ML16015A454: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:}}
{{#Wiki_filter:10 CFR 50.55a A member of the STARS (Strategic Teaming and Resource Sharing) Alliance  Callaway
* Diablo Canyon
* Palo Verde
* Wolf Creek 102-07174-TNW/CJS January 15, 2016 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC  20555-0001
 
==Dear Sirs:==
 
==Subject:==
Palo Verde Nuclear Generating Station (PVNGS) Unit 2, Docket No. STN 50-529 Third 10-Year Interval, Third Period:
Owner's Activity Report Number U2R19  Pursuant to 10 CFR 50.55a and in accordance with the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code Case N-532-4, Arizona Public Service Company (APS) hereby submits the Owner's Activity Report (Form OAR-1) for Unit 2 refueling outage 19 (U2R19). The outage ended on November 15, 2015.
No commitments are being made to the NRC by this letter. Should you need further information regarding this submittal, please contact me at (623) 393-5764.
Sincerely, 
 
Thomas N. Weber Department Leader, Regulatory Affairs
 
TNW/CJS
 
==Enclosure:==
Unit 2 Nineteenth Refueling Outage Owner's Activity Report, Report                  U2R19 cc: M. L. Dapas  NRC Region IV Regional Administrator M. M. Watford NRC NRR Project Manager for PVNGS  C. A. Peabody NRC Senior Resident Inspector for PVNGS  Palo Verde Nuclear Generating Station P.O. Box 52034 Phoenix, AZ 85072 Mail Station 7636 Tel: (623) 393-5764 ENCLOSURE Unit 2  Nineteenth Refueling Outage Owner's Activity Report  Report U2R19 PV-E0796 Ver. 1 FORM OAR-1 OWNER'S ACTIVITY REPORT  Report Number: ________________________________________________________________________________________________      Plant: ___________________________________________________________________________________________________________      Unit No.: ___________ Commercial service date: ___________________ Refueling Outage No.: ___________________  (if applicable)    Current inspection interval ______________________________________________________________________________________  (1st, 2nd, 3rd, 4th, other)  Current inspection period _______________________________________________________________________________________  (1st, 2nd, 3rd)  Edition and Addenda of Section XI applicable to the inspection plans ____________________________________________      Date and revision of inspection plans ___________________________________________________________________________      Edition and Addenda of Section XI applicable to repair/replacement activities, if different than the inspection plans ____________________________________________________________________________ Code Cases used: _____________________________________________________________________________________________  (if applicable)        CERTIFICATE OF CONFORMANCE      I certify that (a) the statements made in this report are correct; (b) the examinations and tests meet the Inspection Plan as required by the ASME Code, Section XI; and (c) the repair/replacement activities and evaluations supporting the completion of _______________ conform to the requirements of Section XI. (refueling outage number)      Signed _________________________________________________________ Date: _____________________________________                CERTIFICATE OF INSERVICE INSPECTION      I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of  and employed by of  have inspected the items described in this Owner's Activity Report, and state that, to the knowledge and belief, the Owner has performed all activities represented by this report in accordance with the Section XI. By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the repair/replacement activities and evaluation described in this report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection. __________________________________________ Commissions (Inspector's Signature) National Board, State, Province, and Endorsements    Date: _____________________________________      2R19PaloVerdeNuclearGeneratingStation,5801S.WintersburgRoad,Tonopah,Arizona85354-75292Sep19,198619IWB,IWC,IWD,IWF=3rd,IWE,IWL=2ndIWB,IWC,IWD,IWF,IWE=3rd,IWL=2nd2001ed,2003ad,IWL2007ed2008adISI=8/29/13R4,PressTest=3/19/14R4,IWE=9/22/15R1,IWL=1/29/15R22001ed2003adN-532-42R19Lehman, William T(Z60076)Digitally signed by Lehman, William T(Z60076)
DN: cn=Lehman, William T(Z60076)
Reason: I am the author of this document Date: 2016.01.07 15:47:42 -07'00'Hogstrom, Robert (YH2450)Digitally signed by Hogstrom, Robert (YH2450)
DN: cn=Hogstrom, Robert (YH2450)
Date: 2016.01.07 16:30:40 -07'00' 2Palo Verde Nuclear Generating StationOwners Activity Report - Unit 2 Refueling Outage 19ExaminationCategoryItemNumberDescriptionof WorkEvaluationDescriptionF-AF1.202SG002H013EWR 4708973Items with flaws or relevant conditions thatTable 1required evaluation for continued service 3Palo Verde Nuclear Generating StationOwners Activity Report - Unit 2 Refueling Outage 19_Table 2Abstract of repair/replacement activitiesrequired for continued serviceCode ClassItemDescriptionDescriptionof WorkDateCompletedRepair/ReplacementPlan Number12RC009H00EReplace Snubber10/29/2015470982122SG005H014Replace Snubber10/26/2015453198622SG008H007Replace Snubber10/21/2015453198822SG011H014Replace Snubber10/31/2015453199122SI159H003Replace Snubber10/20/2015453201622SI174H005Replace Snubber10/24/2015453201722PSGEL011weld repair for corrosion11/13/2015456432732MDGAE01AReplace Fastners for corrosion10/6/2015459157132MDGAE01BReplace Fastners for corrosion10/4/2015459157232PSPAL009 spool 2weld repair for corrosion10/4/2015459157232MDGBE05weld repair for corrosion2/17/2015461441132MDGAE01A/B spools 6,7 and 8weld repair for corrosion10/4/2015463701932MDGAE01Aweld repair for corrosion10/4/2015463701932MDGAE01Bweld repair for corrosion10/4/2015463701932MDGAE04weld repair for corrosion10/4/2015463701932MDGAE05weld repair for corrosion10/4/2015463701932MDGAE05weld repair for corrosion6/10/2015368768232MDGAE04weld repair for corrosion6/10/2015429611332MDGAE01Bweld repair for corrosion6/10/2015429617532MDGAE01AReplace Fastners for corrosion6/10/2015430527132MDGAE01Aweld repair for corrosion6/10/2015430527132MEWBE01weld repair for corrosion10/24/20154551380 10 CFR 50.55a A member of the STARS (Strategic Teaming and Resource Sharing) Alliance  Callaway
* Diablo Canyon
* Palo Verde
* Wolf Creek 102-07174-TNW/CJS January 15, 2016 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC  20555-0001
 
