenick for) DATE 03/12/15 6/17/15 03/26/15 6/22/15}} |
Revision as of 23:10, 14 June 2018
ML15040A428 | |
Person / Time | |
---|---|
Site: | San Onofre |
Issue date: | 06/22/2015 |
From: | Khanna M K Plant Licensing Branch III |
To: | Palmisano T J Southern California Edison Co |
Beza Alemu, NRR/DORL | |
References | |
Download: ML15040A428 (3) | |
Text
Mr. Thomas J. Palmisano UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 June 22, 2015 Vice President and Chief Nuclear Officer Southern California Edison Company San Onofre Nuclear Generating Station P.O. Box 128 San Clemente, CA 92674-0128
SUBJECT:
SAN ONOFRE NUCLEAR GENERATING STATION UNITS 2 AND 3-TERMINATION OF EMERGENCY RESPONSE DATA SYSTEM FEED TO THE U.S. NUCLEAR REGULATORY COMMISSION
Dear Mr. Palmisano:
This letter serves to acknowledge that the Emergency Response Data System (EROS), including the Southern California Edison Company (SCE) EROS data link from the San Onofre Nuclear Generating Station (SONGS), Units 2 and 3, to the U.S. Nuclear Regulatory Commission (NRC) Operations Center, is no longer required based on the permanently shutdown and defueled condition of your facility.Section VI of Appendix E to Part 50 of Title 10 of the Code of Federal Regulations (10 CFR) establishes the requirement for a nuclear power reactor licensee to have a real-time electronic data link from the licensee's onsite computer system to the NRC Operations Center that provides for the automated transmission of a limited data set of selected parameters. However, Section Vl.2 of Appendix E to 10 CFR Part 50 specifically exempts from the requirement to maintain the EROS data link with the NRC those nuclear power facilities that have permanently or indefinitely shut down. By letter dated June 12, 2013 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML 131640201), SCE submitted to the NRC a certification, under 10 CFR 50.82(a)(1 )(i), indicating that it had permanently ceased power operations at SONGS Units 2 and 3, effective June 7, 2013. On June 28, 2013, SCE submitted a certification of permanent removal of fuel from the SONGS Unit 3 reactor vessel under 1 O CFR 50.82(a)(1 )(ii) (ADAMS Accession No. ML 13183A391). On July 22, 2013, SCE submitted a certification of permanent removal of fuel from the SONGS Unit 2 reactor vessel under 1 O CFR 50.82(a)(1 )(ii) (ADAMS Accession No. ML 13204A304). Upon docketing of these certifications, the 10 CFR Part 50 licenses for SONGS Units 2 and 3 no longer authorize operation of the reactors or emplacement or retention of fuel into the reactor vessels, as specified in 1 O CFR 50.82(a)(2). As such, SCE is in the process of terminating the EROS data transmission link to the NRC for SONGS Units 2 and 3. Based on the certification of the permanently shutdown and defueled condition of the SONGS Units 2 and 3 reactors, the NRC acknowledges that SCE is no longer required to maintain the SONGS Units 2 and 3 EROS in accordance with Section Vl.3 of Appendix E to 10 CFR Part 50. The NRG requests that SCE return any NRG-provided hardware or software in support of the EROS link within 90 days of the date of this letter, or as soon as reasonably practical.
T. Palmisano If you have any questions regarding the termination of the EROS data link from SONGS Units 2 and 3 to the NRC Operations Center, or the return of NRC-provided hardware/software, please contact Bezakulu Alemu at (301) 287-3731 or e-mail at Bezakulu.Alemu@nrc.gov. Docket Nos. 50-361 and 50-362 cc: Distribution via Listserv Sincerely, Meena K. Khanna, Chief Plant Licensing IV-2 and Decommissioning Transition Branch Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation
ML 15040A428 OFFICE NSIR/DPR NSIR/DPR NAME BAie mu BStapleton DATE 02/11/15 02/13/15 Sincerely, IRAS. Koenick/ Meena K. Khanna, Chief Plant Licensing IV-2 and Decommissioning Transition Branch Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation BAlemu, NSIR BStapleton, NSIR JDAnderson, NSIR RidsNsirDpr Resource RidsRgn4MailCenter Resource RidsNsirDprOrlob Resource VDricks, RIV MConley, OPA NSIR/DPR/ORLOB/BC NSIR/DPR:D JDAnderson RLewis (JAndersen for) 02/13/15 03/02/15 OFFICE NRR/DORL/LPL4-2/LA NRR/DORL/LPL4-2/PM OGC NLO N RR/DORL/LPL4-2/BC NAME PBlechman TWengert BMizuno MKhanna (SKoenick for) DATE 03/12/15 6/17/15 03/26/15 6/22/15