Corrected TS Pages 6-19g and 6-19h cc: Listserv Sincerely, Dennis J. Galvin, Project Manager Plant Licensing Branch 11-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation CORRECTION TO LICENSE AMENDMENT NO. 127 SHEARON HARRIS NUCLEAR POWER PLANT UNIT 1 RENEWED FACILITY OPERATING LICENSE NO. NPF-63 DOCKET NO. 50-400 Replace the following pages of the Appendix A Technical Specifications with the attached corrected pages. Remove 6-19g 6-19h Insert 6-19g 6-19h Enclosure ADMINISTRATIVE CONTROLS PROCEDURES AND PROGRAMS (Continued) m. lnservice Testing Program This program provides controls for inservice testing of ASME Code Class 1, 2, and 3 components. The program shall include the following: 1. Testing frequencies specified in the ASME Code for Operation and Maintenance of Nuclear Power Plants and applicable Addenda as follows: ASME Code for Operation and Maintenance of Nuclear Power Plants and applicable Addenda terminology for inservice testing activities Weekly Monthly Quarterly or every 3 months Semiannually or every 6 months Every 9 months Yearly or annually Biennially or every 2 years Required Frequencies for performing inservice testing activities At least once per 7 days At least once per 31 days At least once per 92 days At least once per 184 days At least once per 276 days At least once per 366 days At least once per 731 days 2. The provisions of SR 4.0.2 are applicable to the above required Frequencies and to other normal and accelerated Frequencies specified as 2 years or less in the lnservice Testing Program for performing inservice testing activities, 3. The provisions of SR 4.0.3 are applicable to inservice testing activities, and 4. Nothing in the ASME Code for Operation and Maintenance of Nuclear Power Plants shall be construed to supersede the requirements of any Technical Specification. SHEARON HARRIS -UNIT 1 6-19g Amendment No. 127 ADMINISTRATIVE CONTROLS PROCEDURES AND PROGRAMS (Continued) n. Technical Specifications (TS) Bases Control Program This program provides a means for processing changes to the Bases of these Technical Specifications. 1. Changes to the Bases of the TS shall be made under appropriate administrative controls and reviews. 2. Licensees may make changes to Bases without prior NRG approval provided the changes do not require either of the following: a. A change in the TS incorporated in the license, or b. A change to the FSAR or Bases that requires NRC approval pursuant to 10 CFR 50.59. 3. The Bases Control Program shall contain provisions to ensure that the Bases are maintained consistent with the FSAR 4. Proposed changes that meet the criteria of Specification 6.8.4.n.2 above shall be reviewed and approved by the NRC prior to implementation. Changes to the Bases implemented without prior NRC approval shall be provided to the NRC on a frequency consistent with 10 CFR 50.71 (e). SHEARON HARRIS -UNIT 1 6-19h Amendment No. 127 T. Hamilton
Corrected TS Pages 6-19g and 6-19h cc: Listserv Sincerely, Dennis J. Galvin, Project Manager Plant Licensing Branch 11-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation CORRECTION TO LICENSE AMENDMENT NO. 127 SHEARON HARRIS NUCLEAR POWER PLANT UNIT 1 RENEWED FACILITY OPERATING LICENSE NO. NPF-63 DOCKET NO. 50-400 Replace the following pages of the Appendix A Technical Specifications with the attached corrected pages. Remove 6-19g 6-19h Insert 6-19g 6-19h Enclosure ADMINISTRATIVE CONTROLS PROCEDURES AND PROGRAMS (Continued) m. lnservice Testing Program This program provides controls for inservice testing of ASME Code Class 1, 2, and 3 components. The program shall include the following: 1. Testing frequencies specified in the ASME Code for Operation and Maintenance of Nuclear Power Plants and applicable Addenda as follows: ASME Code for Operation and Maintenance of Nuclear Power Plants and applicable Addenda terminology for inservice testing activities Weekly Monthly Quarterly or every 3 months Semiannually or every 6 months Every 9 months Yearly or annually Biennially or every 2 years Required Frequencies for performing inservice testing activities At least once per 7 days At least once per 31 days At least once per 92 days At least once per 184 days At least once per 276 days At least once per 366 days At least once per 731 days 2. The provisions of SR 4.0.2 are applicable to the above required Frequencies and to other normal and accelerated Frequencies specified as 2 years or less in the lnservice Testing Program for performing inservice testing activities, 3. The provisions of SR 4.0.3 are applicable to inservice testing activities, and 4. Nothing in the ASME Code for Operation and Maintenance of Nuclear Power Plants shall be construed to supersede the requirements of any Technical Specification. SHEARON HARRIS -UNIT 1 6-19g Amendment No. 127 ADMINISTRATIVE CONTROLS PROCEDURES AND PROGRAMS (Continued) n. Technical Specifications (TS) Bases Control Program This program provides a means for processing changes to the Bases of these Technical Specifications. 1. Changes to the Bases of the TS shall be made under appropriate administrative controls and reviews. 2. Licensees may make changes to Bases without prior NRG approval provided the changes do not require either of the following: a. A change in the TS incorporated in the license, or b. A change to the FSAR or Bases that requires NRC approval pursuant to 10 CFR 50.59. 3. The Bases Control Program shall contain provisions to ensure that the Bases are maintained consistent with the FSAR 4. Proposed changes that meet the criteria of Specification 6.8.4.n.2 above shall be reviewed and approved by the NRC prior to implementation. Changes to the Bases implemented without prior NRC approval shall be provided to the NRC on a frequency consistent with 10 CFR 50.71 (e). SHEARON HARRIS -UNIT 1 6-19h Amendment No. 127