==Dear Sirs:==
 
==Subject:==
Palo Verde Nuclear Generating Station (PVNGS) Unit 2, Docket No. STN 50-529 Third 10-Year Interval, Third Period:
Owner's Activity Report Number U2R19  Pursuant to 10 CFR 50.55a and in accordance with the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code Case N-532-4, Arizona Public Service Company (APS) hereby submits the Owner's Activity Report (Form OAR-1) for Unit 2 refueling outage 19 (U2R19). The outage ended on November 15, 2015.
No commitments are being made to the NRC by this letter. Should you need further information regarding this submittal, please contact me at (623) 393-5764.
Sincerely, 
 
Thomas N. Weber Department Leader, Regulatory Affairs
 
TNW/CJS
 
==Enclosure:==
Unit 2 Nineteenth Refueling Outage Owner's Activity Report, Report                  U2R19 cc: M. L. Dapas  NRC Region IV Regional Administrator M. M. Watford NRC NRR Project Manager for PVNGS  C. A. Peabody NRC Senior Resident Inspector for PVNGS  Palo Verde Nuclear Generating Station P.O. Box 52034 Phoenix, AZ 85072 Mail Station 7636 Tel: (623) 393-5764 ENCLOSURE Unit 2  Nineteenth Refueling Outage Owner's Activity Report  Report U2R19 PV-E0796 Ver. 1 FORM OAR-1 OWNER'S ACTIVITY REPORT  Report Number: ________________________________________________________________________________________________      Plant: ___________________________________________________________________________________________________________      Unit No.: ___________ Commercial service date: ___________________ Refueling Outage No.: ___________________  (if applicable)    Current inspection interval ______________________________________________________________________________________  (1st, 2nd, 3rd, 4th, other)  Current inspection period _______________________________________________________________________________________  (1st, 2nd, 3rd)  Edition and Addenda of Section XI applicable to the inspection plans ____________________________________________      Date and revision of inspection plans ___________________________________________________________________________      Edition and Addenda of Section XI applicable to repair/replacement activities, if different than the inspection plans ____________________________________________________________________________ Code Cases used: _____________________________________________________________________________________________  (if applicable)        CERTIFICATE OF CONFORMANCE      I certify that (a) the statements made in this report are correct; (b) the examinations and tests meet the Inspection Plan as required by the ASME Code, Section XI; and (c) the repair/replacement activities and evaluations supporting the completion of _______________ conform to the requirements of Section XI. (refueling outage number)      Signed _________________________________________________________ Date: _____________________________________                CERTIFICATE OF INSERVICE INSPECTION      I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of  and employed by of  have inspected the items described in this Owner's Activity Report, and state that, to the knowledge and belief, the Owner has performed all activities represented by this report in accordance with the Section XI. By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the repair/replacement activities and evaluation described in this report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection. __________________________________________ Commissions (Inspector's Signature) National Board, State, Province, and Endorsements    Date: _____________________________________      2R19PaloVerdeNuclearGeneratingStation,5801S.WintersburgRoad,Tonopah,Arizona85354-75292Sep19,198619IWB,IWC,IWD,IWF=3rd,IWE,IWL=2ndIWB,IWC,IWD,IWF,IWE=3rd,IWL=2nd2001ed,2003ad,IWL2007ed2008adISI=8/29/13R4,PressTest=3/19/14R4,IWE=9/22/15R1,IWL=1/29/15R22001ed2003adN-532-42R19Lehman, William T(Z60076)Digitally signed by Lehman, William T(Z60076)
DN: cn=Lehman, William T(Z60076)
Reason: I am the author of this document Date: 2016.01.07 15:47:42 -07'00'Hogstrom, Robert (YH2450)Digitally signed by Hogstrom, Robert (YH2450)
DN: cn=Hogstrom, Robert (YH2450)
Date: 2016.01.07 16:30:40 -07'00' 2Palo Verde Nuclear Generating StationOwners Activity Report - Unit 2 Refueling Outage 19ExaminationCategoryItemNumberDescriptionof WorkEvaluationDescriptionF-AF1.202SG002H013EWR 4708973Items with flaws or relevant conditions thatTable 1required evaluation for continued service 3Palo Verde Nuclear Generating StationOwners Activity Report - Unit 2 Refueling Outage 19_Table 2Abstract of repair/replacement activitiesrequired for continued serviceCode ClassItemDescriptionDescriptionof WorkDateCompletedRepair/ReplacementPlan Number12RC009H00EReplace Snubber10/29/2015470982122SG005H014Replace Snubber10/26/2015453198622SG008H007Replace Snubber10/21/2015453198822SG011H014Replace Snubber10/31/2015453199122SI159H003Replace Snubber10/20/2015453201622SI174H005Replace Snubber10/24/2015453201722PSGEL011weld repair for corrosion11/13/2015456432732MDGAE01AReplace Fastners for corrosion10/6/2015459157132MDGAE01BReplace Fastners for corrosion10/4/2015459157232PSPAL009 spool 2weld repair for corrosion10/4/2015459157232MDGBE05weld repair for corrosion2/17/2015461441132MDGAE01A/B spools 6,7 and 8weld repair for corrosion10/4/2015463701932MDGAE01Aweld repair for corrosion10/4/2015463701932MDGAE01Bweld repair for corrosion10/4/2015463701932MDGAE04weld repair for corrosion10/4/2015463701932MDGAE05weld repair for corrosion10/4/2015463701932MDGAE05weld repair for corrosion6/10/2015368768232MDGAE04weld repair for corrosion6/10/2015429611332MDGAE01Bweld repair for corrosion6/10/2015429617532MDGAE01AReplace Fastners for corrosion6/10/2015430527132MDGAE01Aweld repair for corrosion6/10/2015430527132MEWBE01weld repair for corrosion10/24/20154551380}}

Revision as of 17:41, 30 May 2018

Palo Verde, Unit 2 - Submittal of Owner'S Activity Report (Form OAR-1) Refueling Outage 19 (U2R19)
ML16015A454
Person / Time
Site: Palo Verde Arizona Public Service icon.png
Issue date: 01/15/2016
From: Weber T N
Arizona Public Service Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
102-07174-TNW/CJS
Download: ML16015A454 (5)


Text

10 CFR 50.55a A member of the STARS (Strategic Teaming and Resource Sharing) Alliance Callaway

  • Diablo Canyon
  • Palo Verde
  • Wolf Creek 102-07174-TNW/CJS January 15, 2016 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001

Dear Sirs:

Subject:

Palo Verde Nuclear Generating Station (PVNGS) Unit 2, Docket No. STN 50-529 Third 10-Year Interval, Third Period:

Owner's Activity Report Number U2R19 Pursuant to 10 CFR 50.55a and in accordance with the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code Case N-532-4, Arizona Public Service Company (APS) hereby submits the Owner's Activity Report (Form OAR-1) for Unit 2 refueling outage 19 (U2R19). The outage ended on November 15, 2015.

No commitments are being made to the NRC by this letter. Should you need further information regarding this submittal, please contact me at (623) 393-5764.

Sincerely,

Thomas N. Weber Department Leader, Regulatory Affairs

TNW/CJS

Enclosure:

Unit 2 Nineteenth Refueling Outage Owner's Activity Report, Report U2R19 cc: M. L. Dapas NRC Region IV Regional Administrator M. M. Watford NRC NRR Project Manager for PVNGS C. A. Peabody NRC Senior Resident Inspector for PVNGS Palo Verde Nuclear Generating Station P.O. Box 52034 Phoenix, AZ 85072 Mail Station 7636 Tel: (623) 393-5764 ENCLOSURE Unit 2 Nineteenth Refueling Outage Owner's Activity Report Report U2R19 PV-E0796 Ver. 1 FORM OAR-1 OWNER'S ACTIVITY REPORT Report Number: ________________________________________________________________________________________________ Plant: ___________________________________________________________________________________________________________ Unit No.: ___________ Commercial service date: ___________________ Refueling Outage No.: ___________________ (if applicable) Current inspection interval ______________________________________________________________________________________ (1st, 2nd, 3rd, 4th, other) Current inspection period _______________________________________________________________________________________ (1st, 2nd, 3rd) Edition and Addenda of Section XI applicable to the inspection plans ____________________________________________ Date and revision of inspection plans ___________________________________________________________________________ Edition and Addenda of Section XI applicable to repair/replacement activities, if different than the inspection plans ____________________________________________________________________________ Code Cases used: _____________________________________________________________________________________________ (if applicable) CERTIFICATE OF CONFORMANCE I certify that (a) the statements made in this report are correct; (b) the examinations and tests meet the Inspection Plan as required by the ASME Code,Section XI; and (c) the repair/replacement activities and evaluations supporting the completion of _______________ conform to the requirements of Section XI. (refueling outage number) Signed _________________________________________________________ Date: _____________________________________ CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of and employed by of have inspected the items described in this Owner's Activity Report, and state that, to the knowledge and belief, the Owner has performed all activities represented by this report in accordance with the Section XI. By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the repair/replacement activities and evaluation described in this report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection. __________________________________________ Commissions (Inspector's Signature) National Board, State, Province, and Endorsements Date: _____________________________________ 2R19PaloVerdeNuclearGeneratingStation,5801S.WintersburgRoad,Tonopah,Arizona85354-75292Sep19,198619IWB,IWC,IWD,IWF=3rd,IWE,IWL=2ndIWB,IWC,IWD,IWF,IWE=3rd,IWL=2nd2001ed,2003ad,IWL2007ed2008adISI=8/29/13R4,PressTest=3/19/14R4,IWE=9/22/15R1,IWL=1/29/15R22001ed2003adN-532-42R19Lehman, William T(Z60076)Digitally signed by Lehman, William T(Z60076)

DN: cn=Lehman, William T(Z60076)