==SUBJECT:==
Package: ML 173408389 Letter: ML 173248048 Correction Panes: ML 173248129 OFFICE DORULPL2-2/PM DORL/LPL2-2/LA NAME DGalvin BClayton DATE 12/01/17 11/30/17 DORULPL2-2/PM MBarillas 12/04/17   
SHEARON HARRIS NUCLEAR POWER PLANT, UNIT 1 -CORRECTION TO LICENSE AMENDMENT NO. 127 REGARDING CHANGES TO THE INSERVICE INSPECTION AND TESTING REQUIREMENTS AND ESTABLISHMENT OF A TECHNICAL SPECIFICATIONS BASES CONTROL PROGRAM (CAC NO. MD5802) DATED DECEMBER 6, 2017 DISTRIBUTION: PUBLIC PM Reading File RidsRgn2MailCenter Resource RidsACRS_MailCTR Resource RidsNrrLABClayton Resource RidsNrrDorllp12-2 Resource RidsNrrPMShearonHarris Resource ADAMS Accession Nos.: Package: ML 173408389 Letter: ML 173248048 Correction Panes: ML 173248129 OFFICE DORULPL2-2/PM DORL/LPL2-2/LA NAME DGalvin BClayton DATE 12/01/17 11/30/17 DORULPL2-2/PM MBarillas 12/04/17 OFFICIAL RECORD COPY DORULPL2 2/BC UShoop PBuckbern for\ 12/05/17 DORL/LPL2 2/PM DGalvin 12/06/17   
}}
}}

Revision as of 04:02, 10 May 2018

Shearon Harris Nuclear Plant, Unit 1 - Correction to License Amendment No. 127 Regarding Changes to the Inservice Inspection and Testing Requirements and Establishment of a Technical Specifications Bases Control Program (CAC No. MD5802)
ML17324B048
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 12/06/2017
From: Galvin D J
Plant Licensing Branch II
To: Hamilton T
Duke Energy Progress
Galvin D J DORL/LPL2-2 415-6256
Shared Package
ML17340B389 List:
References
CAC MD5802
Download: ML17324B048 (6)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON.DC 20555-0001 Ms. Tanya Hamilton Site Vice President Shearon Harris Nuclear Power Plant Duke Energy 5413 Shearon Harris Road New Hill, NC 27562-0165 December 6, 2017

SUBJECT:

SHEARON HARRIS NUCLEAR POWER PLANT, UNIT 1 -CORRECTION TO LICENSE AMENDMENT NO. 127 REGARDING CHANGES TO THE INSERVICE INSPECTION AND TESTING REQUIREMENTS AND ESTABLISHMENT OF A TECHNICAL SPECIFICATIONS BASES CONTROL PROGRAM (CAC NO. MD5802)

Dear Ms. Hamilton:

By letter dated June 12, 2008 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML081430111 ), the U.S. Nuclear Regulatory Commission (NRG) issued Amendment No. 127 to Renewed Facility Operating License No. NPF-63 for the Shearon Harris Nuclear Power Plant, Unit 1 (Harris). The amendment relocated the lnservice Testing requirements to the administrative section of the Technical Specifications (TSs), removed the lnservice Inspection requirements from the TSs, and established a TSs Bases Control Program. These changes were in response to the Duke Energy Progress, LLC (previously Carolina Power and Light Company) (the licensee) license amendment request dated June 15, 2007, as supplemented by letter dated March 6, 2008 (ADAMS Accession Nos. ML071800018 and ML080720337). This year, while periorming the acceptance review on a license amendment request submitted November 7, 2017, (ADAMS Accession No. ML 17312A362), the NRG staff identified an error on TS pages 6-199 and 6-19h associated with Amendment No. 127. Specifically, the TS pages 6-19g and 6-19h were issued without the applicable headings, "ADMINISTRATIVE CONTROLS" and "PROCEDURES AND PROGRAMS (Continued)." It appears that this error was introduced when the licensee submitted its markup and clean TS pages for Amendment No. 127, and because TS pages 6-19g and 6-19h were new pages to be added to the TS. The licensee submitted the markup pages as "inserts" without headings, while the clean pages were submitted with correct headings that were consistent with the Administrative Controls section of the Harris TS. The NRC inadvertently issued the pages without the headings. The corrected pages are enclosed.

T. Hamilton If you have any questions, please contact me at (301) 415-6256 or by e-mail at Dennis.Galvin@nrc.gov. Docket No. 50-400

Enclosure:

Corrected TS Pages 6-19g and 6-19h cc: Listserv Sincerely, Dennis J. Galvin, Project Manager Plant Licensing Branch 11-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation CORRECTION TO LICENSE AMENDMENT NO. 127 SHEARON HARRIS NUCLEAR POWER PLANT UNIT 1 RENEWED FACILITY OPERATING LICENSE NO. NPF-63 DOCKET NO. 50-400 Replace the following pages of the Appendix A Technical Specifications with the attached corrected pages. Remove 6-19g 6-19h Insert 6-19g 6-19h Enclosure ADMINISTRATIVE CONTROLS PROCEDURES AND PROGRAMS (Continued) m. lnservice Testing Program This program provides controls for inservice testing of ASME Code Class 1, 2, and 3 components. The program shall include the following: 1. Testing frequencies specified in the ASME Code for Operation and Maintenance of Nuclear Power Plants and applicable Addenda as follows: ASME Code for Operation and Maintenance of Nuclear Power Plants and applicable Addenda terminology for inservice testing activities Weekly Monthly Quarterly or every 3 months Semiannually or every 6 months Every 9 months Yearly or annually Biennially or every 2 years Required Frequencies for performing inservice testing activities At least once per 7 days At least once per 31 days At least once per 92 days At least once per 184 days At least once per 276 days At least once per 366 days At least once per 731 days 2. The provisions of SR 4.0.2 are applicable to the above required Frequencies and to other normal and accelerated Frequencies specified as 2 years or less in the lnservice Testing Program for performing inservice testing activities, 3. The provisions of SR 4.0.3 are applicable to inservice testing activities, and 4. Nothing in the ASME Code for Operation and Maintenance of Nuclear Power Plants shall be construed to supersede the requirements of any Technical Specification. SHEARON HARRIS -UNIT 1 6-19g Amendment No. 127 ADMINISTRATIVE CONTROLS PROCEDURES AND PROGRAMS (Continued) n. Technical Specifications (TS) Bases Control Program This program provides a means for processing changes to the Bases of these Technical Specifications. 1. Changes to the Bases of the TS shall be made under appropriate administrative controls and reviews. 2. Licensees may make changes to Bases without prior NRG approval provided the changes do not require either of the following: a. A change in the TS incorporated in the license, or b. A change to the FSAR or Bases that requires NRC approval pursuant to 10 CFR 50.59. 3. The Bases Control Program shall contain provisions to ensure that the Bases are maintained consistent with the FSAR 4. Proposed changes that meet the criteria of Specification 6.8.4.n.2 above shall be reviewed and approved by the NRC prior to implementation. Changes to the Bases implemented without prior NRC approval shall be provided to the NRC on a frequency consistent with 10 CFR 50.71 (e). SHEARON HARRIS -UNIT 1 6-19h Amendment No. 127

Package: ML 173408389 Letter: ML 173248048 Correction Panes: ML 173248129 OFFICE DORULPL2-2/PM DORL/LPL2-2/LA NAME DGalvin BClayton DATE 12/01/17 11/30/17 DORULPL2-2/PM MBarillas 12/04/17