Reason: I am the author of this document Date: 2016.01.07 15:47:42 -07'00'Hogstrom, Robert (YH2450)Digitally signed by Hogstrom, Robert (YH2450)

DN: cn=Hogstrom, Robert (YH2450)

Date: 2016.01.07 16:30:40 -07'00' 2Palo Verde Nuclear Generating StationOwners Activity Report - Unit 2 Refueling Outage 19ExaminationCategoryItemNumberDescriptionof WorkEvaluationDescriptionF-AF1.202SG002H013EWR 4708973Items with flaws or relevant conditions thatTable 1required evaluation for continued service 3Palo Verde Nuclear Generating StationOwners Activity Report - Unit 2 Refueling Outage 19_Table 2Abstract of repair/replacement activitiesrequired for continued serviceCode ClassItemDescriptionDescriptionof WorkDateCompletedRepair/ReplacementPlan Number12RC009H00EReplace Snubber10/29/2015470982122SG005H014Replace Snubber10/26/2015453198622SG008H007Replace Snubber10/21/2015453198822SG011H014Replace Snubber10/31/2015453199122SI159H003Replace Snubber10/20/2015453201622SI174H005Replace Snubber10/24/2015453201722PSGEL011weld repair for corrosion11/13/2015456432732MDGAE01AReplace Fastners for corrosion10/6/2015459157132MDGAE01BReplace Fastners for corrosion10/4/2015459157232PSPAL009 spool 2weld repair for corrosion10/4/2015459157232MDGBE05weld repair for corrosion2/17/2015461441132MDGAE01A/B spools 6,7 and 8weld repair for corrosion10/4/2015463701932MDGAE01Aweld repair for corrosion10/4/2015463701932MDGAE01Bweld repair for corrosion10/4/2015463701932MDGAE04weld repair for corrosion10/4/2015463701932MDGAE05weld repair for corrosion10/4/2015463701932MDGAE05weld repair for corrosion6/10/2015368768232MDGAE04weld repair for corrosion6/10/2015429611332MDGAE01Bweld repair for corrosion6/10/2015429617532MDGAE01AReplace Fastners for corrosion6/10/2015430527132MDGAE01Aweld repair for corrosion6/10/2015430527132MEWBE01weld repair for corrosion10/24/20154551380 10 CFR 50.55a A member of the STARS (Strategic Teaming and Resource Sharing) Alliance Callaway

  • Diablo Canyon
  • Palo Verde
  • Wolf Creek 102-07174-TNW/CJS January 15, 2016 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001

Dear Sirs:

Subject:

Palo Verde Nuclear Generating Station (PVNGS) Unit 2, Docket No. STN 50-529 Third 10-Year Interval, Third Period:

Owner's Activity Report Number U2R19 Pursuant to 10 CFR 50.55a and in accordance with the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code Case N-532-4, Arizona Public Service Company (APS) hereby submits the Owner's Activity Report (Form OAR-1) for Unit 2 refueling outage 19 (U2R19). The outage ended on November 15, 2015.

No commitments are being made to the NRC by this letter. Should you need further information regarding this submittal, please contact me at (623) 393-5764.

Sincerely,

Thomas N. Weber Department Leader, Regulatory Affairs

TNW/CJS

Enclosure:

Unit 2 Nineteenth Refueling Outage Owner's Activity Report, Report U2R19 cc: M. L. Dapas NRC Region IV Regional Administrator M. M. Watford NRC NRR Project Manager for PVNGS C. A. Peabody NRC Senior Resident Inspector for PVNGS Palo Verde Nuclear Generating Station P.O. Box 52034 Phoenix, AZ 85072 Mail Station 7636 Tel: (623) 393-5764 ENCLOSURE Unit 2 Nineteenth Refueling Outage Owner's Activity Report Report U2R19 PV-E0796 Ver. 1 FORM OAR-1 OWNER'S ACTIVITY REPORT Report Number: ________________________________________________________________________________________________ Plant: ___________________________________________________________________________________________________________ Unit No.: ___________ Commercial service date: ___________________ Refueling Outage No.: ___________________ (if applicable) Current inspection interval ______________________________________________________________________________________ (1st, 2nd, 3rd, 4th, other) Current inspection period _______________________________________________________________________________________ (1st, 2nd, 3rd) Edition and Addenda of Section XI applicable to the inspection plans ____________________________________________ Date and revision of inspection plans ___________________________________________________________________________ Edition and Addenda of Section XI applicable to repair/replacement activities, if different than the inspection plans ____________________________________________________________________________ Code Cases used: _____________________________________________________________________________________________ (if applicable) CERTIFICATE OF CONFORMANCE I certify that (a) the statements made in this report are correct; (b) the examinations and tests meet the Inspection Plan as required by the ASME Code,Section XI; and (c) the repair/replacement activities and evaluations supporting the completion of _______________ conform to the requirements of Section XI. (refueling outage number) Signed _________________________________________________________ Date: _____________________________________ CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of and employed by of have inspected the items described in this Owner's Activity Report, and state that, to the knowledge and belief, the Owner has performed all activities represented by this report in accordance with the Section XI. By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the repair/replacement activities and evaluation described in this report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection. __________________________________________ Commissions (Inspector's Signature) National Board, State, Province, and Endorsements Date: _____________________________________ 2R19PaloVerdeNuclearGeneratingStation,5801S.WintersburgRoad,Tonopah,Arizona85354-75292Sep19,198619IWB,IWC,IWD,IWF=3rd,IWE,IWL=2ndIWB,IWC,IWD,IWF,IWE=3rd,IWL=2nd2001ed,2003ad,IWL2007ed2008adISI=8/29/13R4,PressTest=3/19/14R4,IWE=9/22/15R1,IWL=1/29/15R22001ed2003adN-532-42R19Lehman, William T(Z60076)Digitally signed by Lehman, William T(Z60076)

DN: cn=Lehman, William T(Z60076)

Reason: I am the author of this document Date: 2016.01.07 15:47:42 -07'00'Hogstrom, Robert (YH2450)Digitally signed by Hogstrom, Robert (YH2450)

DN: cn=Hogstrom, Robert (YH2450)

Date: 2016.01.07 16:30:40 -07'00' 2Palo Verde Nuclear Generating StationOwners Activity Report - Unit 2 Refueling Outage 19ExaminationCategoryItemNumberDescriptionof WorkEvaluationDescriptionF-AF1.202SG002H013EWR 4708973Items with flaws or relevant conditions thatTable 1required evaluation for continued service 3Palo Verde Nuclear Generating StationOwners Activity Report - Unit 2 Refueling Outage 19_Table 2Abstract of repair/replacement activitiesrequired for continued serviceCode ClassItemDescriptionDescriptionof WorkDateCompletedRepair/ReplacementPlan Number12RC009H00EReplace Snubber10/29/2015470982122SG005H014Replace Snubber10/26/2015453198622SG008H007Replace Snubber10/21/2015453198822SG011H014Replace Snubber10/31/2015453199122SI159H003Replace Snubber10/20/2015453201622SI174H005Replace Snubber10/24/2015453201722PSGEL011weld repair for corrosion11/13/2015456432732MDGAE01AReplace Fastners for corrosion10/6/2015459157132MDGAE01BReplace Fastners for corrosion10/4/2015459157232PSPAL009 spool 2weld repair for corrosion10/4/2015459157232MDGBE05weld repair for corrosion2/17/2015461441132MDGAE01A/B spools 6,7 and 8weld repair for corrosion10/4/2015463701932MDGAE01Aweld repair for corrosion10/4/2015463701932MDGAE01Bweld repair for corrosion10/4/2015463701932MDGAE04weld repair for corrosion10/4/2015463701932MDGAE05weld repair for corrosion10/4/2015463701932MDGAE05weld repair for corrosion6/10/2015368768232MDGAE04weld repair for corrosion6/10/2015429611332MDGAE01Bweld repair for corrosion6/10/2015429617532MDGAE01AReplace Fastners for corrosion6/10/2015430527132MDGAE01Aweld repair for corrosion6/10/2015430527132MEWBE01weld repair for corrosion10/24/20154551380